LONG-RANGE PROPERTY MANAGEMENT PLAN

FILLMORE HERITAGE CENTER


GARAGE AND COMMERCIAL AIR RIGHTS PARCEL
EXECUTIVE SUMMARY
The Successor Agency to the Redevelopment Agency of the City and County of San Francisco
(the Successor Agency) submits its Long-Range Property Management Plan (PMP) for the
disposition of a 112-space public parking garage (the Garage Parcel) and 50,000 square feet of
commercial space (the Commercial Air Rights Parcel) (together, the Property) in the
Fillmore Heritage Center in the former Western Addition A-2 Redevelopment Project Area,
which expired on January 1, 2009.
The Fillmore Heritage Center is an $80.5 million public-private partnership that includes 80
condominiums, the Commercial Air Rights Parcel, and the Garage Parcel. Of that $80.5 million,
about 35% ($28.1 million) was financed using public funds from the City and County of San
Francisco (the City) and the former San Francisco Redevelopment Agency (the SFRA). The
public investment of dollars built the Garage Parcel and the Commercial Air Rights Parcel, both
of which were intended to help revitalize the lower Fillmore Street commercial corridor.
The City financed the construction of the Commercial Air Rights Parcel by borrowing $5.5
million from the U.S. Department of Housing and Urban Development, or HUD (the HUD
Loan) and then loaning that money to the commercial developer (FDC) to build the
Commercial Air Rights Parcel (the FDC Loan). The SFRA financed the construction of the
Garage Parcel ($5.6 million) and also contributed the land ($6.6 million), and allowed FDC to
pay the purchase price for the land over time under a ground lease on the Commercial Air Rights
Parcel (the Ground Lease). FDC subleases the Commercial Air Rights Parcel to two
subtenants, a jazz club/restaurant and a second restaurant. The SFRA provided these two
subtenants with tenant improvement loans totaling $10.4 million.
The Successor Agency continues to own the Commercial Air Rights Parcel and the Garage
Parcel. FDC is currently in default on the FDC Loan and owes the City about $1.4 million. In
addition, the main tenant in the Commercial Air Rights Parcel (Yoshis San Francisco) is in
bankruptcy and will likely not continue operating in this space for much longer.
Disposition Plan. The disposition plan for the Garage Parcel is a sale at market value. Because
the land is part of the Garage Parcel, any proceeds from a sale will be considered Community
Development Block Grant (CDBG) program income because the land was purchased with
federal urban renewal grant funds.1

See Closeout Agreement by and between the Redevelopment Agency and the City Relating to Western Addition
Area Two Redevelopment Project (June 16, 2982) which requires that all proceeds from the sale or lease of such
property after financial settlement . . . shall be treated as program income to the Community Development Block
Grant Program (the Closeout Agreement).
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 1 of 8

The disposition plan for the Commercial Air Rights Parcel is a transfer to the City to continue
enforcing the Ground Lease with FDC. The Ground Lease has a 35-year term, and allows FDC
to pay the remaining balance of the purchase price for the land (about $3.0 million) to the
Successor Agency over the term of the Ground Lease, after FDC pays off the FDC Loan to the
City. Any payments the Successor Agency receives pursuant to the Ground Lease would be
available for purposes consistent with Redevelopment Dissolution Law. The Successor Agency
believes a governmental purpose exists in this case because of the significant investment of
federal funds in the Property and the obligation to repay the Citys HUD Loan.
In the likely event that the City forecloses on its leasehold interest in the Commercial Air Rights
Parcel, the Successor Agency will sell the Commercial Air Rights Parcel at market value with
the proceeds distributed first to the City to repay the HUD Loan and second to the Successor
Agency for purposes consistent with Redevelopment Dissolution Law.

BACKGROUND
The Fillmore Heritage Center can be divided into three components: (1) the residential units,
which were entirely privately financed, (2) the Commercial Air Rights Parcel, which was
financed with both private and public funds, and (3) the Garage Parcel, which was entirely
publicly financed. Each of these components is discussed in more detail below.

Residential Units. The Fillmore Heritage Center includes 80 condominiums, including


12 affordable condominiums. The construction of these units was completely privately
financed with about $35 million from a pension fund. No public dollars went into the
residential component of the Fillmore Heritage Center. All the units have been sold to
individual homeowners, and the proceeds were used to pay back the private construction
lender and the SFRA for a portion ($3.5 million) of the $6.6 million land value. The
condo owners operate a homeowners association, which manages the residential space, a
separate residential garage, and the common areas within the Fillmore Heritage Center
(the HOA). All the condo owners pay common area maintenance fees to the HOA.

Commercial Air Rights Parcel. The Fillmore Heritage Center also includes about
50,000 square feet of commercial space on the ground floor of the building (the
Commercial Air Rights Parcel). The City financed the construction of the commercial
space. To do this, the City, acting through the Mayors Office of Housing (MOH),
borrowed $5.5 million from HUD in the form of a securitized Section 108 loan, which is
backed by the Citys federal CDBG fund allocation (the HUD Loan). The City then
gave these federal dollars to FDC, an affiliate of the developer, Fillmore Development
Associates (FDA), in the form of a construction loan, so that FDC could build the
commercial space (the FDC Loan). The SFRA also contributed about $10.4 million in
loan funds for the tenant improvements.
The Successor Agency owns the Commercial Air Rights Parcel and master leases the
entire 50,000 square feet under a ground lease to FDC. The ground lease structure was
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 2 of 8

used as a financing mechanism to allow the developer to pay the $6.6 million purchase
price for the land over time instead of in one lump sum upfront. FDC, as master tenant,
subleases the commercial space to two tenants: (1) Yoshis San Francisco, a jazz
club/restaurant, and (2) Food for Soul, which operates another restaurant called 1300 on
Fillmore. These subtenants pay rent and common area maintenance fees to FDC, who is
supposed to (a) pass the rent through to the City as a debt service payment on the FDC
Loan, and (b) pass the common area maintenance payments through to the HOA. FDC,
however, has not recently made payments on a regular basis to the City and the HOA.
FDC is about $1.4 million in arrears on the FDC Loan with the City and about $120,000
behind on its common area maintenance payments to the HOA.
FDC is required to pay the common area maintenance charges under its ground lease with
the Successor Agency; however, the Successor Agency is ultimately liable for these
charges, as owner of the Commercial Air Rights Parcel, under a separate project
document. The Successor Agency has paid the outstanding amount to the HOA with
reserve balances authorized under the Successor Agencys Recognized Obligations
Payment Schedule III and 13-14A, both approved by the Oversight Board and the State
Department of Finance (DOF). Staff has asked for new property tax funds to cover
some common area maintenance payments going forward (in the event the space
currently occupied by Yoshis San Francisco doesnt generate enough income to pay
them) on the Successor Agencys Recognized Obligations Payment Schedule 13-14B,
which still needs approval from the Oversight Board and DOF.

Garage Parcel. The Fillmore Heritage Center also includes a 112-space public parking
garage (the Garage Parcel). The SFRA financed the construction of this garage using
$5.6 million in tax exempt bond proceeds. The SFRA also used about $860,000 in
federal grant funds for site preparation/environmental remediation. The Successor
Agency still owns the Garage Parcel and operates it through a garage management
agreement with a private garage operator. The garage also pays common area
maintenance fees to the HOA.

In sum, the public investment went into the land, site preparation, and building the Garage Parcel
and the Commercial Air Rights Parcel. The SFRA contributed the land, which was valued at
about $6.6 million, and accepted a payback plan on the purchase price of the land over time ($3.5
million has been paid to date). The SFRA contributed an additional $5.6 million in grant funds
for construction of the Garage Parcel. And about $16 million in SFRA/City loan funds went into
building the Commercial Air Rights Parcel.

LONG-RANGE PROPERTY MANAGEMENT PLAN (PMP)


The following presents the information requested pursuant to Section 34191.5 of the California
Health and Safety Code for the Garage Parcel and the Commercial Air Rights Parcel. These
properties are also shown on Attachment A (Photo of Fillmore Heritage Center) and Attachment
B (DOF Tracking Sheet for Other Properties) as Nos. 1 and 2.
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 3 of 8

Date of Acquisition
The SFRA purchased the 52,938-square-foot lot on which the Fillmore Heritage Center now sits
(which was an assemblage of 12 different lots) between April 1967 and April 1969 with urban
renewal grant funds from the federal government (explained in more detail below).
Value of Property at Time of Acquisition
The sum the SFRA paid to purchase the 12 different lots was $939,450.
Current Value of the Property
The estimated current value for the Garage Parcel is $4.0 million and the estimated current value
for the Commercial Air Rights Parcel is $7.8 million. More information about these values, and
restrictions on sales proceeds, is described in sections below.
Purpose for which the Property was Acquired
During the 1960s and 1970s, redevelopment agencies across the country were buying up huge
tracts of land for the purposes of implementing redevelopment programs, using urban renewal
grant funds from the federal government. This program was generally referred to as the Urban
Renewal Program authorized by the U.S. Congress, which set federal standards for urban
renewal under Title I of the Housing Act of 1949. This program, which displaced thousands of
people from their homes and businesses, also occurred in San Francisco, most dramatically in the
former Western Addition A-2 Redevelopment Project Area.
The SFRA originally acquired the land on which the Fillmore Heritage Center now sits with
urban renewal funds provided through a federal Loan and Grant Contract dated December 27,
1956 (Contract No. Calif. 2-2 (LG)), which was approved by the U.S. Department of Housing
and Urban Renewal (the HUD Contract). Under the HUD Contract, the SFRA was required to
use the federal funds to carry out redevelopment activities in accordance with the local
redevelopment plan and the federal urban renewal standards.
In 1982, the City and the SFRA executed, with HUD concurrence, a Closeout Agreement for the
Western Addition Area Two Redevelopment Project (Calif. R-54) in which the land that was
developed for the Property is identified as Parcel 732-A. (See the Closeout Agreement, Exhibit
A at page 3.) The Closeout Agreement states: All remaining undisposed properties acquired by
the Agency in the redevelopment area are shown in Exhibit A hereto. All the proceeds from the
sale or lease of such property after financial settlement of the Program shall be treated as
program income to the Community Development Block Grant Program under the provisions of
24 C.F.R. 570.506. (See the Closeout Agreement at p. 2.)
Address/Location
The Garage Parcel and the Commercial Air Rights Parcel are both located at the Fillmore
Heritage Center at 1310 Fillmore Street.
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 4 of 8

Lot Size
The Garage Parcel (0732-32) is approximately 50,000 square feet, and includes 112 parking
stalls and miscellaneous parking equipment. The Commercial Parcel (0732-33) is also 50,000
square feet, and includes (1) a 28,000-square-foot jazz club/restaurant (Yoshis San Francisco)
(2) a 6,300-square-foot restaurant/music lounge (1300 on Fillmore), and (3) a gallery,
screening room, and common areas.
Current Zoning
Both the Garage Parcel and the Commercial Parcel are zoned under the San Francisco Planning
Code as NC-3, a moderate-scale neighborhood commercial district. This designation is intended
in most cases to offer a wide variety of comparison and specialty goods and services to a
population greater than the immediate neighborhood, additionally providing convenience goods
and services to the surrounding neighborhoods. These districts are linear districts located along
heavily trafficked thoroughfares which also serve as major transit routes. They include some of
the longest linear commercial streets in the City, some of which have continuous retail
development for many blocks. Large-scale lots and buildings and wide streets distinguish these
districts from smaller-scaled commercial streets, although NC-3 districts may include small as
well as moderately scaled lots. Buildings typically range in height from two to four stories with
occasional taller structures. Moderately large commercial uses and buildings are permitted.
A wide variety of uses are permitted with special emphasis on neighborhood-serving businesses.
Eating and drinking, entertainment, financial service and certain auto uses generally are
permitted with certain limitations at the first and second stories. Other retail businesses, personal
services and offices are permitted at all stories of new buildings. Limited storage and
administrative service activities are permitted with some restrictions.
Estimate of the Current Value (Including Appraisal Information)
Garage Parcel. A recent appraisal by Carneghi-Blum dated July 19, 2010, valued the Garage
Parcel as of August 2012 at $4.0 million. In its appraisal, Carneghi-Blum stated that the Garage
Parcel is well positioned within the Lower Fillmore area parking market, and will offer growth
opportunities that parallel the area's growth prospects once the regional and national economies
resume job creation. Lack of development land, structural limitations on new parking
development and municipal policy is restricting new supply.
Commercial Air Rights Parcel. Another recent appraisal by Carneghi-Blum dated December 3,
2012 valued a smaller but similar jazz club/restaurant just down the street from the Commercial
Air Rights Parcel. In that appraisal, the smaller jazz club/restaurant was valued at approximately
$325 per square foot as of November 2012. The comparable properties analyzed in the appraisal
ranged from about $227 to $331 per square foot of building area. Using the low end of this
range to value the revenue-producing square footage in the Commercial Air Rights Parcel, the
value would be approximately $7.8 million.

Successor Agency to the San Francisco Redevelopment Agency


Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 5 of 8

In its December 3, 2012 appraisal of the smaller jazz club, Carneghi-Blum states, Like
restaurants, the economics of the business are difficult and sometimes the operations are not
operated in a business-like manner. However, San Francisco has a strong tradition of nightlife,
and the ability to open new nightclubs and bars in most areas of the City is difficult. Therefore,
areas which allow these uses and buildings which currently house them do have an advantage in
terms of leasing or selling the facilities to new operators. The future outlook for entertainment,
bar, and nightclub venues in the subject neighborhood is considered stable.
Restricted Funds. Any proceeds from the sale of the Garage Parcel (which includes the land) is
restricted and must be used as CDBG program income because the land was purchased with
federal urban renewal grant funds and is subject to the Closeout Agreement described above.
Any proceeds from the sale of the Commercial Air Rights Parcel must first go to the City to pay
off the Citys $5.5 million HUD Loan.
Estimate of Revenues Generated (Including Contractual Requirements for Use of Funds)
Garage Parcel. The Garage Parcel generates on average between $25,000 and $27,000 a month,
after parking taxes. That revenue goes toward reimbursing the garage operator for the expenses
incurred in running the garage, per the Garage Management Agreement between the Successor
Agency and Pacific Park Management Inc. dated May 1, 2011 (the Management Agreement).
Per the Management Agreement, the Successor Agency must reimburse the garage operator for
any operating deficits every six months. The garages performance is very dependent on the
performance of the commercial tenants in the Fillmore Heritage Center. Currently, the garage is
running a deficit of about $2,000 a month on average, which is a significant improvement from
just three years ago, when the average deficit was about $8,000 a month. Thus, the Successor
Agency requested property tax funds (RPTTF) to cover the expected deficit, along with
replenishment of the garages operating and capital reserve, through the Recognized Obligations
Payment Schedule 13-14B lines 120 and 126. .
If surplus revenues are generated, the Management Agreement requires the operator to set aside
$4,000 a month for an operating/capital reserve. The operator is also entitled per the
Management Agreement to a modest incentive fee if surplus revenues are generated.
Commercial Air Rights Parcel. As mentioned, the Commercial Air Rights Parcel is ground
leased to FDC, who in turn subleases it to two subtenants: Yoshis San Francisco and 1300 on
Fillmore. The rent from these two subtenants totals about $58,000 a month. FDC uses this
rental income to make its debt service payment to the City on the FDC Loan, per its loan
agreement with the City. The City then uses that money to make its debt service payment on the
HUD Loan, per its loan agreement with the federal government.
History of Environmental Contamination, Studies, Remediation Efforts
Baseline Environmental Consulting prepared reports on the land on which the Fillmore Heritage
Center sits in May 1996 and July 2000. These reports concluded that the property contains leadand petroleum-contaminated soils to a depth of approximately four feet. Historical land uses
include a storage company, upholstery shop, furniture store, printing shop, sign painter, paved
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 6 of 8

and unpaved parking areas, and construction staging area, all of which may have contributed to
the contamination. The report recommended that the contaminated soil be excavated and
properly disposed of in a hazardous waste facility. The consultants estimated the cost of
excavation to be between $600,000 and $840,000. As a result, the SFRA applied for and
received a grant from the California Environmental Protection Agency of $860,000 to remediate
the site when construction began on the Fillmore Heritage Center in 2005.
Potential for Transit-Oriented Development; Advancement of Planning Objectives
As mentioned, both the Garage Parcel and the Commercial Parcel are zoned under the San
Francisco Planning Code as NC-3, a moderate-scale neighborhood commercial district. These
districts are linear districts located along heavily trafficked thoroughfares which also serve as
major transit routes. Due to its centralized location within San Francisco, the lower Fillmore
Street commercial corridor is served by several municipal bus routes.
In the RFQ that sought a developer for the land on which the Fillmore Heritage Center now sits,
the SFRA emphasized that development of the property was pivotal to the successful
revitalization of the lower Fillmore (Street) commercial corridor, which is the center of the
Fillmore Jazz Preservation District (the Jazz District). The Jazz District was established by
the SFRA Commission to focus resources on reestablishing a vibrant commercial district along
lower Fillmore Street that reflects the historical and cultural heritage of the area. A key
component of this economic development strategy was to develop catalyst sites to draw people
from a wide geographic area, so that existing businesses would benefit from the increased
customer base and new businesses would be created. The land on which the Fillmore Heritage
Center sits was such a catalyst site, given its location, size and development potential.
Developing it with destination entertainment/retail uses fulfilled these planning objectives.
History of Previous Development and Leasing Proposals
The land on which the Fillmore Heritage Center now sits sat vacant for more than 30 years.
Various development proposals were floated over the years but nothing ever materialized into a
development agreement. Finally, in 1989, the SFRA entered into an Agreement for Disposition
of Land for Private Development (the LDA) with Fillmore Renaissance Associates, L.P.
(Renaissance Associates). Due to unfavorable market conditions and other factors,
Renaissance Associates was not able to proceed with the residential development originally
planned for the land. Years later, in 1995, the LDA was amended to permit a multi-screen
cinema complex, a jazz and supper club, and a parking garage. For the next six years,
Renaissance Associates attempted to sign leases with tenants and put the financing together to
build the project, but was ultimately unsuccessful.
In June 2001, the SFRA began the solicitation process for a new developer. This solicitation
resulted in the selection of Fillmore Development Associates, or FDA, which built the Fillmore
Heritage Center (An affiliate of FDA, Fillmore Development Commercial, or FDC, built the
Commercial Air Rights Parcel). The Fillmore Heritage Center opened in 2007.

Successor Agency to the San Francisco Redevelopment Agency


Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 7 of 8

Disposition of the Property


Based on the foregoing, the Successor Agency proposes the following disposition plan for the
Garage Parcel and the Commercial Air Rights Parcel.
The disposition plan for the Garage Parcel is a sale at market value. Because the land is part of
the Garage Parcel, any proceeds from a sale will be considered CDBG program income because
the land was purchased with federal urban renewal grant funds.2
The disposition plan for the Commercial Air Rights Parcel is a transfer to the City to continue
enforcing the Ground Lease with FDC. The Ground Lease has a 35-year term, and allows FDC
to pay the remaining balance of the purchase price for the land (about $3.0 million) to the
Successor Agency over the term of the Ground Lease, after FDC pays off the FDC Loan to the
City. Any payments the Successor Agency receives pursuant to the Ground Lease would be
available for purposes consistent with Redevelopment Dissolution Law. The Successor Agency
believes a governmental purpose exists in this case because of the significant investment of
federal funds in the Property and the obligation to repay the Citys HUD Loan.
In the likely event that the City forecloses on its leasehold interest in the Commercial Air Rights
Parcel, the Successor Agency will sell the Commercial Air Rights Parcel at market value with
the proceeds distributed first to the City to repay the HUD Loan and second to the Successor
Agency for purposes consistent with Redevelopment Dissolution Law.
Properties Dedicated to Governmental Use Purposes and Properties Retained for Purposes
of Fulfilling an Enforceable Obligation
See above section.

Attachment A:
Attachment B:

Photo of Fillmore Heritage Center


DOF Tracking Sheet --Other Properties

See Closeout Agreement by and between the Redevelopment Agency and the City Relating to Western Addition
Area Two Redevelopment Project (June 16, 2982) which requires that all proceeds from the sale or lease of such
property after financial settlement . . . shall be treated as program income to the Community Development Block
Grant Program (the Closeout Agreement).
Successor Agency to the San Francisco Redevelopment Agency
Long-Range Property Management Plan GARAGE PARCEL & COMMERCIAL AIR RIGHTS PARCEL
Page 8 of 8

Attachment A
Photo of Fillmore Heritage Center

Attachment B
DOF Tracking Sheet Other Properties
(See Tab L)

Major Projects Tracking

Project name/location

Site/Project Description:

Current
Status

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?

SPECIFIC PLANS
1

2*

Lake Merritt BART Station


Area:

Chinatown

Coliseum City:

Specific, Development plans for


750 acres at current Coliseum
and Airport Biz Park

Final EIR and


Plan being
approved
Draft EIR &
Plan out for
public
comment

Nov 2014

To Plan Comm Oct 8, CED Cmte


10/28

Dec 2014

Public workshop Oct 8. Plan Comm


Nov 2014

COMMERCIAL PROJECTS
3A*

3B

23rd & Valdez: City-owned


parcel

15K sqft retail, 250 residential


units (20% affordable), 350
parking spaces

Masri Family holdings:

Large format retail, 17-19K sq ft


other retail, and high-rise
housing at 23rd & Harrison

Family has retained Genesis as


developer

Retail on two floors, large


floorplate office above.

