Mooring/Move procedures
5| PAGE
Basic steps
6| PAGE
www.bimv.com
7| PAGE
Approval Certificate
www.bimv.com
8| PAGE
www.bimv.com
9| PAGE
Positioning procedure
www.bimv.com
10| PAGE
NOBLE DENTON
www.bimv.com
11| PAGE
Considerations of strenght
Arrangements for each different unit
Towing bridles
Tow mooring planifications
Use of mooring-tow lines
www.bimv.com
12| PAGE
TOWING ARRANGEMENTS
www.bimv.com
13| PAGE
www.bimv.com
14| PAGE
Equipment
Minimum Breakings Strength (ST)1.3 in.
Pendant Wire 6 x 37 Galv. IWRC3602.2 in.
Pendant Wire 6 x 37 Galv. IWRC2723.2 in.
Pendant Wire 6 x 37 Galv. IWRC(Weak Link)1802604.3 in. 85 ton G-2130 Safety Anchor
Shackle4255.2 in. 55 ton G-2130 Safety
Anchor Shackle3306.3 in. G RIII Stud Link
Chain552.57.Triangular Flounder or Fish
Plate290
www.bimv.com
15| PAGE
www.bimv.com
16| PAGE
Towing Bridle
Fishplate
Hawser
Tugger line
www.bimv.com
17| PAGE
FISHPLATE
www.bimv.com
18| PAGE
www.bimv.com
19| PAGE
Connection Details
www.bimv.com
20| PAGE
3/ 85 ton shackles
www.bimv.com
21| PAGE
2 Tugs towing
www.bimv.com
22| PAGE
www.bimv.com
23| PAGE
www.bimv.com
24| PAGE
www.bimv.com
25| PAGE
www.bimv.com
26| PAGE
www.bimv.com
27| PAGE
www.bimv.com
28| PAGE
www.bimv.com
29| PAGE
www.bimv.com
30| PAGE
www.bimv.com
31| PAGE
Bridle Stowage
www.bimv.com
32| PAGE
www.bimv.com
33| PAGE
www.bimv.com
34| PAGE
SHACKLES STRENGHT
www.bimv.com
35| PAGE
www.bimv.com
36| PAGE
www.bimv.com
37| PAGE
www.bimv.com
38| PAGE
www.bimv.com
39| PAGE
www.bimv.com
40| PAGE
Mooring materials
Strength:Construction:Fibre:(KN)
Wire Rope
Aramid HM strong synthetic fibre
HMPE(high modulus polyethylene)= spectra or
dyneema
LCAP(liquid crystal aromatic polyester) =vectran
Nylon( strong dry / 20% less wet)
Polyester( strength dry = wet)
Polypropylene ( floating)
www.bimv.com
41| PAGE
www.bimv.com
42| PAGE
www.bimv.com
43| PAGE
www.bimv.com
44| PAGE
www.bimv.com
45| PAGE
www.bimv.com
46| PAGE
www.bimv.com
47| PAGE
www.bimv.com
48| PAGE
Ocean Tows
Small semi-submersible
8-10,000
15 16,000
Large semi-submersible with propulsion
8 10.000
10 18,000
Large semi-submersible without propulsion
11 13,000
20 22,000
Small jack-up (100-150 ft. waterdepth)
6 8,000
8 9,000
Medium jack-up (150 250 ft. waterdepth)
8 10,000
12 16,000
Large jack-up (300+ ft. waterdepth)
10 16,000
15 18,000
www.bimv.com
49| PAGE
www.bimv.com
50| PAGE
www.bimv.com
51| PAGE
www.bimv.com
52| PAGE
www.bimv.com
53| PAGE
www.bimv.com
54| PAGE
Cont. BP test
www.bimv.com
55| PAGE
www.bimv.com
56| PAGE
Beaufort Force 9
Strong gale
Wind speed (knots): 41 - 47
Wave height (feet): 23 - 32
Sea state: High waves; sea begins to roll; dense
streaks of foam; spray may reduce
visibility
www.bimv.com
57| PAGE
58| PAGE
www.bimv.com
59| PAGE
Petterssen, 1958
www.bimv.com
60| PAGE
www.bimv.com
61| PAGE
www.bimv.com
62| PAGE
CANDRIL WAVE/CURRENT
www.bimv.com
63| PAGE
Example AHT
www.bimv.com
64| PAGE
Built 2002 chinaclassed lloyds +100a1 +lmc, ums2,258 grt / 677 nrt
1,800 dwt
67.40m loa x 15.50m beam x 7.50m x depth x 6.20m draft
2 x wartsila 16v 32lnd main engines 2 x cp propellers in nozzles2 x 9t
bow thrusters1 x 8t stern thrustermax speed 17 knots1 x
triple drum ah/towing winch, 450t brake2 x 10t tugger winches 2 x 10t
capstans 180 cbm
chain locker1 x j-hook344 m2 clear deck area - 12.6m x 27.3m10.0
t/m2
deck strength700 tons deck cargo1 x deck crane (3t @ 15m
420 cbm fresh water 1,200 cbm fuel oilfifi 1: 2 x 1200 cbm/hr
fifi pumps accommodation for 20 persons in 17 cabins
www.bimv.com
65| PAGE
OFFSHORE POSITIONING
www.bimv.com
66| PAGE
ANCHOR PATTERNS
www.bimv.com
67| PAGE
www.bimv.com
68| PAGE
www.bimv.com
69| PAGE
www.bimv.com
70| PAGE
www.bimv.com
71| PAGE
www.bimv.com
72| PAGE
www.bimv.com
73| PAGE
www.bimv.com
74| PAGE
POSITION CALCULATING
www.bimv.com
75| PAGE
Move to position
2 AHT
www.bimv.com
76| PAGE
3 AHTs
www.bimv.com
77| PAGE
To location
www.bimv.com
78| PAGE
Alongside platform
www.bimv.com
79| PAGE
Dropping anchors
www.bimv.com
80| PAGE
Running Anchors
www.bimv.com
81| PAGE
www.bimv.com
82| PAGE
Move of anchor
www.bimv.com
83| PAGE
PRELAID MOORINGS
www.bimv.com
84| PAGE
www.bimv.com
85| PAGE
www.bimv.com
86| PAGE
www.bimv.com
87| PAGE
www.bimv.com
88| PAGE
Use of 3 AHT
www.bimv.com
89| PAGE
www.bimv.com
90| PAGE
www.bimv.com
91| PAGE
www.bimv.com
92| PAGE
www.bimv.com
93| PAGE
Cont. M.S.L
www.bimv.com
94| PAGE
Cont M.S.L
www.bimv.com
95| PAGE
www.bimv.com
96| PAGE
www.bimv.com
97| PAGE
www.bimv.com
98| PAGE
SURFACE
BLOCK
www.bimv.com
99| PAGE
www.bimv.com
100| PAGE
Chase of anchors
www.bimv.com
101| PAGE
www.bimv.com
102| PAGE
LIFTING CHAIN
www.bimv.com
103| PAGE
Departure Sequence
www.bimv.com
104| PAGE
3 AHT
www.bimv.com
105| PAGE
www.bimv.com
106| PAGE
Calm buoy
www.bimv.com
107| PAGE
www.bimv.com
108| PAGE
www.bimv.com
109| PAGE
www.bimv.com