GOVERNMENT OF MONTENEGRO

MINISTRY OF SUSTAINABLE
DEVELOPMENT & TOURISM

PRELIMINARY DESIGN FOR WWTP CETINJE &


SEWERAGE NETWORK WITH FACILITIES

BOOK 5 WASTE WATER TREATMENT


PLANT
Volume 5.2 Hydraulic Design

MAY 2013.

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

GENERAL PROJECT CONTENT


No.

NAME OF PROJECT PART


GEOTECHNICAL STUDY
HYDROLOGICAL STUDY ON RAINFALL AND FLOW

BOOK 1

GENERAL BOOK

BOOK 2

SEWAGE NETWORK

BOOK 3

ATMOSPHERIC NETWORK

BOOK 4

HYDRAULIC TUNNEL BELVEDER

BOOK 5

WASTE WATER TREATMENT PLANT (WWTP)

Volume 5.1

Process design

Volume 5.2

Hydraulic design

Volume 5.3

Architectural design

Volume 5.4

Mechanical design

Volume 5.5.1

Electrical design new TS

Volume 5.5.2

Electrical design electrical equipment for the treatment process and


SCADA

Volume 5.5.3

Electrical design additional installations

Volume 5.6

Previous expropriation study

Note: All general documentation of project is located in Book 1 General book.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

TERMS OF REFERENCE

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

TABLE OF CONTENT
1. LOCATION WWTP CETINJE ............................................................................................................. 2
2. HYDROTECHNICAL SOLUTION ....................................................................................................... 4
2.1. WASTE WATER LINE TREATMENT ....................................................................................................................4
2.2. PROTECTION LINE OF OVERFLOW WATER ........................................................................................................4

3. HYDRAULIC CALCULATIONS.......................................................................................................... 5
4. EXTERNAL PIPELINES ................................................................................................................... 13
5. EXTERNAL AND INTERNAL WATER AND SEWAGE SYSTEM..................................................... 14
5.1. EXTERNAL WATER SYSTEM ...........................................................................................................................14
5.2. EXTERNAL SEWAGE SYSTEM.........................................................................................................................14
5.3. INTERNAL WATER AND SEWAGE SYSTEM.......................................................................................................15

6. RAIN WATER SYSTEM.................................................................................................................... 17


6.1. CHANNEL DESCRIPTION ................................................................................................................................17
6.2. HYDRAULIC CALCULATIONS ..........................................................................................................................17

7. SYSTEM OF FIRE PROTECTION .................................................................................................... 19


7.1. EXTERNAL AND INTERNAL HYDRANT NETWORK .............................................................................................19
7.2. HYDRAULIC CALCULATION ............................................................................................................................20

8. BILL OF QUANTITIES...................................................................................................................... 22
8.1. EXTERNAL PIPELINES ...................................................................................................................................22
8.2. EXTERNAL WATER, HYDRANTS AND SEWAGE NETWORK ................................................................................23
8.3. INTERNAL WATER AND SEWAGE NETWORK ...................................................................................................28
8.4. RAIN WATER DRAINAGE SYSTEM ...................................................................................................................35
8.5. SUMMARY RECAPITULATION .........................................................................................................................36

9. LIST OF GRAPHICAL DOCUMENTATION...................................................................................... 37

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 1

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

1. LOCATION WWTP CETINJE


According to the adopted regulations plans, location of the future waste water treatment
plant for the Royal Capital Cetinje is located on a site near the village Dobrsko selo.
WWTP occupies a rectangular shape of the total area 7.944,0 m, and enclosed area
6.600 m (or 66 acres). This area will be located at ground level, leveled approximately
530,00 masl, while the current field is in a range of small slope between elevation 542,00
to 526,60 masl. To WWTP location can be reached by turning from the highway
Podgorica-Cetinje, which leads next to Belveder restaurant and come down on the
macadam road which will be reconstructed for the needs of the plant. This road would
later serve as a service road to serving this plant.
Location of the future WWTP extends on a total of 12 land parcels, some of them are fully
engaged and some of them are partially engaged, which is shown in detail in previous
expropriation study.

PICTURE 1 LOCATION OF THE FUTURE WWTP

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 2

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

PICTURE 2 ACCESS ROAD

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 3

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

2. HYDROTECHNICAL SOLUTION
Waste water gravity comes to the location of the WWTP by fecal sewer 400. Because of
the difference in altitude from exit of collector of the future tunnel Belveder to location of
the plant, we provide larger number of manholes with cascades so that water leads to
manhole with flow meter at low pressure from a few meters, so that this flow meter can
work with full profile. After leaving this manhole, the water enters in the separating
chamber from where water distributed on two lines with 50% capacity (55 l/sec) to a
screens and grit and grease chamber. Also, lateral is designed safety overflow, which also
represents the by-pass through whole plant. The dimension of this pipeline is 500 and
through him all water amount leads to collecting manhole. In this manhole water is
combined with purified water and that mix leads to manhole with exit flow meter, and then
gravity, with free fall, goes to trapezoidal channel for large atmospherically water which
goes to river Rijeka Crnojevia.

2.1. WASTE WATER LINE TREATMENT


From grit and grease chamber, water through pressure pipeline goes to equalization tanks
where it is the accumulation done for equal supply to the SBR units. This unit works
discontinuous, i.e. it has a period of charging and discharging, that difference in
continuous flow and operating mode of SBR accepts equalization tanks. In the first phase
is provide to be completed one units SBR, while in the final phase is provide two more.
Water supply to the SBR is done through the inlet pipeline 500, by which the water is
distributed into one of six units of SBR (two units were merged into one building units).
The entry in each unit is providing via penstock gate.
After water treatment in SBR, the water is collected in the collecting pipeline and then to a
collecting manhole, from where water gravity goes to pumping station within command
building. These pumps provide enough pressure for water filtration through sand filters
(chosen filter type is one who work normally under pressure), after filters the water leads
into the manhole with reducing-valve pressure and goes to manhole with exit flow meter.
Situation with routes of external pipe connection have been given in the hydro-technical
part of the project and in the appendix is given hydraulic profile of water and sludge line
through the plant.
On the sludge line, from the SBR through pipeline 100 leads to thickener and filter
presses.