Lane Partners has purchased


property

4A* Sears Redevelopment:

DDA
approved

Application to Planning expected Jan


2015, CEQA docs March 2015

4B*

Former Sears Auto Center


site:

City has LDDA for site

LDDA
amendment
being sought

City Council Oct 7

4C*

Telegraph Plaza Garage:


Telegraph + 21st

Mixed-use retail, residential,


hotel with public parking

ENA being
sought

CED Cmte 10/14, Council 10/21

4D* Parcel 4, Telegraph & 19th:

4E

Giant Burger: Telegraph +


22nd

City owned, currently temporary


Public Art Park

RFP to be issued, est Sept/Oct 2014

Pre-application rec'd for 80 units


above ground floor retail

Bay Investment retained by owner


A. Hahn

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Updated 9/23/14
Page 1 of 7

Major Projects Tracking


Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?

Project name/location

Site/Project Description:

Current
Status

1800 San Pablo:

25K sqft retail, 200 residential


units, 290 parking spaces

ENA expired

Application to Planning expected


Dec 2014, entitlements Apr 2015,
DDA approval May 2015

1100 Broadway: By SKS;


rehabs historic Key Systems
Bldg

310,000 sqft office tower, plus


9,810 sqft retail

Entitled, OPA
in place

SKS prepping marketing plan and


seeking anchor tenant. 2015 owner
deadline to construct

T12 Shorenstein parcel:


Jefferson at 11th/12th

600,000 sqft office use; could


change to residential

Entitled

Could require amend DDA and


CEQA; ongoing nego w Shorenstein

8*

T5-6 City Center:


Broadway/Clay/11th/12th

Would build 2 of these 3


options: 580,000 sqft
office/hotel, 7,500 sqft retail,
and/or residential

Entitled, ENA
approved

ENA extended with Strada.


Designing 15 story residential tower

5*

Henry J. Kaiser Auditorium

RFP issued; replies due Nov 2014

10

20th & Harrison: Kaiser


Center expansion

Addition of two new office


towers, 1.3M sqft office, 23,000
sqft retail

11A

Sprouts Grocery: 30th &


Broadway

Grocery store 37,000 sqft, small


EIR certified
retail shops 17,000 sqft

11B 3093 Broadway:

12

Safeway, 51st & Pleasant


Valley:

13

Safeway, College and


Claremont

14

Millsmont Shopping Center

Considering submittal of app for


residential tower option

Entitled

Fall 2014

Summer
2015

20K sqft retail, 440 units


residential

Predevelopme
nt

290,000 sqft retail; expands


Safeway, adds retail and
restaurants

Approved

Summer/F
all 2014

Entitled,
under
construction

Underway Nov 2014

Site owned by and currently part


of Mills College

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Building permits to be issued in Sept

SRMErnst preparing application


submittal, IDing financing
Phase I building permits being
obtained, est Oct 2014

Developer preparing preliminary


community outreach and submittals
Updated 9/23/14
Page 2 of 7

Major Projects Tracking

Project name/location

15* Foothill/Seminary Point:

Site/Project Description:

Current
Status

28,000 sqft retail; Walgreens


anchor tenant

Entitled

Ground
broken 3/13
EIR to be
amended

16

Brooklyn Basin: Oak-to-9th

3,100 units and 200,000 sqft


commercial, 30 acres open
space, 2 marinas

17

Jack London Square Phase


III: Parcels D & F

Seeking rezoning to allow


Residential

18A

Oakland Army Base: By


Prologis/CCIG.

18B

Oakland Army Base-Recyclers

DDA and
Move CWS and CASS from West
boundaries
Oakland to OAB/North Gateway
nego

18C

Oakland Army Base--Truck


stop and parking

17 Acres in Central/North
Gateway

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?
DDA to be executed. Notice to
Proceed issued for streetscape
project.
Horizontal
2014,
Vertical
2015

Regular bi-weekly meetings


underway. Infrastructure permit to
be issued in Sept.
To Council Sept 23

Ground
Underway
broken Nov 1

LDDA
amended

RESIDENTIAL PROJECTS, Private/Market


Mixed Use, with ground floor or other Commercial component
19

Coliseum Transit Village


Phase I.

110 units Market and workforce


housing, plus 1,500 sqft retail.
Has rec'd $8.5M Prop 1C funds

ENA signed

DDA being developed; seeking infill


exemption for entitlements

20*

Fruitvale Transit Village


Phase II.

275 units; City owns BART


parking lot. $4M Prop 1C funds
awarded, also $4 loan secured

Entitled, EIR
complete

L & M selected as developer.


Revised ENA being sought.

Broadway Grand Phase II,


"The Hive": Signature
Properties

106 townhouses and additional


retail.

21

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Phase II
constructio
n
underway

Developer conducting own


Transportation Impact Fee study

Updated 9/23/14
Page 3 of 7

Major Projects Tracking

22

Project name/location

Site/Project Description:

Oak Knoll Redevelopment


project:

Previous plan was 900 units,


80,000 sqft retail; affordable
reduced by 70 units

Current
Status

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?
Sun Cal met City in July re state of
development

Updated 9/23/14
Page 4 of 7

Major Projects Tracking

Project name/location

Site/Project Description:

Current
Status

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?

With no Commercial component


ENA entered
12th Street Remainder: City- 22 story high-rise, est 250 units,
with Urban
5,000 sqft retail
owned, at Lake Merritt
Core

DDA to be sought after Lake M


Specific Plan adoption. OUSD has
RFP out for its property.

24

Emerald Views: At 19th


Street, by Joe O'Donoghue

370 units, 42 stories

Final EIR to Plan Comm Fall 2014

25

MacArthur Transit Village


market-rate, BRIDGE master
developer

426 market rate units, 18


affordable rental/condo units,
42,500 sqft commercial/retail

23*

350 units (+175 parking spots)


26A West Oakland Transit Village on CalTrans big parcel, 88 units
on CalTrans small

Spring
2015?
ENA with City
approved

26B West Oakland BART property

BRIDGE relocating office here. $8M


NMTC allocation. Parking garage
opened.
Waiting for CalTrans agree to sell to
City, then City sell to developer

BART near to selection of developer

Former Red Star Yeast


factory

Previous structure had major fire


damage

Cassidy-Turley marketing site for


housing

27

1640 Broadway

250 residential units, Joe Hernon


Entitled
owner

Owner may seek density bonus to


increase # of units, more affordable
units

28

Broadway and 23rd

Est 200 new units. Site is


currently surface parking

Preparing pre-application for


possible residential high-rise

29

Telegraph and 27th, at 980


Freeway

Garage being sold by Kaiser

Possible use for auto dealer


inventory parking

30

2909 Telegraph

Former Courthouse Athletic Club


site

Charmaine Curtis developer. CEQA


submission under review

26C

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Updated 9/23/14
Page 5 of 7

Major Projects Tracking

31

Project name/location

Site/Project Description:

1331 Harrison

High-rise residential, +/-200


units

Current
Status

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?
To Plan Comm Oct 2014

AFFORDABLE HOUSING PROJECTS


32

MacArthur Transit Village


affordable: By BRIDGE
Housing

90 units. $16.4M City/Agency


funded (31%)

Under
construction

33

Cathedral Gardens: By
Ecumenical Asso. For Housing
(EAH)

100 units. $9.8M City/Agency


funding (34%)

Under
construction

Summer/F
all 2015
Adjacent City Park received State
improvement funding, design
underway.

MAJOR RECRUITMENTS
34

Target Store: considering


multiple Oakland sites

needs 20-90,000 sqft depending


on type of store planned

SITES TO WATCH
Draft CEQA remediation planning
underway

35

GE Site

36

Mandela/Grand

American Steel/Pacific Pipe site,


12 acres, owned by Maurice
Kanbar

Site is on market

37

CalTrans site on Mandela

Near Target

Auto dealer proposal to GM for this


location

38

276 Hegenberger Road

21 acre site

39

Howard Terminal: Baseball


stadium

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Updated 9/23/14
Page 6 of 7

Major Projects Tracking

Current
Status

Next
discuss
?

Construct Complete
Issues, Next Steps
Start?
Date?

Project name/location

Site/Project Description:

40

14th and Castro

Nearly full block, by Valva Realty

Site is on market

41

610 Hegenberger: Former Pakn-Save


4 stories/112 beds, plus 14,000
sqft ground floor commercial

If project proceeds would need new


ENA

300 unit residential tower and re- Entitlements


use of existing historic bldg
underway

Preliminary discussions underway

Clara + Edes: Skilled


42* Nursing/Assisted Living Facility,
plus ground floor commercial
43

Hamalian 19th and


Broadway: Downtown
residential

44

Housing possibilities under early


West Grand & Filbert: Former
discussion. City Ventures has
FoodsCo site
option on property

45

Hill Elmhurst: City-owned


parcels at 94th and
International.

46

Other privately-held
Industrial sites to watch:

54 units. $8.5M NOFA funding


earmarked.

Phase I
entitled.

* Asterisks on item #s indicate property transfers which would require Compensation Agreements

Initial LIHTC funding not awarded;


developer will re-apply and/or seek
other sources

Updated 9/23/14
Page 7 of 7

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Pre-Application Discussions
1 ~1900 Broadway*
2 ~2270 Broadway*

3 ~5132 Telegraph Ave

4 ~459 23rd Street*

APPLICANT CONTACT

COUNCIL
DISTRICT

DESCRIPTION

Seth Hamalian
(415) 355-6612

1900 Broadway
APN: 008 -0638-005-00

294 residential units


11,000 sq.ft commercial

Lakeshore Partners LLC


Tom Peterson
(510)444-7191

2270 Broadway
APN: 008-0656-002-01

Nautilus Group
Jason Laub
(510)343-5593

5110-5132 Telegraph Ave


APN 014-1226-009-02, 0141226-013-00

AGI-Avant Inc
Tom Holt
(415) 775-7005

459 23rd Street


APN: 008-0658-004-01

Application Submitted Under Review


Maria Poncel
5 ~495 22nd Street
415-828-7061
6 ~459 8th Street

LOCATION
(ADDRESS AND/OR APN)

495 22nd Street


APN: 008-0648-011-03

Pre-application filed. Environmental


work complete

223 residential units


6,000 sq. ft.commercial

Peterson Vollmann
238-6167

Pre-application filed

216 residential units


25,000 sq. ft. commercial

Mike Rivera
238-6417

Pre-application filed

114 residential rental units


3,000 sq. ft. commercial

Peterson Vollmann
238-6167

Pre-application filed

81 residential units
6,000 sq.ft. commercial

Aubrey Rose
238-2071

Application filed

50 residential units
4,000 sq.ft. commercial

Peterson Vollmann
238-6167

Application filed

STATUS

Neil Gray
238-3878

CITY CONTACT

Signature Land Advisors


Scott Zengel
(510)251-9278

459 8th Street


APN :001-0201-015-00

7 ~Lake Merritt Boulevard*

Ronnie Turner
Urban Core
(510) 395-2766

12th Street / 2nd Avenue


APN: 019-0027-014-00

247 residential units


201 parking spaces
5,000 sq.ft retail/community
space

Neil Gray
238-3878

Application filed.

8 ~Uptown Parcel 4
(Telegraph/19th Street)*

Forest City Residential, Inc.


Susan Smartt
(415) 836-5980

1911 Broadway
APN:008-0716-058

370 residential units

Jens Hillmer
238-3317

City Request For Proposal for sale of


property available 10/14/14. Proposals
due 12/1/14.

9 ~2201 Brush Street

EBALDC
Jared Wright
(510)287-5353

2201 Brush Street


APN: 003-0025-011-00, 0030025-011-00

59 affordable apartment units


130 children YMCA childcare
center

Maurice BrenyahAddow
238-6342

Application filed. NEPA analysis


underway

Pyatok Architects
Peter Waller
(510) 465-7010

71st Ave
APN: 041-4166-031-02

Peterson Vollmann
238-6167

Application filed.

10 ~Coliseum Transit Village


Phase I

110 residential units

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 1

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
RESIDENTIAL PROJECTS
Application Submitted Under Review
Brick Architects, LLP
11 ~ Temescal Apartments
Rob Zirkle & Tai Kwong
(510)516-0167
SRM Development
Ryan Leong
(509) 944-4557

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

4901-4939 Broadway,
311-313 51st St,
4964-4974 Desmond St
APN: 013 -1136-008-04, 013 1136-011-00, 013 -1136-01200, 013 -1136-009-02, 013 1106-005-05, 013 -1136-00402

DESCRIPTION

130 residential units


8,700 sf. ft. retail

CITY CONTACT

STATUS

Mike Rivera
238-6417

Application filed

12 ~Courthouse Condominiums
(formerly 2935 Telegraph Ave.)

Curtis Development
Charmaine Curtis
(415)609-4996

2935 Telegraph Ave


APN: 009-0698-001-00

162 residential units


4,045 sq.ft retail

Maurice BrenyahAddow
238-6342

Major Revision filed 7/14/14 to add


20 additional units. NOP and Initial
Study published 10/06/06. DEIR
published 03/19/07; Planning
Commission certification and
approval of FEIR on 08/01/07.
Planning Commission approval
04/01/09 for revisions to Conditions
of Approval. Applicant withdrew
request for revisions 04/20/09.
Building Permit #B0901385.
Extension granted 10/1/13 until
12/31/14.

13 Felton Acres

Robert Felton
(510) 548-4637

Devon Way
APN: 048H-7600-007-00

Subdivision into 25 single


family lots and two new roads

Lynn Warner
238-6983

Application filed.

222 19th Street


APN: 008-0634-003-00

370 residential units


933 sq.ft cafe

Heather Klein
238-3659

Application filed. NOP published


11/09/07. Design Review Committee
04/23/08. DEIR published 10/05/11.
FEIR preparation underway.

Dave O'Keeffe
14 Emerald Views *
(formerly19th Street Residential (415) 760-7118
Condominiums)

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 2

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
15 ~1331 Harrison Project*

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

1331 Harrison Street


APN: 002-0065-006-01

169 residential units


3,600 sq.ft retail

Molly Maybrun
16 ~Wood Street Project:
Development Area 4 (Previously City Ventures
approved for 301 units as HFH (415)271-3669
Apartments

Block bounded by Wood


Street; 14 St.,16th St. and
Frontage Road. APN: various

17 ~377 2nd Street*

John Winder
(415) 318-8634

18 ~Merrill Gardens

Chad Lorentz
Urbal Architects
(206)257-0972.

377 2nd Street


APN: 001 -0143-008-00
001 -0143-007-00
001-0143-010-00
5107-5175 Broadway. APN:
014-1241-009, 008-00, 005-01,
006-01.

Jibu John
(925) 940-4850

176 residential units


5,100 sq. ft. commercial

96 residential units

127 assisted living units,


7,800 sq.ft. commercial

CITY CONTACT

STATUS

Neil Gray
238-3878

Planning Commission approval


10/15/14.

Maurice BrenyahAddow
238-6342

Planning Commission approval


8/6/14.

Aubrey Rose
238-2071

Approved 03/07/14. Appealed


03/14/14. Revised approval 06/30/14.

Mike Rivera
236-6417

Planning Commission Approval on


06/20/14.
Building Permits filed:
RB1401555 (residential) on 06/02/14,
RB1402855 (demolition) on 09/24/14
B1401138 (commercial) on 09/25/14

NOP published 05/18/11. DEIR


published in 7/13.Planning
Commission approval and
certification of FEIR 7/13. Project
appealed, denied by City Council
11/19/13.
Approved 7/31/13.

Ryan Leong
SRM Development
(509) 944-4557

19 4311-4317 Macarthur Blvd

Alexis Gevorgion
(818) 380-2600

4311- 4317 Macarthur Blvd


APN:030 -1982-121-00
030 -1982-122-00

115 senior apartments


3,446 sq.ft retail
64 parking spaces

Lynn Warner
238-6983

20 2425 Valdez Street

Jose Coelho
(510) 446-2222

2425 Valdez St
APN: 008 -0672-007-02

70 Micro Living Quarters


1 Live Work Space

Michael Bradley
238-6935

21 Fruitvale Village Phase II

Unity Council/Signature
Properties
Patrick Van Ness
(925) 463-1122

Block bounded by 35th and


37th Avenues, East 12th Street
and BART tracks
APN: 033-2197-019 and 0332177-02

Phased multifamily residential Darin Ranelletti


development with 275 residential 238-3663
units
Parking garage

NOP published 12/22/08. DEIR


published 01/12/10. FEIR published
04/2810. Planning Commission
approval and certification of the FEIR
05/19/10. Extension granted 1/10/14
until 12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 3

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

RESIDENTIAL PROJECTS
Application Approved
22 9400 International Blvd

Acts Community Development 9400-9500 International Blvd


Colby Northridge
APN: 046 -5423-022-00,
(949) 660-7272
046 -5423-001-01, 046 -5423018-002

59 affordable units
3,500 sq.ft commercial

Peterson Vollmann
238-6167

Approved 2/12/12.

23 1431 Jefferson Street*

Menlo Capital Group LLC


Bob Hemati
(415) 762-8200

1417-1431 Jefferson Street


APN: 003 -0071-018-00
003 -0071-017-00

54 residential units
3,000 sq.ft commercial

Ulla-Britt Jonsson,
238-3322

24 325 7th Street*

Mark McClure
(510) 463-6338

325 7th Street


APN:001 -0189-005-00
001 -0189-013-00
001 -0189-014-01

382 residential units


9,000 sq.ft. commercial

Heather Klein
238-3659

Approved 07/09/08. NEPA


completed. Building Permit
#B1101888. Extension granted on
1/15/13 until 12/31/13.
NOP published 12/18/07. DEIR
published 10/18/10. FEIR published
06/30/11. Planning Commission
approval and certification of the FEIR
07/20/11. Extension granted on
2/24/13 until 12/31/14.

25 2850 Hannah Street

Marc Babsin
(415)489-1313

90 residential units
2,800 sq.ft commercial

Peterson Vollmann
238-6167

Approved 10/25/2013.

26 Creekside Mixed Use Project

Nautilus Group
Jason Laub
(510) 345-5593

2850 Hannah Street


APN: 007 -0589-029-00
007 -0589-023-00
5132 Telegraph Ave
APN: 014 -1226-013-00

120 residential units


7,700 sq.ft commercial

Darin Ranelletti
238-3663

27 Wattling Street

Phil Lesser
(650) 347-6014

3927 Wattling Street


APN: 033-2170-003-00

18 condominium units
61 townhome units

Heather Klein
238-3659

28 2538 Telegraph Ave*

Rina Davis
2538 Telegraph LLC
(510) 390-4408

2538 Telegraph Ave


437 26th St
APN: 009 -0683-021-01
009 -0683-024-00

97 residential units
9,000 sq.ft. commercial

Catherine Payne,
238-6168

NOP published 12/21/07. DEIR


published 08/15/08. Planning
Commission approval and
certification of FEIR 11/19/08.
Extension granted 01/6/2014 until
12/31/14.
Planning Commission approval and
certification of FEIR on 06/18/08.
Revisions submitted 10/20/10.
Revisions approved 1/18/11.
Extension granted 12/19/13 until
12/31/14.
Planning Commission approval
01/04/06. TPM granted 02/19/09.
Extension granted 12/31/13 until
12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 4

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
29 4801 Shattuck Ave

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Steven Tiffin
(510) 550-4200

4801 Shattuck Ave


APN: 013-1162-009-01
013-1162-009-02
013-1162-010-00

44 residential units

Peterson Vollmann
238-6167

Planning Commission approval


04/04/07. Appeal denied by City
Council 07/17/07. Litigation ruling in
favor of project. Extension granted
12/3/13 until 12/31/14.

30 Hollis 34

Kathy Kuhler
Dogtown Development
(510) 428-1714

3241 Hollis
Entire Block of 007-0619

124 live/work units

Peterson Vollmann
238-6167

Planning Commission approval


10/18/06. TPM approval 10/18/06.
Extension granted on 12/17/13 until
12/31/14.

31 51st & Telegraph, Civiq

Jason Laub
Nautilus Group
(510) 345-5593

Area bounded by Telegraph,


51st and Clark Streets
APN: Multiple

68 residential units
Less than 3,000 sq.ft
commercial

Darin Ranelletti
238-3663

Planning Commission approval


1/18/06. Appealed to City Council.
Appeal withdrawn at City Council
03/21/06. Extension granted 01/14/13
until 12/31/14.

32 2116 Brush Street

Everett Cleveland
EBALDC
(510) 287-5353

2101-2116 Brush Street;


760 22nd Street
APN: 003 -0025-010-00 thru
011-00
003-0035-006-00 thru 005-00
003-0023-007-01 thru 011-02

Parcel A
63 residential units
Parcel B
18 residential units
Parcel C
65 residential units

Heather Klein
238-3659

Planning Commission approval


02/07/07. Extension granted 12/10/13
until 12/31/14.

33 Valdez & 23rd Street Project*

Jens Hillmer
City of Oakland
(510) 238-3317

281 residential units


500 car parking structure
including 250 public spaces
12,000 sq.ft retail

Heather Klein
238-3659

Planning Commission approval


12/07/05. TPM approval 02/28/06.
Extension granted 12/19/13 until
12/31/14.

34 Emerald Parc

Tom Dolan
(510) 839-7200

Valdez St./Webster/23rd
St./24th Streets
APN: 008-0668-004-00; 0080668-009-07
008-0668-005-00
2400 Filbert Street
APN: 005-0433-018-04

Peterson Vollmann
238-6167

35 3884 Martin Luther King Jr.


