Table 3.

1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Quality Control Manager


(Deputy Project Manager)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Project Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Specialist Cable Stayed Bridge

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Bridge Engineer Cable Stay

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Highway Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Foundation/Pylon Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Safety Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Environmental Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

10 Gender and HIV

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

11 Concrete Plant Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

12 Scheduling Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

13 Quantity Surveyor

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

14 Administration Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Assistant Administration
Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

16 Public Relations Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

17 Administrators

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

18 Procurement Cordinator

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

19 Accountant

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

20 Document Controller

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

21 Construction Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

15

- 17 -

22 Site Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

23 CAD Operators

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

24 Foreman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

25 Carpenter

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

26 Piling Worker

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

27 Superstructure Worker

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

28 Cable Stay Worker

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

29 Mechanical & Electrical Worker

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

30 Mason

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

31 Steel Fixer (Bar bender)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

32 Topographic Surveyors

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

33 Chainman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

34 Laboratory Technician

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Laborers
35
(Casual Worker)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

36 Operator

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

37 Welder

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

38 Driver

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

39 Mechanic

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

40 Auto Electrician

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

41 Tyreman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

42 Store Keeper

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

43 Checker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

44 Watchman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

45 Cooks and Cleaners

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Total
Daily Average

#REF!

Table 3. 2 Contratctor's Equipment in May 2014


Number of Equipment for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

Total

Equipment
1

Excavator (0.8m3)

0.8m3(0.6)

unit

Excavator(1.1m3)

1.1m3(0.8)

unit

Bulldozer (15t)

15t

unit

Bulldozer (32t)

32t WR

unit

Wheel Loader (1.5m3)

1.5m3

unit

Dump Truck (10t)

10t

unit

Truck With Crane(4t)

4t

unit

Crawler Crane(50t)

50t

unit

Crawler Crane(100t)

100t

unit

10 Truck Crane(16t)

16t

unit

11 Truck Crane(25t)

25t

unit

12 Tower Crane (200t.m)

200t.m

unit

13 Elevator (2t)

2t

unit

14 Vibration Hammer 60KW

60KW

unit

15 vibration Hammer for Rock Pile

120KW

unit

16 All Casing Pile Rig

Dia 2m/1.5m

unit

17 Concrete Batch Plant (1m3/bt)

60m3/hr

unit

18 Agitator Truck

5m3

unit

19 Concrete Pump (Boom)

110m3

unit

20 Asphalt Plant 500kg/bt

30t/h

unit

21 Asphalt Finisher

2.4/4.5m

unit

22 Air Compressor

3.7m3

unit

23 Power Generator (25kVA)

25kVA

unit

24 Power Generator (45kVA)

45kVA

unit

25 Power Generator (200kVA)

200kVA

unit

26 Travelling Form (W=24m)

W=24m

unit

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

27 Motor Grader

unit

28 Compact Roller

unit

29 Pneumatic Roller

unit

30 Fuel tanker

unit

- 18 -

31 Service Vans

unit

32 Water Browser

unit

33 Folk Lift

unit

34 Bitumen Hand Sprayer

unit

35 Road Marking Machine

unit

Tools & Miscellaneous

unit

Bar Cutter

unit

Bar Bender

unit

Welding Machine

unit

Water Pump

unit

Concrete Vibrator

unit

Concrete Breaker

unit

Oxygen-Acetylene set

10 Chain Saw

unit
unit

11 Plate Rammer

unit

12 Rammer

unit

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0

Total

#REF!

Table 3. 1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

Quality Control Manager


(Deputy Project Manager)

pers.

Project Engineer

pers.

Specialist Cable Stayed Bridge

pers.

Bridge Engineer Cable Stay

pers.

Highway Engineer

pers.

Foundation/Pylon Engineer

pers.

Safety Officer

pers.

Environmental Officer

pers.

10 Gender and HIV

pers.

11 Concrete Plant Manager

pers.

12 Scheduling Engineer

pers.

13 Quantity Surveyor

pers.

14 Administration Manager

pers.

Assistant Administration
Manager

pers.

16 Public Relations Officer

pers.

17 Administrators

pers.

18 Procurement Cordinator

pers.

19 Accountant

pers.

20 Document Controller

pers.

21 Construction Engineer

pers.

22 Site Engineer

pers.

15

- 17 -

23 CAD Operators

pers.

24 Foreman

pers.

25 Carpenter

pers.

30 Mason

pers.

31 Steel Fixer (Bar bender)

pers.

32 Topographic Surveyors

pers.

33 Chainman

pers.

34 Laboratory Technician

pers.

Laborers
35
(Casual Worker)

pers.

36 Operator

pers.

37 Welder

pers.

38 Driver

pers.

39 Mechanic

pers.

40 Auto Electrician

pers.

41 Tyreman

pers.

42 Store Keeper

pers.

43 Checker

pers.

44 Watchman

pers.

45 Cooks and Cleaners

pers.

26 Piling Worker
27 Superstructure Worker
28 Cable Stay Worker
29 Mechanical & Electrical Worker

Total
Daily Average

0
0

Table 3. 2 Contratctor's Equipment in May 2014


Number of Equipment for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

Total

Equipment
1

Excavator (0.8m3)

0.8m3(0.6)

unit

Excavator(1.1m3)

1.1m3(0.8)

unit

Bulldozer (15t)

15t

unit

Bulldozer (32t)

32t WR

unit

Wheel Loader (1.5m3)

1.5m3

unit

Dump Truck (10t)

10t

unit

Truck With Crane(4t)

4t

unit

Crawler Crane(50t)

50t

unit

Crawler Crane(100t)

