From:
To:
Cc:
Subject:
Date:
Attachments:
FYR, Michael,
Attached is a Screencheck Draft of your projects CEQA analysis staff just received the Wind
Study today.
Please review and let us know if you have any comments/questions. City staff are also reviewing
this draft and we are aiming to get our comments back to LSA by Dec 29th or soon after.
The next version from LSA will incorporate these last round of comments and will be Final.
Hopefully, the Final CE Memo can be delivered the first full week of January, depending on when
City is able to get our last round of comments to LSA.
Thanks,
_____________________________________________
Hui-Chang Li
We will have a paper copy prepared for Heather. Given that we wont be able to get it to her today
and that she will be out until the 29 th , well wait until the end of the week when hopefully we can
incorporate the complete wind study (which Ill also send electronically when I receive it). Please let
me know if anyone else needs paper copies.
Thanks, Theresa
From: Lee, Heather [mailto:HLee@oaklandcityattorney.org]
Sent: Tuesday, December 16, 2014 1:12 PM
To: Gray, Neil D.; Parks, Jamie
Cc: Li, Hui Chang; Theresa Wallace
Subject: RE: Lake Merritt Boulevard Screencheck
NeilI need this in hard copy. I am out of the office after tomorrow until the 29 th , so I dont think
Ill be able to review before the week of the 29 th .
Heather B. Lee
Supervising Deputy City Attorney, Land Use/Development/Building
Office of the City Attorney
One Frank H. Ogawa Plaza, 6th Floor
Oakland CA 94612
Tel: 510.238.3838
Fax: 510.238.6500
e-mail: hlee@oaklandcityattorney.org
On the web at http://www.oaklandcityattorney.org
Please consider the environment before printing this email
From: Gray, Neil D.
Sent: Tuesday, December 16, 2014 11:34 AM
To: Lee, Heather; Parks, Jamie
Cc: Li, Hui Chang; Theresa Wallace (Theresa.Wallace@lsa-assoc.com)
Subject: FW: Lake Merritt Boulevard Screencheck
compare version that shows the changes made since Admin #2.
Appendix C, which is the wind study, is not included however. CPP, the wind consultant, wants to be
sure that they receive payment before finalizing their study (we need 8-10 business days to pay our
subconsultants after receiving payment from the applicant). I have been trying to work that out with
them but my main contact there has been traveling. I am attaching the table they created to insert
into the report, per your comments. I hope to be able to have the next draft from them by the end
of this week. I will keep you updated.
- Theresa
Theresa Wallace , Associate
LSA Associates, Inc.
2215 Fifth Street
Berkeley, CA 94710
Phone: 510.540.7331
From:
To:
Cc:
Subject:
Date:
Attachments:
Gray, Neil D.
dhogman@pyatok.com
Li, Hui Chang; Mike Pyatok (mpyatok@pyatok.com); Michael Johnson (mjohnson@urbancorellc.com); Ronnie
Turner (rtdevelops@comcast.net)
FW: Lake Merritt Tower - Calculations
Tuesday, February 17, 2015 10:36:27 AM
image001.png
Hi Dan,
Couple of other things:
Have you looked at Ed Manasses recommendations for the North and South facades? Michael
heard the recommendations at a meeting a few weeks ago. Also, please study increasing the
ground floor grade separation of the unit that is out of compliance with the 2.5 ft requirement.
Thanks,
Neil Gray, Planner III | City of Oakland | Bureau of Planning | 250 Frank H. Ogawa, Suite 2114
|Oakland, CA 94612 | Phone: (510)238-3878 | Fax: (510) 238-4730 | Email: ngray@oaklandnet.com |
Website: www.oaklandnet.com/planning
Hi Dan,
Can you email me a full set of plans for Lake Merritt Blvd scaled to 11X17? Please include the blown
up ground floor elevations.
Thanks,
Neil Gray, Planner III | City of Oakland | Bureau of Planning | 250 Frank H. Ogawa, Suite 2114
|Oakland, CA 94612 | Phone: (510)238-3878 | Fax: (510) 238-4730 | Email: ngray@oaklandnet.com |
Website: www.oaklandnet.com/planning
Neil,
In response to your phone call yesterday, please see the points below.
1. Average per story lot coverage, above base (level 3 and above) 34.53% - this includes the
wing buildings. Without the wings, the tower itself, level 8 and above, we are at 31.73%.
2. Average floor area, above base (level 3 and above) 13,904 sf. The tower itself is really
12,776 sf, and this is true for levels 8 through 24. Overall, the average floor area is greater
due to the two wing buildings at base, which increase the floor area at levels 3-7. The tower
itself, without the wings, is really under 13,000sf.
3. Average set back from the estuary The part of the building that is nearest to the estuary is
set back 192, per survey.
4. Bike Parking (as designed by AVRP, consulting architect)
a. Total 84 Spaces
b. Dimensions
i. 3 x 66 (rectangular footprint) 42 spaces
ii. 3 x 66 (Triangular footprint) 44 spaces
5. Regarding the 26 vertical separation between street and townhouses. We do comply with
all townhouses, except one, at the corner of East 12 th and 2nd Avenue. And After talking to
Mike Pyatok, we need to emphasize the fact that we have a 10 setback from the sidewalk
and planting will be protecting those windows. Additionally, there are not sleeping areas at
street level. Given the above, we believe that such a requirement should be lessened in this
one case.
6. Regarding the required 15 vertical separation between the commercial spaces at ground
floor and the residential units above we do provide a 29 floor to floor separation from
commercial space to the residential space above in the lobby and cafe. Along 12 th Street
and along the park we provide townhouses with 13 floor to floor separation, but we dont
see how this residential use should be affected by the 15 vertical separation required at
commercial spaces.
If there is anything else you might need, please let me know,
Thanks,
Dan
From:
To:
Cc:
Subject:
Date:
Hi Neil,
If you havent already done so, could you please follow up with Ed to make sure his design
comments from our meeting on 1/29/15 are communicated in writing to UrbanCore so that their
architects address his concerns?
Thanks,
_____________________________________________
Hui-Chang Li
Ed, I wanted to followup on our last meeting. Did you send me an email
with a summary of your design comments from that meeting? If so I
may have misplaced it and was discussing the refinements with Mike
Pyatok and Doug Austin. Please send any comments or I will convey
your thoughts further with Mike/Doug so we can have a revised elevation
drawing shortly fyr. Thanks, Michael
_______________________
Michael E. Johnson, President
UrbanCore Development, LLC
4096 Piedmont Avenue
Suite 313
Oakland, CA 94611
c: (415) 748-2300
e: mjohnson@urbancorellc.com
www.urbancorellc.com
From:
To:
Subject:
Date:
Hi Neil,
Did Notices go out to interested parties about the March 18th Planning Commission meeting?
Do you need any info from me?
Thanks,
_____________________________________________
Hui-Chang Li
Thanks,
_____________________________________________
Hui-Chang Li
The staff report become public the Friday prior to the meeting. Notice goes out 17 days prior to the
meeting I will need an interested parties list from you.