Way

Neil Cotter
(650) 259-9303

40 residential units

Planning Commission approval


11/16/05. Appeal denied by City
Council 02/21/06. Extension granted
1/10/14 until 12/31/14.
Planning Commission approval
9/20/06. Extension granted 1/8/14
until 12/31/14.

3884 Martin Luther King Jr.


Way
APN: 012-0968-031-00

55 townhomes

Darin Ranelletti
238-3663

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 5

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

David Eckert
(510) 339-4720

14-40 Siena Dr
APN: 040A-3848-006 through
040A-3848-026

22 single-family homes

Heather Klein
238-3659

DEIR published 01/05/05; FEIR


published 2/18/05. Planning
Commission certification and
approval of the FEIR 03/02/05; TTM
approval 06/1/05. City Council
GHAD approval 12/05/06. Extension
granted 12/13/13 until
12/31/14.Application filed 10/13 to
GHAD to amend the project to
remove the GHAD condition.

Madison Park Financial


Bob Huff
(510) 452-2944

1032 39th Street


APN: 012 -0953-027-00

25 residential units in Oakland


75 residential units in
Emeryville

Catherine Payne
238-6168
Miroo Desai
Emeryville Senior
Planner
(510) 596-3785

38 Ave Vista
(formerly 460 Grand Ave)

Bridge Housing
Joseph McCarthy
(415) 989-1111

460 Grand Ave


APN: 010-0779-012-00
010-0779-014-01
010-0779-015-01

68 Residential units
Estimated 16 million dollars
project cost

Darin Ranelletti,
238-3663

39 Monte Vista Villas


(formerly Leona Quarry)

Discovery Builders
Dana Owyoung
(925) 682-6419

7100 Mountain Boulevard


APN: 037A-3151-001-01

123 residential units

Bill Quesada,
Building Services,
238-6345

Oakland Planning Commission


12/3/08. Emeryville City Council
approval 01/20/08. Extension granted
10/12/12 until 12/31/14. Emeryville
has building permit authority;
Building permits issued; Under
construction.
Design Review Committee 02/22/06.
Planning Commission approval
06/07/06. Appeal denied by City
Council 07/18/06. Building Permit #
B1301912 issued 12/6/2013. Under
construction.
City Council approval 12/03/02. City
Council re-approval 02/17/04. Other
Monte Vista Villas projects complete.
Multiple Building Permits. Under
construction.

40 Red Star

National Affordable
Communities
David Booker
(949) 222-9119

1396 5th Street


APN: 004-0069-004-00

119 affordable senior units


3,300 sq.ft. commercial
Estimated 15 million dollars
project cost

Darin Ranelletti
238-3663

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
36 Siena Hills

Under Construction
37 ~1032 39th Street

APPLICANT CONTACT

DESCRIPTION

CITY CONTACT

STATUS

Planning Commission approval


06/17/05. Revised project submitted
04/16/08. Building Permit #
B1004649. Under construction.
Construction delay due to fire in June
2012.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 6

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

RESIDENTIAL PROJECTS
Under Construction
41 Cathedral Gardens *

AEH Housing
Benny Kwong
(415)295-8857

42 116 E 15th Street

SAHA
Cindy Heavens
(510)647-0700

2126 M L King Jr Way


616 21st St.
620 21st St.
APN:008 -0659-023-00
008 -0647-016-00
008 -0647-017-00
116 E 15th Street, 1507 2nd
Ave, 1521 2nd Ave
APN: 020 -0181-016-00
020 -0181-013-01
020 -0181-005-01

100 affordable housing units


Rehabilitation of the Rectory
building
Estimated 19 million dollars
project cost

Peterson Vollmann
238-6167

Planning Commission approval


07/20/10. Building permits issued
(B1104230, B1104231, B1202305).
Under construction.

92 affordable senior units


Estimated 13.5 million dollars
project cost

Aubrey Rose
238-2071

Planning Commission approval


04/27/11. Building permit #
B1203644 issued 4/29/13. Under
construction.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 7

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Pre-Application Discussions
43 51st & Telegraph, Civiq

44 ~2315 Valdez*

45 ~23rd & Valdez Streets*

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

5110 Telegraph, LLC


Roy Alper
(510) 550-7175

5110 Telegraph Ave


APN: 014 -1226-009-02

TDP-Webster LLC
Stephanie Hill
(415)381-3001
WP West Acquisitions LLC
Brian Pianca
(415) 888-8075

2315 Valdez Street


APN: 008-0668-009-07

2302 Valdez Street


APN: 008-0669-009: -010: 012; -013; -014; -015; -016; & -

3073-3093 Broadway
APN: 009-0705-002-02; -00201; -001-04; & -001-08

Wood Street Development


Area 8
APN: 018-0310-003-08; 0180310-003-09; 018-0310-003-10; 018-0310-003--11
167 acre site
8750 Mountain Blvd.
APN: Multiple

Application Submitted - Under Review


3093 Broadway Holdings LLC
46 ~3093 Broadway*
Stephen Siri
(415)262-5156
47 ~Wood Street Development.
Area 8
Phase 1

Holliday Development
Kevin Brown
(510)588-5134

48 Oak Knoll Redevelopment


Project

SunCal Oak Knoll LLC


Pat Kelliher
(510)251-0711

DESCRIPTION

Retain previously approved


entitlements
Option 2
Increase ground floor retail to
19,600 sq.ft.
100 residential units
60,000 sq.ft of office
235 residential units
15,000 sq. ft. commercial

CITY CONTACT

STATUS

Catherine Payne
238-6168

Pre-application filed.

Peterson Vollmann
238-6167

Pre-application filed

193 residential units


29,000 sq. ft. retail

Peterson Vollmann
238-6167

Pre-application filed

423 residential units


22,000 sq. ft. commercial

Peterson Vollmann
238-6167

Application filed.

235 residential units


18,812 sq.ft. commercial

Maurice BrenyahAddow
238-6342

Application filed.

960 residential units (408 SFD, Peterson Vollmann


248 townhomes, 304
238-6167
condominiums)
82,000 sq.ft. commercial

Request for General Plan conformity


05/06. Director's determination of
General Plan conformity 05/16/06.
Request for amended General Plan
conformity 12/06. Director's
determination of amended General
Plan conformity 12/20/06. NOP and
Initial Study for Supplemental EIR
issued 02/08/07. Planning
Commission denied the Appeal and
upheld the General Plan
determination 03/07/07. SEIR
published 09/06/07. Public hearing
for Draft SEIR 10/10/07. SunCal
requested no further work Fall 2008.
Inactive.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 8

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Application Approved
49 ~Jack London Square
Redevelopment

APPLICANT CONTACT

Jack London Square Partners,


Dean Rubinson,
(415)391-9800

LOCATION
(ADDRESS AND/OR APN)

Eight Development areas


within Jack London Square
bounded by Alice, 2nd,
Harrison, and Embarcadero.
APN - Multiple

COUNCIL
DISTRICT

CITY CONTACT

STATUS

Master PlanCatherine Payne


1.2 million S.F. of mixed-use
238-6168
retail, commercial, and office
Sites A-B,D,E,H, I: (1,700 seat
movie theater, 250 room hotel,
supermarkets, restaurants, and
offices)
66 Franklin (Haslett Building)
Residential option for 665 units
on parcels D and F2

DEIR published 09/08/03. FEIR


published 2/11/04. Planning
Commission approval and
certification of FEIR 03/17/04. City
Council approval 04/04. Application
for sites D and F2 and all other sites
for removal of office cap and
extension of the DA term currently
under review. ZUC hearing on
1/15/13. DRC hearing on 12/18/13.
Revision to PUD, GPA and associate
permits approved 09/23/14.

General Plan Amendment from Catherine Payne


Central City East
238-6168
Redevelopment Plan
Amendment and Central District
Urban Renewal Plan
Amendment
New Planned Waterfront
Zoning District
Zoning Map Amendments
3,100 residential units
200,000 sq.ft. commercial
3,950 structured parking spaces
29.9 acres public open space
2 renovated marinas; 170 boat
slips
wetlands restoration area

DEIR published 09/01/05. FEIR


published 02/01/06.Planning
Commission approval and
certification of FEIR 03/15/06.
Appeal filed 3/24/06. City Council
denial of the appeal and approval of
the project, amendments, rezoning
06/20/06 and 07/18/06.Revised EIR
published 09/30/08. Revised EIR
certified by City Council on 1/20/09.
Revision to PDP, FDP for Phase 1
streets & infrastructure, and TDM to
Planning Commission 11/05/14.

177,600 sq.ft. of office


4,710 sq.ft. ground floor retail
Structured parking
Alternative approved for 254
residential units with ground
floor retail

Approved 10/00. All residential


alternative approved by Planning
Commission 10/01. Planning
Commission re-approval 05/04/05.
Vesting TPM approved 11/21/06.
Extension granted 12/20/13 until
12/31/14.

50 ~Brooklyn Basin (formerly Oak Oakland Harbor Partners, LLC


to Ninth Mixed Use)
Patrick Van Ness
(925) 463-1122

64.2 acre waterfront site


bounded by Fallon Street,
Embarcadero Road, 10th Ave.,
and the Oakland Estuary
APN: 0430-001-02, 0430-00104 (por), 0460-003,004,0465002, 0470-002 (por).

3&2

51 1640 Broadway Mixed Use


Project*

1640 Broadway
APN: 008-0622-001-02, 0080622-001-03, 008-0622-00104, 008-0622-001-05

Joe Hernon
(011) 353-868-394799

DESCRIPTION

Heather Klein
238-3659

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 9

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Application Approved
52 188 11th Street*

53 Mandela Transit Village

PROJECT NAME
MIXED-USE PROJECTS
Projects Under Construction
54 ~Broadway West Grand
(formerly known as Negherbon
Mixed Use Project)*

55 ~Macarthur BART Transit


Village

APPLICANT CONTACT

EBALDC
Ener Chu
(510) 287-5353

Capital Stone Group


Dr. Thomas Casey
(510) 689-8094

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

176 11th Street, 198 11th


Street, 1110 Jackson
APN: 002 -0081-008-00
002-0081-007-00
002-0081-002-00
1357 5th Street
APN 018-0390-010-07

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

99 affordable apartment units


18,000 sq.ft health clinic and
commercial

Peterson Vollmann
238-6167

Approved administratively 11/24/10.


Extension granted on 1/14/13 until
12/31/14.

120 residential units


38,500 sq.ft. commercial

Darin Ranelletti
238-3663

Planning Commission approval


8/6/03. Planning Commission reapproval 2/18/09. Extension granted
02/18/10 until 12/31/11.

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

Signature Properties
Doug Park
(925) 463-1122

2345 Broadway
APN: 008 0666-007-00

Parcel B
367 residential units
8,500 sq.ft. retail

Catherine Payne
238-6168

Macarthur Transit Community


Partners, LLC
Deborah Castles
(510) 273-2002

7 acre site located between


Telegraph, 40th, and Macarthur
and Highway 24

624 residential units


42,500 sq.ft. retail/commercial
Estimated 18 million dollars
project cost

Catherine Payne
238-6168
Lynn Warner
238-6983

STATUS

DEIR published 08/26/04. Planning


Commission approval and
certification of FEIR 10/06/04. TTM
approval 06/20/06. Amendments filed
for Parcel B. Planning Commission
approval 06/04/08.PUD Application
for revising Phase II. Application
approved on 8/28/13. Project under
construction.
Planning Commission approval and
certification of the FEIR 06/04/08.
City Council approval of the
Rezoning 07/15/08. Owner
Participation Agreement and
Development Agreement approval by
City Council 07/21/09. Stage 1 FDP
City Council approval 12/21/10. Stage
2 FDP application filed 12/17/10.
Planning Commission approval Stage
2 FDP 04/06/11. City Council
approval of Stage 2 FDP 05/17/11.
Building permit #B1300446 granted
on 9/16/2013. Phase I under
construction. Application filed for
Phase 2. DRC 11/12/14 pending.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 10

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Pre-Application Discussions
Joe DeCredico
56 Spanish Speaking Citizens
Foundation
(510)883-1521
Application Submitted - Under Review
Philips/Perkins Eastman
57 ~3431 Foothill Blvd
Tania Philips
(415) 926-7909

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

1470 Fruitvale Ave


APN: 033 -2121-023-00

3431 Foothill Blvd


APN: 033-2127-015-01

DESCRIPTION

40,000 sq.ft. civic building

CITY CONTACT

Neil Gray
238-3878

STATUS

Pre-application filed.

84 assisted living units


Aubrey Rose
22 memory care units
238-2071
31 skilled nursing units
6 on-site living units for priests

Application filed. Planning


Commission review 9/15/14,
remanded to DRC 10/22/14.

58 ~Children's Hospital

Doug Nelson
(510) 428-3066

5714 Martin Luther King Jr.


Way
Bounded by Martin Luther
King Jr. Way, 53rd St, and
Highway 24.
APN: multiple

Demolition of 2-residences,
Heather Klein
trailers, and helipad structure
238-3659
Construction of:
89,100 sq.ft. out-patient building
4,900 sq.ft. central plant
14,500 sq.ft. family residence
31,300 sq.ft. clinical building
43,500 sq.ft.link building
101,000 sq.ft. Acute Care
Pavilion
4 level parking structure with
334 stalls
Interior renovations

Application filed. NOP published on


7/26/13. DEIR hearings before
LPAB 9/8/14, PC 9/17/2014, and
BPAC on 9/18/2014. FEIR
preparation underway.

59 Head Royce School

Dennis Malone
(510) 531-1300

4315 Lincoln Ave.


APN: 029A-1367-006-01

Amendments to the PUD

Heather Klein
238-3659

Application filed.

60 1800 San Pablo

Sid Afshar
Sunfield Development LLC
(510) 452-5555

1800 San Pablo Ave


APN: 008 -0642-006-00

120,000 sq.ft. commercial


309 auto fee parking spaces

Lynn Warner
238-6983

NOP published 10/7/11.DEIR


published 7/6/12. FSEIR certified
1/14/12. Project has not been
approved.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 11

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Application Approved
John Nguyen
61 ~Skilled Nursing Facility/
Medical Office/ Retail Sales
(510)538-9991

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

1230 37th Ave


APN: 033-2156-023

136 assisted living beds


13,334 sq.ft. medical office
3,316 sq.ft. retail

Neil Gray
238-3878

Planning Commission approved


08/06/14.

62 ~Safeway (Broadway @ Pleasant Project Development Centers


Valley)
Alvin B. Chan, Inc.
(925) 738-1400

5050-5100 Broadway
APN: 014-1242-002-03, 0141242-005-07

Redevelopment of existing
shopping center with new
331,000 sq.ft. shopping center

Darin Ranelletti
238-3663

63 Oakland Zoo (Master Plan


Amendment): Phase II

East Bay Zoological Society


Nik Haas-Dejehia
(510) 623-9525 x138

9777 Golf Links Rd


APN - multiple

Revisions to the Oakland Zoo


Darin Ranelletti
Master Plan previously approved 238-3663
in 1998

64 St. John's Episcopal Church


Parking and New Sanctuary

St. John's Episcopal Church


Jerry Moran
(510) 531-0980

5928 Thornhill Dr, &


1707 Gouldin Rd
APN: 048F-7390-003-03 &
048F-7390-004-09

Demolition of house at 5928


Thornhill Drive
new access bridge over creek
creek rehabilitation/bank
stabilization
5,500 sq.ft. sanctuary

Caesar Quitevis
238-6343

65 City Center T5/T6 (2005)

Shorenstein Realty Investors


Nick Loukianoff
(415) 772-7062

11th/12th/Clay/Broadway
APN: 002-0097-038-00
through 002-0097-040-00

600,000 sq.ft. office


7,500 sq.ft. commercial

Lynn Warner
238-6983

NOP published 06/26/09. DEIR


published 01/11/13. Planning
Commission approval and
certification of FEIR 9/25/13.
Approved on 6/21/2011. Phase I
(Veterinary Hospital) completed in
year 2013. Phase II (California
Exhibit) approved.
NOP and Initial Study published
03/06/08. DEIR published 11/17/10.
FEIR published 5/23/12. Planning
Commission approval and
certification of FEIR 6/6/12.
Easement proposals between
applicant and appellant neighbors
filed with City. Pending resolution to
revise SCA between appellants and
church.
Planning Commission approval of
PPUD 4/00. City in the process of
renegotiating City Center DDA
extending the completion
requirements.

66 Replacement of Embarcadero
Bridge

City of Oakland
Nader Rabahat
(510)238-6605

80 Fallon Street, 1 5th Ave


APN: 000O-0430-001-04
000O-0430-001-02

Replacement of the
Embarcadero Bridge over Lake
Merritt Channel

Michael Bradley
238-6935

Creek Protection Permit approved


01/03/11.

67 1100 Broadway

SKS Investments
Steven Wolmark
(415)421-8200

1100 Broadway
APN:002-0051-006-02

Rehabilitation of the Key


System Building
310,285 sq.ft. of office
9,810 sq.ft. of retail.

Heather Klein
238-3659

Planning Commission approval and


Addendum certification 02/13/08.
Extension granted 02/14 until
12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 12

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

300 Lakeside Drive


Area bounded by 20th and 21st
Streets and Webster and
Harrison Streets

Lowney Architects
Daniel Backman
(510)836-5400

3001-3039 Broadway
APN: 009 -0705-004-00, 009 0705-005-00,
009 -0705007-00

70 ~Safeway (College Ave)

Ken Lowney
(510)836-5400

6310 College Ave


APN: 048A-7070-001-01

71 ~2134-2148 Broadway /
Kapor Center

Ben Hidalgo /
Fougeron Architects
(415) 641-5744

2134-2148 Broadway
APN:008-0650-001-00

72 Oakland Army Base

CCIG Prologis; City of


Oakland; Doug Cole
(510)238-7661

Maritime St. and W. Grand


Ave.
APN: multiple

PROJECT NAME

APPLICANT CONTACT

COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS


Application Approved
Tomas Schoenberg
68 Kaiser Center
The SWIG Company
(415)291-1100

Projects Under Construction


69 ~Shops at Broadway

DESCRIPTION

CITY CONTACT

STATUS

Demolition of 280,000 S.F.


2 new towers:42-stories with
780,000 S.F. office
34-stories with 565,000 S.F.
office and 22,000 S.F. retail

Heather Klein
238-3659

NOP published 05/22/08.


Environmental Scoping Session
before the LPAB 06/09/08 and
Planning Commission 06/18/08.
DEIR published 8/23/10. LPAB
DEIR hearing 10/4/10. PC DEIR
hearing 10/6/10. FEIR published
04/21/11. Planning Commission
approval and FEIR certification
05/04/11. Extension granted 04/14
until 12/31/14.

39,000 sq.ft. retail


Estimated 5.2 million dollar
project cost.

Peterson Vollmann
238-6167

NOP published 07/27/12. Project


approved and FEIR certified
12/18/2013. Building permit #
B1304954 issued. Under construction

New 45,000 sq.ft. grocery store Peterson Vollmann


and ground floor retail with
238-6167
additional 9,500 sq.ft. of
commercial
Estimated project cost 9.8
Million Dollars ( $ 8.6 million
cost of the store and $ 1.2 million
of the retail building)

NOP published 10/30/09. DEIR


published 07/1/11. FEIR published
7/6/12. Planning Commission
approval and certification of FEIR
7/25/12. City Council approved
revised project 12/18/12. Building
permit # B1301812.Project under
construction. Retail building permit #
B1304086 issued. Under
construction.
Zoning Manager approval 10/25/13.
Building permit #B1400472 issued
09/18/14. Under construction.

3-Jan

4-story addition that totals a


Mike Rivera
44,000 sf. ft. of commercial floor 238-6417
area.
Estimated 10 million dollars
project cost

Redevelop 160 acres with


approx. 1.5 million sq. ft. of new
industrial space.
Estimated 500 million dollar
project cost

Darin Ranelletti,
510-238-3663; Doug
Cole,
238-7661

Master Plan and LDDA approved


June 2012. Rezoning approved 7/13.
Horizontal infrastructure
improvements under construction.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 13

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Projects Under Construction
Alta Bates Summit Medical
73 Alta Bates Summit Medical
Center- Summit Campus Master Center
Plan
Shahrokh Sayadi
(415)203-6345

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

23-acre campus generally


between Telegraph and
Webster, and between 30th
Street and 34th Street
APN - Multiple

ABSMC Master Plan


Bill Quesada,
Phase 2
Building Services,
Longer-term campus-wide
238-6345
improvements, new medical
office buildings, classrooms and
closure of a portion of Summit St
for new campus plaza.

Application filed. NOP published


01/23/09. DEIR published 12/21/09.
FEIR published 5/7/10. Planning
Commission approval 05/19/10.
Appealed to City Council. Council
denial of the appeal and approval of
the project 07/06/10. Building permit
B#1001826. Phase II under review.

Revision in program from 450


residential units to 600,000 S.F.
office.

Lynn Warner
238-6983

Master Plan for new hospital:


1,216 space parking garage
Hospital building of about
1.06 M sf. ft.
Central Utility Plant

Bill Quesada,
Building Services,
238-6345

Head Start Center

Aubrey Rose
238-2071

Revision from residential units to


office square footage. Planning
Commission approval and Addendum
certification 12/05/07. Building
permit #B0803952. Project stopped
construction.
Planning Commission certification
and approval of FEIR 06/07/06. City
Council approval of GPA, RPA and
re-zoning 6/27/06. Planning
Commission approval of the design of
Phase I, MOB 11/1/06. Planning
Commission approval of Design
Review for Phase 2, Hospital
11/19/08. Building permit
B#0902127 for the parking garage.
Main hospital permit granted under
OSHPD. Phase III for new
administrative offices to be
submitted.
Planning Commission approval
05/04/11. Building permit
#B1004457 issued. Project under
construction.

