Вы находитесь на странице: 1из 3

COMMISSIONING TEST REPORT LINE PROTECTION TERMINAL TYPE REL 670

CUSTOMER

: M/s PGCIL LTD

STATION

: 765/400kv PGCIL substation, INDORE


i.

Make
Auxiliary supply
Software version
Drawing reference

: ABB
: 110V DC
:
: YN1M302045-CCA

Type
Rating
Location
Serial Number
ii.

Mechanical Condition
LEDS Display

OK
OK

:
:
:
:

P444
Ir=1A, Ur=110V, 50Hz
7R15A

32562481

PHYSICAL INSPECTION

Mounting & Wiring

iii.

Protected Line Datas Primary


Protected Line Name

GENERAL INFORMATION AND DATA

OK

PROTECTED LINE AND PROTECTION DEVICE


DATA

: 765 KV VADODARA LINE

Total Line Length

: 293 Km

Date of Testing

: 25/5/2015

Main CT/PT Ratios


Line CT Ratio
Line PT Ratio

3000/1 A
765kV/110V

Setting Calculations
Refer the enclosed setting calculation sheet.

B.

SECONDARY INJECTION TEST WITH FREJA 300

1) Analog Channel Measurements


CH. CHANNEL
INJECTED
NO RATING

MEASURED

1A

1A

0.999

Distance Protection Current R

1A

1A

1.000

Distance Protection Current Y

1A

1A

0.999

Distance Protection Current B

1A

1A

1.003

Distance Protection Current N

110V

63.5V

63.574

Distance Protection Voltage R

110V

63.5V

63.512

Distance Protection Voltage Y

110V

63.5V

63.578

Distance Protection Voltage B

11

110V

63.5V

63.564

Bus voltage for Synchronization

2) Zone Reactive and Resistive Reach

P444 Test Report

COMMENTS

Page 1 of 3

OMICRON Test Results enclosed.

765kv INDORE

3) Timing Test for all Zones

OMICRON Test Results enclosed

4) Power Swing Blocking Test

OMICRON Test Results enclosed

5) Auto Re-close Testing

Checked OK

6) Fuse Failure function -

Checked OK

7) Broken Conductor function

Checked Ok

8) SOTF function

Checked OK

9) Stub Function

Checked OK

10) Fault Locator

Checked OK

11) OV Protection:
STAGE 1:
INJECTED VOLTAGE
R PHASE- 70V
Y PHASE- 70 V
B PHASE- 70V
R-Y-B PHASE- 70 V
STAGE 2:
INJECTED VOLTAGE
R PHASE- 95.40V
Y PHASE- 95.40 V
B PHASE- 95.40V
R-Y-B PHASE- 95.40 V

TRIP TIME
5.08 Sec
5.028 Sec
5.030 Sec
5.027 Sec
TRIP TIME
127.3 msec
126.6 msec
127.7 msec
125 msec

12) DIR Earth Fault Protection:


PICK UP:
Phase

PICKUP CURRENT

OPERATING ANGLE

101 mA

40 TO 230

101 mA

110 TO 280

100.9 mA

160 TO 350

Phase

INJECTING CURRENT

ACTUAL OPERATING TIME(sec)

220 mA

220 mA

220 mA

Phase

INJECTING CURRENT

ACTUAL OPERATING TIME(sec)

440 mA

2.62

2 times:

4 Times:

P444 Test Report

Page 2 of 3

765kv INDORE

440 mA

2.65

440 mA

2.63

Phase

INJECTING CURRENT

ACTUAL OPERATING TIME(sec)

660 mA

2.05

660 mA

2.07

660 mA

2.06

6 Times:

INTERNAL FUNCTIONAL TESTS

Check of LED

Checked OK.

Check of Trip Relays

Checked Ok.

Check of Signal Output Relays

Checked OK.

Check of Binary Inputs

Checked Ok.

Alarm and Trip Functions

Checked Ok.

Remarks

Relay Tested and found working satisfactorily.


Tested By For ABB

Name

M.Veeramani

Witnessed by For M/s PGCIL


Name

Sign

Sign

Date

Date

P444 Test Report

Page 3 of 3

765kv INDORE