CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra
Dpto.
Provincia
Distrito
Fecha de Inicio
Fecha de Trmino
PARTIDA
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00
60.00
61.00
62.00
63.00
64.00
65.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
74.00
75.00
76.00
77.00
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
86.00
87.00
88.00
89.00
90.00
91.00
92.00
93.00

CONSTRUCCION DE CANAL DE RIEGO ALLCCACCOCHA-HUANDO I ETAPA


GOBIERNO REGIONAL DE HUANCAVELICA
HUANCAVELICA
HUANCAVELICA
HUANDO
16 de Abril de 2007
07 de Setiembre del 2007
DESCRIPCION

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA 4.80x3.
MOVILIZACION Y DESMOVILIZACION DE MAQUINA
CONSTRUCCION DE CAMPAMENTO PROVISIONAL
MEJORAMIENTO DE TROCHA DE ACCESO
CONSTRUCCION DE TROCHA DE ACCESO A CANA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
BOCATOMA
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
RELLENO COMPACTADO CON MATERIAL PROPI
ESCOLLERA DE ROCA GRANITICA d=0.60m Pmin=
OBRAS DE CONCRETO SIMPLE
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO CICLOPEO FC=140KG/CM2+30% PM
CONCRETO CICLOPEO FC=175KG/CM2+25% PM
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
JUNTA DE DILATACION CON WATER STOP 6" e=1
COMPUERTAS Y REJILLAS
COMPUERTA PLANA TIPO ARMCO 1.00x1.20M MO
COMPUERTA PLANA TIPO ARMCO 0.85x0.45M MO
REJILLA METALICA INGRESO VENTANA CAPTACI
VARIOS
ALBAILERA DE PIEDRA EMBOQUILLADA CON
CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
EXCAVACION EN ROCA FIJA
FILTROS DE GRAVA HASTA 2" CON TUBERA P
RELLENO COMPACTADO CON MATERIAL PROPI
REFINE Y NIVELACION DE CAJA DE CANAL
CANAL
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 175KG/CM2
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
JUNTA DE DILATACION CON WATER STOP 6" e=1
JUNTA DE DILATACION E=1" SELLADO CON MA
JUNTA DE CONTRACCIN E=1" SELLADO CON
DESARENADOR (01 UNIDAD)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
COMPUERTA PLANA TIPO ARMCO 0.50x0.50M MO
RAPIDAS (05 UNIDADES)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
JUNTA DE DILATACION CON WATER STOP 6" e=1
CAPTACION DE MANANTIAL (01 UNIDAD)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
COMPUERTA TIPO TARJETA DE 0.50X0.50m E=1/4
GUIA PARA COMPUERTA TIPO TARJETA DE 0.50X
REJILLA METALICA 0.50x0.50m
PIEDRA ACOMODADA e= 0.30M
TOMAS (05 UNIDADES)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
COMPUERTA PLANA TIPO ARMCO 0.30x0.30M MO
VALVULA COMPUERTA DE FIERRO FUNDIDO BB
TAPA METALICA DE 0.60x0.60M e=3/16" DE REG
CRUCES DE CARRETERA (02 UNIDADES)
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
PIEDRA ACOMODADA e= 0.30M
CONDUCTO CUBIERTO Y PASARELAS (367M)
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
CRUCE DE QUEBRADAS (183 M)
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
PIEDRA ACOMODADA e= 0.30M
TRANSPORTE DE MATERIALES
FLETE TERRESTRE
COSTO DIRECTO S/.
GASTOS GENERALES 3.5%
UTILIDAD 2.5%
SUB TOTAL S/.
I.G.V. 19%
TOTAL AVANCE MENSUAL S/.
% AVANCE MENSUAL
TOTAL AVANCE ACUMULADO S/.
% AVANCE ACUMULADO

P. UNIT.

MES 02 (31 DIAS - MAYO)


%
MONTO S/.

MES 03 (30 DIAS - JUNIO)


%
MONTO S/.

MES 04 (31 DIAS - JULIO)


%
MONTO S/.

MES 05 (31 DIAS - AGOSTO)


%
MONTO S/.

MES 05 (07 DIAS - SETIEMBRE)


%
MONTO S/.

CANT

und
glb
m2
Km
Km

1.00
1.00
100.00
1.00
1.00

1,179.36
8,000.00
117.41
5,000.00
8,200.00

1,179.36
8,000.00
11,741.00
5,000.00
8,200.00

100.00%
50.00%
100.00%
100.00%
100.00%

1,179.36
4,000.00
11,741.00
5,000.00
8,200.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
50.00%
0.00%
0.00%
0.00%