74 City Center T12 (2005)*

Shorenstein Realty Investors


Tom Hart
(415) 772-7000

11th/12th/MLK/Jefferson
APN: 002-0027-007-00

75 Kaiser Permanente

Kaiser Permanente
Judy DeVries
(510) 752-2004

Generally the area surrounding


the intersection of Broadway
and Macarthur Boulevard.

76 Foothill Square Redevelopment


Project

Jay-Phares Corp.
John Jay
(510)562-9500

10700 MacArthur Boulevard


APN: 047 -5589-001-00
047 -5589-001-06
047 -5589-001-05
047 -5589-001-04

1 and 3

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 14

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
1 ~California Hotel

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

EBALDC
Natalie Bonnewit
(510)287-5353

3501 San Pablo Ave


APN: 005 -0479-002-01

Rehabilitation and conversion


Jason Madani
of the existing studio and
238-4790
affordable units and ground floor
commercial into 137 affordable
apartments.

Project completed in year 2014.

2 ~MacArthur Blvd Senior


Apartments

Kristen McLane
(909) 624-6222

10920 MacArthur Blvd


APN: 047-5583-008-02

33 senior apartment units

Aubrey Rose
238-2071

Project completed in year 2014.

3 ~Lion Creek Crossing


(formerly Coliseum Gardens)

EBALDC
Carlos Castellmos
(510) 287-5335

66th Ave. at San Leandro


Street
APN: Multiple

Phase V
128 rental senior housing units

Catherine Payne
238-6168

Project completed in year 2014.

4 1614 Campbell Street

John Protopappas
Madison Park
(510) 452-2944

1614 Campbell St
APN:007 -0560-001-02

92 live/work conversion

Peterson Vollmann
238-6167

Project completed in year 2014.

5 720 E 11th Street

Robert Stevenson
(415)786-6631

720 E 11th Street


APN: 019 -0033-010-02

Moe Hackett
238-3973

Project completed in year 2012.

6 116 6th St*

Affordable Housing Associates 116 6th Street


Adam Deromedi
609 6th Street
(510) 649-8500
APN: 001-0173-009-00

Heather Klein
238-3659

Project completed in year 2012.

7 Arcadia Park

Pulte Homes
Andy Cost
(925) 249-3200

98th Ave. at San Leandro St.,


APN - multiple

8 City Walk
City Center T10 (2005)*

Alta City Walk, LL


(415) 888-8075

13th/14th/MLK/Jefferson
APN: 002-0029-001-00

9 Lion Creek Crossing


(formerly Coliseum Gardens)

EBALDC
Carlos Castellmos
(510) 287-5335

66th Ave. at San Leandro


Street
APN-Multiple

55 affordable units

70 senior affordable apartment


units

168 residential units (previously Darin Ranelletti


approved for 366 residential
238-3663
units)

3,000 sq.ft. retail


252 residential units

283 residential units


7,500 sq.ft of civic and
commercial space
park

Project completed in year 2012.

Don Smith, Bldg.


Permits,
238-4778

Project completed in year 2012.

Catherine Payne
238-6168

Phase I-IV completed in year 2012.


Final Phase V under construction
09/14

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 15

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
10 St Joseph's

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

2647 International Blvd


APN: 025 -0701-004-01

Citizens Housing Corporation


Kaori Tokunhea
(415) 421-8605
Bridge Housing
12 Ironhorse Apartments at
Central Station (formerly 14th Ben Metcalf
Street Apartments -Wood Street) (415) 989-1111
Pulte Homes
13 Zephyr Gate -Wood Street
(925) 249-3268

1720 Macarthur Boulevard


APN: 023-0494-001-07

Portions of APN: 0006-0029001 and 0000-0315-006.

Rehabilitation of the historic


building
84 units senior housing
15,000 sq.ft office
Estimated 12 million dollar
project cost
Phase II
83 apartments units (new
construction)
99 Affordable housing units

Wood Street
APN: 006-0029-001-00

14 3860 Martin Luther King Jr.


Way

Neil Cotter
(650) 259-9303

34 residential units

15 Jackson Courtyard
Condominiums*
16 630 Thomas Berkley Square
Housing *

Gerald Green
(415) 377-5286
SUDA/
Alan Dones
(510) 715-3491

3860 & 3880 Martin Luther


King Jr. Way
APN: 012-0968-030-01
012-0968-031-00
210 14th Street
APN 008 0627-020-00
630 Thomas L. Berkley Way
APN: N/A - TPM7541 Parcel 3

45 condominium units

17 1755 Broadway*

1755 Broadway LLC


Andrew Brog
(310) 963-7878
Deni Adaniya
(510) 841.4410, ext.19

1755 Broadway
APN:008 -0640-005-00

Uptown Parcel 6
555-19th Street, 550-18th
Street
APN 008-0642-017
311 2nd Street
APN:001 -0149-007-00

Conversion of floors 2-5 of


office to 24 live/work
condominiums.
80 residential units
2500 sq.ft.
Childcare
Art space
105 residential condominium
units

124 Grand Ave and 2264


Webster St.
APN: 008-0655-007-00 &
008-0655-009-01

BRIDGE Housing Corp


Smitha Seshadri
(415) 989-1111

11 Altenheim Senior Housing

18 Fox Courts

19 311 2nd St*

Embarcadero Pacific
Michael Reynolds
(510) 444-4064

20 100 Grand*

Essex Property Trust


John Eudy
(650) 849-1600

130 residential condominium


units

88 residential condominium
units
3 commercial spaces

241 residential units

CITY CONTACT

STATUS

Robert Merkamp
238-6283

Project completed in year 2011.

Robert Merkamp
238-6283

Project completed in year 2010.

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits
238-4778
Darin Ranelletti,
238-3663

Project completed in year 2009.

Heather Klein
238-3659
Heather Klein
238-3659

Project completed in year 2009.

Mike Rivera,
238-6417

Project completed in year 2009.

Catherine Payne
238-6168

Project completed in year 2009.

Heather Klein
238-3659

Project completed in year 2009.

Darin Ranelletti
238-3663

Project completed in year 2009.

Project completed in year 2009.

Project completed in year 2009.

Project completed in year 2009.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 16

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
21 Pacific Cannery Lofts

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Project completed in year 2009.

Neil Gray
238-3878

Project completed in year 2009.

Adaptive re-use of historic


building into 24 condominiums
and ground floor retail

Heather Klein,
238-3659

Project completed in year 2008.

200/210/228 Broadway
APN: 001 0141-002-01
001 0141-011-00

Project completed in year 2008.

Pyatok Architects Inc


Gary Struthers
(510) 465-7010

901& 907 Jefferson Street


APN: 002-0025-007-00
through 002-0025-009-00

75 condominium units
1,030 sq.ft. retail

Heather Klein,
238-3659
Don Smith, Bldg.
Permits
238-4778
Darin Ranelletti,
238-3663

BayRock Residential
Marilyn Ponte
(510) 594-8811
A. F. Evans
Steve Kuklin
(415) 591-2204

620-636 Broadway
APN: 001-0197-002-00

3,600 sq.ft retail


157 condominium units

Heather Klein
238-3659

Project completed in year 2008.

8th/9th/Clay and Jefferson


801-807 Clay Street
APN: 001-0209-001, 002, 003,
004
Between Rilea Way and
Greenridge Drive on Keller
Ave.
APN: 04A-3457-033-01

Phase II
72-86 condominium units
14,000 sq.ft flexible space

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2007.

Heather Klein
238-3659

Project completed in year 2007.

Catherine Payne,
238-6168

Project completed in year 2007.

Bill Quesada,
Building Services,
238-6345

Project completed in year 2007.

22 Madison Lofts*

Affordable Housing Associates 160 14th St.


Mark Garrel
APN: 008-0628-005-01
(510) 649-8500

23 Packard Lofts* (formerly 2355


Broadway)

2355 Broadway LLC


John Protopappas
(510) 452-2944

2355 Broadway
APN: 008-0666-006-00

24 The Ellington* (formerly


3rd/Broadway Mixed Use)

The Emerald Fund


Marc Babsin
415-777-2914

25 901 Jefferson*

PCL Associates
Cal Inman
(510)547-2122

28 Siena Hills

Hillside Homes
Edward Patmont
(925) 946-0583

29 Uptown Project *

Forest City Residential, Inc.


Susan Smartt
(415) 836-5980

Area bounded by San Pablo,


Telegraph, 18th and 20th
Streets
APN - Multiple

The DeSilva Group


David Chapman
(925) 828-7999

7100 Mountain Boulevard


APN: 037A-3151-001-01

30 Monte Vista Villas


(formerly Leona Quarry)

STATUS

Don Smith, Bldg.


Permits
238-4778

27 Housewives Market*

CITY CONTACT

99 condo warehouse lofts


45 live/work lofts
15 townhouse lofts
4 work/live lofts
(part Wood Street Development)
Approximately 76 condominium
units
2,666 sq.ft of retail

1111-1119 Pine Street


APN: 006-0029-002-00

26 8 Orchids*

DESCRIPTION

134 residential units


11,000 sq.ft. retail

10 single-family homes

Parcel I
Parcel II
Parcel III
665 residential units

320 residential units


3,350 sq.ft community center

Project completed in year 2008.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 17

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
31 288 Third Street*
(formally 300 Harrison Street)
32 Altenheim Senior Housing
(Phase I)
33 206 Second Street*

34 1511 Jefferson *

35 Ford Street Lofts

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

91 condominiums units

Scott Miller
238-2235

Project completed in year 2007.

93 apartment units
Rehabilitation of existing
historic buildings

Scott Miller
238-2235

Phase I completed in year 2007.

2,380 sq.ft of live/work


1,310 sq.ft of retail space
75 condominium units

Heather Klein
238-3659

Project completed in year 2007.

Robert Merkamp
238-6283

Project completed in year 2007.

Scott Miller
238-2235

Project completed in year 2007.

Signature Properties
Chris Weekley
(925) 463-1122
Citizens Housing Corporation
Kaori Tokunhea
(415) 421-8605

300 Harrison Street


APN: 001-0153-016

1720 Macarthur Boulevard


APN: 023-0494-001-07

MV Jackson
Robison Brown
(415) 284-1200

206 Second Street


APN: 001-0157-003-00

Meritage Homes of California


Randall Harris
(925) 256-6042
Signature Properties
(905) 436-9350

1511 Jefferson Street


APN:003-0071-006-00

3041, 3061, and 3065 Ford


Street
APN: 025-0666-002-00
8th/9th/Clay and Jefferson
801-807 Clay Street
APN: 001-0209-001, 002, 003,
004

Phase I
Don Smith,
Between 102 -111 condominium Bldg. Permits
units
238-4778
11,000 sq.ft flexible space
3,000 sq.ft of retail
Structured parking

Project completed in year 2007.

41st and Adeline; land area is


in both Oakland and
Emeryville. 1007 41st Street
APN: 012 1022-001-00
6549 San Pablo Ave
APN: 016-1506-001-02

62 lot units on former


office/warehouse site

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2007.

72 condominium units

Lynn Warner
238-6983

Project completed in year 2006.

94 residential units
9,800 sq.ft office

Scott Miller,
238-2235
Don Smith, Bldg.
Permits
238-4778
Robert Merkamp
238-6283

Project completed in year 2006.

Heather Klein
238-3659

Project completed in year 2006.

78 condominium units

81 condominium residential
units

36 Housewives Market*

A.F. Evans
Steve Kuklin
(415) 591-2204

37 Green City Loft Project

Green City Development


Martin Samuels
(510) 635-7698

38 66th & San Pablo

The Olson Company


(925) 242-1050

39 Wheelink Project*

Jordan Real Estate


Wayne Jordan
(510) 663-3865

4th and Alice Street; JLS


District
428 Alice Street
APN 001 0155-001-00

40 Lincoln Court Senior Housing

Domus Development
(415) 558-9500

2400 Macarthur Blvd


APN: 029 -0993-020-01

41 Aqua Via*
(Harbor View or Second Street
Lofts)

Urban Developments
Marge Cafarelli
(415) 512-8118

121-129 2nd Street


APN: 001-0165-015-00

100 condominium units


5,190 sq.ft of commercial /
office

82 senior housing apartment


units

Project completed in year 2006.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 18

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
42 Cotton Mill Studios

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Tom Dolan Architects


(510) 839-7200

1091 Calcot Place


APN: 019-0055-001-04

74 unit live/work conversion

Robert Merkamp
238-6283

Project completed in year 2006.

43 Glascock Residential Project


The Estuary

Signature Properties
Patrick Van Ness
(925) 463-1122

100 residential units

Scott Miller
238-2235

Project completed in year 2006.

44 Preservation Park III*

Signature Properties
(905) 436-9350

92 residential townhouses

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2006.

45 City Limits Project (Formerly


FABCO)

Pulte Homes
Dennis O'Keefe
(925)249-3218

92 condominium residential
units

Scott Miller
238-2235

Project completed in year 2005.

46 Arioso Project*

SNK Development
(415) 896-1186

2893 Glascock at Derby


4.1 Acres
APN: 025-0674-001-00
025-0674-002-00
025-0674-003-00
11th 12th and MLK on a
vacant parcel
655 12th Street
APN: 002-0021-011-01
002-0021-012-00
1165 and 1249 67th Street west
of San Pablo Ave.
APN: 049-1507-004-00
016 1507-008-03
016 1507-009-02
901 Franklin Street
APN: 002-0096-004-00

88 condominium units
6,000 sq.ft commercial
structured parking

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2005.

9001-9321 MacArthur Blvd.


APN: 047-5484-006-04, 00703, 010-02, 011, 012, 013, 02201, 022-02, 023
Telegraph Ave. and 24th Street
2401 Telegraph Avenue
APN: 008-0675-004-00
1431 8th Street
APN: 004-0067-021-00

78 single family homes

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2004.

50 new residential lots


5,300 sq.ft ground floor retail

Project completed in year 2004.

14 condominium units

Don Smith, Bldg.


Permits
238-4778
Heather Klein
238-3659
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2003.

47 Palm Villas Residential Project

Em Johnson Interest
(510) 839-3057

48 Telegraph Gateway Project *

Tom Dolan Architects


Scott Galka
(510) 839-7200
Bridge Housing
Kristy Wang
(415) 989-1111

49 Mandela Gateway Townhomes

50 Ettie Street/Mandela Parkway

David Baker Architects


(415) 896-6700

2818 Mandela Parkway


APN: 007-0587-002-05

91 live/work units

51 Mandela Gateway Gardens


(formerly Westwood Gardens)

Oakland Housing Authority and 1431 7th Street


Bridge Housing
APN: 004-0067-021-00
Pete Nichol
(415) 989-1111

200 residential units (40 units in Heather Klein


replacement of existing
238-3659
Westwood Gardens) 15,000 sq.ft
of retail space - combination
rental and ownership; Some
live/work units.

Project completed in year 2003.

Project completed in year 2003.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 19

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
52 Durant Square

APPLICANT CONTACT

Signature Properties
(925) 463-1122

53 San Pablo Affordable Senior


Housing

Oakland Community Housing


Inc.
(510) 763-7676
54 Bridge Housing Linden Court Bridge Housing
(415) 989-1111

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

International Blvd. And Durant


Ave.
10970 International Blvd.
APN: 047-5519-043-00

3255 San Pablo Avenue


between 32nd and 34th Streets
APN: 005-0470-017-01
1089 26th Street. Near
McClymonds High School in
West Oakland
2240 Chestnut Street, at West
Grand
APN: 005-0428-001-00

43 new single family


168 new townhouses
40 new live/work (60 total)
Food 4 Less
Renovated building with
continued commercial uses
50+ residential units

Hope IV project in conjunction


with OHA
58 affordable rental housing
units
6 affordable for sale housing
units
14 loft units, 4,000 sq.ft retail
4,000 sq.ft supportive services
270 residential units

DESCRIPTION

Low-income housing (approx.


79 units)

CITY CONTACT

STATUS

Heather Klein
Project completed in year 2003.
238-3659
Bill Quesada, Building
Permits, 238-6345

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits
238-4778
Don Smith, Bldg.
Permits
238-4778

Project completed in year 2003.

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2002.

Project completed in year 2003.

55 Bridge Housing - Chestnut


Court

Bridge Housing
(415) 989-1111

56 The Essex - Lake Merritt*

Lakeshore Partners
Tom Peterson
(510) 444-7191
SNK Development
(415) 896-1186

17th and Lakeshore


108 - 17th Street
APN: 008-0633-002-01
3rd and Jackson Streets
208 Jackson Street
APN:001-0159-006-00

312 units
13,500 sq.ft commercial

58 Safeway Building*

Reynolds & Brown


Dana Perry
(925) 674-8400

4th and Jackson Streets


201 4th Street
APN: 001-0155-008-00

Reuse existing warehouse and


add new top floor for 46
live/work units
4,500 sq.ft commercial
6,500 sq.ft office

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2002.

59 46th Street Lofts


(formerly Flecto Project)

Levin, Menzies, Kelly


Paul Menzies
(925) 937-4111

47th and Adeline; land area is


in both Oakland and
Emeryville.
119 Linden Street
APN: 049-1172-002
013-1172-003
013-1172-004

79 units and 3,000 sq.ft


commercial space
Adaptive reuse of and addition
to the former Flecto building.

Catherine Payne
238-6168

Project completed in year 2006.

57 Allegro Project*

Project completed in year 2003.

Project completed in year 2002.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 20

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Mixed-Use Projects
60 Seven Directions

61 Broadway West Grand


(formerly known as Negherbon
Mixed Use Project)*

APPLICANT CONTACT

Pyatok Architects Inc,


Curtis Caton,
(510) 465-7010
Signature Properties
Doug Park
(925) 463-1122

62 Dreyer's Site Residential Lofts*


The Sierra

COD Builders
Kava Massih
(510) 644-1920
63 Fruitvale Transit Village Phase I FDC, Evelyn Johnson,
(510) 535-6911
Commercial, Industrial, and Civic Projects
East Bay Zoological Society
64 ~Oakland Zoo (Master Plan
Amendment) Phase I
Nik Haas-Dejehia
(510) 623-9525 x138
65 ~Foothill Square Redevelopment Jay-Phares Corp.
Project
John Jay
(510)562-9500
Macarthur Transit Community
66 ~Macarthur BART Transit
Village
Partners, LLC
Deborah Castles
Kaiser Permanente
67 ~Kaiser Permanente
Judy DeVries
(510) 752-2004
Alta Bates Summit Medical
68 ~Alta Bates Summit Medical
Center- Summit Campus Master Center
Plan
Shahrokh Sayadi
(415)203-6345

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

2946 International Boulevard


APN: 025-0716-012-00

2345 Broadway
APN: 008 0666-007-00

311 Oak Street


APN: 001-0163-012-00

DESCRIPTION

38 housing units
20,115 S.F. clinic space

CITY CONTACT

STATUS

Robert Merkamp
238-6283

Project completed in year 2008.

Parcel A
132 residential units
21,300 sq.ft. retail

Catherine Payne
238-6168

Project completed in year 2006.

220 units
30,000 sq.ft commercial

Project completed in year 2003.

Fruitvale BART Station

Don Smith, Bldg.


Permits
238-4778
Darin Ranelletti
238-3663

9777 Golf Links Rd


APN - multiple

Darin Ranelletti
238-3663

Phase I (veterinary hospital)


completed in year 2013.

10700 MacArthur Boulevard


APN: 047 -5589-001-00
047 -5589-001-06
7 acre site located between
Telegraph, 40th, and Macarthur
and Highway 24
Generally the area surrounding
the intersection of Broadway
and Macarthur Boulevard.
23-acre campus generally
between Telegraph and
Webster, and between 30th
Street and 34th Street
APN - Multiple

Revisions to the Oakland Zoo


Master Plan previously approved
in 1998
Redevelopment of a commercial
shopping center approx. 13.8
acres
Public Parking Garage

Aubrey Rose
238-2071

Project completed in year 2014.

Catherine Payne
238-6168
Lynn Warner
Bill Quesada,
Building Services,
238-6345
Bill Quesada,
Building Services,
238-6345

Project completed in year 2014.

1 and 3

Masterplan for residential and


commercial/civic use and new
parking structure

Master Plan for new hospital:


1,216 space parking garage
Hospital building of about
ABSMC Master Plan
Phase 1
Demolition of the Merritt
Classroom and other small
buildings
Construction of a 230,000 S.F.
(11-story) acute care hospital
1,090-space (7-story) parking
garage.

Project completed in year 2003.

Phase I and II completed in year


2014.
Phase 1 Project completed in year
2014.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 21

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
69 Lake Merritt Channel Wetland City of Oakland
and Widening Project

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Lake Merritt Channel between


Lake Merritt and I-880
APN: 000O-0450-001, 002,
000O-0455-001-01, 001-07,
008-05,012

70 Aspire Public Schools

Charles Robitaille
925-698-1118

1009 66th Ave


APN:041-4056-003-00

71 Kaiser Permanente

Kaiser Permanente
Judy DeVries
(510) 752-2004

Generally the area surrounding


the intersection of Broadway
and Macarthur Boulevard.

