ABOUT ESTIMATE

Name of the wor Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b)
Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,
Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road (via) Mori,
Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via)
Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km
0/0 to 10/6 for the year 2012-13.

Names of the roads


1 Kunavaram - Kesanapalli road from km 0/0 to 12/0
2 Kesavadasupalem - Kesanapalli road from km 0/0 to 14/0
3 Chintalamori - Gondi road from km 0/0 to 9/425
4 Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
5 Visweswarayapuram - Gogannamatam road from km 0/0 to 10/6

Section

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Sub - Division

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Division

Executive Engineer (R&B),


R&B Division : Amalapuram

Circle

Superintending Engineer (R&B),


R&B Circle : Kakinada

ROADS & BUILDINGS DEPARTMENT


MAINTENANCE FOR THE YEAR 2012-2013
Name of work : Mtc of (a) Kunavaram - Kesanapalli road from
km

0/0

to

Kesanapalli

12/0
road

(b)

Kesavadasupalem

(via)

Sankaraguptam,

Chintalamori, Padamatipalem from km 0/0 to


14/0 (c) Chintalamori - Gondi road (via) Mori,
Addalapalem

from

km

0/0

to

9/425

(d)

Lakkavaram - Sankaraguptam road from km 0/0


to 3/0 (e) Visweswarayapuram - Gogannamatam
road (via) Lakkavaram, Irusumanda, Gudapalli,
Katrenipadu, Mutyalapalem from km 0/0 to
10/6 for the year 2012-13.

Estimate Amount :

Rs. 8,50,000 /-

R&B Section : Malikipuram


R&B Sub-division : Razole
R&B Division : Amalapuram
R&B Circle : Kakinada

EAST GODAVARI DISTRICT

Specification report accompany the Estimate for the work of


Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem Kesanapalli road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0
(c) Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram
- Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road
(via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6
for the year 2012-13.
Amount of Estimate :

Rs.8,50,000 /-

The roads (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem Kesanapalli road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c)
Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via)
Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 are important
Major District roads and Other district roads in East Godavari District in the jurisidiction of R&B
Section, Malikipuram of R&B Sub-division, Razole.
NECESSITY:
These roads connects number of villages and number of R&B roads and heavy intensity of
traffic flows on these roads as the public of all the villages travels on this road. Hence it is very
much necessary to maintain all these roads pothole free and traffic worthy for the year 2012-13.
AUTHORITY:
The Govt. of A.P vide G.O.Ms.No. 132 Dt. 22-06-2005 has communicated guide lines for
mtc. of Roads.
The following specifications / provisions are adopted in the estimate.
1

Providing BT patch work with 40mm HBG and 10-11.2mm HBG chips

Providing patch work with Wet Mix Macadam

Sectioning of Berms, Removing High berms, Filling low berms and Scours with gravel etc.

Jungle clearance from the road embankment.

Brick Masonry with CM (1:8) for repairs to Culverts and Parapet walls

Patch Plastering with CM (1:5) for Parapet walls of culverts

Repairs and Painting to culverts.

Fixing of missing KM & HM stones and Guard stones

Other provisions such as painting KM, HM, Guard stones etc.

10 Provision for Libility Amount for the year 2008-2009.


11 Provision for D.T.P. Charges, Xerox charges, Advertisement charges and other unforeseen items
The rates are worked out based on Circular Memo No.Maintenance/EE(TEC)
/TA.13/AE.4/2006, dt.18.03.2006 of Chief Engineer (R&B). Roads and current common SSR for the
year 2008 - 2009 duly adopting nearest approved quarries. Seigniorage charges are actually payable
to the Mines and Geology department. Hence, necessary provision is made in the estimate.
Provision for VAT is shown separately in the estimate as per G.O.Ms No 141, T(R&B) Dept., Dt
27.07.2006.
The work will be carried out as per standard specifications of MORT&H, APSS, circulars
and latest G.O's communicated from time to time.

Asst. Executive Engineer (R&B),


Deputy Executive Engineer (R&B),Executive Engineer (R&B),

R&B Section : Malikipuram

R&B Sub-division : Razole

R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
-:oOo:-

Kunavaram - Kesanapalli road from km 0/0 to 12/0


Reach proposed in the present estimate:
Centre KM of the Working Reach
A) For HBG metal:
HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156
From km
58 / 250
to
31
From km
/
to
From km
13 / 675
to
5
6.000
Working K.M.
K.M.
c) Total lead
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 183 / 200
to
156
From km
58 / 250
to
31
From km
/
to
From km
13 / 675
to
5
6.000
Working K.M.
K.M.
c) Total lead

km
=
=

/ 595
/ 735
/
/ 200

/
/
/
/
/

6.000

of
of
of
of

/ 000 to

12

000

12.000 kms
6.000 kms

2.200 kms

K.M.

NH 5
NH 5 to RP road
Kadali Irrigation channel road
SM road

200 of Kakinada - Rajahmundry Road


595 of NH 5
735 of NH 5 to RP road
of Kadali Irrigation channel road
200 of SM road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
From km
13 / 675
to
5 / 200 of SM road
6.000
Working K.M.
K.M.
Total lead

=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
82.000 kms

0.000 kms

38.405
26.515
0.941
8.475
6.000
82.536

=
=
=
=
=
=
=
Or say:

4.600
26.605
26.515
0.941
8.475
6.000
73.136

=
=
=
=
=
=
=
Or say:

0.110
0.200
9.178
0.941
8.475
6.000
24.904

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km
/
to
/
of Visakhapatnam - Kathipudi
From km
/
to
/
of Kathipudi - Amalapuram road
From km
/
to
/
of A.B road upto Ambajipeta
From km
/
to
/
of A.G. road
From km
49 / 200
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
From km
13 / 675
to
5 / 200 of SM road
Working K.M.
6.000
K.M.
c) Total lead

=
=
=
=
=
=
=
=
=
=
Or say:

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

kms
kms
kms
kms
kms
kms
kms
73.000 kms

kms
###
kms
###
kms
kms
kms
kms###
kms
25.000 kms###

1.600
120.600
96.300
7.270
6.595
9.050
0.941
8.475
6.000
256.831
257.000

Deputy Executive Engineer (R&B), Executive Engineer (R&B),


R&B Sub-division : Razole
R&B Division : Amalapuram

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
-:oOo:-

Kesavadasupalem - Kesanapalli road from km 0/0 to 14/0


Reach proposed in the present estimate:
Centre KM of the Working Reach
A) For HBG metal:
HBG metal from Rayavaram quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156
From km
61 / 425
to
31
From km 123 / 935
to
115
From km
81 / 600
to
91
From km
0 / 000
to
5
Working K.M.
c) Total lead
B) For gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
61 / 425
to
From km 123 / 935
to
From km
81 / 600
to
From km
0 / 000
to
Working K.M.
c) Total lead

60
156
31
115
91
5

/
/
/
/
/

/
/
/
/
/
/

km
=
=

595
735
550
000
600

200
595
735
550
000
600

7.000

of
of
of
of
of

of
of
of
of
of
of

to

14

NH 5
NH 5 to RP road
NH 214
KANF road
NH 214

14.000 kms
7.000 kms

2.200 kms

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
NH 214
KANF road
NH 214

=
=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
kms
100.000 kms

0.000 kms

38.405
29.690
8.385
9.400
5.600
7.000
100.680

=
=
=
=
=
=
=
=
Or say:

4.600
26.605
29.690
8.385
9.400
5.600
7.000
91.280

=
=
=
=
=
=
=
=
Or say:

0.110
0.200
12.353
8.385
9.400
5.600
7.000
43.048

kms
kms
kms
kms
kms
kms
kms
kms
91.000 kms

kms
###
kms
###
kms
kms
kms
kms
kms
kms
43.000 kms

:
Visakhapatnam Refinery

61
115
91
5

/
/
/
/
/
/
/
/
/

of
of
of
of
of
425 of
550 of
000 of
600 of

Refinery to V-V road (NH.5)


Visakhapatnam - Kathipudi
Kathipudi - Amalapuram road
A.B road upto Ambajipeta
A.G. road
Rajavaram - Podalada Road
NH 214
KANF road
NH 214

=
=
=
=
=
=
=
=
=
=
=
Or say:

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

K.M.

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 123 / 935
to
115 / 550 of NH 214
From km
81 / 600
to
91 / 000 of KANF road
From km
0 / 000
to
5 / 600 of NH 214
Working K.M.
c) Total lead
D) For Bitumen & Emulsion
a) Lead from ex-factory a
b) Metalled road length:
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
49 / 200
to
From km 123 / 935
to
From km
81 / 600
to
From km
0 / 000
to
Working K.M.
Add lead for the center of reach

000

1.600
120.600
96.300
7.270
6.595
12.225
8.385
9.400
5.600
7.000
274.975
275.000

Deputy Executive Engineer (R&B), Executive Engineer (R&B),


R&B Sub-division : Razole
R&B Division : Amalapuram

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
-:oOo:-

Chintalamori - Gondi road from km 0/0 to 9/425


Reach proposed in the present estimate:
Centre KM of the Working Reach
A) For HBG metal:
HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156
From km
61 / 425
to
31
From km 120 / 350
to
115
From km
0 / 000
to
2
From km
0 / 000
to
4
From km
0 / 000
to
3
From km
7 / 800
to
5
4.713
Working K.M.
K.M.
c) Total lead
B) For gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 183 / 200
to
156
From km
61 / 425
to
31
From km 120 / 350
to
115
From km
0 / 000
to
2
From km
0 / 000
to
4
From km
0 / 000
to
3
From km
7 / 800
to
5
4.713
Working K.M.
K.M.
c) Total lead

/
/
/
/
/
/
/

/
/
/
/
/
/
/
/

km
=
=

595
735
550
600
000
000
800

200
595
735
550
600
000
000
800

4.713

of
of
of
of
of
of
of

of
of
of
of
of
of
of
of

to

425

9.425 kms
4.713 kms

2.200 kms

K.M.

