Академический Документы
Профессиональный Документы
Культура Документы
PAGE
N SHOUGANG
TITLE
992663-5921-D-E-ET-0001
N SANDVIK
1/12
REV.
C1847-TS-30-521-0-0
REVISIONS
IT: ISSUE
TYPE
Rev.
IT
A Preliminary
B - For Approval
C - For Information
D - For Quotation
Description
E - For Construction
F - As Purchased
G - As Built
H - Cancelled
By
Ver.
Apr.
Aut.
Date
FOR QUOTATION
MNS
MNS
MNS
MNS 02.06.2014
MNS
MNS
MNS
MNS 11.07.2014
N SHOUGANG
TITLE
C1847-TS-30-521-0-0
PAGE
2/12
REV.
Content
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
PAGE
3/12
REV.
1. OBJECTIVE OF SPECIFICATION
This specification establishes the minimum requirements for design, manufacture, testing at
manufacturers work, transportation & delivery of e-houses.
Stacker
Reclaimer
Inspection & Test Plan = Quality Control Plan (QCP)
Specification Drawings
C1847-PS1-30-521-1-0.dwg
C1847-PS1-30-521-2-0.dwg
C1847-PS1-30-521-3-0.dwg
C1847-PR1-30-521-1-0.dwg
C1847-PR1-30-521-2-0.dwg
C1847-PR1-30-521-3-0.dwg
997601-5000-G-E-CD-001
992881-5700-G-E-CD-0001 Rev. C
997601-5000-G-E-ET-001
Steelstructure ITP
Paint ITP
N SHOUGANG
TITLE
992663-5921-D-E-ET-0001
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
N SANDVIK
C1847-TS-30-521-0-0
PAGE
4/12
REV.
4. SITE DATA
4.1
LOCATION
The equipment described in this specification shall be installed in a iron ore mine located in
Distrito San Juan de Marcona / Peru in South America.
The following site conditions are to be considered for selecting the equipment offered.
4.2
Value
Altitude
850m
35C
5C
50% / 90%
90km/h
Atmosphere
Rated Seismic:
Zone 3
(According to the Peruvian Technical
Standard Structure 030)
Design should be considering tropical climate weather conditions with rapid condensations,
heavy rain, windblown to near horizontal. The air is heavily saline and corrosive dust laden.
The equipment will be in open area, exposed to the all-adverse weather condition.
Refer to Specification 992881-5000-G-E-CD-0001
4.3
4.4
ELECTRICAL DATA
Medium Voltage Supply:
480VAC, 3 phase, 60 Hz
Small Consumers:
230VAC
Protection Class:
APLICATION
The mine operation Expansion Project and Benefit plant shall be equipped with a new bulk
handling system (BHS) for iron ore.
The stockyard of the BHS shall be mainly composed of the following:
992663-5921-D-E-ET-0001
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
PAGE
N SHOUGANG
TITLE
N SANDVIK
5/12
REV.
C1847-TS-30-521-0-0
EQUIPMENT
- 1 Stacker
- 1 Reclaimer
5. SCOPE OF WORK
5.1
GENERAL
The scope of work includes design, manufacture, inspection at manufacturers works,
transportation, delivery of complete e-houses and accessories required for specified duty
requirements of the above mentioned machines. Transportation requirements will be
covered in separate agreement.
5.2
SCOPE
Equipment
Qty
1.1
Stacker 01
C1847-PS1-30-521-1-0.dwg
E-House
1.2
Reclaimer 01
C1847-PR1-30-521-1-0.dwg
E-House
Sum
According Drawing
Equipment Type
6. E-HOUSE
6.1
PURPOSE:
Used for housing MV, LV & control cabinets on the stackers and reclaimers
6.1.1
N SHOUGANG
TITLE
PAGE
6/12
REV.
