FresnIllo Peru SAC

PROYECTO MARIELA
Estudio de Impacto Ambiental Semidetallado
______________________________________________

Captulo 4 Descripcin de las Actividades a


Realizar

ELABORADO POR:

Blache Snow Consulting SAC (BLASCO)


www.blachesnow.com | info@blachesnow.com

Finalizado: MARZO 2014

AMT: CDB/JPC/AGA/YSS/MTI/JCC

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

TABLA DE CONTENIDO
4-1

4-2

4-3
4-4
4-5

4-6

4-7

GENERALIDADES ...................................................................................................... 1
4-1.1
DESCRIPCIN DEL TIPO DE PERFORACIN ............................................. 1
4-1.2
NMERO ESTIMADO DE TRABAJADORES ................................................. 1
4-1.3
EQUIPOS Y MAQUINARIA A UTILIZAR ......................................................... 2
4-1.4
REA DE EXPLORACIN DEL PROYECTO ................................................ 3
COMPONENTES PRINCIPALES ................................................................................ 9
4-2.1
PLATAFORMAS DE PERFORACIN ............................................................ 9
4-2.2
POZAS DE SEDIMENTACIN ..................................................................... 23
4-2.3
ACCESOS ................................................................................................... 24
COMPONENTES AUXILIARES ................................................................................ 25
REA DISTURBADA Y VOLUMEN A REMOVER .................................................... 25
CONSUMO Y ABASTECIMIENTO ............................................................................ 26
4-5.1. CONSUMO DE ADITIVOS, COMBUSTIBLES Y GRASAS ........................... 26
4-5.2. CONSUMO Y ABASTECIMIENTO DE AGUA ............................................... 28
4-5.3. FUENTE DE ENERGA ................................................................................ 29
EFLUENTES Y RESIUDOS A GENERAR................................................................. 30
4-6.1. VOLUMEN ESTIMADO DE EFLUENTES A GENERARSE ........................... 30
4-6.2. VOLMENES ESTIMADO DE GENERACIN DE RESIDUOS SLIDOS .... 30
CRONOGRAMA MENSUAL DETALLADO ............................................................... 32

LISTA DE TABLAS
TABLA 4-1.1: RELACIN DE PERSONAL DE ARUNTANI .................................................................................... 1
TABLA 4-1.2: RELACIN DE PERSONAL DE LA CONTRATISTA ....................................................................... 2
TABLA 4-1.4-1: ZONAS Y SECTORES DE LA ACTIVIDAD ................................................................................... 4
TABLA 4-1.4-2: COORDENADAS UTM DE LOS VRTICES DEL REA DEL PROYECTO ................................. 4
TABLA 4-2.1-1: CARACTERSTICAS DE LAS PLATAFORMAS DE PERFORACIN Y SONDAJES ................... 9
TABLA 4-4-1: DETALLE DEL CLCULO DEL REA DISTURBADA Y DEL VOLUMEN A REMOVER ............... 25
TABLA 4-5.1-1: CONSUMO DE COMBUSTIBLE TIPO DIESEL 2 ....................................................................... 26
TABLA 4-5.1-2: CONSUMO DE ACEITES Y GRASAS ........................................................................................ 27
TABLA 4-5.1-2: CONSUMOS ESTIMADOS ......................................................................................................... 27
TABLA 4-5.2-1: REQUERIMIENTO DE AGUA ..................................................................................................... 28
TABLA 4-5.2-2: REQUERIMIENTO DE AGUA ..................................................................................................... 28
TABLA 4-6.2-2: VALORES CONSIDERADOS PARA LA ESTIMACIN DE RESIDUOS SOLIDOS .................... 30
TABLA 4-6.2-3: ESTIMADO DE GENERACIN DE RESIDUOS SOLIDOS POR TIPO Y CLASE ...................... 31
TABLA 4-7-1: CRONOGRAMA MENSUAL DETALLADO .................................................................................... 32

Pgina TDC-1

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-1 GENERALIDADES
4-1.1 DESCRIPCIN DEL TIPO DE PERFORACIN
El presente programa de exploracin incluye actividades por un periodo de 40 meses. Se considera
desarrollar actividades de exploracin superficial que comprendern la ejecucin de 116 800 m de
perforacin diamantina (diamond drill hole, DDH por sus siglas en ingls) distribuidos en 584
plataformas de perforacin.
El proceso de extraccin de muestras considera la utilizacin de brocas de dimetros HQ y NQ (la
muestra o testigo no excede en los de 2,5 pulgadas de dimetro). La profundidad promedio de los
taladros ser de 200 m, se estima un avance aproximado de 40 m por da. Complementariamente, cada
plataforma tendr 2 pozas de sedimentacin las cuales servirn para el manejo de los lodos resultantes
del proceso de perforacin.
En el presente captulo se describen las actividades a ejecutar y los componentes principales y
auxiliares a construir. Asimismo, se detallan los aspectos tcnicos respecto al suministro de insumos
para la perforacin (agua, aditivos, combustible, grasas), el cronograma detallado, entre otros. El
detalle de los aspectos relacionados a los controles ambientales durante el desarrollo de las
actividades del Proyecto se presenta en el Plan de Manejo Ambiental (Captulo 7).
4-1.2 NMERO ESTIMADO DE TRABAJADORES
Para realizar las labores de exploracin, se contar con dos grupos de trabajo, el primero integrado por
trabajadores de ARUNTANI los cuales brindaran el soporte general para la perforacin, es decir la
habilitacin de plataformas, pozas, accesos, entre otros y conducirn el desarrollo de esta actividad.
Un segundo conformado por la compaa perforista quienes se encargarn de las labores de
perforacin diamantina.
Personal de ARUNTANI
ARUNTANI contar con 41 personas en total, considerando jefe de proyecto, gelogos asistentes,
administrador, tractorista, ayudante de tractorista, choferes, encargados de muestreo, seguridad y otros
apoyos y personal obrero. Seguidamente en la Tabla 4-1.1 se detalla, el nmero de trabajadores
involucrados segn profesin u oficio:
TABLA 4-1.1: RELACIN DE PERSONAL DE ARUNTANI

Pgina IV-1

PERSONAL

CANTIDAD

Jefe de Proyecto (Ing. Gelogo)

01

Gelogos Asistentes

03

Administrador

01

Tractorista

01

Ayudante de tractorista

01

Choferes

08

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PERSONAL

CANTIDAD

Muestreros

06

Ayudantes de campo

04

Seguridad / Vigilantes

06

Obreros (Cierre y Rehabilitacin)

10

TOTAL

41

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

Es preciso mencionar que estos trabajadores no son considerados como personal nuevo en el rea,
sino que corresponden a trabajadores de la Unidad Minera Tucari, que sern asignados para el
presente proyecto.
Personal de la Contratista
La contratista contar con un equipo de 29 personas, incluyendo supervisores, perforistas, ayudantes y
y bomberos. En la siguiente Tabla 4-1.2 se detalla la cantidad de trabajadores segn labor.
TABLA 4-1.2: RELACIN DE PERSONAL DE LA CONTRATISTA

PERSONAL

CANTIDAD

Supervisor

02

Perforistas

06

Ayudante de Perforista

18

Bomberos

03

TOTAL

29

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

En este punto, es preciso indicar que todo el personal se alojar en las instalaciones del campamento
de la Unidad Minera Tucari, por lo que no ser necesaria la habilitacin de un campamento en la zona
del proyecto.

4-1.3 EQUIPOS Y MAQUINARIA A UTILIZAR


Para el desarrollo de las actividades de exploracin se considera la utilizacin de diferentes equipos,
que permitirn en primera instancia la ejecucin de accesos y posteriormente la habilitacin de
plataformas y perforacin. Seguidamente se listan los equipos a utilizar, indicando sus cantidades:
Equipos de habilitacin de accesos y plataformas.

Tractor D6 (1)

Herramientas simples (pico, pala, barreta, etc).

Equipos para la desarrollo de la perforacin

Maquina perforadora tipo LF-700 y LC- 1000 o similar (3).

Pgina IV-2

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Tuberas de perforacin HQ y NQ (200 y 300 respectivamente).

Accesorios y herramientas de perforacin.

Grupo electrgeno porttil (1).

Luminarias (3).

Extintores (3).

Camioneta pick up 4x4 (4).

Camin Cisterna para agua (1).

Bomba para agua (3).

4-1.4 REA DE EXPLORACIN DEL PROYECTO


Las actividades de exploracin, plantean la ejecucin de componentes del proyecto, se describen mas
adelante; estos componentes, que incluyen las plataformas de perforacin (objeto principal de la
presente solicitud) se enmarcan dentro del derecho minero Acumulacin Mariela propiedad de
ARUNTANI pero se circunscriben a un rea menor denominada rea del proyecto.
En esa misma lnea, el Artculo 2 de la Resolucin Ministerial N 209-2010-MEM/DM establece que
las certificaciones ambientales debern incluir la georeferenciacin de las reas en actividad minera
(exploracin en este caso) y uso minero. Como se indic previamente, todos los trabajadores se
alojarn en la Unidad Minera Tucari, por ello no se construir campamento en el rea del proyecto.
Asimismo, solo se considera la habilitacin de accesos secundarios desde las vas existentes; en
consecuencia no existen componentes que pudieran ser considerados como de uso minero; por lo
mismo, se considerar solo el rea de actividad minera que por tanto es similar al rea del proyecto.
En ese sentido, el rea de exploracin considera tres zonas principales de perforacin que se dividen
en 6 polgonos que configuran reas de actividad minera (plataformas y accesos):

La primera zona denominada Tucari se encuentra ubicada al Noroeste del proyecto en los
alrededores del tajo Tucari y se encuentra conformada por un solo polgono (sector) que
contiene todas las actividades proyectadas en esta zona.

La segunda zona denominada Huilcane se encuentra ubicada al sur de la primera en la parte


central del proyecto, considera al igual que la anterior un solo polgono (sector) que contiene
todas las actividades proyectadas en esta zona.

La tercera zona denominada Santa Rosa, se encuentra al Sureste del proyecto y considera
actividades de exploracin en los alrededores de la ex-mina Santa Rosa y de la quebrada
Cacachara y sus afluentes; en esta zona las perforaciones se encuentran distribuidas en 4
sectores denominados Victoria, Milagros, Alicia e Ichujasi.

