MINE OPERATION EXPANSION

PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

PAGE

N SHOUGANG

TITLE

992663-5921-D-E-ET-0001
N SANDVIK

1/12
REV.

C1847-TS-30-521-0-0

REVISIONS
IT: ISSUE
TYPE
Rev.

IT

A Preliminary
B - For Approval

C - For Information
D - For Quotation
Description

E - For Construction
F - As Purchased

G - As Built
H - Cancelled

By

Ver.

Apr.

Aut.

Date

FOR QUOTATION

MNS

MNS

MNS

MNS 02.06.2014

FOR QUOTATION as commented

MNS

MNS

MNS

MNS 11.07.2014

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

2/12
REV.

Content
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Objective of Specification ..................................................................................................... 3


Terms and Definition ............................................................................................................ 3
Reference to Contractual Documents .................................................................................. 3
Site Data .............................................................................................................................. 4
Scope of Work ..................................................................................................................... 5
E-House ............................................................................................................................... 5
Codes & Standards .............................................................................................................. 7
Design & Construction ......................................................................................................... 9
Protection Treatment ......................................................................................................... 10
Testing & Inspection .......................................................................................................... 10
Packaging, Transportation & Storage................................................................................. 10
Client Specification Excerpt ............................................................................................... 11
Documentation ................................................................................................................... 11

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

3/12
REV.

1. OBJECTIVE OF SPECIFICATION
This specification establishes the minimum requirements for design, manufacture, testing at
manufacturers work, transportation & delivery of e-houses.

2. TERMS AND DEFINITION


PS
PR
ITP

Stacker
Reclaimer
Inspection & Test Plan = Quality Control Plan (QCP)

3. REFERENCE TO CONTRACTUAL DOCUMENTS


The following documents are important for the requirements of this specification and part of
the attached specification package:
Title

Document Code / File Name

Specification Drawings

C1847-PS1-30-521-1-0.dwg
C1847-PS1-30-521-2-0.dwg
C1847-PS1-30-521-3-0.dwg
C1847-PR1-30-521-1-0.dwg
C1847-PR1-30-521-2-0.dwg
C1847-PR1-30-521-3-0.dwg

Client Electric Design Criteria

997601-5000-G-E-CD-001
992881-5700-G-E-CD-0001 Rev. C

Client Electric Specification

997601-5000-G-E-ET-001

Steelstructure ITP

1847-QA-01_0 - ITP Steel structure


and / or
997601-5000-G-ST-ET-001 Rev.1

Paint ITP

1847-QA-04_0 - ITP Paint


and / or
997601-5000-G-ST-ET-002 Rev.1

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

992663-5921-D-E-ET-0001

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

N SANDVIK

C1847-TS-30-521-0-0

PAGE

4/12
REV.

4. SITE DATA
4.1

LOCATION
The equipment described in this specification shall be installed in a iron ore mine located in
Distrito San Juan de Marcona / Peru in South America.
The following site conditions are to be considered for selecting the equipment offered.

4.2

SITE CONDITIONS EXCERPT


Criteria

Value

Altitude

850m

Max. Air Temperature (for design)

35C

Min. Air Temperature (for design)

5C

Relative Humidity min. / max

50% / 90%

Wind Speed (operational)

90km/h

Atmosphere

Sea Breeze, highly corrosive and high


contamination level of an industrial type

Rated Seismic:

Zone 3
(According to the Peruvian Technical
Standard Structure 030)

Design should be considering tropical climate weather conditions with rapid condensations,
heavy rain, windblown to near horizontal. The air is heavily saline and corrosive dust laden.
The equipment will be in open area, exposed to the all-adverse weather condition.
Refer to Specification 992881-5000-G-E-CD-0001
4.3

4.4

ELECTRICAL DATA
Medium Voltage Supply:

4,16kV (+/- 10%)

Motor Supply Voltage:

480VAC, 3 phase, 60 Hz

Small Consumers:

480/230 VAC, 3/1 phase / 60Hz

MCC Control Voltage:

230VAC

Control Signal Voltage:

24VDC for PLC input/output signals

Protection Class:

IPW55 for motors (weather proofed)


IP65 for junction boxes, control boxes, control panels,
and field devices

APLICATION
The mine operation Expansion Project and Benefit plant shall be equipped with a new bulk
handling system (BHS) for iron ore.
The stockyard of the BHS shall be mainly composed of the following:

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

992663-5921-D-E-ET-0001

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
4.5

PAGE

N SHOUGANG

TITLE

N SANDVIK

5/12
REV.

