GROUND WORK
site investigation
Technique : pile bore method was used.
Process :
Plant and material :
EARTH WORK
EXCAVATION :
Technique : the technique of excavation was done with bored
piling.
Process : the process of pile bore is first the steel circular
casing are installed into the grounds after that the soil was
DEWATERING : the dewatering of the site was done by multiple
stages dewatering method. The dewatering process was done
with the help of non-submersible dewatering pump.
SUB STRUCTURE
FOUNDATION : foundation of the plot was done by end bearing
pile method. For making end bearing pile foundation plant and
material used were HR 130 automatic machine, pilling rig, diesel.
PLINTH : plinth beams connected the columns at fix level from the
ground for this plant used were batching plant, steel yard, transit
mixture and material used were aggregate, steel, sand, cement,
water, diesel.
SUPERSTRUCTURE
Ground work
Advantages
Ongoing: jcb, dumper and hand helps were used
for excavation used so it reduced construction cost.
Completed: pilling method was used for
excavation the advantages of this is it gives perfect finishing and
also work was done fast.
Disadvantages
Ongoing : jcb, dumper and hand helps were used
for excavation so it was a time consumption process.
Completed : pilling method was costly as
compare to jcb, dumper and hand helps.
Sub structure
Advantages
Ongoing : isolated foundation was used. And it
was affordable and construction procedure of isolated foundation
is simple.
Completed : end bearing pilling foundation were
used it takes heavy load
Disadvantages
Ongoing : isolated foundation does not takes
heavy load and used in small projects.
Completed : end bearing pilling foundation was
costly.
Super structure
Advantages
Ongoing :
r.c.c framed structure : the
construction was done fast and simple.
Flooring : kota stone is hard tough
and it is cheap.
Completed :
Mivan shuttering : high quality
finish, cost effective, column and beam was cast in one operation.
The work was done fast.
Disadvantages
Ongoing :
r.c.c framed structure :it is costly and
maintenance problem.
Completed :
Combination of rigid and flexible
pavement was easily open and patched.
Car parking : stilt car parking was
easily made and also in low cost.
Disadvantages
Ongoing :
Flexible pavement : hiher
maintenance cost .
Completed :
Combination of rigid and flexible
pavement was higher maintenance cost.