1| PAGE

Kuala Lumpur, June 2011

Capt. Nol Haegeman

LOAD OUT TRAINING - DAY 3:


OFFSHORE MARITIME RISK ANALYSIS
www.bimv.com

2| PAGE

www.bimv.com

3| PAGE

LOAD OUT MOVES TO LOCATION

www.bimv.com

4| PAGE

Mooring/Move procedures

Consideration of the planning mooring


operations
Short move from docking to heavy weight or
towed move to location
Transported & moored on heavy weight
ships or under tow by tugs & AHTs
Interfield move
Coastal interfield move
Oceanic move
www.bimv.com

5| PAGE

Basic steps

Local law application as on Unclos EEZ considerations


Preparing of checklists based from barge to all assisting
equipment units
Capability of barge / offshore unit for mooring in
designated location
Are AHTs & mooring anchor equipment available & in
good condition
Use of competent, experienced and certified labour
Time schedule planning based on meteological &
geographical limiations
www.bimv.com

6| PAGE

Cont. Basic steps

With drawings provided proposed mooring-anchor pattern


described & approved by authorities & experts
Anchor-mooring procedures & sequence as location approaches
described &planified based on drawings
Positioning by tugs & AHTs based on DP & transponder
observations
Sufficient tugs available as required bollard power based on
Deadweight & prevailing weather conditions
Good communication required between all individual & combined
offshore units
Approvals & permissions by oil/mineral industry departments and
marine underwriters by warranty surveyors-certifications
Certificate of Approval

www.bimv.com

7| PAGE

Approval Certificate

www.bimv.com

8| PAGE

Operations planning check list

www.bimv.com

9| PAGE

Positioning procedure

www.bimv.com

10| PAGE

NOBLE DENTON

www.bimv.com

11| PAGE

Tow - Mooring gear

Considerations of strenght
Arrangements for each different unit
Towing bridles
Tow mooring planifications
Use of mooring-tow lines

www.bimv.com

12| PAGE

TOWING ARRANGEMENTS

www.bimv.com

13| PAGE

STRENGHT TOWING GEAR

www.bimv.com

14| PAGE

TYPICAL TOWING GEAR


REQUIREMENTS

Equipment
Minimum Breakings Strength (ST)1.3 in.
Pendant Wire 6 x 37 Galv. IWRC3602.2 in.
Pendant Wire 6 x 37 Galv. IWRC2723.2 in.
Pendant Wire 6 x 37 Galv. IWRC(Weak Link)1802604.3 in. 85 ton G-2130 Safety Anchor
Shackle4255.2 in. 55 ton G-2130 Safety
Anchor Shackle3306.3 in. G RIII Stud Link
Chain552.57.Triangular Flounder or Fish
Plate290
www.bimv.com

15| PAGE

STANDARD MAIN BRIDLE

www.bimv.com

16| PAGE

Towing Bridle

Fishplate
Hawser
Tugger line

www.bimv.com

17| PAGE

FISHPLATE

www.bimv.com

18| PAGE

TOWING RINGS & HARP SHACKLE

www.bimv.com

19| PAGE

Connection Details

STUD LINCK &PINS

Dont use Panama

www.bimv.com

20| PAGE

Deep draft towing gear

3/ 85 ton shackles

www.bimv.com

21| PAGE

2 Tugs towing

www.bimv.com

22| PAGE

Towing using anchor/chain

Chain out minimum 150 ft

www.bimv.com

23| PAGE

Narrow Water Towing

Short tow line

www.bimv.com

24| PAGE

LONG DISTANCE OCEAN TOW

www.bimv.com

25| PAGE

TOW GEAR INSPECTION

www.bimv.com

26| PAGE

STRENGHT OF TOWING GEAR

www.bimv.com

27| PAGE

Basic Tow Line Configuration

www.bimv.com

28| PAGE

Towing arrangements for heavy duty semisubmersible

www.bimv.com

29| PAGE

Heavy duty strenght towing gear


components

www.bimv.com

30| PAGE

Stowage of Towing gear

www.bimv.com

31| PAGE

Bridle Stowage

Maintenance bridle & padlocks


Emergency bridles

www.bimv.com

32| PAGE

HIGHLINE TOWING BRIDLE

www.bimv.com

33| PAGE

MINIMUM B.L & STRAND ROPE

www.bimv.com

34| PAGE

SHACKLES STRENGHT

www.bimv.com

35| PAGE

Strenght Requirements Towing Gear

www.bimv.com

36| PAGE

TOWING LINE / PENDANT

www.bimv.com

37| PAGE

MULTIPLE STRAND WIRE ROPE

S- lay strand composition

www.bimv.com

38| PAGE

Strenght composition for mooring lines


( wire synthetic)
1 ) Parallel yarn :
- Highest strenght conversion
- High modulus