C1847-TS-30-521-0-0

EQUIPMENT
- 1 Stacker
- 1 Reclaimer

5. SCOPE OF WORK
5.1

GENERAL
The scope of work includes design, manufacture, inspection at manufacturers works,
transportation, delivery of complete e-houses and accessories required for specified duty
requirements of the above mentioned machines. Transportation requirements will be
covered in separate agreement.

5.2

SCOPE
Equipment

Qty

1.1

Stacker 01

C1847-PS1-30-521-1-0.dwg

E-House

1.2

Reclaimer 01

C1847-PR1-30-521-1-0.dwg

E-House

Sum

According Drawing

Equipment Type

6. E-HOUSE
6.1

PURPOSE:
Used for housing MV, LV & control cabinets on the stackers and reclaimers

6.1.1

E-House Requirements for Stacker and Bucket Wheel Reclaimer


the e-house must be designed as a complete closed and sealed cabin with proper
isolation
rigid strong self-carrying base frame with outside dimensions and connection points as
per attached drawings.
rigid to support the e-house with panels and all devices mounted, to transport and
assembly on site.
support on the roof support points located as per drawing (proposal)
doors and room separations to be realized as per drawings
door as sealed industrial type with steel frame,
equipped with bronze hardware and master keyed lock,
panic bar operated emergency exit device, self-closing with arrestor at fully opened
double floor (twin deck construction) min. 400mm with cable trays and opening outlets
incl. 1 lifting pad for floor plates in each e-house
net height according attached drawings

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0001
N SANDVIK

PAGE

6/12
REV.

C1847-TS-30-521-0-0

walls and roof as steel plate construction with minimum plate thickness 2,5mm has to be
thermal and sound insulated with non-inflammable material
inner walls and ceiling or roof shall be heat isolated so as to prevent dew condensation
roof inclined and equipped with strong eye bolts (or equal) for transportation and
installation
e-houses shall be heat, dust, rain, wind and noise isolated
eave and gutter shall be provided for doors and pressure relief flaps
space for dry chemical type fire extinguisher on wall has to be provided
lighting (anti vibrating type) with 500lx at floor level with several on/off switches
according drawings and emergency light function (min. 0,5 hours)
illuminated, battery maintained emergency EXIT signs above doors have to be installed
removable cable ways in walls and roof for lighting and plugs as per SANDVIK
requirements
power sockets: 15A / 230V / 2 pin switched interlock socket outlets have to be used
one maintenance desk for radio, intercom, . has so be provided
clock installed on wall
serrated rubber carpet on floor
split type industrial air condition (cooling and heating), suitable for the specified ambient
conditions (heavy duty marine stainless steel type HVAC) with R134A cooling fluid,
according client specification
cooling power: appr. 4 x 4kW for stacker and appr. 4 x 5,5kW for reclaimer, detailed
calculation required / heat loss information of cabinets to be informed later.
provision for optional external air supply / pressurizing unit (overpressure to prevent
entrance of dust and gas) via 2 filter stages, low noise level not to disturb communication
via radio
drainage of condensing water to outside of the container until ground level
installation and wiring of electrical cabinets, including all connections between the
panels, inside E-house confirm to connection diagrams supplied by SANDVIK. (EPLAN)
PLC-, LV- and MV-Panels in separated areas, see GA.
pressure relief flap for MV switchgear
fire detection with semi-automatic NOVAC 1230 fire-fighting system for LV & MV rooms
client specification excerpt for electrical rooms has to be considered and followed
potential equalization: every delivered non electrical equipment has to be connected
continuously electro conductive for the purpose of potential equalization and has to be
connected to the interior grounding system (collector line or connection points), if
necessary with cable connection (NYY-J 16mm) or tin-coated copper cord.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

7/12
REV.