NH 5
NH 5 to RP road
NH 214
S M road
CBM Road
Lakkavaram - Sankaraguptam road
Kesavadasupalem - Kesanapalli road

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
NH 214
S M road
CBM Road
Lakkavaram - Sankaraguptam road
Kesavadasupalem - Kesanapalli road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 120 / 350
to
115 / 550 of NH 214
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
4 / 000 of CBM Road
From km
0 / 000
to
3 / 000 of Lakkavaram - Sankaraguptam road
From km
7 / 800
to
5 / 800 of Kesavadasupalem - Kesanapalli road
4.713
Working K.M.
K.M.
c) Total lead
D) For Bitumen & Emulsion
a) Lead from ex-factory a
b) Metalled road length:
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
49 / 200
to
From km 120 / 350
to
From km
0 / 000
to
From km
0 / 000
to
From km
0 / 000
to
From km
7 / 800
to
Working K.M.
4.713

=
=
=
=
=
=
=
=
=
Or say:

38.405
29.690
4.800
2.600
4.000
3.000
2.000
4.713
91.408

kms
kms
kms
kms
kms
kms
kms
kms
kms
91.000 kms

0.000 kms

=
=
=
=
=
=
=
=
=
=
Or say:

4.600
26.605
29.690
4.800
2.600
4.000
3.000
2.000
4.713
82.008

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
82.000 kms

=
=
=
=
=
=
=
=
=
=
Or say:

0.110
0.200
12.353
4.800
2.600
4.000
3.000
2.000
4.713
33.776

kms
###
kms
###
kms
kms
kms
kms
kms
kms
kms###
kms
34.000 kms

:
Visakhapatnam Refinery

61
115
2
4
3
5

/
/
/
/
/
/
/
/
/
/
/

of
of
of
of
of
425 of
550 of
600 of
000 of
000 of
800 of

Refinery to V-V road (NH.5)


Visakhapatnam - Kathipudi
Kathipudi - Amalapuram road
A.B road upto Ambajipeta
A.G. road
Rajavaram - Podalada road
NH 214
S M road
CBM Road
Lakkavaram - Sankaraguptam road
Kesavadasupalem - Kesanapalli road

=
=
=
=
=
=
=
=
=
=
=
=
Or say:

1.600
120.600
96.300
7.270
6.595
12.225
4.800
2.600
4.000
3.000
2.000
4.713
265.703
265.000

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B), Executive Engineer (R&B),


R&B Sub-division : Razole
R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

-:oOo:-

Lakkavaram - Sankaraguptam road from km 0/0 to 3/0


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
From km
61 / 425
to
From km 115 / 550
to
From km
0 / 000
to
From km
0 / 000
to
1.500
Working K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
61 / 425
to
From km 115 / 550
to
From km
0 / 000
to
From km
0 / 000
to
1.500
Working K.M.
c) Total lead

km
=
=

/ 000 to

000

1.500 kms
1.500

K.M.

=
156
31
120
2
4

60
156
31
120
2
4

/
/
/
/
/

/
/
/
/
/
/

595
735
350
600
000

200
595
735
350
600
000

3.000 kms

of
of
of
of
of

of
of
of
of
of
of

NH 5
NH 5 to RP road
NH 214
S M road
CBM Road

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
NH 214
S M road
CBM Road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 115 / 550
to
120 / 350 of NH 214
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
4 / 000 of CBM Road
1.500
Working K.M.
Total lead

2.200 kms

=
=
=
=
=
=
=
Or say:

38.405
29.690
4.800
2.600
4.000
1.500
83.195

kms
kms
kms
kms
kms
kms
kms
83.000 kms

0.000 kms

=
=
=
=
=
=
=
=
Or say:

4.600
26.605
29.690
4.800
2.600
4.000
1.500
73.795

=
=
=
=
=
=
=
=
Or say:

0.110
0.200
12.353
4.800
2.600
4.000
1.500
25.563

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km
/
to
/
of Visakhapatnam - Kathipudi
From km
/
to
/
of Kathipudi - Amalapuram road
From km
/
to
/
of A.B road upto Ambajipeta
From km
/
to
/
of A.G. road
From km
49 / 200
to
61 / 425 of Rajavaram - Podalada Road
From km 115 / 550
to
120 / 350 of NH 214
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
4 / 000 of CBM Road
1.500
Working K.M.
c) Total lead

=
=
=
=
=
=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
kms
kms
73.000 kms

kms
###
kms
###
kms
kms
kms
kms
kms###
kms
25.000 kms###

1.600
120.600
96.300
7.270
6.595
12.225
4.800
2.600
4.000
1.500
257.490
257.000

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B), Executive Engineer (R&B),


R&B Sub-division : Razole
R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

-:oOo:-

Visweswarayapuram - Gogannamatam road from km 0/0 to 10/6


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
From km
61 / 425
to
From km 115 / 550
to
From km
0 / 000
to
From km
0 / 000
to
5.300
Working K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
61 / 425
to
From km 115 / 550
to
From km
0 / 000
to
From km
0 / 000
to
5.300
Working K.M.
c) Total lead

156
31
120
2
5

60
156
31
120
2
5

/
/
/
/
/

/
/
/
/
/
/

km
=
=

595
735
350
600
800

200
595
735
350
600
800

5.300

of
of
of
of
of

of
of
of
of
of
of

/ 000 to

10

600

10.600 kms
5.300 kms

2.200 kms

K.M.

NH 5
NH 5 to RP road
NH 214
S M road
CBM Road

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
NH 214
S M road
CBM Road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425 of Rajavaram - Podalada Road
From km 115 / 550
to
120 / 350 of NH 214
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
5 / 800 of CBM Road
5.300
Working K.M.
Total lead

=
=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
kms
88.000 kms

0.000 kms

4.600
26.605
29.690
4.800
2.600
5.800
5.300
79.395

=
=
=
=
=
=
=
=
Or say:

0.110
0.200
12.353
4.800
2.600
5.800
5.300
31.163

=
=
=
=
=
=
=
=
=
=
=
Or say:

Deputy Executive Engineer (R&B),

38.405
29.690
4.800
2.600
5.800
5.300
88.795

=
=
=
=
=
=
=
=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km
/
to
/
of Visakhapatnam - Kathipudi
From km
/
to
/
of Kathipudi - Amalapuram road
From km
/
to
/
of A.B road upto Ambajipeta
From km
/
to
/
of A.G. road
From km
49 / 200
to
61 / 425 of Rajavaram - Podalada Road
From km 115 / 550
to
120 / 350 of NH 214
From km
0 / 000
to
2 / 600 of S M road
From km
0 / 000
to
5 / 800 of CBM Road
5.300
Working K.M.
c) Total lead

Asst. Executive Engineer (R&B),

kms
kms
kms
kms
kms
kms
kms
kms
79.000 kms

kms
###
kms
###
kms
kms
kms
kms
kms###
kms
31.000 kms###

1.600
120.600
96.300
7.270
6.595
12.225
4.800
2.600
5.800
5.300
263.090
263.000

Executive Engineer (R&B),

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

R&B Section : Malikipuram

R&B Sub-division : Razole

R&B Division : Amalapuram

R.M.R
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road
(via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road
(via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
(e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu,
Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Kunavaram - Kesanapalli road from km 0/0 to 12/0
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

82

552.30

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

82

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Segnior Net rate


-age
(excluding
charge stacking
s
charges)

Blasting
charges

25% for
M/C

10

11

12

491.30

70.00

--

50.00

1,163.60

Cum

561.00

491.30

70.00

--

50.00

1,172.30

Cum

82

552.30

821.30

70.00

205.33

50.00

1,698.93

Cum

"

82

552.30

836.30

70.00

209.08

50.00

1,717.68

Cum

"

"

82

552.30

681.30

70.00

170.33

50.00

1,523.93

Cum

HBG

"

"

82

552.30

551.30

70.00

137.83

50.00

1,361.43

Cum

7 9.50 mm to 11.2 mm IRC m/c metal for patchwork

HBG

"

"

82

561.00

551.30

70.00

137.83

50.00

1,370.13

Cum

8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

82

552.30

421.30

70.00

105.33

50.00

1,198.93

Cum

9 2.36 mm 5.00 mm IRC m/c metal

HBG

"

"

82

552.30

225.30

70.00

56.33

50.00

953.93

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

82

552.30

216.30

--

--

50.00

818.60

Cum

11 40 mm SS-5 metal

HBG

"

"

82

552.30

491.30

70.00

122.83

50.00

1,286.43

Cum

12 20 mm SS-5 metal

HBG

"

"

82

552.30

836.30

70.00

209.08

50.00

1,717.68

Cum

Gravel

Kadium

73

460.30

50.50

--

--

22.00

532.80

Cum

Sand

P. Gannavaram

25

233.50

169.50

--

--

40.00

443.00

Cum

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

257

0.00

0.00

0
0.00
(ED 14.42%) (VAT 4%)