--Neil
Neil Gray, Planner III | City of Oakland | Bureau of Planning | 250 Frank H. Ogawa, Suite 2114
|Oakland, CA 94612 | Phone: (510)238-3878 | Fax: (510) 238-4730 | Email: ngray@oaklandnet.com |
Website: www.oaklandnet.com/planning
Neil,
When will the agenda and staff report be public for the March 18th Planning Commission meeting?
What sort of public noticing normally happens?
_____________________________________________
Hui-Chang Li
From:
To:
Subject:
Date:
Gerard, Jennie
Li, Hui Chang
FW: Michael finds this acceptable: Final Section 21 of DDA Term Sheet
Thursday, April 30, 2015 11:34:02 AM
Please reply to Abel and me re length of DDA period and how it is defined. Thnx.
Jennie Gerard, Chief of Staff
Oakland District 2 Councilmember Abel Guillen
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
It says during the DDA period.how long is that and how is that defined.
From: Gerard, Jennie
Sent: Thursday, April 30, 2015 11:30 AM
To: Guillen, Abel
Cc: Li, Hui Chang
Subject: Michael finds this acceptable: Final Section 21 of DDA Term Sheet
e: mjohnson@urbancorellc.com
www.urbancorellc.com
On Thu, Apr 30, 2015 at 11:17 AM, Gerard, Jennie <JGerard@oaklandnet.com> wrote:
Michael,
Here is language acceptable to Abel, which builds on your suggestion of leaving the funding
in escrow until the skate board park project is ready to move forward. Our language removes
references to matching funding since we dont have a bid now, and it makes clear what the
back-up plan for the funding is in the event that the skate board park project doesnt move
forward.
At the time of transfer of the property, developer will fund at least $150,000 into escrow
towards the construction of a skate board park on existing publicly-owned property in
Council District 2, such as at San Antonio Park. If the remaining funds necessary for the
development of the skate board park are not available at the time of transfer, the developer's
funds will remain in escrow until all the skate board park funding is available. Should the
skate board park project not go forward during the DDA period, the $150,000 will be
distributed to organizations that already are recipients of these community benefits, as
decided by the District 2 Councilmember.
Jennie Gerard, Chief of Staff
Oakland District 2 Councilmember Abel Guillen
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
All,
Regarding the timing of the skate park funding, are we OK with adding this
additional language that Michael is requesting to the community benefits list:
If the balance of the funds to complete the skate park have not been identified at
time of property transfer, developers funds will come at a later date when the funds
have been identified.
Thank you,
_____________________________________________
Hui-Chang Li Urban Economic Analyst
CITY OF OAKLAND, Economic & Workforce Development Department
Project Implementation Division
From:
To:
Subject:
Date:
All,
Below is the email Notice about the release of the Draft EIR for the LMSAP for public review, FYI. This
should be shared with your CEQA consultant.
To receive these announcements and updates about the LMSAP, e-mail your contact information to
lake_merritt_plan@oaklandnet.com
Or you could check the Citys webpage for the latest posts:
http://www2.oaklandnet.com/Government/o/PBN/OurServices/Plans/DOWD008198#NewsandAnnouncements
Note that the comment period end-date for the DEIR has now been extended to December 20, 2013 (from
the Dec 16th as mentioned in Notice below).
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Hui-Chang Li
Urban Economic Analyst
NOTICE OF AVAILABILITY/RELEASE OF A DRAFT ENVIRONMENTAL IMPACT REPORT (DEIR) FOR THE LAKE
MERRITT STATION AREA PLAN AND NOTICE OF PUBLIC HEARINGS ON DEIR
TO: All Interested Parties
SUBJECT: Notice of Availability/Release of Draft Environmental Impact Report for the Lake Merritt Station
Area Plan, and Notice of Public Hearing on the same.
REVIEW PERIOD: November 1, 2013 through December 16, 2013
CASE NO.: ZS11225, ER110017, GP13287, ZT13288, RZ13289 (CEQA State Clearinghouse Number
2012033012)
PROJECT SPONSOR: City of Oakland
PROJECT LOCATION: The Lake Merritt Station Area encompasses approximately 315 acres generally bound by
14th Street to the north, I-880 to the south, Broadway to the west, and 5th Avenue to the east. The Planning
Area includes the Lake Merritt BART Station, Oakland Chinatown business and residential districts, Laney
College and Peralta facilities, the Oakland Public Library, the Oakland Museum of California, the Alameda
County Courthouse and other County offices, the building currently occupied by the Association of Bay Area
Governments (ABAG) and the Metropolitan Transportation Commission (MTC), the Lake Merritt Channel, and
a portion of the East Lake district.
PROJECT DESCRIPTION:
With a planning horizon to 2035, the Plan builds on extensive community feedback to articulate a roadmap
for future development, continued revitalization and economic growth, and community enhancement in the
Station Area. The Plan seeks to achieve the vision and goals established by the community and key
stakeholders. This vision includes several statements, which are summarized here:
The distribution, location, and extent of the uses of land, including open space, within the area
covered by the plan;
The distribution, location, and extent and intensity of major components of public and private
transportation, sewage, water, drainage, solid waste disposal, energy, and other essential
facilities;
The Plan includes land use changes that will reduce the barriers to increased transit use from both the
immediate area and surrounding neighborhoods. The Plan seeks to create an activity core around a
rejuvenated transit station. Simultaneously, the Plan seeks to reinforce and integrate the cultural and
recreational resources that make this transit station unique. The Plan identifies ways in which streets, open
spaces, and other infrastructure in the area can be improved, and establishes regulations for development
projects that further the areas vitality and safety.
The Station Area Plan requires General Plan and Planning Code amendments (text and map changes) along
with Design Guidelines to achieve the Plans goals. For more information on the project, including draft
documents, please visit the project website at: http://www.business2oakland.com/lakemerrittsap.
ENVIRONMENTAL REVIEW: A Notice of Preparation of an EIR was issued by the City of Oaklands Department
of Planning and Building on March 1, 2012. A Draft Environmental Impact Report (DEIR) has now been
prepared for the project under the requirements of the California Environmental Quality Act (CEQA) pursuant
to Public Resources Code Section 21000 et. seq. The DEIR analyzes the potentially significant environmental
impacts in the following environmental categories: Land Use, Planning, Population and Housing;
Transportation and Traffic; Air Quality; Climate Change and Greenhouse Gases; Parks and Recreation; Public
Services; Utilities and Service Systems; Cultural and Historic Resources; Aesthetics; Biological Resources;
Geology and Soils; Hazards and Hazardous Materials; and Hydrology and Water Quality. The Draft EIR
identifies significant and unavoidable environmental impacts related to: Transportation and Circulation; Air
Quality; and Cultural Resources.