100t

unit

10 Truck Crane(16t)

16t

unit

11 Truck Crane(25t)

25t

unit

12 Tower Crane (200t.m)

200t.m

unit

13 Elevator (2t)

2t

unit

14 Vibration Hammer 60KW

60KW

unit

15 vibration Hammer for Rock Pile

120KW

unit

16 All Casing Pile Rig

Dia 2m/1.5m

unit

17 Concrete Batch Plant (1m3/bt)

60m3/hr

unit

18 Agitator Truck

5m3

unit

19 Concrete Pump (Boom)

110m3

unit

20 Asphalt Plant 500kg/bt

30t/h

unit

21 Asphalt Finisher

2.4/4.5m

unit

22 Air Compressor

3.7m3

unit

23 Power Generator (25kVA)

25kVA

unit

24 Power Generator (45kVA)

45kVA

unit

25 Power Generator (200kVA)

200kVA

unit

26 Travelling Form (W=24m)

W=24m

unit

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

27 Motor Grader

unit

28 Compact Roller

unit

29 Pneumatic Roller

unit

30 Fuel tanker

unit

- 18 -

31 Service Vans

unit

32 Water Browser

unit

33 Folk Lift

unit

34 Bitumen Hand Sprayer

unit

35 Road Marking Machine

unit

Tools & Miscellaneous

unit

Bar Cutter

unit

Bar Bender

unit

Welding Machine

unit

Water Pump

unit

Concrete Vibrator

unit

Concrete Breaker

unit

Oxygen-Acetylene set

10 Chain Saw

unit
unit

11 Plate Rammer

unit

12 Rammer

unit

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0

Total

#REF!

Table 3. 1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Quality Control Manager


(Deputy Project Manager)

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Project Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Specialist Cable Stayed Bridge

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Bridge Engineer Cable Stay

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Highway Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Foundation/Pylon Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Safety Officer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Environmental Officer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

10 Gender and HIV

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

11 Concrete Plant Manager

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

12 Scheduling Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

13 Quantity Surveyor

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

14 Administration Manager

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Assistant Administration
Manager

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

16 Public Relations Officer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

17 Administrators

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

18 Procurement Cordinator

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

19 Accountant

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

20 Document Controller

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

21 Construction Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

22 Site Engineer

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

15

- 17 -

23 CAD Operators

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

24 Foreman

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

25 Carpenter

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

26 Piling Worker

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

27 Superstructure Worker

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

28 Cable Stay Worker

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

29 Mechanical & Electrical Worker

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

30 Mason

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

31 Steel Fixer (Bar bender)

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

32 Topographic Surveyors

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

33 Chainman

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

34 Laboratory Technician

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Laborers
35
(Casual Worker)

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

36 Operator

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

37 Welder

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

38 Driver

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

39 Mechanic

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

40 Auto Electrician

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

41 Tyreman

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

42 Store Keeper

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

43 Checker

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

44 Watchman

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

45 Cooks and Cleaners

pers.

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Total
Daily Average

#REF!

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

1-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

2-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Materials on Site

Description

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

3-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

4-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

5-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

6-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Materials on Site

Description

No.

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

7-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Consultant's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

8-May-15

Weather Jinja Meteological Record

Section:

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

No.

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

9-May-15

Weather Jinja Meteological Record

Section:

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Status

Description

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Driver

Assistant Administration Manager


Public Relations Officer

No.

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

10-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown

No.

Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

11-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Equipment on site

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

No.

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

12-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

No.

Wire nails 4"

Crawler Crane(100t)

Water Browser

Wire nails 5"

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

13-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Materials on Site

Description of Work

Equipment on site

Qty

Description

Qty

Description

No.

Description

Status

No.

Gabion boxes

Excavator (0.8m3)

Power Generator (25kVA)

Fuel

Excavator(1.1m3)

Power Generator (200kVA)

Plywood
Timber (3"X2")

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Timber (4"X2")

Wheel Loader (1.5m3)

Motor Grader

Wire nails 1"


Wire nails 2"

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Wire nails 3"

Crawler Crane(50t)

Service Vans

Wire nails 4"


Wire nails 5"

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

14-May-15

Section:

Jinja Side

Weather Jinja Meteological Record


Temperature Jinja Meteological
Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes

Qty

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Fuel

Excavator(1.1m3)

Power Generator (200kVA)

Plywood

Bulldozer (15t)

Travelling Form (W=24m)

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

No.

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Name

Designation

Designation

Signature
Resident Engineer

Checked By:

Name

Signature
Contractor's Representative

Consultant's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

15-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Status

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Excavator (0.8m3)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Description

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description
CAD Operators

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Carpenter
Piling Worker

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)

Construction of

Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

16-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Status

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Excavator (0.8m3)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Description

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description
CAD Operators

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Carpenter
Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

17-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description

Status

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

No.

Description

Description

No.

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

CAD Operators
Carpenter

Project Manager

Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

18-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Equipment on site

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig

Concrete Culverts 600Dia

Main Concrete Batch Plant

No.

Status

Concrete Culverts 900Dia

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

CAD Operators

No.

Laborers
(Casual
Welder
Worker)

Carpenter

Description

Description

No.

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

19-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)

No.

Status

Y20

Wire nails 4"

Crawler Crane(100t)

Y25

Wire nails 5"

Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

No.

Description

Description

No.

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

CAD Operators
Carpenter

Project Manager

Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

20-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Equipment on site

Description

Status

Qty

Description

Qty

Description

No.

Hardcore

Gabion boxes

Excavator (0.8m3)

Cement 42.5N

Fuel

Excavator(1.1m3)

Cement 52.5N

Bulldozer (15t)

BRC

Plywood
Timber (3"X2")

Y8

Timber (4"X2")

Wheel Loader (1.5m3)

Y10

Dump Truck (10t)

Y12

Wire nails 1"


Wire nails 2"

Y16

Wire nails 3"

Crawler Crane(50t)

Y20

Wire nails 4"


Wire nails 5"

Crawler Crane(100t)

Y25

Bulldozer (32t)

Truck With Crane(4t)

Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Status

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description

Personnel on Site

Description

No.

CAD Operators

No.

Laborers
(Casual
Welder
Worker)

Carpenter

Description

Description

No.

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

21-May-15

RAINY

Section:

Jinja Side

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Qty

Equipment on site

Hardcore

Description
Gabion boxes

Cement 42.5N

Fuel

Excavator(1.1m3)

Cement 52.5N

Plywood

Bulldozer (15t)

BRC

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bulldozer (32t)

Status

Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description

No.

Excavator (0.8m3)

Wheel Loader (1.5m3)


Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Status

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description

Personnel on Site
No.

CAD Operators

Description
Laborers
(Casual
Welder
Worker)

Carpenter

No.

Description

No.

