Вы находитесь на странице: 1из 3

5/23/2015

Sustainability/LEEDEvaluation

Introduction
Project
Owner
BIMUses
Share

64

BIMUSES
PLAN
ExistingConditions
CostEstimation
PhasePlanning
SiteAnalysis
Programming

DESIGN
ExistingConditions
DesignAuthoring
DesignReviews
DrawingGeneration
EngineeringAnalysis
EnergyAnalysis
LightingAnalysis
SustainablityEvaluation
CodeValidation
PhasePlanning
CostEstimation

CONSTRUCT
ExistingConditions
CostEstimation
PhasePlanning
SiteUtilizationPlanning
3DCoordination
ConstSystemDesign
DigitalFabrication
3DControl&Planning
Field/ManageTracking
RecordModeling

OPERATE
RecordModeling
http://bim.psu.edu/Uses/Sustainability_Evaluation.aspx

1/3

5/23/2015

Sustainability/LEEDEvaluation

BuildMaintSchedule
BuildSystemAnalysis
AssetManagement
SpaceManage&Track
DisasterPlanning

Sustainability/LEEDEvaluation
Description:
AprocessinwhichaBIMprojectisevaluatedbasedonLEEDorothersustainablecriteria.This
processshouldoccurduringallstagesofafacilitieslifeincludingplanning,design,construction,and
operation.Applyingsustainablefeaturestoaprojectintheplanningandearlydesignphasesismore
effective(abilitytoimpactdesign)andefficient(costandscheduleofdecisions).Thiscomprehensive
processrequiresmoredisciplinestointeractearlierbyprovidingvaluableinsights.Thisintegration
mayrequirecontractualintegrationinplanningphase.Inadditiontoachievingsustainablegoals,
havingLEEDapprovalprocessaddscertaincalculations,documentations,andverifications.Energy
simulations,calculations,anddocumentationscanbeperformedwithinanintegrativeenvironment
whenresponsibilitiesarewelldefinedandclearlyshared.

PotentialValue:
Facilitatesinteraction,collaborationandcoordinationofteammembersearlyintheproject
processareconsideredtobefavorabletosustainableprojects.
Enablesearlyandreliableevaluationofdesignalternatives.
Availabilityofcriticalinformationearlyhelpsproblemresolutionefficientlyintermsofcost
premiumandscheduleconflicts.
Shortenstheactualdesignprocessbythehelpofearlyfacilitateddesigndecisions.Shorter
designprocessiscosteffectiveandprovidesmoretimeforotherprojects.
Leadstodeliverybetterprojectquality.
Reducesdocumentationloadafterdesignandacceleratescertificationbecauseconcurrently
preparedcalculationscanbeusedforverification.
Reducesoperationalcostsofthefacilityduetotheenergyperformanceoftheproject.It
optimizedbuildingperformanceviaimprovedenergymanagement.
Increasestheemphasisonenvironmentallyfriendlyandsustainabledesign.
Assistsprojectteamwithpotentialfuturerevisionsthroughoutthelifecycle.

ResourcesRequired:
Designauthoringsoftware

TeamCompetenciesRequired:
Abilitytocreateandreview3DModel
KnowledgeofuptodateLEEDCreditInformation
Abilitytoorganizeandmanagethedatabase
http://bim.psu.edu/Uses/Sustainability_Evaluation.aspx

2/3

5/23/2015

Sustainability/LEEDEvaluation

SelectedResources:
Krygiel,E.,andBrad,N.,2008,GreenBIM:SuccessfulSustainableDesignwithBuilding
InformationModeling,SanFrancisco.
McGrawHillConstruction,2010,GreenBIMHowBuildingInformationModelingIs
ContributingtoGreenDesignandConstruction,SmartMarketReport,McGrawHill
Construction.
TheComputerIntegratedConstructionResearchProgram,2010,BIMProjectExecution
PlanningVersion2.0,PennStateUniversity.
BalfourBeattyConstruction,2010,SustainabilityandEngineeringGuideVersion2.0,
BalfourBeattyConstruction.

CICDirector:JohnMessner
Copyright2011

http://bim.psu.edu/Uses/Sustainability_Evaluation.aspx

3/3