7. CODES & STANDARDS


The manufacturer shall be qualified for producing e-houses, supplied for power stations
coal mines and terminals, in similar applications in term of capacity, length, width, diameter
etc. Supplier shall provide the relevant reference list for each proposed item.
All equipment covered under this specification shall comply with all currently applicable
statutes, regulations & safety codes of European Standard as nominated within this
documents or any relevant national or government standard of any member of the
European Communities or any relevant International Standard recognised by such a
member state, can be used for compliance provided that the standard offers guarantees of
safety, suitability and fitness for purpose.
Especially, the whole supply and any of its parts shall be designed, manufactured and
erected in accordance with Peruvian laws and the local directives in force and with any
prescription from public authorities.
7.1

7.2

7.3

GENERAL
ANSI

American National Standards Institute

DIN

Deutsches Institut fr Normung

ISO

International Organization for Standardization

MECHANICAL STANDARDS
ISO 2262:

Steel Shackles

ISO 2372:

Analysis of Vibration

ISO 5049/1:

Mobile Continuous Bulk Handling Equipment

BS 302:

Stranded Steel Wire Ropes

BS 3643:

ISO Metric Screw Threads

BS 4235:

Metric Keys and Keyways

BS 4500:

ISO Limits and Fits

BS 5304:

Safety of Machinery (Guarding)

BS 970:

Shafting

STRUCTURAL STANDARDS
DIN 267:

Metric Threads - Laminated Metric Thread Screws

DIN 1026:

Metric channels

BS-EN 287 Part 1;

Approval testing of welders/fusion welding

BS-EN 288 Part 3:

Specification and approval of welding procedures for metallic materials

BS 5135:

Metal arc welding of carbon and carbon manganese steels

BS 4360:

Weldable structural steel

BS 2573 Part 1:

Classification, stress calculations and design of structures

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

BS 3923:

Methods for ultrasonic examination of welds

BS 2600:

Radiographic examination of fusion welded butt joints in steel

BS 4 Part 1:

I and H sections

BS 4848 Part 2:

Hot finished hollow sections

BS 6363:

Cold formed sections

BS 29:

Forgings

BS 3100:

Steel castings

BS 1452:

Cast iron

PAGE

8/12
REV.

ISO - R657/EN10056: Angles


SABS 094:

The use of high strength friction grip bolts and nuts

SABS 135:

ISO metric bolts, screws and nuts (hexagon and square) (coarse thread
free fit series)

SABS 1431:

Weldable structural steel

SABS 136:

Isometric precision hexagon-head bolts and screws, and hexagon nuts


(coarse thread medium fit series)

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

9/12
REV.

8. DESIGN & CONSTRUCTION


The equipment to be supplied shall be designed based on the information given in this
specification and additional requirements as per referenced documents. The bidder shall
carefully examine the data furnished and shall satisfy himself regarding performance of the
equipment under specified operating condition.
8.1

GENERAL INFORMATIONS
The e-houses shall be designed taking into account the following main requirements:
The e-houses shall be supplied in accordance with the official instruction by codes and
standards, herein mentioned, to come into force at the date of order. In particular the
European Community standard 89/392/CEE, Machinery Directive shall be followed and
every ISPESL and CE certificates shall be provided. Its also clarified that all the codes and
standards expressly mentioned in this TS shall be applied within the limitation or reference
values specified. Use of FEM standards, Section II is allowed only if not in conflict with the
regulation, codes and standards expressly indicated in the Procurement Technical
Specification (PTS).
The e-houses shall be designed for service defined as heavy duty and continuous operation
and shall be installed outside.
The e-houses shall be suitable for the specified operating conditions and it shall be
designed and manufactured for a minimum service life of (30) thirty years.
All the auxiliary components and related accessories shall be designed in order to have a
mean time between maintenance (MTBM) not less than the scheduled maintenance step
activities for the main equipment.
All the main equipment, auxiliary components and related accessories shall be prefabricated as much as possible.
The e-houses shall be designed considering all space requirements and all access for field
erection, pre-commissioning, commissioning and start-up, operation and maintenance
activities. If during any inspection activities, this requirement is not met; its suppliers
responsibility to perform all the necessary modification at its own care and cost.
Site welding activities shall be avoided or minimized.
Site painting activities shall be avoided or minimized.
Final equipment colours and shades will be communicated and are specified in the paint
ITP. All welds shall be continuous, seal type, in order to prevent the corrosion on all
structural parts where a visual checking and maintenance activities cannot be performed.
Tack welds are not permitted.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

10/12
REV.

9. PROTECTION TREATMENT

The design of protection against corrosion shall be done according to the


environment (severe marine and industrial atmosphere) and the functional
requirements (presence of coal dust). The result shall be proved by means of the
evidence on practical applications for a significant period and/or by laboratory tests.

All surfaces which are directly exposed to the external atmosphere shall be
galvanized and painted in accordance to paint specification.

The treatments against corrosion for all the other secondary structures shall be
designed and chosen by the designer(s) according to the above-mentioned
environmental conditions.