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Description

Project Manager

Signature
Resident Engineer

Contractor's Representative

Assistant Administration Manager


Public Relations Officer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Driver

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Procurement Cordinator

Driver

Project Manager

Document Controller
Construction Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


-

Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B -

Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Main Concrete Batch Plant

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Legend: Status: W - Working, I - Idle, B Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

Description
Project Manager

Driver

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Power Generator (25kVA)

Hardcore

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)

Water Browser

Y20

Wire nails 4"

Crawler Crane(100t)

Folk Lift

Y25

Wire nails 5"

Truck Crane(16t)

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Gabion boxes

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Fuel

Excavator(1.1m3)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (15t)

Motor Grader

BRC

Plywood
Timber (3"X2")

Motor Grader

Y8

Timber (4"X2")

Wheel Loader (1.5m3)

Pneumatic Roller

Y10

Dump Truck (10t)

Fuel tanker

Y12

Wire nails 1"


Wire nails 2"

Service Vans

Y16

Wire nails 3"

Crawler Crane(50t)

Water Browser

Y20

Crawler Crane(100t)

Folk Lift

Y25

Wire nails 4"


Wire nails 5"

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Bulldozer (32t)

Truck With Crane(4t)

Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site

Description

No.

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

Description
Project Manager

Driver

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Bill Item

Equipment on site

Materials on Site

Description

No.

Description

Power Generator (25kVA)

Hardcore

Description
Gabion boxes

Power Generator (200kVA)

Cement 42.5N

Fuel

Excavator(1.1m3)

Travelling Form (W=24m)

Cement 52.5N

Plywood

Bulldozer (15t)

Motor Grader

BRC

Bulldozer (32t)

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Status

Qty

Qty

Description
Excavator (0.8m3)

Wheel Loader (1.5m3)


Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

No.

Driver

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:
Name

Submitted b

Approved By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

22-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

No.

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

23-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Materials on Site

Description

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

No.

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

24-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10
Sika 40

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

MC 30

Qty

Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

25-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Tower Crane (200t.m)

Qty

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

26-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Qty

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

27-May-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Materials on Site

No.

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

No.

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

28-May-15

Weather Jinja Meteological Record

ITEM
RAINY

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

FROM

Equipment on site
No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

No.

Remarks:

Submitted by:

Checked By:
Name

Approved By:

Name

Designation
Signature
Contractor's Representative

Signature
Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

29-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

No.

Status

Submitted by:

Approved By:

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

30-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Status

Description

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Driver

Assistant Administration Manager


Public Relations Officer

No.

Status

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Remarks:

Submitted by:

Approved By:

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

31-May-15

Section:

Weather Jinja Meteological Record

Jinja Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown

No.

Status

Personnel on Site

Description

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

No.

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Designation

Designation

Signature
Resident Engineer

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Signature
Contractor's Representative

Consultant

Qty

Checked By:

Name

Consultant's Representative

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Wire nails 4"


Wire nails 5"

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

Materials on Site

AMOUNT (mm)

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes

Qty

Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

No.

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia

Concrete Culverts 1200Dia


Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Personnel on Site

Description
CAD Operators
Carpenter
Piling Worker

No.

Description
Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

Laboratory Technician
Operator

No.

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia

Concrete Culverts 1200Dia


Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Personnel on Site

Description
CAD Operators
Carpenter
Piling Worker

No.

Description
Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

No.

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

Laboratory Technician
Operator

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Concrete Culverts 1200Dia
Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Qty

Personnel on Site

Description

No.

Description

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

CAD Operators
Carpenter

Laboratory Technician
Operator

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

No.

Table 3. 2 Contratctor's Equipment in May 2014


Number of Equipment for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

Total

Equipment
1

Excavator (0.8m3)

0.8m3(0.6)

unit

Excavator(1.1m3)

1.1m3(0.8)

unit

Bulldozer (15t)

15t

unit

Bulldozer (32t)

32t WR

unit

Wheel Loader (1.5m3)

1.5m3

unit

Dump Truck (10t)

10t

unit

Truck With Crane(4t)

4t

unit

Crawler Crane(50t)

50t

unit

Crawler Crane(100t)

100t

unit

10 Truck Crane(16t)

16t

unit

11 Truck Crane(25t)

25t

unit

12 Tower Crane (200t.m)

200t.m

unit

13 Elevator (2t)

2t

unit

14 Vibration Hammer 60KW

60KW

unit

15 vibration Hammer for Rock Pile

120KW

unit

16 All Casing Pile Rig

Dia 2m/1.5m

unit

17 Concrete Batch Plant (1m3/bt)

60m3/hr

unit

18 Agitator Truck

5m3

unit

19 Concrete Pump (Boom)

110m3

unit

20 Asphalt Plant 500kg/bt

30t/h

unit

21 Asphalt Finisher

2.4/4.5m

unit

22 Air Compressor

3.7m3

unit

23 Power Generator (25kVA)

25kVA

unit

24 Power Generator (45kVA)

45kVA

unit

25 Power Generator (200kVA)

200kVA

unit

26 Travelling Form (W=24m)

W=24m

unit

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

27 Motor Grader

unit

28 Compact Roller

unit

29 Pneumatic Roller

unit

30 Fuel tanker

unit

- 18 -

31 Service Vans

unit

32 Water Browser

unit

33 Folk Lift

unit

34 Bitumen Hand Sprayer

unit

35 Road Marking Machine

unit

Tools & Miscellaneous

unit

Bar Cutter

unit

Bar Bender

unit

Welding Machine

unit

Water Pump

unit

Concrete Vibrator

unit

Concrete Breaker

unit

Oxygen-Acetylene set

10 Chain Saw

unit
unit

11 Plate Rammer

unit

12 Rammer

unit

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0

Total

#REF!