Pgina IV-3

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

En la siguiente Tabla 4.1.4-1 se presentan las reas correspondientes a cada uno de las zonas y
polgonos de actividad:

ACTIVIDAD MINERA

TABLA 4-1.4-1: ZONAS Y SECTORES DE LA ACTIVIDAD


ZONA
Tucari
Huilcane

Santa Rosa

SECTOR
Tucari

REA (HA)
1 510,02

Huilcane

1 623,05

Victoria

254,64

Milagros

792,90

Alicia

201,64

Ichujasi

557,50

TOTAL

4939.78

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

El rea del proyecto, considera entonces un total de 4 939,78 ha. Seguidamente en la Tabla 4-1.4-2 se
presentan las coordenadas UTM de los vrtices de los polgonos de actividad minera que conforman
el rea del proyecto.
TABLA 4-1.4-2: COORDENADAS UTM DE LOS VRTICES DEL REA DEL PROYECTO

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE
TUCARI

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

22

370 919,43

8 167 677,13

373 148,95

8 171 130,63

23

371 526,20

8 168 263,88

373 888,53

8 170 184,51

24

371 699,97

8 169 407,12

374 009,80

8 168 979,41

25

371 347,24

8 170 289,73

374 349,42

8 168 708,39

26

371 733,76

8 170 499,84

374 438,31

8 168 603,90

27

372 206,57

8 171 024,78

374 490,97

8 167 939,78

28

372 416,91

8 171 034,04

374 398,62

8 167 602,37

29

372 501,98

8 171 043,42

374 428,80

8 167 407,96

30

372 670,10

8 170 996,83

374 444,67

8 167 183,07

31

372 820,67

8 171 101,11

10

374 566,27

8 166 885,45

11

374 583,96

8 166 294,32

32

376 522,34

8 160 506,57

12

374 049,51

8 165 756,21

33

376 252,62

8 159 213,04

13

372 642,10

8 166 473,48

34

371 145,09

8 159 704,24

14

372 355,82

8 166 522,98

35

371 014,63

8 160 672,99

15

371 761,03

8 166 385,40

36

371 366,77

8 161 126,35

16

371 589,93

8 166 460,36

37

371 337,12

8 161 318,49

17

370 939,18

8 166 280,09

38

371 769,73

8 161 829,75

18

369 473,55

8 166 720,36

39

372 777,80

8 162 480,63

19

369 016,13

8 167 095,90

40

373 429,58

8 162 586,16

20

369 894,49

8 167 368,04

41

374 373,24

8 163 329,94

21

370 264,08

8 167 902,22

42

374 921,28

8 162 827,69

Pgina IV-4

HUILCANE

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

43

375 597,55

8 162 821,50

82

385 353,58

8 159 682,61

44

375 918,99

8 162 647,90

83

385 858,14

8 159 954,12

45

376 798,47

8 161 009,65

84

386 582,64

8 159 978,34

85

386 592,35

8 159 655,23

VICTORIA
46

384 664,70

8 157 296,12

86

386 880,94

8 159 750,44

47

386 135,56

8 157 340,38

87

387 902,64

8 160 403,04

48

386 186,75

8 155 640,17

88

387 756,82

8 160 768,00

49

384 715,89

8 155 595,87

89

387 781,83

8 160 937,87

50

384 670.57

8 156 700,54

51

384 557,44

8 156 892,76

ALICIA

ICHUJASI
90

388 118,99

8 154 107,32

91

388 134,39

8 154 010,42

52

393 450,36

8 156 446,88

92

388 509,40

8 154 017,26

53

393 451,09

8 156 221,49

93

388 750,70

8 154 085,00

54

393 170,41

8 155 887,50

94

389 241,34

8 153 909,52

55

391 712,47

8 155 848,95

95

390 503,64

8 153 879,81

56

391 676,16

8 157 054,80

96

391 761,91

8 153 519,75

57

393 256,67

8 157 103,49

97

391 776,89

8 153 009,20

98

392 151,96

8 152 703,55

MILAGROS
58

388 619,38

8 160 821,88

99

392 036,86

8 151 838,36

59

388 382,47

8 160 235,39

100

391 810,86

8 151 851,30

60

390 232,31

8 160 295,03

101

390 684,11

8 151 818,22

61

390 219,91

8 160 576,99

102

390 663,09

8 152 534,44

62

390 425,76

8 160 677,23

103

390 265,56

8 153 302,67

63

390 564,93

8 160 784,43

104

391 247,94

8 153 445,19

64

390 742,73

8 160 691,78

105

390 277,91

8 153 724,32

65

390 754,15

8 160 311,85

106

389 014,84

8 153 730,73

66

391 090,96

8 160 322,71

107

388 696,76

8 153 933,87

67

391 312,11

8 159 961,04

108

388 161,54

8 153 839,63

68

391 737,42

8 159 940,15

109

388 267,02

8 153 175,91

69

391 763,44

8 159 133,19

110

387 948,65

8 153 158,24

70

390 612,19

8 159 096,05

111

387 898,36

8 153 003,89

71

390 648,08

8 158 377,12

112

387 543,50

8 152 663,64

72

389 894,54

8 158 355,96

113

386 832,29

8 152 320,74

73

389 858,75

8 159 071,74

114

385 822,64

8 151 838,14

74

388 049,92

8 159 013,39

115

385 238,44

8 151 285,69

75

388 012,81

8 160 164,03

116

385 206,69

8 150 891,99

76

387 980,67

8 160 233,75

117

385 289,24

8 150 453,83

77

386 868,24

8 159 460,19

118

385 149,54

8 150 383,98

78

386 804,38

8 158 000,22

119

384 558,99

8 151 692,09

79

385 898,00

8 158 945,29

120

384 500,74

8 152 188,25

80

384 655,86

8 158 907,93

121

384 490,18

8 152 290,86

81

384 766,29

8 159 259,08

122

384 169,58

8 152 480,07

Pgina IV-5

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

123

384 944,02

8 153 792,33

135

386 271,17

8 152 218,08

124

385 541,61

8 153 439,63

136

386 353,19

8 152 315,98

125

384 767,18

8 152 127,38

137

386 638,94

8 152 474,73

126

384 705,35

8 152 163,87

138

386 808,27

8 152 493,25

127

384 761,45

8 151 757,14

139

387 043,75

8 152 617,60

128

385 002,88

8 151 264,35

140

387 387,71

8 152 744,60

129

385 062,41

8 151 383,42

141

387 649,85

8 152 952,98

130

385 244,32

8 151 571,93

142

387 777,23

8 153 148,73

131

385 419,60

8 151 743,91

143

387 718,03

8 153 145,44

132

385 624,65

8 151 932,43

144

387 582,86

815 4091,16

133

385 770,18

8 152 008,50

134

385 948,77

8 152 180,48

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE
TUCARI

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

25

371 347,24

8 170 289,73

373 148,95

8 171 130,63

26

371 733,76

8 170 499,84

373 888,53

8 170 184,51

27

372 206,57

8 171 024,78

374 009,80

8 168 979,41

28

372 416,91

8 171 034,04

374 349,42

8 168 708,39

29

372 501,98

8 171 043,42

374 438,31

8 168 603,90

30

372 670,10

8 170 996,83

374 490,97

8 167 939,78

31

372 820,67

8 171 101,11

374 398,62

8 167 602,37

374 428,80

8 167 407,96

32

376 522,34

8 160 506,57

374 444,67

8 167 183,07

33

376 252,62

8 159 213,04

10

374 566,27

8 166 885,45

34

371 145,09

8 159 704,24

11

374 583,96

8 166 294,32

35

371 014,63

8 160 672,99

12

374 049,51

8 165 756,21

36

371 366,77

8 161 126,35

13

372 642,10

8 166 473,48

37

371 337,12

8 161 318,49

14

372 355,82

8 166 522,98

38

371 769,73

8 161 829,75

15

371 761,03

8 166 385,40

39

372 777,80

8 162 480,63

16

371 589,93

8 166 460,36

40

373 429,58

8 162 586,16

17

370 939,18

8 166 280,09

41

374 373,24

8 163 329,94

18

369 473,55

8 166 720,36

42

374 921,28

8 162 827,69

19

369 016,13

8 167 095,90

43

375 597,55

8 162 821,50

20

369 894,49

8 167 368,04

44

375 918,99

8 162 647,90

21

370 264,08

8 167 902,22

45

376 798,47

8 161 009,65

22

370 919,43

8 167 677,13

23

371 526,20

8 168 263,88

46

384 664,70

8 157 296,12

24

371 699,97

8 169 407,12

47

386 135,56

8 157 340,38

Pgina IV-6

HUILCANE

VICTORIA

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

48

386 186,75

8 155 640,17

88

387 714,69

8 160 810,83

49

384 715,89

8 155 595,87

89

387 781,83

8 160 937,87

50

384 666,78

8 156 650,19

51

384 557,44

8 156 892,76

ALICIA

ICHUJASI
90

388 118,99

8 154 107,32

91

388 134,39

8 154 010,42

52

393 450,36

8 156 446,88

92

388 509,40

8 154 017,26

53

393 451,09

8 156 221,49

93

388 750,70

8 154 085,00

54

393 170,41

8 155 887,50

94

389 241,34

8 153 909,52

55

391 712,47

8 155 848,95

95

390 503,64

8 153 879,81

56

391 676,16

8 157 054,80

96

391 761,91

8 153 519,75

57

393 256,67

8 157 103,49

97

391 776,89

8 153 009,20

98

392 151,96

8 152 703,55

MILAGROS
58

388 619,38

8 160 821,88

99

392 036,86

8 151 838,36

59

388 382,47

8 160 235,39

100

391 810,86

8 151 851,30

60

390 232,31

8 160 295,03

101

390 684,11

8 151 818,22

61

390 219,91

8 160 576,99

102

390 663,09

8 152 534,44

62

390 402,48

8 160 724,40

103

390 265,56

8 153 302,67

63

390 564,93

8 160 784,43

104

391 247,94

8 153 445,19

64

390 739,68

8 160 793,32

105

390 277,91

8 153 724,32

65

390 754,15

8 160 311,85

106

389 014,84

8 153 730,73

66

391 090,96

8 160 322,71

107

388 696,76

8 153 933,87

67

391 312,11

8 159 961,04

108

388 161,54

8 153 839,63

68

391 737,42

8 159 940,15

109

388 267,02

8 153 175,91

69

391 763,44

8 159 133,19

110

387 948,65

8 153 158,24

70

390 612,19

8 159 096,05

111

387 898,36

8 153 003,89

71

390 648,08

8 158 377,12

112

387 543,50

8 152 663,64

72

389 894,54

8 158 355,96

113

386 832,29

8 152 320,74

73

389 858,75

8 159 071,74

114

385 822,64

8 151 838,14

74

388 049,92

8 159 013,39

115

385 238,44

8 151 285,69

75

388 012,81

8 160 164,03

116

385 206,69

8 150 891,99

76

387 980,67

8 160 233,75

117

385 289,24

8 150 453,83

77

386 868,24

8 159 460,19

118

385 149,54

8 150 383,98

78

386 804,38

8 158 000,22

119

384 558,99

8 151 692,09

79

385 898,00

8 158 945,29

120

384 500,74

8 152 188,25

80

384 655,86

8 158 907,93

121

384 490,18

8 152 290,86

81

384 656,18

8 159 196,75

122

384 169,58

8 152 480,07

82

385 353,58

8 159 682,61

123

384 944,02

8 153 792,33

83

385 858,14

8 159 954,12

124

385 541,61

8 153 439,63

84

386 582,64

8 159 978,34

125

384 767,18

8 152 127,38

85

386 592,35

8 159 655,23

126

384 705,35

8 152 163,87

86

386 880,94

8 159 750,44

127

384 761,45

8 151 757,14

87

387 902,64

8 160 403,04

128

385 002,88

8 151 264,35

Pgina IV-7

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

Vrtice

Coordenadas UTM
WGS84 19S
ESTE
NORTE

129

385 062,41

8 151 383,42

137

386 638,94

8 152 474,73

130

385 244,32

8 151 571,93

138

386 808,27

8 152 493,25

131

385 419,60

8 151 743,91

139

387 043,75

8 152 617,60

132

385 624,65

8 151 932,43

140

387 387,71

8 152 744,60

133

385 770,18

8 152 008,50

141

387 649,85

8 152 952,98

134

385 948,77

8 152 180,48

142

387 777,23

8 153 148,73

135

386 271,17

8 152 218,08

143

387 718,03

8 153 145,44

136

Pgina IV-8

386 353,19

8 152 315,98

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-2 COMPONENTES PRINCIPALES


En este apartado, se detallan los componentes principales de la actividad de exploracin. Estos
componentes se encuentran definidos como principales pues representan las habilitaciones ms
importantes del programa ya que influyen directamente en el estudio geolgico de la zona (objetivo
del programa de perforacin).
4-2.1 PLATAFORMAS DE PERFORACIN
Para el desarrollo de las actividades de exploracin ser necesaria la construccin y/o habilitacin de
un total de 584 plataformas de perforacin, que permitirn la ejecucin de 584 sondajes tipo
diamantina (DDH). Se estima que las perforaciones se realizarn con un avance dependiendo de las
condiciones del terreno, variable de 30 a 40 m por da por cada mquina perforadora, las cuales sern
como mximo 3. En cada plataforma se ejecutar un sondaje en direcciones y profundidades
variables, hasta que en su conjunto, las plataformas de perforacin alcancen la longitud total de
116 800 m.
Para la instalacin de las perforadoras se construirn plataformas de 10 m x 8 m, las cuales sern
habilitadas principalmente en forma manual y en algunos casos mediante el uso de maquinaria.
Durante la habilitacin de las plataformas se deber realizar el movimiento de tierras, lo que consiste
en retirar el material necesario de acuerdo a la topografa y la estabilidad del terreno. El material
excedente de la construccin o habilitacin de plataformas ser utilizado en la conformacin de la
plataforma aplicando corte y relleno; en los casos en los que exista top soil ser removido, y
almacenado al lado de cada una de estas plataformas y ser cubierto con material impermeable para
prevenir su dispersin y los procesos erosivos.
La Tabla 4-2.1-1 muestra las caractersticas de las plataformas de perforacin para la presente
solicitud. Mientras que el Plano 3-6 muestra la ubicacin de las plataformas de perforacin.
TABLA 4-2.1-1: CARACTERSTICAS DE LAS PLATAFORMAS DE PERFORACIN Y SONDAJES A
EJECUTAR
COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

