This procedure outlines the system of control and inspections to be adopted for the fixing
on site of tiles and mosaics.

PROJECT: PROJECT NAME

SECTION:

FINISHING

DATE

OF

ISSUE

Dec. 2012
BY:

SUBJECT:
QA/QC ENGINEER
Ceramic Tiles, Terrazzo Tiles
And Mosaics Method
Statement

APPROVED

BY:

QEHS MANAGER
ACTION

VERIFY

1.

SCOPE

Project

This procedure outlines Manager


the system of control
and inspections to be
adopted for the fixing on Project
site
of
tiles
and
mosaics.
Engineer
2.

PROCEDURE

.1 A
statement
prepared
approved.
include:

Storemethod
shall be keeper
and
It
shall
Project

Manager
i) Acceptance
conditions
for
laying
e.g. Project
maximum
moisture content
of
substrate, Engineer
levelness,
soundness,
cleanliness,
environment.

ii) Surface
preparation and
bonding
e.g.
bonding agent,
bed
mix
proportions,

Method

Statement

Sample

approval

Instructions

FINI/05/A

FINI/05/A

adhesives.

iii) Specific
requirements
with regard to
setting
out,
alignment
of
joints and cutting.

iv) Method of
protecting
finished
work.

v) Source
documents
for
tiles,
adhesive

.2 A sample of tiles
shall be prepared on the
wall in accordance with
the specifications laid
down in the contract
and approved by the
Consultant.

.3

Storage of tiles:

i) Tiles shall be
delivered to site
palletised, on a
clean
hard
surface free from
contamination by

mud or surface
water.

ii) Ensure that


manufacturers
instructions
in
respect
of
storage
conditions
of
adhesives
are
strictly followed.

.4 The
Project
Director/Manager or his
designate will confirm
that materials are in
compliance
with
contract
specification
requirements.

.5 In the case of
internal wall tiling, work
will not proceed until all
concealed
conduits,
pipes, electrical cables
and boxes etc. that
penetrate the tiling have
been fixed securely in
position and making
good
is
complete.
Obtain written clearance
from MEP Co-ordinator
that all their works in
that area is clear for
taking up the tiling work.

PROJECT: PROJECT NAME

Ref No. FINI/05


PAGE 2 OF 3

SECTION:

DATE

OF

ISSUE

FINISHING

Dec. 2012
BY:

SUBJECT:
QA/QC ENGINEER
APPROVED

BY:

CERAMIC TILES, TERRAZZO


TILES AND MOSAICS
QEHS MANAGER
ACTION

VERIFY

.6 Site operatives must Gen.


observe the following while
fixing tiles in addition to the
specifications laid down in Forema
the
contract
document. n

i) In the case of Gen.


internal wall tiles, the
setting out course or
layout
course
is Forema
n
established.

ii) The level and


events of the wall
surface should not
exceed the allowable
tolerance as specified
in the contract. Any
such defect should be
rectified
before
proceeding
further.

iii) While setting out


for
floor
tiling,
establish a datum
level for the finished
floor and control the
overall level of the
finished
floor
by
means of series of
spot levels. The Site
Engineer will involve
Consultants
representative
while
fixing levels.

FINI/05/A

FINI/05/A

iv) Avoid cutting tiles


as far as possible. If
cutting
cannot
be
avoided locate cut tiles
where they will be
least noticeable, if in
doubt
refer
to
specification.

v) The sequence of
fixing tiles shall be as
follows
unless
specified otherwise in
the
contract:

Floor tiles from


the centre of room

Internal

walls

Upward from the


setting out course
up to the specified
height (in case of
false
ceiling)
otherwise from top
and downwards up
to starting level.

External

walls

always from top to


bottom
covering
one horizontal strip
after another but

preferably to be
done
in
bays.

vi) The mortar or adhesive is


spread on the surface using a trowel
or blade in thin layers as specified.

vii) Before
placing
the next tile take care
to allow correct joint
width by placing the
correct spacers in all
corner
joints.

viii) Do not start joint


grouting work till tiles
are properly fixed to
the surface. Normally
the time period varies
between 24 hrs to 48
hrs.

.7 Protection
Cleaning:

and

i) Protect
external
tiling and mosaics
from rain and sun until
the bed and joints
have set. Continue the
protection
for
the
period specified.

PROJECT: PROJECT NAME

Ref No. FINI/05


PAGE 3 OF 3

SECTION:

DATE OF ISSUE

FINISHING

Dec. 2012
BY:

SUBJECT:
QA/QC
ENGINEER
APPROVED BY:
CERAMIC TILES, TERRAZZO TILES AND MOSAICS
QEHS
MANAGER
ACTIO
N

VERIF
Y

ii) Do not allow tiling and mosaics to be


wetted in shower bath areas for the
period as specified, until the bedding and
joints
have
set
and
hardened.

iii) Do not permit any traffic at all on the


flooring till the tiles are set afterwards
permit
light
foot
traffic
only.

iv) For general protection spread white


no-staining saw dust over the floor but not
earlier than the period during which grout
is
hardened.

PROJECT: PROJECT NAME

SITE NO.:

CERAMIC TILES, TERRAZZO TILES AND MOSAICS

Sheet No.

SUBCONTRACTOR:

CLIENT

SECTION OF WORK ____________________________LOCATION


_________________

Checke
d
STAGE

ITEM

DATE
by

PREPARATIO
N

1. Method statement approved.

PE

2. Materials to specification
(including suitability of adhesive).

SE

3. Check storage condition of


materials.
4. Establish line and level.
5. Check moisture content of
substrate.

SK
SU
GF

6. Liaise with MEP section for


completion of their works.

PE/MEP

7. Acceptance of substrate

GF

8. Sample area acceptable.

PE

APPROVAL TO PROCEED WITH


LAYING

QA/QC

INSTALLATION 9. Check setting-out

SU

10. Check line and level.

SU

11. Check mixing, colour and


application of grout.

GF

12. Check sequence of fixing tiles.

SE

APPROVAL TO PROCEED

QA/QC

POST

13. Check initial cleaning of work.


14. Check protection applied
INSTALLATION
correctly.
APPROVAL TO PROCEED

GF
GF
CM

Вам также может понравиться