The City of Oaklands Department of Planning and Building is hereby releasing this DEIR, finding it to be
accurate and complete and ready for public review. Starting on Friday, November 1, 2013, copies of the DEIR
are available for review or distribution to interested parties at no charge at the Department of Planning and
Building, 250 Frank Ogawa Plaza, Suite 3315, Oakland, CA 94612, Monday through Friday, 8:30 a.m. to 4:30
p.m. Additional copies are available for review at the Oakland Public Library, Social Science and Documents,
125 14th Street, Oakland, CA 94612 and at the Oakland Asian Cultural Center, 388 9th Street #290, Oakland,
CA 94607. The Draft EIR may also be reviewed on the Citys Current Environmental Review Documents
webpage: http://www2.oaklandnet.com/Government/o/PBN/OurServices/Application/DOWD009157
The City has scheduled two public hearings on the DEIR:
Landmarks Preservation Advisory Board
Monday, November 18, 2013
6:00 p.m.
Oakland City Hall, Hearing Room 1
One Frank H. Ogawa Plaza
Oakland, CA 94612
City Planning Commission
Wednesday, November 20, 2013
6:00 p.m.
Oakland City Hall, Council Chambers
One Frank H. Ogawa Plaza
Oakland, CA 94612
Members of the public are welcome to attend these hearings and provide comments. Comments on the DEIR
should focus on whether the DEIR is sufficient in discussing possible impacts to the physical environmental,
ways in which potential adverse effects may be avoided or minimized through mitigation measures, and
alternatives to the Station Area Plan in light of the EIRs purpose to provide useful and accurate information
about such factors. Comments may be made at the public hearings described above or in writing. Please
address all written comments to Christina Ferracane, Strategic Planning, City of Oakland, Planning and
Building Department, 250 Frank H. Ogawa Plaza, Suite 3315, Oakland, CA 94612; 510-238-3903 (phone);
510-238-6538 (fax); or e-mailed to cferracane@oaklandnet.com. Comments on the DEIR must be received
no later than 4:00 p.m. on December 16, 2013.
After all comments have been received, a Final EIR will be prepared and the Planning Commission will
consider certification of the EIR and rendering a decision on the Station Area Plan at a public hearing, date
yet to be determined. All comments received will be considered by the City prior to finalizing the EIR and
taking any further action pertaining to this EIR. If you challenge the environmental document or other actions
pertaining to this Project in court, you may be limited to raising only those issues raised at the public hearings
described above or written in correspondence received by December 16, 2013. For further information
please contact Christina Ferracane at 510-238-3903 or cferracane@oaklandnet.com.
Rachel Flynn
Environmental Review Officer
From:
To:
Cc:
Subject:
Date:
Attachments:
Wald, Mark
Li, Hui Chang
Gray, Neil D.
FW: Oakland Guidelines for Environmental Consultants
Thursday, January 02, 2014 11:06:31 AM
City Guidelines for Environmental Contracts (1-5-12).pdf
Per your request. Also, the Planning Department is the custodian of the document, so they should
be able to furnish it to you, as well as other related materials.
Mark P. Wald
Senior Deputy City Attorney
Oakland City Attorney's Office
One Frank H. Ogawa Plaza, 6th Floor
Oakland, CA 94612
Tel:
(510) 238-3540
Fax:
(510) 238-6500
email: mpwald@oaklandcityattorney.org
From:
To:
Cc:
Subject:
Date:
Attachments:
Golde, James
Li, Hui Chang; Hayes, Gil
Kawamoto, Edwin
FW: Order No. 1117013451 - To Follow, Oakland, CA, 94601 - Wedge Parcel
Thursday, September 12, 2013 1:38:43 PM
PrelimPackage-1117013451.pdf
Since this is a brand new parcel please review for accuracy and forward any comments to Ed
Kawamoto.
Regards,
JamesGolde
From:
To:
Subject:
Date:
Attachments:
Golde, James
Li, Hui Chang
FW: Order No. 1117013451 - Parcel 1, Parcel Map 10111, Oakland, CA, 94601
Monday, December 30, 2013 11:31:12 AM
PrelimPackage-1117013451.pdf
See here is the preliminary report. Id like to speak to you about this site.
Regards,
JamesGolde
Good Morning James. Heres the updated Preliminary Report for the Wedge reflecting the recorded
Parcel Map.
Niels
Niels Povlsen
Sr. Account Executive
Old Republic Title Company
555 12th Street, Suite 2000
Oakland CA 94607
510-375-1521 cell
510-272-1121 office
510-208-5045 fax
npovlsen@ortc.com
From:
To:
Subject:
Date:
Attachments:
Kawamoto, Edwin
Golde, James; Li, Hui Chang
FW: Order No. 1117013451 - To Follow, Oakland, CA, 94601
Thursday, September 12, 2013 1:09:40 PM
PrelimPackage-1117013451.pdf
From:
To:
Subject:
Date:
Lane, Patrick
Li, Hui Chang; Jens Hillmer (JHHillmer@oaklandnet.com)
FW: OUSD RFQ
Thursday, July 10, 2014 2:57:34 PM
FYI
Patrick Lane [mailto:pslane@oaklandnet.com]
Development Manager, City Of Oakland
Economic & Workforce Development Department
Project Implementation Division
250 Frank H. Ogawa Plaza, Suite 5313
Oakland CA 94612
tel (510) 238-7362
fax (510) 238-3691
From: Kahn, Kelley
Sent: Thursday, July 10, 2014 2:11 PM
To: Hunter, Gregory; Lane, Patrick; Flynn, Rachel; Hillmer, J H
Subject: OUSD RFQ
From:
To:
Subject:
Date:
Sawicki, Mark
Lane, Patrick; Li, Hui Chang
FW: Please authorize at least 50% of property sale proceeds to maintain Measure DD improvements at Lake
Merritt
Thursday, April 30, 2015 5:27:08 PM
I urge the Council to approve that at least 50% of the proceeds from sale
of the 12th Street "remainder parcel" be devoted to a fund for maintenance
of Measure DD improvements at Lake Merritt.
Bond funds from the passage of Measure DD were approved to make the most significant
and broadly-recognized open space improvements around the city in decades. However,
Measure DD's capital funds cannot be used for maintenance. Care and protection of the
various improvements must be increased to match the greatly increased usage. Lake Merritt
and its adjacent parks need more service and maintenance than the current one-&-onehalf park employee positions can provide.
The "remainder parcel," created by Measure DD, resulted from realignment of the former
mini-freeway into attractive lanes, new pedestrian and bicycle paths, and landscaping
and visitor enhancements, now known as Lake Merritt Boulevard.
This recommendation deserves your support. Please take the long-term view of guardian of
these prominent Oakland assets. Please protect and safeguard the huge investment Oakland
voters made to successfully transform the Lake's environment for the 21st century.
Thank you!
Aileen Frankel
From:
To:
Subject:
Date:
Estes, Lesley
Miller, Scott; Li, Hui Chang
FW: PM 10111 - The "wedge" - Surplus property at 12th Street
Tuesday, July 23, 2013 10:52:10 AM
Can either of you help provide the planning approval for the wedge
parcel on E. 12 th street. Thank you
Lesley Estes
Watershed and Stormwater Management
Department of Engineering
City of Oakland | Public Works Agency | APWA Accredited Agency
250 Frank Ogawa Plaza Suite 4314 | Oakland, CA 94612
(510) 238-7431 | (510) 238-7227 Fax
lestes@oaklandnet.com
Report A Problem | Public Works Agency Call Center | (510) 615-5566
www.oaklandpw.com | pwacallcenter@oaklandnet.com | Mobile app: SeeClickFix
Lesley:
This parcel map will be completed and ready to finalize by Wed. However in looking
thru my records, I can not find a copy of any action by the Planning department. I
seem to recall that it was approved, but there is no typical memo in my files.