8 170 234

5 083

TUK-1

200

-90

373 546

8 169 903

5 022

TUK-2

200

-90

373 295

8 169 724

4 961

TUK-3

200

-90

PLT-4

373 222

8 169 524

4 971

TUK-4

200

-90

PLT-5

372 991

8 169 223

4 972

TUK-5

200

-90

PLT-6

372 825

8 169 019

4 972

TUK-6

200

-90

PLT-7

373 055

8 168 648

4 925

TUK-7

200

-90

PLT-8

372 994

8 168 905

4 967

TUK-8

200

-90

PLT-9

372 942

8 170 230

4 900

TUK-9

200

-90

PLT-10

373 130

8 169 858

4 926

TUK-10

200

-90

PLT-11

373 804

8 170 034

5 134

TUK-11

200

-90

PLT-12

373 804

8 169 834

5 134

TUK-12

200

-90

PLATAFORMA

ESTE

NORTE

PLT-1

373 604

PLT-2
PLT-3

Pgina IV-9

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-13

373 804

8 169 634

5 115

TUK-13

200

-90

PLT-14

373 203

8 169 230

4 997

TUK-14

200

-90

PLT-15

373 858

8 169 162

5 128

TUK-15

200

-90

PLT-16

373 749

8 169 009

5 137

TUK-16

200

-90

PLT-17

373 865

8 168 844

5 129

TUK-17

200

-90

PLT-18

373 714

8 168 634

5 051

TUK-18

200

-90

PLT-19

373 804

8 168 434

5 046

TUK-19

200

-90

PLT-20

373 452

8 170 043

5 018

TUK-20

200

-90

PLT-21

371 954

8 170 038

4 822

TUK-21

200

-90

PLT-22

373 943

8 169 021

5 200

TUK-22

200

-90

PLT-23

373 205

8 168 587

4 932

TUK-23

200

-90

PLT-24

373 463

8 168 640

4 969

TUK-24

200

-90

PLT-25

374 004

8 168 434

5 068

TUK-25

200

-90

PLT-26

373 411

8 168 131

4 996

TUK-26

200

-90

PLT-27

374 003

8 167 601

5 193

TUK-27

200

-90

PLT-28

373 941

8 167 425

5 142

TUK-28

200

-90

PLT-29

374 004

8 167 234

5 075

TUK-29

200

-90

PLT-30

374 004

8 167 034

5 050

TUK-30

200

-90

PLT-31

373 511

8 169 586

4 999

TUK-31

200

-90

PLT-32

373 530

8 169 413

5 034

TUK-32

200

-90

PLT-33

373 530

8 169 243

5 058

TUK-33

200

-90

PLT-34

373 518

8 169 051

5 075

TUK-34

200

-90

PLT-35

373 545

8 168 856

5 037

TUK-35

200

-90

PLT-36

374 204

8 168 634

5 125

TUK-36

200

-90

PLT-37

374 204

8 168 434

5 101

TUK-37

200

-90

PLT-38

373 406

8 168 336

4 959

TUK-38

200

-90

PLT-39

374 204

8 168 034

5 116

TUK-39

200

-90

PLT-40

374 204

8 167 634

5 159

TUK-40

200

-90

PLT-41

374 204

8 167 434

5 155

TUK-41

200

-90

PLT-42

374 204

8 167 234

5 116

TUK-42

200

-90

PLT-43

374 204

8 167 034

5 095

TUK-43

200

-90

PLT-44

374 204

8 166 834

5 121

TUK-44

200

-90

PLT-45

374 036

8 166 630

5 111

TUK-45

200

-90

PLT-46

374 204

8 166 434

5 153

TUK-46

200

-90

PLT-47

373 952

8 168 630

5 092

TUK-47

200

-90

PLT-48

374 299

8 168 335

5 109

TUK-48

200

-90

PLT-49

374404

8 168 034

5 145

TUK-49

200

-90

PLT-50

374 404

8 167 834

5 191

TUK-50

200

-90

PLT-51

374 404

8 167 434

5 166

TUK-51

200

-90

PLT-52

374 404

8 167 234

5 166

TUK-52

200

-90

PLT-53

374 404

8 167 034

5 174

TUK-53

200

-90

PLT-54

374 404

8 166 834

5 176

TUK-54

200

-90

Pgina IV-10

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-55

374 404

8 166 634

5 204

TUK-55

200

-90

PLT-56

374 404

8 166 434

5 200

TUK-56

200

-90

PLT-57

373 589

8 168 522

4 999

TUK-57

200

-90

PLT-58

372 512

8 168 402

4 881

TUK-58

200

-90

PLT-59

373 255

8 168 346

4 948

TUK-59

200

-90

PLT-60

373 599

8 168 081

5 042

TUK-60

200

-90

PLT-61

373 915

8 168 262

5 058

TUK-61

200

-90

PLT-62

374 123

8 168 228

5 081

TUK-62

200

-90

PLT-63

372 104

8 168 034

4 870

TUK-63

200

-90

PLT-64

372 259

8 168 237

4 850

TUK-64

200

-90

PLT-65

373 696

8 167 334

5 058

TUK-65

200

-90

PLT-66

372 704

8 168 434

4 900

TUK-66

200

-90

PLT-67

372 851

8 168 469

4 914

TUK-67

200

-90

PLT-68

373 104

8 168 434

4 932

TUK-68

200

-90

PLT-69

373 354

8 168 532

4 944

TUK-69

200

-90

PLT-70

372 904

8 168 234

4 944

TUK-70

200

-90

PLT-71

373 304

8 168 234

4 967

TUK-71

200

-90

PLT-72

373 538

8 168 284

4 980

TUK-72

200

-90

PLT-73

373 472

8 168 024

5 050

TUK-73

200

-90

PLT-74

372 687

8 169 322

4 954

TUK-74

200

-90

PLT-75

372 841

8 169 079

4 975

TUK-75

200

-90

PLT-76

371 585

8 170 019

4 775

TUK-76

200

-90

PLT-77

372 680

8 169 406

4 918

TUK-77

200

-90

PLT-78

371 919

8 169 192

4 999

TUK-78

200

-90

PLT-79

371 880

8 168 748

4 951

TUK-79

200

-90

PLT-80

372 104

8 170 234

4 903

TUK-80

200

-90

PLT-81

372 798

8 169 903

4 900

TUK-81

200

-90

PLT-82

372 091

8 169 299

4 971

TUK-82

200

-90

PLT-83

372 229

8 169 040

4 990

TUK-83

200

-90

PLT-84

372 304

8 170 034

4 834

TUK-84

200

-90

PLT-85

372 760

8 169 263

4 963

TUK-85

200

-90

PLT-86

372 691

8 168 972

4 960

TUK-86

200

-90

PLT-87

372 304

8 168 834

4 908

TUK-87

200

-90

PLT-88

372 117

8 168 693

4 890

TUK-88

200

-90

PLT-89

372 504

8 170 234

4 863

TUK-89

200

-90

PLT-90

372 525

8 169 694

4 853

TUK-90

200

-90

PLT-91

372 629

8 169 497

4 889

TUK-91

200

-90

PLT-92

372 575

8 169 082

4 996

TUK-92

200

-90

PLT-93

372 547

8 168 903

4 926

TUK-93

200

-90

PLT-94

372 453

8 168 675

4 872

TUK-94

200

-90

PLT-95

372 823

8 169 582

4 887

TUK-95

200

-90

PLT-96

372 668

8 169 209

4 988

TUK-96

200

-90

Pgina IV-11

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-97

372 772

8 169 004

4 972

TUK-97

200

-90

PLT-98

372 787

8 168 895

4 942

TUK-98

200

-90

PLT-99

372 622

8 168 668

4 882

TUK-99

200

-90

PLT-100

372 931

8 170 042

4 909

TUK-100

200

-90

PLT-101

372 775

8 169 741

4 885

TUK-101

200

-90

PLT-102

372 995

8 169 377

4 955

TUK-102

200

-90

PLT-103

372 710

8 169 154

4 992

TUK-103

200

-90

PLT-104

372 904

8 169 034

4 975

TUK-104

200

-90

PLT-105

372 812

8 168 831

4 929

TUK-105

200

-90

PLT-106

372 856

8 168 751

4 922

TUK-106

200

-90

PLT-107

373 132

8 170 001

4 950

TUK-107

200

-90

PLT-108

373 087

8 169 090

5 000

TUK-108

200

-90

PLT-109

373 065

8 168 814

4 957

TUK-109

200

-90

PLT-110

373 033

8 168 742

4 940

TUK-110

200

-90

PLT-111

373 304

8 170 234

4 984

TUK-111

200

-90

PLT-112

373 317

8 169 858

4 968

TUK-112

200

-90

PLT-113

373 304

8 169 034

5 048

TUK-113

200

-90

PLT-114

373 304

8 168 834

4 992

TUK-114

200

-90

PLT-115

373 323

8 168 622

4 944

TUK-115

200

-90

PLT-116

373 204

8 169 434

4 980

TUK-116

200

-90

PLT-117

372 826

8 169 140

4 975

TUK-117

200

-90

PLT-118

373 174

8 168 953

5 009

TUK-118

200

-90

PLT-119

372 370

8 169 321

4 973

TUK-119

200

-90

PLT-120

372 970

8 169 525

4 911

TUK-120

200

-90

PLT-121

372 956

8 169 778

4 899

TUK-121

200

-90

PLT-122

373 781

8 169 403

5 087

TUK-122

200

-90

PLT-123

372 370

8 169 532

4 861

TUK-123

200

-90

PLT-124

372 643

8 169 839

4 888

TUK-124

200

-90

PLT-125

373 719

8 168 217

5 032

TUK-125

200

-90

PLT-126

373 208

8 168 727

4 949

TUK-126

200

-90

PLT-127

372 503

8 169 422

4 936

TUK-127

200

-90

PLT-128

372 825

8 169 447

4 914

TUK-128

200

-90

PLT-129

372 743

8 168 742

4 908

TUK-129

200

-90

PLT-130

372 058

8 168 921

4 968

TUK-130

200

-90

PLT-131

373 361

8 169 340

5 022

TUK-131

200

-90

PLT-132

374 072

8 168 839

5 167

TUK-132

200

-90

PLT-133

373 956

8 165 870

5 038

TUK-133

200

-90

PLT-134

373 757

8 166 042

5 013

TUK-134

200

-90

PLT-135

373 865

8 166 861

5 025

TUK-135

200

-90

PLT-136

373 754

8 166 603

5 017

TUK-136

200

-90

PLT-137

373 877

8 166 315

5 043

TUK-137

200

-90

PLT-138

371 904

8 167 834

4 848

TUK-138

200

-90

Pgina IV-12

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-139

371 904

8 167 634

4 868

TUK-139

200

-90

PLT-140

371 904

8 167 434

4 856

TUK-140

200

-90

PLT-141

371 904

8 167 234

4 841

TUK-141