--

0.00

MT

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

257

771.00

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

48,034.15

MT

13 Gravel
14 Sand (for Mortar)

Source

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2010

Per

R.M.R
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road
(via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road
(via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
(e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu,
Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Kesavadasupalem - Kesanapalli road from km 0/0 to 14/0
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

100

637.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

100

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Segnior Net rate


-age
(excluding
charge stacking
s
charges)

Blasting
charges

25% for
M/C

10

11

12

491.30

70.00

--

50.00

1,249.10

Cum

646.50

491.30

70.00

--

50.00

1,257.80

Cum

100

637.80

821.30

70.00

205.33

50.00

1,784.43

Cum

"

100

637.80

836.30

70.00

209.08

50.00

1,803.18

Cum

"

"

100

637.80

681.30

70.00

170.33

50.00

1,609.43

Cum

HBG

"

"

100

637.80

551.30

70.00

137.83

50.00

1,446.93

Cum

7 9.50 mm to 11.2 mm IRC m/c metal for patchwork

HBG

"

"

100

646.50

551.30

70.00

137.83

50.00

1,455.63

Cum

8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

100

637.80

421.30

70.00

105.33

50.00

1,284.43

Cum

9 2.36 mm 5.00 mm IRC m/c metal

HBG

"

"

100

637.80

225.30

70.00

56.33

50.00

1,039.43

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

100

637.80

216.30

--

--

50.00

904.10

Cum

11 40 mm SS-5 metal

HBG

"

"

100

637.80

491.30

70.00

122.83

50.00

1,371.93

Cum

12 20 mm SS-5 metal

HBG

"

"

100

637.80

836.30

70.00

209.08

50.00

1,803.18

Cum

13 Gravel
14 Sand (for Mortar)

Source

Per

Gravel

Kadium

91

540.90

50.50

--

--

22.00

613.40

Cum

Sand

P. Gannavaram

43

320.90

169.50

--

--

40.00

530.40

Cum

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

MT
245

735.00

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

47,998.15

MT

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

R.M.R
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road
(via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road
(via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
(e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu,
Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Chintalamori - Gondi road from km 0/0 to 9/425
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

91

595.05

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

91

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Segnior Net rate


-age
(excluding
charge stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,206.35

Cum

603.75

491.30

70.00

--

50.00

1,215.05

Cum

91

595.05

821.30

70.00

205.33

50.00

1,741.68

Cum

"

91

595.05

836.30

70.00

209.08

50.00

1,760.43

Cum

"

"

91

595.05

681.30

70.00

170.33

50.00

1,566.68

Cum

HBG

"

"

91

595.05

551.30

70.00

137.83

50.00

1,404.18

Cum

7 9.50 mm to 11.2 mm IRC m/c metal for patchwork

HBG

"

"

91

603.75

551.30

70.00

137.83

50.00

1,412.88

Cum

8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

91

595.05

421.30

70.00

105.33

50.00

1,241.68

Cum

9 2.36 mm 5.00 mm IRC m/c metal

HBG

"

"

91

595.05

225.30

70.00

56.33

50.00

996.68

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

91

595.05

216.30

--

--

50.00

861.35

Cum

11 40 mm SS-5 metal

HBG

"

"

91

595.05

491.30

70.00

122.83

50.00

1,329.18

Cum

12 20 mm SS-5 metal

HBG

"

"

91

595.05

836.30

70.00

209.08

50.00

1,760.43

Cum

Gravel

Kadium

82

501.30

50.50

--

--

22.00

573.80

Cum

Sand

P. Gannavaram

34

277.70

169.50

--

--

40.00

487.20

Cum

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

265

0.00

0.00

0
0.00
(ED 14.42%) (VAT 4%)

--

0.00

MT

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

265

795.00

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

48,058.15

MT

13 Gravel
14 Sand (for Mortar)

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.

Source

Per
12

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

R.M.R
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road
(via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road
(via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
(e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu,
Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

83

557.05

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

83

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Segnior Net rate


-age
(excluding
charge stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,168.35

Cum

565.75

491.30

70.00

--

50.00

1,177.05

Cum

83

557.05

821.30

70.00

205.33

50.00

1,703.68

Cum

"

83

557.05

836.30

70.00

209.08

50.00

1,722.43

Cum

"

"

83

557.05

681.30

70.00

170.33

50.00

1,528.68

Cum

HBG

"

"

83

557.05

551.30

70.00

137.83

50.00

1,366.18

Cum

7 9.50 mm to 11.2 mm IRC m/c metal for patchwork

HBG

"

"

83

565.75

551.30

70.00

137.83

50.00

1,374.88

Cum

8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

83

557.05

421.30

70.00

105.33

50.00

1,203.68

Cum

9 2.36 mm 5.00 mm IRC m/c metal

HBG

"

"

83

557.05

225.30

70.00

56.33

50.00

958.68

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

83

557.05

216.30

--

--

50.00

823.35

Cum

11 40 mm SS-5 metal

HBG

"

"

83

557.05

491.30

70.00

122.83

50.00

1,291.18

Cum

12 20 mm SS-5 metal

HBG

"

"

83

557.05

836.30

70.00

209.08

50.00

1,722.43

Cum

Gravel

Kadium

73

460.30

50.50

--

--

22.00

532.80

Cum

Sand

P. Gannavaram

25

233.50

169.50

--

--

40.00

443.00

Cum

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

257

0.00

0.00

0
0.00
(ED 14.42%) (VAT 4%)

--

0.00

MT

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

257

771.00

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

48,034.15

MT

13 Gravel
14 Sand (for Mortar)

Source

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

Per
12

R.M.R
Name of the work:

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road
(via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road
(via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0
(e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu,
Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Visweswarayapuram - Gogannamatam road from km 0/0 to
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

88

580.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

88

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Segnior Net rate


-age
(excluding
charge stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,192.10

Cum

589.50

491.30

70.00

--

50.00

1,200.80

Cum

88

580.80

821.30

70.00

205.33

50.00

1,727.43

Cum

"

88

580.80

836.30

70.00

209.08

50.00

1,746.18

Cum

"

"

88

580.80

681.30

70.00

170.33

50.00

1,552.43

Cum

HBG

"

"

88

580.80

551.30

70.00

137.83

50.00

1,389.93

Cum

7 9.50 mm to 11.2 mm IRC m/c metal for patchwork

HBG

"

"

88

589.50

551.30

70.00

137.83

50.00

1,398.63

Cum

8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

88

580.80

421.30

70.00

105.33

50.00

1,227.43

Cum

9 2.36 mm 5.00 mm IRC m/c metal

HBG

"

"

88

580.80

225.30

70.00

56.33

50.00

982.43

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

88

580.80

216.30

--

--

50.00

847.10

Cum

11 40 mm SS-5 metal

HBG

"

"

88

580.80

491.30

70.00

122.83

50.00

1,314.93

Cum

12 20 mm SS-5 metal

HBG

"

"

88

580.80

836.30

70.00

209.08

50.00

1,746.18

Cum

Gravel

Kadium

79

487.90

50.50

--

--

22.00

560.40

Cum

Sand

P. Gannavaram

31

263.30

169.50

--

--

40.00

472.80

Cum

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

263

0.00

0.00

0
0.00
(ED 14.42%) (VAT 4%)

--

0.00

MT

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

263

789.00

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

48,052.15

MT

13 Gravel
14 Sand (for Mortar)

Source

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.
For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

Per
12

Average R.M.R
Name of the work:

Sl.
No
.

Name of the road

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,
Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam
road from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem fro
km 0/0 to 10/6 for the year 2012-13.
40 mm
25 mm
40 mm
to 45
to 27
to 45
mm IRC
mm IRC
mm IRC metal for
m/c
metal patchwor
metal
k
3

19 mm
to 22
mm IRC
m/c
metal

12 mm
to 14
mm IRC
m/c
metal

Rate
9.50 mm
HBG
9.50 mm to 11.2 5.00 mm
2.36 to
Stone
to 11.2
mm IRC
to 7.00
5mm IRC
chips
mm IRC
m/c
mm IRC
m/c
2.36mm
m/c
metal for
m/c
metal
and
metal patchwor metal
below
k
5
6

1 Kunavaram - Kesanapalli 1,163.60 1,172.30 1,698.93 1,717.68 1,523.93 1,361.43 1,370.13 1,198.93
road from km 0/0 to 12/0

20 mm
SS-5
metal

Gravel

Sand

Bitumen
Emulsion

10

11

818.60

1,286.43 1,717.68

532.80

443.00

0.00

2 Kesavadasupalem 1,249.10 1,257.80 1,784.43 1,803.18 1,609.43 1,446.93 1,455.63 1,284.43 1,039.43
Kesanapalli road from km
0/0 to 14/0

904.10

1,371.93 1,803.18

613.40

530.40

0.00

3 Chintalamori - Gondi
road from km 0/0 to
9/425
4 Lakkavaram Sankaraguptam road
from km 0/0 to 3/0

1,206.35 1,215.05 1,741.68 1,760.43 1,566.68 1,404.18 1,412.88 1,404.18

996.68

861.35

1,329.18 1,760.43

573.80

487.20

0.00

1,168.35 1,177.05 1,703.68 1,722.43 1,528.68 1,366.18 1,374.88 1,203.68

958.68

823.35

1,291.18 1,722.43

532.80

443.00

0.00

5 Visweswarayapuram Gogannamatam road


from km 0/0 to 10/6

1,192.10 1,200.80 1,727.43 1,746.18 1,552.43 1,389.93 1,398.63 1,227.43

982.43

847.10

1,314.93 1,746.18

560.40

472.80

0.00

Average Rate

953.93

40 mm
SS-5
metal

###

###

###

###

###

###

###

###

986.23

850.90

###

###

562.64

475.28

0.00

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ MT

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

verage R.M.R

m 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,


i - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam
gannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from
km 0/0 to 10/6 for the year 2012-13.
Rate
Bitumen
80/100
Grade
12
48,034.15