You should confirm this with Scott to avoid any conflicts. A copy of the this email is
sent to him to facilitate this.
g
GILBERT E. HAYES, PS
- City Surveyor
Confidentiality Notice: This electronic mail transmission may contain privileged information and/or confidential
information only for use by the intended recipients. Any usage, distribution, copying or disclosure by any other
person other than the intended recipient is strictly prohibited and may be subject to civil action and/or criminal
penalties. If you have received this e-mail transmission in error, please notify the sender by reply e-mail or by
From:
To:
Cc:
Subject:
Date:
Attachments:
Hui-Chang Li
_____________________________________________
Hui-Chang Li
Especial thanks and appreciation to Director Flynn and Planning Manager Patrick Lane for their
cooperative consideration.
Director Flynn's 30 October letter is addressed to Oakland Tenants Union, certainly one of the
concerned and requesting organizations. The initial requests, however, relating to the "remainder
parcel" were submitted 21 May & 21 July by the Measure DD Community Coalition, the City-ordained
organization charged with monitoring and oversight of DD projects.
Accordingly, it is requested that the same letter (with minor revisions as appropriate) be transmitted to
the DD Coalition for the Coalition's records, as followup and response to the initial request and report of
DD's appointed "Subcommittee on the Lake Merritt Boulevard Remainder Parcel"
The transmittal can be addressed to:
Subcommittee on Lake Merritt Boulevard Remainder Parcel
Measure DD Community Coalition
via:
William Threlfall, DD Coordinator wthrelfall@pacbell.net
with Copies to the Subcommittee:
Naomi Schiff,
Naomi@17th.com
Joel Peter,
joelpeter88@gmail.com
James E Vann jamesevann@aol.com
Many thanks,
James E Vann,
for the Meas DD Subcommittee
Hi James,
See attached the letter from Rachel Flynn in response to your e-mail below dated
September 10, 2014 and your letter dated April 16, 2014.
_____________________________________________
Hui-Chang Li Urban Economic Analyst
CITY OF OAKLAND, Economic & Workforce Development Department
Project Implementation Division
250 Frank H. Ogawa Plaza, Ste. 5313, Oakland CA 94612
Tel: 510.238.6239
Fax: 510.238.3691
From:
To:
Subject:
Date:
Attachments:
Hi Neil,
See attached comments about wind study from Measure DD folks for forwarding to LSA.
They make a good point that Citys existing palm trees on E 12th St might conflict with the studys
wind mitigation recommendation (SCA 12 and SCA 13) to install porous trees on the same block.
Thank you,
_____________________________________________
Hui-Chang Li
From:
To:
Subject:
Date:
Attachments:
Importance:
Todd, Amber
Lin, Margaretta; Payne, Catherine; Li, Hui Chang; Kaminski, Laura
FW: Rules Requests for CED 4/14
Tuesday, March 24, 2015 5:06:05 PM
Rules Request Brooklyn Basin Transportation Demand Management Plan CED 4.14.doc
Rules Request Impact Fee Nexus Study CED 4.14.doc
Rules Request Comprehensive Housing Action Plan CED 4.14.doc
Rules Request 12th Street Remainder Parcel CED 4.14.doc
High
Thank you,
Amber Todd
City Administrator Analyst
Office of the City Administrator
City of Oakland
(510) 238-6369
atodd@oakalndnet.com
From:
To:
Cc:
Subject:
Date:
Gerard, Jennie
Li, Hui Chang
Mendoza, Mandalyn; Kernighan, Pat
FW: Site for community meeting for E 12th St Remainder Parcel
Monday, October 07, 2013 6:06:05 PM
Hi Hui Chang,
Please see the following message from OUSD board president and District 2 representative
David Kakishiba. If there is a charge for the use of La Escuelita Education Center by the
UrbanCore-Integral developers, Ill let you know so that you can apprise them. In the
meantime, my colleague Mandalyn Mendoza will let Ronnie Turner know that the location is
set for October 24 meeting at 6:30 pm.
Jennie Gerard, Chief of Staff
Oakland City Council President Patricia Kernighan
District 2 Councilmember
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
From: David Kakishiba [mailto:junji@ebayc.org]
Sent: Monday, October 07, 2013 6:00 PM
To: Gerard, Jennie
Cc: david.kakishiba@ousd.k12.ca.us; Kernighan, Pat; Mendoza, Mandalyn; Li, Hui Chang
Subject: Re: Site for community meeting for E 12th St Remainder Parcel
I think so, but I will figure out on my end. If there is a problem, I will let you know, but I
doubt there will be.
On Oct 7, 2013, at 5:37 PM, Gerard, Jennie wrote:
Hi again,
The Office of Parks & Recreation checked the Joint Use Agreement only to find that La
Escuelita Education Center appears not to be on the list, unless it is known by another name.
If its not on the list, will there be a charge for the use of the facility? Please advise.
Thank you again for looking into this so quickly.
Jennie Gerard, Chief of Staff
Oakland City Council President Patricia Kernighan
District 2 Councilmember
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
From: David Kakishiba [mailto:junji@ebayc.org]
Sent: Monday, October 07, 2013 4:45 PM
We have reserved The Great Room at the La Escuelita Education Center for you on
Thursday, October 24th from 6:30pm to 8:30pm. I assume you will exercise our joint use
agreement for the use of the space.
Sent from my iPhone
On Oct 7, 2013, at 2:32 PM, "Gerard, Jennie" <JGerard@oaklandnet.com> wrote:
Hi David,
The times arent set but Im guessing that 6:30 pm to 8:30 pm would be ideal.
Please advise as to what times would work for OUSD. Thanks.
Jennie Gerard, Chief of Staff
Oakland City Council President Patricia Kernighan
District 2 Councilmember
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
From: David Kakishiba [mailto:junji@ebayc.org]
Sent: Monday, October 07, 2013 2:30 PM
To: Gerard, Jennie
Cc: david.kakishiba@ousd.k12.ca.us; Kernighan, Pat; Mendoza, Mandalyn
Subject: Re: Site for community meeting for E 12th St Remainder Parcel
Hello David,
I hope this finds you well.
As you may know, UrbanCore-Integral, LLC has an Exclusive Negotiating
Agreement on the remainder parcel located at E. 12th Street and 2nd Avenue,
which was created when 12th St was relocated and became Lake Merritt Blvd. A
condition of the ENA is that the developers hold a community meeting to present
the project, which is a residential high-rise over ground floor neighborhoodserving retail, and obtain community feedback. Pats office is assisting the
developer in securing a meeting space that is easily accessible to the surrounding
E.12th Street neighbors and merchants. We believe an ideal location would be a
one that is close to the parcel site. Two OUSD locations stand out as great
From:
To:
Cc:
Subject:
Date:
Mendoza, Mandalyn
rtdevelops@comcast.net
Li, Hui Chang; Gerard, Jennie
FW: Site for community meeting for E 12th St Remainder Parcel
Tuesday, October 08, 2013 4:58:42 PM
Hello Ronnie,
Please see below email for confirmation from David Kakishiba that The Great Room at La
Escuelita is reserved for October 28th from 6:30-8:30pm.