200

-90

PLT-142

372 153

8 167 403

4 893

TUK-142

200

-90

PLT-143

372 104

8 167 234

4 868

TUK-143

200

-90

PLT-144

372 104

8 167 034

4 840

TUK-144

200

-90

PLT-145

372 333

8 167 253

4 890

TUK-145

200

-90

PLT-146

372 304

8 167 074

4 850

TUK-146

200

-90

PLT-147

372 433

8 166 866

4 850

TUK-147

200

-90

PLT-148

372 504

8 167 034

4 850

TUK-148

200

-90

PLT-149

372 635

8 167 072

4 880

TUK-149

200

-90

PLT-150

372 904

8 167 034

4 905

TUK-150

200

-90

PLT-151

373 104

8 167 034

4 930

TUK-151

200

-90

PLT-152

373 304

8 167 034

4 961

TUK-152

200

-90

PLT-153

373 504

8 167 034

4 968

TUK-153

200

-90

PLT-154

373 704

8 167 034

5 019

TUK-154

200

-90

PLT-155

372 704

8 166 834

4 874

TUK-155

200

-90

PLT-156

373 214

8 167 192

4 993

TUK-156

200

-90

PLT-157

370 962

8 167 548

4 800

TUK-157

200

-90

PLT-158

370 875

8 167 272

4 800

TUK-158

200

-90

PLT-159

371 004

8 167 134

4 806

TUK-159

200

-90

PLT-160

371 004

8 166 934

4 859

TUK-160

200

-90

PLT-161

370 298

8 167 802

4 808

TUK-161

200

-90

PLT-162

371 244

8 167 542

4 800

TUK-162

200

-90

PLT-163

371 166

8 167 390

4 800

TUK-163

200

-90

PLT-164

371 204

8 167 134

4 816

TUK-164

200

-90

PLT-165

371 259

8 166 903

4 863

TUK-165

200

-90

PLT-166

371 204

8 166 734

4 889

TUK-166

200

-90

PLT-167

371 204

8 166 534

4 920

TUK-167

200

-90

PLT-168

371 354

8 167 818

4 800

TUK-168

200

-90

PLT-169

371 404

8 167 534

4 800

TUK-169

200

-90

PLT-170

371 493

8 167 390

4 802

TUK-170

200

-90

PLT-171

371 404

8 167 134

4 813

TUK-171

200

-90

PLT-172

371 404

8 166 934

4 856

TUK-172

200

-90

PLT-173

371 348

8 166 717

4 894

TUK-173

200

-90

PLT-174

371 404

8 166 534

4 923

TUK-174

200

-90

PLT-175

371 604

8 167 734

4 808

TUK-175

200

-90

PLT-176

371 604

8 167 534

4 813

TUK-176

200

-90

PLT-177

371 604

8 167 334

4 813

TUK-177

200

-90

PLT-178

371 642

8 167 241

4 812

TUK-178

200

-90

PLT-179

371 848

8 167 116

4 825

TUK-179

200

-90

PLT-180

369 239

8 167 092

4 750

TUK-180

200

-90

Pgina IV-13

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-181

369 473

8 166 818

4 750

TUK-181

200

-90

PLT-182

369 974

8 166 959

4 765

TUK-182

200

-90

PLT-183

370 296

8 167 675

4 800

TUK-183

200

-90

PLT-184

370 874

8 166 402

4 901

TUK-184

200

-90

PLT-185

369 683

8 166 964

4 750

TUK-185

200

-90

PLT-186

370 772

8 166 934

4 851

TUK-186

200

-90

PLT-187

370 506

8 166 923

4 813

TUK-187

200

-90

PLT-188

369 474

8 166 991

4 750

TUK-188

200

-90

PLT-189

373 632

8 166 836

4 978

TUK-189

200

-90

PLT-190

373 890

8 162 330

4 983

TUK-190

200

-90

PLT-191

375 602

8 162 336

5 061

TUK-191

200

-90

PLT-192

374 097

8 161 696

5 090

TUK-192

200

-90

PLT-193

375 001

8 161 879

5 114

TUK-193

200

-90

PLT-194

375 866

8 161 470

5 010

TUK-194

200

-90

PLT-195

372 293

8 161 728

5 163

TUK-195

200

-90

PLT-196

374 511

8 161 690

5 097

TUK-196

200

-90

PLT-197

373 973

8 160 824

5 154

TUK-197

200

-90

PLT-198

376 376

8 160 949

4 963

TUK-198

200

-90

PLT-199

373 369

8 161 775

5 110

TUK-199

200

-90

PLT-200

373 504

8 161 404

5 100

TUK-200

200

-90

PLT-201

376 070

8 161 172

5 042

TUK-201

200

-90

PLT-202

375 448

8 160 798

5 072

TUK-202

200

-90

PLT-203

373 177

8 160 506

5 018

TUK-203

200

-90

PLT-204

375 895

8 160 780

4 996

TUK-204

200

-90

PLT-205

373 378

8 160 034

5 032

TUK-205

200

-90

PLT-206

375 453

8 160 500

5 082

TUK-206

200

-90

PLT-207

372 678

8 160 245

4 999

TUK-207

200

-90

PLT-208

371 404

8 159 884

4 858

TUK-208

200

-90

PLT-209

372 950

8 162 261

5 103

TUK-209

200

-90

PLT-210

374 990

8 162 309

5 100

TUK-210

200

-90

PLT-211

373 304

8 159 657

5 073

TUK-211

200

-90

PLT-212

375 618

8 162 026

5 007

TUK-212

200

-90

PLT-213

375 001

8 161 466

5 165

TUK-213

200

-90

PLT-214

372 919

8 161 715

5 243

TUK-214

200

-90

PLT-215

375 663

8 161 160

5 100

TUK-215

200

-90

PLT-216

372 206

8 159 916

4 880

TUK-216

200

-90

PLT-217

372 285

8 161 341

5 193

TUK-217

200

-90

PLT-218

374 277

8 161 268

5 167

TUK-218

200

-90

PLT-219

372 925

8 161 358

5 200

TUK-219

200

-90

PLT-220

375 437

8 161 392

5 164

TUK-220

200

-90

PLT-221

375 437

8 161 686

5 046

TUK-221

200

-90

PLT-222

376 195

8 159 729

5 074

TUK-222

200

-90

Pgina IV-14

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-223

374 594

8 159 655

5 050

TUK-223

200

-90

PLT-224

375 422

8 159 638

5 042

TUK-224

200

-90

PLT-225

374 582

8 160 041

5 108

TUK-225

200

-90

PLT-226

374 485

8 162 335

5 025

TUK-226

200

-90

PLT-227

375 949

8 161 826

4 925

TUK-227

200

-90

PLT-228

385 804

8 159 834

4 869

TUK-228

200

-90

PLT-229

385 304

8 159 634

4 907

TUK-229

200

-90

PLT-230

385 604

8 159 634

4 864

TUK-230

200

-90

PLT-231

385 201

8 159 468

4 914

TUK-231

200

-90

PLT-232

385 445

8 159 465

4 877

TUK-232

200

-90

PLT-233

384 804

8 159 234

5 022

TUK-233

200

-90

PLT-234

385 350

8 159 246

4 867

TUK-234

200

-90

PLT-235

385 104

8 159 034

4 917

TUK-235

200

-90

PLT-236

384 958

8 159 132

4 963

TUK-236

200

-90

PLT-237

385 281

8 159 118

4 885

TUK-237

200

-90

PLT-238

385 493

8 159 037

4 863

TUK-238

200

-90

PLT-239

386 228

8 159 825

4 875

TUK-239

200

-90

PLT-240

386 073

8 159 600

4 873

TUK-240

200

-90

PLT-241

388 204

8 159 734

4 815

TUK-241

200

-90

PLT-242

388 304

8 159 534

4 909

TUK-242

200

-90

PLT-243

388 404

8 159 734

4 848

TUK-243

200

-90

PLT-244

388 304

8 159 944

4 800

TUK-244

200

-90

PLT-245

388 704

8 159 734

4 904

TUK-245

200

-90

PLT-246

388 481

8 159 343

4 931

TUK-246

200

-90

PLT-247

388 777

8 159 108

4 812

TUK-247

200

-90

PLT-248

388 756

8 159 338

4 895

TUK-248

200

-90

PLT-249

388 956

8 159 333

4 869

TUK-249

200

-90

PLT-250

388 859

8 159 512

4 914

TUK-250

200

-90

PLT-251

389 083

8 159 128

4 806

TUK-251

200

-90

PLT-252

389 380

8 159 118

4 798

TUK-252

200

-90

PLT-253

389 216

8 159 333

4 898

TUK-253

200

-90

PLT-254

389 559

8 159 343

4 869

TUK-254

200

-90

PLT-255

389 068

8 159 507

4 917

TUK-255

200

-90

PLT-256

389 656

8 159 527

4 908

TUK-256

200

-90

PLT-257

389 840

8 159 379

4 844

TUK-257

200

-90

PLT-258

390 162

8 159 343

4 818

TUK-258

200

-90

PLT-259

389 907

8 159 537

4 856

TUK-259

200

-90

PLT-260

390 197

8 159 905

4 912

TUK-260

200

-90

PLT-261

391 066

8 159 282

4 904

TUK-261

200

-90

PLT-262

391 654

8 159 261

4 961

TUK-262

200

-90

PLT-263

391 194

8 159 910

4 992

TUK-263

200

-90

PLT-264

390 703

8 160 064

4 899

TUK-264

200

-90

Pgina IV-15

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-265

390 636

8 160 447

4 991

TUK-265

200

-90

PLT-266

390 412

8 159 547

4 837

TUK-266

200

-90

PLT-267

390 928

8 159 573

4 906

TUK-267

200

-90

PLT-268

391 429

8 159 578

4 941

TUK-268

200

-90

PLT-269

390 678

8 159 302

4 840

TUK-269

200

-90

PLT-270

389 702

8 159 134

4 800

TUK-270

200

-90

PLT-271

390 024

8 159 149

4 807

TUK-271

200

-90

PLT-272

389 365

8 159 517

5 009

TUK-272

200

-90

PLT-273

388 455

8 159 537

4 907

TUK-273

200

-90

PLT-274

390 417

8 159 343

4 828

TUK-274

200

-90

PLT-275

390 663

8 159 558

4 858

TUK-275

200

-90

PLT-276

390 923

8 159 747

4 934

TUK-276

200

-90

PLT-277

390 673

8 159 752

4 875

TUK-277

200

-90

PLT-278

390 407

8 159 731

4 850

TUK-278

200

-90

PLT-279

391 189

8 159 573

4 900

TUK-279

200

-90

PLT-280