0.00
4,000.00
0.00
0.00
0.00

Km
Km

12.00
12.00

643.85
190.24

7,726.20
2,282.88

40.00%
50.00%

3,090.48
1,141.44

20.00%
50.00%

1,545.24
1,141.44

10.00%
0.00%

772.62
0.00

10.00%
0.00%

772.62
0.00

10.00%
0.00%

772.62
0.00

10.00%
0.00%

772.62
0.00

m3
m3
m3
m3

485.60
121.40
100.35
78.00

6.20
22.09
13.41
133.11

3,010.72
2,681.73
1,345.69
10,382.58

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

20.00%
20.00%
20.00%
20.00%

602.14
536.35
269.14
2,076.52

80.00%
80.00%
80.00%
80.00%

2,408.58
2,145.38
1,076.55
8,306.06

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m2
m3
m3
m2

55.00
40.90
57.10
154.00

13.18
144.45
158.19
23.48

724.90
5,908.01
9,032.65
3,615.92

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

10.00%
10.00%
10.00%
10.00%

72.49
590.80
903.27
361.59

90.00%
90.00%
90.00%
90.00%

652.41
5,317.21
8,129.39
3,254.33

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m3
m2
kg
m

93.60
255.00
4896.00
15.00

281.02
28.73
3.28
24.07

26,303.47
7,326.15
16,058.88
361.05

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

26,303.47
7,326.15
16,058.88
361.05

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

und
und
und

1.00
1.00
1.00

1,763.52
1,460.31
228.21

1,763.52
1,460.31
228.21

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

100.00%
100.00%
100.00%

1,763.52
1,460.31
228.21

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

m2

55.13

32.01

1,764.71

0.00%

0.00

0.00%

0.00

90.00%

1,588.24

10.00%

176.47

0.00%

0.00

0.00%

0.00

m3
m3
m3
m3
m3
m

27009.05
13607.24
13084.05
420.45
1611.87
12000.00

6.20
25.30
39.38
39.15
22.29
0.95

167,456.11
344,263.17
515,249.89
16,460.62
35,928.58
11,400.00

20.00%
20.00%
10.00%
0.00%
0.00%
0.00%

33,491.22
68,852.63
51,524.99
0.00
0.00
0.00

30.00%
30.00%
20.00%
10.00%
20.00%
10.00%

50,236.83
103,278.95
103,049.98
1,646.06
7,185.72
1,140.00

30.00%
30.00%
30.00%
30.00%
40.00%
40.00%

50,236.83
103,278.95
154,574.97
4,938.19
14,371.43
4,560.00

20.00%
20.00%
40.00%
30.00%
30.00%
30.00%

33,491.22
68,852.63
206,099.96
4,938.19
10,778.57
3,420.00

0.00%
0.00%
0.00%
30.00%
10.00%
20.00%

0.00
0.00
0.00
4,938.19
3,592.86
2,280.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

m2
m3
m3
m2
kg
m
m
m

36.40
3453.54
20.69
791.46
642.10
19.60
930.41
5582.47

13.18
253.56
271.08
24.69
3.28
24.07
2.48
1.46

479.75
875,679.60
5,608.65
19,541.15
2,106.09
471.77
2,307.42
8,150.41

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

239.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50.00%
25.00%
5.00%
25.00%
5.00%
5.00%
15.00%
15.00%