2.2. PROTECTION LINE OF OVERFLOW WATER


Security overflow, by the separating chamber overflow which leads to by pass, is
provided from the collecting basin.
Especially are given discharge for drainage water from certain object through special
manhole discharged into treated waste water.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 4

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

3. HYDRAULIC CALCULATIONS
Water supply from the tunnel to the plant
D=
Qmax, =
i=
L=

250
102.8
39
250

mm
l/s
%
m

h=
Kv=

0.16
525.16

m
masl

529.00

masl

hour

ADOPTED
Kv=

0.25
0.1028
0.39

m
m3/s

From entry flow meter to separating chamber


L=

hour

=
D=
v=
k=
=
ul=
zat=
iz=

102.8
400
0.81806
0.15
0.01600
0.5
0.1
1

l/s
mm
m/s
mm

h=
Kv=

0.07027
528.93

m
masl

Qmax,

0.1028
0.4

m3/s
m

From separating chamber through Hubers packet do equalization tanks


Entrance in Hubers packet is 300, which means that we must have reduced from 400.
For adopted packet, manufacturer was prescribed losses:
h=
Kv=

0.14
528.79

m
masl

Outlet from Hubers packet is 350.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 5

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
Revision manhole Equalization tanks
Qmax,hour/2 =
51.4
D=
350
v= 0.53424
ul=
0.5
zat=
0.1
iz=
1

h= 0.02328
Kv=
528.77

Equalization tank
Qmax,day =
A=
v=
ul=
iz=

60.4
160
0.00038
0.5
1

h= 1.09E-08
Kv=
528.77

l/s
mm
m/s

0.0514
0.35

m3/s
m

0.0604

m3/s

m
masl

l/s
m2
m/s

m
masl

In equalization tanks are given two pumps (1+1) which, by pipeline 300, pump water in manhole in front
of equalization tanks, from there water goes by gravity to SBR pipeline 300.
Water elevation on which the pumps push water in manhole in front of SBR is:
Kv=

528.55

masl

Losses in Equalization tanks are small, so they will be ignored.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 6

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Equalization tank SBR


FIRST
Qmax,day =
D=

60.4
350

l/s
mm

L=
v=
k=

26
0.62779
0.15

m
m/s
mm

=
ul=
zat=
iz=
rac=
kol=

0.01655
0.5
0.1
1
1.5
0.1

h=
max Kv=
min Kv=

0.08696
528.44
526.94

m
masl
masl

Qmax,day =
D=
L=
v=
k=
=
ul=
zat=
iz=
rac=
kol=

60.4
350
15.5
0.62779
0.15
0.01655
0.5
0.1
1
1.5
0.1

l/s
mm
m
m/s
mm

h=
max Kv=
min Kv=

0.07900
528.45
526.95

m
masl
masl

0.0604
0.35

m3/s
m

0.0604
0.35

m3/s
m

SECOND

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 7

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

THIRD
Qmax,day =
D=
L=
v=
k=
=
ul=
zat=
iz=
rac=
kol=

60.4
350
8.5
0.62779
0.15
0.01655
0.5
0.1
1
1.5
0.1

l/s
mm
m
m/s
mm

h=
max Kv=
min Kv=

0.07436
528.46
526.96

m
masl
masl

Qmax,day =
D=
L=
v=
k=
=
ul=
zat=
iz=
rac=
kol=

60.4
350
19
0.62779
0.15
0.01655
0.5
0.1
1
1.5
0.1

l/s
mm
m
m/s
mm

h=
max Kv=
min Kv=

0.08634
528.44
526.94

m
masl
masl

0.0604
0.35

m3/s
m

0.0604
0.35

m3/s
m

FOURTH

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 8

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

FIFTH
Qmax,day =
D=
L=
v=
k=
=
ul=
zat=
iz=
rac=
kol=

60.4
350
30.5
0.62779
0.15
0.01655
0.5
0.1
1
1.5
0.1

l/s
mm
m
m/s
mm

h=
max Kv=
min Kv=

0.09927
528.43
526.93

m
masl
masl

Qmax,day =
D=
L=
v=
k=
=
ul=
zat=
iz=
rac=
kol=

60.4
350
44
0.62779
0.15
0.01655
0.5
0.1
1
1.5
0.1

l/s
mm
m
m/s
mm

h=
max Kv=
min Kv=

0.11410
528.42
526.92

m
masl
masl

0.0604
0.35

m3/s
m

0.0604
0.35

m3/s
m

0.0604

m3/s

SIXTH

SBR
Qmax,day =

60.4

A= 900.00
v= 6.71E-05
ul=
0.5
iz=
1

l/s
m2
m/s

h= 6.89E-10 m

Losses through SBR are small, so they will be ignored.


IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 9

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

As authoritative value will be adopted the biggest loss, and that is loss which is made to six SBR basin
and is 1.61 m, so authoritative water elevation is Kv = 526.92 masl.
SBR - Collecting basin
FIRST AND SECOND
V=
t=
Q=
D=
L=
v=
k=
=
ul =
iz =

300
30
166.667
500
93.5
0.84883
0.15
0.01513
0.5
1

m3
min
l/s
mm
m
m/s
mm

h=
Kv=
Kv=

0.65478
526.29
526.30

m
masl
masl

1800
0.16667
0.5

s
m3/s
m
Manhole between
L=
68
m
h= 0.57135 m
Kv= 526.37 masl
Kv= 526.38 masl

FIRST
SECOND

FIRST
SECOND

THIRD AND FOURTH


V=
300
m3
t=
30
min
Q = 166.6667 l/s
D=
500
mm
L=
70.5
m
v= 0.84883 m/s
k=
0.15
mm
= 0.01513
ul=
0.5
iz=
1
h=
Kv=
Kv=

