MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM

ID

Task Name

Duration

MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM

W-2
1
2
3
4
5
6
7
8
9
10
11
12
13
94
99
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238

1 Project Kickoff Meeting


2 Personnel Mobilization
3 PROJECT MANAGEMENT
3.1 Review of FEED documents and data gathering
3.2 Site Visit
3.3 Work Breadown Structure and Execution Plan
3.4 Development of Master Document Register
3.5 Man Power Planing
3.6 Engineering Design Basis
3.7 Issue of Long Lead Items
3.8 Review of acquired data / Mark-up of As-Built document form Site
3.9 Site Visit Report
4 Project Control and Quality Assurance
5 Project Monthly Review Meeting
6 Daily Interdiscilinary Check
7 Mobilization to Site
8 DETAILED ENGINEERING
8.1 SURVEY (Detailed Topographical, Geotechnical and Geophysical Survey
Data)
8.1.1 Geophysical / Geotechnical Survey of Pipeline Route ROW From Sahara
Depot to Airport Terminals
8.1.2 Geophysical / Geotechnical Survey of Sahara Aviation Depot Facilities
and Airport Fuel Hydrant Station
8.1.3 Geotechnical / Geophysical Soil Investigation and Report
8.1.4 Soil Resistivity (Field Work)
8.1.5 Soil Resistivity Lab & Report
8.1.6 Survey Report and CADD
8.2 PROCESS
8.2.1 Prepare Process Flow Diagram (PFD), Piping & Instrumentation Diagram
(P&ID), Utility Flow Diagram ( UFD)
8.2.2 Sizing Calculations (Piping, Valves Tanks, Hydrant system)
8.2.3 Data Sheets
8.2.4 Detailed Pipeline Hydraulic Studies & Report
8.3 HSSE
8.3.1 HAZOP
8.3.2 HAZOP Closeout Report
8.4 PIPING / MECHANICAL
8.4.1 Piping Specifications
8.4.2 Data Sheets
8.4.3 Sizing Calculations (Piping & Valves)
8.4.4 Wall Thickness Calculation / Stress reports
8.4.5 Piping General Arrangment Layout
8.4.6 Tie-In Details
8.4.7 Piping MTO
8.4.8 Piping Isometrics Drawings
8.5 PIPELINE
8.5.1 Pipeline Specifications
8.5.2 Data Sheets
8.5.3 Typical Drawings
8.5.4 Pipeline MTO
8.5.5 Pipeline Stress Analysis / Modelling
8.5.6 Pipeline Alignment Sheet
8.6 CIVIL / STRUCTURAL
8.6.1 Plot Plan General Arrangement Drawings
8.6.2 Civil Specification
8.6.3 Support and Foundation Sizing Calculations
8.6.4 Civil Structural Drawings & Details
8.7 INSTRUMENTATION & CONTROL
8.7.1 Instrument Operating Philosophy
8.7.2 Instrumentation Specifications
8.7.3 Instrument Data Sheets / Control valve sizing calculations
8.7.4 Leak Detection Design
8.7.5 Instrument Equipment Layout Drawings
8.7.6 SCADA Concept / Logic
8.7.7 Instrument Drawings / Block diagrams
8.7.8 Instrument MTO
8.8 ELECTRICAL
8.8.1 Specifications & Data Sheets for Electrical Equipments
8.8.2 Electrical Cable, Power Requirement Calculations & Sizing Reports
8.8.3 Electrical Equipment Layout & Drawings
8.8.4 Electrical Schedule / Single Line Diagram
8.8.5 Earthing, Lightning & Perimeter Lighting Details
8.8.6 Hazardous Area Clasifications
8.8.7 Electrical MTOs
8.9 GENERAL
8.9.1 Project Closout Report
8.9.2 General Operation and Maintenance Manual
8.10 Engineering Close-Out Report

Project: MURITALA MOHAMMED AIR


Date: Wed 5/20/15

FRAZIMEX ENGINEERING LIMITED

W-1

Month 1
W1

W2

W3

W4

Month 2
W5

W6

W7

W8

W9

Month 3
W10

4 mons
1 day
1 day
2.35 mons
3 days
4 days
5 days
10 days
5 days
7 days
30 days
7 days
7 days
3.96 mons
3.27 mons
3.96 mons
2 days
3.85 mons
0.9 mons
6 days
6 days
7 days
8 days
7 days
7 days
1.5 mons
30 days
10 days
10 days
5 days
0.4 mons
3 days
5 days
2.8 mons
15 days
15 days
10 days
25 days
25 days
10 days
10 days
25 days
1.7 mons
15 days
15 days
12 days
10 days
15 days
25 days
2 mons
15 days
15 days
25 days
25 days
1.95 mons
10 days
25 days
25 days
20 days
15 days
25 days
20 days
10 days
2.5 mons
10 days
20 days
25 days
20 days
20 days
20 days
10 days
0.25 mons
5 days
5 days
4 days

Task

Summary

External Milestone

Inactive Summary

Manual Summary Rollup

Finish-only

Split

Project Summary

Inactive Task

Manual Task

Manual Summary

Progress

Milestone

External Tasks

Inactive Milestone

Duration-only

Start-only

Deadline

Page 1 of 1

W11

W12

W13

Month 4
W14

W15

W16

W17