391 337

8 159 312

4 924

TUK-280

200

-90

PLT-281

390 192

8 159 726

4 882

TUK-281

200

-90

PLT-282

390 203

8 159 527

4 841

TUK-282

200

-90

PLT-283

388 049

8 160 833

4 944

TUK-283

200

-90

PLT-284

387 823

8 160 815

4 961

TUK-284

200

-90

PLT-285

384 804

8 156 834

4 870

TUK-285

200

-90

PLT-286

384 804

8 156 634

4 855

TUK-286

200

-90

PLT-287

385 004

8 157 034

4 893

TUK-287

200

-90

PLT-288

385 004

8 156 834

4 882

TUK-288

200

-90

PLT-289

385 004

8 156 634

4 829

TUK-289

200

-90

PLT-290

385 188

8 157 197

4 871

TUK-290

200

-90

PLT-291

385 204

8 157 034

4 866

TUK-291

200

-90

PLT-292

385 204

8 156 834

4 841

TUK-292

200

-90

PLT-293

385 204

8 156 634

4 809

TUK-293

200

-90

PLT-294

385 204

8 156 434

4 774

TUK-294

200

-90

PLT-295

385 204

8 156 234

4 749

TUK-295

200

-90

PLT-296

385 403

8 157 204

4 837

TUK-296

200

-90

PLT-297

385 404

8 157 034

4 827

TUK-297

200

-90

PLT-298

385 404

8 156 834

4 822

TUK-298

200

-90

PLT-299

385 404

8 156 634

4 758

TUK-299

200

-90

PLT-300

385 404

8 156 434

4 736

TUK-300

200

-90

PLT-301

385 404

8 156 234

4 716

TUK-301

200

-90

PLT-302

385 604

8 157 034

4 787

TUK-302

200

-90

PLT-303

385 604

8 156 834

4 775

TUK-303

200

-90

PLT-304

385 604

8 156 634

4 761

TUK-304

200

-90

PLT-305

385 604

8 156 434

4 741

TUK-305

200

-90

PLT-306

385 604

8 156 234

4 719

TUK-306

200

-90

Pgina IV-16

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-307

385 804

8 157 034

4 750

TUK-307

200

-90

PLT-308

385 804

8 156 834

4 732

TUK-308

200

-90

PLT-309

385 804

8 156 634

4 715

TUK-309

200

-90

PLT-310

385 804

8 156 434

4 700

TUK-310

200

-90

PLT-311

385 804

8 156 234

4 700

TUK-311

200

-90

PLT-312

385 604

8 156 097

4 700

TUK-312

200

-90

PLT-313

386 093

8 156 122

4 700

TUK-313

200

-90

PLT-314

386 059

8 155 772

4 698

TUK-314

200

-90

PLT-315

385 980

8 155 976

4 696

TUK-315

200

-90

PLT-316

387 846

8 153 773

4 802

TUK-316

200

-90

PLT-317

387 715

8 153 641

4 799

TUK-317

200

-90

PLT-318

387 718

8 153 525

4 771

TUK-318

200

-90

PLT-319

387 812

8 153 842

4 819

TUK-319

200

-90

PLT-320

387 935

8 153 695

4 781

TUK-320

200

-90

PLT-321

387 918

8 153 931

4 836

TUK-321

200

-90

PLT-322

387 918

8 153 840

4 813

TUK-322

200

-90

PLT-323

387 976

8 153 760

4 792

TUK-323

200

-90

PLT-324

387 815

8 153 940

4 844

TUK-324

200

-90

PLT-325

388 034

8 153 938

4 822

TUK-325

200

-90

PLT-326

388 051

8 153 850

4 805

TUK-326

200

-90

PLT-327

388 056

8 153 747

4 788

TUK-327

200

-90

PLT-328

388 008

8 153 567

4 754

TUK-328

200

-90

PLT-329

387 703

8 153 943

4 850

TUK-329

200

-90

PLT-330

387 679

8 153 761

4 824

TUK-330

200

-90

PLT-331

387 756

8 153 894

4 835

TUK-331

200

-90

PLT-332

388 044

8 153 637

4 768

TUK-332

200

-90

PLT-333

387 766

8 154 049

4 871

TUK-333

200

-90

PLT-334

387 899

8 154 064

4 865

TUK-334

200

-90

PLT-335

387 774

8 153 405

4 750

TUK-335

200

-90

PLT-336

388 071

8 153 332

4 750

TUK-336

200

-90

PLT-337

384 304

8 152 534

4 669

TUK-337

200

-90

PLT-338

384 504

8 152 534

4 682

TUK-338

200

-90

PLT-339

384 704

8 152 534

4 694

TUK-339

200

-90

PLT-340

384 704

8 152 734

4 696

TUK-340

200

-90

PLT-341

384 904

8 152 734

4 716

TUK-341

200

-90

PLT-342

385 104

8 152 834

4 742

TUK-342

200

-90

PLT-343

385 004

8 152 934

4 723

TUK-343

200

-90

PLT-344

384 904

8 153 034

4 699

TUK-344

200

-90

PLT-345

385 204

8 153 034

4 744

TUK-345

200

-90

PLT-346

384 904

8 153 234

4 692

TUK-346

200

-90

PLT-347

385 104

8 153 234

4 716

TUK-347

200

-90

PLT-348

385 304

8 153 334

4 739

TUK-348

200

-90

Pgina IV-17

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-349

385 004

8 153 534

4 687

TUK-349

200

-90

PLT-350

385 204

8 153 534

4 697

TUK-350

200

-90

PLT-351

390 804

8 153 134

5 045

TUK-351

200

-90

PLT-352

390 804

8 152 934

5 069

TUK-352

200

-90

PLT-353

391 004

8 153 334

4 949

TUK-353

200

-90

PLT-354

391 004

8 153 134

5 050

TUK-354

200

-90

PLT-355

391 004

8 152 934

5 010

TUK-355

200

-90

PLT-356

391 004

8 152 734

4 963

TUK-356

200

-90

PLT-357

391 204

8 153 134

5 050

TUK-357

200

-90

PLT-358

391 204

8 152 934

4 993

TUK-358

200

-90

PLT-359

391 204

8 152 734

4 955

TUK-359

200

-90

PLT-360

391 304

8 152 534

4 919

TUK-360

200

-90

PLT-361

391 304

8 152 334

4 911

TUK-361

200

-90

PLT-362

391 304

8 152 134

4 922

TUK-362

200

-90

PLT-363

391 304

8 151 934

4 935

TUK-363

200

-90

PLT-364

391 404

8 152 934

4 997

TUK-364

200

-90

PLT-365

391 404

8 152 734

4 975

TUK-365

200

-90

PLT-366

391 504

8 152 534

4 975

TUK-366

200

-90

PLT-367

391 504

8 152 334

4 999

TUK-367

200

-90

PLT-368

391 504

8 152 134

5 000

TUK-368

200

-90

PLT-369

391 504

8 151 934

4 985

TUK-369

200

-90

PLT-370

391 704

8 152 534

4 948

TUK-370

200

-90

PLT-371

391 704

8 152 334

4 930

TUK-371

200

-90

PLT-372

391 704

8 152 134

4 943

TUK-372

200

-90

PLT-373

391 704

8 151 934

4 933

TUK-373

200

-90

PLT-374

391 912

8 156 481

4 930

TUK-374

200

-90

PLT-375

393 143

8 156 473

5 139

TUK-375

200

-90

PLT-376

393 139

8 157 010

5 100

TUK-376

200

-90

PLT-377

393 146

8 156 216

5 098

TUK-377

200

-90

PLT-378

393 150

8 156 010

5 106

TUK-378

200

-90

PLT-379

391 905

8 156 646

4 960

TUK-379

200

-90

PLT-380

392 288

8 156 669

5 006

TUK-380

200

-90

PLT-381

392 614

8 156 665

5 034

TUK-381

200

-90

PLT-382

393 143

8 156 669

5 173

TUK-382

200

-90

PLT-383

392 292

8 156 481

4 980

TUK-383

200

-90

PLT-384

392 610

8 156 469

5 042

TUK-384

200

-90

PLT-385

392 089

8 156 569

4 965

TUK-385

200

-90

PLT-386

392 425

8 156 287

5 012

TUK-386

200

-90

PLT-387

392 297

8 156 120

4 961

TUK-387

200

-90

PLT-388

392 618

8 156 059

4 999

TUK-388

200

-90

PLT-389

392 905

8 155 934

5 044

TUK-389

200

-90

PLT-390

373 184

8 170 834

5 000

TUK-390

200

-90

Pgina IV-18

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-391

371 864

8 170 554

5 041

TUK-391

200

-90

PLT-392

372 259

8 170 389

4 968

TUK-392

200

-90

PLT-393

372 584

8 170 594

4 944

TUK-393

200

-90

PLT-394

373 004

8 170 304

4 915

TUK-394

200

-90

PLT-395

373 249

8 170 204

4 974

TUK-395

200

-90

PLT-396

373 205

8 169 899

4 939

TUK-396

200

-90

PLT-397

372 109

8 169 982

4 823

TUK-397

200

-90

PLT-398

372 839

8 169 854

4 900

TUK-398

200

-90

PLT-399

372 774

8 169 474

4 902

TUK-399

200

-90

PLT-400

371 844

8 169 384

4 895

TUK-400

200

-90

PLT-401

371 864

8 169 084

4 989

TUK-401

200

-90

PLT-402

372 714

8 169 094

4 995

TUK-402

200

-90

PLT-403

372 954

8 169 159

4 975

TUK-403

200

-90

PLT-404

373 464

8 169 279

5 043

TUK-404

200

-90

PLT-405

373 054

8 168 914

4 979

TUK-405

200

-90

PLT-406

373 034

8 168 659

4 925

TUK-406

200

-90

PLT-407

372 181

8 170 947

5 082

TUK-407

200

-90

PLT-408

372 043

8 169 223

5 010

TUK-408

200

-90

PLT-409

372 780

8 168 667

4 904

TUK-409

200

-90

PLT-410

372 798

8 168 526

4 905

TUK-410

200

-90

PLT-411

372 963

8 168 459

4 923

TUK-411

200

-90

PLT-412

372 943

8 168 772

4 932

TUK-412

200

-90

PLT-413

372 879

8 168 939

4 961

TUK-413

200

-90

PLT-414

373 126

8 168 871

4 983

TUK-414

200

-90

PLT-415

373 220

8 168 856

4 989

TUK-415

200

-90

PLT-416

373 170

8 168 785

4 968

TUK-416

200

-90

PLT-417

372 233

8 168 945

4 955

TUK-417

200

-90

PLT-418

372 064

8 168 732