47,998.15

48,058.15

48,034.15

48,052.15

###
/ MT

LEAD CHARGES
Earth/Gravel/
Sand
loading
10.00
unloading
8.50
stacking
5.50
0.25
50.00
0.5
75.00

Cost of Materials, Labour


Metal
12.80
8.70
8.70
110.00
110.00

1
2
3
4
5
6
7

100.00
106.00
112.00
118.00
124.00
130.00
136.00

120.00
126.00
132.00
138.00
144.00
150.00
156.00

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

142.00
148.00
154.00
160.00
166.00
172.00
178.00
184.00
190.00
196.00
202.00
208.00
214.00
219.00
224.00
229.00
234.00
239.00
244.00
249.00
254.00
259.00
264.00
268.80
273.60
278.40
283.20
288.00
292.80
297.60
302.40
307.20
312.00

162.00
168.00
174.00
180.00
186.00
192.00
198.00
204.00
210.00
216.00
222.00
228.00
234.00
239.75
245.50
251.25
257.00
262.75
268.50
274.25
280.00
285.75
291.50
297.00
302.50
308.00
313.50
319.00
324.50
330.00
335.50
341.00
346.50

Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for Mortar
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

316.80
321.60
326.40
331.20
336.00
340.80
345.60
350.40
355.20
360.00
364.60
369.20
373.80
378.40
383.00
387.60
392.20
396.80
401.40
406.00
410.60
415.20
419.80
424.40
429.00
433.60
438.20
442.80
447.40
452.00
456.60
461.20
465.80
470.40
475.00
479.60
484.20
488.80
493.40
498.00
502.40
506.80
511.20
515.60
520.00
524.40
528.80
533.20
537.60
542.00

352.00
357.50
363.00
368.50
374.00
379.50
385.00
390.50
396.00
401.50
406.50
411.50
416.50
421.50
426.50
431.50
436.50
441.50
446.50
451.50
456.50
461.50
466.50
471.50
476.50
481.50
486.50
491.50
496.50
501.50
506.50
511.50
516.50
521.50
526.50
531.50
536.50
541.50
546.50
551.50
556.25
561.00
565.75
570.50
575.25
580.00
584.75
589.50
594.25
599.00

Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

546.40
550.80
555.20
559.60
564.00
568.40
572.80
577.20
581.60
586.00
590.20
594.40
598.60
602.80
607.00
611.20
615.40
619.60
623.80
628.00
632.20
636.40
640.60
644.80
649.00
653.20
657.40
661.60
665.80
670.00
674.20
678.40
682.60
686.80
691.00
695.20
699.40
703.60
707.80
712.00
716.20
720.40
724.60
728.80
733.00
737.20
741.40
745.60
749.80
754.00

603.75
608.50
613.25
618.00
622.75
627.50
632.25
637.00
641.75
646.50
651.00
655.50
660.00
664.50
669.00
673.50
678.00
682.50
687.00
691.50
696.00
700.50
705.00
709.50
714.00
718.50
723.00
727.50
732.00
736.50
741.00
745.50
750.00
754.50
759.00
763.50
768.00
772.50
777.00
781.50
786.00
790.50
795.00
799.50
804.00
808.50
813.00
817.50
822.00
826.50

141
142
143
144
145
146
147
148
149
150

758.20
762.40
766.60
770.80
775.00
779.20
783.40
787.60
791.80
796.00

831.00
835.50
840.00
844.50
849.00
853.50
858.00
862.50
867.00
871.50

abour

360.00
390.00
500.00
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
39.75
82.00
500.00
830.00
845.00
690.00
560.00
430.00
234.00
225.00
56.00
500.00
830.00
845.00
690.00
560.00
430.00
175.00
60.00
31500.00
32000.00 January, 2009
4000.00
31000.00
70.00
67.00
45.00
20.00
36.00
188.00
193.40

146.00
2760.00
2600.00
2250.00
1320.00
575.00
1550.00
540.00
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
1090.00
620.00
345.00
4.50
4.50
40.00

Unit

Description

20

Rate

Per

Amount

4505.57
57.00
375.00
2831.98

cum
kg
10cum
cum

216.27
213.01
3.79
240.72

Cost, supply and fixing of Guide stones of size 1.20M


x 0.20M x 0.20M using V.R.C.C (1:2:4) mix using 20mm
size SS 5 HBG MC chips and 3.737 kgs of Steel and its
fabrication charges and conveyance to different places
including digging pit of size 0.45 x 0.45m 0.50M & fixing
the stone in position with C.C. (1:5:10) mix with 40mm
size HBG metal in bottom 100MM thick and arranged
the stone & including cost and conveyance of all
materials to work site etc., complete.
0.048
3.737
0.101
0.085

cum
kgs
cum
cum

V.C.C. ( 1:2:4) For guide stone 1.20 x 0.20 x 0.20


Cost of steel
Earth work 0.45 x 0.45 x 0.50
C C ( 1:4:8)
Bottom = 0.45 x 0.45 x 0.100 = 0.020
Alround = 0.45x 0.45 x0.40 =
0.081
Deduct stone = 0.20x 0.20x 0.40 = -0.016
0.085 cum

Or say
21

673.78
673.78
674.00
Each

Cost and supply and fixing of 5th KM stone of size


1.52M x 0.52M x 0.25M using R.C.C. (1:2:4) mix using
20mm size HBG MC chips and 9.00 Kgs of steel & its
fabrication charges and conveyance to site at different
places where ever necessary including cost and
conveyance of all materials to work site etc., complete.
0.1976
9.00
0.203

cum V.C.C. ( 1:2:4) 5km stone (1.52 x 0.52 x 0.25 )


kgs Cost of steel
cum Earth work ( 0.75 x 0.45 x 0.60 )

4505.57
57.00
375.00

cum
kg
10cum

Or say
22

890.30
513.00
7.61
1410.91
1410.91
1411.00
each

Cost and supply and fixing of KM stone of size 1.10M x


0.37M x 0.25M using R.C.C. (1:2:4) mix using 20mm
size HBG MC chips and 5.50 Kgs of steel its fabrication
charges & conveyance to site at different places where
ever necessary including cost and conveyance of all
materials to work etc., complete.
0.102
5.50
0.122

cum V.C.C. 1:2:4 ( 1.10m x 0.37m x 0.25m )


kgs Cost of steel & fabrication
cum Earth work ( 0.60 x 0.45 x 0.45m )

4505.57
57.00
375.00

cum
kg
10cum

Or say
23

459.57
313.50
4.58
777.64
777.64
778.00
each

Cost and supply and fixing of HM stone of size 0.90M x


0.20M x 0.20M using R.C.C. (1:2:4) mix using 20mm
size HBG MC chips and 3.31 Kgs of steel its fabrication
charges & conveyance to site at different places where
ever necessary including cost and conveyance of all
materials to work site etc., complete.
0.036
3.310
0.064

cum V.C.C. 1:2:4 ( 0.90m x 0.20m x 0.20m )


kgs Cost of steel & fabrication
cum Earth work ( 0.40 x 0.40 x 0.40m )

4505.57
57.00
375.00

cum
kg
10cum

Or say

Asst. Executive Engineer (R&B),

162.20
188.67
2.40
353.27
353.27
353.00
each

Deputy Executive Engineer (R&B),

R&B Section : Malikipuram

R&B Sub-division : Razole

### Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem
specification including cost,seignorage of all materials and including premixing the material with water at OMC
in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc.,
as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4 th revision) for finished item of
work. (Payment based on levels for finished item of work)
Unit = cum
Page 110,111 of MoRT&H SDB
Taking output = 225 cum
(A) Labour
0.48 nos. Mate
2.00 nos. Mazdoor skilled
10.00 nos. Mazdoor
Total
(B) Machinery
6.60 hr
Wet mix plant of 60 tonne hr. capacity
6.00 hr
Electric generating set 125 KVA
6.00 hr
front end loader 1 cum capacity
6.00 hr
Mechanical Paver finisher 100 TPH
3.90 hr
Power road roller 8-10 T
3.00 hr
Water tanker
Total
(C) Material
89.10 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30%
(Av. Of 40-45, 25-27, 19-22mm )
118.80 cum

89.10 cum
(D)
6.00
(E)
(F)

22.4 to 2.36mm IRC&MoRT&H HBG M/C metal@40%


(Av. Of 19-22mm, 12-14mm, 9.5-11.2mm, 5-7mm,
2.36 - 5mm )

2.36mm to 75 micron @ 30% (2.36mm & below)


Total
Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)
%
Total of (A) + (B)+( C)+(D)
Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum

188.00
193.40
146.00

day
day
day

90.24
386.80
1460.00
1937.04

1320.00
1090.00
0.00
0.00
540.00
345.00

hr
hr
hr
hr
hr
hr

8712.00
6540.00
0.00
0.00
2106.00
1035.00
18393.00

1559.04

cum

138910.17

1389.98

cum

165129.62

850.90

cum

75815.19
379854.98
0.00
400185.02
0.00
400185.02
1778.60
1779.00
Cum

DATAS
Name of Work ::- Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b)
Kesavadasupalem - Kesanapalli road (via) Sankaraguptam,
Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d)
Lakkavaram - Sankaraguptam road from km 0/0 to 3/0 (e)
Visweswarayapuram - Gogannamatam road (via) Lakkavaram,
Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6
for the year 2012-13.
ROAD WORK
Description of Item

Quantity

Rate

per

1 Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 600mm/800mm/1000mm dia. R.C.C Hume pipes in position including lifting, aligning,
lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and
2906 (4th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-inCharge for finished item of work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
600 mm Dia.,
(A)
0.14
0.50
3.00

Labour
nos
nos
nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 600mm Dia., pipes
Total
(C) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)
6.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

188.00
206.00
146.00

day
day
day

1859.00

RM

188.00
206.00
146.00

nos.
nos.
nos.