Until not revised by additional specification (paint ITP) 70m galvanized plus top
coat paint should be considered.

10.

TESTING & INSPECTION

10.1

GENERAL
Tests shall be done both at manufactures shop. If applicable prior to manufacturing the
manufacturer shall provide a Quality Control Plan (QCP) or an Inspection & Test Plan (ITP)
for approval by Sandvik and if required by the client.
The ITP shall include hold and witness points for all parties involved.
Shop testing and inspection report shall be provided.

10.2

TEST SCOPE
All e-houses shall be inspected and tested in accordance with the applicable standards
and/or codes with the following clarifications:
The E-houses will be pre-tested (functional and e-house communication network) at
supplier site.
Dimensional check before shipment
Visual control

11.

PACKAGING, TRANSPORTATION & STORAGE


E-houses shall be securely stored and transported with protective seaworthy packing.

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

11/12
REV.

12.

CLIENT SPECIFICATION EXCERPT

12.1

ELECTRICAL ROOMS
The electrical control and drive equipment shall be mounted inside panels inside electrical
room mounted on the machine, out of the way of any iron ore spillage.
The electrical rooms shall be enclosed, fully insulated and air conditioned with two lockable
access doors with panic handles on the inside. The enclosure shall be of sufficient size to
permit unrestricted access to all equipment for routine service and maintenance and the
headroom shall not be less than 3,00m. A minimum of 700mm working space must be
provided in front of all panels. The floor shall be of easily removable chequered plate
panels with countersunk bolts, covered with durable PVC type flooring mats.
All entrance doors, cable entries, sheeting overlaps etc. shall be effectively sealed.
Dust emanating from the commodities being handled must be filtered out by means of a
polypropylene cyclonic type pre-filter in combination with a conventional secondary filter
system.
The construction of the room shall be a stainless steel frame with fully welded on outer
stainless steel sheeting and riveted inner sheeting over insulation. The roof shall be
slanted.
All window and door frames are to be stainless steel. Weather pieces are to be provided
above windows and doors.
The air-conditioning unit must be a split type, heavy duty off shore marine type generally
complying with specification for Air-Conditioning. All fittings, bolts, brackets, etc. must be
stainless steel. The condenser/evaporator must be made from stainless steel, copper or
brass tubing. The enclosure must be stainless steel.
A semi-automatic NOVAC 1230 fire fighting system shall be provided for the low voltage
side as well as medium voltage side (separate room) of the electrical room.

13.

DOCUMENTATION
Details of the requirements for documentation are defined in a separate specification and
shall comprise:

13.1

BIDDER DOCUMENTATION
The bidder shall present documents showing the equipment offered and prepare drawings
showing the positioning and functionality of the equipment in its working position.

13.2

VENDOR MANUALS
It shall consist of

Detailed description of the equipment supplied; technical data sheet etc.


Spare list
Assembly-, Commissioning-, Operation-, Maintenance and Repair instructions
Transport and storage instructions

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.

N SHOUGANG

TITLE

This Manual is SANDVIK property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification E-House


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0001
N SANDVIK

C1847-TS-30-521-0-0

PAGE

12/12
REV.

The supplier shall submit a typical vendor manual from similar project to SANDVIK for
review and approval by SANDVIK.
13.3

QUALITY
The manufacturers Data report (MDR) shall consist of:

Quality inspection and test reports, certificate as per ITP-requirements


CE-Declaration according to the EC Machine Directive
CE-Declaration in accordance with the ATEX Directives if any
Supplier shall provide a Certificate of the companys integrated Quality System

The supplier shall submit a typical MDR from similar projects to SANDVIK for review and
approval by SANDVIK.
13.4

REQUIRED DOCUMENTS
GA Drawing:

21 days after signing the contract.

Final design drawing (CAD), documentation, bore holes position scheme and design
calculation with all relevant data shall be submitted no later than 21 days after signing the
contract.
Inspection and Testing Plan (refer to QA)
Spare Parts Catalogue
Project specific operating, maintenance, lubrication manuals (no generic documentation)
including transportation, storage and assembly instructions shall be supplied electronically
(only native files) and in paper
Languages
German:

English:

1 electronically / 2 printed

Spanish:

1 electronically / 2 printed

If any doubt or in case any inconsistencies within this specification including its attachments
arise, please contact SANDVIK Mining and Construction Materials Handling GmbH & Co KG

Вам также может понравиться