Table 3. 1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Quality Control Manager


(Deputy Project Manager)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Project Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Specialist Cable Stayed Bridge

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Bridge Engineer Cable Stay

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Highway Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Foundation/Pylon Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Safety Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Environmental Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

10 Gender and HIV

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

11 Concrete Plant Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

12 Scheduling Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

13 Quantity Surveyor

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

14 Administration Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Assistant Administration
Manager

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

16 Public Relations Officer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

17 Administrators

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

18 Procurement Cordinator

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

19 Accountant

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

20 Document Controller

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

21 Construction Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

22 Site Engineer

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

15

- 17 -

23 CAD Operators

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

24 Foreman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

25 Carpenter

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

26 Piling Worker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

27 Superstructure Worker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

28 Cable Stay Worker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

29 Mechanical & Electrical Worker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

30 Mason

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

31 Steel Fixer (Bar bender)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

32 Topographic Surveyors

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

33 Chainman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

34 Laboratory Technician

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Laborers
35
(Casual Worker)

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

36 Operator

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

37 Welder

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

38 Driver

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

39 Mechanic

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

40 Auto Electrician

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

41 Tyreman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

42 Store Keeper

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

43 Checker

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

44 Watchman

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

45 Cooks and Cleaners

pers.

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

###

### #REF! ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

#REF!

Total
Daily Average

#REF!

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

1-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

2-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Materials on Site

Description

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

3-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

4-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

5-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

6-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Materials on Site

Description

No.

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

Description

No.

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering C


Engineering Consultants Limited (Joint

Daily Works Records


SITE WEATHER REPORT

Date:

7-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Bulldozer (15t)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (32t)

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Truck Crane(16t)

Folk Lift

Y25

Truck Crane(25t)

Bitumen Hand Sprayer

Y32

Tower Crane (200t.m)

Road Marking Machine

Binding wire

Elevator (2t)

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Mixer

Concrete Breaker

Concrete Culverts 1200Dia

Agitator Truck

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Asphalt Finisher

Rammer

Sika 10

Air Compressor

Sika 40

Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Description

Personnel on Site
No.

Description

Description

No.

Project Manager

Quantity Surveyor

CAD Operators

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Consultant's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

8-Jan-15

Section:

Weather Jinja Meteological Record

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

No.

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

9-Jan-15

Section:

Weather Jinja Meteological Record

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Status

Description

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Driver

Assistant Administration Manager


Public Relations Officer

No.

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

10-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown

No.

Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

11-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Equipment on site

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

No.

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

12-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

No.

Wire nails 4"

Crawler Crane(100t)

Water Browser

Wire nails 5"

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

13-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Materials on Site

Description of Work

Equipment on site

Qty

Description

Qty

Description

No.

Description

Status

No.

Gabion boxes

Excavator (0.8m3)

Power Generator (25kVA)

Fuel

Excavator(1.1m3)

Power Generator (200kVA)

Plywood
Timber (3"X2")

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Timber (4"X2")

Wheel Loader (1.5m3)

Motor Grader

Wire nails 1"


Wire nails 2"

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Wire nails 3"

Crawler Crane(50t)

Service Vans

Wire nails 4"


Wire nails 5"

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description

No.

No.

Laborers
(Casual
Welder
Worker)

Description

Description

No.

No.

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

e at Jinja

Construction of a New Bridge Across River


(Loan No. UD-P4)
Consultant

Client

Contractor

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
FROM

TO

AMOUNT (mm)

Date:

14-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work

Materials on Site

Qty

Equipment on site

Description
Gabion boxes

Qty

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Fuel

Excavator(1.1m3)

Power Generator (200kVA)

Plywood

Bulldozer (15t)

Travelling Form (W=24m)

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

No.

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Signature

Name

Designation

Designation

Signature
Resident Engineer

Checked By:

Name

Signature
Contractor's Representative

Consultant's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

15-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Status

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Excavator (0.8m3)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Description

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description
CAD Operators

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Carpenter
Piling Worker

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)

Construction of

Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

16-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Status

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Excavator (0.8m3)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Description

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description
CAD Operators

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Carpenter
Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

17-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description

Status

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

No.

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

No.

Description

Description

No.

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

CAD Operators
Carpenter

Project Manager

Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

18-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Equipment on site

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig

Concrete Culverts 600Dia

Main Concrete Batch Plant

No.

Status

Concrete Culverts 900Dia

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

CAD Operators

No.

Laborers
(Casual
Welder
Worker)

Carpenter

Description

Description

No.

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

19-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Status

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16

Qty

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)

No.

Status

Y20

Wire nails 4"

Crawler Crane(100t)

Y25

Wire nails 5"

Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Personnel on Site

Description

Description

No.

No.

Description

Description

No.

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

CAD Operators
Carpenter

Project Manager

Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Construction of
Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

20-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Equipment on site

Description

Status

Qty

Description

Qty

Description

No.

Hardcore

Gabion boxes

Excavator (0.8m3)

Cement 42.5N

Fuel

Excavator(1.1m3)

Cement 52.5N

Bulldozer (15t)

BRC

Plywood
Timber (3"X2")

Y8

Timber (4"X2")

Wheel Loader (1.5m3)

Y10

Dump Truck (10t)

Y12

Wire nails 1"


Wire nails 2"

Y16

Wire nails 3"

Crawler Crane(50t)

Y20

Wire nails 4"


Wire nails 5"

Crawler Crane(100t)

Y25

Bulldozer (32t)

Truck With Crane(4t)

Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Status

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description

Personnel on Site

Description

No.

CAD Operators

No.

Laborers
(Casual
Welder
Worker)

Carpenter

Description

Description

No.

Project Manager

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Assistant Administration Manager


Public Relations Officer

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Representative

ew Bridge Across River Nile at Jinja

Construction of

(Loan No. UD-P4)


Contractor

n and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Consultant

Client

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Authority (UNRA)

aily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

Date:

21-Jan-15

Section:

Njeru Side

RAINY

Works Executed:

Description of Work Done

Bill Item

Materials on Site

Description

Qty

Equipment on site

Hardcore

Description
Gabion boxes

Cement 42.5N

Fuel

Excavator(1.1m3)

Cement 52.5N

Plywood

Bulldozer (15t)

BRC

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bulldozer (32t)

Status

Y8
Y10
Y12
Y16
Y20
Y25

Qty

Description

No.