0.51904
526.44
526.42

m
masl
masl

1800
0.166667
0.5

s
m3/s
m
Manhole between
L=
46
m
h= 0.43673 m
Kv= 526.52 masl
Kv= 526.51 masl

THIRD
FOURTH

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 10

THIRD
FOURTH

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

FIFTH AND SIXTH


V=
300
m3
t=
30
min
Q = 166.6667 l/s
D=
500
mm
L=
46.5
m
v= 0.84883 m/s
k=
0.15
mm
= 0.01513
ul=
0.5
iz=
1
h=
Kv=
Kv=

0.38220
526.55
526.53

m
masl
masl

1800
0.166667
0.5

s
m3/s
m
Manhole between
L=
24
m
h= 0.30210 m
Kv= 526.63 masl
Kv= 526.61 masl

FIFTH
SIXTH

FIFTH
SIXTH

As authoritative value will be adopted the biggest loss which gave us the lowest water elevation, so
authoritative water elevation is: Kv = 526.29 masl.
Collecting basin - Filters
Pressure flow
Line losses are ignored, so we have only local.
Pressure at the outlet of the pump is 5 bars.
D=
Q=
v=
ul=
zat=
iz=
rac=
kol=
kl=

100
13
1.65521
0.5
0.1
1
1.5
0.5
1.5

mm
l/s
m/s

h=

0.85180

0.1
0.013

m
m3/s

0.09 bars

Pressure at the inlet in filters is 4.91 bars.


Losses through filters are 0.8 bars, so pressure at outlet of the filters is 4.11 bars.
h=

8.00

UV disinfection
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 11

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Adopted loss through UV disinfection is 20 cm, i.e. after UV disinfection pressure is 4.09 bars.
h=

0.20

0.02 bars

From UV to exit flow meter


Qpump =
D=
L=
v=
k=
=
ul=
zat=
iz=
kol=

39
250
24
0.79450
0.15
0.01800
0.5
0.1
1
0.5

l/s
mm
m
m/s
mm

h=

0.12315

0.039
0.25

m3/s
m

0.012 bars

From here the water goes to exit flow meter, which is under pressure.
A detail description of the flow meter is located in the mechanical part of the project.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 12

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

4. EXTERNAL PIPELINES
With external pipelines are covered pipes which connect object from input to output flow
meter.
Provided pipes are from HDPE or PE, which is mostly, used because of the technical
benefits and economic costs.
In the line of water treatment are connected the following facilities:

Section
from - to

Diameter
(mm)

Length
(m)

Flow meter manhole separating chamber

400

18.0

Equalization tanks manhole in front of SBR

300

8.6

Manhole in front of SBR - SBR

350

55.3

SBR collecting basin

500

92.8

Collecting basin - filters

100

3.3

pressure pipeline

Filters UV disinfection

100

7.0

pressure pipeline

UV disinfection by pass

250

4.2

By pass (from exit flow meter)

100

6.0

Note

pressure pipeline

In the line of sludge treatment are connected the following facilities:

Section
from - to

Diameter
(mm)

Length
(m)

Note

SBR thickener

100

98.2

pressure pipeline

Thickener command building

100

9.9

pressure pipeline

In addition to these pipelines are especially given independent systems, external water
network with hydrants and external sewage network, and for drainage atmospheric water
is provided open channel system. These entire projects are given independently in this
book.
Bill of Quantities of outside pipeline works is given in section 8 Bill of Quantities of this
book.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 13

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

5. EXTERNAL AND INTERNAL WATER AND SEWAGE SYSTEM


5.1. EXTERNAL WATER SYSTEM
In the external water supply network are included the following facilities: guard house,
command building, grit and grease chamber.
External water supply network is connected to a city water supply network of city Cetinje
with sump 150 at junction in which is located internal flow meter. Available pressure at
the connection is here 4.0 bars.
Water needs:
In this plant from external water supply network is provided following purposes:
Fire protection needs
Sanitation needs
Washing facilities (basin)

5.2. EXTERNAL SEWAGE SYSTEM


External sewage network is used for evacuation of waste water from sanitary facilities
located in buildings WWTP Cetinje. There is no city sewage system in the location of the
plant, because of that provided the sewage and drainage collected from beginning of
process of purification.
To the external sewage drains system is connected following customers:
Sanitary facilities from guard house (object 3)
Sanitary facilities from command building (object 12)
Considering the small amount of wastewater, the network is dimensioned according to
technical regulations.
All pipelines are gravity.
All pipes are made of PE or PVC of various diameters. These materials are selected
because of the sewerage pipes have the following advantages over other types of
materials:
They are easy to install;
They have more bandwidth for the same diameter pipeline;
They are easy to transport and
They are easy to make new connections.
The network is dimensioned so that the adopted slopes, fulfillments of cross section are
not exceeding 50%.
All sewage water collects and drains to a separating chamber (object 5) and leads to a
process of purification.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 14

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
In the following table is given diameter pipes and slopes by sections:
Section
From - to
a1 RS1
RS1 RS2
RS2 RS3
a2 RS3
RS3 RS4
a3 RS4
RS4 RS5

Kuzv
(masl)
527.40
527.37
526.99
527.30
526.26
527.30
526.23

L
(m)
1.30
19.40
36.30
0.80
2.80
0.80
39.80

I
(%)
2
2
2
2
1
2
1

Kniz
(masl)
527.37
526.99
526.26
527.28
526.23
527.28
525.83

Junction
RS1
RS2
RS3
RS3
RS4
RS4
RS5

5.3. INTERNAL WATER AND SEWAGE SYSTEM


Guard house is located on leveled plateau at a level +528.80 masl, near the entrance
gate, from which it is direct, visual and physical access control or exit from the area of
plants on the access road.
The facility is on ground level, square in shape, dimensions 4.20 x 4.20 m and consists of
office (for one or two persons), entrance hall and bathroom. Ground floor elevation of the
building is raised to 0.15m in relation to the elevation of the plateau at the site of
construction.
Water supply system is designed to be made of galvanized water pipes with diameter
from 15 to 25 mm. Water supply is connected to the existing external system within the
waste water treatment plant with pipes 25 and connects to an external distribution
network 100.
Sewage will be constructed of PVC sewer pipe with diameters from 75 to 160 mm.
Provided is one sewer vertical in the object. Waste water is drained with pipe 160 to the
manhole RS-1.
Command building is multi-level building, (Po + P +1) rectangular shape, overall
dimensions 17:44 x 11.54 m, 9.25 m height. Object is accessed from the plateau on the
north and northwest sides. Ground floor elevation of the building is raised by 0.15m
relative to level of plateau at the site of construction. Under ground elevation is on the
absolute elevation of 528.95 mals.
In the basement is provided: Space to house compressors, filters and UV disinfection and
stairs.
The ground floor contains the following facilities:
Hallway and stairs to first floor and basement;
Office;
Two toilets with sink;
Warehouse;
Workshop;
Room for sludge treatment;
Mounting hole for the basement.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 15

