Академический Документы
Профессиональный Документы
Культура Документы
CUSTOMER
STATION
Make
Auxiliary supply
Software version
Drawing reference
: ABB
: 110V DC
:
: YN1M302045-CCA
Type
Rating
Location
Serial Number
ii.
Mechanical Condition
LEDS Display
OK
OK
:
:
:
:
P444
Ir=1A, Ur=110V, 50Hz
7R15A
32562481
PHYSICAL INSPECTION
iii.
OK
: 293 Km
Date of Testing
: 25/5/2015
3000/1 A
765kV/110V
Setting Calculations
Refer the enclosed setting calculation sheet.
B.
MEASURED
1A
1A
0.999
1A
1A
1.000
1A
1A
0.999
1A
1A
1.003
110V
63.5V
63.574
110V
63.5V
63.512
110V
63.5V
63.578
11
110V
63.5V
63.564
COMMENTS
Page 1 of 3
765kv INDORE
Checked OK
Checked OK
Checked Ok
8) SOTF function
Checked OK
9) Stub Function
Checked OK
Checked OK
11) OV Protection:
STAGE 1:
INJECTED VOLTAGE
R PHASE- 70V
Y PHASE- 70 V
B PHASE- 70V
R-Y-B PHASE- 70 V
STAGE 2:
INJECTED VOLTAGE
R PHASE- 95.40V
Y PHASE- 95.40 V
B PHASE- 95.40V
R-Y-B PHASE- 95.40 V
TRIP TIME
5.08 Sec
5.028 Sec
5.030 Sec
5.027 Sec
TRIP TIME
127.3 msec
126.6 msec
127.7 msec
125 msec
PICKUP CURRENT
OPERATING ANGLE
101 mA
40 TO 230
101 mA
110 TO 280
100.9 mA
160 TO 350
Phase
INJECTING CURRENT
220 mA
220 mA
220 mA
Phase
INJECTING CURRENT
440 mA
2.62
2 times:
4 Times:
Page 2 of 3
765kv INDORE
440 mA
2.65
440 mA
2.63
Phase
INJECTING CURRENT
660 mA
2.05
660 mA
2.07
660 mA
2.06
6 Times:
Check of LED
Checked OK.
Checked Ok.
Checked OK.
Checked Ok.
Checked Ok.
Remarks
Name
M.Veeramani
Sign
Sign
Date
Date
Page 3 of 3
765kv INDORE