72 Jack London Square


Redevelopment

Jack London Square Partners,


Stuart Richard,
(415)391-9800

Eight Development areas


within Jack London Square
bounded by Alice, 2nd,
Harrison, and Embarcadero.
APN - Multiple

73 Head Royce School

John Malick & Associates


John Malick
(510)595-8042

4315 Lincoln Ave


APN: 029A-1367-004-04

74 Cathedral of Christ the Light

CMA
Eileen Ash
(415) 597-8414

2121 Harrison Street and


Grand Avenue
APN:008-0653-024

1 and 3

DESCRIPTION

Widening and tidal restoration


improvements along Lake Merritt
with the 12th Street
Reconstruction Project, 10th
Street Bridge Project, and Lake
Merritt Channel Improvement
Project at the 7th Street Flood
Control Station.
Demolish vacant industrial
building/construct a school with
420 students

CITY CONTACT

STATUS

Lesley Estes,
Project completed in year
Watershed
2013.
Improvement Program
Supervisor,
238-7431

Aubrey Rose
238-2071

Project completed in year 2011.

Phase I
Scott Gregory
West Broadway Medical Services (contract planner)
Building and Garage
(510) 535-6690
Phase II
Specialty Medical Office Building

Project completed in year 2011.

commercial, office, and parking


Site C (10 Clay Street/505
Embarcadero West) (Ferry
Landing)
Site F (65 Harrison Street) (Jack
London Market)
Development of School
Masterplan

Catherine Payne
238-6168

Site C, G and F completed in year


2009.

Heather Klein
238-3659

Project completed in year 2009.

Catherine Payne
238-6168

Project completed in year 2009.

255,000 sq.ft Cathedral

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 22

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
SUCCESSFUL COMPLETIONS

APPLICANT CONTACT

Commercial, Industrial, and Civic Projects


SUDA/
75 Thomas Berkley Square
North County Center for Self
Sufficiency
Alan Dones
(510) 715-3491

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

San Pablo Ave between MLK


Jr. Way, Thomas L. Berkley
Way, and 21st Street.
630 20th Street
APN: 008-0645-015-01
008-0645-01801 and 02
0080645-019 through 025

114,000 sq.ft office for the


Alameda County Social Services
Division and the North County
Self Sufficiency Center
5,000 sq.ft. of retail

CITY CONTACT

STATUS

Heather Klein
238-3659
Don Smith, Bldg.
Permits
238-4778

Project completed in year 2009.

76 Perkins Street Residential Care

A.F. Evans
John Rimbach
(510) 891-444-7191

468-484 Perkins St.


APN: 010-0767-014-00

56 room care facility for elderly Don Smith, Bldg.


residents
Permits 238-4778

Project completed in year 2009.

77 Cox Cadillac Mixed Use

Bond Company
Robert Bond
(312) 853-0070

Intersection of Harrison St.,


27th and Bay Place
230 Bay Place
APN 010 0795-027-01

56,000 sq.ft commercial


Renovation of historic Cadillac
Showroom

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2008.

Komorous-Towey
Klara Komorous
(510)446-2244
John Sutton
Prentiss Properties
(510)465-2101

66 Franklin Street
APN:001-0060-322

Robert Merkamp
238-6283

Project completed in year 2008.

2100 Franklin Street


APN:008 -0651-003-01

Renovation of existing building


with approximately 95 sq.ft. of
commercial
15,000 sq.ft retail
218,000 sq.ft office

Catherine Payne
238-6168

Project completed in year 2007.

Shorenstein Realty Investors


Nick Loukianoff
(415) 772-7062

11th/12th/Clay/Jefferson
APN: 002-0033-006-00
through 015-00

450,000 sq.ft. office


7,500 sq.ft. retail

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2001.

78 66 Franklin Street*

79 Center 21

80 City Center T9 (2000)

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 23

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
City of Oakland
81 East Oakland Sports Center
Community and Economic
Development Agency
Project Delivery Division
Lyle Oehler
(510) 238-3389

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Phased Master Plan for a sports Lynn Warner


center at Ira Jinkins Park.
238-6983
Phase 1
26,000:indoor swimming
pool/water slide (natatorium), a
dance/exercise room, a multipurpose room/learning center, and
other accessory activities. If
funded a fitness/weight room and
two outdoor basketball courts
Phase II
23,000 square foot facility and
outdoor amenities

16th and 17th Streets and San


Pablo Avenue
1630 San Pablo
APN: 008 0620-015-00
008 -0620-014-00
008 0620-009-01
Oakport St. at Hassler Way
APN: 034-2295-005-04

California Commercial
Investments
Phil Tagami
(510) 268-8500

83 Lexus Dealership

Lance Gidel
(408) 370-0280

84 Infiniti of Oakland

Hendricks Automotive
Ron Tye
(925) 463-9074
AMB Property Corp.

Oakport Road at Hassler Way


APN: 034-2295-005-04

7200 Edgewater Drive


APN: 041 3902-003-17

Best Buy Architects MBH


Sherry Fraiser (510) 865-8663

Yerba Buena and Mandela


Parkway (Portion of OTR site)
APN: 007-0617-047-00

86 Best Buy Retail Store

CITY CONTACT

9175 Edes Avenue


APN: 044-5053-001-06

82 17th Street Parking


Garage

85 Edgewater Distribution Center

DESCRIPTION

+330 -space parking garage

STATUS

Project completed in year 2007.

Heather Klein
238-3659
Patrick Lane,
Redevelopment,
238-7362

Project completed in year 2006.

22,000 sq.ft building for auto


sales, service, repair of parts
Outdoor auto sales lot for 275 New automotive dealership

Heather Klein
238-3659

Project completed in year 2006.

Heather Klein
238-3659

Project completed in year 2006.

406,700 sq.ft
warehouse/industrial use

Project completed in year 2004.

45,000 sq.ft Best Buy retail


store proposed

Port of Oakland
Commercial Real
Estate 627-1210
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2003.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 24

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
Carl Groch,
87 Rainin Instruments
(415) 592-3950

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Edgewater Drive & Hassler


Road
7500 Edgewater Drive

180,000 sq.ft
office/manufacturing/R&D
facility

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2002.

9th and Broadway


900 Broadway
APN: 002-0094-002-00
1111 Jackson Street
APN 002-75-002-00
Shellmound at I-80
4300 Shellmound Street

150-room hotel

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2002.

Don Smith, Bldg.


Permits, 238-4778
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2002.

550 85th Avenue


APN: 042 4313-001-00

Renovation of existing 111,000


sq.ft State office building
Additional 3-level parking
structure for 800 cars in portion
of existing surface parking lot
64,525 sq.ft bakery and
warehouse

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

92 Extended Stay American Hotel Extended Stay America


OTR Site
Dan Stearns
(425) 603-1530

Yerba Buena and Mandela


Parkway
APN: 007-0617-014-01

149 hotel rooms

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

93 Courtyard by Marriott Hotel

Marriott,
Don Celli
(916) 369-4050
Phil Tagami
(510) 268-8500

350 Hegenberger Road


APN: 044-5074-009-03

154-room hotel

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

1500 Broadway
APN: 008-0619-004-01

Rehabilitation of historic
building for office &
commercial uses
187,000 sq.ft office
50,000 sq.ft retail

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

95 Expo Design Center

Mike Abate
(714) 940-5810

Project completed in year 2001.

Joe Ernst
(510) 864-5985

KMART vacating present store


Home Expo Center has
assumed lease.
300,000 sq.ft high-tech research
and development campus

Don Smith, Bldg.


Permits, 238-4778

96 Zhone Technologies

1555 40th St
APN: 007-0617-016-03, 0070617-016-05
66th Avenue and Oakport
Street
7195 Oakport
APN: 041-3902-022-60

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2000.

88 Oakland Garden Hotel


(Courtyard Marriott)
89 1111 Jackson Street Phase I
90 IKEA Parking Structure

91 Just Desserts

94 Rotunda Building Reuse

Michael Chan
Oakland Garden Hotel
(510) 251-6440
Peter Wong
(510) 628-9060
Ikea Property, Inc.
Doug Pass
(925) 249-0317
Just Desserts
John Schmiedel
(415) 864-6450

Project completed in year 2002.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 25

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Pre-Application Discussions
1 ~1900 Broadway*
2 ~2270 Broadway*

3 ~5132 Telegraph Ave

4 ~459 23rd Street*

APPLICANT CONTACT

COUNCIL
DISTRICT

DESCRIPTION

Seth Hamalian
(415) 355-6612

1900 Broadway
APN: 008 -0638-005-00

294 residential units


11,000 sq.ft commercial

Lakeshore Partners LLC


Tom Peterson
(510)444-7191

2270 Broadway
APN: 008-0656-002-01

Nautilus Group
Jason Laub
(510)343-5593

5110-5132 Telegraph Ave


APN 014-1226-009-02, 0141226-013-00

AGI-Avant Inc
Tom Holt
(415) 775-7005

459 23rd Street


APN: 008-0658-004-01

Application Submitted Under Review


Maria Poncel
5 ~495 22nd Street
415-828-7061
6 ~459 8th Street

LOCATION
(ADDRESS AND/OR APN)

495 22nd Street


APN: 008-0648-011-03

Pre-application filed. Environmental


work complete

223 residential units


6,000 sq. ft.commercial

Peterson Vollmann
238-6167

Pre-application filed

216 residential units


25,000 sq. ft. commercial

Mike Rivera
238-6417

Pre-application filed

114 residential rental units


3,000 sq. ft. commercial

Peterson Vollmann
238-6167

Pre-application filed

81 residential units
6,000 sq.ft. commercial

Aubrey Rose
238-2071

Application filed

50 residential units
4,000 sq.ft. commercial

Peterson Vollmann
238-6167

Application filed

STATUS

Neil Gray
238-3878

CITY CONTACT

Signature Land Advisors


Scott Zengel
(510)251-9278

459 8th Street


APN :001-0201-015-00

7 ~Lake Merritt Boulevard*

Ronnie Turner
Urban Core
(510) 395-2766

12th Street / 2nd Avenue


APN: 019-0027-014-00

247 residential units


201 parking spaces
5,000 sq.ft retail/community
space

Neil Gray
238-3878

Application filed.

8 ~Uptown Parcel 4
(Telegraph/19th Street)*

Forest City Residential, Inc.


Susan Smartt
(415) 836-5980

1911 Broadway
APN:008-0716-058

370 residential units

Jens Hillmer
238-3317

City Request For Proposal for sale of


property available 10/14/14. Proposals
due 12/1/14.

9 ~2201 Brush Street

EBALDC
Jared Wright
(510)287-5353

2201 Brush Street


APN: 003-0025-011-00, 0030025-011-00

59 affordable apartment units


130 children YMCA childcare
center

Maurice BrenyahAddow
238-6342

Application filed. NEPA analysis


underway

Pyatok Architects
Peter Waller
(510) 465-7010

71st Ave
APN: 041-4166-031-02

Peterson Vollmann
238-6167

Application filed.

10 ~Coliseum Transit Village


Phase I

110 residential units

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 1

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
RESIDENTIAL PROJECTS
Application Submitted Under Review
Brick Architects, LLP
11 ~ Temescal Apartments
Rob Zirkle & Tai Kwong
(510)516-0167
SRM Development
Ryan Leong
(509) 944-4557

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

4901-4939 Broadway,
311-313 51st St,
4964-4974 Desmond St
APN: 013 -1136-008-04, 013 1136-011-00, 013 -1136-01200, 013 -1136-009-02, 013 1106-005-05, 013 -1136-00402

DESCRIPTION

130 residential units


8,700 sf. ft. retail

CITY CONTACT

STATUS

Mike Rivera
238-6417

Application filed

12 ~Courthouse Condominiums
(formerly 2935 Telegraph Ave.)

Curtis Development
Charmaine Curtis
(415)609-4996

2935 Telegraph Ave


APN: 009-0698-001-00

162 residential units


4,045 sq.ft retail

Maurice BrenyahAddow
238-6342

Major Revision filed 7/14/14 to add


20 additional units. NOP and Initial
Study published 10/06/06. DEIR
published 03/19/07; Planning
Commission certification and
approval of FEIR on 08/01/07.
Planning Commission approval
04/01/09 for revisions to Conditions
of Approval. Applicant withdrew
request for revisions 04/20/09.
Building Permit #B0901385.
Extension granted 10/1/13 until
12/31/14.

13 Felton Acres

Robert Felton
(510) 548-4637

Devon Way
APN: 048H-7600-007-00

Subdivision into 25 single


family lots and two new roads

Lynn Warner
238-6983

Application filed.

222 19th Street


APN: 008-0634-003-00

370 residential units


933 sq.ft cafe

Heather Klein
238-3659

Application filed. NOP published


11/09/07. Design Review Committee
04/23/08. DEIR published 10/05/11.
FEIR preparation underway.

Dave O'Keeffe
14 Emerald Views *
(formerly19th Street Residential (415) 760-7118
Condominiums)

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 2

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
15 ~1331 Harrison Project*

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

1331 Harrison Street


APN: 002-0065-006-01

169 residential units


3,600 sq.ft retail

Molly Maybrun
16 ~Wood Street Project:
Development Area 4 (Previously City Ventures
approved for 301 units as HFH (415)271-3669
Apartments

Block bounded by Wood


Street; 14 St.,16th St. and
Frontage Road. APN: various

17 ~377 2nd Street*

John Winder
(415) 318-8634

18 ~Merrill Gardens

Chad Lorentz
Urbal Architects
(206)257-0972.

377 2nd Street


APN: 001 -0143-008-00
001 -0143-007-00
001-0143-010-00
5107-5175 Broadway. APN:
014-1241-009, 008-00, 005-01,
006-01.

Jibu John
(925) 940-4850

176 residential units


5,100 sq. ft. commercial

96 residential units

127 assisted living units,


7,800 sq.ft. commercial

CITY CONTACT

STATUS

Neil Gray
238-3878

Planning Commission approval


10/15/14.

Maurice BrenyahAddow
238-6342

Planning Commission approval


8/6/14.

Aubrey Rose
238-2071

Approved 03/07/14. Appealed


03/14/14. Revised approval 06/30/14.

Mike Rivera
236-6417

Planning Commission Approval on


06/20/14.
Building Permits filed:
RB1401555 (residential) on 06/02/14,
RB1402855 (demolition) on 09/24/14
B1401138 (commercial) on 09/25/14

NOP published 05/18/11. DEIR


published in 7/13.Planning
Commission approval and
certification of FEIR 7/13. Project
appealed, denied by City Council
11/19/13.
Approved 7/31/13.

Ryan Leong
SRM Development
(509) 944-4557

19 4311-4317 Macarthur Blvd

Alexis Gevorgion
(818) 380-2600

4311- 4317 Macarthur Blvd


APN:030 -1982-121-00
030 -1982-122-00

115 senior apartments


3,446 sq.ft retail
64 parking spaces

Lynn Warner
238-6983

20 2425 Valdez Street

Jose Coelho
(510) 446-2222

2425 Valdez St
APN: 008 -0672-007-02

70 Micro Living Quarters


1 Live Work Space

Michael Bradley
238-6935

21 Fruitvale Village Phase II

Unity Council/Signature
Properties
Patrick Van Ness
(925) 463-1122

Block bounded by 35th and


37th Avenues, East 12th Street
and BART tracks
APN: 033-2197-019 and 0332177-02

Phased multifamily residential Darin Ranelletti


development with 275 residential 238-3663
units
Parking garage

NOP published 12/22/08. DEIR


published 01/12/10. FEIR published
04/2810. Planning Commission
approval and certification of the FEIR
05/19/10. Extension granted 1/10/14
until 12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 3

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

RESIDENTIAL PROJECTS
Application Approved
22 9400 International Blvd

Acts Community Development 9400-9500 International Blvd


Colby Northridge
APN: 046 -5423-022-00,
(949) 660-7272
046 -5423-001-01, 046 -5423018-002

59 affordable units
3,500 sq.ft commercial

Peterson Vollmann
238-6167

Approved 2/12/12.

23 1431 Jefferson Street*

Menlo Capital Group LLC


Bob Hemati
(415) 762-8200

1417-1431 Jefferson Street


APN: 003 -0071-018-00
003 -0071-017-00

54 residential units
3,000 sq.ft commercial

Ulla-Britt Jonsson,
238-3322

24 325 7th Street*

Mark McClure
(510) 463-6338

325 7th Street


APN:001 -0189-005-00
001 -0189-013-00
001 -0189-014-01

382 residential units


9,000 sq.ft. commercial

Heather Klein
238-3659

Approved 07/09/08. NEPA


completed. Building Permit
#B1101888. Extension granted on
1/15/13 until 12/31/13.
NOP published 12/18/07. DEIR
published 10/18/10. FEIR published
06/30/11. Planning Commission
approval and certification of the FEIR
07/20/11. Extension granted on
2/24/13 until 12/31/14.

25 2850 Hannah Street

Marc Babsin
(415)489-1313

90 residential units
2,800 sq.ft commercial

Peterson Vollmann
238-6167

Approved 10/25/2013.

26 Creekside Mixed Use Project

Nautilus Group
Jason Laub
(510) 345-5593

2850 Hannah Street


APN: 007 -0589-029-00
007 -0589-023-00
5132 Telegraph Ave
APN: 014 -1226-013-00

120 residential units


7,700 sq.ft commercial

Darin Ranelletti
238-3663

27 Wattling Street

Phil Lesser
(650) 347-6014

3927 Wattling Street


APN: 033-2170-003-00

18 condominium units
61 townhome units

Heather Klein
238-3659

28 2538 Telegraph Ave*

Rina Davis
2538 Telegraph LLC
(510) 390-4408

2538 Telegraph Ave


437 26th St
APN: 009 -0683-021-01
009 -0683-024-00

97 residential units
9,000 sq.ft. commercial

Catherine Payne,
238-6168

NOP published 12/21/07. DEIR


published 08/15/08. Planning
Commission approval and
certification of FEIR 11/19/08.
Extension granted 01/6/2014 until
12/31/14.
Planning Commission approval and
certification of FEIR on 06/18/08.
Revisions submitted 10/20/10.
Revisions approved 1/18/11.
Extension granted 12/19/13 until
12/31/14.
Planning Commission approval
01/04/06. TPM granted 02/19/09.
Extension granted 12/31/13 until
12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 4

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
29 4801 Shattuck Ave

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Steven Tiffin
(510) 550-4200

4801 Shattuck Ave


APN: 013-1162-009-01
013-1162-009-02
013-1162-010-00

44 residential units

Peterson Vollmann
238-6167

Planning Commission approval


04/04/07. Appeal denied by City
Council 07/17/07. Litigation ruling in
favor of project. Extension granted
12/3/13 until 12/31/14.

30 Hollis 34

Kathy Kuhler
Dogtown Development
(510) 428-1714

3241 Hollis
Entire Block of 007-0619

124 live/work units

Peterson Vollmann
238-6167

Planning Commission approval


10/18/06. TPM approval 10/18/06.
Extension granted on 12/17/13 until
12/31/14.

31 51st & Telegraph, Civiq

Jason Laub
Nautilus Group
(510) 345-5593

Area bounded by Telegraph,


51st and Clark Streets
APN: Multiple

68 residential units
Less than 3,000 sq.ft
commercial

Darin Ranelletti
238-3663

Planning Commission approval


1/18/06. Appealed to City Council.
Appeal withdrawn at City Council
03/21/06. Extension granted 01/14/13
until 12/31/14.

32 2116 Brush Street

Everett Cleveland
EBALDC
(510) 287-5353

2101-2116 Brush Street;


760 22nd Street
APN: 003 -0025-010-00 thru
011-00
003-0035-006-00 thru 005-00
003-0023-007-01 thru 011-02

Parcel A
63 residential units
Parcel B
18 residential units
Parcel C
65 residential units

Heather Klein
238-3659

Planning Commission approval


02/07/07. Extension granted 12/10/13
until 12/31/14.

33 Valdez & 23rd Street Project*

Jens Hillmer
City of Oakland
(510) 238-3317

281 residential units


500 car parking structure
including 250 public spaces
12,000 sq.ft retail

Heather Klein
238-3659

Planning Commission approval


12/07/05. TPM approval 02/28/06.
Extension granted 12/19/13 until
12/31/14.

34 Emerald Parc

Tom Dolan
(510) 839-7200

Valdez St./Webster/23rd
St./24th Streets
APN: 008-0668-004-00; 0080668-009-07
008-0668-005-00
2400 Filbert Street
APN: 005-0433-018-04

Peterson Vollmann
238-6167

35 3884 Martin Luther King Jr.


Way

Neil Cotter
(650) 259-9303

40 residential units

Planning Commission approval


11/16/05. Appeal denied by City
Council 02/21/06. Extension granted
1/10/14 until 12/31/14.
Planning Commission approval
9/20/06. Extension granted 1/8/14
until 12/31/14.

3884 Martin Luther King Jr.


Way
APN: 012-0968-031-00

55 townhomes

Darin Ranelletti
238-3663

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 5

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

David Eckert
(510) 339-4720

14-40 Siena Dr
APN: 040A-3848-006 through
040A-3848-026

22 single-family homes

Heather Klein
238-3659

DEIR published 01/05/05; FEIR


published 2/18/05. Planning
Commission certification and
approval of the FEIR 03/02/05; TTM
approval 06/1/05. City Council
GHAD approval 12/05/06. Extension
granted 12/13/13 until
12/31/14.Application filed 10/13 to
GHAD to amend the project to
remove the GHAD condition.