Excavator (0.8m3)

Wheel Loader (1.5m3)


Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Y32

Truck Crane(25t)

Binding wire

Tower Crane (200t.m)

Aggregates(6/10)

Elevator (2t)

Aggregates(10/14)

Vibration Hammer 60KW

Aggregates(14/20)

vibration Hammer for Rock Pile

Concrete Culverts 450Dia

All Casing Pile Rig


Main Concrete Batch Plant

Concrete Culverts 600Dia


Concrete Culverts 900Dia

Status

Back-Up Concrete Batch Plant

Concrete Culverts 1200Dia

Concrete Mixer

Metallic Culverts

Agitator Truck

Sand

Concrete Pump (Boom)

Gravel

Asphalt Plant 500kg/bt

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

Personnel on Site

Description

Personnel on Site
No.

CAD Operators

Description
Laborers
(Casual
Welder
Worker)

Carpenter

No.

Description

No.

Quantity Surveyor
Administration Manager

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Mason

Store Keeper

Foundation/Pylon Engineer

Accountant

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Document Controller

Topographic Surveyors

Watchman

Environmental Officer

ICT

Chainman

Cooks and Cleaners

Gender and HIV

Construction Engineer

Laboratory Technician

Concrete Plant Manager

Site Engineer

Operator

Scheduling Engineer

Foreman

Piling Worker

Driver

Remarks:

Checked By:

Submitted by:

Approved By:

Name

Name
Designation

Signature
Consultant's Representative

Description

Project Manager

Signature
Resident Engineer

Contractor's Representative

Assistant Administration Manager


Public Relations Officer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Driver

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description
Laborers
(Casual
Welder
Worker)

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Procurement Cordinator

Driver

Project Manager

Document Controller
Construction Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


-

Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B -

Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

Power Generator (25kVA)

Hardcore

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Main Concrete Batch Plant

Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Legend: Status: W - Working, I - Idle, B Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

Description
Project Manager

Driver

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Description

Bill Item

Materials on Site

No.

Description

Status

Power Generator (25kVA)

Hardcore

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Qty

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)

Water Browser

Y20

Wire nails 4"

Crawler Crane(100t)

Folk Lift

Y25

Wire nails 5"

Truck Crane(16t)

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Personnel on Site

Description

No.

Description

No.

No.

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Equipment on site

Bill Item

Materials on Site

Description

No.

Description

Status

Qty

Description

Qty

Description

Power Generator (25kVA)

Hardcore

Gabion boxes

Excavator (0.8m3)

Power Generator (200kVA)

Cement 42.5N

Fuel

Excavator(1.1m3)

Travelling Form (W=24m)

Cement 52.5N

Bulldozer (15t)

Motor Grader

BRC

Plywood
Timber (3"X2")

Motor Grader

Y8

Timber (4"X2")

Wheel Loader (1.5m3)

Pneumatic Roller

Y10

Dump Truck (10t)

Fuel tanker

Y12

Wire nails 1"


Wire nails 2"

Service Vans

Y16

Wire nails 3"

Crawler Crane(50t)

Water Browser

Y20

Crawler Crane(100t)

Folk Lift

Y25

Wire nails 4"


Wire nails 5"

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Bulldozer (32t)

Truck With Crane(4t)

Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site

Description

No.

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

Description
Project Manager

Driver

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:

Submitted b

Approved By:

Name

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Contractor

Consultant

Client

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Uganda National Roads Au

Daily Works Records


SITE WEATHER REPORT

Weather Jinja Meteological Record

ITEM

FROM

TO

AMOUNT (mm)

Date:

RAINY

Temperature Jinja Meteological

Section:

Record
Works Executed:

Description of Work Done

Bill Item

Equipment on site

Materials on Site

Description

No.

Description

Power Generator (25kVA)

Hardcore

Description
Gabion boxes

Power Generator (200kVA)

Cement 42.5N

Fuel

Excavator(1.1m3)

Travelling Form (W=24m)

Cement 52.5N

Plywood

Bulldozer (15t)

Motor Grader

BRC

Bulldozer (32t)

Motor Grader

Y8

Pneumatic Roller

Y10

Fuel tanker

Y12

Service Vans

Y16

Water Browser

Y20

Folk Lift

Y25

Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Bitumen Hand Sprayer

Y32

Truck Crane(25t)

Road Marking Machine

Binding wire

Tower Crane (200t.m)

Tools & Miscellaneous

Aggregates(6/10)

Elevator (2t)

Bar Cutter

Aggregates(10/14)

Vibration Hammer 60KW

Bar Bender

Aggregates(14/20)

vibration Hammer for Rock Pile

Welding Machine

Concrete Culverts 450Dia

All Casing Pile Rig

Water Pump

Concrete Culverts 600Dia

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Concrete Mixer

Oxygen-Acetylene set

Metallic Culverts

Agitator Truck

Chain Saw

Sand

Concrete Pump (Boom)

Plate Rammer

Gravel

Asphalt Plant 500kg/bt

Rammer

Sika 10

Asphalt Finisher

Sika 40

Air Compressor

MC 30

Power Generator (45kVA)

Status

Qty

Qty

Description
Excavator (0.8m3)

Wheel Loader (1.5m3)


Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)

Main Concrete Batch Plant


Back-Up Concrete Batch Plant

Legend: Status: W - Working, I - Idle, B Personnel on Site

Description

No.

Personnel on Site
No.

Description

Description

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Assistant Administration Manager

Piling Worker

Public Relations Officer

Superstructure Worker

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Cable Stay Worker

Auto Electrician

Bridge Engineer Cable Stay

Mechanical & Electrical Worker

Tyreman/ Turn-man

Highway Engineer

Mason

Store Keeper

Foundation/Pylon Engineer

Steel Fixer (Bar bender)

Checker/ Clerk

Safety Officer

Topographic Surveyors

Watchman

Environmental Officer

Chainman

Cooks and Cleaners

Gender and HIV

Procurement Cordinator
Document Controller
Construction Engineer

Laborers
(Casual
Welder
Worker)

No.

Driver

Project Manager

Laboratory Technician

Concrete Plant Manager

Operator

Scheduling Engineer
Remarks:

Checked By:
Name

Submitted b

Approved By:

Name

Name

Designation

Designation

Signature

Signature
Consultant's Representative

Signature
Resident Engineer

Contractor's Repres

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

22-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

No.

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

23-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Materials on Site

Description

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

No.

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

24-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10
Sika 40

Power Generator (45kVA)


Legend: Status: W - Working, I - Idle, B - Brokendown

MC 30

Qty

Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

25-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Tower Crane (200t.m)

Qty

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

26-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site
No.