3051.00

RM

800 mm Dia.,
(A)
0.18
0.50
4.00

Labour
nos
nos
nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 800mm Dia., pipes
Total
(C) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)
6.00 %
(D) Total of (A) + (B)+( C)

(E) Add Contractors Profit at 10% on (D)


Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

Chief Engineer (R&B) Roads

Chief Engineer (R&B) NABARD

Chief Engineer (R&B) Roads

Engineer-in-Chief (R&B)

Managing Director APRDC

Administration & NH

m 0/0 to 12/0 (b)


karaguptam,
4/0 (c) Chintalamori 0 to 9/425 (d)
0 to 3/0 (e)
a) Lakkavaram,
alem from km 0/0 to 10/6

Amount

m Dia., NP-3 class for pipe


Labour charges for laying,
n including lifting, aligning,
cification 2900, 2905 and
ected by the Engineer-in-

26.32
103.00
438.00
567.32
23237.50
23237.50
0.00
23804.82
0.00
23804.82
1904.39
1904.00
1 RM

33.84
103.00
584.00
720.84
38137.50
38137.50
0.00
38858.34

0.00
38858.34
3108.67
3109.00
1 RM

R&B) NABARD

(R&B)

NH

DATAS FOR MAINTENANCE ITEMS


Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
1 Providing B.T. patch work with 40-45 mm HBG metal using 80/100 Grade Bitumen at 42Kgs / 1Cum
including cost of materials and cost of Bitumen and labour charges for all operations such as trimming the
edges of the pot holes, cleaning the surface, applying tack coat with hot Bitumen, carrying and spreading
stone ballast by hand tamping with rammers, spreading Bitumen to the required consistency including
fuel charges for heating Bitumen and hire and all other incidental charges and operations charges of
Bitumen boiler, etc., complete for finished item of work.
(As per Memo No. Maintenance/EE(TEC) /TA.13/AE.4/2006, dt.18.03.2006.)
Materials
Bitumen 80/100 Grade
42 Kgs.
42 Kgs. 48,035.35 /1MT
40-45 mm HBG metal
1 Cum.
1 cum
1,204.60 /1Cum
Labour Charges
Mazdoor
2.86 Nos.
146.00 / each
Machinery
T&P Charges L.S.
say

2,017.48
1,204.60
417.56
40.00
3,679.64
3,680.00
/ 1 Cum.

2 Providing B.T. patch work with 10-11.20 mm HBG machine crushed chips using 80/100 Grade Bitumen at
72Kgs / 1Cum including cost of materials and cost of Bitumen and labour charges for all operations such
as trimming the edges of the pot holes, cleaning the surface, applying tack coat with hot Bitumen,
carrying and spreading stone ballast by hand tamping with rammers, spreading Bitumen to the required
consistency including fuel charges for heating Bitumen and hire and all other incidental charges and
operations charges of Bitumen boiler, etc., complete for finished item of work.
(As per Memo No. Maintenance/EE(TEC) /TA.13/AE.4/2006, dt.18.03.2006.)
Materials
Bitumen 80/100 Grade
72 Kgs.
72 Kgs. 48,035.35 /1MT
10-11.20 mm HBG chips
1 Cum.
1 cum
1,402.43 /1 cum
Labour Charges
Mazdoor
2.86 Nos.
146.00 / each
Machinery
T&P Charges L.S.
say

3,458.55
1,402.43
417.56
40.00
5,318.54
5,319.00
/ 1 Cum.

3 Providing W.B.M. patch work with 40-45 mm HBG metal including cost of all materials like metal and
gravel, and labour charges for all operations such as picking the existing metalled surface 50mm to
100mm deep and spreading metal and blindage with gravel, watering and tamping, etc., complete for
finished item of work as directed by the Engineer-in-charge.
Materials
40-45 mm HBG metal
1 Cum.
1.00 cum
Gravel for blindage
1 Cum. / 4
0.25 cum
Labour Charges
Rate as per Item Sl. No.345, Pg.30 of Common SSR 2008-09
Rate per 0.50 Cum. (i.e., 10 x 1 x 0.50 = 0.50 Cum.) = Rs.28.00
Rate per 1 Cum. (28.00 x 2 = 56.00)

1,204.60 /1Cum
562.64 /1 cum

1,204.60
140.66

28.00 /10Sqm

say

56.00
1,401.26
1,401.00
/ 1 Cum.

4 Stripping the excess soil from the shoulder surface / Making up loss of material / irregularities on the
shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment for
sectioning the berms / shoulders as per MORT&H Specification No. 3003
Rate as per Circular Memo. No:Maintenance/EE(TEC)/TA-15/AE4/2005, Dt:13-05-2005
3.00
/ 1 Sqm.
5 Clearing light Jungle / Scrub Jungle from berms of the road embankment

Rate as per S.S.R. 2008-2009 (SSR Sl. No.196, Pg.21)

2.00
/ 1 Sqm.

6 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps.
Rate as per S.S.R. 2008-2009 (SSR Sl. No.198, Pg.21)

3.30
/ 1 Sqm.

7 Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc.,
complete including seignioarge charges for finished item of work as per MoRT&H specification 301(4th
Revision) and as directed by the Engineer-in-Charge for cutting High berms and filling Low berms etc.
complete.
Earth work Excavation
Add Seigniorage charges

1.00
1.00

Cum
cum

37.50
22.00

Cum
cum
or say

37.50
22.00
59.50
59.50
/1 Cum.

8 Providing gravel irrespective of thickness in layers including cost of gravel, spreading, watering and rolling
with hand roller etc., complete.
Cost of Gravel
1.16 cum
562.64 / cum
652.66
Spreading gravel rate as per SSR (Sl. No.349, Pg.30)
1.00 cum
230.00 / 10cum
23.00
675.66
or say
676.00
/ 1 Cum.
9 Cost of Cement Mortars (1:8)
Cost of Sand for mortar
Cost of Cement
Labour for mixing cement mortar (S. No.184, Pg.20)

1.00 Cum
180.00 Kgs.
1.00 Cum

475.28 Cum.
5,400.00 MT
28.00 Cum.
say

475.28
972.00
28.00
1,475.28
1,475.00
/ 1Cum.

10 Brick Masonry in CM (1:8) using 2nd class bricks having a crushing strength of 35 kgs / sqm including
cost, conveyance and seigniorage of all materials, labour charges, etc., complete as per standard
specifications for finished item of work
Cost of Bricks (Sl. No.1 Pg.9 (Building items))
512.00 Nos.
3,128.50 / 1000
1,601.79
Cost of Cement Mortor (1:8)
0.20 Cum. 1,475.28 1 Cum.
295.06
Brick layer 1st class
0.42 Nos.
206.00 each
86.52
Brick layer 2nd class
0.98 Nos.
188.00 each
184.24
Man mazdoor
0.70 Nos.
146.00 each
102.20
Woman mazdoor
2.10 Nos.
146.00 each
306.60
2,576.41
say
2,576.00
/ 1Cum.
11 Cost of Cement Mortars (1:5)
Cost of Sand for mortar
Cost of Cement
Labour for mixing cement mortar (S. No.184, Pg.20)

1.00 Cum
288.00 Kgs.
1.00 Cum

475.28 Cum.
5,400.00 MT
28.00 Cum.
say

475.28
1,555.20
28.00
2,058.48
2,058.00
/ 1Cum.

12 Plastering 12mm thick in CM (1:5) including cost, conveyance and seigniorage charges of all materials
including labour charges, etc., complete as per standard specifications for finished item of work
Cost of Cement Mortor (1:5)
0.15 Cum. 2,058.48 Cum.
308.77
Brick layer 1st class
0.33 Nos.
206.00 each
67.98
Brick layer 2nd class
0.77 Nos.
188.00 each
144.76
Man mazdoor
0.50 Nos.
146.00 each
73.00

Woman mazdoor

1.10 Nos.

146.00 each
say

160.60
755.11
755.00
/ 10Sqm.

13 White washing single coat with best shell sime slaked and screened from approved source including cost
and conveyance of shell lime, gum, gangi water, pickley peace juce, etc., complete for finished item of
work as directed by the Engineer-in-Charge.
Cost of Shell lime (SSR Item No.187) Pg.No.20
Gum, Gunji water & Prickly pier juice
I Class Painter
II Class Painter
Man Mazdoor
Woman Mazdoors.
Total Rate per 100 Sqm.

0.05 Cum.
0.33
0.77
0.30
1.90

Nos.
Nos.
Nos.
Nos.

