---------- Forwarded message ---------From: Anugya Jain <anugya.jain@ericsson.

com>
Date: Thu, 14 Aug 2014 10:59:40 +0530
Subject: Fwd: Fwd: Fwd: RE: 3G New Sites / Sectors Audit
To: sanjayitproforu@gmail.com

Hi Sir,
As discussed please find the list of the check points for Upcoming new SCFT sites
with below details and required inputs.
* License Check-by using the "Invh" command need to check all the
necessary license are available with feature activated script are
with enclosed report.
* Nbr List audit need to be done post site on aired,ensure up to
3rd-Tire no missing Nbr captured based on MIPT & Handover matrices.
* Golden Radio Parameter audit for Node-b & RNC level,Golden parameter
with recommended values enclosed with report.
* As per New PSC plan*(plan already shared with the respective
team)*SCFT site must be have the updated PSC's, and up to the 3rd
Tire wont be any PSC Conflict.
* LAC/RAC/URA Audit as per Plan provided by the planing team must be
same,during the SCFT LAC/RAC/URA must be same based on neighboring
sites & Geographical location.
* Major KPI(RRC CS/PS,RAB Speech/HSDPA,DCR,IRAT CS/PS & Traffic & Data
Download must be >0) must be under threshold KPI tracker formate
enclosed herewith KPI threshold values.
* RSSI of the Cell must be>-90 (dBm).
Reporting format;
Site MO
Type of Site RNC Status
SCFT
Status
Nbr Audit
Radio Parameter Audit
Audit KPI
RSSI
RRC RAB DCR IRAT Traffic/Download
7737 UDLFP3B
New Site
DLGGN01
SCFT
ok
discrepancies found
ok
ok
ok
RNC Parameters;
*Parameter
qhyst2
nInSyncInd
aseDlAdm
aseUlAdm
pwrAdm

Name* *Recommonded Value*


2
3
400
350
80

Completion Date
License
PSC Audit
LAC/RAC/URA
Completed
ok
high

10-Jul-14
ok
ok

active
?

sf8Adm
0
sf4AdmUl
0
usedFreqThresh2dEcno -15
usedFreqThresh2dRscp -108
sRatSearch 2
numHsPdschCodes
5
numHsScchCodes 2
codeThresholdPdu656
1
nOutSyncInd
10
pwrOffset
15
sf8AdmUl
8
increasedRachCoverageEnabled
1
eulServingCellUsersAdm According to license capacity
hsdpaUsersAdm
According to license capacity
primarycpichpower
maximumtransmissionpower
According to license capacity
dlcodeadm 85
RBS Parameter
*Parameter Name* *Recommoneded Value*
antennaSupervisionThreshold 50
maxNumHsPdschCodes 14
maxHsRate 400
cqiAdjustmentOn TRUE
featureState16Qam
1
featureState64Qam
1
featureStateHsdpaFlexibleScheduler 1
featureStateHsdpaDynamicCodeAllocation
1
queueSelectAlgorithm
1
eulMaxShoRate
6016
eDchCapability
1
FeatureStateEnhancedLayer2
1
featureStateEul2msTti
1
featureStateDlPowerControlEul 1
featureStateGrake 1
eulMaxOwnUuLoad
80
eulMaxAllowedSchRate 5760
eulNonServHwRate
1024
invh License Check
get . Maxtot Power Setting
altk Alarms check
get . numhscoderesources
Codes Check
lh ru fui get vswr VSWR Check
rbs
Pwd
Major Radio KPI's;

*
*
*
*
*1.6* *400 m-600 m*
*Max 10% OFFSET WRT Neigh* *Max 10% OFFSET
WRT
Neigh*
*Max 10% OFFSET WRT Neigh* *Max 10% OFFSET WRT Neigh* *Max
10%
OFFSET WRT Neigh*
*Max 10% OFFSET WRT Neigh* *>=98.5%* *>=98.5%*
*>=97.5%* *>=97.5%* *>=97.5%* *<=1.5%* *<=1.5%* *>=98%*
*>25*
*>=94%*
*>100*
*>=94%*
*<-80*
MO
Date SHO OVERHEAD
PROP DELAY CS RRC ATT W.R.T NBRS PS RRC ATT
W.R.T NBRS RAB ATT W.R.T NBRS
CS TRAFFIC( ERLANGS)
DATA DOWNLOAD
DATA UPLOAD
CS RRC SUCCESS RATE
PS RRC SUCCESS RATE
RAB
SUCCESS RATE
SPEECH
RAB SUCCESS RATE HSDPA
RAB SUCCESS RATE EUL DCR VOICE
DCR
HSDPA
SHO SUCCESS RATE
IRAT ATT CS(BBH) IRAT SUCCESS RATE CS
IRAT
ATT PS
IRAT SUCCESS RATE PS
RSSI
MLCMRGX 3/19/2014