239.88
218,919.90
280.43
4,885.29
105.30
23.59
346.11
1,222.56

0.00%
30.00%
45.00%
30.00%
45.00%
50.00%
30.00%
30.00%

0.00
262,703.88
2,523.89
5,862.35
947.74
235.89
692.23
2,445.12

0.00%
30.00%
50.00%
30.00%
50.00%
45.00%
30.00%
30.00%

0.00
262,703.88
2,804.33
5,862.35
1,053.05
212.30
692.23
2,445.12

0.00%
15.00%
0.00%
15.00%
0.00%
0.00%
25.00%
25.00%

0.00
131,351.94
0.00
2,931.17
0.00
0.00
576.86
2,037.60

m2
m3
m2
kg
und

21.75
18.65
128.72
611.00
1.00

13.18
275.74
25.73
3.28
1,097.12

286.67
5,142.55
3,311.97
2,004.08
1,097.12

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

10.00%
0.00%
0.00%
0.00%
0.00%

28.67
0.00
0.00
0.00
0.00

30.00%
10.00%
0.00%
10.00%
0.00%

86.00
514.26
0.00
200.41
0.00

60.00%
25.00%
45.00%
40.00%
0.00%

172.00
1,285.64
1,490.39
801.63
0.00

0.00%
65.00%
55.00%
50.00%
100.00%

0.00
3,342.66
1,821.58
1,002.04
1,097.12

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

m2
m3
m2
kg
m

121.00
125.15
579.79
3128.75
37.95

13.18
275.74
24.69
3.28
24.07

1,594.78
34,508.86
14,315.02
10,262.30
913.46

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

10.00%
10.00%
10.00%
10.00%
0.00%

159.48
3,450.89
1,431.50
1,026.23
0.00

30.00%
30.00%
30.00%
30.00%
20.00%

478.43
10,352.66
4,294.51
3,078.69
182.69

40.00%
40.00%
40.00%
40.00%
20.00%

637.91
13,803.54
5,726.01
4,104.92
182.69

20.00%
20.00%
20.00%
20.00%
60.00%

318.96
6,901.77
2,863.00
2,052.46
548.08

m2
m3
m2
kg
und
und
und
m2

13.50
7.85
35.10
96.00
1.00
1.00
1.00
3.00

14.12
275.74
25.73
3.28
443.07
273.33
299.83
33.41

190.62
2,164.56
903.12
314.88
443.07
273.33
299.83
100.23

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

80.00%
70.00%
70.00%
70.00%
0.00%
0.00%
0.00%
0.00%

152.50
1,515.19
632.18
220.42
0.00
0.00
0.00
0.00

20.00%
30.00%
30.00%
30.00%
0.00%
0.00%
0.00%
85.00%

38.12
649.37
270.94
94.46
0.00
0.00
0.00
85.20

0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
15.00%

0.00
0.00
0.00
0.00
443.07
273.33
299.83
15.03

m2
m3
m2
kg
und
und
und

35.00
21.00
230.75
576.00
10.00
5.00
5.00

13.18
275.74
25.73
3.28
937.90
437.57
246.88

461.30
5,790.54
5,937.20
1,889.28
9,379.00
2,187.85
1,234.40

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

70.00%
70.00%
70.00%
70.00%
0.00%
0.00%
0.00%

322.91
4,053.38
4,156.04
1,322.50
0.00
0.00
0.00

30.00%
30.00%
30.00%
30.00%
100.00%
100.00%
100.00%

138.39
1,737.16
1,781.16
566.78
9,379.00
2,187.85
1,234.40

m3
m2
kg
m2

12.11
50.40
425.50
32.00

266.92
24.69
3.28
33.41

3,232.40
1,244.38
1,395.64
1,069.12

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

50.00%
50.00%
50.00%
50.00%

1,616.20
622.19
697.82
534.56

50.00%
50.00%
50.00%
50.00%

1,616.20
622.19
697.82
534.56

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

m3
m2
kg

139.06
965.20
4171.80

266.92
24.69
3.28

37,117.90
23,830.79
13,683.50

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

40.00%
40.00%
40.00%

14,847.16
9,532.32
5,473.40

60.00%
60.00%
60.00%

22,270.74
14,298.47
8,210.10

m3
m2
kg
m2

118.44
489.28
4145.40
457.50

266.92
24.69
3.28
33.41

31,614.00
12,080.32
13,596.91
15,285.08

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

70.00%
70.00%
70.00%
70.00%

22,129.80
8,456.22
9,517.84
10,699.56

30.00%
30.00%
30.00%
30.00%

9,484.20
3,624.10
4,079.07
4,585.52

glb

1.00

29,978.38
2,430,335.59
85,061.75
60,758.39
2,576,155.73
489,469.59
3,065,625.32

0.00%

0.00
188,221.13
6,587.74
4,705.53
199,514.40
37,907.74
237,422.13
7.74%
237,422.13
7.74%

20.00%

5,995.68
280,900.73
9,831.53
7,022.52
297,754.78
56,573.41
354,328.19
11.56%
591,750.32
19.30%

20.00%

5,995.68
661,470.99
23,151.48
16,536.77
701,159.24
133,220.26
834,379.50
27.22%
1,426,129.82
46.52%

20.00%

5,995.68
638,064.13
22,332.24
15,951.60
676,347.97
128,506.11
804,854.08
26.25%
2,230,983.90
72.77%

20.00%

5,995.68
416,720.26
14,585.21
10,418.01
441,723.48
83,927.46
525,650.94
17.15%
2,756,634.84
89.92%

20.00%

5,995.68
244,958.35
8,573.54
6,123.96
259,655.85
49,334.61
308,990.46
10.08%
3,065,625.31
100.00%

29,978.38

TOTAL

MES 01 (15 DIAS - ABRIL)


%
MONTO S/.