780.00
L.S.
206.00
188.00
146.00
146.00

/ Cum.
/ each
/ each
/ each
/ each

39.00
2.00
67.98
144.76
43.80
277.40
574.94
57.50
/ 10 Sqm.

14 Providing Synthetic Enamel Paint Single coat including cost of Paint, conveyance to site and labour
charges for all operations viz., cleaning, washing, painting etc., complete for finished item of work
Synthetic enamel paint (SSR Item No.390) Pg.No.23
Painter 1st class
Painter 2nd class

0.70 Lit.
0.21 Nos.
0.49 Nos.

175.00 Lt.
206.00 each
188.00 each
say

122.50
43.26
92.12
257.88
258.00
/10Sqm.

15 Cost of Cement Concrete (1:5:10) using 40mm HBG metal (SS5)


Cost of 40mm size HBG metal (SS5)
Cost of Sand for Mortor
Const of Cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor

0.92
0.46
165.60
0.06
0.14
1.40
1.80

Cum.
Cum.
Kgs.
Nos.
Nos.
Nos.
Nos.

1,318.73
475.28
5,400.00
206.00
188.00
146.00
146.00

1Cum.
1Cum.
MT
each
each
each
each

1,213.23
218.63
894.24
12.36
26.32
204.40
262.80
2,831.98
/ 1Cum.

16 Tor / Mild Steel wrought and put up


Cost of steel as per SSR
1 M.T.
Fabrication charges including binding wire
1 M.T.
(S No.147, Pg.14 of Buildings SSR)

48,000.00 MT
9.00 1 Kg
say

48,000.00
9,000.00
57,000.00
57.00
/ 1 Kg.

17 Cost of Reinforced Cement Concrete (1:2:4) using 20mm HBG chips (SS5)
Cost of 20mm size HBG chips (SS5)
Cost of Sand for Mortor
Const of Cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor

0.92
0.46
330.00
0.12
0.28
2.10
3.50

Cum.
Cum.
Kgs.
Nos.
Nos.
Nos.
Nos.

1,749.98
475.28
5,400.00
206.00
188.00
146.00
146.00

1Cum.
1Cum.
MT
each
each
each
each

1,609.98
218.63
1,782.00
24.72
52.64
306.60
511.00
4,505.57
/ 1Cum.

18 Earth work excavation in Loamy and Clayey soils like black cotton soils, red earth and ordinary gravel for
foundations of KM Stones / HM Stones / Guard Stones

Cost as per SSR 20-B (Sl. No.240 Pg.24)


Add Seigniorage charges

1.00 Cum.
1.00 Cum.

37.50 1Cum.
22.00 1Cum.

37.50
22.00
59.50
/1Cum.

Schedule of provisions provided in the Maintenance estimate as per


G.O.Ms. No.132, T(R&B) Dept., dt.22.06.2005

Sl.
No
.

Name of the road

: Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b)


Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,
Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road (via) Mori,
Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from
km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram,
Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the
year 2012-13.

Eligible amount

: Rs.8,50,000 /-

Details of Provision

Amount provided %age of amount


%age of amount
in the estimate
provided in the
as per G.O.
(in Rs.)
estimate

a B.T. Pot hole filling B.T. edge repairs, (and other


itmes on B.T. Cariageway such as crack sealing,
minor surface repair, etc.,)

55% to 65%

Rs.6,27,744 /-

73.85%

b Unpaved shoulder repair (Berms) / Surface


drains maintenance / including gravelling berms

7% to 13%

Rs.93,043 /-

10.95%

c Jungle clerance / tree and shrub trimming

4% to 6%

Rs.12,000 /-

1.41%

d Culvert repairs / vents maintenance / parapet


wall repairs / retaining wall repair, etc.,

5% to 9%

Rs.9,238 /-

1.09%

e Bridge repairs including expansion joints /


bearings / parapets, etc.,

2% to 4%

Rs.0 /-

0.00%

7% to 13%

Rs.51,068 /-

6.01%

Sign maintenance / guard stones maintenance /


painting KM / HM stones

g Other Items (RCC pipes)

4% to 6%

Rs.0 /0.00%
----------------------- ------------------------Rs.7,93,093 /93.31%

h Provision for VAT @ 4%

Rs.31,724 /-

Provision for Technical agents

Rs.2,000 /-

Provision for Insurance Premium

Rs.2,000 /-

k Provision for Price Adjustment


l

Unforeseen items such as DTP charges, Xerox


charges, etc.

Rs.10,000 /Rs.11,183 /Rs.8,50,000 /-

Note : The total of all the above items shall not exceed the
Kilometrage rates. The percentage of individual items
can be diverted to other fruitful needy items only ofter
completing the particular item in full.
Estimate Value shall be restricted to 75% of the amount
arrived based on KM War rates of the G.O.

Any other Remarks

DETAILED CUM ABSTACT ESTIMATE


ame of the work: Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b)
Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,
Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road (via)
Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram Gogannamatam
road
(via)
Lakkavaram,
Irusumanda,
Gudapalli,
Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.
Sl
.
N
o
1

Description of item

No

Length

Breadt
h
5

Depth
6

Quantit
y
7

Rate /
per
8

Amount
9

1 Providing B.T. patch work with 40-45 mm HBG metal using 80/100 Grade
Bitumen at 42Kgs / 1Cum including cost of materials and cost of Bitumen
and labour charges for all operations such as trimming the edges of the pot
holes, cleaning the surface, applying tack coat with hot Bitumen, carrying and
spreading stone ballast by hand tamping with rammers, spreading Bitumen to
the required consistency including fuel charges for heating Bitumen and hire
and all other incidental charges and operations charges of Bitumen boiler,
etc., complete for finished item of work.
As per separate sheet enclosed

78.00
Cum.

### 287,040.00
/ 1 Cum.

2 Providing B.T. patch work with 10-11.20 mm HBG machine crushed chips
using 80/100 Grade Bitumen at 72Kgs / 1Cum including cost of materials
and cost of Bitumen and labour charges for all operations such as trimming
the edges of the pot holes, cleaning the surface, applying tack coat with hot
Bitumen, carrying and spreading stone ballast by hand tamping with
rammers, spreading Bitumen to the required consistency including fuel
charges for heating Bitumen and hire and all other incidental charges and
operations charges of Bitumen boiler, etc., complete for finished item of work.
As per separate sheet enclosed

48.00
Cum.

### 255,312.00
/ 1 Cum.

3 Providing, Laying, Spreading and compacting graded HBG crushed stone


aggregate to Wet Mix macadem specification including cost,seignorage of all
materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by tipper to site , laying in
uniform layers with paver in
base courses on well prepared surface and
compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th
revision) for finished item of work.

As per separate sheet enclosed

48.00
Cum.

###
/ 1 Cum.

85,392.00

3.00
/ 1 Sqm.

60,000.00

4 Stripping the excess soil from the shoulder surface / Making up loss of
material / irregularities on the shoulder to the design level by adding fresh
approved soil and compacting with appropriate equipment for sectioning the
berms / shoulders as per MORT&
As per separate sheet enclosed

20000
Sqm.

5 Removal of unserviceable soils upto SDR including excavation, loading and


disposal upto 1000 mts etc., complete including seignioarge charges for
finished item of work as per MoRT&H specification 301(4th Revision) and as
directed by the Engineer-in-Charge for cutting High berms and filling Low
berms etc. complete.

2
3
As per separate sheet enclosed

7
8
10.00
59.50
Cum
/ 1 Cum
Providing
gravel
irrespective
of
thickness
in
layers
including
cost
of
gravel,
6
spreading, watering and rolling with hand roller etc., complete.
As per separate sheet enclosed

48.00
Cum

9
595.00

676.00
/ 1 Cum

32,448.00

6000
Sqm.

2.00
/ 1 Sqm.

12,000.00

3.00
Cum

###
/ 1 Cum

7,728.00

20
Sqm.

755.00
/ 10 Sqm.

1,510.00

1.00
Nos.

778.00
/ each

778.00

10.00
Nos.

353.00
/ each

3,530.00

50.00
Nos.

674.00
/Each

33,700.00

7 Clearing light Jungle / Scrub Jungle from berms of the road embankment
As per separate sheet enclosed

8 Brick Masonry in CM (1:8) using 2nd class bricks having a crushing


strength of 35 kgs / sqm including cost, conveyance and
seigniorage of all materials, labour charges, etc., complete as per
standard specifications for finished item of work
As per separate sheet enclosed

9 Plastering 12mm thick in CM (1:5) including cost, conveyance and


seigniorage charges of all materials including labour charges, etc.,
complete as per standard specifications for finished item of work
As per separate sheet enclosed

10 Cost and supply and fixing of KM stone of size 1.10M x 0.37M x


0.25M using R.C.C. (1:2:4) mix using 20mm size HBG MC chips and
5.50 Kgs of steel its fabrication charges & conveyance to site at
different places
where ever
necessary including cost and
conveyance of all materials to work etc., complete.

As per separate sheet enclosed

11 Cost and supply and fixing of HM stone of size 0.90M x 0.20M x


0.20M using R.C.C. (1:2:4) mix using 20mm size HBG MC chips and
3.31 Kgs of steel its fabrication charges & conveyance to site at
different places
where ever
necessary including cost and
conveyance of all materials to work site etc., complete.