Status

Description

Materials on Site

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Qty

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

No.

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

27-Jan-15

Weather Jinja Meteological Record

ITEM

FROM

RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Materials on Site

No.

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site

Description

No.
Project Manager

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

No.

Remarks:

Submitted by:

Checked By:

Approved By:

Name

Name

Designation
Signature

Signature
Consultant's Representative

Contractor's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./Pyu


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT

28-Jan-15

Weather Jinja Meteological Record

ITEM
RAINY

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

FROM

Equipment on site
No.

Materials on Site

Description

Status

No.

Description

Status

Excavator (0.8m3)

Power Generator (25kVA)

Hardcore

Excavator(1.1m3)

Power Generator (200kVA)

Cement 42.5N

Travelling Form (W=24m)

Cement 52.5N

Motor Grader

BRC

Wheel Loader (1.5m3)

Motor Grader

Y8

Dump Truck (10t)

Pneumatic Roller

Y10

Truck With Crane(4t)

Fuel tanker

Y12

Crawler Crane(50t)

Service Vans

Y16

Crawler Crane(100t)

Water Browser

Y20

Folk Lift

Y25

Bitumen Hand Sprayer

Y32

Road Marking Machine

Binding wire

Tools & Miscellaneous

Aggregates(6/10)

Vibration Hammer 60KW

Bar Cutter

Aggregates(10/14)

vibration Hammer for Rock Pile

Bar Bender

Aggregates(14/20)

All Casing Pile Rig

Welding Machine

Concrete Culverts 450Dia

Main Concrete Batch Plant

Water Pump

Concrete Culverts 600Dia

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Culverts 900Dia

Concrete Breaker

Concrete Culverts 1200Dia

Tower Crane (200t.m)

Oxygen-Acetylene set

Metallic Culverts

Concrete Pump (Boom)

Chain Saw

Sand

Asphalt Plant 500kg/bt

Plate Rammer

Gravel

Rammer

Sika 10

Qty

Sika 40
Power Generator (45kVA)

MC 30

Legend: Status: W - Working, I - Idle, B - Brokendown


Personnel on Site

Personnel on Site
No.

Project Manager

Description

Description

No.

Quantity Surveyor

CAD Operators

Administration Manager

Carpenter

Project Engineer

Assistant Administration Manager

Piling Worker

Specialist Cable Stayed Bridge

Public Relations Officer

Superstructure Worker

Bridge Engineer Cable Stay

Administrators

Cable Stay Worker

Highway Engineer

Procurement Cordinator

Mechanical & Electrical Worker

Foundation/Pylon Engineer

Accountant

Mason

Safety Officer

Document Controller

Steel Fixer (Bar bender)

Environmental Officer

ICT

Topographic Surveyors

Gender and HIV

Construction Engineer

Chainman

Concrete Plant Manager

Site Engineer

Laboratory Technician

Scheduling Engineer

Foreman

Operator

No.

Remarks:

Submitted by:

Checked By:
Name

Approved By:

Name

Designation
Signature
Contractor's Representative

Signature
Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

29-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Description

Status

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Driver

Remarks:

Assistant Administration Manager


Public Relations Officer

No.

Status

Submitted by:

Approved By:

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

30-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Status

Description

No.

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site

Description
Laborers
(Casual
Welder
Worker)

No.

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Driver

Assistant Administration Manager


Public Relations Officer

No.

Status

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

Remarks:

Submitted by:

Approved By:

Checked By:

Name

Name

Designation

Designation

Signature

Signature

Resident Engineer

Consultant's Representative

Contractor's Representative

Construction of a New Bridge Across River Nile at Jinj


(Loan No. UD-P4)
Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

Client

Contractor

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and Construction


Co. Ltd (Joint Venture)

Daily Works Records


TO

AMOUNT (mm)

Date:

31-Jan-15

Weather Jinja Meteological Record

Section:

Njeru Side

Temperature Jinja Meteological


Record

Works Executed:

Bill Item

Description of Work Done

Materials on Site

Equipment on site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Qty

Description

No.

Status

Description

Excavator (0.8m3)

Power Generator (25kVA)

Excavator(1.1m3)

Power Generator (200kVA)

Bulldozer (15t)

Travelling Form (W=24m)

Bulldozer (32t)

Motor Grader

Wheel Loader (1.5m3)

Motor Grader

Dump Truck (10t)

Pneumatic Roller

Truck With Crane(4t)

Fuel tanker

Crawler Crane(50t)

Service Vans

Crawler Crane(100t)

Water Browser

Truck Crane(16t)

Folk Lift

Truck Crane(25t)

Bitumen Hand Sprayer

Tower Crane (200t.m)

Road Marking Machine

Elevator (2t)

Tools & Miscellaneous

Vibration Hammer 60KW

Bar Cutter

vibration Hammer for Rock Pile

Bar Bender

All Casing Pile Rig

Welding Machine

Main Concrete Batch Plant

Water Pump

Back-Up Concrete Batch Plant

Concrete Vibrator

Concrete Mixer

Concrete Breaker

Agitator Truck

Oxygen-Acetylene set

Concrete Pump (Boom)

Chain Saw

Asphalt Plant 500kg/bt

Plate Rammer

Asphalt Finisher

Rammer

Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown

No.

Status

Personnel on Site

Description

No.

Laborers
(Casual
Welder
Worker)
Driver

Description

No.

Description

Project Manager

Quantity Surveyor
Administration Manager

Mechanic

Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge

Auto Electrician

Bridge Engineer Cable Stay

Administrators

Tyreman/ Turn-man

Highway Engineer

Procurement Cordinator

Store Keeper

Foundation/Pylon Engineer

Accountant

Checker/ Clerk

Safety Officer

Document Controller

Watchman

Environmental Officer

ICT

Cooks and Cleaners

Gender and HIV

Construction Engineer

Concrete Plant Manager

Site Engineer

Scheduling Engineer

Foreman

No.