C1847-TS-30-521-0-0
walls and roof as steel plate construction with minimum plate thickness 2,5mm has to be
thermal and sound insulated with non-inflammable material
inner walls and ceiling or roof shall be heat isolated so as to prevent dew condensation
roof inclined and equipped with strong eye bolts (or equal) for transportation and
installation
e-houses shall be heat, dust, rain, wind and noise isolated
eave and gutter shall be provided for doors and pressure relief flaps
space for dry chemical type fire extinguisher on wall has to be provided
lighting (anti vibrating type) with 500lx at floor level with several on/off switches
according drawings and emergency light function (min. 0,5 hours)
illuminated, battery maintained emergency EXIT signs above doors have to be installed
removable cable ways in walls and roof for lighting and plugs as per SANDVIK
requirements
power sockets: 15A / 230V / 2 pin switched interlock socket outlets have to be used
one maintenance desk for radio, intercom, . has so be provided
clock installed on wall
serrated rubber carpet on floor
split type industrial air condition (cooling and heating), suitable for the specified ambient
conditions (heavy duty marine stainless steel type HVAC) with R134A cooling fluid,
according client specification
cooling power: appr. 4 x 4kW for stacker and appr. 4 x 5,5kW for reclaimer, detailed
calculation required / heat loss information of cabinets to be informed later.
provision for optional external air supply / pressurizing unit (overpressure to prevent
entrance of dust and gas) via 2 filter stages, low noise level not to disturb communication
via radio
drainage of condensing water to outside of the container until ground level
installation and wiring of electrical cabinets, including all connections between the
panels, inside E-house confirm to connection diagrams supplied by SANDVIK. (EPLAN)
PLC-, LV- and MV-Panels in separated areas, see GA.
pressure relief flap for MV switchgear
fire detection with semi-automatic NOVAC 1230 fire-fighting system for LV & MV rooms
client specification excerpt for electrical rooms has to be considered and followed
potential equalization: every delivered non electrical equipment has to be connected
continuously electro conductive for the purpose of potential equalization and has to be
connected to the interior grounding system (collector line or connection points), if
necessary with cable connection (NYY-J 16mm) or tin-coated copper cord.
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
PAGE
7/12
REV.
7.2
7.3
GENERAL
ANSI
DIN
ISO
MECHANICAL STANDARDS
ISO 2262:
Steel Shackles
ISO 2372:
Analysis of Vibration
ISO 5049/1:
BS 302:
BS 3643:
BS 4235:
BS 4500:
BS 5304:
BS 970:
Shafting
STRUCTURAL STANDARDS
DIN 267:
DIN 1026:
Metric channels
BS 5135:
BS 4360:
BS 2573 Part 1:
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
BS 3923:
BS 2600:
BS 4 Part 1:
I and H sections
BS 4848 Part 2:
BS 6363:
BS 29:
Forgings
BS 3100:
Steel castings
BS 1452:
Cast iron
PAGE
8/12
REV.
SABS 135:
ISO metric bolts, screws and nuts (hexagon and square) (coarse thread
free fit series)
SABS 1431:
SABS 136:
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
PAGE
9/12
REV.
GENERAL INFORMATIONS
The e-houses shall be designed taking into account the following main requirements:
The e-houses shall be supplied in accordance with the official instruction by codes and
standards, herein mentioned, to come into force at the date of order. In particular the
European Community standard 89/392/CEE, Machinery Directive shall be followed and
every ISPESL and CE certificates shall be provided. Its also clarified that all the codes and
standards expressly mentioned in this TS shall be applied within the limitation or reference
values specified. Use of FEM standards, Section II is allowed only if not in conflict with the
regulation, codes and standards expressly indicated in the Procurement Technical
Specification (PTS).
The e-houses shall be designed for service defined as heavy duty and continuous operation
and shall be installed outside.
The e-houses shall be suitable for the specified operating conditions and it shall be
designed and manufactured for a minimum service life of (30) thirty years.
All the auxiliary components and related accessories shall be designed in order to have a
mean time between maintenance (MTBM) not less than the scheduled maintenance step
activities for the main equipment.
All the main equipment, auxiliary components and related accessories shall be prefabricated as much as possible.
The e-houses shall be designed considering all space requirements and all access for field
erection, pre-commissioning, commissioning and start-up, operation and maintenance
activities. If during any inspection activities, this requirement is not met; its suppliers
responsibility to perform all the necessary modification at its own care and cost.
Site welding activities shall be avoided or minimized.
Site painting activities shall be avoided or minimized.
Final equipment colours and shades will be communicated and are specified in the paint
ITP. All welds shall be continuous, seal type, in order to prevent the corrosion on all
structural parts where a visual checking and maintenance activities cannot be performed.