Madison Park Financial


Bob Huff
(510) 452-2944

1032 39th Street


APN: 012 -0953-027-00

25 residential units in Oakland


75 residential units in
Emeryville

Catherine Payne
238-6168
Miroo Desai
Emeryville Senior
Planner
(510) 596-3785

38 Ave Vista
(formerly 460 Grand Ave)

Bridge Housing
Joseph McCarthy
(415) 989-1111

460 Grand Ave


APN: 010-0779-012-00
010-0779-014-01
010-0779-015-01

68 Residential units
Estimated 16 million dollars
project cost

Darin Ranelletti,
238-3663

39 Monte Vista Villas


(formerly Leona Quarry)

Discovery Builders
Dana Owyoung
(925) 682-6419

7100 Mountain Boulevard


APN: 037A-3151-001-01

123 residential units

Bill Quesada,
Building Services,
238-6345

Oakland Planning Commission


12/3/08. Emeryville City Council
approval 01/20/08. Extension granted
10/12/12 until 12/31/14. Emeryville
has building permit authority;
Building permits issued; Under
construction.
Design Review Committee 02/22/06.
Planning Commission approval
06/07/06. Appeal denied by City
Council 07/18/06. Building Permit #
B1301912 issued 12/6/2013. Under
construction.
City Council approval 12/03/02. City
Council re-approval 02/17/04. Other
Monte Vista Villas projects complete.
Multiple Building Permits. Under
construction.

40 Red Star

National Affordable
Communities
David Booker
(949) 222-9119

1396 5th Street


APN: 004-0069-004-00

119 affordable senior units


3,300 sq.ft. commercial
Estimated 15 million dollars
project cost

Darin Ranelletti
238-3663

PROJECT NAME
RESIDENTIAL PROJECTS
Application Approved
36 Siena Hills

Under Construction
37 ~1032 39th Street

APPLICANT CONTACT

DESCRIPTION

CITY CONTACT

STATUS

Planning Commission approval


06/17/05. Revised project submitted
04/16/08. Building Permit #
B1004649. Under construction.
Construction delay due to fire in June
2012.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 6

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

RESIDENTIAL PROJECTS
Under Construction
41 Cathedral Gardens *

AEH Housing
Benny Kwong
(415)295-8857

42 116 E 15th Street

SAHA
Cindy Heavens
(510)647-0700

2126 M L King Jr Way


616 21st St.
620 21st St.
APN:008 -0659-023-00
008 -0647-016-00
008 -0647-017-00
116 E 15th Street, 1507 2nd
Ave, 1521 2nd Ave
APN: 020 -0181-016-00
020 -0181-013-01
020 -0181-005-01

100 affordable housing units


Rehabilitation of the Rectory
building
Estimated 19 million dollars
project cost

Peterson Vollmann
238-6167

Planning Commission approval


07/20/10. Building permits issued
(B1104230, B1104231, B1202305).
Under construction.

92 affordable senior units


Estimated 13.5 million dollars
project cost

Aubrey Rose
238-2071

Planning Commission approval


04/27/11. Building permit #
B1203644 issued 4/29/13. Under
construction.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 7

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Pre-Application Discussions
43 51st & Telegraph, Civiq

44 ~2315 Valdez*

45 ~23rd & Valdez Streets*

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

5110 Telegraph, LLC


Roy Alper
(510) 550-7175

5110 Telegraph Ave


APN: 014 -1226-009-02

TDP-Webster LLC
Stephanie Hill
(415)381-3001
WP West Acquisitions LLC
Brian Pianca
(415) 888-8075

2315 Valdez Street


APN: 008-0668-009-07

2302 Valdez Street


APN: 008-0669-009: -010: 012; -013; -014; -015; -016; & -

3073-3093 Broadway
APN: 009-0705-002-02; -00201; -001-04; & -001-08

Wood Street Development


Area 8
APN: 018-0310-003-08; 0180310-003-09; 018-0310-003-10; 018-0310-003--11
167 acre site
8750 Mountain Blvd.
APN: Multiple

Application Submitted - Under Review


3093 Broadway Holdings LLC
46 ~3093 Broadway*
Stephen Siri
(415)262-5156
47 ~Wood Street Development.
Area 8
Phase 1

Holliday Development
Kevin Brown
(510)588-5134

48 Oak Knoll Redevelopment


Project

SunCal Oak Knoll LLC


Pat Kelliher
(510)251-0711

DESCRIPTION

Retain previously approved


entitlements
Option 2
Increase ground floor retail to
19,600 sq.ft.
100 residential units
60,000 sq.ft of office
235 residential units
15,000 sq. ft. commercial

CITY CONTACT

STATUS

Catherine Payne
238-6168

Pre-application filed.

Peterson Vollmann
238-6167

Pre-application filed

193 residential units


29,000 sq. ft. retail

Peterson Vollmann
238-6167

Pre-application filed

423 residential units


22,000 sq. ft. commercial

Peterson Vollmann
238-6167

Application filed.

235 residential units


18,812 sq.ft. commercial

Maurice BrenyahAddow
238-6342

Application filed.

960 residential units (408 SFD, Peterson Vollmann


248 townhomes, 304
238-6167
condominiums)
82,000 sq.ft. commercial

Request for General Plan conformity


05/06. Director's determination of
General Plan conformity 05/16/06.
Request for amended General Plan
conformity 12/06. Director's
determination of amended General
Plan conformity 12/20/06. NOP and
Initial Study for Supplemental EIR
issued 02/08/07. Planning
Commission denied the Appeal and
upheld the General Plan
determination 03/07/07. SEIR
published 09/06/07. Public hearing
for Draft SEIR 10/10/07. SunCal
requested no further work Fall 2008.
Inactive.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 8

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Application Approved
49 ~Jack London Square
Redevelopment

APPLICANT CONTACT

Jack London Square Partners,


Dean Rubinson,
(415)391-9800

LOCATION
(ADDRESS AND/OR APN)

Eight Development areas


within Jack London Square
bounded by Alice, 2nd,
Harrison, and Embarcadero.
APN - Multiple

COUNCIL
DISTRICT

CITY CONTACT

STATUS

Master PlanCatherine Payne


1.2 million S.F. of mixed-use
238-6168
retail, commercial, and office
Sites A-B,D,E,H, I: (1,700 seat
movie theater, 250 room hotel,
supermarkets, restaurants, and
offices)
66 Franklin (Haslett Building)
Residential option for 665 units
on parcels D and F2

DEIR published 09/08/03. FEIR


published 2/11/04. Planning
Commission approval and
certification of FEIR 03/17/04. City
Council approval 04/04. Application
for sites D and F2 and all other sites
for removal of office cap and
extension of the DA term currently
under review. ZUC hearing on
1/15/13. DRC hearing on 12/18/13.
Revision to PUD, GPA and associate
permits approved 09/23/14.

General Plan Amendment from Catherine Payne


Central City East
238-6168
Redevelopment Plan
Amendment and Central District
Urban Renewal Plan
Amendment
New Planned Waterfront
Zoning District
Zoning Map Amendments
3,100 residential units
200,000 sq.ft. commercial
3,950 structured parking spaces
29.9 acres public open space
2 renovated marinas; 170 boat
slips
wetlands restoration area

DEIR published 09/01/05. FEIR


published 02/01/06.Planning
Commission approval and
certification of FEIR 03/15/06.
Appeal filed 3/24/06. City Council
denial of the appeal and approval of
the project, amendments, rezoning
06/20/06 and 07/18/06.Revised EIR
published 09/30/08. Revised EIR
certified by City Council on 1/20/09.
Revision to PDP, FDP for Phase 1
streets & infrastructure, and TDM to
Planning Commission 11/05/14.

177,600 sq.ft. of office


4,710 sq.ft. ground floor retail
Structured parking
Alternative approved for 254
residential units with ground
floor retail

Approved 10/00. All residential


alternative approved by Planning
Commission 10/01. Planning
Commission re-approval 05/04/05.
Vesting TPM approved 11/21/06.
Extension granted 12/20/13 until
12/31/14.

50 ~Brooklyn Basin (formerly Oak Oakland Harbor Partners, LLC


to Ninth Mixed Use)
Patrick Van Ness
(925) 463-1122

64.2 acre waterfront site


bounded by Fallon Street,
Embarcadero Road, 10th Ave.,
and the Oakland Estuary
APN: 0430-001-02, 0430-00104 (por), 0460-003,004,0465002, 0470-002 (por).

3&2

51 1640 Broadway Mixed Use


Project*

1640 Broadway
APN: 008-0622-001-02, 0080622-001-03, 008-0622-00104, 008-0622-001-05

Joe Hernon
(011) 353-868-394799

DESCRIPTION

Heather Klein
238-3659

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 9

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
MIXED-USE PROJECTS
Application Approved
52 188 11th Street*

53 Mandela Transit Village

PROJECT NAME
MIXED-USE PROJECTS
Projects Under Construction
54 ~Broadway West Grand
(formerly known as Negherbon
Mixed Use Project)*

55 ~Macarthur BART Transit


Village

APPLICANT CONTACT

EBALDC
Ener Chu
(510) 287-5353

Capital Stone Group


Dr. Thomas Casey
(510) 689-8094

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

176 11th Street, 198 11th


Street, 1110 Jackson
APN: 002 -0081-008-00
002-0081-007-00
002-0081-002-00
1357 5th Street
APN 018-0390-010-07

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

99 affordable apartment units


18,000 sq.ft health clinic and
commercial

Peterson Vollmann
238-6167

Approved administratively 11/24/10.


Extension granted on 1/14/13 until
12/31/14.

120 residential units


38,500 sq.ft. commercial

Darin Ranelletti
238-3663

Planning Commission approval


8/6/03. Planning Commission reapproval 2/18/09. Extension granted
02/18/10 until 12/31/11.

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

Signature Properties
Doug Park
(925) 463-1122

2345 Broadway
APN: 008 0666-007-00

Parcel B
367 residential units
8,500 sq.ft. retail

Catherine Payne
238-6168

Macarthur Transit Community


Partners, LLC
Deborah Castles
(510) 273-2002

7 acre site located between


Telegraph, 40th, and Macarthur
and Highway 24

624 residential units


42,500 sq.ft. retail/commercial
Estimated 18 million dollars
project cost

Catherine Payne
238-6168
Lynn Warner
238-6983

STATUS

DEIR published 08/26/04. Planning


Commission approval and
certification of FEIR 10/06/04. TTM
approval 06/20/06. Amendments filed
for Parcel B. Planning Commission
approval 06/04/08.PUD Application
for revising Phase II. Application
approved on 8/28/13. Project under
construction.
Planning Commission approval and
certification of the FEIR 06/04/08.
City Council approval of the
Rezoning 07/15/08. Owner
Participation Agreement and
Development Agreement approval by
City Council 07/21/09. Stage 1 FDP
City Council approval 12/21/10. Stage
2 FDP application filed 12/17/10.
Planning Commission approval Stage
2 FDP 04/06/11. City Council
approval of Stage 2 FDP 05/17/11.
Building permit #B1300446 granted
on 9/16/2013. Phase I under
construction. Application filed for
Phase 2. DRC 11/12/14 pending.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 10

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Pre-Application Discussions
Joe DeCredico
56 Spanish Speaking Citizens
Foundation
(510)883-1521
Application Submitted - Under Review
Philips/Perkins Eastman
57 ~3431 Foothill Blvd
Tania Philips
(415) 926-7909

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

1470 Fruitvale Ave


APN: 033 -2121-023-00

3431 Foothill Blvd


APN: 033-2127-015-01

DESCRIPTION

40,000 sq.ft. civic building

CITY CONTACT

Neil Gray
238-3878

STATUS

Pre-application filed.

84 assisted living units


Aubrey Rose
22 memory care units
238-2071
31 skilled nursing units
6 on-site living units for priests

Application filed. Planning


Commission review 9/15/14,
remanded to DRC 10/22/14.

58 ~Children's Hospital

Doug Nelson
(510) 428-3066

5714 Martin Luther King Jr.


Way
Bounded by Martin Luther
King Jr. Way, 53rd St, and
Highway 24.
APN: multiple

Demolition of 2-residences,
Heather Klein
trailers, and helipad structure
238-3659
Construction of:
89,100 sq.ft. out-patient building
4,900 sq.ft. central plant
14,500 sq.ft. family residence
31,300 sq.ft. clinical building
43,500 sq.ft.link building
101,000 sq.ft. Acute Care
Pavilion
4 level parking structure with
334 stalls
Interior renovations

Application filed. NOP published on


7/26/13. DEIR hearings before
LPAB 9/8/14, PC 9/17/2014, and
BPAC on 9/18/2014. FEIR
preparation underway.

59 Head Royce School

Dennis Malone
(510) 531-1300

4315 Lincoln Ave.


APN: 029A-1367-006-01

Amendments to the PUD

Heather Klein
238-3659

Application filed.

60 1800 San Pablo

Sid Afshar
Sunfield Development LLC
(510) 452-5555

1800 San Pablo Ave


APN: 008 -0642-006-00

120,000 sq.ft. commercial


309 auto fee parking spaces

Lynn Warner
238-6983

NOP published 10/7/11.DEIR


published 7/6/12. FSEIR certified
1/14/12. Project has not been
approved.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 11

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Application Approved
John Nguyen
61 ~Skilled Nursing Facility/
Medical Office/ Retail Sales
(510)538-9991

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

1230 37th Ave


APN: 033-2156-023

136 assisted living beds


13,334 sq.ft. medical office
3,316 sq.ft. retail

Neil Gray
238-3878

Planning Commission approved


08/06/14.

62 ~Safeway (Broadway @ Pleasant Project Development Centers


Valley)
Alvin B. Chan, Inc.
(925) 738-1400

5050-5100 Broadway
APN: 014-1242-002-03, 0141242-005-07

Redevelopment of existing
shopping center with new
331,000 sq.ft. shopping center

Darin Ranelletti
238-3663

63 Oakland Zoo (Master Plan


Amendment): Phase II

East Bay Zoological Society


Nik Haas-Dejehia
(510) 623-9525 x138

9777 Golf Links Rd


APN - multiple

Revisions to the Oakland Zoo


Darin Ranelletti
Master Plan previously approved 238-3663
in 1998

64 St. John's Episcopal Church


Parking and New Sanctuary

St. John's Episcopal Church


Jerry Moran
(510) 531-0980

5928 Thornhill Dr, &


1707 Gouldin Rd
APN: 048F-7390-003-03 &
048F-7390-004-09

Demolition of house at 5928


Thornhill Drive
new access bridge over creek
creek rehabilitation/bank
stabilization
5,500 sq.ft. sanctuary

Caesar Quitevis
238-6343

65 City Center T5/T6 (2005)

Shorenstein Realty Investors


Nick Loukianoff
(415) 772-7062

11th/12th/Clay/Broadway
APN: 002-0097-038-00
through 002-0097-040-00

600,000 sq.ft. office


7,500 sq.ft. commercial

Lynn Warner
238-6983

NOP published 06/26/09. DEIR


published 01/11/13. Planning
Commission approval and
certification of FEIR 9/25/13.
Approved on 6/21/2011. Phase I
(Veterinary Hospital) completed in
year 2013. Phase II (California
Exhibit) approved.
NOP and Initial Study published
03/06/08. DEIR published 11/17/10.
FEIR published 5/23/12. Planning
Commission approval and
certification of FEIR 6/6/12.
Easement proposals between
applicant and appellant neighbors
filed with City. Pending resolution to
revise SCA between appellants and
church.
Planning Commission approval of
PPUD 4/00. City in the process of
renegotiating City Center DDA
extending the completion
requirements.

66 Replacement of Embarcadero
Bridge

City of Oakland
Nader Rabahat
(510)238-6605

80 Fallon Street, 1 5th Ave


APN: 000O-0430-001-04
000O-0430-001-02

Replacement of the
Embarcadero Bridge over Lake
Merritt Channel

Michael Bradley
238-6935

Creek Protection Permit approved


01/03/11.

67 1100 Broadway

SKS Investments
Steven Wolmark
(415)421-8200

1100 Broadway
APN:002-0051-006-02

Rehabilitation of the Key


System Building
310,285 sq.ft. of office
9,810 sq.ft. of retail.

Heather Klein
238-3659

Planning Commission approval and


Addendum certification 02/13/08.
Extension granted 02/14 until
12/31/14.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 12

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

300 Lakeside Drive


Area bounded by 20th and 21st
Streets and Webster and
Harrison Streets

Lowney Architects
Daniel Backman
(510)836-5400

3001-3039 Broadway
APN: 009 -0705-004-00, 009 0705-005-00,
009 -0705007-00

70 ~Safeway (College Ave)

Ken Lowney
(510)836-5400

6310 College Ave


APN: 048A-7070-001-01

71 ~2134-2148 Broadway /
Kapor Center

Ben Hidalgo /
Fougeron Architects
(415) 641-5744

2134-2148 Broadway
APN:008-0650-001-00

72 Oakland Army Base

CCIG Prologis; City of


Oakland; Doug Cole
(510)238-7661

Maritime St. and W. Grand


Ave.
APN: multiple

PROJECT NAME

APPLICANT CONTACT

COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS


Application Approved
Tomas Schoenberg
68 Kaiser Center
The SWIG Company
(415)291-1100

Projects Under Construction


69 ~Shops at Broadway

DESCRIPTION

CITY CONTACT

STATUS

Demolition of 280,000 S.F.


2 new towers:42-stories with
780,000 S.F. office
34-stories with 565,000 S.F.
office and 22,000 S.F. retail

Heather Klein
238-3659

NOP published 05/22/08.


Environmental Scoping Session
before the LPAB 06/09/08 and
Planning Commission 06/18/08.
DEIR published 8/23/10. LPAB
DEIR hearing 10/4/10. PC DEIR
hearing 10/6/10. FEIR published
04/21/11. Planning Commission
approval and FEIR certification
05/04/11. Extension granted 04/14
until 12/31/14.

39,000 sq.ft. retail


Estimated 5.2 million dollar
project cost.

Peterson Vollmann
238-6167

NOP published 07/27/12. Project


approved and FEIR certified
12/18/2013. Building permit #
B1304954 issued. Under construction

New 45,000 sq.ft. grocery store Peterson Vollmann


and ground floor retail with
238-6167
additional 9,500 sq.ft. of
commercial
Estimated project cost 9.8
Million Dollars ( $ 8.6 million
cost of the store and $ 1.2 million
of the retail building)

NOP published 10/30/09. DEIR


published 07/1/11. FEIR published
7/6/12. Planning Commission
approval and certification of FEIR
7/25/12. City Council approved
revised project 12/18/12. Building
permit # B1301812.Project under
construction. Retail building permit #
B1304086 issued. Under
construction.
Zoning Manager approval 10/25/13.
Building permit #B1400472 issued
09/18/14. Under construction.

3-Jan

4-story addition that totals a


Mike Rivera
44,000 sf. ft. of commercial floor 238-6417
area.
Estimated 10 million dollars
project cost

Redevelop 160 acres with


approx. 1.5 million sq. ft. of new
industrial space.
Estimated 500 million dollar
project cost

Darin Ranelletti,
510-238-3663; Doug
Cole,
238-7661

Master Plan and LDDA approved


June 2012. Rezoning approved 7/13.
Horizontal infrastructure
improvements under construction.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 13

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
APPLICANT CONTACT
COMMERCIAL, INDUSTRIAL, CIVIC PROJECTS
Projects Under Construction
Alta Bates Summit Medical
73 Alta Bates Summit Medical
Center- Summit Campus Master Center
Plan
Shahrokh Sayadi
(415)203-6345

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

23-acre campus generally


between Telegraph and
Webster, and between 30th
Street and 34th Street
APN - Multiple

ABSMC Master Plan


Bill Quesada,
Phase 2
Building Services,
Longer-term campus-wide
238-6345
improvements, new medical
office buildings, classrooms and
closure of a portion of Summit St
for new campus plaza.

Application filed. NOP published


01/23/09. DEIR published 12/21/09.
FEIR published 5/7/10. Planning
Commission approval 05/19/10.
Appealed to City Council. Council
denial of the appeal and approval of
the project 07/06/10. Building permit
B#1001826. Phase II under review.

Revision in program from 450


residential units to 600,000 S.F.
office.

Lynn Warner
238-6983

Master Plan for new hospital:


1,216 space parking garage
Hospital building of about
1.06 M sf. ft.
Central Utility Plant

Bill Quesada,
Building Services,
238-6345

Head Start Center

Aubrey Rose
238-2071

Revision from residential units to


office square footage. Planning
Commission approval and Addendum
certification 12/05/07. Building
permit #B0803952. Project stopped
construction.
Planning Commission certification
and approval of FEIR 06/07/06. City
Council approval of GPA, RPA and
re-zoning 6/27/06. Planning
Commission approval of the design of
Phase I, MOB 11/1/06. Planning
Commission approval of Design
Review for Phase 2, Hospital
11/19/08. Building permit
B#0902127 for the parking garage.
Main hospital permit granted under
OSHPD. Phase III for new
administrative offices to be
submitted.
Planning Commission approval
05/04/11. Building permit
#B1004457 issued. Project under
construction.

74 City Center T12 (2005)*

Shorenstein Realty Investors


Tom Hart
(415) 772-7000

11th/12th/MLK/Jefferson
APN: 002-0027-007-00

75 Kaiser Permanente

Kaiser Permanente
Judy DeVries
(510) 752-2004

Generally the area surrounding


the intersection of Broadway
and Macarthur Boulevard.

76 Foothill Square Redevelopment


Project

Jay-Phares Corp.
John Jay
(510)562-9500

10700 MacArthur Boulevard


APN: 047 -5589-001-00
047 -5589-001-06
047 -5589-001-05
047 -5589-001-04

1 and 3

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 14

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
1 ~California Hotel

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

EBALDC
Natalie Bonnewit
(510)287-5353

3501 San Pablo Ave


APN: 005 -0479-002-01

Rehabilitation and conversion


Jason Madani
of the existing studio and
238-4790
affordable units and ground floor
commercial into 137 affordable
apartments.