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
All rooms are accessible through the central hall, and for workshop, room for sludge
treatment and mounting hole are provided and direct access from the outside.
First floor contains the following facilities:
Control room;
Manager office;
Two working office;
Two toilets with sink
Living room with kitchen for workers;
Physical and chemistry laboratory;
Microbiological laboratory;
Hallway with stairs.
Water supply network is designed to be made of galvanized water pipes with diameter
from 15 to 50 mm. Water network is connected to the existing system within external
water in the plant pipes 50, which is connected to the external distribution system and
two 100 and 25 pipe from which the divorce connected to the pipe 50. Sewage will
be constructed of PVC sewer pipe with diameters from 75 to 160 mm. Two sewage
verticals are planned in the object. Part of the wastewater is discharged with pipe 160 to
the manhole RS-3, and other waste water through a pipe 160 to the manhole RS-4.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 16

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

6. RAIN WATER SYSTEM


For drainage of storm water from the plant, is provided the system of open channel, which
are placed parallel with internal road. It is planed that channel leads rain water from plant
to river Rijeka Crnojevia.
Authoritative rain for territory of the Municipality of Cetinje which are adopted during
calculation are twenty minutes rains, t = 20 min, with return period of five years, T = 5 y,
and amount i = 22.4 l/m2/20 min, or i = 0.01867 l/m2/s.
During the calculation are adopted basic parameters, such as runoff coefficient, which is
for green areas = 0.35, and for roads and roofs of building is = 1.

6.1. CHANNEL DESCRIPTION


These channels installed at the plant for waste water treatment, used for collecting water
from the roofs of buildings and land under roads and green areas.
The channels are placed at the edge of the plant and between object following the internal
road, and they serve to protect WWTP from atmospheric water and evacuation of water
from impermeable surfaces.
Channels are designed as a concrete channels, rectangular cross section, width and
depth of 30cm or 40cm, depending of the amount of water which they should receive.
In section 1 4, the channel passes through internal road, so it is planed that on this part
of road channel should be covered by grid resistant on heavy traffic.

6.2. HYDRAULIC CALCULATIONS


During the calculation are adopted the following values:
Mannings coefficient n = 0.013 m-1/3/s
Runoff coefficient from green areas = 0.35
Runoff coefficient from impermeable surfaces = 1
Intensity of rainfall i = 0.01867 l/m2/s
Detailed hydraulic calculation is shown below.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 17

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

CHANNEL 1

Section

Ground
elevation
upstream

Bottom
elevation
upstream

Ground
elevation
downstream

Bottom
elevation
downstream

Length
L

Slope
I

Area
(road +
object)

Runoff
coefficient

Green
area

Runoff
coefficient

Intensity

Flow
Q

Total flow
Q

Water
depth in
channel
h

Velocity
v

Channel
width

masl

masl

masl

masl

m2

m2

l/m2/s

l/s

l/s

m/s

529.00
528.70

528.70
528.40

528.70
528.30

528.40
528.00

11.14
21.20

0.06
0.09

Ground
elevation
upstream

Bottom
elevation
upstream

Ground
elevation
downstream

Bottom
elevation
downstream

Length
L

Slope
I

Area
(road +
object)

Runoff
coefficient

Green
area

masl

masl

masl

masl

m2

m2

529.00
528.60

528.70
528.30

528.60
528.30

528.30
528.00

Ground
elevation
upstream

Bottom
elevation
upstream

Ground
elevation
downstream

Bottom
elevation
downstream

Length
L

Slope
I

Area
(road +
object)

Runoff
coefficient

Green
area

masl

masl

masl

masl

m2

m2

528.30

527.90

528.20

1-2
2-3

56.30
89.30

0.53
0.45

373.56
267.90

1
1

638.30
774.00

0.35
0.35

0.01867
0.01867

11.14
10.06

0.66
0.77

0.30
0.30

Runoff
coefficient

Intensity

Flow
Q

Total flow
Q

Water
depth in
channel
h

Velocity
v

Channel
width

l/m2/s

l/s

l/s

m/s

20.65
30.91

0.09
0.11

CHANNEL 2

Section

1-4
4-3

89.30
56.30

0.45
0.53

785.10
267.24

1
1

918.05
806.62

0.35
0.35

0.01867
0.01867

20.65
10.26

0.76
0.90

0.30
0.30

Runoff
coefficient

Intensity

Flow
Q

Total flow
Q

Water
depth in
channel
h

Velocity
v

Channel
width

l/m2/s

l/s

l/s

m/s

0.93

53.05

0.12

CHANNEL 3

Section

3-5

527.80

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

14.30

0.70

143.00

PAGE 18

0.35

0.01867

1.13

0.40

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

7. SYSTEM OF FIRE PROTECTION


7.1. EXTERNAL AND INTERNAL HYDRANT NETWORK
For fire fighting of any fire on the building is provided the external and internal hydrant
network. The external network is placed around the plant in a ring, pipe diameter 100,
for operating pressures up to 10 bars, while for the internal of command building is
designed hydrant, pipe diameter 50.
Fire fight hydrant network is connected to a city water supply network of city Cetinje,
where is provided amount of 12 l/sec and minimum pressure of 4 bar.
The total amount of water needed for firefighting in the building, depending on the degree
of resistance to fire and building categories according to the technological process of fire
risk are given in the table.
TABLE 7.1