4 910

TUK-418

200

-90

PLT-419

372 126

8 168 293

4 833

TUK-419

200

-90

PLT-420

372 873

8 169 368

4 936

TUK-420

200

-90

PLT-421

372 912

8 169 292

4 950

TUK-421

200

-90

PLT-422

372 779

8 169 362

4 934

TUK-422

200

-90

PLT-423

373 932

8 169 199

5 153

TUK-423

200

-90

PLT-424

374 312

8 168 736

5 196

TUK-424

200

-90

PLT-425

371 429

8 167 711

4 800

TUK-425

200

-90

PLT-426

371 100

8 166 880

4 870

TUK-426

200

-90

PLT-427

371 184

8 167 206

4 805

TUK-427

200

-90

PLT-428

371 364

8 166 980

4 848

TUK-428

200

-90

PLT-429

371 292

8 166 840

4 876

TUK-429

200

-90

PLT-430

372 136

8 167 138

4 857

TUK-430

200

-90

PLT-431

372 441

8 167 125

4 856

TUK-431

200

-90

PLT-432

372 804

8 167 245

4 925

TUK-432

200

-90

Pgina IV-19

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-433

372 755

8 167 296

4 934

TUK-433

200

-90

PLT-434

373 047

8 167 326

5 015

TUK-434

200

-90

PLT-435

373 175

8 167 280

5 013

TUK-435

200

-90

PLT-436

373 297

8 167 352

5 053

TUK-436

200

-90

PLT-437

373 562

8 166 755

4 974

TUK-437

200

-90

PLT-438

373 797

8 166 885

5 014

TUK-438

200

-90

PLT-439

373 973

8 166 751

5 078

TUK-439

200

-90

PLT-440

373 768

8 166 172

5 017

TUK-440

200

-90

PLT-441

373 880

8 166 154

5 028

TUK-441

200

-90

PLT-442

375 606

8 160 636

5 039

TUK-442

200

-90

PLT-443

386 504

8 159 909

4 900

TUK-443

200

-90

PLT-444

390 376

8 160 636

5 081

TUK-444

200

-90

PLT-445

391 637

8 159 649

4 977

TUK-445

200

-90

PLT-446

390 341

8 158 454

4 860

TUK-446

200

-90

PLT-447

376 226

8 159 461

5 106

TUK-447

200

-90

PLT-448

372 633

8 169 158

5 000

TUK-448

200

-90

PLT-449

372 974

8 169 466

4 923

TUK-449

200

-90

PLT-450

373 765

8 168 595

5 065

TUK-450

200

-90

PLT-451

372 181

8 168 281

4 843

TUK-451

200

-90

PLT-452

371 682

8 167 490

4 825

TUK-452

200

-90

PLT-453

371 807

8 167 563

4 847

TUK-453

200

-90

PLT-454

371 749

8 167 451

4 835

TUK-454

200

-90

PLT-455

371 813

8 167 504

4 847

TUK-455

200

-90

PLT-456

371 859

8 167 496

4 853

TUK-456

200

-90

PLT-457

371 842

8 167 437

4 848

TUK-457

200

-90

PLT-458

372 043

8 167 510

4 888

TUK-458

200

-90

PLT-459

372 027

8 167 554

4 892

TUK-459

200

-90

PLT-460

371 981

8 167 688

4 891

TUK-460

200

-90

PLT-461

371 938

8 167 728

4 874

TUK-461

200

-90

PLT-462

372 366

8 167 490

4 963

TUK-462

200

-90

PLT-463

372 419

8 167 465

4 972

TUK-463

200

-90

PLT-464

372 451

8 167 429

4 964

TUK-464

200

-90

PLT-465

372 587

8 167 438

5 004

TUK-465

200

-90

PLT-466

372 769

8 167 455

5 022

TUK-466

200

-90

PLT-467

372 691

8 167 504

5 044

TUK-467

200

-90

PLT-468

373 306

8 167 539

5 121

TUK-468

200

-90

PLT-469

372 206

8 167 171

4 872

TUK-469

200

-90

PLT-470

372 306

8 166 973

4 850

TUK-470

200

-90

PLT-471

372 792

8 167 030

4 892

TUK-471

200

-90

PLT-472

374 134

8 167 384

5 124

TUK-472

200

-90

PLT-473

374 324

8 167 069

5 130

TUK-473

200

-90

PLT-474

372 939

8 168 873

4 951

TUK-474

200

-90

Pgina IV-20

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-475

372 980

8 168 839

4 947

TUK-475

200

-90

PLT-476

372 981

8 168 956

4 975

TUK-476

200

-90

PLT-477

373 258

8 168 703

4 947

TUK-477

200

-90

PLT-478

373 403

8 168 785

4 988

TUK-478

200

-90

PLT-479

372 805

8 168 775

4 919

TUK-479

200

-90

PLT-480

372 811

8 168 966

4 961

TUK-480

200

-90

PLT-481

373 367

8 168 104

5 007

TUK-481

200

-90

PLT-482

373 582

8 161 866

5 066

TUK-482

200

-90

PLT-483

375 006

8 162 090

5 100

TUK-483

200

-90

PLT-484

375 426

8 162 311

5 082

TUK-484

200

-90

PLT-485

375 228

8 161 979

5 084

TUK-485

200

-90

PLT-486

375 120

8 161 846

5 127

TUK-486

200

-90

PLT-487

375 038

8 161 719

5 129

TUK-487

200

-90

PLT-488

375 443

8 161 964

5 027

TUK-488

200

-90

PLT-489

375 691

8 162 080

5 006

TUK-489

200

-90

PLT-490

375 741

8 162 020

4 990

TUK-490

200

-90

PLT-491

375 355

8 161 622

5 095

TUK-491

200

-90

PLT-492

375 238

8 161 522

5 173

TUK-492

200

-90

PLT-493

375 104

8 161 505

5 159

TUK-493

200

-90

PLT-494

375 019

8 161 439

5 171

TUK-494

200

-90

PLT-495

375 339

8 161 395

5 200

TUK-495

200

-90

PLT-496

375 318

8 161 326

5 200

TUK-496

200

-90

PLT-497

375 323

8 161 299

5 200

TUK-497

200

-90

PLT-498

375 527

8 161 093

5 124

TUK-498

200

-90

PLT-499

375 499

8 160 896

5 084

TUK-499

200

-90

PLT-500

375 532

8 160 783

5 056

TUK-500

200

-90

PLT-501

376 064

8 161 034

5 000

TUK-501

200

-90

PLT-502

376 173

8 161 192

5 050

TUK-502

200

-90

PLT-503

375 550

8 162 710

5 166

TUK-503

200

-90

PLT-504

373 414

8 160 544

5 107

TUK-504

200

-90

PLT-505

388 312

8 159 812

4 813

TUK-505

200

-90

PLT-506

388 413

8 159 643

4 878

TUK-506

200

-90

PLT-507

388 448

8 159 679

4 869

TUK-507

200

-90

PLT-508

388 484

8 159 646

4 880

TUK-508

200

-90

PLT-509

388 342

8 159 604

4 885

TUK-509

200

-90

PLT-510

388 238

8 159 594

4 865

TUK-510

200

-90

PLT-511

388 378

8 159 570

4 899

TUK-511

200

-90

PLT-512

388 406

8 159 610

4 886

TUK-512

200

-90

PLT-513

388 452

8 159 609

4 887

TUK-513

200

-90

PLT-514

388 519

8 159 608

4 892

TUK-514

200

-90

PLT-515

388 519

8 159 562

4 903

TUK-515

200

-90

PLT-516

388 439

8 159 467

4 943

TUK-516

200

-90

Pgina IV-21

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-517

388 477

8 159 460

4 938

TUK-517

200

-90

PLT-518

388 534

8 159 480

4 923

TUK-518

200

-90

PLT-519

388 554

8 159 520

4 915

TUK-519

200

-90

PLT-520

388 525

8 159 410

4 926

TUK-520

200

-90

PLT-521

388 569

8 159 418

4 921

TUK-521

200

-90

PLT-522

388 631

8 159 460

4 908

TUK-522

200

-90

PLT-523

388 698

8 159 540

4 900

TUK-523

200

-90

PLT-524

388 554

8 159 267

4 910

TUK-524

200

-90

PLT-525

388 574

8 159 313

4 914

TUK-525

200

-90

PLT-526

388 581

8 159 360

4 917

TUK-526

200

-90

PLT-527

388 628

8 159 372

4 912

TUK-527

200

-90

PLT-528

388 662

8 159 422

4 907

TUK-528

200

-90

PLT-529

388 731

8 159 489

4 900

TUK-529

200

-90

PLT-530

388 770

8 159 462

4 900

TUK-530

200

-90

PLT-531

388 745

8 159 430

4 900

TUK-531

200

-90

PLT-532

388 691

8 159 394

4 905

TUK-532

200

-90

PLT-533

388 652

8 159 342

4 907

TUK-533

200

-90

PLT-534

388 635

8 159 300

4 906

TUK-534

200

-90

PLT-535

388 604

8 159 253

4 904

TUK-535

200

-90

PLT-536

388 682

8 159 260

4 900

TUK-536

200

-90

PLT-537

388 695

8 159 295

4 900

TUK-537

200

-90

PLT-538

388 680

8 159 364

4 905

TUK-538

200

-90

PLT-539

388 805

8 159 420

4 900

TUK-539

200

-90

PLT-540

388 846

8 159 389

4 892

TUK-540

200

-90

PLT-541

388 717

8 159 266

4 895

TUK-541

200

-90

PLT-542

388 672

8 159 216

4 889

TUK-542

200

-90

PLT-543

388 827

8 159 303

4 878

TUK-543

200

-90

PLT-544

388 862

8 159 353

4 884

TUK-544

200

-90

PLT-545

388 770

8 159 196

4 865

TUK-545

200

-90

PLT-546

388 922

8 159 442

4 895

TUK-546

200

-90

PLT-547

388 843

8 159 207

4 856

TUK-547

200

-90

PLT-548

388 902

8 159 385

4 885

TUK-548

200

-90

PLT-549

388 952

8 159 550

4 923

TUK-549

200

-90

PLT-550

388 993

8 159 468

4 896

TUK-550

200

-90

PLT-551

389 029

8 159 622

4 946

TUK-551

200

-90

PLT-552

389 070

8 159 583

4 939

TUK-552

200

-90

PLT-553

389 207

8 159 425

4 934

TUK-553

200

-90

PLT-554

389 118

8 159 428

4 913

TUK-554

200

-90

PLT-555

389 020

8 159 384

4 879

TUK-555

200

-90

PLT-556

388 970

8 159 388

4 880

TUK-556

200