For outreach, the listing below is revised from that which was provided to Michael Johnson
and Merlin Edwards in August, 2013. Added are contacts for the Coalition of Advocates for
Lake Merritt, Americas Best Value Inn and the Oakland Unified School District. Per our
discussion, getting the word out to these various groups (and any others on your list) within
the next week or so is ideal.
Council President Kernighans E-News: We will be sending out the October edition before
the 10/28 meeting so can include an announcement there then. Please send you
announcement to jgerard@oaklandnet.com by Monday, October 14 at the latest.
Lake Neighbors - Sasha Esposito San Roman (sasha@sanroman-m.com); e-mail list of a
couple hundred names of residents of the East Lake area
Lake Merritt Business Association Steve Ma (stevemawoodys@gmail.com) is chair of this
group of businesses and apartment building representatives.
East Lake Merchants Watch Thu Nguyet Pham (pham1@yahoo.com), the leader of a group
of 30+ businesses in the Clinton Park area
Cleveland Heights Neighbors yahoo site Jim Ratliff (jim@virtualperfection.com),
administrator of the site, which reaches a couple hundred residents between Lakeshore Ave
and Park Blvd, E 18th St and MacArthur Blvd
Bella Vista/17Y NCPC yahoo site - 17Y_NCPC@yahoogroups.com; e-mail list of a couple
hundred residents living between Park Blvd & 14th Ave, E 21st St and MacArthur Blvd
primarily.
1200 Lakeshore Amy Marshall (amy@1200lakeshore.com) is the building manager.
Americas Best Value Inn - Paul Schriner, 510. 444-4949 (motels main line)
Oakland Heritage Alliance Naomi Schiff (Naomi@17th.com) can distribute the
announcement to OHA membership
Coalition of Advocates for Lake Merritt James Vann (jamesevann@aol.com) is a leader of
the group whose proposal for what has become the Lake Merritt Blvd created the remainder
parcel.
Measure DD Community Coalition info@waterfrontaction.org; e-mail list of many dozens
of people watching very carefully the improvements in and around Lake Merritt, particularly
Thanks.
On Tue, Oct 8, 2013 at 3:37 PM, David Kakishiba <junji@ebayc.org> wrote:
Jennie/Mandalyn, The Great Room is now reserved for Monday, October 28, 2013, from
6:30pm to 8:30pm.
Edgar, the contact information for the actual meeting organizer is as follows:
Ronnie Turner
Cell phone: (510) 395-2766
Email: rtdevelops@comcast.net
*********
David Kakishiba
President, Board of Education
Oakland Unified School District
1000 Broadway, 3rd Floor
Oakland, California 94612
david.kakishiba@ousd.k12.ca.us
510-435-8582
From:
To:
Subject:
Date:
Attachments:
Hi Christine,
(Im still working on your earlier info requestsbut just to respond to your latest questions)
The sale of 12th Street Remainder parcel has been a topic of closed session meetings 4 times
December 4, 2012
April 16, 2013
February 17, 2015
March 3, 2015
The agenda/titles are published/public and can be found online here:
http://www2.oaklandnet.com/Government/o/CityCouncil/s/councilmeetings/ClosedSessionAgendas/index.htm
(and I have attached the relevant agendas to this email for your easy reference.)
However, the content of the discussions on Citys real estate negotiations that are held at closed session are
not public information.
The City Council authorized the ENA with UrbanCore at their open meeting on July 2013.
Heres the staff report online:
https://oakland.legistar.com/LegislationDetail.aspx?ID=1441186&GUID=8BADE21D-E83E-4381-BAF0BA64C6F8CDAD&Options=ID|Text|&Search=ena
Hope this answers your questions.
_____________________________________________
Hui-Chang Li
Was this in a closed session? Is there a report or any document from that decision made in that
meeting? Do you know the date of the meeting?
On Mon, Mar 16, 2015 at 2:01 PM, Li, Hui Chang <HLi@oaklandnet.com> wrote:
The decision to go with UrbanCore instead of Wood Partners was a decision of City Council.
_____________________________________________
Hui-Chang Li
Tel: 510.238.6239
Fax: 510.238.3691
Hi Hui Chang,
Much of my notes from that meeting were erased when my computer crashed last week. If you don't
mind, can you please remind me what was the reason that the city selected the UrbanCore RFP over
the Wood Partners RFP? Who made this decision/has the authority to decide which RFP is
selected?
Thank you, Christine
510 254 1879
On Mon, Mar 16, 2015 at 11:32 AM, Li, Hui Chang <HLi@oaklandnet.com> wrote:
Hi Christine,
For your Public Records Request, I am working with Planning staff to assemble the documents, but
you will need to follow the Citys procedure in making a public records request. (While it isnt
always necessary to do a formal request, in this case it makes sense since your request is so
extensive.)
To do this, please contact Amber Todd in the Citys Administrators office at (510) 238-6369 or
atodd@oaklandnet.com.
I am working on getting you answers to your other questions. (See below for notes on who will be
providing responses).
Thank you,
Hui-Chang
From: Christine Cherdboonmuang [mailto:christine.apocc@gmail.com]
Sent: Friday, March 13, 2015 11:45 AM
To: Ranelletti, Darin; Li, Hui Chang; Gray, Neil D.; Lane, Patrick
Cc: Amy Vanderwarker
Subject: Thank you + documents requested + follow-up questions from EUJ
Documents request:
1) Staff packet for Planning Commissioners: if it will not be posted publicly by today (still not
posted as of 11:40am), then can you please send us the entire staff packet that Planning
Commissioners will review?
Planning
Any of the following that are not already included in the staff packet:
2) the original RFP from UrbanCore submitted in Feb 2013
Hui-Chang
3) the RFP proposal submitted by Wood Partners in February 2013
Hui-Chang
4) the ENA and any documents that marked the completion/outcomes of the ENA period
Hui-Chang
5) the supplemental EIR by LSA consultants
Neil
6) Any documentation of the community meetings that were helde.g. meeting minutes and agendas,
public notice flyers, summary of community feedback and findings, and UrbanCores responses to this
feedback
Hui-Chang
7) the document cited at the end of Patrick Lanes 11/17/14 letter to Measure DD Coalition, citing an
attachment that provides the latest overview of the proposed projectplease send to us what you
sent to them as an attachment
Hui-Chang
8) The text of your explanation that you provided to the city to justify the exemption of this parcel
from the public lands for lease not for sale policy passed in Dec 2014.
Hui-Chang
9) A list all RFPs that the city sent out between July 2011-December 2014, including list of invited
firms for each RFP.
Hui-Chang & Patrick
10) the Healthy Development Tracklist, or a summary of findings to date if there is something like that
already printed (Darin)
Note: The City is partnering with the Alameda County Public Health Department and East Oakland Building
Healthy Communities to develop Healthy Development Guidelines for Oakland but the work is still ongoing;
the guidelines have not been created yet.
