GHAZIABAD DEVELOPMENT
AUTHORITY
GHAZIABAD.
TENDER DOCUMENT
VOLUME II
PRICE BID

NAME OF WORK:

dkS'kkEch ;kstuk esa lhoj


ykbu ds lek/kku gsrq
VsUpySasl i)fr ls 600 ,e-,eC;kl dh lhoj ykbu fcNkus dk
dk;ZA

YEAR : 2012 -13


EXECUTIVE ENGINEER
25-04-2013

DOWNLOAD COPY

GHAZIABAD DEVELOPMENT AUTHORITY


GHAZIABAD.
TENDER DOCUMENT
VOLUME II
PRICE BID
NAME OF WORK: dkS'kkEch

;kstuk esa lhoj


ykbu ds lek/kku gsrq
VsUpySasl i)fr ls 600 ,e-,eC;kl dh lhoj ykbu fcNkus dk
dk;ZA

Estimated Cost

Rs. 95.52 Lacs

Cost of Tender
Earnest Money
Time of Completion
Liability /Maintenance
period
Validity of Tender
Date of Receipt of Tender
Date of Opening of Tender
i) Pre-Qualification Bid
ii) Price Bid

:
:
:

Rs.1688/- only
Rs. 1.91 Lacs
6 months

:
:
:
:
:
:

One year
3 months
20.04.2013 to 04.05.2013
07.05.2013
07.05.2013
After Sanction PQ Bid as
and when informed by
GDA.
25-04-2013

DOWNLOAD COPY

25-04-2013

DOWNLOAD COPY

GHAZIABAD

DEVELOPMENT AUTHORITY
(B.O.Q.)
Abstract of cost

Name of work: CONSTRUCTION OF TRENCHLESS OF REMAINING SEWER LINE


THROUGH WATER BODY COMPOUND IN KAUSHAMBI SCHEME GHAZIABAD.
S.No.
Description
Qty.
Unit
Rate
Amount
01
Earth work in excavation by
mechanical
means
(Hydraulic
excavator) manual means over
areas (exceeding 30cm in depth on
plan)
including
disposal
of
excavated earth, lead upto 50m and
(a)
All kinds of soil lift of 0.0 to 1.5m or 210
Cum
112.27
23576.70
part thereof in (A.R.)
(b)
All kinds of soil lift of 1.5m to 3.0m 210
Cum
141.25
29662.50
or part thereof in (A.R.)
(c)
All kinds of soil lift of 3.0m to 4.5m
210
Cum
177.20
37212.00
or part thereof in (A.R.)
(D)
All kinds of soil lift of 4.5m to 6.0m
210
Cum
207.30
43533.00
or part thereof in (A.R.)
(E)
All kinds of soil lift of 6.0m to 7.5m
70
Cum
270.50
18935.00
or part thereof in (A.R.)
3.
Close timbering over areas including
strutting, shorting and packing,
cavities (wherever required) etc.
complete (Measurements to be
taken of the face area timbered)
(DSR 2012/2.18)
(a)
Depth no exceeding 1.5m (DSR
105
Sqm
90.25
9476.25
2012/2.18.1)
(b)
Depth exceeding 1.5m but not
105
Sqm
95.30
10006.50
exceeding 3.00m (DSR
2012/2.18.2)
(c)
Depth exceeding 3.00m but not
105
Sqm
100.75
10578.75
exceeding 4.50m (DSR
2012/2.18.3)
(d)
Depth exceeding 4.50m but not
140
Sqm
106.50
14910.00
exceeding 6.50m (DSR
2012/2.18.3)
3.
Extra for planking strutting and 455
Sqm
1329.05
604717.75
packing materials for cavities
(inclose timbering) permanently left
to be measured) (DSR 2012/2.19)
4
Constructing of R.C.C. circular 3.0
Nos.
95756.00
287268.00
manhole as per direction of e/i of
1.60m internal dia & 5.00m deep all
complete as per approved design &
drawing of G.D.A. (A.O.R.)
5.
Add extra/Deduct for 1.00m depth of 3.0
Rmt
16666.00
49998.00
shaft as per direction of E/I internal
approved design & drawing of GDA
(A.O.R.)
6
P/L and jointing 600mm dia M.S. 135
Rmt
41000.00 5535000.00
25-04-2013

