Corporate Well Services

Work over job plan

Aim to contribute 7-8 % of oil production


through engineered intervention.
Arrest
pressure decline / sustain
production from matured fields by
addressing reservoir related problems
Address safety related issues

Onshore Work over operations

Average wells worked over per year 1500


85-90 rigs deployed every year
Mix of rig capacity 30 MT to 150 MT
Mix of ONGC owned and Charter hired
Presently 57 own rigs and 25 charter hired rigs in
operation
Rig Capacity

ONGC Owned
Under
In operation
commissioning

Charter Hired
Under
In operation
mobilisation

50 MT (300 HP)

0
29

0
0

3
7

0
1

100 MT (525 HP)

27

10

150 MT & above (650 HP)

Total

57

25

30 MT (140 HP)

Offshore Work over operations

Average wells worked over per year 100


10-12 rigs required every year
Mix of jack up drilling rigs & Modular work over rigs
Mix of ONGC owned and Charter hired

Rig type

ONGC Owned

Charter Hired

Modular Rigs with capability


for 6 drain hole drilling

1+2*

Jack up Drilling rigs

2-3

4-5

Note: *Presently there is only one modular rig in operation. 2 rigs are under
mobilisation

Points to ponder

Ever increasing requirement of Work over operations to


arrest pressure decline in mature fields.
Ageing of owned Work Over rigs leading to efficiency
reduction.

Rig requirement Onshore


As per present work plan

Acquisition plan - replace ageing fleet over next 2-4 years in phased
manner
Owned Rig
Capacity

No. of rigs

Age range

50 MT

20

22-28 yrs

100 MT

23

21-30 yrs

150 MT

27 yrs

Total

44

Charter Hiring plan


Total requirement 28-30 rigs for three years period.
Tenders expected to be invited as under
Expected Yr of
tendering as per
present work plan
2015-16
2016-17
2017-18
2018-19
Total

No. of Rigs - capaicity-wise


30T

50T

100T

150 T

Total

4
0
4
0
8

2
0
6
1
9

3
6
5
3
17

4
1
3
2
10

13
7
18
6
44

Note: In case of any change in work program, there may be addition / deletion to above.

Rig requirement Offshore


As per present work plan

Charter Hiring plan 3 Modular rigs to be in operation


after mobilisation of 2 rigs
Continue to deploy jack up drilling rigs as per requirement
(owned & charter hired)
In
operation

Additional
deployment

Total Rigs

Modular Rigs with


capability for 6 drain
hole drilling

Jack up rigs

6-8

1-2

7-10

Rig type

Looking for

Acquisition of new rigs (50-150MT) with latest technology


for efficient operation and safety.
Charter hiring of Rigs to be able to provide rigs with 30150 MT capacity.
Expected to fulfill tender conditions, comply all industry
standards / safety requirements and provide back ups for
accessories and spares and.
Ensure Timely Delivery / mobilisation.

Offshore Engineering Services


In Summation....

Contractors/Vendors are solicited to participate in the tenders.

Tenders are available at tenders.ongc.co.in

Address of Offshore Engineering Services , Mumbai :


Executive Director Chief Offshore Engineering Services
4th Floor, 11 High, ONGC Office
Bandra-Sion Link Road,
Sion (West), Mumbai-400017
Ph: 022-24088422
Fax: 0091-22-24088500
Contact persons for Technical / commercial queries :
1.
S.V. Haviryaji, Head Offshore Design
2.
S.C. Aggarwal, Head Offshore Works
3.
Manas Chakraborty, Head Material Management
4.
Mrs H.K. Joshi, Head Finance

Вам также может понравиться