As per separate sheet enclosed

12 Cost, supply and fixing of Guide stones of size 1.20M x 0.20M x


0.20M using V.R.C.C (1:2:4) mix using 20mm size SS 5 HBG MC
chips and 3.737 kgs of Steel and its fabrication charges and
conveyance to different places including digging pit of size 0.45 x
0.45m 0.50M & fixing the stone in position with C.C. (1:5:10) mix
with 40mm size HBG metal in bottom 100MM thick and arranged
the stone & including cost and conveyance of all materials to work
site etc., complete.
As per separate sheet enclosed

1
2
3
4
5
6
7
13 White washing two coats with best shell sime slaked and screened from
approved source including cost and conveyance of shell lime, gum, gangi
water, pickley peace juce, etc., complete for finished item of work as directed
by the Engineer-in-Charge.

As per separate sheet enclosed

800.00
Sqm

57.50
10 Sqm

4,600.00

14 Providing Synthetic Enamel Paint Single coat including cost of Paint,


conveyance to site and labour charges for all operations viz., cleaning,
washing, painting etc., complete for finished item of work
As per separate sheet enclosed

200.00 258.00
Sqm. / 10 Sqm.

15 Painting letters and figures of size 5to 8 and 8 to 10 cm with synthetic enamel
paint on 5th km, km, HM and guide stones and village pedestals etc.
complete.
As per separate sheet enclosed
1,650.00
Nos

2.00
Each

5,160.00

3,300.00

---------------793,093.00
31,724.00

16 Provosion for VAT @ 4%


17 Provision for technical agents

2,000.00

18 provision for Insurance premium

2,000.00

19 Provision for Price Adjustment

10,000.00

20 Unforeseen items such as DTP charges, Xerox charges, Advt. charges etc.

11,183.00

Total

###

Asst. Executive Engineer (R&B),


Deputy Executive Engineer (R&B),
Executive Engineer (R&B),
R&B Section : Malikipuram
R&B Sub-division : Razole R&B Division : Amalapuram

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

1) Sub-Division

R&B Sub Division, Razole

2) Section

R&B Section, Malikipuram

3) Name of the Road

Kunavaram - Kesanapalli road from km 0/0 to 12/0

4) Classification

M.D.R.

5) Length of the road

12.000 Kms.

6) Road width

S.L. :

12.00 km I.L. :

7) Surface of the road

C.C. :

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

---

B.T. : 12.000 Kms.

D.L. :

--

WBM :

Stretch

Length

km 0.000 to 6.000
km 9.000 to 12.000

6.000 Kms
3.000 Kms

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

12.000 Kms

Rs. 12,000 /-

---

Rs. 15,000 /-

---

Rs. 6,000 /TOTAL

10) Any other Remarks

Total Amount including 50% extra for Amalapuram Division


:

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

1) Sub-Division

R&B Sub Division, Razole

2) Section

R&B Section, Malikipuram

3) Name of the Road

Kesavadasupalem - Kesanapalli road from km 0/0 to 14/0

4) Classification

O.D.R.

5) Length of the road

14.000 Kms.

6) Road width

S.L. : - 14.000 Kms

I.L. : --

7) Surface of the road

C.C. : --

B.T. :14.000 Kms.

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Stretch

D.L. : --

WBM : ---

Length

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

14.000 kms

Rs. 12,000 /-

---

Rs. 15,000 /-

---

Rs. 6,000 /TOTAL

Total Amount including 50% extra for Amalapuram Division


10) Any other Remarks

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

1) Sub-Division

R&B Sub Division, Razole

2) Section

R&B Section, Malikipuram

3) Name of the Road

Chintalamori - Gondi road from km 0/0 to 9/425

4) Classification

O.D.R.

5) Length of the road

9.425 Kms.

6) Road width

S.L. : 9.425 Kms

I.L. : --

7) Surface of the road

C.C. : --

B.T. : 9.425 Kms.

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Stretch

D.L. : --

WBM : ---

Length

km 0.000 to 3.400
km 6.365 to 9.000

3.400 Kms
2.635 Kms

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

9.425 kms

Rs. 12,000 /-

Rs. 15,000 /-

---

Rs. 6,000 /TOTAL

10) Any other Remarks

Total Amount including 50% extra for Amalapuram Division


:

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

1) Sub-Division

R&B Sub Division, Razole

2) Section

R&B Section, Malikipuram

3) Name of the Road

Lakkavaram - Sankaraguptam road from km 0/0 to 3/0

4) Classification

O.D.R.

5) Length of the road

3.000 Kms.

6) Road width

S.L. : - 3.000 kms

I.L. : --

D.L. : --

7) Surface of the road

C.C. : --

B.T. : 3.000 Kms.

WBM : ---

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Stretch

Length

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane

Length
in Kms.

KM war
rate per KM

3.000 kms

Rs. 12,000 /-

b) Double Lane / Other Multi lane


B) WBM / Gravel / Other Roads

Rs. 15,000 /---

Rs. 6,000 /TOTAL

10) Any other Remarks

Total Amount including 50% extra for Amalapuram Division


:

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli
road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c) Chintalamori Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road
from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda,
Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

1) Sub-Division

R&B Sub Division, Razole

2) Section

R&B Section, Malikipuram

3) Name of the Road

Visweswarayapuram - Gogannamatam road from km 0/0 to 10/6

4) Classification

O.D.R.

5) Length of the road

10.600 Kms.

6) Road width

S.L. : - 10.600 Kms

I.L. : -- -

D.L. : --

7) Surface of the road

C.C. : --

B.T. : 8.720 km

WBM : 1.880 km

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Stretch

Length

km 2.800 to 8.720

5.920 Kms

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

8.720 Kms

Rs. 12,000 /-

Rs. 15,000 /-

1.880 kms

Rs. 6,000 /TOTAL

Total Amount including 50% extra for Amalapuram Division


10) Any other Remarks

ABSTRACT
Name of work :

Sl.
No.

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem Kesanapalli road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to 14/0 (c)
Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via)
Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the
year 2012-13.

Name of the road

Classification

Eligibility amount as
per G.O. (including
50% Addl. Grant)

Kunavaram - Kesanapalli road from km 0/0 to 12/0

M.D.R.

Rs.216,000 /-

Kesavadasupalem - Kesanapalli road from km 0/0 to 14/0

O.D.R.

Rs.252,000 /-

Chintalamori - Gondi road from km 0/0 to 9/425

O.D.R.

Rs.169,650 /-

Lakkavaram - Sankaraguptam road from km 0/0 to 3/0

O.D.R.

Rs.54,000 /-

Visweswarayapuram - Gogannamatam road from km 0/0 to


10/6

O.D.R.

Rs.173,880 /-

TOTAL

--------------------------Rs.8,65,530 /-

Restricted to

Or Say

Rs 8,50,000/---------------------------

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

e works

vadasupalem - Kesanapalli
to 14/0 (c) Chintalamori am - Sankaraguptam road
Lakkavaram, Irusumanda,
12-13.

UM: -

During the year


2011-12
2011-12

Amount
required

144000
----Rs. 144,000 /Rs.216,000 /-

e works

vadasupalem - Kesanapalli
to 14/0 (c) Chintalamori am - Sankaraguptam road
Lakkavaram, Irusumanda,
12-13.

UM:

During the year

Amount
required
Rs.168,000 /--Rs.168,000 /Rs.252,000 /-

e works

vadasupalem - Kesanapalli
to 14/0 (c) Chintalamori am - Sankaraguptam road
Lakkavaram, Irusumanda,
12-13.

UM:

During the year


2010-11
2010-11

Amount
required

Rs.113,100 /--Rs.113,100 /Rs.169,650 /-

e works

vadasupalem - Kesanapalli
to 14/0 (c) Chintalamori am - Sankaraguptam road
Lakkavaram, Irusumanda,
12-13.

UM:

During the year


-

Amount
required

Rs.36,000 /-

--Rs.36,000 /-

Rs.54,000 /-

e works

vadasupalem - Kesanapalli
to 14/0 (c) Chintalamori am - Sankaraguptam road
Lakkavaram, Irusumanda,
12-13.

0 to 10/6

UM:

During the year


2012-13

Amount
required

Rs.104,640 /Rs.11,280 /Rs.115,920 /-

Rs.173,880 /-

(b) Kesavadasupalem m from km 0/0 to 14/0 (c)


o 9/425 (d) Lakkavaram Gogannamatam road (via)
om km 0/0 to 10/6 for the

Restricted to
75% amount

-------------------------------------------------

xecutive Engineer (R&B),


R&B Division : Amalapuram

Name of the work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori,
Padamatipalem from km 0/0 to 14/0 (c) Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram - Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli,
Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

Cum

Cum

Kunavaram
Kesanapalli road from
km 0/0 to 12/0

36

15

2 Kesavadasupalem
Kesanapalli road from
km 0/0 to 14/0

Chintalamori - Gondi
road from km 0/0 to
9/425
Lakkavaram
Sankaraguptam
from km 0/0 to 3/0

road

Visweswarayapuram
Gogannamatam
road
from km 0/0 to 10/6

Total

KM, HM &
Guard Stones
KM HM Guard

with
primer

300
MM

600
MM

RM

RM

Sqm

Sqm

Cum

Cum

Cum

Cum

18

4,000

---

2,500

12

---

---

50

150

400

---

---

2,000

---

1,500

---

---

---

30

200

500

---

---

2,000

---

1,000

15

---

---

---

---

50

150

300

---

---

24

18

12

10,000

---

500

---

---

20

---

20

150

100

---

---

2,000

---

500

---

---

---

12

---

50

150

350

---

---

78

48

48

20,000

6,000

10

48

20

10

50

200

800 1,650

0.00

0.00

Cum

Cum

Cum

Sqm

Sqm

Sqm

Cum

Cum

Cum

Cum

Sqm

Sqm

Sqm

RM

RM

Deputy Executive Engineer (R&B),

Cum Nos. Nos. Nos.