26
262 1116 2.04
77.56
1.18 99.73 8
62.5

506.02
0

*36.81*

100

97.71 100

81.33

#DIV/0

Regards..
Aditya Pratap Singh

-------- Original Message -------Subject:


RE: 3G New Sites / Sectors Audit
Date: Fri, 1 Aug 2014 10:50:23 +0530
From: Fasel Mustafa <fasel.mustafa@ericsson.com>
To:
Sandeep Bansal <sandeep.bansal@ericsson.com>, Aditya Pratap Singh
<aditya.pratap.singh@ericsson.com>, Anugya Jain <anugya.jain@ericsson.com>
CC:
Sanjay Chawla <sanjay.chawla@ericsson.com>, Maninder Singh S
<maninder.s.singh@ericsson.com>, Mukesh Somani
<mukesh.somani@ericsson.com>, Rupesh Shrivastav
<rupesh.shrivastav@ericsson.com>, Praveen Kumar Tiwari P
<praveen.kumar.p.tiwari@ericsson.com>, Prasoon Tiwari
<prasoon.tiwari@ericsson.com>, Sukisha Kanwar
<sukisha.kanwar@ericsson.com>, Sanjeev Mahrolia XM
<sanjeev.xm.mahrolia@ericsson.com>

Can u share the details so that can be taken care of


Regards
*From:*Sandeep Bansal
*Sent:* Thursday, July 31, 2014 7:46 PM
*To:* Aditya Pratap Singh; Anugya Jain
*Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav;
Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar; Fasel Mustafa; Sanjeev
Mahrolia XM
*Subject:* RE: 3G New Sites / Sectors Audit
Hi Aditya,
Can you please share details of radio parameter discrepancies so that it will be
taken care next time.
Site

MO

Type of Site

RNC

Status

SCFT Completion Date

Nbr Audit

Radio Parameter Audit

5451

UBURARE

New Site

DLEVK07

SCFT Completed

1-Jul-14

Nbrs missing

discrepancies found

5424

UDLTPURQ

Sector Addition

DLEVK07

SCFT Completed

17-Jul-14

Nbrs missing

discrepancies found

11021

UASVHHB

New Site

DLEVK07

SCFT Completed

16-Jul-14

ok

discrepancies found

602

UMUKNGRQ

Sector Addition

DLEVK07

SCFT Completed

22-Jul-14

Nbrs missing

discrepancies found

10967

URMGRJP

New Site

DLEVK07

SCFT Completed

18-Jul-14

ok

discrepancies found

1689

UMAYFLDQ

Sector Addition

DLEGN04

SCFT Completed

22-Jul-14

Nbrs missing

discrepancies found

4215

UINDRAPQ

Sector Addition

DLEVK08

SCFT Completed

23-Jul-14

ok

discrepancies found

1989

UGURS56Q

Sector Addition

DLEGN04

SCFT Completed

4-Jul-14

Nbrs missing

discrepancies found

Regards
Sandeep
*From:*Aditya Pratap Singh
*Sent:* Thursday, July 31, 2014 5:03 PM
*To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain
*Cc:* Sandeep Bansal; Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh
Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar
*Subject:* Re: 3G New Sites / Sectors Audit
Hi Sir,
Please find the enclosed new Sites audit report for
DLEVK07,DLEVK08,DLEGN04RNC's site got on aired in July-14 month,details reports
are enclosed here with.
Item highlighted are being taking care by the Operation team.
@Sanjeev;Request you to please take care the site getting on aired onwards to
avoid the such discrepancies.
Site

MO

Type of Site

RNC

Status

SCFT Completion Date

License Status

Nbr Audit

Radio Parameter Audit

PSC Audit

LAC/RAC Audit

KPI

RSSI
RRC

RAB

DCR

IRAT

Traffic/Download
5451

UBURARE

New Site

DLEVK07

SCFT Completed

1-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
5424

UDLTPURQ

Sector Addition

DLEVK07

SCFT Completed

17-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
11021

UASVHHB

New Site

DLEVK07

SCFT Completed

16-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
602

UMUKNGRQ

Sector Addition

DLEVK07

SCFT Completed

22-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
10967

URMGRJP

New Site

DLEVK07

SCFT Completed

18-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
1689

UMAYFLDQ

Sector Addition

DLEGN04

SCFT Completed

22-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
10979

USHBDDR

New Site

DLEVK07

SCFT Completed

24-Jul-14

active

ok

ok

ok

ok

ok

ok

ok

ok

ok

ok
4215

UINDRAPQ

Sector Addition

DLEVK08

SCFT Completed

23-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

INDRAPQ 60% success

ok

ok
1989

UGURS56Q

Sector Addition

DLEGN04

SCFT Completed

4-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

EUL 80% success

ok

ok

ok

ok
Best Regards;
Aditya Pratap Singh
Specialist-Network Engineering
+91-8800894132
On 07/30/2014 05:55 PM, Fasel Mustafa wrote:
+ Sukisha