DOWNLOAD COPY

10

Pipe 12mm thick without F.R.P.


coating sewer line below road by
tranchless technology at a depth
6.00m including all T&P etc.
complete GDA (A,R.)
Coating of inner surface of pipe with
F.R.P. Coating with 750.00 in
surface protection against corrosion
complete in all including sand
blasting of M.S. Pipe. (U.P. Jal
Nigam Kanpur)
Making connection of existing
600mm dia sewer line as per site
condition i/c the cost of D.G. Safety
Equipment arrangement Barricading
of the work area as per the
requirement etc. Pluging the sewer
line in both side or more for jointing
the new sewer line and cleaning the
line, complete in all respect GDA.
(A.O.R.)
Cleaning of existing 600m Dia
sewer line manhole as per site
condition i/c the cost of D.G. safty
equipment arrangement barricading
of the work area as per the required
etc. complete in all respect. GDA
(A.O.R.)
Pumping out sub soil water to keep
trenches dry during excavation of
trencher and others cons. Up to
related to depth 0.0m to 2.0m depth
of sub soil water. GDA (A.O.R.)

J.E.

264

Sqm

7736.00

2042304.00

2.0

Nos.

150000.00

300000.00

12

Nos.

15000.00

180000.00

135

RM

2630.00

355050.00

Total Rs.

95,52,228.4
5

A.E.

E.E.

25-04-2013

DOWNLOAD COPY

GHAZIABAD DEVELOPMENT AUTHORITY


GHAZIABAD.
NAME OF WORK:

dkS'kkEch ;kstuk esa lhoj


ykbu ds lek/kku gsrq
VsUpySasl i)fr ls 600 ,e-,eC;kl dh lhoj ykbu fcNkus dk
dk;ZA
PRICE BID

I/We hereby tender for the execution of above mentioned work according to the Bill of
quantities, Specification and terms and conditions referred to in the tender documents within
the time frame as mentioned and in accordance with the specifications, design, drawings and
instruction in writing and with such materials as are provided for and in all other respects in
accordance with such conditions so for as applicable.
I/We hereby agree to the percentage mentioned (below/above) on the printed rates of the Bill
of Quantities for the execution of the above work.
1.
2.
3.
4.
5.

The Quantities are liable to wide variation upto 25% extent for which no claim
whatsoever shall be entertained.
All extra items shall be executed on the same rates as % percentage tendered by
the contractor section wise on the basis of schedule of rates at the time of inviting
the tenders or the current schedule rates which ever is lesser.
Al works shall be carried out as per Morth C.P.W.D. / U.P.P.W.D. detailed
specification and amendments made therein from time to time.
Sales Tax as admissible from time to time will be recovered from the gross amount
of the bills.
In the event of any dispute Ghaziabad Courts will have exclusive jurisdiction and no
suit shall be lie in any other court outside Ghaziabad District.

6.

Bsdsnkj }kjk fufonk ds lkFk #0 100@& dk LVkEi


isij rFkk #0 & 10@& dk jsosU;w LVSEi ij Bsdsnkj
ekud Hkk"kk esa gLrk{kj dj layXu fd;k tk;sxk]
ftl ij Bsdsnkj }kjk ;g vUMjVsfdax nh tk;sxh fd
fufonk dh njsa oS|rk dh vof/k 10 fnu esa okfil
ugha yh tk;sxh rFkk fu/kkZfjr oS|rk vof/k esa
fufonk dh njsa okfil yh tkrh gSA ml fLFkfr esa
fufonk ds lkFk layXu /kjksgj jkf'k 100izfr'kr
tCr dj yh tk;sxh A

7.

I/We ......................................................... hereby offer to execute the above


Work ........................................................ on ............................................ % (in
figure)
(in
words)
..............................................................................
..................................
above/below the rates printed on the attached bill of quantity in respect of section.
25-04-2013

DOWNLOAD COPY

........................................................ of the works.

Contractor

Asst. Engineer(E)
G.D.A.

Officer Opening
Tender

Officer Recommending Vice Chairman


Tender
G.D.A.