Project completed in year 2014.

2 ~MacArthur Blvd Senior


Apartments

Kristen McLane
(909) 624-6222

10920 MacArthur Blvd


APN: 047-5583-008-02

33 senior apartment units

Aubrey Rose
238-2071

Project completed in year 2014.

3 ~Lion Creek Crossing


(formerly Coliseum Gardens)

EBALDC
Carlos Castellmos
(510) 287-5335

66th Ave. at San Leandro


Street
APN: Multiple

Phase V
128 rental senior housing units

Catherine Payne
238-6168

Project completed in year 2014.

4 1614 Campbell Street

John Protopappas
Madison Park
(510) 452-2944

1614 Campbell St
APN:007 -0560-001-02

92 live/work conversion

Peterson Vollmann
238-6167

Project completed in year 2014.

5 720 E 11th Street

Robert Stevenson
(415)786-6631

720 E 11th Street


APN: 019 -0033-010-02

Moe Hackett
238-3973

Project completed in year 2012.

6 116 6th St*

Affordable Housing Associates 116 6th Street


Adam Deromedi
609 6th Street
(510) 649-8500
APN: 001-0173-009-00

Heather Klein
238-3659

Project completed in year 2012.

7 Arcadia Park

Pulte Homes
Andy Cost
(925) 249-3200

98th Ave. at San Leandro St.,


APN - multiple

8 City Walk
City Center T10 (2005)*

Alta City Walk, LL


(415) 888-8075

13th/14th/MLK/Jefferson
APN: 002-0029-001-00

9 Lion Creek Crossing


(formerly Coliseum Gardens)

EBALDC
Carlos Castellmos
(510) 287-5335

66th Ave. at San Leandro


Street
APN-Multiple

55 affordable units

70 senior affordable apartment


units

168 residential units (previously Darin Ranelletti


approved for 366 residential
238-3663
units)

3,000 sq.ft. retail


252 residential units

283 residential units


7,500 sq.ft of civic and
commercial space
park

Project completed in year 2012.

Don Smith, Bldg.


Permits,
238-4778

Project completed in year 2012.

Catherine Payne
238-6168

Phase I-IV completed in year 2012.


Final Phase V under construction
09/14

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 15

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
10 St Joseph's

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

2647 International Blvd


APN: 025 -0701-004-01

Citizens Housing Corporation


Kaori Tokunhea
(415) 421-8605
Bridge Housing
12 Ironhorse Apartments at
Central Station (formerly 14th Ben Metcalf
Street Apartments -Wood Street) (415) 989-1111
Pulte Homes
13 Zephyr Gate -Wood Street
(925) 249-3268

1720 Macarthur Boulevard


APN: 023-0494-001-07

Portions of APN: 0006-0029001 and 0000-0315-006.

Rehabilitation of the historic


building
84 units senior housing
15,000 sq.ft office
Estimated 12 million dollar
project cost
Phase II
83 apartments units (new
construction)
99 Affordable housing units

Wood Street
APN: 006-0029-001-00

14 3860 Martin Luther King Jr.


Way

Neil Cotter
(650) 259-9303

34 residential units

15 Jackson Courtyard
Condominiums*
16 630 Thomas Berkley Square
Housing *

Gerald Green
(415) 377-5286
SUDA/
Alan Dones
(510) 715-3491

3860 & 3880 Martin Luther


King Jr. Way
APN: 012-0968-030-01
012-0968-031-00
210 14th Street
APN 008 0627-020-00
630 Thomas L. Berkley Way
APN: N/A - TPM7541 Parcel 3

45 condominium units

17 1755 Broadway*

1755 Broadway LLC


Andrew Brog
(310) 963-7878
Deni Adaniya
(510) 841.4410, ext.19

1755 Broadway
APN:008 -0640-005-00

Uptown Parcel 6
555-19th Street, 550-18th
Street
APN 008-0642-017
311 2nd Street
APN:001 -0149-007-00

Conversion of floors 2-5 of


office to 24 live/work
condominiums.
80 residential units
2500 sq.ft.
Childcare
Art space
105 residential condominium
units

124 Grand Ave and 2264


Webster St.
APN: 008-0655-007-00 &
008-0655-009-01

BRIDGE Housing Corp


Smitha Seshadri
(415) 989-1111

11 Altenheim Senior Housing

18 Fox Courts

19 311 2nd St*

Embarcadero Pacific
Michael Reynolds
(510) 444-4064

20 100 Grand*

Essex Property Trust


John Eudy
(650) 849-1600

130 residential condominium


units

88 residential condominium
units
3 commercial spaces

241 residential units

CITY CONTACT

STATUS

Robert Merkamp
238-6283

Project completed in year 2011.

Robert Merkamp
238-6283

Project completed in year 2010.

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits
238-4778
Darin Ranelletti,
238-3663

Project completed in year 2009.

Heather Klein
238-3659
Heather Klein
238-3659

Project completed in year 2009.

Mike Rivera,
238-6417

Project completed in year 2009.

Catherine Payne
238-6168

Project completed in year 2009.

Heather Klein
238-3659

Project completed in year 2009.

Darin Ranelletti
238-3663

Project completed in year 2009.

Project completed in year 2009.

Project completed in year 2009.

Project completed in year 2009.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 16

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
21 Pacific Cannery Lofts

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Project completed in year 2009.

Neil Gray
238-3878

Project completed in year 2009.

Adaptive re-use of historic


building into 24 condominiums
and ground floor retail

Heather Klein,
238-3659

Project completed in year 2008.

200/210/228 Broadway
APN: 001 0141-002-01
001 0141-011-00

Project completed in year 2008.

Pyatok Architects Inc


Gary Struthers
(510) 465-7010

901& 907 Jefferson Street


APN: 002-0025-007-00
through 002-0025-009-00

75 condominium units
1,030 sq.ft. retail

Heather Klein,
238-3659
Don Smith, Bldg.
Permits
238-4778
Darin Ranelletti,
238-3663

BayRock Residential
Marilyn Ponte
(510) 594-8811
A. F. Evans
Steve Kuklin
(415) 591-2204

620-636 Broadway
APN: 001-0197-002-00

3,600 sq.ft retail


157 condominium units

Heather Klein
238-3659

Project completed in year 2008.

8th/9th/Clay and Jefferson


801-807 Clay Street
APN: 001-0209-001, 002, 003,
004
Between Rilea Way and
Greenridge Drive on Keller
Ave.
APN: 04A-3457-033-01

Phase II
72-86 condominium units
14,000 sq.ft flexible space

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2007.

Heather Klein
238-3659

Project completed in year 2007.

Catherine Payne,
238-6168

Project completed in year 2007.

Bill Quesada,
Building Services,
238-6345

Project completed in year 2007.

22 Madison Lofts*

Affordable Housing Associates 160 14th St.


Mark Garrel
APN: 008-0628-005-01
(510) 649-8500

23 Packard Lofts* (formerly 2355


Broadway)

2355 Broadway LLC


John Protopappas
(510) 452-2944

2355 Broadway
APN: 008-0666-006-00

24 The Ellington* (formerly


3rd/Broadway Mixed Use)

The Emerald Fund


Marc Babsin
415-777-2914

25 901 Jefferson*

PCL Associates
Cal Inman
(510)547-2122

28 Siena Hills

Hillside Homes
Edward Patmont
(925) 946-0583

29 Uptown Project *

Forest City Residential, Inc.


Susan Smartt
(415) 836-5980

Area bounded by San Pablo,


Telegraph, 18th and 20th
Streets
APN - Multiple

The DeSilva Group


David Chapman
(925) 828-7999

7100 Mountain Boulevard


APN: 037A-3151-001-01

30 Monte Vista Villas


(formerly Leona Quarry)

STATUS

Don Smith, Bldg.


Permits
238-4778

27 Housewives Market*

CITY CONTACT

99 condo warehouse lofts


45 live/work lofts
15 townhouse lofts
4 work/live lofts
(part Wood Street Development)
Approximately 76 condominium
units
2,666 sq.ft of retail

1111-1119 Pine Street


APN: 006-0029-002-00

26 8 Orchids*

DESCRIPTION

134 residential units


11,000 sq.ft. retail

10 single-family homes

Parcel I
Parcel II
Parcel III
665 residential units

320 residential units


3,350 sq.ft community center

Project completed in year 2008.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 17

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
31 288 Third Street*
(formally 300 Harrison Street)
32 Altenheim Senior Housing
(Phase I)
33 206 Second Street*

34 1511 Jefferson *

35 Ford Street Lofts

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

91 condominiums units

Scott Miller
238-2235

Project completed in year 2007.

93 apartment units
Rehabilitation of existing
historic buildings

Scott Miller
238-2235

Phase I completed in year 2007.

2,380 sq.ft of live/work


1,310 sq.ft of retail space
75 condominium units

Heather Klein
238-3659

Project completed in year 2007.

Robert Merkamp
238-6283

Project completed in year 2007.

Scott Miller
238-2235

Project completed in year 2007.

Signature Properties
Chris Weekley
(925) 463-1122
Citizens Housing Corporation
Kaori Tokunhea
(415) 421-8605

300 Harrison Street


APN: 001-0153-016

1720 Macarthur Boulevard


APN: 023-0494-001-07

MV Jackson
Robison Brown
(415) 284-1200

206 Second Street


APN: 001-0157-003-00

Meritage Homes of California


Randall Harris
(925) 256-6042
Signature Properties
(905) 436-9350

1511 Jefferson Street


APN:003-0071-006-00

3041, 3061, and 3065 Ford


Street
APN: 025-0666-002-00
8th/9th/Clay and Jefferson
801-807 Clay Street
APN: 001-0209-001, 002, 003,
004

Phase I
Don Smith,
Between 102 -111 condominium Bldg. Permits
units
238-4778
11,000 sq.ft flexible space
3,000 sq.ft of retail
Structured parking

Project completed in year 2007.

41st and Adeline; land area is


in both Oakland and
Emeryville. 1007 41st Street
APN: 012 1022-001-00
6549 San Pablo Ave
APN: 016-1506-001-02

62 lot units on former


office/warehouse site

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2007.

72 condominium units

Lynn Warner
238-6983

Project completed in year 2006.

94 residential units
9,800 sq.ft office

Scott Miller,
238-2235
Don Smith, Bldg.
Permits
238-4778
Robert Merkamp
238-6283

Project completed in year 2006.

Heather Klein
238-3659

Project completed in year 2006.

78 condominium units

81 condominium residential
units

36 Housewives Market*

A.F. Evans
Steve Kuklin
(415) 591-2204

37 Green City Loft Project

Green City Development


Martin Samuels
(510) 635-7698

38 66th & San Pablo

The Olson Company


(925) 242-1050

39 Wheelink Project*

Jordan Real Estate


Wayne Jordan
(510) 663-3865

4th and Alice Street; JLS


District
428 Alice Street
APN 001 0155-001-00

40 Lincoln Court Senior Housing

Domus Development
(415) 558-9500

2400 Macarthur Blvd


APN: 029 -0993-020-01

41 Aqua Via*
(Harbor View or Second Street
Lofts)

Urban Developments
Marge Cafarelli
(415) 512-8118

121-129 2nd Street


APN: 001-0165-015-00

100 condominium units


5,190 sq.ft of commercial /
office

82 senior housing apartment


units

Project completed in year 2006.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 18

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
42 Cotton Mill Studios

APPLICANT CONTACT

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Tom Dolan Architects


(510) 839-7200

1091 Calcot Place


APN: 019-0055-001-04

74 unit live/work conversion

Robert Merkamp
238-6283

Project completed in year 2006.

43 Glascock Residential Project


The Estuary

Signature Properties
Patrick Van Ness
(925) 463-1122

100 residential units

Scott Miller
238-2235

Project completed in year 2006.

44 Preservation Park III*

Signature Properties
(905) 436-9350

92 residential townhouses

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2006.

45 City Limits Project (Formerly


FABCO)

Pulte Homes
Dennis O'Keefe
(925)249-3218

92 condominium residential
units

Scott Miller
238-2235

Project completed in year 2005.

46 Arioso Project*

SNK Development
(415) 896-1186

2893 Glascock at Derby


4.1 Acres
APN: 025-0674-001-00
025-0674-002-00
025-0674-003-00
11th 12th and MLK on a
vacant parcel
655 12th Street
APN: 002-0021-011-01
002-0021-012-00
1165 and 1249 67th Street west
of San Pablo Ave.
APN: 049-1507-004-00
016 1507-008-03
016 1507-009-02
901 Franklin Street
APN: 002-0096-004-00

88 condominium units
6,000 sq.ft commercial
structured parking

Don Smith, Bldg.


Permits
238-4778

Project completed in year 2005.

9001-9321 MacArthur Blvd.


APN: 047-5484-006-04, 00703, 010-02, 011, 012, 013, 02201, 022-02, 023
Telegraph Ave. and 24th Street
2401 Telegraph Avenue
APN: 008-0675-004-00
1431 8th Street
APN: 004-0067-021-00

78 single family homes

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2004.

50 new residential lots


5,300 sq.ft ground floor retail

Project completed in year 2004.

14 condominium units

Don Smith, Bldg.


Permits
238-4778
Heather Klein
238-3659
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2003.

47 Palm Villas Residential Project

Em Johnson Interest
(510) 839-3057

48 Telegraph Gateway Project *

Tom Dolan Architects


Scott Galka
(510) 839-7200
Bridge Housing
Kristy Wang
(415) 989-1111

49 Mandela Gateway Townhomes

50 Ettie Street/Mandela Parkway

David Baker Architects


(415) 896-6700

2818 Mandela Parkway


APN: 007-0587-002-05

91 live/work units

51 Mandela Gateway Gardens


(formerly Westwood Gardens)

Oakland Housing Authority and 1431 7th Street


Bridge Housing
APN: 004-0067-021-00
Pete Nichol
(415) 989-1111

200 residential units (40 units in Heather Klein


replacement of existing
238-3659
Westwood Gardens) 15,000 sq.ft
of retail space - combination
rental and ownership; Some
live/work units.

Project completed in year 2003.

Project completed in year 2003.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 19

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Residential Projects
52 Durant Square

APPLICANT CONTACT

Signature Properties
(925) 463-1122

53 San Pablo Affordable Senior


Housing

Oakland Community Housing


Inc.
(510) 763-7676
54 Bridge Housing Linden Court Bridge Housing
(415) 989-1111

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

International Blvd. And Durant


Ave.
10970 International Blvd.
APN: 047-5519-043-00

3255 San Pablo Avenue


between 32nd and 34th Streets
APN: 005-0470-017-01
1089 26th Street. Near
McClymonds High School in
West Oakland
2240 Chestnut Street, at West
Grand
APN: 005-0428-001-00

43 new single family


168 new townhouses
40 new live/work (60 total)
Food 4 Less
Renovated building with
continued commercial uses
50+ residential units

Hope IV project in conjunction


with OHA
58 affordable rental housing
units
6 affordable for sale housing
units
14 loft units, 4,000 sq.ft retail
4,000 sq.ft supportive services
270 residential units

DESCRIPTION

Low-income housing (approx.


79 units)

CITY CONTACT

STATUS

Heather Klein
Project completed in year 2003.
238-3659
Bill Quesada, Building
Permits, 238-6345

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits
238-4778
Don Smith, Bldg.
Permits
238-4778

Project completed in year 2003.

Don Smith, Bldg.


Permits
238-4778
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2002.

Project completed in year 2003.

55 Bridge Housing - Chestnut


Court

Bridge Housing
(415) 989-1111

56 The Essex - Lake Merritt*

Lakeshore Partners
Tom Peterson
(510) 444-7191
SNK Development
(415) 896-1186

17th and Lakeshore


108 - 17th Street
APN: 008-0633-002-01
3rd and Jackson Streets
208 Jackson Street
APN:001-0159-006-00

312 units
13,500 sq.ft commercial

58 Safeway Building*

Reynolds & Brown


Dana Perry
(925) 674-8400

4th and Jackson Streets


201 4th Street
APN: 001-0155-008-00

Reuse existing warehouse and


add new top floor for 46
live/work units
4,500 sq.ft commercial
6,500 sq.ft office

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2002.

59 46th Street Lofts


(formerly Flecto Project)

Levin, Menzies, Kelly


Paul Menzies
(925) 937-4111

47th and Adeline; land area is


in both Oakland and
Emeryville.
119 Linden Street
APN: 049-1172-002
013-1172-003
013-1172-004

79 units and 3,000 sq.ft


commercial space
Adaptive reuse of and addition
to the former Flecto building.

Catherine Payne
238-6168

Project completed in year 2006.

57 Allegro Project*

Project completed in year 2003.

Project completed in year 2002.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 20

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014
PROJECT NAME
SUCCESSFUL COMPLETIONS
Mixed-Use Projects
60 Seven Directions

61 Broadway West Grand


(formerly known as Negherbon
Mixed Use Project)*

APPLICANT CONTACT

Pyatok Architects Inc,


Curtis Caton,
(510) 465-7010
Signature Properties
Doug Park
(925) 463-1122

62 Dreyer's Site Residential Lofts*


The Sierra

COD Builders
Kava Massih
(510) 644-1920
63 Fruitvale Transit Village Phase I FDC, Evelyn Johnson,
(510) 535-6911
Commercial, Industrial, and Civic Projects
East Bay Zoological Society
64 ~Oakland Zoo (Master Plan
Amendment) Phase I
Nik Haas-Dejehia
(510) 623-9525 x138
65 ~Foothill Square Redevelopment Jay-Phares Corp.
Project
John Jay
(510)562-9500
Macarthur Transit Community
66 ~Macarthur BART Transit
Village
Partners, LLC
Deborah Castles
Kaiser Permanente
67 ~Kaiser Permanente
Judy DeVries
(510) 752-2004
Alta Bates Summit Medical
68 ~Alta Bates Summit Medical
Center- Summit Campus Master Center
Plan
Shahrokh Sayadi
(415)203-6345

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

2946 International Boulevard


APN: 025-0716-012-00

2345 Broadway
APN: 008 0666-007-00

311 Oak Street


APN: 001-0163-012-00

DESCRIPTION

38 housing units
20,115 S.F. clinic space

CITY CONTACT

STATUS

Robert Merkamp
238-6283

Project completed in year 2008.

Parcel A
132 residential units
21,300 sq.ft. retail

Catherine Payne
238-6168

Project completed in year 2006.

220 units
30,000 sq.ft commercial

Project completed in year 2003.

Fruitvale BART Station

Don Smith, Bldg.


Permits
238-4778
Darin Ranelletti
238-3663

9777 Golf Links Rd


APN - multiple

Darin Ranelletti
238-3663

Phase I (veterinary hospital)


completed in year 2013.

10700 MacArthur Boulevard


APN: 047 -5589-001-00
047 -5589-001-06
7 acre site located between
Telegraph, 40th, and Macarthur
and Highway 24
Generally the area surrounding
the intersection of Broadway
and Macarthur Boulevard.
23-acre campus generally
between Telegraph and
Webster, and between 30th
Street and 34th Street
APN - Multiple

Revisions to the Oakland Zoo


Master Plan previously approved
in 1998
Redevelopment of a commercial
shopping center approx. 13.8
acres
Public Parking Garage

Aubrey Rose
238-2071

Project completed in year 2014.

Catherine Payne
238-6168
Lynn Warner
Bill Quesada,
Building Services,
238-6345
Bill Quesada,
Building Services,
238-6345

Project completed in year 2014.

1 and 3

Masterplan for residential and


commercial/civic use and new
parking structure

Master Plan for new hospital:


1,216 space parking garage
Hospital building of about
ABSMC Master Plan
Phase 1
Demolition of the Merritt
Classroom and other small
buildings
Construction of a 230,000 S.F.
(11-story) acute care hospital
1,090-space (7-story) parking
garage.

Project completed in year 2003.

Phase I and II completed in year


2014.
Phase 1 Project completed in year
2014.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 21

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
69 Lake Merritt Channel Wetland City of Oakland
and Widening Project

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Lake Merritt Channel between


Lake Merritt and I-880
APN: 000O-0450-001, 002,
000O-0455-001-01, 001-07,
008-05,012

70 Aspire Public Schools

Charles Robitaille
925-698-1118

1009 66th Ave


APN:041-4056-003-00

71 Kaiser Permanente

Kaiser Permanente
Judy DeVries
(510) 752-2004

Generally the area surrounding


the intersection of Broadway
and Macarthur Boulevard.

72 Jack London Square


Redevelopment

Jack London Square Partners,


Stuart Richard,
(415)391-9800

Eight Development areas


within Jack London Square
bounded by Alice, 2nd,
Harrison, and Embarcadero.
APN - Multiple

73 Head Royce School

John Malick & Associates


John Malick
(510)595-8042

4315 Lincoln Ave


APN: 029A-1367-004-04

74 Cathedral of Christ the Light

CMA
Eileen Ash
(415) 597-8414

2121 Harrison Street and


Grand Avenue
APN:008-0653-024

1 and 3

DESCRIPTION

Widening and tidal restoration


improvements along Lake Merritt
with the 12th Street
Reconstruction Project, 10th
Street Bridge Project, and Lake
Merritt Channel Improvement
Project at the 7th Street Flood
Control Station.
Demolish vacant industrial
building/construct a school with
420 students

CITY CONTACT

STATUS

Lesley Estes,
Project completed in year
Watershed
2013.
Improvement Program
Supervisor,
238-7431

Aubrey Rose
238-2071

Project completed in year 2011.