www.bimv.com

39| PAGE

Wire/Rope strenght configuration


2) Parallel strand

3) Limited parallel strands

www.bimv.com

40| PAGE

Mooring materials

Strength:Construction:Fibre:(KN)
Wire Rope
Aramid HM strong synthetic fibre
HMPE(high modulus polyethylene)= spectra or
dyneema
LCAP(liquid crystal aromatic polyester) =vectran
Nylon( strong dry / 20% less wet)
Polyester( strength dry = wet)
Polypropylene ( floating)
www.bimv.com

41| PAGE

Minimum Break Load for 8 strand


synthetics

www.bimv.com

42| PAGE

Wire mooring lines

Hexagon wire ( same diam)

Warrington ( diff diam)

Warrington Seal comp.

www.bimv.com

43| PAGE

Tension on wire lines only

2,2 GN ( giga newton) = 10 kip

www.bimv.com

44| PAGE

Only H.M mooring lines

www.bimv.com

45| PAGE

Wire lines & Auxilary synthetics

www.bimv.com

46| PAGE

Wire + Synthetic Fibre mixed Lines

www.bimv.com

47| PAGE

Use of lines by deadweight

www.bimv.com

48| PAGE

TUG HORSE POWER BHP


Field Moves

Ocean Tows

Small semi-submersible
8-10,000
15 16,000
Large semi-submersible with propulsion
8 10.000
10 18,000
Large semi-submersible without propulsion
11 13,000
20 22,000
Small jack-up (100-150 ft. waterdepth)
6 8,000
8 9,000
Medium jack-up (150 250 ft. waterdepth)
8 10,000
12 16,000
Large jack-up (300+ ft. waterdepth)
10 16,000
15 18,000
www.bimv.com

49| PAGE

STILL WATER RESISTANCE vs SPEED

www.bimv.com

50| PAGE

AHTs Supplys Tugs

www.bimv.com

51| PAGE

www.bimv.com

52| PAGE

BOLLARD POWER AHT


BP is tractive force in tonnes or Kn
Depends on propeller type/ available
nozzlesshape of hull draught & trim
Rules of thumb conversion BHP to B.P
- 0,9 x BHP x 1,1/100 (fix pitch - rudder)
- 0,9 x BHP x 1,2/100 (fix pitch - nozzle)
- 0,9 x BHP x 1,25/100 (contr.pitch - rudder)
- 0,9 x BHP x 1,4/100 (contr.pitch - nozzle)

www.bimv.com

53| PAGE

Bollard Power Test

Static bollard power

www.bimv.com

54| PAGE

Cont. BP test

Dynamic bollard power

www.bimv.com

55| PAGE

REQUIRED BOLLARD POWER


Required B.P=
(Displacement (t) x 60) : 100.000 + 40
In still water to move up to 3 4 knts

www.bimv.com

56| PAGE

Warranty B.P for ZERO Knts


-To remain in position meteo elements in opposite
direction of heading
- Wind 44 knts
- Current 3 knts
- Wave height 25 ft

Beaufort Force 9
Strong gale
Wind speed (knots): 41 - 47
Wave height (feet): 23 - 32
Sea state: High waves; sea begins to roll; dense
streaks of foam; spray may reduce
visibility
www.bimv.com

57| PAGE

B.P (resistance factors)

Wind Resistance (Rw) ( area- wind velocity-still water tow speed)

Wave forming Resistance ( Rwf) ( hull shape- under water area)

Current Effect (Rc) ( wetted underwater area)

Hawser Resistance (Rh)

Wave height Effects (Rwh)

Shape Coefficient (Bc)

