Вы находитесь на странице: 1из 4

RECUE PLAN FOR POWER TOOLING & TOUCH UP PAINTING

USING
ROPE ACCESS METHOD.
1.

Rescue plan.
When planning any work at height the job Method Statement shall include rescue
plan.
Work at height shell not commence until the rescue plan is in place.
For working at height activities, the rescue plan shall be approved by the appropriate
approving authority.
The personnel caring out the work shall demonstrate that they can conduct the
rescue plan prior to commencing any work.
The Rescue plan should identify all potential incident and emergency
procedures shall be established to deal with all such events.
The rescue plan should consider;

The location of the workplace.


Any special risks at the work place.
The height of any rescue.
Where the rescue will be conducted from.
The number of personnel who may need to be rescued.
Change of teams work positions.
How personnel will be rescued from any fall protection equipment used (air
bags, netting, safety harness, etc.)
Potential risk to the rescuers.
Number of rescuers required
Availability of rescue equipment.
Time for the rescue to be conducted.
Access for the emergency services.
Communication between the Rope Access Team leader and platform In charge
(PIC) / Radio Operator (Channel 2)

Where the rescue is complex i.e from a combined space, from a non permanent working
platform, here multiple personnel may require rescue, work is a remote location
etc..professional advice shall be sought.

Rescue shall also be assisted by Emergency Response Team at the


platform Facility.

RECUE PLAN FOR POWER TOOLING & TOUCH UP PAINTING


USING
ROPE ACCESS METHOD.
2. Type of Rescue for the job task
Lower only by accompanying Rescue.
Victim held by his stop, with free ropes below.
Abseil or prussic to the victim, if abseiling, an independent rope will probably
required for the rescue.
On reaching the victim attach yourself to his ascender using the short cowstail or
karabiners. Transfer your weight to it. Pass his descender rope through, and take a
turn around an extra friction crab. Abseil down together using his descender.

RECUE PLAN FOR POWER TOOLING & TOUCH UP PAINTING


USING
ROPE ACCESS METHOD.
3. Type of rescue for the job task.
Vertical lift by an Accompanying Rescuer.
Climb or abseil down to the victim. For short distance it is also practical to prussic
down his work rope. Arrange yourself just above him ready for prussiking.
Attached his harness to yours using preferably, his cowstail. Put both feet into your
foot loop(full frog system) and prussic upwards to take his weight. Disconnect his
equipment from his rope and keep it in case you need it.
Prussik upwards using both legs and both arms. This method is very tiring so it only
practical over a short distance and as a last resort.
A more practical method involves the use of a pulley / foot loop system where the
rescuer acts a counterweight to a victim.
Attached a small pully to a victims jumar karabiner, as high up his work rope as
possible. Pass the rope foot loop through the pulley and attach the small loop to the
victims harness. Use a large loop as a foot loop to step in, thus using the rescuers
weight as a counterbalance.
NOTE 1; A pulley and rope foot loop set is included in each recovery kit.
NOTE 2; If pulley and rope foot loop are not available, the victims foot loop can be
used and the shunt karabiner used directly.
NOTE 3; This method is also very useful for taking the weight of the victim off his
croll when it necessary to transfer him from ascending to descending mode.

RECUE PLAN FOR POWER TOOLING & TOUCH UP PAINTING


USING
ROPE ACCESS METHOD.
4. Other method of rescue.
The job task also requires overboard activities which expose the rope access
personnel to drown in the event of emergency. Some additional precautionary
measures shall be taken for the event if take place.
The precautionary measure to considered;
a) Wind speed and weather factor.
b) To coordinate with daily operation activities.
c) If working over board Rope Access personnel shall be substituted by a life vest of
life jacket.
d) As for the work required to be performed on the critical line/piping, gas test need
to be test by CHESS gas tester before proceed the job.

Technician Name
1)

IRATA Level

Signature

2)
3)
4)

Prepared by.
Signature:

Review by
Signature:

Approved by.
Signature:

Name: Beriak Ulok


Position: IRATA Level
3/Supv.
Date:

Name:
Position: Safety Officer.
Date:

Name:
Position: Construction
Supervisor.
Date:

RECUE PLAN FOR POWER TOOLING & TOUCH UP PAINTING


USING
ROPE ACCESS METHOD.
Attachment Rescue photo chat:

Rescue
r

Casualty

Attach Casualty withcows


tail and karabiners

Rescuer

Casualty

Using pulley system 3:1 prussic upwards using foot loop


for disconnect his equipment from the rope.