Вы находитесь на странице: 1из 44

Balancing methods

TA Hydronic College Training

What is the purpose of balancing ?

Produced by TA Hydronic College

Adjusting the design flows in all terminal units in


design conditions (when all control valves are fully open),
while creating minimum additional pressure drops.

1) Call Santa Claus!

2) Have a method.
2

Infinity of possible balancing solutions


2 psi
100

3 psi
100

3 psi
100

2 psi
100

3 psi
100

1.
4 psi
1 psi

3 psi
1 psi

100

2 psi
1 psi

100

100

1 psi
0.5 psi

100

0.5 psi
0.5 psi

100

2.
6 psi

Produced by TA Hydronic College

100

5 psi

100

4 psi

100

3 psi

100

2.5 psi

...

12 psi

11 psi

10 psi

= 9.5 psi
= 21.9 ft

100

3.
13 psi

= 7.5 psi
= 17.3 ft

9.5 psi

= 16.5 psi
= 38 ft
3

Building brick: the hydronic module

Produced by TA Hydronic College

Direct return piping

1 balancing valve
per circuit

3 Main balancing valve


4

Produced by TA Hydronic College

Splitting into modules

Splitting into modules

Produced by TA Hydronic College

Simplifying the drawing


is essential

Splitting into modules


=

Produced by TA Hydronic College

Solution for the


main module

Splitting into modules


=

Produced by TA Hydronic College

Another solution
for the main module

Turning direction criteria for splitting into modules


30 gpm 30 gpm

4 gpm

4 gpm

4 gpm

Produced by TA Hydronic College

At any bifurcation
between many and many units
turn in the direction of the main flow

Remark: bifurcations can be

30 gpm

4 gpm

4 gpm

4 gpm

At any bifurcation
between one and many units
turn in the direction of the many units
regardless of the flow

or
9

Splitting into modules

Produced by TA Hydronic College

Find out the


sub-modules (1)

10

Splitting into modules

Produced by TA Hydronic College

Find out the


sub-modules (2)

11

Splitting into modules

Produced by TA Hydronic College

Find out the


sub-modules (3)

12

Splitting into modules


=
A.6

A.5

Produced by TA Hydronic College

A.4

13

Where to install balancing valves ?

Produced by TA Hydronic College

Where would you install


balancing valves ?

14

Exercise: Split the plant into modules and place valves


All black numbers is q in gpm
All red numbers is p in psi
4/2

4/2

3/2

4/2

4/2

12/4

1/1

8/3

1/1
2/2

1/1

6/2

10/4

8/3

1/1

2/2

2/2

2/2

2/2

2/2

2/2
2/2

10/4

5/2
2/2

Produced by TA Hydronic College

7/3

7/3

=
5/2

Mark with where STAD/F is needed,


use the smallest amount!
Size all STAD/F regardless of pipe p

Exercise: Split the plant into modules, place and calculate valves
All black numbers is q in gpm
All red numbers is p in psi
All blue numbers in feet
All circuit length is 10 feet

4/2

4/2

60
4/2

3/2

1/1

12/4

60

150

150

150

1/1

2/2

2/2
60

60

60

100

90

2/2

2/2
60

60
8/3

1/1

8/3

1/1

2/2

2/2
60

2/2

4/2

60 10/4

6/2
5/2

60

60

10/4

60

60

90
5 30

30
60

100

60

30

7/3

Produced by TA Hydronic College

60
7/3

60
5/2

Mark with where STAD/F is needed,


use the smallest amount!
Size all pipes and STAD/F in TA Select
Compare the valve size from the previous
exercise

2/2

2/2

Balancing a module

Produced by TA Hydronic College

The iterative method


(trial and error) quickly becomes
a nightmare because of
hydraulic interactivity

17

Balancing a module

30

20

10

20

20
Exploit the
proportion
rule

Produced by TA Hydronic College

100

45

30

15

30

30

150
18

Balancing a module

10

Produced by TA Hydronic College

11

10

12

10

10

13

10

13

The proportion rule


applies itself
downstream
from a
perturbation

19

Balancing methods
Proportional method
adapted from air system balancing methodologies
not optimal in pressure drops

Compensated method (Pr. Robert Petitjean)


designed for application with balancing valves
optimal in pressure drops

TA Balance method (Pr. Robert Petitjean)

Produced by TA Hydronic College

fully computerized: automatic determination of the index valve


optimal in pressure drops

20

The compensated method


Reference
valve

Produced by TA Hydronic College

Preset the reference valve for a pressure drop of


at least 1 ft at design flow.
(use calculation disk or TA SCOPE)
21

The compensated method


Reference
valve

Partner valve

Produced by TA Hydronic College

100%

Obtain the design flow in the reference valve


by adjusting the partner valve.
22

The compensated method


Reference
valve

Partner
valve

Produced by TA Hydronic College

100%

Maintain the flow in the reference valve, by adjusting


the Partner valve, while adjusting valve no 4. (by using
the computer method in TA SCOPE on no 4)
23

The compensated method

Produced by TA Hydronic College

100%

100%

Continue the procedure with valve no 3.