-90

PLT-557

388 901

8 159 279

4 863

TUK-557

200

-90

PLT-558

388 885

8 159 146

4 815

TUK-558

200

-90

Pgina IV-22

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

PLATAFORMA

COORDENADAS UTM
WGS 84/ ZONA 19 S

ALTITUD
(msnm)

SONDAJE

PROF.

INCLINACIN

AZIMUT

ESTE

NORTE

PLT-559

388 952

8 159 198

4 829

TUK-559

200

-90

PLT-560

389 012

8 159 236

4 837

TUK-560

200

-90

PLT-561

389 061

8 159 329

4 866

TUK-561

200

-90

PLT-562

389 140

8 159 327

4 875

TUK-562

200

-90

PLT-563

389 085

8 159 267

4 841

TUK-563

200

-90

PLT-564

389 079

8 159 221

4 827

TUK-564

200

-90

PLT-565

389 224

8 159 277

4 862

TUK-565

200

-90

PLT-566

389 359

8 159 345

4 904

TUK-566

200

-90

PLT-567

389 465

8 159 376

4 901

TUK-567

200

-90

PLT-568

389 727

8 159 378

4 857

TUK-568

200

-90

PLT-569

389 599

8 159 449

4 900

TUK-569

200

-90

PLT-570

390 006

8 159 315

4 825

TUK-570

200

-90

PLT-571

390 105

8 159 452

4 838

TUK-571

200

-90

PLT-572

389 376

8 159 407

4 933

TUK-572

200

-90

PLT-573

389 473

8 159 427

4 924

TUK-573

200

-90

PLT-574

389 547

8 159 415

4 899

TUK-574

200

-90

PLT-575

390 022

8 159 258

4 822

TUK-575

200

-90

PLT-576

390 120

8 159 376

4 824

TUK-576

200

-90

PLT-577

390 197

8 159 433

4 825

TUK-577

200

-90

PLT-578

390 807

8 159 330

4 856

TUK-578

200

-90

PLT-579

389 668

8 159 620

4 918

TUK-579

200

-90

PLT-580

389 966

8 159 262

4 825

TUK-580

200

-90

PLT-581

388 410

8 159 289

4 911

TUK-581

200

-90

PLT-582

388 354

8 159 334

4 928

TUK-582

200

-90

PLT-583

388 284

8 159 390

4 897

TUK-583

200

-90

PLT-584

388 396

8 159 436

4 950

TUK-584

200

-90

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

4-2.2 POZAS DE SEDIMENTACIN


El manejo de los lodos de perforacin se realizar de tal modo que el aprovechamiento del agua se
maximice y que se permita la reutilizacin, la cual aumenta la eficiencia del sistema reduciendo el
volumen de agua fresca a utilizar. El manejo de los lodos, que permite la recuperacin del volumen de
agua, se realiza a travs de pozas de sedimentacin, las cuales se encuentran cercanas a la perforacin
y operan de forma secuencial o en serie (una despus de la otra), de tal forma que el lodo decantado
en cada poza sea cada vez menor y el agua clarificada pueda ser devuelta a la alimentacin para la
perforacin.
Las pozas para captacin de lodos sern construidas a mano y en la medida de lo posible debern estar
ubicadas adyacentes o muy cerca de la plataforma de perforacin. Las pozas de lodos tendrn una
dimensin de 2 metros de ancho por 2 metros de largo por 2,5 metros de profundidad, considerndose
2 para cada una de las plataformas y totalizando entre ambas una capacidad de captacin de 20,0 m3.

Pgina IV-23

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Los fluidos provenientes de la plataforma de perforacin, ingresarn mediante una cuneta de 0,40 m x
0,30 m y que en caso se observen obstrucciones sern habilitadas con tubera de PVC de 4 de
dimetro.
A pesar que la actividad usa principalmente la bentonita y otros aditivos biodegradables y solubles en
agua, como medida preventiva, en la base las pozas tendrn una membrana impermeable de
polietileno para evitar filtraciones, dicha capa estar sujeta al exterior mediante zanjas de anclaje de
0,30 x 0,30 m. Una vez culminado el proceso de cierre, en caso se encuentre en correcto estado, se
procurar reutilizar la membrana impermeable.
El diseo de las Pozas de lodos se incluye en el Anexo 4-1 (P-01).
4-2.3 ACCESOS
Para el traslado del personal, maquinaria, vehculos y herramientas hacia las plataformas e
instalaciones auxiliares se requerir de la construccin de accesos nuevos. Estos accesos, tendrn un
ancho de 4,40 m y sern habilitados a mano o de ser necesario mediante el uso del tractor. Se estima
como mximo que pendientes llegarn a 10% en tramos cortos y se han diseado tomando en cuenta,
en lo posible, la pendiente natural del terreno para evitar grandes volmenes de corte de material.
La longitud total de los caminos vehiculares y de maquinaria a acondicionar para el acceso hacia las
plataformas, se estima en aproximadamente 166 Km (4,40 m de ancho), de acuerdo a la topografa de
la zona a acceder y a las necesidades de la maquinaria a utilizar.
Para los accesos proyectados a utilizar durante la poca de lluvias, es necesario habilitar cunetas al
lado de los mismos; el diseo de las cunetas ser de seccin trapezoidal, con una base menor de
0,35 m, mayor de 0,40 m y 0,45 m de altura. Este sub-componente se encuentra considerado dentro
del ancho de 4,40 m del acceso tal y como se muestra en el Anexo 4-1 (P-02).
El material que pudiera resultar excedente de la construccin o habilitacin de accesos vehiculares se
acumular en el talud inferior y el suelo orgnico (top soil) en el talud superior, este material ser
protegido de manera que puedan ser utilizados en las labores de cierre progresivo y rehabilitacin.

Pgina IV-24

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-3 COMPONENTES AUXILIARES


Como se mencion previamente, los trabajadores de la perforacin (de ARUNTANI y los
contratistas) se alojarn en la Unidad Minera Tucari, por lo mismo, todos los servicios sern
proporcionados por dicha infraestructura. Asimismo, todos los combustibles, aditivos e insumos
necesarios para la perforacin, sern tambin trasladados desde los almacenes de la Unidad Minera
Tucari, hacia la zona de las plataformas de perforacin de manera progresiva segn requerimiento de
los frentes de perforacin. Por lo mencionado, no se contempla la construccin de instalaciones
auxiliares para el proyecto de exploracin Mariela.
Sin perjuicio de lo mencionado, se debe indicar que adems de plataformas y accesos, dentro del rea
de la plataforma se habilitar un bao qumico. Es decir que en total se contara con 3 baos qumicos
rotativos.

4-4 REA DISTURBADA Y VOLUMEN A REMOVER


Con los datos de dimensiones y cantidades descritas previamente, se han calculado el rea aproximada
a ser disturbada y los volmenes de material a ser removidos. En la siguiente Tabla 4-4-1, se muestra
el resumen de los clculos y en base a las caractersticas de cada uno de los componentes.
TABLA 4-4-1: DETALLE DEL CLCULO DEL REA DISTURBADA Y DEL VOLUMEN DE MATERIAL A
REMOVER

Componentes

Largo (m)

Ancho (m)

Cantidad

10

584

Pozas de Lodos

Accesos

4,40

Plataformas

Total

Profundidad (m)

Volumen (m3)

46 720

0,5

23 360

1 168

4 672

2,5

11 680

166 000

730 400

0,5

365 200

858 296

400 240

rea (m )

rea (m )

Volumen (m )

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

En total el rea a ser disturbada corresponde a aproximadamente 85,83 ha, y un volumen de


aproximadamente 400 240 m3 de material a ser removido.

Pgina IV-25

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-5 CONSUMO Y ABASTECIMIENTO


4-5.1. CONSUMO DE ADITIVOS, COMBUSTIBLES Y GRASAS
Aditivos de Perforacin
Las cantidades de aditivos (adelgazantes, espumantes, lubricantes y otros) utilizados en la perforacin
diamantina, depende de las condiciones geolgicas de los barrenos (presencia de arcillas, agua,
fracturamiento de roca, etc.), por lo que no se puede establecer exactamente las cantidades a ser
utilizadas finalmente. Para este caso se utilizar como aditivo principal la bentonita que ayudar a la
perforacin en la formacin de un recubrimiento impermeable contra la pared del taladro que no deje
filtrar agua en la formacin geolgica, adems de la estabilizacin de las paredes del taladro y
enfriamiento de la herramienta de perforacin. Seguidamente se muestran las cantidades aproximadas
a utilizar por cada 100 m de perforacin:

Bentonita: 250 Kg.

Aditivo Polmero (DP-600 o GS-500): 10 Kg.

Aditivo Alternativo (Borotex): 8 Kg.