Assistant Administration Manager


Public Relations Officer

Remarks:

Submitted by:

Approved By:

Name

Designation

Designation

Signature
Resident Engineer

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Signature
Contractor's Representative

Consultant

Qty

Checked By:

Name

Consultant's Representative

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"

Qty

Wire nails 4"


Wire nails 5"

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

Materials on Site

AMOUNT (mm)

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description

No.

Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

Consultant

o. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


ering Consultants Limited (Joint Venture)

TO

AMOUNT (mm)

Materials on Site

Description
Gabion boxes

Qty

Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Description
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners

Approved By:

Resident Engineer

No.

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia

Concrete Culverts 1200Dia


Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Personnel on Site

Description
CAD Operators
Carpenter
Piling Worker

No.

Description
Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

Laboratory Technician
Operator

No.

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Description

Qty

Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia

Concrete Culverts 1200Dia


Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Personnel on Site

Description
CAD Operators
Carpenter
Piling Worker

No.

Description
Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

No.

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

Laboratory Technician
Operator

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

uction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


SITE WEATHER REPORT
ITEM

FROM

TO

AMOUNT (mm)

RAINY

Description of Work Done

Materials on Site

Description

Qty

Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Concrete Culverts 1200Dia
Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30

Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"

Hardcore

Qty

Personnel on Site

Description

No.

Description

Piling Worker

Laborers
(Casual
Welder
Worker)
Driver

Superstructure Worker

Mechanic

Cable Stay Worker

Auto Electrician

Mechanical & Electrical Worker

Tyreman/ Turn-man

Mason

Store Keeper

Steel Fixer (Bar bender)

Checker/ Clerk

Topographic Surveyors

Watchman

Chainman

Cooks and Cleaners

CAD Operators
Carpenter

Laboratory Technician
Operator

Checked By:

Approved By:

Name

Signature
Consultant's Representative

Resident Engineer

No.

Table 3. 2 Contratctor's Equipment in May 2014


Number of Equipment for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Equipment
1

Excavator (0.8m3)

0.8m3(0.6)

unit

Excavator(1.1m3)

1.1m3(0.8)

unit

Bulldozer (15t)

15t

unit

Bulldozer (32t)

32t WR

unit

Wheel Loader (1.5m3)

1.5m3

unit

Dump Truck (10t)

10t

unit

Truck With Crane(4t)

4t

unit

Crawler Crane(50t)

50t

unit

Crawler Crane(100t)

100t

unit

10 Truck Crane(16t)

16t

unit

11 Truck Crane(25t)

25t

unit

12 Tower Crane (200t.m)

200t.m

unit

13 Elevator (2t)

2t

unit

14 Vibration Hammer 60KW

60KW

unit

15 vibration Hammer for Rock Pile

120KW

unit

16 All Casing Pile Rig

Dia 2m/1.5m

unit

17 Concrete Batch Plant (1m3/bt)

60m3/hr

unit

18 Agitator Truck

5m3

unit

19 Concrete Pump (Boom)

110m3

unit

20 Asphalt Plant 500kg/bt

30t/h

unit

21 Asphalt Finisher

2.4/4.5m

unit

22 Air Compressor

3.7m3

unit

23 Power Generator (25kVA)

25kVA

unit

24 Power Generator (45kVA)

45kVA

unit

25 Power Generator (200kVA)

200kVA

unit

26 Travelling Form (W=24m)

W=24m

unit

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

27 Motor Grader

unit

28 Compact Roller

unit

29 Pneumatic Roller

unit

30 Fuel tanker

unit

- 18 -

31 Service Vans

unit

32 Water Browser

unit

33 Folk Lift

unit

34 Bitumen Hand Sprayer

unit

35 Road Marking Machine

unit

Tools & Miscellaneous

unit

Bar Cutter

unit

Bar Bender

unit

Welding Machine

unit

Water Pump

unit

Concrete Vibrator

unit

Concrete Breaker

unit

Oxygen-Acetylene set

10 Chain Saw

unit
unit

11 Plate Rammer

unit

12 Rammer

unit

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

Total

Table 3. 1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

Quality Control Manager


(Deputy Project Manager)

pers.

Project Engineer

pers.

Specialist Cable Stayed Bridge

pers.

Bridge Engineer Cable Stay

pers.

Highway Engineer

pers.

Foundation/Pylon Engineer

pers.

Safety Officer

pers.

Environmental Officer

pers.

10 Gender and HIV

pers.

11 Concrete Plant Manager

pers.

12 Scheduling Engineer

pers.

13 Quantity Surveyor

pers.

14 Administration Manager

pers.

Assistant Administration
Manager

pers.

16 Public Relations Officer

pers.

17 Administrators

pers.

18 Procurement Cordinator

pers.

19 Accountant

pers.

20 Document Controller

pers.

21 Construction Engineer

pers.

22 Site Engineer

pers.

15

- 17 -

23 CAD Operators

pers.

24 Foreman

pers.

25 Carpenter

pers.

26 Piling Worker

pers.

27 Superstructure Worker

pers.

28 Cable Stay Worker

pers.

29 Mechanical & Electrical Worker

pers.

30 Mason

pers.

31 Steel Fixer (Bar bender)

pers.

32 Topographic Surveyors

pers.

33 Chainman

pers.

34 Laboratory Technician

pers.

Laborers
35
(Casual Worker)

pers.

36 Operator

pers.

37 Welder

pers.

38 Driver

pers.

39 Mechanic

pers.

40 Auto Electrician

pers.

41 Tyreman

pers.

42 Store Keeper

pers.

43 Checker

pers.

44 Watchman

pers.

45 Cooks and Cleaners

pers.

Total
Daily Average

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

1-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

2-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

3-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

4-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

5-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

6-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

7-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

8-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

9-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

10-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

11-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

12-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

13-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

14-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

15-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

16-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

17-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

18-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

19-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

20-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

21-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

22-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

23-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

24-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

25-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

26-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

27-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

28-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

29-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

30-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

31-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Table 3. 1 Contractor's Manpower in May 2014


Number of Manpower for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Project Manager

pers.

Quality Control Manager


(Deputy Project Manager)

pers.

Project Engineer

pers.

Specialist Cable Stayed Bridge

pers.

Bridge Engineer Cable Stay

pers.

Highway Engineer

pers.

Foundation/Pylon Engineer

pers.

Safety Officer

pers.