UND

100.00%

1,179.36

100.00%

8,000.00

100.00%

11,741.00

100.00%

5,000.00

100.00%

8,200.00

100.00%

7,726.20

100.00%

2,282.88

100.00%

3,010.72

100.00%

2,681.73

100.00%

1,345.69

100.00%

10,382.58

100.00%

724.90

100.00%

5,908.01

100.00%

9,032.65

100.00%

3,615.92

100.00%

26,303.47

100.00%

7,326.15

100.00%

16,058.88

100.00%

361.05

100.00%

1,763.52

100.00%

1,460.31

100.00%

228.21

100.00%

1,764.71

100.00%

167,456.11

100.00%

344,263.17

100.00%

515,249.89

100.00%

16,460.62

100.00%

35,928.58

100.00%

11,400.00

100.00%

479.75

100.00%

875,679.60

100.00%

5,608.65

100.00%

19,541.15

100.00%

2,106.09

100.00%

471.77

100.00%

2,307.42

100.00%

8,150.41

100.00%

286.67

100.00%

5,142.55

100.00%

3,311.97

100.00%

2,004.08

100.00%

1,097.12

100.00%

1,594.78

100.00%

34,508.86

100.00%

14,315.02

100.00%

10,262.30

100.00%

913.46

100.00%

190.62

100.00%

2,164.56

100.00%

903.12

100.00%

314.88

100.00%

443.07

100.00%

273.33

100.00%

299.83

100.00%

100.23

100.00%

461.30

100.00%

5,790.54

100.00%

5,937.20

100.00%

1,889.28

100.00%

9,379.00

100.00%

2,187.85

100.00%

1,234.40

100.00%

3,232.40

100.00%

1,244.38

100.00%

1,395.64

100.00%

1,069.12

100.00%

37,117.90

100.00%

23,830.79

100.00%

13,683.50

100.00%

31,614.00

100.00%

12,080.32

100.00%

13,596.91

100.00%

15,285.08

100.00%

29,978.38

2,430,335.59

VALORIZACION DE OBRA No 02
Mes: 31.Mayo.07
Propietario :
Proyecto :

GOBIERNO REGIONAL DE HUANCAVELICA


Construccin Canal de Riego Allccaccocha - Huando I Etapa

Licitacin:
Contratista:
Supervisor:

Licitacin Publica Nacional N 0001-2006 Gob. Reg. Hvca


CONSORCIO HUANCAVELICA
Ing. Demnis Blas Heredia Benavides

Regin
: Huancavelica
Departamento : Huancavelica
Provincia : Huancavelica
Distrito
: Huando
Localidad : Incaan, Miraflores

Monto de Obra
: 3 065,625.32
Fecha de Inicio de Obra : 16.Abril.07
Plazo de Ejecucin
: 145 das cal.
Fecha de Trmino de Obra : 07.Setiembre.07

PARTIDA

PRESUPUESTO

Descripcin
U.

01
01.01
01.02
01.03
01.04
01.05
02
02.01
02.02
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.04
04.04.01

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA 4.80x3.60M
und
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
glb
CONSTRUCCION DE CAMPAMENTO PROVISIONAL DE LA OBRA
m2
MEJORAMIENTO DE TROCHA DE ACCESO
Km
CONSTRUCCION DE TROCHA DE ACCESO A CANAL
Km
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
Km
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
Km
BOCATOMA
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
m3
EXCAVACION EN ROCA SUELTA
m3
RELLENO COMPACTADO CON MATERIAL PROPIO CON PLANCHA VIBRATORIA
m3
ESCOLLERA DE ROCA GRANITICA d=0.60m Pmin= 0.55Tn
m3
OBRAS DE CONCRETO SIMPLE
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO CICLOPEO FC=140KG/CM2+30% PM.
m3
CONCRETO CICLOPEO FC=175KG/CM2+25% PM.
m3
ENCOFRADO Y DESENCOFRADO
m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
JUNTA DE DILATACION CON WATER STOP 6" e=1"
m
COMPUERTAS Y REJILLAS
COMPUERTA PLANA TIPO ARMCO 1.00x1.20M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
COMPUERTA PLANA TIPO ARMCO 0.85x0.45M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
REJILLA METALICA INGRESO VENTANA CAPTACION 3.00x0.30M
und
VARIOS
ALBAILERA DE PIEDRA EMBOQUILLADA CON MORTERO 1:3
m2
CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
m3
EXCAVACION EN ROCA SUELTA
m3
EXCAVACION EN ROCA FIJA
m3
FILTROS DE GRAVA HASTA 2" CON TUBERA PERFORADA DE 200MM
m3
RELLENO COMPACTADO CON MATERIAL PROPIO CON PLANCHA VIBRATORIA
m3
REFINE Y NIVELACION DE CAJA DE CANAL
m
CANAL
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 175KG/CM2
m3
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
JUNTA DE DILATACION CON WATER STOP 6" e=1"
m
JUNTA DE DILATACION E=1" SELLADO CON MATERIAL BITUMINOSO
m
JUNTA DE CONTRACCIN E=1" SELLADO CON MATERIAL BITUMINOSO
m
DESARENADOR (01 UNIDAD)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
COMPUERTA PLANA TIPO ARMCO 0.50x0.50M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
RAPIDAS (05 UNIDADES)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2

Metrado

P.Unit.

1.00
1.00
100.00
1.00
1.00

1,179.36
8,000.00
117.41
5,000.00
8,200.00

12.00
12.00

643.85
190.24

485.60
121.40
100.35
78.00

6.20
22.09
13.41
133.11

55.00
40.90
57.10
154.00

13.18
144.45
158.19
23.48

93.60
255.00
4,896.00
15.00

281.02
28.73
3.28
24.07

1.00
1.00
1.00

1,763.52
1,460.31
228.21

55.13

32.01

27,009.05
13,607.24
13,084.05
420.45
1,611.87
12,000.00

6.20
25.30
39.38
39.15
22.29
0.95

36.40
3,453.54
20.69
791.46
642.10
19.60
930.41
5,582.47

13.18
253.56
271.08
24.69
3.28
24.07
2.48
1.46

21.75
18.65
128.72
611.00
1.00

13.18
275.74
25.73
3.28
1,097.12

121.00

13.18

Presupuesto
34,120.36
1,179.36
8,000.00
11,741.00
5,000.00
8,200.00
10,009.08
7,726.20
2,282.88
17,420.72
3,010.72
2,681.73
1,345.69
10,382.58
19,281.48
724.90
5,908.01
9,032.65
3,615.92
50,049.55
26,303.47
7,326.15
16,058.88
361.05
3,452.04
1,763.52
1,460.31
228.21
1,764.71
1,764.71
1,090,758.37
167,456.11
344,263.17
515,249.89
16,460.62
35,928.58
11,400.00
914,344.84
479.75
875,679.60
5,608.65
19,541.15
2,106.09
471.77
2,307.42
8,150.41
11,842.39
286.67
5,142.55
3,311.97
2,004.08
1,097.12
61,594.42
1,594.78