Phase I
Scott Gregory
West Broadway Medical Services (contract planner)
Building and Garage
(510) 535-6690
Phase II
Specialty Medical Office Building

Project completed in year 2011.

commercial, office, and parking


Site C (10 Clay Street/505
Embarcadero West) (Ferry
Landing)
Site F (65 Harrison Street) (Jack
London Market)
Development of School
Masterplan

Catherine Payne
238-6168

Site C, G and F completed in year


2009.

Heather Klein
238-3659

Project completed in year 2009.

Catherine Payne
238-6168

Project completed in year 2009.

255,000 sq.ft Cathedral

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 22

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
SUCCESSFUL COMPLETIONS

APPLICANT CONTACT

Commercial, Industrial, and Civic Projects


SUDA/
75 Thomas Berkley Square
North County Center for Self
Sufficiency
Alan Dones
(510) 715-3491

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

San Pablo Ave between MLK


Jr. Way, Thomas L. Berkley
Way, and 21st Street.
630 20th Street
APN: 008-0645-015-01
008-0645-01801 and 02
0080645-019 through 025

114,000 sq.ft office for the


Alameda County Social Services
Division and the North County
Self Sufficiency Center
5,000 sq.ft. of retail

CITY CONTACT

STATUS

Heather Klein
238-3659
Don Smith, Bldg.
Permits
238-4778

Project completed in year 2009.

76 Perkins Street Residential Care

A.F. Evans
John Rimbach
(510) 891-444-7191

468-484 Perkins St.


APN: 010-0767-014-00

56 room care facility for elderly Don Smith, Bldg.


residents
Permits 238-4778

Project completed in year 2009.

77 Cox Cadillac Mixed Use

Bond Company
Robert Bond
(312) 853-0070

Intersection of Harrison St.,


27th and Bay Place
230 Bay Place
APN 010 0795-027-01

56,000 sq.ft commercial


Renovation of historic Cadillac
Showroom

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2008.

Komorous-Towey
Klara Komorous
(510)446-2244
John Sutton
Prentiss Properties
(510)465-2101

66 Franklin Street
APN:001-0060-322

Robert Merkamp
238-6283

Project completed in year 2008.

2100 Franklin Street


APN:008 -0651-003-01

Renovation of existing building


with approximately 95 sq.ft. of
commercial
15,000 sq.ft retail
218,000 sq.ft office

Catherine Payne
238-6168

Project completed in year 2007.

Shorenstein Realty Investors


Nick Loukianoff
(415) 772-7062

11th/12th/Clay/Jefferson
APN: 002-0033-006-00
through 015-00

450,000 sq.ft. office


7,500 sq.ft. retail

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2001.

78 66 Franklin Street*

79 Center 21

80 City Center T9 (2000)

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 23

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
City of Oakland
81 East Oakland Sports Center
Community and Economic
Development Agency
Project Delivery Division
Lyle Oehler
(510) 238-3389

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

Phased Master Plan for a sports Lynn Warner


center at Ira Jinkins Park.
238-6983
Phase 1
26,000:indoor swimming
pool/water slide (natatorium), a
dance/exercise room, a multipurpose room/learning center, and
other accessory activities. If
funded a fitness/weight room and
two outdoor basketball courts
Phase II
23,000 square foot facility and
outdoor amenities

16th and 17th Streets and San


Pablo Avenue
1630 San Pablo
APN: 008 0620-015-00
008 -0620-014-00
008 0620-009-01
Oakport St. at Hassler Way
APN: 034-2295-005-04

California Commercial
Investments
Phil Tagami
(510) 268-8500

83 Lexus Dealership

Lance Gidel
(408) 370-0280

84 Infiniti of Oakland

Hendricks Automotive
Ron Tye
(925) 463-9074
AMB Property Corp.

Oakport Road at Hassler Way


APN: 034-2295-005-04

7200 Edgewater Drive


APN: 041 3902-003-17

Best Buy Architects MBH


Sherry Fraiser (510) 865-8663

Yerba Buena and Mandela


Parkway (Portion of OTR site)
APN: 007-0617-047-00

86 Best Buy Retail Store

CITY CONTACT

9175 Edes Avenue


APN: 044-5053-001-06

82 17th Street Parking


Garage

85 Edgewater Distribution Center

DESCRIPTION

+330 -space parking garage

STATUS

Project completed in year 2007.

Heather Klein
238-3659
Patrick Lane,
Redevelopment,
238-7362

Project completed in year 2006.

22,000 sq.ft building for auto


sales, service, repair of parts
Outdoor auto sales lot for 275 New automotive dealership

Heather Klein
238-3659

Project completed in year 2006.

Heather Klein
238-3659

Project completed in year 2006.

406,700 sq.ft
warehouse/industrial use

Project completed in year 2004.

45,000 sq.ft Best Buy retail


store proposed

Port of Oakland
Commercial Real
Estate 627-1210
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2003.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 24

CITY OF OAKLAND - ACTIVE MAJOR DEVELOPMENT PROJECTS


November 2014

PROJECT NAME
APPLICANT CONTACT
SUCCESSFUL COMPLETIONS
Commercial, Industrial, and Civic Projects
Carl Groch,
87 Rainin Instruments
(415) 592-3950

LOCATION
(ADDRESS AND/OR APN)

COUNCIL
DISTRICT

DESCRIPTION

CITY CONTACT

STATUS

Edgewater Drive & Hassler


Road
7500 Edgewater Drive

180,000 sq.ft
office/manufacturing/R&D
facility

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2002.

9th and Broadway


900 Broadway
APN: 002-0094-002-00
1111 Jackson Street
APN 002-75-002-00
Shellmound at I-80
4300 Shellmound Street

150-room hotel

Don Smith, Bldg.


Permits 238-4778

Project completed in year 2002.

Don Smith, Bldg.


Permits, 238-4778
Don Smith, Bldg.
Permits, 238-4778

Project completed in year 2002.

550 85th Avenue


APN: 042 4313-001-00

Renovation of existing 111,000


sq.ft State office building
Additional 3-level parking
structure for 800 cars in portion
of existing surface parking lot
64,525 sq.ft bakery and
warehouse

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

92 Extended Stay American Hotel Extended Stay America


OTR Site
Dan Stearns
(425) 603-1530

Yerba Buena and Mandela


Parkway
APN: 007-0617-014-01

149 hotel rooms

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

93 Courtyard by Marriott Hotel

Marriott,
Don Celli
(916) 369-4050
Phil Tagami
(510) 268-8500

350 Hegenberger Road


APN: 044-5074-009-03

154-room hotel

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

1500 Broadway
APN: 008-0619-004-01

Rehabilitation of historic
building for office &
commercial uses
187,000 sq.ft office
50,000 sq.ft retail

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2001.

95 Expo Design Center

Mike Abate
(714) 940-5810

Project completed in year 2001.

Joe Ernst
(510) 864-5985

KMART vacating present store


Home Expo Center has
assumed lease.
300,000 sq.ft high-tech research
and development campus

Don Smith, Bldg.


Permits, 238-4778

96 Zhone Technologies

1555 40th St
APN: 007-0617-016-03, 0070617-016-05
66th Avenue and Oakport
Street
7195 Oakport
APN: 041-3902-022-60

Don Smith, Bldg.


Permits, 238-4778

Project completed in year 2000.

88 Oakland Garden Hotel


(Courtyard Marriott)
89 1111 Jackson Street Phase I
90 IKEA Parking Structure

91 Just Desserts

94 Rotunda Building Reuse

Michael Chan
Oakland Garden Hotel
(510) 251-6440
Peter Wong
(510) 628-9060
Ikea Property, Inc.
Doug Pass
(925) 249-0317
Just Desserts
John Schmiedel
(415) 864-6450

Project completed in year 2002.

* 10K PROJECT (project includes residential units located in Downtown)


~Denotes new project, a recent change to the project description, or status.
Compiled by Planning and Zoning, (510) 238-3941.
Page 25

Board of Governors
Joan Harrington, Chair
Santa Clara University
School of Law
Fred W. Alvarez
Jones Day
Denelle M. Dixon-Thayer
Mozilla Corporation
Martin R. Glick
Arnold & Porter LLP
Bruce Ives
Hewlett-Packard Company
Dolores Jimenez
Kaiser Permanente
Leo P. Martinez
UC Hastings College of the Law
Robert H. Olson
Squire Patton Boggs (retired)
Jahan C. Sagafi
Outten & Golden LLP
Rohit K. Singla
Munger, Tolles & Olson LLP
Abdi Soltani
ACLU of Northern California

Staff
Guillermo Mayer
President & CEO
John T. Affeldt
Richard A. Marcantonio
Managing Attorneys
Liz Guillen
Director of Legislative
& Community Affairs

May 8, 2015
VIA ELECTRONIC MAIL (msawicki@oaklandnet.com)
Mark Sawicki
Director, Economic & Workforce Development Department
1 Frank H. Ogawa Plaza
Oakland, CA 94612
Re:

Public Records Act Request 12th Street Remainder Parcel

Dear Mr. Sawicki:


Pursuant to the California Public Records Act, Government Code
Sections 6250 et seq., we request that you make available to us, within
ten (10) days, for our review and copying the public records in the
possession of the City of Oakland described below. It is our desire to
secure these records with as little burden as possible on you and other
City staff; accordingly, please do not hesitate to contact me if there are
alternative ways of securing the requested information in a more
streamlined fashion.
Background

Deborah Harris
Director of Development
Sumi Paik
Director of Finance &
Administration
Angelica K. Jongco
Samuel Tepperman-Gelfant
Senior Staff Attorneys
Rigel S. Massaro
Marybelle Nzegwu
David Zisser
Staff Attorneys
Hilary Hammell
Attorney & Law Fellow
Patty Leal
Finance Manager
Princess Masilungan
Legal Administrative Coordinator
Madelyn Wargowski
Development & Administrative
Assistant
Jesse White
Communication Coordinator

On May 5, 2015, item 13 on the agenda of the Oakland City Council was
DDA for 12th Street Remainder Parcel. In the agenda, the Economic
and Workforce Development Department recommended that the City
Council adopt an ordinance authorizing the City Administrator to
negotiate and execute a development and disposition agreement with
UrbanCore Development, LLC for the sale of the 12th Street Parcel. The
developer plans to build a 21-story residential apartment tower that
includes 298 market-rate residential units (see Agenda Report, Feb. 27,
2015).
In making this request, we seek more specific information about the
Citys actions or decisions in connection with the recommended
disposition of the 12th Street Parcel.
Definitions Used in this Request
With regard to the following requests, these definitions are provided in
an effort to specify as clearly as possible the nature of each request:

Public Records Act Request 12th Street Parcel


May 8, 2015

Page 2 of 3

12th Street Parcel refers to the 12th Street Remainder Parcel located at East 12th Street and 2nd
Avenue in Oakland, as referenced in item 13 of the agenda of the Oakland City Council for May
5, 2015.
The City refers to the City of Oakland and includes all of its officers, agents and departments,
including without limitation the Oakland City Council and Mayor, as well as all City agencies,
commissions, and committees.
Inventory means any inventory or list of lands held, owned or controlled by the City, including
but not limited to any inventory prepared pursuant to Government Code 50569.
Records means and includes all writings as defined in Section 50 of the California Evidence
Code, namely, handwriting, typewriting, printing, photostatting, photographing, photocopying,
transmitting by electronic mail or facsimile, and every other means of recording any tangible
thing, any form of communication or representation, including letters, words, pictures, sounds, or
symbols, or combinations thereof, and any record thereby created, regardless of the manner in
which the record has been stored.
Surplus Lands has the meaning given to that term in California Government Code 54221(b),
namely, land owned by any local agency, that is determined to be no longer necessary for the
agencys use, except property being held by the agency for the purpose of exchange.
The Surplus Lands Act refers to California Government Code 54220-54233.
Request
Pursuant to the Public Records Act, please provide us with all of the following Records:
1. All Inventories that include or refer to the 12th Street Parcel, and all Records that refer to
any Inventory or its preparation, including staff reports, Planning Commission agendas
and minutes, City Council agendas and minutes (including agendas and minutes for
closed sessions), resolutions, and ordinances.
2. All Records discussing, referencing, or authorizing disposition of the 12th Street Parcel,
including those pursuant to California Government Code 52201, 37350-37351, and
37420-37430, and Health and Safety Code 34191.5.
3. All Records that reflect or refer to any finding or determination by the City under
Oakland Municipal Code Chapter 2.42 in regard to the 12th Street Parcel, including,
without limitation, any finding or determination that calling for bids or offers on a
competitive basis is impractical, unavailing or impossible or that it is in the best interests
of the City to sell the real property by negotiated sale, and the explanation for such
determinations and findings.
4. All Records that reflect or refer to the applicability or non-applicability to the 12th Street
Parcel of the Surplus Lands Act, Oakland Municipal Code Chapter 2.42 or any other law
regulating disposition of City property, including, without limitation, electronic mail,
staff reports, studies, agendas and minutes (including agendas and minutes for closed
sessions).

Public Records Act Request 12th Street Parcel


May 8, 2015

Page 3 of 3

5. All Records that constitute, reflect or refer to any written offer by the City to sell, lease or
otherwise transfer or dispose of the 12th Street Parcel to any person or entity, public,
private, or nonprofit.
6. All Records that constitute, reflect or refer to any Requests for Proposals (RFP) relating
to the 12th Street Parcel that the City sent to any person or entity, public, private, or
nonprofit.
7. All communications the City sent to, or received from, any person or entity, public,
private, or nonprofit, that refer or relate to or mention the 12th Street Parcel.
8. The most current appraisal of the value of the 12th Street Parcel.
As noted, we have attempted to be as specific as we can in designating public records without
having access to the records themselves. If you find any of these requests insufficiently focused
or effective, we request that you provide the assistance required by Government Code Section
6253.1, including assisting the member of the public to identify records and information that are
responsive to the request or to the purpose of the request.
If you believe any portion of the information we have requested is exempt from disclosure by
express provision of the law, Government Code Section 6253(a) additionally requires
segregation or deletion of that material and the release of the remainder of the information.
Please make the information requested available for our review before charging us for copies.
Where the information is contained in electronic databases, we request that such information be
provided in electronic form, pursuant to Government Code Section 6253.9.
Thank you in advance for your timely attention to this request. Please do not hesitate to contact
us.
Sincerely,

David Zisser
Staff Attorney
(415) 625-8455

Sam Tepperman-Gelfant
Senior Staff Attorney
(415) 625-8464

Michael Rawson
Director, The Public Interest Law Project
(510) 891-9794 ext. 145

Cc:

Barbara Parker, City Attorney


John Flores, Interim City Administrator
LaTonda Simmons, City Clerk

CITY ADMINISTRATOR
TRACKING NO.

AGENDA ITEM TRANSMITTAL FORM

March 6, 2015

DATE:
TO:

City Administrator / Agency Administrator

ATTN: Saundra Eve-Fisher, City Administrator Analyst


(Please Print or Type)

FROM: Agency / Dept. / Div.: Project


1.

Implementation Division

This item is: [ ] An Informational Report; No Action Requested


[ ] Motion [ ] Resolution [X ] Ordinance

Contact Person: Hui-Chang

Li

Ext.: __X6239_

[ ] A Report and Recommendation for a:

Title of Item:

An Ordinance Authorizing: (1) The City Administrator, Without Returning To The City Council, To
Negotiate And Execute A Disposition And Development Agreement and Related Documents Between
The City of Oakland, And A Development Entity Comprised Of UrbanCore Development, LLC and
UDR, INC., (Or Its Related Entities Or Affiliates) For Sale Of The 12th Street Remainder Parcel
Located At E12th Street And 2nd Avenue For No Less Than $5.1 Million And Development As A
Residential Mixed-Use Project, All Of The Foregoing Documents To Be In A Form And Content
Substantially In Conformance With The Term Sheet Attached As Exhibit A; (2) Set-Aside Of No
More Than $250,000 From Land Sales Proceeds For Remediation of Site, And (3) Appropriation of
$200,000 From Land Sales Proceeds To Fund An Asset Portfolio Management Plan
(USE SEPARATE SHEET IF NECESSARY)
2.

This item is to be placed on the agenda(s) of

3/24/15

for:

(Date)

[ X ] 1. City Council / ORA Committee (Specify):


[ ] 2. Consent Calendar
[ ] 3. City Council / ORA - Regular Agenda
[ ] 4. Other:

CED

3.

A signature indicates that the staff report and support items attached to this form have been reviewed and/or approved by the
designated authority (indicate n/a if not applicable):
Report - Initial Review for Legal Issues:
Legislation Approved for Form and Legality:
CITY ATTORNEY Date
CITY ATTORNEY Date
Report (and, if any, corresponding Legislation) Reviewed for Fiscal Impact(s) and / or Funding Codes:
BUDGET OFFICE
Impartial Analysis of Proposed City / ORA Major Expenditure * Attached / No Comments:
(Circle One)
CITY AUDITOR
Date
* Defined in Administrative Instruction 137 as an expenditure/commitment of $250,000 or more. The types of projects subject to review

Date

include, but are not limited to, proposals, contracts, ventures, loans, programs, and construction projects. These analyses are used for
informational purposes only.

[ ] 1. Cover Letter w/report (Orig. & 2 copies) [ ] 3. Resolution, orig. + 2 copies

[ ] 5. Agreement / Contract (3 copies)

[ ] 2. Attachments (specify how many _____) [ ] 4. Ordinance, orig. + 2 copies & [ ] 6. Other
Notice & Digest (orig. + 2 copies)
[ ] This agenda item is NOT complete. (Please specify below the missing items and when they will be submitted)
AGENCY DIRECTOR/
DEPT. HEAD SIGNATURE: _______________________________________________________________________________________
INSTRUCTIONS: Signed Agenda Reports and all accompanying documents and/or legislation are due to the Office of the City Administrator
no later than 5:00 P.M. on the THURSDAY three (3) weeks prior to the date scheduled for presentation.
_______

(FOR CITY ADMINISTRATORS OFFICE USE ONLY)


NOTES:
___________________________________________________________________________ DATE:
Revised: 8/06

CITY ADMINISTRATOR
TRACKING NO.

AGENDA ITEM TRANSMITTAL FORM

March 11, 2015

DATE:
TO:

City Administrator / Agency Administrator

ATTN: Saundra Eve-Fisher, City Administrator Analyst


(Please Print or Type)

FROM: Agency / Dept. / Div.: Project


1.

Implementation Division

This item is: [ ] An Informational Report; No Action Requested


[ ] Motion [ ] Resolution [X ] Ordinance

Contact Person: Hui-Chang

Li

Ext.: __X6239_

[ ] A Report and Recommendation for a:

Title of Item:

An Ordinance Authorizing: (1) The City Administrator, Without Returning To The City Council, To
Negotiate And Execute A Disposition And Development Agreement and Related Documents Between
The City of Oakland, And A Development Entity Comprised Of UrbanCore Development, LLC and
UDR, INC., (Or Its Related Entities Or Affiliates) For Sale Of The 12th Street Remainder Parcel
Located At E12th Street And 2nd Avenue For No Less Than $5.1 Million And Development As A
Residential Mixed-Use Project, All Of The Foregoing Documents To Be In A Form And Content
Substantially In Conformance With The Term Sheet Attached As Exhibit A; (2) Set-Aside Of No
More Than $500,000 From Land Sales Proceeds For Remediation of Site, And (3) Appropriation of
$200,000 From Land Sales Proceeds To Fund An Asset Portfolio Management Plan
(USE SEPARATE SHEET IF NECESSARY)
2.

This item is to be placed on the agenda(s) of

3/24/15

for:

(Date)

[ X ] 1. City Council / ORA Committee (Specify):


[ ] 2. Consent Calendar
[ ] 3. City Council / ORA - Regular Agenda
[ ] 4. Other:

CED

3.

A signature indicates that the staff report and support items attached to this form have been reviewed and/or approved by the
designated authority (indicate n/a if not applicable):
Report - Initial Review for Legal Issues:
Legislation Approved for Form and Legality:
CITY ATTORNEY Date
CITY ATTORNEY Date
Report (and, if any, corresponding Legislation) Reviewed for Fiscal Impact(s) and / or Funding Codes:
BUDGET OFFICE
Impartial Analysis of Proposed City / ORA Major Expenditure * Attached / No Comments:
(Circle One)
CITY AUDITOR
Date
* Defined in Administrative Instruction 137 as an expenditure/commitment of $250,000 or more. The types of projects subject to review

Date

include, but are not limited to, proposals, contracts, ventures, loans, programs, and construction projects. These analyses are used for
informational purposes only.

[ ] 1. Cover Letter w/report (Orig. & 2 copies) [ ] 3. Resolution, orig. + 2 copies

[ ] 5. Agreement / Contract (3 copies)

[ ] 2. Attachments (specify how many _____) [ ] 4. Ordinance, orig. + 2 copies & [ ] 6. Other
Notice & Digest (orig. + 2 copies)
[ ] This agenda item is NOT complete. (Please specify below the missing items and when they will be submitted)
AGENCY DIRECTOR/
DEPT. HEAD SIGNATURE: _______________________________________________________________________________________
INSTRUCTIONS: Signed Agenda Reports and all accompanying documents and/or legislation are due to the Office of the City Administrator
no later than 5:00 P.M. on the THURSDAY three (3) weeks prior to the date scheduled for presentation.
_______

(FOR CITY ADMINISTRATORS OFFICE USE ONLY)


NOTES:
___________________________________________________________________________ DATE:
Revised: 8/06

Вам также может понравиться