Asimismo, sobre la composicin de los lodos de perforacin, queremos precisar que los mismos son
una mezcla de agua, aditivos especiales y productos naturales. Los fluidos de perforacin son
utilizados en los diferentes mtodos de perforacin con el objetivo de mejorar, mantener y controlar la
estabilidad del terreno en el pozo, dependiendo de las caractersticas y a la profundidad que se
encuentre el mismo.
Combustibles
El abastecimiento de combustible tanto para las camionetas (Diesel-2), las mquinas perforadoras
(Diesel-2) y los otros equipos, ser transportado a los sitios de perforacin mediante un camin
cisterna debidamente equipado. Este camin operar como cisterna mvil, y transportar el
combustible a las plataformas de perforacin cuando sea necesario y segn requerimiento de la
mquina.
Se estima un consumo de combustible (Diesel-2) por mquina perforadora de 80 galones por da (200
gal por cada 100 m de perforacin). El detalle de los consumos totales por cada equipo se presenta en
la siguiente Tabla 4-5.1-1:

TABLA 4-5.1-1: CONSUMO DE COMBUSTIBLE TIPO DIESEL 2

Equipo

Consumo
Unidad
(gal/da)

Numero

Consumo
Mensual
(gal)

Contingencia
Mensual
(15%)

Meses

Consumo
Total
(gal)

Habilitacin de accesos
Tractor

Pgina IV-26

40

1200

180

30

41400

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

Consumo
Unidad
(gal/da)

Equipo

Numero

Consumo
Mensual
(gal)

Contingencia
Mensual
(15%)

Meses

Consumo
Total
(gal)

Desarrollo de la perforacin
Maquina de Perforacin

80

7200

1080

32

264960

Camionetas 4x4

18

3240

486

32

119232

Camin Cisterna

240

36

32

8832

Total

434424

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

Aceites y grasas
El aceite se utilizar para el mantenimiento preventivo de los equipos (principalmente la maquina
perforadora) y las grasas para la proteccin de enroscados de tuberas y articulaciones de autopartes
por mantenimiento. En la siguiente tabla se muestra en la siguiente Tabla 4-5.1-2:
TABLA 4-5.1-2: CONSUMO DE ACEITES Y GRASAS

Cantidad

Aceites y Grasas

10 Gal / 100 m de
perforacin

Aceite 15w40

Variable por
Mantenimiento

Grasa

Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

Es preciso mencionar, que los mantenimientos sern efectuados en las instalaciones de la Unidad
Minera Tucari y no se efectuar dicha labor en el rea del proyecto.
Resumen de Consumos y Hojas de Datos de Seguridad de Materiales (MSDS)
Si bien, los consumos descritos son variables, se ha estimado el consumo total para todos los insumos
a ser utilizados en la perforacin, lo cual se muestra a continuacin en la Tabla 4-5.1:
TABLA 4-5.1-2: CONSUMOS ESTIMADOS
Aditivos

Total

Unidad

Aditivos de la Perforacin
Bentonita
Aditivo Polmero (DP-600 o GS-500)
Adtivo Alternativo (Borotex)

292000

Kg

11680

Kg

9344

Kg

434424

Gl

Combustible
Diesel 2
Fuente: ARUNTANI, 2014 / Elaboracin: Blasco, 2014

Finalmente en el Anexo 4-2 se adjuntan las mencionadas hojas MSDS de cada uno de los productos a
utilizar en el proyecto.

Pgina IV-27

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-5.2. CONSUMO Y ABASTECIMIENTO DE AGUA


Requerimiento de Agua
Uso Industrial
El requerimiento de agua, corresponde a 200 galones (0.76 m3) por metro perforado, y se estima que
para los 116 800 metros del Proyecto de Exploracin, se requerira 88 768,00 m3 de agua. En ese
sentido, considerando un avance promedio de 40 m diario por maquina, seguidamente se presenta el
requerimiento aproximado mensual y por dotacin de agua.

TABLA 4-5.2-1: REQUERIMIENTO DE AGUA


Requerimiento
por metro
perforado
3

(gal)

(m )

200

0.76

Avance diario de
Perforacin
(m)

Requerimiento
Mensual
3
(m )

Requerimiento
Diario
3
(m )

Dotacin
(L/s)

40

912

30,4

0,35

Elaboracin: Blasco, 2014

Como se muestra en la Tabla 4-5.2-1 la dotacin estimada por mquina es de 0,35 L/s. Teniendo en
cuenta que se considera como mximo perforar utilizando 3 mquinas. La dotacin en el periodo
mximo de perforacin ser de 1,05 L/s.
Uso Domestico
En general se considera un consumo promedio de 50 L/hab/da que considera uso para aseo personal,
bebida y preparacin de alimentos. Existirn 70 trabajadores durante la etapa de perforacin y 41
durante las etapas en las que no se perfora. En ese sentido, considerando que la etapa de perforacin
se realizar en 32 meses, se estima un consumo poblacional de 3 360 m3. Por otro lado, durante los
meses en los que no se perfora (8 meses), se estima un consumo de 492 m3. Es as que, durante todo el
proyecto se estima un requerimiento de agua de 3852 m3.
Abastecimiento de Agua
Uso Industrial
Para el abastecimiento se utilizarn tres puntos los cuales se detallan a continuacin en la Tabla 4-5.2-1:
TABLA 4-5.2-2: REQUERIMIENTO DE AGUA

Coordenadas UTM
WGS84 19S

Cdigo

Descripcin

Este

Norte

P-1

Se encuentra en quebrada Margaritani (Alrededores del Tajo Tucari)

372 930

8 169 667

P-2

Se encuentra al norte de tajo Tucari.

373 030

8 168 553

P-3

Se encuentra en la quebrada Huilcane

376 354

8 161 649

Elaboracin: Blasco, 2014

Pgina IV-28

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

El agua ser recolectada y transportada a las plataformas de perforacin mediante un camin cisterna.
Para el caso de las plataformas cercanas al punto de captacin se proceder a bombear el agua al
punto de perforacin directamente con mangueras.
Uso Domestico
Como se mencion previamente el consumo de agua para uso domstico ser proporcionado en la
Unidad Minera Tucari.
4-5.3. FUENTE DE ENERGA
Para la generacin de energa elctrica, se cuenta con conexin a la red interconectada nacional para
la Unidad Minera Tucari, que permitir brindar este servicio a las actividades administrativas que
requerir el proyecto.
Las plataformas contarn un con pequeo grupo electrgeno porttil y las luminarias estacionarias
incorporadas a las mquinas de perforacin.

Pgina IV-29

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-6 EFLUENTES Y RESIDUOS A GENERAR


4-6.1. VOLUMEN ESTIMADO DE EFLUENTES A GENERARSE
No se producirn efluentes domsticos en el rea, ya que como se mencion no se existir un
campamento. Sin perjuicio de ello, se contar dentro del rea de la plataforma con baos qumicos
que tampoco generan una descarga.
Los efluentes producidos por la perforacin de taladros, compuestos por lodos (lquido y solido), se
canalizarn hacia las pozas donde sern almacenadas, de tal manera que los slidos en suspensin
sedimenten y reutilizado el agua en la perforacin. No existir descarga hacia un cuerpo de agua
superficial.
4-6.2. VOLMENES ESTIMADO DE GENERACIN DE RESIDUOS SLIDOS
Para la estimacin de los volmenes de generacin de residuos slidos se consider principalmente
que en el rea no existir un campamento y por lo mismo, los residuos generados sern nicamente de
origen industrial. En ese sentido, se tom como referencia el Informe Estadstico de Residuos Slidos
2007-2008 elaborado por la Direccin General de Asuntos Ambientales Mineros (DGAAM) del
Ministerio de Energa y Minas, el cual considera los datos de las Declaraciones Anuales de Manejo de
Residuos Slidos y Manifiestos de Manejo de Residuos Peligrosos del periodo de la referencia,
complementando con otra informacin bibliogrfica. De lo revisado se estimaron los valores de la
Tabla 4-6.2-1 para uso industrial segn tipo de residuo:
TABLA 4-6.2-2: VALORES CONSIDERADOS PARA LA ESTIMACIN DE RESIDUOS SOLIDOS DE ORIGEN
INDUSTRIAL

Diario (Kg)

Total
Mensual
(Kg)

Residuos de papel, cartn y


productos de papel

2,00

60,00

Residuos slidos de material


plstico

0,20

6,00

Residuos de vidrios en forma no


dispersable

0,13

3,90

Residuos contaminados con


mezclas y emulsiones de aceite y
agua o hidrocarburos y agua

1,00

30,00

3,33

99,9

Tipo

No
Peligroso

Peligrosos

Clase

TOTAL

Total

Elaboracin: Blasco, 2014

Seguidamente, en la Tabla 4-6.2-3 se presenta la clasificacin por tipo de residuo generado, en arreglo
a lo dispuesto en el Reglamento de la Ley General de Residuos Slidos, asimismo para el clculo
aproximado de los volmenes a ocupar se ha considerado una densidad terica de 200 kg/m3
considerando que en este punto (generacin) los residuos no se encuentran compactados caso en el
que la densidad aumentara considerablemente.

Pgina IV-30

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

TABLA 4-6.2-3: ESTIMADO DE GENERACIN DE RESIDUOS SOLIDOS POR TIPO Y CLASE

Cdigo

Tipo

Total Diario

Clase

Total Mensual

Total Proyecto

Kg

m3

Kg

m3

Kg

m3

Residuos de papel,
cartn y productos de
papel

0,01

60

0,3

1920

9,6

Residuos slidos de
material plstico

0,2

0,001

0,03

192

0,96

B.2.2

Residuos de vidrios
en forma no
dispersable

0,13

0,00065

3,9

0,0195

124,8

0,624

A.4.6

Residuos
contaminados con
mezclas y emulsiones
de aceite y agua o
hidrocarburos y agua

0,005

30

0,15

960

4,8

3196,8

15,98

B.3.2

B.3.1

No Peligroso

Peligroso

Total
Elaboracin: Blasco, 2014

Se estima entonces un total de 3 196,80 Kg de residuos a generarse, de los cuales 2 236,8 Kg


corresponden a residuos no peligrosos, mientras que el resto representa los peligrosos. En el Capitulo
de Plan de Manejo Ambiental se especifica de manera detallada como se manejaran los residuos
slidos generados por el proyecto.

Pgina IV-31

..

ARUNTANI SAC
ESTUDIO DE IMPACTO AMBIENTAL SEMIDETALLADO
Proyecto de Exploracin Mariela

4-7 CRONOGRAMA MENSUAL DETALLADO


El programa de trabajo contempla un total de 40 meses, incluyendo la etapa de cierre y post-cierre. Especficamente, la etapa de perforacin se realizar en 32
meses. En la siguiente Tabla 4.7-1 se muestra el cronograma:
TABLA 4-7-1: CRONOGRAMA MENSUAL DETALLADO

ACTIVIDADES

MESES
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Rehabilitacin de
accesos existentes
Construccin de
trochas de acceso
Construccin de
plataformas
Perforacin
Evaluacin de
Resultados
Cierre Progresivo
Cierre Final
Post-Cierre
Elaboracin: Blasco, 2014

Pgina IV-32

..