The degree of Category


resistance to technological
The amount of water in liters per second needed for a fire,
fire in building
process
depending on the volume in cubic meters building which will
according
to be protected
fire risk
3001
5001
20001 50001
200001
up to to
to
to
to
to
over
3000

5000

20000

50000

200000

400000

400000

V and IV

K4, K5

10

10

10

10

15

20

25

V and IV

K1, K2, K3

10

10

15

20

30

35

III

K4, K5

10

10

15

25

I and II

K4 and K5

10

15

20

30

I and II

K3

15

20

25

Considering that the category of technological process in the facility K5, and the volume of
the largest facility of up to 2.000 m3, and the fact that the degree of resistance to the fire
building II, the amount of water needed for effective firefighting is 10 l/sec.
In our case, for turning off the fire, must be provide a minimum amount of water of 10
l/sec, which is required for simultaneous operation of external (5 l/sec) and internal (2 x
2,5 = 5 l/sec) hydrants network, or with two external hydrants.
7.1.1. EXTERNAL HYDRANT NETWORKS
External hydrant network is providing in the form of a ring system of pipelines.
The largest distance between the external hydrants is 80 m, with a fact that the fire in a
building can be put out with the outer two hydrants simultaneously.
The distance from hydrants to building wall is at minimum 5 m.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 19

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
Around the building are placed underground hydrants.
Hydrants diameter is 80.
Pipe of distribution pipelines in network of pipes and hydrants for each hydrant have a
diameter not less than 100.
Minimum work pressure at external hydrant should be 2.5 bars.
7.1.2. INTERNAL HYDRANT NETWORKS
For fire fighting in enclosed building, areas over 150 m2, is planed internal hydrant
network, which are powered by external hydrant network.
Pressure at the most unfavorable hydrant is no less than 2.5 bars.
For inside hydrant network is provide minimum inner pipe diameter 52mm, and hydrant
connector smallest inner diameter 52mm, type C, according to JUS M.B6. 673.
Distance between hydrants is such that the entire aria which will be protected by covering
with jet water, with certain allowances for the fact that length of hose is 15m, and length of
compact jet is 5m.
In fire cabinets set is putted a fire hose with normal diameter of 52mm, with a nozzle
diameter of 12mm.
Internal hydrant network in the building is set up so that it is possible to protect all areas of
fire.

7.2. HYDRAULIC CALCULATION


Hydraulic calculation of hydrants network are done for the case when two farthest external
hydrants works, and in this case there are hydrants PH2 and PH3. Pressure which will be
provided from city network of Cetinje on inlet 150 in junction where located flow meter at
the entrance on the plant is is 4.0 bars. Considering that the minimum pressure at external
hydrant is 2.5 bars, that losses in network should not exceed 1.5 bars.
From the hydraulic calculation (given in table 7.2) that show that the losses in the ring
hydrant networks are almost negligible, so it can be concluded from the fact that the
hydrants will work smoothly.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 20

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
PICTURE 7.1 DESIGN OF HYDRANTS NETWORK AT WWTP CETINJE

TABLE 7.2 HYDRAULIC CALCULATIONS OF LOSSES IN HYDRANTS NETWORK

Section
from - to
Tv1
Tv3
t1
Tv4
Tv4
Tv5
t2
Tv6
Tv7
Tv7
Tv1
M

Tv3
t1
PH2
t1
Tv5
t2
PH3
t2
Tv6
Tv4
Tv7
Tv1

Length
(m)

Diameter
(mm)

29.09
3.05
0.65
3.89
11.01
5.95
0.65
23.09
11.01
29.09
6.94
4.24

100
100
80
100
100
100
80
100
100
100
100
150

Flow
(l/s)

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

3.97
3.97
5
1.03
1.92
1.92
5
3.08
3.08
2.95
6.03
10

Velocity
(m/s)
0.51
0.51
0.99
0.13
0.25
0.25
0.99
0.39
0.39
0.38
0.77
0.57

Loss
(m/m)
0.003
0.003
0.012
0
0.001
0.001
0.012
0.002
0.002
0.002
0.006
0.002

Pressure
loss
(bar)
0.008
0.001
0.001
0
0.001
0
0.001
0.004
0.002
0.004
0.004
0.001

PAGE 21

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

8. BILL OF QUANTITIES
8.1. EXTERNAL PIPELINES
No.

DESCRIPTION OF
WORKS

Unit

Quantity

Unit price
Euro

PRICE
Euro

m3

583.0

5.0

2,915.0

m3

175.0

11.0

1,925.0

Backfilling of the trench dug into the layers of


20cm, with compacting. Backfill to be made to
the technical regulations for this type of work.
Calculation per m3.

m3

373.0

3.0

1,119.0

Planning surplus excavated material on the


site. Calculation per m3.

m3

210.0

2.0

420.0

A. External pipe connections (I PHASE)


I Earth works
1
2
3

Excavation of trenches for laying pipes and


manholes in the soil category III.
Calculation per m3
Procurement, delivery and filling of pipes
beneath the sand, d = 10 cm and filling 30cm
above the pipe. Calculation per m3.

I Earth work

Total

6,379.0

IV Installation works

Procurement, transport and installation


HDPE100 pipe with fittings and fittings,
complete. Calculation per m1
315/23.2
355/26.1
400/29.4
500/36.8

m1

IV Installation works
1

3.0
24.0
28.0
157.0

68.0
88.0
115.0
135.0

Total

204.0
2,112.0
3,220.0
21,195.0
26,731.0

HIDRAULIC TESTING
Hydraulic testing of the placed supply on the
test pressure in accordance with instructions of
the relevant community organizations and the
technical requirements of this project, with the
obligatory presence of the supervisor.
Calculation per meter tested supply.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

212

3.0

PAGE 22

636.0

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
2

DESINFECTION
Disinfection and cleaning of pipelines as
directed by the relevant community
organizations and the competent supervisory
authority with the presence of mandatory
supervisory authority. Calculation of the m1
cleaned pipeline

m1

V Other works

212

3.0

Total

636.0
1,272.0

RECAPITULATION FOR COSTRUCTION WORKS


for external water network

I Earth works
IV Mounting works
V Other works

6,379.0
26,731.0
1,272.0

TOTAL

34,382.0 Euro

8.2. EXTERNAL WATER, HYDRANTS AND SEWAGE NETWORK

No.