Sqm

with
out
primer
Sqm Sqm

Pipe Culverts

Sqm

Asst. Executive Engineer (R&B),

Sqm Nos. Nos. Nos.

Synthetic
Enamel paint

Painting Letters

Brick work for


Earth Gravel culverts using
work
filling
for high low
Scrub berms berms II Class Fly Ash
Juliflora
jungle
Bricks Bricks

White washing

40 mm 10-11.2
HBG
mm HBG

Jungle
clearance

Plastering for
culverts

Name of the road

Wetmix
macadam

Sl.
No.

BT Patch work with


Bitumen/Emulsion

Sectioning of
Berms

Details of Maintanance Items

Executive Engineer (R&B),

Nos

Cum

Cum

R&B Section : Malikipuram

Sqm

Sqm

Sqm

Cum

Cum

Cum

R&B Sub-division : Razole

Cum

KM, HM &
Guard Stones
KM HM Guard

Sqm Nos. Nos. Nos.

Synthetic
Enamel paint
with
primer
Sqm

with
out
primer
Sqm Sqm

R&B Division : Amalapuram

Painting Letters

Brick work for


Earth Gravel culverts using
work
filling
for high low
Scrub berms berms II Class Fly Ash
Juliflora
jungle
Bricks Bricks

White washing

Jungle
clearance

Plastering for
culverts

40 mm 10-11.2
HBG
mm HBG

Sectioning of
Berms

Name of the road

Wetmix
macadam

Sl.
No.

BT Patch work with


Bitumen/Emulsion

Pipe Culverts
300
MM

600
MM

RM

RM

KM wise Requirement of Patchwork quantities under Maintenance work


Name of work :

Mtc of (a) Kunavaram - Kesanapalli road from km 0/0 to 12/0 (b) Kesavadasupalem - Kesanapalli road (via) Sankaraguptam, Chintalamori, Padamatipalem from km 0/0 to
14/0 (c) Chintalamori - Gondi road (via) Mori, Addalapalem from km 0/0 to 9/425 (d) Lakkavaram - Sankaraguptam road from km 0/0 to 3/0 (e) Visweswarayapuram Gogannamatam road (via) Lakkavaram, Irusumanda, Gudapalli, Katrenipadu, Mutyalapalem from km 0/0 to 10/6 for the year 2012-13.

Kunavaram - Kesanapalli
road

Kesavadasupalem Kesanapalli road

B.T.
B.T. Patch
Sl.
Patch
work with W No.
work with
10 M
40MM
11.20MM M
HBG
HBG

Lakkavaram - Sankaraguptam
road

Chintalamori - Gondi road

B.T.
Sl.
B.T. Patch Patch
W No
work with work with
M .
40MM
10 M
HBG
11.20MM
HBG

B.T. Patch
Sl.
B.T. Patch
work with W No.
work with
10 M
40MM
11.20MM M
HBG
HBG

Visweswarayapuram Gogannamatam road

B.T. Patch
Sl.
work with
No
W
10 .
11.20MM M
M
HBG

B.T. Patch
B.T. Patch
work with W
work with
10 M
40MM
11.20MM M
HBG
HBG

Sl.
No.

KM

km 1

km 1

2.000

3.000

KM 1

km 1

6.000

6.000

km 1

1.000

1.000

km 2

km 2

2.000

1.000

KM 2

km 2

12.000

6.000

km 2

1.000

1.000

km 3

km 3

2.000

KM 3

km 3

6.000

6.000

km 3

1.000

1.000

km 4

km 4

1.000

2.000

KM 4

3.000

1.000

km 4

km 5

km 5

1.000

1.000

KM 5

3.000

1.000

km 5

km 6

km 6

KM 6

3.000

1.000

km 6

km 7

12.000

5.000

km 7

KM 7

km 7

km 8

12.000

5.000

km 8

KM 8

km 8

KM

KM

KM

B.T. Patch
work with
40MM HBG

KM

km 9

12.000

5.000

km 9

KM 9

km 9

10

km 10

10 km 10

10 KM 10

10 km 10

11

km 11

11 km 11

11 km 11

12

km 12

12 km 12

13 km 13

14 km 14

6.000

9.000

3.000

3.000

TOTAL

36.000

15.000

18

9.000

3.000

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

Executive Engineer (R&B),

R&B Section : Malikipuram

R&B Sub-division : Razole

R&B Division : Amalapuram

24.000

18.000

12

DATA FOR

HM STONES

1) Supplying and fixing of HM Stones (as per approved drawings) with RCC (1:2:4) mix using 20mm
(SS.5) size HBG machine crushed chips for precast stones and fixing in foundation concrete (1:4:8)
mix using 40mm (SS.5) size HBG metal and including all labour charges for earth work excavation,
laying foundation concrete and fixing in position and prepare the pedastals as per drawings and
plastering with C.M. (1:3) 12mm thick and fixing with R.C.C. Collars plain bended confirming to I.S.
458 / 1988 including cost, seigniorage and conveyance of all materials and labour charges for all
operations such as curing etc., complete for finished item of work as directed by the departmental
officers incharge of the work.

Sl.
No.
1

Item
2

No
.
3

L
4

Measurements
B
5

D
6

Content
Rate / per
s
7
8

1 Earth work excavation

1x1

TT / 4 x 0.35 x 0.35 x 0.40

0.039
cum.

2 Cement concrete (1:4:8)

1x1

TT /4 x 0.35 x 0.35 x 0.40

0.039

Deductions

3 Steel reinforcement
6mm dia vertical
6mm dia stirrups

1x2

0.150

0.100

0.300

1.90 = 2.80 @ 0.222 Kgs / 1 m

1x5 x 0.375 = 1.875 @ 0.222 Kgs/1m

4 RCC (1:2:4) using 20mm HBG 1


metal (SS5)

Amount
9

48,000.00
/10 cum

187.20

24.72
/1cum

0.84

0.416
1.038
Kg.

37.50
/ 1Kg.

38.93

#REF!
/1cum

#REF!

160.60
/10 sqm

7.40

-0.005
0.034
cum.

0.622

0.20

0.150

0.750

0.023
cum.

0.500

0.350

--

0.175

1 x TT x 0.35 x 0.20

--

0.220

1 x TT/4 x 0.352

--

0.096

--

-0.03

5 Plastering in CM (1:3) 12mm


thick
1x1
Pedestal

Deduct HM stone portion

0.20

0.150

0.461
sqm.
6 Provision for 350mm dia RCC collars rate as per S.S.R.

each

97.00

7 Add extra for Form work for the precast concrete block and
preparation of pedestals alround, conveyance, fixing at the site, etc.,

L.S.

1.11

#REF!
/ each

DATA FOR

KM STONES

1) Supplying and fixing of KM Stones (as per approved drawings) with RCC (1:2:4) mix using 20mm
(SS.5) size HBG machine crushed chips for precast stones and fixing in foundation concrete (1:4:8)
mix using 40mm (SS.5) size HBG metal and including all labour charges for earth work excavation,
laying foundation concrete and fixing in position and prepare the pedastals as per drawings and
plastering with C.M. (1:3) 12mm thick and fixing with R.C.C. Collars plain bended confirming to I.S.
458 / 1988 including cost, seigniorage and conveyance of all materials and labour charges for all
operations such as curing etc., complete for finished item of work as directed by the departmental
officers incharge of the work.
Sl.
No.
1

Item
2

No
.
3

L
4

Measurements
B
5

D
6

Content
Rate / per
s
7
8

1 Earth work excavation

1x1

TT / 4 x 0.60 x 0.60 x 0.60

0.170
cum.

2 Cement concrete (1:4:8)

1x1

TT /4 x 0.60 x 0.60 x 0.70

0.198

Deductions

3 Steel reinforcement
8mm dia vertical
6mm dia stirrups

1x2

0.350

0.250

0.550

2.50 = 5.00 @ 0.39 Kgs / 1 m

1x7 x 1.075 = 7.525 @ 0.222 Kgs/1m

-0.048
0.150
cum.

Amount
9

48,000.00
/10 cum

816.00

24.72
/1cum

3.71

37.50
/ 1Kg.

135.79

#REF!
/1cum

#REF!

160.60
/10 sqm

27.78

1.950
1.671
3.621
Kg.

4 RCC (1:2:4) using 20mm


HBG metal (SS5)

ler portion
Semicircular

ler portion

0.935

0.350

0.250

1/2 x TT/4 x 0.35 x 0.35 x 0.25

0.082
0.012
0.094
cum.

5 Plastering in CM (1:3) 12mm


thick

ler portion
ler portion top

1xTT/2 x 0.350

For semicircular faces


Pedestal
top
Deduct KM stone portion

1.200

--

0.924

0.250

--

0.138

2 x TT/4 x 0.352 x 1/2

--

0.096

2 x TT x 0.60 x 0.20

--

0.377

1 x TT x 0.60 x 0.60/4

--

0.283

--

-0.088

0.385

0.35

0.25

1.730
sqm.
6 Provision for RCC collars 600mm dia rate as per SSR

each

255.00

7 Add extra for Form work for the precast concrete block and
preparation of pedestals alround, conveyance, fixing at the site, etc.,

L.S.

0.68

#REF!
/ each