AND MOUs
PROCUREMENT
Procurementis the acquisition of
goods, services or works from an
external source. It is favorable that
the goods, services or works are
appropriate
and
that
they
are
procured at the best possiblecostto
meet the needs of the purchaser in
terms of quality and quantity, time,
and location. Corporations and public
bodies
often
define
processes
intended to promote fair and open
PUBLIC PROCUREMENT
Public Procurement can be defined
as the procurement of goods, works
and services by all Govt. Ministries,
Departments, Agencies, Statutory
Corporations and Public Sector
Undertakings in the Centre and the
States, Municipal Corporations and
other local bodies and even by
private Public Sector Undertakings
providing
public
services
on
PUBLIC PRIVATE
PROCUREMENT
MATERIALS MANAGEMENT
Material management is an approach for
PROCUREMENT FLOW
DIAGRAM
Raising of
Indent
Finance
Screening
Committee
Budget
Clearance
MMD
Tender
Opening
Issue of
Enquiry
Enq. Proposal
& Approval
Scrutiny of
Indent
Indent
Registration
Techno-comml
Purchase
Proposal
Issue of
Order
Follow up with
Evaluation
Clarification
From Parties
Issue
of Materials
Storage
of Materials
Acceptance
Inspection
Supplier
Receipt of
Material
MODE OF TENDERING
Repeat Order*
Emergency Purchase*
ESTIMATE PREPRATION
Indent Estimate should be judiciously prepared
TCS PREPARATION
1.
2.
3.
4.
5.
GENERAL CONDITIONS OF
CONTRACT
Scope of Facilities
Completion Time
Contractors Responsibilities
Employers Responsibilities
Payment Terms, Taxes and Duties
Confidential Information: Patent, Copyright
Work Execution
Test and Inspection
Guarantee and liabilities
Dispute Settlement, Risk Distribution
ORDER EXECUTION
PO
FAC, etc
All correspondences to be made with a copy to MM
Commercial issues, to be referred to MM
No additional supply / job / alteration to Scope shall be
of Facilities
Training
subcontracting
Design and Engineering
Codes and Standards
and
Other
SPECIFICATIONS/CONTRACT
TECH.
SPECIFICATION: Technical Specifications, schedules,
detailed designs, statements of technical data,
performance characteristics value and all other technical
particulars of the Contract
IMPORTANT TERMS/DEFINITION
(Contd.)
CONTRACTORS REPRESENTATIVE:
Person nominated
by the Contractor and approved by the Employer hereof
to perform the duties delegated by the contractor. For
site work Contractors Representative shall also mean
the representative of Sub-Contractors and SubContractors Sub-Contractors
SUB-CONTRACTOR:
FACILITIES:
The
work
specified
in
Technical
Specification, including General Technical Specification
and all supply & services to be carried out by the
Contractor under the Contract.
IMPORTANT TERMS/DEFINITION
(Contd.) All those services ancillary
INSTALLATION SERVICES/SERVICES:
to the supply of Plant and Equipment for the Facilities, to be
provided by the Contractor under the Contract; e.g., design &
engineering, supervision work, Customs & Port clearance,
loading & unloading, dismantling & modification, intermediate
storage, transportation & provision of insurance, inspection, site
preparation works, installation, testing, commissioning,
demonstration of performance guarantee tests, training, etc.
CONTRACTORS EQUIPMENT: All plant, equipment, machinery,
tools, apparatus, appliances or things of every kind required in or
for installation completion and maintenance of Facilities that are
to be provided by the Contractor, but does not include Plant &
Equipment, or other things intended to form or forming part of
the Facilities.
SITE: The land and other places upon which the Facilities are to
be installed, and such other land or places as may be specified in
the Contract as forming part of the site.
IMPORTANT TERMS/DEFINITION
(Contd.)
EFFECTIVE DATE OF
CONTRACT: The date of signing of
Contract or 30 days from date of Letter of acceptance
(LOA), whichever is earlier
TIME FOR COMPLETION: The time specified in the
IMPORTANT TERMS/DEFINITION
(Contd.) CERTIFICATE:
PRELIMINARY ACCEPTANCE
The
Certificate to be issued by the Employer on successful
completion of preliminary Acceptance Tests
issued by the
commissioning
PERFORMANCE
Employer
on
completion
of
IMPORTANT TERMS/DEFINITION
PERFORMANCE (Contd.)
GUARANTEE CERTIFICATE:
The
Certificate to be issued by the Employer upon
successful establishment of Performance Guarantee
Parameters
FINAL
the
the
MOU
THANK YOU