DESCRIPTION OF
WORKS

Unit.

Quantity

Unit price
Euro

PRICE
Euro

m3

395.4

5.0

1,977.0

m3

148.7

11.0

1,635.7

m3

243.3

3.0

729.9

m3

2.60

11.0

28.6

m3

153.5
Total

2.0

307.0
4,678.2

A. External water and hydrant network


I Earth works
1
2
3

Excavation of trenches for laying pipes and


manholes in the soil category III Calculation
per m3
Procurement, delivery and filling of pipes
beneath the sand, d = 10 cm and filling 30cm
above the pipe. Calculation per m3.
Backfilling of the trench dug into the layers of
20cm, with compacting. Backfill to be made to
the technical regulations for this type of work.
Calculation per m3.
Procurement, transport and placing pebbles
in a layer of 20cm below the buffer layer.
Calculation per m3.
Planning surplus excavated material on the
site. Calculation per m3.
I Earth works

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 23

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

II Concrete and reinforced concrete for water meter manhole


Unreinforced concrete
1

Concreting of the buffer layer reinforced


concrete manhole below MB15 thickness d = 10
cm.1.9X1.9X2 +2 X3 = 13.2
Calculation per m2.

m2

9.6

8.0

76.8

Procurement, transport and installation r the


concrete bearing under the water meter.
Calculation per m3.

m3

0.16

140.0

22.4

m3

11.5

180.0

2,070.0

Reinforced concrete
1

Construction of reinforced concrete manhole of


the reinforced concrete MB30, VDP8 in all the
drawings and regulations for this kind of works
together with the formwork.
((1.9X1.9X0.25)+(1.9X1.9X0.15)+(2.2X1.5X0.2
X4)) x 2 + (2x3x0.25+2x3x0.1+2.21x0.25x9.5) =
15.50
Calculation per m3.
II Concrete and reinforced concrete for
water meter manhole
III Reinforcement work
Procurement, transport, unloading,
straightening,
cleaning, cutting, bending and placing
of concrete iron to static calculation.
Calculation per kg.
RA 400/500 - 2

Total

kg

III Reinforcement work

1,035.0

2,169.2

1.2

Total

1,242.0
1,242.0

IV Installation works
1

Procurement, transport and installation


HDPE100 pipe with fittings and fittings,
complete. Calculation per m1
PE100110
PE10090
PE10063
PE10025
Procurement, transport and installation of built
furniture, kit. The calculation per unit.
110/25
110/80

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m1

415.0
8.0
28.0
3.0

24.0
22.0
20.0
10.0

9,960.0
176.0
560.0
30.0

unit

1
4

120.0
175.0

120.0
700.0

PAGE 24

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Procurement, transport and installation of water


fittings, together with connecting and sealing
material, a set of certificate, operating
instructions and maintenance. Calculation per
unit
Combined water meter 100 mm,
The cap NP 10 bars
100mm
50mm

230.0

230.0

3
1

140.0
70.0

420.0
70.0

unit

250.0

1,000.0

unit

180.0

180.0

unit

180.0

180.0

unit
unit

1
16

200.0
30.0

200.0
480.0

unit

30.0

120.0

unit

190.0

190.0

unit

180.0

720.0

unit

14

5.0

70.0

unit

Procurement and installation of underground


hydrant
4
5

DN80/PN10
Procurement and installation of cast iron cover
for heavy traffic. Calculation per unit
625mm

Procurement and installation of cast iron cover


for heavy traffic. Calculation per unit
600X600mm
Procurement and installation of cast iron cover
for heavy traffic. Calculation per unit 700X700
mm

E-PE-HD compound DN80/PN10


The arched piece with the foot, N90 , cast iron

8
9
10

DN80/PN10
Procurement and installation of hydrant
cabinets for Internal hydrants with water valve
with connection 2 ", l = 15m hose and full brass
door
Procurement
and
installation
of
oval
DN80/PN10 valve with built-capped and street
furniture
Procurement and installation of cast iron
creepers. Calculation per unit
IV Installation works

Total

15,406.0

V Other works
1

HIDRAULIC TESTING
Hydraulic testing of the placed supply on the
test pressure in accordance with instructions of
the relevant community organizations and the
technical requirements of this project, with the
obligatory presence of the supervisor.
Calculation per meter tested supply.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m1

454

3.0

PAGE 25

1,362.0

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

RECAPITULATION FOR CONSTRUCTION WORKS


for external water network

I Earth works
II Concrete and reinforced concrete for water meter manhole
III Reinforcement works
IV Installation works
V Other works

2,169.2
1,242.0
15,406.0
2,724.0

TOTAL

26,219.4 Euro

No.

DESCRIPTION OF

Unit.

4,678.2

Quantity

WORKS

Unit price

PRICE

Euro

Euro

B External sewage
I Earth works
1

Excavation of trenches for laying pipes and


manholes in the soil category III, bottom plan,
groundwater pumping, and all other costs
charged to this position
m3

172.0

5.0

860.0

m3

55.1

11.0

606.1

Backfilling of the trench dug into the layers of


20cm, with compacting. Backfill to be made to
the technical regulations for this type of work
(172-60)=112
Calculation per m3.

m3

112.0

3.0

336.0

Planning surplus excavated material on the site


(172-112) = 60. Calculation per m3.

m3

60.0

2.0

120.0

Calculation per m3.


Procurement, delivery and filling of pipes
beneath the sand, d = 10 cm and filling 30cm
above the pipe. Calculation per m3.

I Earth works

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

Total

1,922.1

PAGE 26

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

II Concrete and reinforced concrete works


Unreinforced concrete
1

Concreting of the buffer layer reinforced concrete


below manholes thickness MB15
d=10 cm. (0.65xx5)=6.63
Calculation per m2.

m2

6.63

8.0

Reinforced concrete
Construction of reinforced concrete standard
manholes of the reinforced concrete MB30
Calculation per m.