Environmental Officer

pers.

10 Gender and HIV

pers.

11 Concrete Plant Manager

pers.

12 Scheduling Engineer

pers.

13 Quantity Surveyor

pers.

14 Administration Manager

pers.

Assistant Administration
Manager

pers.

16 Public Relations Officer

pers.

17 Administrators

pers.

18 Procurement Cordinator

pers.

19 Accountant

pers.

20 Document Controller

pers.

21 Construction Engineer

pers.

22 Site Engineer

pers.

15

- 17 -

23 CAD Operators

pers.

24 Foreman

pers.

25 Carpenter

pers.

26 Piling Worker

27 Superstructure Worker

28 Cable Stay Worker

29 Mechanical & Electrical Worker

30 Mason

pers.

31 Steel Fixer (Bar bender)

pers.

32 Topographic Surveyors

pers.

33 Chainman

pers.

34 Laboratory Technician

pers.

Laborers
35
(Casual Worker)

pers.

36 Operator

pers.

37 Welder

pers.

38 Driver

pers.

39 Mechanic

pers.

40 Auto Electrician

pers.

41 Tyreman

pers.

42 Store Keeper

pers.

43 Checker

pers.

44 Watchman

pers.

45 Cooks and Cleaners

pers.

Total
Daily Average

Table 3. 2 Contratctor's Equipment in May 2014


Number of Equipment for Each Day
Description

Unit

Monthly

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Total

Equipment
1

Excavator (0.8m3)

0.8m3(0.6)

unit

Excavator(1.1m3)

1.1m3(0.8)

unit

Bulldozer (15t)

15t

unit

Bulldozer (32t)

32t WR

unit

Wheel Loader (1.5m3)

1.5m3

unit

Dump Truck (10t)

10t

unit

Truck With Crane(4t)

4t

unit

Crawler Crane(50t)

50t

unit

Crawler Crane(100t)

100t

unit

10 Truck Crane(16t)

16t

unit

11 Truck Crane(25t)

25t

unit

12 Tower Crane (200t.m)

200t.m

unit

13 Elevator (2t)

2t

unit

14 Vibration Hammer 60KW

60KW

unit

15 vibration Hammer for Rock Pile

120KW

unit

16 All Casing Pile Rig

Dia 2m/1.5m

unit

17 Concrete Batch Plant (1m3/bt)

60m3/hr

unit

18 Agitator Truck

5m3

unit

19 Concrete Pump (Boom)

110m3

unit

20 Asphalt Plant 500kg/bt

30t/h

unit

21 Asphalt Finisher

2.4/4.5m

unit

22 Air Compressor

3.7m3

unit

23 Power Generator (25kVA)

25kVA

unit

24 Power Generator (45kVA)

45kVA

unit

25 Power Generator (200kVA)

200kVA

unit

26 Travelling Form (W=24m)

W=24m

unit

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

27 Motor Grader

unit

28 Compact Roller

unit

29 Pneumatic Roller

unit

30 Fuel tanker

unit

- 18 -

31 Service Vans

unit

32 Water Browser

unit

33 Folk Lift

unit

34 Bitumen Hand Sprayer

unit

35 Road Marking Machine

unit

Tools & Miscellaneous

unit

Bar Cutter

unit

Bar Bender

unit

Welding Machine

unit

Water Pump

unit

Concrete Vibrator

unit

Concrete Breaker

unit

Oxygen-Acetylene set

10 Chain Saw

unit
unit

11 Plate Rammer

unit

12 Rammer

unit

Total

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

1-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

2-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

3-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

4-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

5-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

6-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

7-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

8-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

9-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

10-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

11-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

12-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

13-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

14-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

15-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

16-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

17-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

18-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

19-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

20-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

21-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

22-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

23-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

24-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

25-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

26-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

27-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

28-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

29-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

30-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

Construction of a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Client

Contractor

Consultant

Uganda National Roads Authority (UNRA)

The ZENITAKA Corporation and HYUNDAI Engineering and


Construction Co. Ltd (Joint Venture)

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants I


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Date:

31-Jul-14

Weather

Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C

Jinja Meteological Record

Site Record

Jinja Meteological Record

Site Record

Works Executed:

Bill Item

Description of Work Done

Equipment on site

Description

No.

Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)

Description

Materials on Site

No.

Description

Travelling Form (W=24m)

Hardcore

Motor Grader

cement

Compact Roller

sand

Pneumatic Roller

Y12

Fuel tanker

Y16

Service Vans

Y20

Water Browser

Y25

Folk Lift

Y32

Bitumen Hand Sprayer

Aggregates(6/14)

Road Marking Machine

Aggregates(14/20)

Tools & Miscellaneous

Gabion boxes

Bar Cutter

Metallic Culverts

Bar Bender

Concrete Culverts

Welding Machine

Fuel

Water Pump

Plywood

Concrete Vibrator

Timber (3"X2")

Concrete Breaker

Timber (4"X2")

Oxygen-Acetylene set

Wire nails 1"

Chain Saw

Wire nails 2"

Plate Rammer

Wire nails 3"

Rammer

Wire nails 4"

Description

Wire nails 5"


Binding wire
mc 30

Personnel at site

Description

Qty

No.

Description

Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer

Quantity Surveyor

Specialist Cable Stayed


Bridge
Bridge Engineer Cable Stay
Highway Engineer
Foundation/Pylon Engineer
Safety Officer
Environmental Officer
Gender and HIV
Concrete Plant Manager

Public Relations Officer

Scheduling Engineer

Foreman

Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators

Personnel at site
No.

Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator

Description

No.
Welder
Driver

Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

Submitted by:

Checked By:

Name

Name

Designation

Designation

Signature

Signature
Contractor's Representative

Approved By:
Name

Signature

Consultant's Representative

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer

a New Bridge Across River Nile at Jinja


(Loan No. UD-P4)
Consultant

Oriental Consultants Co. Ltd/Eight-Japan Engineering Conultants Inc./PyungHwa


Engineering Consultants Limited (Joint Venture)

Daily Works Records


Site Record
Site Record

Description of Work Done

Materials on Site

Description

Qty

Personnel at site

Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners

No.

Approved By:

Resident Engineer