Anterior
Metrado
Valorizado

0.00
0.50
20.00
1.00
1.00
9.85
12.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9,453.78
4,316.66
3,585.86
0.00
298.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

19,548.20
0.00
4,000.00
2,348.20
5,000.00
8,200.00
8,624.80
6,341.92
2,282.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
315,687.88
58,613.44
109,211.50
141,211.17
0.00
6,651.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

AVANCES
Actual
Metrado
Valorizado

0.00
0.25
20.00
0.00
0.00
0.85
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14,382.19
404.52
2,712.42
0.00
1,140.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4,348.20
0.00
2,000.00
2,348.20
0.00
0.00
547.27
547.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
231,635.87
89,169.58
10,234.36
106,815.10
0.00
25,416.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Saldo de Obra
Acumulado
Metrado
Valorizado

0.00
0.75
40.00
1.00
1.00
10.70
12.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

23,835.97
4,721.18
6,298.28
0.00
1,438.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

%
Metrado

23,896.40
0.00
6,000.00
4,696.40
5,000.00
8,200.00
9,172.08
6,889.20
2,282.88

70.04%
0.00%
75.00%
40.00%
100.00%
100.00%
91.64%
89.17%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

547,323.76
147,783.01
119,445.85
248,026.27
0.00
32,068.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50.18%
88.25%
34.70%
48.14%
0.00%
89.26%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
0.25
60.00
0.00
0.00
1.30
0.00

485.60
121.40
100.35
78.00
55.00
40.90
57.10
154.00
93.60
255.00
4,896.00
15.00
1.00
1.00
1.00
55.13

3,173.08
8,886.06
6,785.77
420.45
173.17
12,000.00
36.40
3,453.54
20.69
791.46
642.10
19.60
930.41
5,582.47
21.75
18.65
128.72
611.00
1.00
121.00

Monto
10,223.96
1,179.36
2,000.00
7,044.60
0.00
0.00
837.01
837.01
0.00
17,420.72
3,010.72
2,681.73
1,345.69
10,382.58
19,281.47
724.90
5,908.01
9,032.65
3,615.92
50,049.55
26,303.47
7,326.15
16,058.88
361.05
3,452.04
1,763.52
1,460.31
228.21
1,764.71
1,764.71
543,434.61
19,673.10
224,817.32
267,223.62
16,460.62
3,859.96
11,400.00
914,344.83
479.75
875,679.60
5,608.65
19,541.15
2,106.09
471.77
2,307.42
8,150.41
11,842.38
286.67
5,142.55
3,311.97
2,004.08
1,097.12
61,594.41
1,594.78

VALORIZACION DE OBRA No 02
Mes: 31.Mayo.07
Propietario :
Proyecto :

GOBIERNO REGIONAL DE HUANCAVELICA


Construccin Canal de Riego Allccaccocha - Huando I Etapa

Licitacin:
Contratista:
Supervisor:

Licitacin Publica Nacional N 0001-2006 Gob. Reg. Hvca


CONSORCIO HUANCAVELICA
Ing. Demnis Blas Heredia Benavides

Regin
: Huancavelica
Departamento : Huancavelica
Provincia : Huancavelica
Distrito
: Huando
Localidad : Incaan, Miraflores

Monto de Obra
: 3 065,625.32
Fecha de Inicio de Obra : 16.Abril.07
Plazo de Ejecucin
: 145 das cal.
Fecha de Trmino de Obra : 07.Setiembre.07

PARTIDA

PRESUPUESTO

Descripcin
U.

04.04.02
04.04.03
04.04.04
04.04.05
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.05.06
04.05.07
04.05.08
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.06.05
04.06.06
04.06.07
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.09.04
05
05.01

CONCRETO F'C= 210KG/CM2


m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
JUNTA DE DILATACION CON WATER STOP 6" e=1"
m
CAPTACION DE MANANTIAL (01 UNIDAD)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
COMPUERTA TIPO TARJETA DE 0.50X0.50m E=1/4"
und
GUIA PARA COMPUERTA TIPO TARJETA DE 0.50X0.50m E=1/4"
und
REJILLA METALICA 0.50x0.50m
und
PIEDRA ACOMODADA e= 0.30M
m2
TOMAS (05 UNIDADES)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
COMPUERTA PLANA TIPO ARMCO 0.30x0.30M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
VALVULA COMPUERTA DE FIERRO FUNDIDO BB DE 200MM INC. DESCARGA
und
TAPA METALICA DE 0.60x0.60M e=3/16" DE REGISTRO
und
CRUCES DE CARRETERA (02 UNIDADES)
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
PIEDRA ACOMODADA e= 0.30M
m2
CONDUCTO CUBIERTO Y PASARELAS (367M)
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
CRUCE DE QUEBRADAS (183 M)
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
PIEDRA ACOMODADA e= 0.30M
m2
TRANSPORTE DE MATERIALES
FLETE TERRESTRE
glb

COSTO DIRECTO DE OBRA

Metrado

P.Unit.