14.20

140.0

II Concrete and reinforced concrete works

53.04

Total

1,988.0
2,041.04

III Installation works


1

Procurement, transport and installation of PVC


sewer pipe with fittings and fittings, set.
Calculation per m1.
160
200

m
m

III Installation works

65.0
41.0

14.0
18.0

Total

910.0
738.0
1,648.0

IV Other works
1

Hydraulic testing of laid sewerage system at test


pressure and water resistance. Calculation per
meter tested network.

Procurement and installation of cast iron


creepers. Calculation per unit.

Procurement and installation of cast iron covers


for heavy traffic 625. Calculation per unit
IV Other works

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

106

3.0

318.0

unit

48

5.0

240.0

unit

180.0

900.0

Total

1,458.0

PAGE 27

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

RECAPITULATION FOR CONSTRUCTION WORKS


for external sewage network

I Earth works
II Concrete and reinforced concrete works
III Installation works
IV Other works

1,922.10
2,041.04
1,648.00
1,458.00

TOTAL

7,069.14 Euro
SUMMARY RECAPITULATION FOR
External water and sewage network

I Water supply and hydrant network


II External sewage

26,219.4
7,069.1

TOTAL

33,288.5 Euro

8.3. INTERNAL WATER AND SEWAGE NETWORK

POS.

DESCRIPTION OF WORKS

UNIT.

QUANTITY

U PRICE()

160 mm

mI

1.00

11.00

11.00

110 mm

10.00

10.00

100.00

6.00

5.00

30.00

PRICE()

0BJECT: Guard house

1. Sewage
1

Plastic PVC pipes


Procurement, transport and setting PVC sewage
pipes with necessary parts, connecting and
midfield material to create sewage. Unit price
includes the examination to be carried
waterproofing in the presence of supervisory.
Unit price entered all the necessary work and
connecting and bonding material.
Calculation per m'.

75 mm

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m
m

PAGE 28

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Sand
Procurement, transport and installation of sand
below and above the water and sewage pipes in
the layer below 10 cm and 10 cm above the
pipe, the lower layer in the direction of the
projected decline.
Calculation per m3
Sewage

m3

5.00

13.00

65.00

Ventilation
Procurement, transport and installation of air
hole. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per unit.

unit

15.00

15.00

mI

17.00

2.00

34.00

Testing sewage
Testing and flushing mounted sewerage system
on the waterproofing.
The calculation of the m.
Total sewage:

255.00

2. Water supply
1

Water pipeline
Procurement, transport and installation of
galvanized steel water pipes with fittings, for
working pressures to 10 bars for water
distribution in the house. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per m
25 mm

mI

3.00

6.00

18.00

15 mm

mI

2.00

4.80

9.60

unit

10.00

10.00

unit

8.00

8.00

Pass valves
Procurement, transport and incorporation of
porous nickel valve cap and rosette. The unit
cost position entering all the necessary work
and connecting and bonding material.
Calculation per unit.
25 mm
Angle Valves
Procurement, transport and angular neckline
valve diameter 15 mm. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 29

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
4

Testing of the pressure


Testing mounted on the water distribution test
pressure of 12 bars, all in accordance with
technical regulations and standards for this type
of work. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per m'.
Disinfection
Disinfection of water distribution in all the
technical regulations and standards for this type
of work. Disinfection must be performed by an
authorized institution. Upon completion of
disinfection rinse water supply.

mI

5.00

2.00

10.00

Calculation per m'.


Total water supply:

mI

5.00

4.00

20.00
75.60

3. Sanitation
1

Toilet
Procurement, transport and installation of toilet
type "Simplon", complete with low-enameled
water tank assembly with plastic pipes merge,
toilet seats made of hard PVC, rubber sleeves,
rubber gasket and screws. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit.
Basins
Procurement, transport and installation of sinks
white faience, domestic production, and class,
complete with pole, standing mixer battery for
hot and cold water, a siphon with a nickel-plated
plugs, chains and rosettes and the "Diana"
screws. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per unit.
-large basin
Container for liquid soap
Procurement, transport and montage containers
for liquid soap. The unit cost position entering all
the necessary work and connecting and bonding
material.
Calculation per unit.
Container for liquid towel
Procurement, transport and montage containers
for liquid towel. The unit cost position entering
all the necessary work and connecting and
bonding material.
Calculation per unit.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

unit

172.00

172.00

unit

115.00

115.00

unit

12.00

12.00

unit

8.00

8.00

PAGE 30

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Toilet towels
Procurement, transport and installation of
bathroom towel holders, position the unit cost of
entering all the necessary work and connecting
and bonding material.
Calculation per unit
Shelf and Mirror
Procurement, transport and montage shelf and
mirror above the sink. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit
Floor drains
Procurement, transport and installation of floor
drains LG 70 mm, with chrome Rostom
(20/20 cm), for installation in bathrooms. The
unit cost position entering all the necessary
work and connecting and bonding material.
The calculation of per unit.
- Horizontal drain 70 mm
Electric Water Heater
Procurement, transport and installation of
electric water heaters.
Calculation per unit
8 lit electric water heater
Total sanitation:

unit

6.00

6.00

unit

25.00

25.00

unit

28.00

28.00

unit

100.00

100.00
466.00

RECAPITULATION
1. Sewage
2. Water supply
3. Sanitation
TOTAL:

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

255.00
75.60
466.00
796.60

PAGE 31

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

POS.

DESCRIPTION OF WORKS

UNIT

QUANTITY

mI

U.PRICE
()

PRICE ()

0BJECT Command building

1. Sewage
1

Plastic PVC pipes


Procurement, transport and setting PVC sewage
pipes with necessary parts, connecting and
midfield material to create sewage. Unit price
includes the examination to be carried
waterproofing in the presence of supervisory
unit price entered all the necessary work and
connecting and bonding material.
Calculation per m'.
160 mm
110 mm
75 mm

11.00

22.00

25.00

10.00

250.00

21.50

5.00

107.50

kom

15.00

30.00

mI

48.50

2.00

97.00

Ventilation
Procurement, transport and installation of air
hole. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per unit.