The flow is maintained in the reference valve and in valve no 4
by virtue of the proportion rule.
Continue until all valves is balanced in this module.
24

The compensated method

Produced by TA Hydronic College

Reliable
Each valve is adjusted only once
Minimum pressure drops

3 people needed
2 instruments needed
Difficult if the index
is not the reference
25

Order for balancing modules


The structure of hydronic modules can
be seen as a hierarchical tree.

=
A.6

By virtue of the proportion rule, before


a valve can be adjusted, all its children
valves must themselves be adjusted.

A.5

A.4

Before a module can be balanced, the


whole descent of this module must be
balanced.

Produced by TA Hydronic College

4
Balancing order:
2
1
3

26

Order for balancing modules

Produced by TA Hydronic College

Correct

Incorrect !

Correct

27

Setting of balancing valves by step 1

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
28

Setting of balancing valves by step 2

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
29

Setting of balancing valves by step 3

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
30

Setting of balancing valves by step 4

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
31

Setting of balancing valves by step 5

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
32

Setting of balancing valves by step 6

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
33

Setting of balancing valves by step 7

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
34

Setting of balancing valves by step 8

Fully open

Produced by TA Hydronic College

50% open
Balanced
Module @ work
35

TA Balance method

TA Balance is a computerized balancing method


incorporated in the TA SCOPE:
1. Two measurements are performed on each valve

Produced by TA Hydronic College

2. It calculates the best settings for the balancing valves


of the module
Preliminary operations:
Partner valve is fully open
Balancing valves of all circuits are set at 50% opening
36

TA Balance method
For each valve :
1) Enter the design flow
2) Enter valve and setting
3) Measure the current flow
4) Shut the valve
5) Measure the pressure drop
6) Re-open the valve
Repeat on all module valves

Produced by TA Hydronic College

For the partner valve :


1) Shut the valve
2) Measure the differential pressure
3) Re-open the valve
TA SCOPE calculates and displays the required valve openings.

37

TA Balance method
The settings displayed by the TA SCOPE are adopted:
Circuits of the module are then proportionally balanced.
With the lowest pressure drops in the valves. (starting
with selected min p in the index valve)

Produced by TA Hydronic College

Setting the partner valve to the


design flow, now or in a later stage

Gives the correct flows in every


balancing valves of the module.
38

TA Balance method
Reliable
Minimum pressure drops
Only one person needed
Only one instrumet needed

Produced by TA Hydronic College

The index valve is


automatically detected
Overall gain of 25% on
the balancing time
39

Balancing methods
Proportional method
adapted from air system balancing methodologies
not optimal in pressure drops
minimum 2 to 3 access to each valve
1 man; 1 instrument

Produced by TA Hydronic College

Compensated method (Pr. Robert Petitjean)


designed for application with balancing valves
optimal in pressure drops
only 1 access to each valve (if index valve at the end)
3(2) men; 2 instruments needed
TA Balance method (Pr. Robert Petitjean)
fully computerized: automatic determination of the index valve
optimal in pressure drops
1 man; 1 instrument
3 to 4 access to each valve
40

Balancing reveals the optimal set-point


1

Minimum pressure drops


in the balancing valves

Produced by TA Hydronic College

Re-open the main valve


and adjust the pump speed

All the pump head in excess is


located in the main valve
41

Pump optimization
50 gpm

50 gpm

50 gpm

50 gpm

50 gpm

40 psi
40 psi
30 psi

250 gpm

0.5 psi

14 psi

13 psi

12 psi

11 psi

10.5 psi
0.5 psi

4 psi
4 psi

3 psi
3 psi

2 psi
2 psi

1 psi
1 psi

10.5 psi
0.5 psi
0.5 psi

Produced by TA Hydronic College

All above 1 ft (0.5 psi) in p in the index valve and main valve is energy waste.
.no balancing is completed before the pump is optimized

Savings are real

Pfizer pharmaceutical production unit nearby Tours (France)

Produced by TA Hydronic College

Installed cooling capacity of 184,256 MBTUH (3 chillers in cascade)


Total design flow: 3400 GPM
Problem: production alarms!
80 TA balancing valves from STAD to STAF 8
Audit of plant with TA Select based on a first measurement campaign
Presettings calculated with TA Select
Viscosity corrections checked with TA Select
Full balancing performed using TA-Balance on one TA-CBI
43

Savings are real


Before
balancing

Industrial plant
184,256 MBTUH
cooling capacity
3900 GPM
49 psi pump head

After
balancing

3400 GPM (-13%)


No production alarms!

Produced by TA Hydronic College

39 psi pump head (-20%)


Pumping power reduction :
52 HP
Savings : 17200 /year
24000 $/year

44