125.15
579.79
3,128.75
37.95

275.74
24.69
3.28
24.07

13.50
7.85
35.10
96.00
1.00
1.00
1.00
3.00

14.12
275.74
25.73
3.28
443.07
273.33
299.83
33.41

35.00
21.00
230.75
576.00
10.00
5.00
5.00

13.18
275.74
25.73
3.28
937.90
437.57
246.88

12.11
50.40
425.50
32.00

266.92
24.69
3.28
33.41

139.06
965.20
4,171.80

266.92
24.69
3.28

118.44
489.28
4,145.40
457.50

266.92
24.69
3.28
33.41

1.00

29,978.38

S/.
GASTOS GENERALES 3.5%
UTILIDAD 2.5%

SUB TOTAL
I.G.V. 19%
TOTAL AVANCE MENSUAL AL 100% S/.

3.5%
2.5%

Presupuesto
34,508.86
14,315.02
10,262.30
913.46
4,689.64
190.62
2,164.56
903.12
314.88
443.07
273.33
299.83
100.23
26,879.57
461.30
5,790.54
5,937.20
1,889.28
9,379.00
2,187.85
1,234.40
6,941.54
3,232.40
1,244.38
1,395.64
1,069.12
74,632.19
37,117.90
23,830.79
13,683.50
72,576.31
31,614.00
12,080.32
13,596.91
15,285.08
29,978.38
29,978.38

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,597.41
3,597.41

Saldo de Obra
Acumulado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,597.41
3,597.41

%
Metrado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.00%
12.00%

125.15
579.79
3,128.75
37.95
13.50
7.85
35.10
96.00
1.00
1.00
1.00
3.00
35.00
21.00
230.75
576.00
10.00
5.00
5.00
12.11
50.40
425.50
32.00
139.06
965.20
4,171.80
118.44
489.28
4,145.40
457.50
0.88

Monto
34,508.86
14,315.02
10,262.30
913.46
4,689.64
190.62
2,164.56
903.12
314.88
443.07
273.33
299.83
100.23
26,879.57
461.30
5,790.54
5,937.20
1,889.28
9,379.00
2,187.85
1,234.40
6,941.54
3,232.40
1,244.38
1,395.64
1,069.12
74,632.19
37,117.90
23,830.79
13,683.50
72,576.32
31,614.00
12,080.32
13,596.91
15,285.08
26,380.97
26,380.97

343,860.89
12,035.13
8,596.52

240,128.75
8,404.51
6,003.22

583,989.64
20,439.64
14,599.74

1,846,345.92
64,622.11
46,158.65

2,576,155.73
489,469.59
3,065,625.32

364,492.54
69,253.58
433,746.12

254,536.48
48,361.93
302,898.41

619,029.02
117,615.51
736,644.53

1,957,126.68
371,854.07
2,328,980.75

14.15%

9.88%

24.03%

75.97%

2,290.83
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573

0.00
0.00
0.00
0.00

AVANCES
Actual
Metrado
Valorizado

2,430,335.59
85,061.75
60,758.39

% AVANCE

..

Anterior
Metrado
Valorizado

RESUMEN DE VALORIZACION N 02
( AL 31 DE MAYO DEL 2007 )
OBRA

CONSTRUCCION DE CANAL DE RIEGO ALLCCACCOCHA-HUANDO I ETAPA

PROPIETARIO
SUPERVISOR
CONTRATISTA
RESIDENTE

: GOBIERNO REGIONAL DE HUANCAVELICA


: DEMNIS BLAS HEREDIA BENAVIDES
: CONSORCIO HUANCAVELICA
: RENE SALAZAR SALCEDO

Presupuesto Contractual c/IGV

ITEM

S/. 3,065,625.32

D E S C R I P C I O N

MONTO S/.

I.

VALORIZACION BRUTA

II.

REAJUSTE DEL PERIODO

III.

AMORTIZACIN ADELANTO DIRECTO

IV.

VALORIZACION NETA ( I + II - III)

#REF!

V.

IMPUESTO GENERAL A LAS VENTAS ( 19% IV )

#REF!

VI.

TOTAL VALORIZACION LIQUIDA ( IV + V )

#REF!

SON : DOCIENTOS CUARENTA Y CINCO MIL OCHENTA Y UNO CON 23/100 NUEVOS SOLES

254,536.48

#REF!

