DETAILED ESTIMATE FOR

CONSTRUCTION OF -----------------------------------------Description

S. #

CIVIL WORKS
1. Excavation in soft rock in trenches to design
section, grades, lines and profiles and disposal of
excavated material within 30 m lead and dressing in
specified manner as per drawings, and in
accordance with the specifications.
( Scheduled Reference NO:______________)*
Long wall 1
Long wall 2
Short wall 1
Short wall 2

x
x
x
x

80.750
51.250
9.750
27.750

Height/
Depth

Bredth

x
x
x
x

3.000
3.000
3.000
3.000

x
x
x
x

Quantity

Amount

3.000 =
1453.50
3.000 =
922.50
3.000 =
614.25
3.000 =
749.25
Total =
3739.50
@ Rs. 1.00 P

Cft
Cft
Cft
Cft
Cft
Cft

Rs

3,739.50

2.000
2.000
7.000
3.000

x
x
x
x

80.750
51.250
9.750
27.750

x
x
x
x

3.000
3.000
3.000
3.000

x
x
x
x

0.250 =
121.13
0.250 =
76.88
0.250 =
51.19
0.250 =
62.44
Total =
311.63
@ Rs. 1.00 P

Cft
Cft
Cft
Cft
Cft
Cft

Rs

311.63

0.750 =
363.38
0.750 =
230.63
0.750 =
153.56
0.750 =
187.31
Total =
934.88
@ Rs. 1.00 P

Cft
Cft
Cft
Cft
Cft
Cft

Rs

934.88

Providing and laying plain cement concrete of


nominal mix ratio as under, using aggregates of
required properties including mixing,
transporting, placing, compacting, finishing and
curing etc., complete in all respects as
specified but excluding the cost of form work Horizontal members - Below ground level up to
3m depth.Nominal Mix Ratio. 1 : 2 : 4

( Scheduled Reference NO:______________)*


Long wall 1
Long wall 2
Short wall 1
Short wall 2

2.000
2.000
7.000
3.000

Length

Providing and laying plain cement concrete of


nominal mix ratio as under, using aggregates of
required properties including mixing,
transporting, placing, compacting, finishing and
curing etc., complete in all respects as
specified but excluding the cost of form work Horizontal members - Below ground level up to
3m depth.Nominal Mix Ratio. 1 : 4 : 8

( Scheduled Reference NO:______________)*


Long wall 1
Long wall 2
Short wall 1
Short wall 2

No

2.000
2.000
7.000
3.000

x
x
x
x

80.750
51.250
9.750
27.750

x
x
x
x

3.000
3.000
3.000
3.000

x
x
x
x

Providing and laying Ist class solid Burnt


brickwork in wall over 115 mm thick laid and
jointed in cement mortar 1:4 in foundation and
Plinth (up to 3 m depth) straight or curve,
including scaffolding rakingout joints & curing
complete as per specifications.Brick Work In
foundation
( Scheduled Reference NO:______________)*
1st Step
Long wall 1
Long wall 2
Short wall 1
Short wall 2

2.000
2.000
7.000
3.000

x
x
x
x

80.375
50.875
10.125
28.125

x
x
x
x

2.625
2.625
2.625
2.625

x
x
x
x

0.750
0.750
0.750
0.750
Total

=
=
=
=
=

316.48
200.32
139.54
166.11
822.45

Cft
Cft
Cft
Cft
Cft

2nd Step
Long wall 1
Long wall 2
Short wall 1
Short wall 2

2.000
2.000
7.000
3.000

x
x
x
x

80.000
50.500
10.500
28.500

x
x
x
x

2.250
2.250
2.250
2.250

x
x
x
x

0.750
0.750
0.750
0.750
Total

=
=
=
=
=

270.00
170.44
124.03
144.28
708.75

Cft
Cft
Cft
Cft
Cft

Description

S. #
3rd Step
Long wall 1
Long wall 2
Short wall 1
Short wall 2

No
2.000
2.000
7.000
3.000

Length

Height/
Depth

Bredth

x
x
x
x

79.625
50.125
10.875
28.875

x
x
x
x

1.875
1.875
1.875
1.875

x
x
x
x

34.000 x
34.000 x
34.000 x

2.625
2.250
1.875

x
x
x

2.625
2.250
1.875

x
x
x

Quantity

0.500
0.500
0.500
0.500
Total
G.Total

=
=
=
=
=
=

149.30
93.98
71.37
81.21
395.86
1927.05

Cft
Cft
Cft
Cft
Cft
Cft

0.750 =
175.71
0.750 =
129.09
0.500 =
59.77
total B =
364.57
Total A- Total B
=
1562.48
@ Rs. 1.00 P

Cft
Cft
Cft
Cft
Cft
Cft

Amount

Deduction for columns

Grand Total

Relavent Technical Documents:


Working Plan Drawings
Cross-sectional Drawings
Structural Detail of Foundation
Detail of Structural Members
Detail of Flooring
Elevation Plans
Detail drawing of Plumbing Work
Detail Drawing of Electrical work
Bar bending schedule
Detail of Fixture with specifications

*Federal/Provincial government notified scheduled rates for Cost estimation


For non scheduled items provide quotations of material

Rs

1,562.48