AIM:
To make the students to know the basic concepts in Civil & Mechanical Engineering.
OBJECTIVE:
To create the clear idea about the powerplants, I.C.engines, refrigeration, airconditioning,
surveying and foundation among the circuit branch students also.
S.No
.

Date

Period

Topics to be covered

No. of

Book No [Page

Hours

No]

Handled
Unit III POWER PLANT ENGINEERING
Target Hours:10
1.
24.01.11
2
Introduction, Classification of
Powerplants
2.
24.01.11
5
Working Principle of Steam Power Plant
3.
27.01.11
4
Working Principle of Hydel PowerPlant
4.
31.01.11
2
Working Principle of Nuclear PowerPlant
5.
31.01.11
5
Working Principle of Diesel PowerPlant
6.
02.02.11
4
Working Principle of Gas PowerPlant
7.
03.02.11
4
Working Principle of Reciprocating
Pumps(single acting and double acting)
8.
07.02.11
2
Working Principle of Centrifugal pump
9.
07.02.11
5
Working Principle of Steam Turbines
10.
09.02.11
4
Working Principle of Hydraulic Turbines
Assignment - 1
Date of Announcement :09-02-11
Date of Submission :14.02.11
Unit IV INTERNAL COMBUSTION ENGINES
Target Hours:10
11.
4
Internal combustion engine as automobile
L11
10.02.11
R4(11.1-11.5)
PowerPlant
12.
12.02.11
4
Working Principle of 4S Diesel Engine
L12
R4(11.8-11.9)
13.
14.02.11
2
Working Principle of 4S Petrol Engine
L13
R4( 11.6-11.7)
14.
14.02.11
5
Working Principle of 2S Diesel Engine
L14
R4( 11.10-11.11)
15.
17.02.11
4
Working Principle of 2S Petrol Engine
L15
R4( 11.11-11.12)
16.
2
Comparison of 4S vs 2S Engines;
L16
21.02.11
R4(11.13-11.14)
Comparison of diesel vs petrol Engines
17.
21.02.11
5
Boiler as a PowerPlant
L17
R4(6.10-6.14)
18.
4
Cochran Boiler, Locomotive Boiler
L18
23.02.11
R4(6.3-6.5)
19.

24.02.11

Babcock&Wilcox Boiler, Lanchashire

L19

R4(6.6-6.9)

Boiler
20.
26.02.11
2
Benson Boiler & Lamont Boiler
L20
R4(6.16-6.18)
Assignment - 2 Date of Announcement : 26.02.11 Date of Submission : 03.03.11
Unit V REFRIGERATION & AIR CONDITIONING
Target Hours:10
21.
26.02.11
5
Terminology of Refrigeration
L21
R4(13.3)
22.
28.02.11
2
Principles of Refrigeration
L22
R4(13.1-13.3)
23.
28.02.11
5
Vapour Compression Refrigeration
L23
R4(13.4-13.5)
24.
02.03.11
4
L24
Vapour Absorption Refrigeration
R4(13.10-13.12)
25.
03.03.11
4
L25
26.
07.03.11
5
L26
Layout of typical Domestic Refrigerator
R4(13.6-13.9)
27.
09.03.11
4
L27
28.
4
Terminology & Principle of
L28
10.03.11
R4(14.1-14.3)
Airconditioning
29.
14.03.11
2
Window Room Airconditioner
L29
R4(14.3-14.5)
30.
14.03.11
5
Split type Airconditioner
L30
R4(14.6-14.8)
Assignment - 3
Date of Announcement : 14.03.11
Date of Submission :23.03.11
CIT-I-Unit-I & II- 07 to 12 March 2010- One Test per Day
Unit ISURVEYING AND CIVIL ENGINEERING MATERIALS
Target Hours:15
31.
16.03.11
4
Objects, Types, Classification of
L31
R4(2.1-2.6)
Surveying, Principles of Surveying
32.
17.03.11
4
L32
33.
21.03.11
2
Measurement of distance
L33
R4( 2.7-2.16)
34.
21.03.11
5
Measurement of angles
L34
R4(2.17-2.18)
35.
23.03.11
4
Levelling
L35
R4(2.32-2.43)
36.
24.03.11
4
L36
37.
26.03.11
4
L37
38.
28.03.11
2
L38
Determination of areas & problems
R4(2.44-2.51)
39.
28.03.11
5
L39
40.
30.03.11
4
Bricks
L40
R4(3.3-3.12)
41.
31.03.11
4
Stones, Sand
L41
R4(3.13-3.20)
42.
06.04.11
4
L42
Cement
R4(3.21-3.26)
43.
07.04.11
4
L43
44.
09.04.11
2
Concrete
L44
R4(3.28-3.36)
45.
09.04.11
5
Steel Sections
L45
R4(3.37-3.43)
Assignment - 4
Date of Announcement :09.04.11
Date of Submission :20.04.11
CIT-II-Unit-III & IV- 25.04.11 to 02.05.11 - One Test per Day
Unit II BUILDING COMPONENTS AND STRUCTURES
Target Hours:14
46.
11.04.11
2
L46
R4(4.12-4.28)
Types of Foundations
47.
11.04.11
5
L47
48.
4
Requirement of good foundation, Bearing
L48
R4(4.7-4.10)
13.04.11
Capacity
49.
18.04.11
2
Brick masonry
L49
R4(5.1-5.9)
50.
18.04.11
5
Stone masonry
L50
R4(5.10-5.19)
51.
20.04.11
4
Beams
L51
R4(5.21-5.24)
52.
21.04.11
4
Columns,lintels
L52
R4(5.25-5.31)
53.
25.04.11
5
Roofing
L53
R4(5.32-5.45)

54.
55.
56.
57.

27.04.11
28.04.11
02.05.11

58.
59.
60.

05.05.11

04.05.11
09.05.11

4
4
5
4

Flooring
Plastering
Mechanics, Internal & External forces
Stress&Strain, Elasticity Problems

L54
L55
L56
L57

R4(5.46-5.56)
R4(5.57-5.60)
R4(6.1-6.10)

4
2
5

Types of Bridges
Dams, Interior design

L58
L59
L60

R4(7.1-8.16)
R4(9.1-9.14)

R4(6.11-6.30)

REFERENCES
1
Shanmugam G and Palanichamy M S, Basic Civil and Mechanical Engineering, TMH
Publishing Co., New Delhi, (1996).
2
Ramamrutham. S, Basic Civil Engineering, Dhanpat Rai Publishing Co. (P) Ltd. (1999).
3
Seetharaman S. Basic Civil Engineering, Anuradha Agencies, (2005).
4
Venugopal K and Prabhu Raja V, Basic Mechanical Engineering, Anuradha Publishers,
Kumbakonam, (2000).
5
Shantha Kumar S R J., Basic Mechanical Engineering, Hi-tech Publications, Mayiladuthurai,
(2000).

FACULTY IN-CHARGE

HOD/MECH

Вам также может понравиться