50,904.84

CONTROL DE VALORIZACIONES
OBRA

CONSTRUCCION DE CANAL DE RIEGO ALLCCACCOCHA-HUANDO I ETAPA


Fecha de Inicio Contractual
PRESUPUESTO : S/. 3 065,625.32 ( Presupuesto de Contrato )
Plazo de Ejecucin
SUPERVISOR
Fecha de Trmino de Obra
CONTRATISTA : CONSORCIO HUANCAVELICA
RESIDENTE
:RENE SALAZAR SALCEDO
Regin
Huancavelica
Provincia
Huancavelica
AD. DIRECTO
: S/. 3 065,625.32 ( 20% Presupuesto de Contrato )
Distrito
Huando

ITEM

DESCRIPCION

I.

VALORIZACION BRUTA

II.

REAJUSTE DE VALORIZACION

III.

AMORTIZACIN ADELANTO EN EFECTIVO

IV.

VALORIZACION NETA ( I + II - III )

V.

IMPUESTO GENERAL A LAS VENTAS ( 19% IV )

VI.

TOTAL VALORIZACION ( VALORIZACION LIQUIDA ( IV + V )

VALORIZ. ACUM
ANTERIOR
S/.

: 16.SET.07
: 145 Dias Calendarios
: 07.SET.07

VALORIZACION
ACTUAL
S/.

VALORIZACION
ACUMULADA ACTUAL
S/.

364,492.54

254,536.48

619,029.02

3,893.09

#REF!

#REF!

72,898.51

50,904.84

123,803.35

295,487.12

#REF!

#REF!

56,142.55

#REF!

#REF!

351,629.67

#REF!

#REF!

..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573

DESCUENTOS POR ADELANTO DIRECTO


OBRA
UBICACIN
ENTIDAD
CONTRATISTA

: CONSTRUCCION CANAL DE RIEGO ALLCCACCOCHA HUANDO I ETAPA

Fecha de Inicio de Plazo


Fecha de Trmino Programado
Presupuesto Contractual c/IGV
Adelanto Directo - Incluye IGV
Adelanto Directo Sin IGV
Plazo de Ejecucin
Nmero de Valorizaciones

: 16/04/07
: 07/09/07

: HUANCAVELICA
: Gobierno Regional de Huancavelica
: CONSORCIO HUANCAVELICA

Valorizacin N01 de Obra c/IGV


Valorizacin N02 de Obra
Valorizacin N03 de Obra
Ads/IGV =
VM =
MC =
AMORTIZACION =

3 065 625.32
613 125.06
515 231.15
145.00 Das Calendario
5.00

S/.
S/.
S/.

433,746.12
302 898.41

S/.
S/.
S/.

20.00%

72,905.21
0.0988

Adelanto Direto sin IGV


Valorizacion Mensual
Monto de Contrato
Ads/IGV*VM/MC

DESCUENTOS DE ADELANTO DIRECTO


Descripcin
Mensual
Acumulado

SALDO S/.

1 Valorizacin (25/04/07)

72 898.51

72 898.51

442 332.64

2 Valorizacin

50 904.84

123 803.35

391 427.80

3 Valorizacin

0.00

0.00

0.00

50 904.84

123 803.35

391 427.80

IGV 19 %

9 671.92

23 522.64

74 371.28

TOTAL S/.

60 576.76

147 325.98

465,799.08

SUB TOTAL S/.

..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573

CALCULO DEL FACTOR DE REAJUSTE - VALORIZACIN N 02 - MAYO 2007


OBRA
:
CONSTRUCCION DE CANAL DE RIEGO ALLCCACCOCHA-HUANDO I ETAPA
AREA GEOGRAFICA N03
FECHA DE PRESUPUESTO: AGOSTO DEL 2006
K = 0.198*(Jr/Jo) + 0.202*(Cr/Co) + 0.133*(AAr/AAo) + 0.358*(MFr/MFo) + 0.109*(GGUr/GGUo)

Mon. Smb.
01.

DESCRIPCION
Mano de Obra incluyendo leyes s.

IU
47.00

Particip.
a
0.198

Factor
b

Porcentaje
c
100.00%

0.198
02.

Cemento Portland Tipo I

21.00

0.202

100.00%

Ir (Abril 2007)
d
f=cxd
361.290
361.290
361.290

Io (Agosto 2006)
Ir/Io
e
g=cxe
h = f/g
361.100
361.100
361.100
1.001

350.430

350.430
350.430

350.430

182.883
166.122

411.340
262.180

0.202
03.

