CHAPTER I
PRELIMINARY
OJT ANGKATAN 33
issue on Science and Technology report on the Olympics this time, so that the
problems that occurred in kWh Meter can be managed so it does not have to cost a
substantial investment in each year
1.3 Scope
The workis focused on innovation modification bangker manufacture protective
waterproof and safe from the entry of small animals (ants) in kWh meters.
1.4 Metodologi
The methods and steps used in the preparation of the work innovations are:
The collection of data based on theoretical studies / literature and data obtained to
get a general idea as the basis of research and discussions with experienced parties.
Data processing and table preparation include the data obtained and calculated.
Surveillance data from devices attached to see the development that occurs before
and after innovation.
OJT ANGKATAN 33
CHAPTER II
ISSUES FACING
In PLN, kWh meteris a very important equipment to support the business of selling
electricity to customers, both medium voltage customers (factories that use 3 phase) and
low voltage(households using onephase). Hence the importance of the attitude of PLN in
maintaining long-lived kWh meter so that PLN no longer need to pay a substantial
investment to procure new kWh meters. With the proliferation of thear rears payment of
electricity bills at this point It makes PLN prepaid kWh meter, which is where customers
must fill out prior balances contained in kWh electricity meter before use. However,
prepaid kWh meteris at the moment as some short comings that make the performance of
prepaid kWh meter cannot work in abundance maximum. As susceptible to water and
other small animals (ants).
Especially in this erain which there has been global warming affecting climate
conditions around the world. Soal so increase the natural disasters that occur almost
through out the territory of Indonesia one of which was flooded.Flooding has resulted
insubstantial losses for the PLN in particular areas of our beloved capital city of Indonesia
is the Jakarta. Almost all houses in Jakarta submerged by flooding, it also led to inundation
kWh meter large enough numbers. Of course this is very detrimental because PLN must
hold the investment costs for the procurement of new kWh meters to support business
processes sales of electricity to customers. For now handling the problemis still focusing
its replacement kWhmeteris broken into a new meter. So the problemis not only limited
finishing find ways to make the problem does not happen again tomorrow.
OJT ANGKATAN 33
CHAPTER III
THEOLOGICAL OFI AND PROBLEM
Minimum information
about kWh meter so
officer dont care about
kwh meter condition
KWH meter
not appropiate
Losses at
Jakarta
city
geographical
conditions that are
below sea level
Gambar 3.1 Metode Fish Bone determine the issue of the loss on the PLN in Jakarta
Loss problem in Jakarta was caused by the break down of a kWh meter can be
seen from the five aspects (4M +1E), the man (man), machinery (machine), material
(material), method (method), and environment (environment). But of all aspects of the
above just focus on the problems caused by the material kWh meter and resolving
problems that can becaused by the geographical conditions of the city under the sea.
As this is potentially cause major flooding so many kWh meter submerged and
OJT ANGKATAN 33
damaged and also improve the reliability of power restoration after the flood so that
when post-flood residents can directly use electricity for their daily activities.
To solve the root problems that have been formulated above, can be formulated
needs analysis is a tool that can protect the physical condition kWh meter to keep it dry
so there is no damage to the kWh meter while submerged. Therefore,the author shave
also included analysis of protective equip mentusing 'SWOT' below.
OJT ANGKATAN 33
Focus is used as writing materials and innovations in this paper lies in the solution
number 1 and 2, namely the making of "Bang PeTer" that more details will be discussed
in Chapter IV.
OJT ANGKATAN 33
CHAPTER IV
AFI SUGGESTION
4.1.1
1.
2.
OJT ANGKATAN 33
3.
4.
5.
6.
OJT ANGKATAN 33
C. Additional Features:
1. There temper switch,
2. Storage TOKEN: call back 5 last token is received,
3. External (remote) disconnection: via serial port or POD.
D. Programmable Features:
Here is programmable at manufacturing time (the time of booking Prepaid kWh Meter):
1. Tamper Switch:
Micro Switch to change the current status of the terminal cover dibuka.Tersedia 2
configuration:
a) Tamper Disconnect,
b) Tamper Logging,
3. Reconnection Time-Out:
time in seconds (s) required by the Contactor to open (give power kepelanggan) after
power-up. (The default and minimum is 30s). Can be set to rise +10 s.
OJT ANGKATAN 33
4.1.2
Design
X+5
KWH Meter
Y+8
Bang Piter
Tampak depan
2. Provide water proof material that matches the size of kWh meter
No
Name
Price
Photo
ket
Waterproof box
Rp. 45.000,-
1 piece
Clamp
Rp. 1000,-
4 piece
Cutter
Rp. 5000,-
1 piece
10
OJT ANGKATAN 33
Rules
Rp. 3000
Hose
Rp 3000 (1m)
Pipe glue
Rp. 5000
1 piece
2 pieces
1m
3. Make some holes that will be used to place the cord exits from the output
transformer and the cables that will be used to make electricity in the house on the
material to be used for Bang PeTer
4. Arrange all these components into one and paste kWh meter will be used to
simulate flood protection
5. Cover all holes found on Bang PeTer using water proof sealer so that water can not
enter into.
6. Do simulation testing at the time of the flood.
11
OJT ANGKATAN 33
CHAPTER V
Saving, Gain, Benefit
5.1. Saving, gain and benefit from the creation of this tool are:
a. Gain
Suppose for the duration of the replacement of damaged kWh meter with a new 900
VA power it takes30 minutes to 1 piece kwh meter
The potential sale of electricityis lost due to the replacement of 50,000 kWh
meteris:
(A xBxCxDxE) =?
where:
A
cos phi
Suppose kWh meter 900 VA power of 50,000 broken pieces then (electricity
selling price of Rp. 780,-, 1 kWh meter replacement time= 30minutes /0.5 hours,
andcosphi=0.8)
Then (900 x 0.8 x 780 x 0.5 x 50,000)= Rp14.04 billion, From the picture above shows that
In a potential sale lost power after post-flooding due to the replacement of kWh
meter Rp.14.04 billion, So with the tool is expected PLN not to lose potential sales of electricity after the
12
OJT ANGKATAN 33
flood due to the shut down for replacement of damaged kWh meter
b. Saving
For the price of a new meter to 900 kWh VA valued at a price Rp.400.000, -, then
the saving of each kWh meters have been fitted with Bang Peter is
(A-B) x C=?
where:
A
c. Benefit
With the application of this tool on the kWh meter customers get benefis such as:
1.PLN eliminate jobs in reimbursement kWh meter flood-damaged immersion
2.Improving the image of PLN in the eyes of society in post-flood recovery of
electric reliability.
13
OJT ANGKATAN 33
CHAPTER VI
CLOSURE
6.1. Conclusion
The conclusion that can be drawn from the writing of the paper this innovation
include:
1. This tool can be an alternative to extend the life time kWh meter so do not need a
huge investment cost procurement of PLN
2. Potential Benefit to improve the image of her that is service to the community after
the flood PLN and the results of this innovation could be used as a reference for the
development can be properly realized.
3.
4.
From the application of these tools get value from the customer's savings
amounted to 16.75 billion every single time a huge flood coming
5. From the application of these tools gain value gained or lost electricity sales
potential experienced by PLN per flooding dating is IDR14.04 billion, -
6.2. Suggestion