Вы находитесь на странице: 1из 7

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

TURN AROUND MAINTENANCE-FEB,2013


PENTA PROJECT
MECHANICAL
104

E-853 to be open for checking Packing

144

108

H-853 to be open for inspection & top


dish gasket leakage to be attended

144

167

New H335 installation and required


modification need to be done

240

A-200 A amps fluctuation problem,


inspection of agitator

D2

42

A-410 abnormal sound to be check

12

N5

79

E-700 PM job to be done

16

D2,D4

88

H-808 to be check for passing

D2

136

E810 Mesh to be inspected by


Mechanical

N2

22

H-321 passing problem to be attended

32

E-340 top manhole leakage observed


and All Manhole to be opened for
inspection of packing

240
4

D1,D10
N4,N5

Mat/Resource req

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

51

A-470 agitator not rotating to be


check the coupling inside the tank'

12

N1

138

H803 Heat exchanger Dish to be


Opened for Tubes to be inspected
and cleaning the tubes

48

D2,D4

139

H804 Heat exchanger Dish to be


Opened for Tubes to be inspected
and cleaning the tubes

48

D3,D5

Mat/Resource req

140

V800 Manhole to be opened for


Process inspection ad cleaning the
Tank

12+8

N2,N3

# Propper lighting for Inside Tank Visual


Inspection #bottom cleaning & buffing
requires, if thickness need to be
measured at the bottom plate # To reach
above 2nd ring for Visual Inspection, we
may need proper scaffolding but
scaffolding requirement will be finalisd
based on inside visual inspection results
# Gas mask for performing UT inside the
tank

141

V802 Manhole to be opened for


inspection Process inspection and
cleaning the Tank

12+8

N2,N3

- do -

142

V400 Manhole to be opened for


inspection Process inspection and
cleaning the Tank

12+8

N4,N5

- do -

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

Mat/Resource req

143

V890 Manhole to be opened for


inspection and cleaning the Tank

12+8

D2,D3

- do -

144

V820 Manhole to be opened for


inspection Process inspection and
cleaning the Tank

12+8

D2,D3

- do -

145

V690 Manhole to be opened for


Process inspection and cleaning the
Tank

12+8

D4,D6

- do -

14

E-330 manhole to be open for packing


inspection

12+4

D1,D2

83

E-803 & E-804 manhole & sight glass


to be open for physical cleaning

D6

100

E-828 top and bottom manhole to be


open for bucket cleaning

D7

135

H853 to be opened for tube inspection

D3

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

147

V200 Manhole to be opened for


Mechanical inspection in Agitator and
Process inspection and cleaning the
Tank

12+4

N4,N5

148

V120 Manhole to be opened for


Mechanical Reliability inspection on
the top of damaged Roof

12+4

D5,D6

Mat/Resource req

Propper lighting for Inside Tank Visual


Inspection #bottom cleaning & buffing
requires, if thickness need to be
measured at the bottom plate# To reach
above 2nd ring for Visual Inspection, we
may need proper scaffolding but
scaffolding requirement will be finalisd
based on inside visual inspection results
# Gas mask for performing UT inside the
tank

150

V 470 manhole to be opened for


Process inspection and cleaning the
Tank

12+4

D7,D8

# Propper lighting for Inside Tank Visual


Inspection #bottom cleaning & buffing
requires, if thickness need to be
measured at the bottom plate # To reach
above 2nd ring for Visual Inspection, we
may need proper scaffolding but
scaffolding requirement will be finalisd
based on inside visual inspection results
# Gas mask for performing UT inside the
tank

159

E803 manhole to be open for Process


inspection and cleaning the Tank

12+4

D7,D8

- do -

160

V600 manhole to be open for Process


inspection and cleaning the Tank

12+4

D7,D8

- do -

161

E804manhole to be open for Process


inspection and cleaning the Tank

12+4

D7,D8

- do -

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

A-405 Inspection
164

Ejectors opening for cleaning E425

12

N8

MECHANICAL PM JOBS

AGITATOR REACTOR

A-200

day 4

15

E-705 PM job to be done

E705

12

day 1

Mat/Resource req

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

16

AGITATOR CLASSIFIER

A-640

day 6

17

PENTA DRYER

E-680

12

day 4

19

BUCKET ELEVATOR -PENTA

E-682

12

day 2

20

SCREEN (SIEVE) -VIBRATOR PENTA

E-684

day 1

24

SCRUBER FAN

F-1400

day 3

25

SCRUBBER FAN

F-1410

day 6

26

AGITATOR,CRUDE CRYSTALLIZER
STAGE 1

A-405

day 3

27

VACUUM BELTFILTER

E-650

day 3

28

AGITATOR E-821

A-821

day 3

Mat/Resource req

S.No.

Description

EQPT. TAG Duration in Assigned


NO.
hours
day

31

FORMATE DRYER

E-825

12

day 4

33

SOF BLOWER

E-825B

day 5

Mat/Resource req

Вам также может понравиться