Questions:
1) In the Lake Merritt Station Area Plan zoning document, the 12th St. Parcel is in an area zoned for
85 feet. Will they be granted an exemption to exceed this height? Will this exemption be up for
approval at the PC meeting? What is the process needed to obtain this exemption?
Planning to answer
2) You named a few listserves that notice went out to for the 2 community meetings.
Written notice was given for one meeting and not the other. For which meeting was written notice
given, and to whom was notice distributed?
HC to answer
Is there a list of addresses or geographic range named to which notice was distributed? Was it
distributed to owners or tenants or both? Neil to answer in response to PRAC and Planning
Commission. HC will respond for Developers meetings.
3) What are the legal guidelines around the community engagement process? Property owners must
be notified? Tenants? 500 ft radius? When is this process required to begin, what aspects of the
development must residents inform, and how is the city and the developer held accountable legally to
responding to feedback from these sessions?
HC to respond for ENA process
Neil, to respond to Planning process
4) What are the procedural rules behind an RFP and an ENA--laws that allow the city to begin an
RFP and an ENA--what requirements must be met and what are the restrictions? How many firms
must be invited to the RFP process and what are the criteria for who is invitedwho ultimately
decides who is invited?
HC to answer
5) What financing does the city require of the developer and when?
HC to answer
6) When does the developer actually purchase the property, before or after construction?
HC to answer
From:
To:
Subject:
Date:
Attachments:
Just FYI, I just went on Assessors parcel viewer website and found that although there is no parcel
info, there is now APN assigned to the 12th St Parcel: 19-27-14.
I dont know why the site address is listed as Bellevue Ave.
I am waiting for this information to be updated in Win2Data but I dont know how long that will
take.
_____________________________________________
Hui-Chang Li
From:
To:
Subject:
Date:
Raymond,
Since Gil is out, can you give me and update on the status of the parcel map for the 12 th St
Remainder parcel?
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Hui-Chang Li
Urban Economic Analyst
Gil,
I am checking in to find out the status of the Parcel map for 12 th Street Remainder Parcel. I heard it
should be done by now. Please let me know as I am working with Patrick on the ENA for the site.
Thank you,
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Hui-Chang Li
Urban Economic Analyst
Hui-Chang Li
Urban Economic Analyst
I talked with gil and he is in the process of creating the new parcel and estimates he will
complete the survey by the end of the month.
OK
Questions
Does the LM area specific plan have language re: use of adjacent open space?
From my reading, I dont think so but will confirm Christina in Planning
Thanks
Lesley
What kind of commercial space is being discussed?
Caf/art gallery. The SF of ground floor commercial space will be a very small proportion of the
entire project.
From:
To:
Subject:
Date:
Attachments:
Hi Neil,
See the comments from members of the Measure DD committee.
Can you confirm if these concerns of theirs will be adequately addressed in LSAs environmental
studies or not?
_____________________________________________
Hui-Chang Li
(a)
(b)
(c)
(d)
Importance: Tidal marsh plants require full sun. The Coalition desires to be informed if the new
building's height will cast more than minimum of shadows on the Tidal Marsh. Extended lengthy
shadows would affect the Marsh's restoration effort. Success of the Tidal Marsh is a requirement of
the City's permits with the U.S. Army Corps and the State Fish & Wildlife Agency.
Naomi Schiff
Joel Peter
James E Vann
Subcommittee for Coordination on Lake Merritt Boulevard Tower Apartments Project
From:
To:
Subject:
Date:
Attachments:
Hi Neil,
According to the schedule, an Admin Draft CE Memo-1 (w/o LOS analysis) is due this
Wednesday. Have you heard if that is still on schedule? Will the delay in the public hearing for the
final Lake Merritt Station Area Plan affect this at all?
I would like to go over the CEQA schedule with you
_____________________________________________
Hui-Chang Li
A delay in final adoption hearings of the LMSAP Final EIR at City Council will affect the
schedule of the CEQA study that is underway for the Lake Merritt Tower project.
See attached the schedule for CEQA work prepared by consultant LSA.
Note that a final Categorical Exception Memo is due by November 6th but this assumes that the
LMSAP Final EIR is adopted prior to this date.
_____________________________________________
Hui-Chang Li
From:
To:
Subject:
Date:
Attachments:
Lane, Patrick
Li, Hui Chang
FW: Updated DDA Term Sheet
Friday, April 24, 2015 11:30:18 AM
UrbanCore DDA Term Sheet Amendment 4-24- AG Updates.docx
12th st parcel-comm benefits 4-24.xlsx
FYI
Patrick Lane [mailto:pslane@oaklandnet.com]
Development Manager, City Of Oakland
Economic & Workforce Development Department
Project Implementation Division
250 Frank H. Ogawa Plaza, Suite 5313
Oakland CA 94612
tel (510) 238-7362
fax (510) 238-3691
From: Guillen, Abel [mailto:AGuillen@oaklandnet.com]
Sent: Friday, April 24, 2015 11:25 AM
To: mjohnson@urbancorellc.com
Cc: Gerard, Jennie; Lane, Patrick
Subject: Updated DDA Term Sheet
Hi Michael,
I appreciate your patience as we move through this process. I understand from staff that this needs
to be completed by Wednesday for publication on Thursday. In any case, it would be great to get
this done by Monday, April 27 th if possible. The new Terms Sheet is updated to reflect
conversations Ive had with neighborhood groups and leaders that I think will move us closer to what
the CED Committee directed at the last meeting.
Look forward to hearing from you.
Abel
From:
To:
Cc:
Subject:
Date:
Lane, Patrick
Li, Hui Chang
Hillmer, J H
Fwd: alternate dog play sites
Wednesday, May 08, 2013 1:16:07 AM
FYI
Sent from my iPhone
Patrick Lane
Begin forwarded message:
From: "Miller, Scott" <SMiller@oaklandnet.com>
Date: May 7, 2013, 8:33:08 PM GMT+02:00
To: "Manasse, Edward" <EManasse@oaklandnet.com>, "Lane, Patrick"
<PSLane@oaklandnet.com>
Subject: FW: Re: alternate dog play sites
Ed, this is what I mentioned in our meeting with Rachel yesterday --- it appears that a
piece near the channel and new residential site has made its way to the potential dog
park list. This may not be such a marketable neighbor to a new high-rise project. Any
thoughts, Ed or Patrick?
Scott
Audree,
I had our 12 th street PM look a bit more closely at the site next to
the Lake Merritt channel and the school administration building (the
triangle). While an acre of the property is being sold to the
developer for a high rise, there is about 20,000 square feet left over
of an oddly shaped area that could be squeezed between the future
building and the water quality detention area. Ali has a site drawing
and our PM did a quick measurement for square feet estimate.
Lesley Estes
Watershed and Stormwater Management
Department of Engineering
I Ali,
You are the best. Lets just keep this under wraps for now This is great thank you.
Can we meet at the Estuary? I am also trying to find out who owns the lot across from
Astro Park where the Gas station was what is that size? We have to find something
other than where we are. Anywhere in the lake is going to be a fight. Ugh any
thoughts?