Height Coefficient ( Freeboard)


www.bimv.com

58| PAGE

Meteological aspects wind current

www.bimv.com

59| PAGE

Forecasting & prevailing synopsis

Petterssen, 1958

www.bimv.com

60| PAGE

Global Meteo Services

For accurate meteo planning acc. Wind,


swell, current
Wefax by NOAA(Nat.Oceon.Atm.Ass)USA
AWT ( applied weather techno.)
BVS ( Bon Voyage System)

www.bimv.com

61| PAGE

WIND VERSUS DRAFT

www.bimv.com

62| PAGE

CANDRIL WAVE/CURRENT

www.bimv.com

63| PAGE

Example AHT

www.bimv.com

64| PAGE

EXAMPLE OCEAN AHT

16.500BHP emergency towing vessel


180 tons bollard pullfull

Built 2002 chinaclassed lloyds +100a1 +lmc, ums2,258 grt / 677 nrt
1,800 dwt
67.40m loa x 15.50m beam x 7.50m x depth x 6.20m draft
2 x wartsila 16v 32lnd main engines 2 x cp propellers in nozzles2 x 9t
bow thrusters1 x 8t stern thrustermax speed 17 knots1 x
triple drum ah/towing winch, 450t brake2 x 10t tugger winches 2 x 10t
capstans 180 cbm
chain locker1 x j-hook344 m2 clear deck area - 12.6m x 27.3m10.0
t/m2
deck strength700 tons deck cargo1 x deck crane (3t @ 15m
420 cbm fresh water 1,200 cbm fuel oilfifi 1: 2 x 1200 cbm/hr
fifi pumps accommodation for 20 persons in 17 cabins

www.bimv.com

65| PAGE

OFFSHORE POSITIONING

www.bimv.com

66| PAGE

ANCHOR PATTERNS

45 symmetric 8 line pattern

www.bimv.com

67| PAGE

10 line spread pattern

www.bimv.com

68| PAGE

12 line spread pattern (e.g FPSO)

www.bimv.com

69| PAGE

Pulling Barge spread

www.bimv.com

70| PAGE

Drilling Tender Spread Combination to


other units

www.bimv.com

71| PAGE

Support Vessel Mooring Spread

www.bimv.com

72| PAGE

Mooring Catery Curves

www.bimv.com

73| PAGE

www.bimv.com

74| PAGE

POSITION CALCULATING

www.bimv.com

75| PAGE

Move to position

2 AHT

www.bimv.com

76| PAGE

3 AHTs

www.bimv.com

77| PAGE

To location

www.bimv.com

78| PAGE

Alongside platform

www.bimv.com

79| PAGE

Dropping anchors

www.bimv.com

80| PAGE

Running Anchors

www.bimv.com

81| PAGE

www.bimv.com

82| PAGE

Move of anchor

www.bimv.com

83| PAGE

PRELAID MOORINGS

www.bimv.com

84| PAGE

AHT Pull Leads

www.bimv.com

85| PAGE

www.bimv.com

86| PAGE

D.O.P use of 2 AHT

www.bimv.com

87| PAGE

MOORING CHAIN EQUIPMENT

www.bimv.com

88| PAGE

D.O.P in Confined Area

Use of 3 AHT

www.bimv.com

89| PAGE

USE OFYOKOHAMA SUPPORT &


SUPPORT BOUY BLOCK

www.bimv.com

90| PAGE

Deploy yokohama support

www.bimv.com

91| PAGE

Yokohama Support Block

www.bimv.com

92| PAGE

Deploy midline support block

www.bimv.com

93| PAGE

Cont. M.S.L

www.bimv.com

94| PAGE

Cont M.S.L

www.bimv.com

95| PAGE

Midline support bouy blocks

www.bimv.com

96| PAGE

MULTIPLE POINT MOORING

www.bimv.com

97| PAGE

MULTIPLE SUPPORT POINT MOORING

www.bimv.com

98| PAGE

SURFACE

BLOCK

www.bimv.com

99| PAGE

SINGLE POINT MOORING

www.bimv.com

100| PAGE

TAKE OFF ANCHOR POSITION

Chase of anchors

www.bimv.com

101| PAGE

TAKE off BUOY / ANCHOR

www.bimv.com

102| PAGE

LIFTING CHAIN

www.bimv.com

103| PAGE

Departure Sequence

Open water 2 AHT

www.bimv.com

104| PAGE

Departure confined space

3 AHT

www.bimv.com

105| PAGE

INSTALLATION OF CALM BUOY

www.bimv.com

106| PAGE

Calm buoy

www.bimv.com

107| PAGE

Positioning Jack up barge

www.bimv.com

108| PAGE

Jack up leg penetration

www.bimv.com

109| PAGE

Thank you & enjoy the offshore

www.bimv.com