AA

Acero de Construccin Corrugado


Agregado Grueso

2.00
5.00

0.058
0.075

43.61%
56.39%

419.370
294.590

0.133
04.
MF

Flete terrestre
Maquinaria y equipo importado

32.00
49.00

0.053
0.305

349.005
14.80%
85.20%

400.040
264.340

0.358
05. GGU Indice General de precios al consumidor 39.00

0.109

382.010
267.940

100.00%

315.200

315.200

315.200

1.000

1.000

0.202

1.067

0.142

0.999

0.357

1.006

0.110

56.553
228.274
284.827

313.290

313.290

313.290

Coeficiente de Reajuste a Abril del 2007

Mes
K

Marzo
1.012

Abril
1.009

REAJUSTE ( R)
VB=SUBTOTAL DEL PRESUPUESTO
R = VB*(Kmes - 1)

Mayo

0.198

179.381
147.846
327.227

284.429

0.109

59.222
225.207

350.430
350.430

K
=bxh

1.009

Junio

Julio

Agosto

..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573

R =

2,290.83

Obra:

Construccin Irrigacin Allccaccocha - Huando I Etapa

Valorizacin No 02
Fecha: 31.Mayo.07
Contratista:
Supervisor:

CONSORCIO HUANCAVELICA

Sustento de Metrados
Partida 1.00

OBRAS PROVISIONALES

Partida 01.02

Movilizacin y Desmovilizacin de Maquinaria (Glb)


Se han movilizado las siguientes maquinarias:
EQUIPO MINIMO REQUERIDO
* 02 tractores sobre orugas D6D
* 02 compresoras neumaticas
* 01 Excavadora 302
* 01 electrosoldador
* 02 camionetas
Al tenerse todos los equipos necesarios, para movimiento de tierras
asi como semovilizan los equipos de vaciaso de concreto, se valoriza el 0.25%
Actual =
0.25 m2
Anterior =
0.50 m2
Acumulado =
0.75 m2

Partida 1.03

Construccin de Campamento Provisional (m2)


Se ha alquilado ambientes distintos en la zona, equivalentes a la construccin
de sus campamentos y y oficinas. Se paga en forma proporcional al tiemo transcurrido.
05 mes = 100.00 %
01 mes = 20.00%
Metrado total:
A valorizar = 20.00% * 100 m2 =
Actual =
Anterior =
Acumulado =

Partida 2.00

TRABAJOS PRELIMINARES

Partida 2.01

Trazo, Nivelacin y replanteo(Km.)

100.00 m2
20.00 m2
20.00 m2
20.00 m2
40.00 m2

El replanteo (80 %) ha sido terminado:


80% * 100% =

80.00% valorizado

El control topogrfico (20%) se valoriza proporcional al tiempo


20% * 31ds / 145 ds

7.10%

Metrado total:
A valorizar:

12.00 Km
82.07 % * 12.00 =

0.85 Km.

Actual =
Anterior =
Acumulado =

Partida 4.00
Partida 4.01
Partida 4.01.01

0.85 Km
9.85 Km
10.70 Km

CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
Excavacin en material suelto (m3)
Del cuadro anexo:
Resumen:
De

Volumen

Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000

Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000

Total:

2,433.31
1,474.63
2,867.61
2,296.67
2,860.56
2,449.41

14,382.19 m3

Actual =
Anterior =
Acumulado =
Partida 4.01.02

14382.19 m3
9453.78 m3
23835.97 m3

Excavacin en roca suelta (m3)


Del cuadro anexo:
Resumen:
De

Volumen

Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000

Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000

Total:
Actual

404.52

404.52 m3
404.52 m3

Anterior =
Acumulado =

Partida 4.01.03

4316.66 m3
4721.18 m3

Excavacin en roca fija (m3)


Del cuadro anexo:
Resumen:
De

Volumen

Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000

Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000

Total:

1,532.94
244.28
795.95
139.25
-

2,712.42 m3

Actual =
Anterior =
Acumulado =

Partida 4.01.05

2712.42 m3
3585.86 m3
6298.28 m3

Relleno compactado con material propio (m3)


Del cuadro anexo:
Resumen:
De

Volumen

Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000

Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000

Total:
Actual =
Anterior =
Acumulado =

128.05
296.60
271.62
305.90
138.11

1,140.28 m3
1140.28 m3
298.42 m3
1438.70 m3

Partida 5.00

TRANSPORTE DE MATERIALES

Partida 5.01

Flete Terrestre
Se ha transportado materiales como:
MATERIAL

UNIDAD

Alambre # 16
Dinamita 65%
Fulminante
Mecha Lenta
Anfo
Nitrato
papeleria
Pentacort
Pintura
Estacas
Gasolina
Petroleo
Aceites

KILOGRAMOS
CAJA
CAJA
TAMBORA
SACO
SACO
MLL
TAMBORA
GALONES
UNIDAD
GALONES
GALONES
BALDES

CANTIDAD

PESO UNITARIOPESO TOTAL

60.00
28.00
22.00
11.00
35.00
30.00
4.00
10.00
15.00
1,000.00
120.00
8,500.00
45.00

1.00
25.00
0.50
20.00
25.00
50.00
5.00
10.00
8.00
0.25
0.80
0.80
20.00
TOTAL KG

Metrado total:

0.12 Glb

A valorizar:

0.12 Glb

Actual =
Anterior =
Acumulado =

0.12 Glb
0.00 Glb
0.12 Glb

60.00
700.00
11.00
220.00
875.00
1,500.00
20.00
100.00
120.00
250.00
96.00
6,800.00
900.00
11,652.00