Audree
From: Schwarz, Alison
Sent: Monday, April 08, 2013 1:05 PM
To: Jones-Taylor, Audree V.
Cc: Soo Hoo, Lily; Estes, Lesley
Subject: Re: alternate dog play sites
Hi Audree,
As discussed here are some rough sq. ft. areas for the following potential alternate dog
play areas:
<!--[if !supportLists]-->1) <!--[endif]-->Lakeside Park: along Grand Ave. between
Lenox Ave. and Perkins - can easily get 25,000 and up to 35,000 sq. ft.
<!--[if !supportLists]-->2) <!--[endif]-->Next to 18 th St. Tennis Courts: 15,000
22,000 sq. ft.
<!--[if !supportLists]-->3) <!--[endif]-->Grand Ave. Bellevue Dr. exit: easily get
25,000 35,000 sq. ft.
<!--[if !supportLists]-->4) <!--[endif]-->Estuary Park: the main grass area is
67,000 sq. ft. the smaller area near the water is at least 15, 500 sq. ft and from
the aerial I couldnt tell if the dirt area next to it was available, but is so it
would add another 2000 -5000 sq. ft.
From:
To:
Subject:
Date:
Attachments:
Faye Paulson
Li, Hui Chang; Michael Johnson
Fwd: Certificate of Insurance for The City of Oakland
Wednesday, October 09, 2013 10:44:12 PM
3493_001.pdf
Hi Hui Chang,
Attached is our proof of insurance.
Faye Paulson | Senior Project Manager
UrbanCore-Integral, LLC
457 10th Street | San Francisco, CA 94103
Direct Line: 415.553.4028 | Cell: 510.862.5629 | Fax: 415.553.4021
fpaulson@urbancorellc.com | www.urbancorellc.com
---------- Forwarded message ---------From: Brienne Myers <Brienne@imwis.com>
Date: Wed, Oct 9, 2013 at 4:07 PM
Subject: Certificate of Insurance for The City of Oakland
To: "fpaulson@urbancorellc.com" <fpaulson@urbancorellc.com>
Cc: Amie Villao <avillao@imwis.com>, Myra Hogue <myra@imwis.com>
Hello Faye,
On behalf of Myra, please find attached copy of certificate of insurance issued for
The City of Oakland and required endorsements.
If you have further questions or concerns, please contact Amie Villao 986-3999.
Thank you.
Brienne Myers
Executive Assistant
Merriwether and Williams Insurance Services, Inc.
550 Montgomery Street, Suite 550
San Francisco, CA 94111
415.986.3999 (Office)
415.986.4421 (Fax)
CA Lic: 0C01378
This email message and attachment are being sent solely for the use by the intended recipient(s) and contains
confidential information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the
intended recipient, please contact the sender by phone or reply by email and destroy all copies of the original
message.
From:
To:
Subject:
Date:
Attachments:
Michael Johnson
Li, Hui Chang
Fwd: FW: Lake Merritt Tower Environmental Review Schedule
Thursday, September 04, 2014 8:49:02 PM
Lake Merritt Schedule 07.23.14.pdf
See attached. Just wanted to make sure you saw this schedule sent to Neil Gray.
Thanks
__________________________
Michael E. Johnson
President & CEO
8UEDQ&RUH'HYHORSPHQW
)LOOPRUH/LYH
Entertainment Group, LLC
457 10th Street
San Francisco, CA 94103
(415) 748-2300
mjohnson@urbancorellc.com
www.urbancorellc.com
---------- Forwarded message ---------From: "Theresa Wallace" <Theresa.Wallace@lsa-assoc.com>
Date: Aug 5, 2014 10:26 AM
Subject: FW: Lake Merritt Tower Environmental Review Schedule
To: <mjohnson@urbancorellc.com>
Cc: <Shannon.Allen@lsa-assoc.com>, <dhogman@pyatok.com>,
<bflewellen@urbancorellc.com>, "Ronnie Turner" <rtdevelops@comcast.net>
Hi Michael
Our current schedule is attached. I am waiting on a couple of items from the City
regarding cumulative assumptions. I will check in on those again and hopefully get it
resolved today so that the shadow and wind modeling can continue progressing.
- Theresa
All
Please see attached the preliminary schedule for environmental review. This
schedule assumes that the CE could be finalized shortly after the Lake Merritt Station
Area Plan FEIR is certified. Our technical studies are underway and we hope to
receive some additional clarification from the applicant team on total square
footages and unit counts by the end of this week.
From:
To:
Cc:
Subject:
Date:
Attachments:
Michael Johnson
Lane, Patrick; Li, Hui Chang
Flynn, Rachel; Zack Wasserman; Kirsty Greer; Don MacKenzie; Ronnie Turner; Merlin Edwards; Brad Flewellen;
Moss, Tomiquia
Fwd: LMT - P&P Bond Letter
Friday, March 20, 2015 11:51:39 AM
20150320095633253.pdf
Patrick, Hui Chang: please see attached. Please forward it to the City Attorney for
review. We would also like to have a short call on Monday to discuss a couple items.
Let us know a good time. Thx, Michael
_____________________________
Michael E.Johnson, President
UrbanCore Development, LLC
4096 Piedmont Avenue
Suite 313
Oakland, CA 94611
c: (415) 748-2300 mjohnson@urbancorellc.com
www.urbancorellc.com
---------- Forwarded message ---------From: "Kirsty Greer" <kgreer@udr.com>
Date: Mar 20, 2015 8:57 AM
Subject: LMT - P&P Bond Letter
To: "Michael Johnson" <mjohnson@urbancorellc.com>
Cc:
THANKS, KIRSTY
(o) 720.348.7605
(m) 347.404.2082
From:
To:
Subject:
Date:
FYI
Sent from my iPhone
Begin forwarded message:
From: "Gerard, Jennie" <JGerard@oaklandnet.com>
Date: February 17, 2015 at 1:46:20 PM PST
To: "Lane, Patrick" <PLane@oaklandnet.com>, "Li, Hui Chang" <HLi@oaklandnet.com>
Subject: Petition in opposition to Lake Merritt Blvd Towers project
Patrick and Hui Chang,
You may already be aware of mounting community opposition to the proposed project on the
remainder parcel. This link below is the latest Ive seen, which Im forwarding to you for your
information.
Jennie Gerard, Chief of Staff
Oakland District 2 Councilmember Abel Guillen
510.238.7023 (direct)
510.238.7002 (District Office)
In the office Monday - Thursday
https://www.change.org/p/oakland-city-council-save-the-e-12th-st-parcel-for-the-people-3?
recruiter=3523628&utm_source=share_petition&utm_medium=email&utm_campaign=share_email_responsive
From:
To:
Subject:
Date:
Attachments:
Michael Johnson
Li, Hui Chang
Fwd: RE: Lake Merritt ENA Amendment
Tuesday, July 29, 2014 12:24:59 PM
Lake ENA Amendment.pdf
Thank you.