Tack welds are not permitted.
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
PAGE
10/12
REV.
9. PROTECTION TREATMENT
All surfaces which are directly exposed to the external atmosphere shall be
galvanized and painted in accordance to paint specification.
The treatments against corrosion for all the other secondary structures shall be
designed and chosen by the designer(s) according to the above-mentioned
environmental conditions.
Until not revised by additional specification (paint ITP) 70m galvanized plus top
coat paint should be considered.
10.
10.1
GENERAL
Tests shall be done both at manufactures shop. If applicable prior to manufacturing the
manufacturer shall provide a Quality Control Plan (QCP) or an Inspection & Test Plan (ITP)
for approval by Sandvik and if required by the client.
The ITP shall include hold and witness points for all parties involved.
Shop testing and inspection report shall be provided.
10.2
TEST SCOPE
All e-houses shall be inspected and tested in accordance with the applicable standards
and/or codes with the following clarifications:
The E-houses will be pre-tested (functional and e-house communication network) at
supplier site.
Dimensional check before shipment
Visual control
11.
N SHOUGANG
TITLE
C1847-TS-30-521-0-0
PAGE
11/12
REV.
12.
12.1
ELECTRICAL ROOMS
The electrical control and drive equipment shall be mounted inside panels inside electrical
room mounted on the machine, out of the way of any iron ore spillage.
The electrical rooms shall be enclosed, fully insulated and air conditioned with two lockable
access doors with panic handles on the inside. The enclosure shall be of sufficient size to
permit unrestricted access to all equipment for routine service and maintenance and the
headroom shall not be less than 3,00m. A minimum of 700mm working space must be
provided in front of all panels. The floor shall be of easily removable chequered plate
panels with countersunk bolts, covered with durable PVC type flooring mats.
All entrance doors, cable entries, sheeting overlaps etc. shall be effectively sealed.
Dust emanating from the commodities being handled must be filtered out by means of a
polypropylene cyclonic type pre-filter in combination with a conventional secondary filter
system.
The construction of the room shall be a stainless steel frame with fully welded on outer
stainless steel sheeting and riveted inner sheeting over insulation. The roof shall be
slanted.
All window and door frames are to be stainless steel. Weather pieces are to be provided
above windows and doors.
The air-conditioning unit must be a split type, heavy duty off shore marine type generally
complying with specification for Air-Conditioning. All fittings, bolts, brackets, etc. must be
stainless steel. The condenser/evaporator must be made from stainless steel, copper or
brass tubing. The enclosure must be stainless steel.
A semi-automatic NOVAC 1230 fire fighting system shall be provided for the low voltage
side as well as medium voltage side (separate room) of the electrical room.
13.
DOCUMENTATION
Details of the requirements for documentation are defined in a separate specification and
shall comprise:
13.1
BIDDER DOCUMENTATION
The bidder shall present documents showing the equipment offered and prepare drawings
showing the positioning and functionality of the equipment in its working position.
13.2
VENDOR MANUALS
It shall consist of
N SHOUGANG
TITLE
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.
992663-5921-D-E-ET-0001
N SANDVIK
C1847-TS-30-521-0-0
PAGE
12/12
REV.
The supplier shall submit a typical vendor manual from similar project to SANDVIK for
review and approval by SANDVIK.
13.3
QUALITY
The manufacturers Data report (MDR) shall consist of:
The supplier shall submit a typical MDR from similar projects to SANDVIK for review and
approval by SANDVIK.
13.4
REQUIRED DOCUMENTS
GA Drawing:
Final design drawing (CAD), documentation, bore holes position scheme and design
calculation with all relevant data shall be submitted no later than 21 days after signing the
contract.
Inspection and Testing Plan (refer to QA)
Spare Parts Catalogue
Project specific operating, maintenance, lubrication manuals (no generic documentation)
including transportation, storage and assembly instructions shall be supplied electronically
(only native files) and in paper
Languages
German:
English:
1 electronically / 2 printed
Spanish:
1 electronically / 2 printed
If any doubt or in case any inconsistencies within this specification including its attachments
arise, please contact SANDVIK Mining and Construction Materials Handling GmbH & Co KG