25-04-2013

DOWNLOAD COPY

SCHEDULE 'C'
The following materials shall be issued at the rates and places noted against
each, in case of delay and non-supply of materials no claim what so ever will be
entertained on this account. However suitable extension of time shall be granted on
these ground for these items at serial No. 1- 8.
Material
Rate
Unit
Remarks
1.
Cement
2.
Flush door shutters
3.
Ribbed Tor steel
4.
Mapxhalt 80/100 (in
drums)
5.
G.I. Pipes
6.
RCC hume pipe/PVC
pressure pipe/C.I. titan
Pipe
7.
Water Tanks
8.
Interlocking
tiles
900/Sqm.
bUVjykWfdax VkbZYl
cement
concrete
izkf/kdj.k
dh
paved blocks

e/kqcu&ckiw/kke
;kstuk ls izkIr djk;h
tk;sxha ftlds ewY; dh
dVkSrh Bsdsnkj ds
ns;d ls dh tk;sxhA

1.

2.
3.
4.
5.
6.
7.
8.

Any other materials if available in Authority stores can be issued to the


contractor for the specific use in the construction work at stock issue rate or
market rate which ever is higher after due permission of the Executive
Engineer.
The Contractor shall not have the option to refuse to take delivery of and
article stated above. No claim will not be accepted in this account.
For non supply or non availability in market the deptt. shall not be held
responsible.
Contractor should ensure that duly required quantities are got issued. The
surplus quantity of materials if available in good condition may be taken by
dept. No charged will be paid contractor for the surplus materials.
Calculation for materials based on U.P. PWD Yard stick shall be binding on
contractor. One bag of cement will be considered equivalent to 1.18 sq.ft.
All receipt is given by the contractors authorized agent whose name should
be intimated to the Engineer In charge in writing shall be conclusive proof of
the delivery of the materials.
For the issue of material more then bonafied requirement the cost will be
recovered at punitive rates which shall be two times of the issue rate.
All incidental for cartage, storage safe custody straitening of steel bars etc.
shall be born by the contractors.
25-04-2013

DOWNLOAD COPY

9.
10.
11.
12.
13.

14.

For cement storage, work double lock system will have to followed by the
contractor.
Not more then one monthly requirement shall be issued at a time.
Bonafide wastage in steel will be calculated @ 3% on measured quantity and
will be permitted in working out steel consumed.
The contractor will have to return empty maxphalt drums to Ghaziabad
Development Authority in good condition, failing which cost of the same @
Rs. 40/- per drum shall be recovered from him.
Bonafied variation in cement will be calculated @ 2% on consumption will be
permitted in working out cement consumed.

izkf/kdj.k LVksj esa LVhy @ lhesUV @ th0vkbZ0ikbZi


miyC/k u gksus dh fLFkfr es bsdsnkj dks mijksDr lkexzh
cktkj ls ; djus dh vuqefr fuEu 'krksZ ds vuqlkj nh tk;sxh A
1-

234-

Bsdsnkj }kjk cktkj ls LVhy@lhesUV@th0vkbZ0ikbZi


; dh fLFkfr esa 'ksM;wy ^lh* dh nj ls] izkf/kdj.k }kjk
; dh x;h lkexzh dh nj vFkok cktkj nj es atks Hkh
U;wure gS] ml ij ; dh tk;sxh A
; dh x;h lkexzh LVhy@lhesUV@th0vkbZ0ikbZi
vkbZ0,l0vkbZ0 ekdZ gksuk pkfg, rFkkC;kt HkkM+k]
mrjkbZ ,oa C;kt bR;kfn dksbZ ns; ugha gksxk A
; dh x;h lkexzh LVhy@lhesUV@th0vkbZ0ikbZi dh
ewy jlhnsa foHkx esa tek djkuh gksxh A
;fn Bsdsnkj }kjk 'ksM;wy lh ls fu/kkZfjr nj ls de ij
lkexzh ; dh tkrh gSa rks nksuksa dk vUrj foHkkx es
tek djkuk gksxk rFkk ;fn 'ksM;wy lh es fu/kkZfjr nj ls
vf/kd nj ij lkexzh ; dh tkrh gS ml fLFkfr es vUrj dk
Hkqxrku ugha fd;k tk;sxk A

Conractor

Officer Opening
Tender

Officer Issuing
Tender

Vice chairman

25-04-2013