2.00

Testing sewage
Testing and flushing mounted sewerage system
on the waterproofing.
The calculation of the m.
Total sewage:

506.50

2. Water supply
1

Water pipeline
Procurement, transport and installation of
galvanized steel water pipes with fittings, for
working pressures to 10 bar for water
distribution in the house. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per m
50 mm
25 mm
20 mm
15 mm
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

mI

9.50

10.00

95.00

42.00

6.00

252.00

7.00

5.00

35.00

13.50

4.80

64.80

m
m
m

PAGE 32

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN
2

Pass valves
Procurement, transport and incorporation of
porous nickel valve cap and rosette. The unit
cost position entering all the necessary work
and connecting and bonding material.
Calculation per unit.
50 mm

unit

25.00

50.00

25 mm

unit

10.00

60.00

Angle Valves
Procurement, transport and angular neckline
valve diameter 15 mm. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit.

unit

8.00

64.00

Hose connection
Procurement, transport and installation
connection hose 50. The unit price position
entering all needed work, and connecting and
bonding material.
Calculation per unit.

unit

20.00

20.00

Testing of the pressure


Testing mounted on the water distribution test
pressure of 12 bars, all in accordance with
technical regulations and standards for this type
of work. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per m'.

mI

72.00

2.00

144.00

Disinfection
Disinfection of water distribution in all the
technical regulations and standards for this type
of work. Disinfection must be performed by an
authorized institution. Upon completion of
disinfection rinse water supply.
Calculation per m'.

mI

72.00

4.00

288.00

Total water supply:


3. Sanitation
1

1,072.80

Toilet
Procurement, transport and installation of toilet
type "Simplon", complete with low-enameled
water tank assembly with plastic pipes merge,
toilet seats made of hard PVC, rubber sleeves,
rubber gasket and screws. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

unit

172.00
PAGE 33

688.00

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

Basins
Procurement, transport and installation of sinks
white faience, domestic production, and class,
complete with pole, standing mixer battery for
hot and cold water, a siphon with a nickel-plated
plugs, chains and rosettes and the "Diana"
screws. The unit cost position entering all the
necessary work and connecting and bonding
material.
Calculation per unit.
-large basin
Container for liquid soap
Procurement, transport and montage containers
for liquid soap. The unit cost position entering all
the necessary work and connecting and bonding
material.
Calculation per unit.
Container for liquid towel
Procurement, transport and montage containers
for liquid towel. The unit cost position entering
all the necessary work and connecting and
bonding material.
Calculation per unit.
Toilet towels
Procurement, transport and installation of
bathroom towel holders, position the unit cost of
entering all the necessary work and connecting
and bonding material.
Calculation per unit
Shelf and Mirror
Procurement, transport and montage shelf and
mirror above the sink. The unit cost position
entering all the necessary work and connecting
and bonding material.
Calculation per unit
Floor drains
Procurement, transport and installation of floor
drains LG 70 mm, with chrome Rostom
(20/20 cm), for installation in bathrooms. The
unit cost position entering all the necessary
work and connecting and bonding material.
The calculation of per unit.
Electric Water Heater
Procurement, transport and installation of
electric water heaters.
Calculation per unit
80 lit electric water heater
8 lit electric water heater
Total sanitation:

unit

115.00

460.00

unit

12.00

48.00

unit

8.00

32.00

unit

6.00

24.00

unit

25.00

100.00

unit

28.00

112.00

unit
unit

1
4

172.00
100.00

172.00
400.00
2,036.00

RECAPITULATION
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 34

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

1. Sewage

506.50

2. Water supply

1,072.80

3. Sanitation

2,036.00

TOTAL

3,615.30

8.4. RAIN WATER DRAINAGE SYSTEM

No.

DESCRIPTION OF

Unit.

Quantity U.price
Euro

WORKS

PRICE
Euro

Drainage channels for rain water


I Preparatory works
1

Route marking channels.


Calculation per m

I Preparatory works

305.5

1.0

Total

305.5
305.5

II Earth works

Excavation for concrete channel in the soil


category III, and the planning. Channel
bottom.
m3

101.0

8.0

807.6

Calculation per m3
Taking the excess land at a location
designated by the supervisory authority
Calculation per m3

m3

101.0

2.5

252.4

II Earth works

Total

1,060.0

III Concrete works


1

Concrete of canal with MB30 (or prefabricated


elements).
Calculation per m3
III Concrete works

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m3

55.6
Total

140.0

7,788.7
7,788.7

PAGE 35

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

IV Other works

Supply and installation of cast iron manhole


grate width 38cm, together with the frame for
the traffic load of 400KN
Calculation per m'

IV Other works

15.1

26.0

Total

392.6
392.6

SUMARY OF COSTRUCTION WORKS


for rain water drainage system

I Preparatory works
II Earth works
III Concrete works
IV Other works

305.5
1,060.0
7,788.7
392.6

TOTAL

9,546.8 Euro

8.5. SUMMARY RECAPITULATION


Position

Price
(EUR)

1.

External pipelines

34,382.0

2.

External water, hydrant and sewage network

33,288.5

3.

Internal water and sewage network

4,411.9

4.

Rain water drainage system

9,546.8

TOTAL

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

81,629.3

PAGE 36

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.2 HYDRAULIC DESIGN

9. LIST OF GRAPHICAL DOCUMENTATION

No.
drawing

Name of drawings

001

GENERAL SITUATION (and external pipelines)

002

Hydraulic profile

003

GENERAL SITUATION, Water, sewage and hydrant network

004

Longitudinal profile of sewage

005

GUARD HOUSE, Ground floor plan water supply and sewage, Profiles
sewage, Axonometric chart water supply and air holes

006

COMMAND BUILDING, Basement plan water supply

007

COMMAND BUILDING, Ground plan water supply

008

COMMAND BUILDING, First floor plan water supply

009

COMMAND BUILDING, Axonometric chart water supply

010

COMMAND BUILDING, Ground plan sewage

011

COMMAND BUILDING, First floor plan sewage

012

COMMAND BUILDING, Roof plan air holes, Profiles sewage

013

GENERAL SITUATION, Rain water drainage system

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 37