Академический Документы
Профессиональный Документы
Культура Документы
1.
General
Position Title
Name of Expert
ABDUS SALAM
Date of Birth
21 November 1968
Bangladesh
2.
Education:
B.E. (Electrical) 1993 and Post Graduate Diploma in Information & Communication Technology (BUET), 2007.
3.
Period
Country
Aug 2014 to
Jan 2015
Bangladesh
May, 2013
to Jul, 2014
Bangladesh
Jun 2010 to
Apr 2013
Bangladesh
Nov 2008
to Dec
2009
Bangladesh
Jun 2008 to
Oct 2008
Bangladesh
CV of ABDUS SALAM
Page 1 of 5
Apr 2001 to
Jun 2008
Bangladesh
Apr 2000 to
Mar 2001
Bangladesh
Feb 1999 to
Mar 2000
Bangladesh
Apr 1998 to
Nov 1998
S@ifurs
Writer, part time
Bangladesh
May 1997 to
Bangladesh
Bangladesh
Dec 1998
Oct 1994 to
Apr 1996
4.
5.
CV of ABDUS SALAM
Speaking
Excellent
Excellent
Reading
Excellent
Excellent
Writing
Excellent
Excellent
Page 2 of 5
6.
5. i) Assist GIS international consultant to coordinate with REB/PBS to identify measures to improve the current utilization of the
Equipment Record Card system of REB/PBS through software.
ii) Assist GIS international consultant to monitor GPS data collection and management of REB/PBS personnel.
iii) Assist GIS international consultant to interface GIS database file with WindMil
software for distribution system analysis.
Name of assignment or project: Construction, Supervision, Estimation and monitoring of Electrical Design for Real State
Company.
Year: Nov 2008 to Dec 2009
Location: Bangladesh
Client: Genetic Ltd. (Real State Company)
Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, 11kV, 0.4kV and
CV of ABDUS SALAM
Page 3 of 5
0.23kV distribution lines & House Wiring including Fire protection and CCTV.
Positions held: Area Manager (Electrical)
Activities performed: Correspondence with top management, consumers, contractors in solving the electrical related problems.
Design, Checking, Construction and Supervision of layout plan for fixture & fittings, conduit layout, Cable trench layout performed by
Contractors. Preparing schematic wiring diagram for Electrical, Telephone outlet, Smoke detection system, Public address system,
transformer foundation, Meter Board, Meter Connection, Main Distribution Board, Emergency Distribution Board, Lift & Motors, Power
Factor Improvement (PFI) Plant, HT & LT Switch Gear Panel and earthing Network of 11/0.415 kV S/S.
Name of assignment or project: Preparation of tender documents for electrical distribution systems for storm water pumping
stations at Rampura financed by World Bank.
Year: Jun 2008 to Oct 2008
Location: Bangladesh
Client: Project Engineering Consulting Engineers Ltd.
Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, pole-mounted
transformers and 33kV, 11kV, 0.4kV and 0.23kV distribution lines & System Analysis
Positions held: Senior Engineer
Activities performed: Design & Supervision of Conduit Layout, Internal Electrification, Supervision of Installation of distribution
transformer & Standby power supply, HV/LV Switchgear Panel, PFI Panel, MDB, EMDB, SDB, Earthing network, HT/LT Cable, Fire
Alarm and Control security system & CCTV System, Intercom Telephonic System, Lift & Motors of Multistoried Building.
Name of assignment or project: Control & Supervision of Preparation of Analytical Reports of different electrical distribution system
studies such as Block Load Study and proposal for new 33/11kV S/S with the proposed feeder route.
Year: Apr 2001 to Jun 2008
Location: Bangladesh
Client: Engineers and Consultants Bangladesh Ltd.
Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, pole-mounted
transformers and 33kV, 11kV, 0.4kV and 0.23kV distribution lines & System Analysis.
Positions held: Senior Design Engineer
Activities performed: Engaged in design works of seven nos. of Rural Electrification Projects (Manikganj, Hobiganj, Dinajpur-1,
Netrokona, Kurigram-Lalmonirhat, Jessore-II and Shariatpur PBS) undertaken by the firm. Responsible for design of distribution
system, voltage drop, System Protection & Co-ordination between PDB Grid S/S and REB distribution System, PFI & system loss
studies; benefit cost ratio analysis and other engineering studies.
His work includes System Analyses, computer programming works in electric utility sector. He is well conversant in Milsoft Windmill
Distribution system Analysis software. He is also capable Software designing and developing of data entry software and analysis
(oracle, Access based) and framing in line with questionnaire design, Sampling methodology, data entry and data editing, quality
controlling of the data and reporting purpose. He is capable to transfer the software/data analysis knowledge/ techniques to
REB/PBS personnel.
Sub-Transmission line study: Under this subject item following works were done.
Analysis of the 132/33 kV network for voltage drop, Selection and Loading of conductor size and capacity, study of Grid S/S on 33
kV source line for 33/11 kV S/S of PBS.
Protection coordination study between PBS S/S and Grid S/S of PGCB for 33 kV source line of PBS S/S.
Survey, planning & design of 33kV & distribution system of DESCO project.
Survey, planning & design of 33kV & Distribution System of all town of 16 Town Power Distribution Project of BPDB.
33 kV network study and analysis of the system under 10-town Power Distribution System Development Project of BPDB
Supervision in the above mentioned works performed and completed by Junior Design Engineers in the Design Section.
Computer Hardware & Networking experiences:
Network trouble shooting and Local Area Networking setup with hub, switch, router configuration,
Name of assignment or project: Hobiganj Palli Biddut Samity, a project of Rural Electrification Board.
Year: Apr 2000 to Mar 2001
Location: Bangladesh
Client: Rural Electrification Board (REB)
Main project features: Staking, Design and supervision of Distribution System including substations, Preparation of BOQ and
System Analysis.
Positions held: Staking Engineer, Hobigonj Palli Biddut Samity
Activities performed: Was responsible for Design & Staking of overhead distribution lines, Preparation of progress & other report,
staking sheets with bill of materials for new/renovation line, inventory & work-plan of taken over PDB distribution lines, collection of
load data from sub-station for various technical studies. Routine observation of voltage level at selected locations, phase balancing,
load Pattern of Sub-Station as well as at different locations of feeders. Guiding & monitoring of field staking activities.
Name of assignment or project: Manikgonj Palli Biddut Samity
CV of ABDUS SALAM
Page 4 of 5
Signature
CV of ABDUS SALAM
Page 5 of 5