Regards
*From:*Aditya Pratap Singh
*Sent:* Tuesday, July 29, 2014 5:29 PM
*To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain; Sandeep Bansal
*Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh
Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari
*Subject:* Re: 3G New Sites / Sectors Audit
Hi Sir,
Please find the enclosed new Sites audit report for GGN cluster
site got on aired in July-14 month,details reports are enclosed here
with.
Item highlighted are being taking care by the Operation team.
Thanks to Anugya efforts putting on New Site to do the audit and
get this corrected.
@Sanjeev;Request you to please take care the site getting on aired
onwards to avoid the such discrepancies.
Site

MO

Type of Site

RNC

Status

SCFT Completion Date

License Status

Nbr Audit

Radio Parameter Audit

PSC Audit

LAC/RAC Audit

KPI

RSSI
RRC

RAB

DCR

IRAT

Traffic/Download
7737

UDLFP3B

New Site

DLGGN01

SCFT Completed

10-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

high

ok

ok

HIGH
3288

UFINANCY

Sector Addition

DLGGN02

SCFT Completed

2-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
7499

UUNTSEZ

Sector Addition

DLGGN02

SCFT Completed

10-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
7690

USREHME

New Site

DLGGN02

SCFT Completed

7-Jul-14

active

ok

ok

ok

ok

ok

ok

ok

ok

ok

ok
3465

UAMREXPQ

Sector Addition

DLGGN03

SCFT Completed

15-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
5919

UGURG40Q

Sector Addition

DLGGN03

SCFT Completed

18-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok
7724

USRWTVH

New Site

DLGGN03

SCFT Completed

16-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

high

ok

ok

ok
10929

UDLFGN1

New Site

DLGGN03

SCFT Completed

12-Jul-14

active

Nbrs missing

discrepancies found

ok

ok

ok

ok

ok

DLFGN1Y 80% success

ok

ok
7392/1

UVPLTE1

New Site

DLGGN03

SCFT Completed

2-Jul-14

active

ok

discrepancies found

ok

ok

ok

ok

ok

ok

ok

ok

Best Regards;
Aditya Pratap Singh
Specialist-Network Engineering
+91-8800894132
On 07/25/2014 04:00 PM, Fasel Mustafa wrote:
As discussed , Pls provide the first cut analysis .
Start from GGN

Regards
*From:*Sanjay Chawla
*Sent:* Friday, July 25, 2014 3:16 PM
*To:* Fasel Mustafa; Praveen Kumar Tiwari P; Prasoon Tiwari
*Cc:* Maninder Singh S; Aditya Pratap Singh; Sanjeev Mahrolia
XM; Mukesh Somani; Rupesh Shrivastav
*Subject:* RE: 3G New Sites / Sectors Audit
Dear Fasel,
SCFT is being taken as part of Cielo project.
Requesting Praveen, Prasoon for providing the same from team. If
required, operations team will support as required.
Description: line
*Thanks & Regards*
**
*SANJAY CHAWLA
NETWORK ENGINEERING*
Ericsson India Global Services Pvt Ltd
Mobile +91 8800337876
sanjay.chawla@ericsson.com <mailto:sanjay.chawla@ericsson.com>
www.ericsson.com <http://www.ericsson.com/>
For more information on our portfolio of learning services
please go to:
http://www.ericsson.com/ourportfolio/ericsson-academy/learning-services
This Communication is Confidential. We only send and receive
email on the basis of the term set out at
www.ericsson.com/email_disclaimer
<http://www.ericsson.com/email_disclaimer>
*From:*Fasel Mustafa
*Sent:* Friday, July 25, 2014 3:07 PM
*To:* Sanjay Chawla
*Cc:* Maninder Singh S; Praveen Kumar Tiwari P; Prasoon Tiwari;
Aditya Pratap Singh; Sanjeev Mahrolia XM; Mukesh Somani
*Subject:* 3G New Sites / Sectors Audit
Dear Sanjay ,
We need to have the audit of the new sites / sectors which came

on air recently in terms of scft reports , parameters , features


, KPIs , CS/PS Traffic and need to high light the deviations ,
if any .
Sanjeev Mahrolia will be sharing the list wef 1^st July ,
appreciate if we can get the response by EOD .
Aside to Sanjeev , As discussed Pls share the details
Regards , Fasel

-(`.) *Always *
`.(`.) *Keep*
(`.). *Smiling!*
`..
Cheers)
.*)
.*)
(.
(.* Sanjay
Thanks and Regards
Sanjay Sahni
(+919311986783)
sanjayitproforu@gmail.com