______________________________________________________
Judi J. Jones | Project Coordinator
Integral Development LLC
Direct: 404.224.1886
3 Please think about the environment before you print this email.
Thanks Vicki. I am sure we will track it down on Tuesday. I'll let you know. MJ
__________________________
Michael E. Johnson
President & CEO
UrbanCore Development
457 10th Street
San Francisco, CA 94103
(415) 748-2300
mjohnson@urbancorellc.com
www.urbancorellc.com
On Jul 28, 2014 8:19 PM, "Vicki Lundy Wilbon" <VLWilbon@integral-online.com>
wrote:
Hello Michael-
The package was sent via FEDEX for delivery this morning. My office tracked the package and the
note read that there was no answer at the office when delivery was attempted this morning. Did
FEDEX leave a notice of attempted delivery at your office?
Nonetheless, by copy of this email, I am requested that Judi send you the tracking info and a PDF of
the signed document.
Best,
Vicki
Vicki, just checking in on status of you signing the document. Please send me a
signed PDF and originals asap overnight if they have not gone out. Thanks, MJ
__________________________
Michael E. Johnson
President & CEO
UrbanCore Development
457 10th Street
San Francisco, CA 94103
(415) 748-2300
mjohnson@urbancorellc.com
www.urbancorellc.com
From:
To:
Subject:
Date:
Attachments:
Ronnie
Li, Hui Chang
Fwd: RE: Meeting Notice in Chinese
Tuesday, January 06, 2015 5:25:29 PM
Community-Meeting-Flyer_Chinese_150120.pdf
Hi Hui-Chang,
See the attached flyer in Chinese!
Ronnie
Sent from my T-Mobile 4G LTE Device
Hi Jennifer, see the attached version text version of the flyer in Chinese.
Ronnie
Hi Ronnie,
As we discussed, attached is the Meeting Notice translated into Chinese. Please include this Chinese flyer in your
circulation.
_____________________________________________
Hui-Chang Li
Fax: 510.238.3691
Hui Chang,
Without the source file, this is the best I can do. Please see attached.
May Tam
X2368
Human Resources . Equal Access
May Tam
X2368
Human Resources . Equal Access
I will see what we can do, and try to get this back to you by the end of today.
Please keep in mind for future projects allow 2 weeks turn around time.
We are in the middle of a big translation project for HSD.
May Tam
X2368
Human Resources . Equal Access
Hi May,
You presented at the Economic & Workforce Development staff meeting last month.
I need a pretty quick turnaround as we are looking to send notices out today.
Thank you!
_____________________________________________
Hui-Chang Li
Fax: 510.238.3691
From:
To:
Subject:
Date:
Attachments:
Schlenk, Sarah
Li, Hui Chang
Fwd: supplemental report for 12th St DDA -May 5 City Council
Thursday, April 30, 2015 11:14:08 AM
12th Remainder Parcel Project DDA - staff report- May 5 Supplemental 0427_sts.doc
ATT00001.htm
Ordinance- DDA 12th Remainder UrbanCore -May 5 supplemental ordinance 0427_sts.doc
ATT00002.htm
image001.jpg
ATT00003.htm
the correct funding blocks for the Affordable Housing Trust Fund
But my legal question for you is: please confirm there is nothing else we
need to do with the Ordinance, esp the title, in light of the fact that
staffs alternative and preferred recommendation is to NOT appropriate
funds from this one-time transaction for ongoing maintenance of Measure
DD improvements.
i.e., if Council votes to go with staffs alternative recommendation, will
another Ordinance have to be produced for the record or will they just
strike from this Ordinance those parts that are not relevant? I am not
familiar with how this normally gets handled
Separately, I will send an email about just the community benefits
_____________________________________________
Hui-Chang Li Urban Economic Analyst
CITY OF OAKLAND, Economic & Workforce Development Department
Project Implementation Division
250 Frank H. Ogawa Plaza, Ste. 5313, Oakland CA 94612
Tel: 510.238.6239
Fax: 510.238.3691
Thanks.
Kiran Bawa
City Administrators Office
Budget Director
510.238.3671
From: Schlenk, Sarah
Sent: Tuesday, April 14, 2015 6:32 PM
To: Bawa, Kiran; Solitei, Osborn
Subject: FW: supplemental report for 12th St DDA - April 21 City Council
Importance: High
Hello,
See below and attached. They are looking for a fund to use for the Lake
Merritt maintenance 25% that Council requested today. Patrick thought
the CAO/Finance should indicate if this action puts a hole in the
planned/proposed budget. He thought that is what the Committee was
looking to the Administration for feedback.
If the LM maintenance does go through, what fund should it be
transferred to? There seemed to be a desire for it to be non-1010. I
mentioned the LLAD is where most park maintenance resides now or
maybe a misc grant fund?
Please advise.
Thanks,
Sarah
From: Li, Hui Chang
Sent: Tuesday, April 14, 2015 5:10 PM
To: Schlenk, Sarah
Cc: Todd, Amber; Lane, Patrick
Subject: supplemental report for 12th St DDA - April 21 City Council
Hi Sarah,
CED Committee recommended an amount of 25% of net land sale
proceeds from sale of 12th St Remainder go toward a fund dedicated for
the maintenance of Measure DD improvements.
(See attached letter from Measure DD Coalition, which actually asked for
50% of the land sale proceeds go toward this purpose.)
I need to reflect this change (and others introduced today at CED) in the
Supplemental Report, due to be published this Thursday for the April 21st
City Council Meeting.
Please review attached report, especially highlighted sections, and advise
on the appropriate Oracle funding block and language.
Thank you,
_____________________________________________
From:
To:
Subject:
Date:
Karen Kunze
Gray, Neil D.; Li, Hui Chang; Merkamp, Robert
Fwd: Support Oakland: Help Oakland"s Economic Growth
Friday, March 27, 2015 7:41:53 AM
WE
SUPPORT!
The Residential Project
Help Develop
Oakland!
Support Increased Housing Supply and
the Growth of Oakland's Economy
Hello,
I am emailing for your support. Our development
team is in the process of petitioning the Oakland City
Planning Commission to approve entitlements for a
much needed residential development in Oakland.
Residences
Michael E Johnson
UrbanCore Development, LLC - President
From:
To:
Subject:
Date:
Attachments:
Monetta, John
Li, Hui Chang
Guaranty
Tuesday, January 27, 2015 1:55:00 PM
Draft CWS DDA - June 16, 2014.docx
Completion Guaranty.docx
Apple:
The Completion Guaranty is Attachment 7 to the Draft DDA (see attached). I pulled it out as a
separate document for you.
John Monetta
Project Manager I
City of Oakland
250 Frank Ogawa Plaza, 5 th Floor
Oakland, CA 94612
510.238.7125 (office)
510.377.6388 (cell)
From:
To:
Cc:
Subject:
Date:
Hi Neil,
You had mentioned a document that delineates the scope of CEQA work consultants
are expected in include.
I assume this is the same as the Citys Guidelines for Environmental Consultant
Contracts Concerning Private Development Projects (dated 1/5/12).
Could you send to Faye (copied to this email) or let us know how to get a copy?
Thanks,
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Hui-Chang Li
Urban Economic Analyst