Sheet: 1 of 4
Date: October 2000
Revision: R0
322/3
321.610
321.645
km
km
Area (A)
=
Length of the longest stream (L)
=
Length of the longest stream from a point opposite
C.G. Of catchment to point of study (Lc)
=
Heigth of the farthest point above the point of interest
along the river (H)
=
50 yr, 24 hr rainfall, R50(24)
=
Ratio of 1hr rainfall to 24 hr rainfall
=
So, 50 yr, 1 hr rainfall, R50(1)
=
iv)
v)
vi)
3.010 km
382.132 m
26.00 cm
0.350
9.1 cm
R.D. Starting
From Bridge
Site
(km)
R.L. Of
River Bed
0.000
3.010
6.100
6.320
6.486
6.650
10.868
20.000
100.000
200.000
300.000
393.000
1
2
3
4
5
6
(m)
Length of
Height
Each
Above
Segment (Li) Datum (Di)
(km)
(m)
0.000
3.010
3.090
0.220
0.166
0.164
Total
Se
9.132
89.132
189.132
289.132
382.132
Di-1+Di
Li.(Di-1+Di)
(m)
(km.m)
9.132
98.264
278.264
478.264
671.264
27.486
303.654
61.218
79.392
110.087
6.65
Note:
11.964 sq km
6.650 km
581.837
13.1570
,Say
13.157 m/km
where
L=
A=
S1=
4.130
4.616
5.746
miles
sq miles
%
Step-2
where
R = 50 yr, 24 hr rainfall, R50(24)
F = Areal Reduction Factor
=
=
26.00
0.86
cm
(Ref: Article 2.1.1 of reference 1)
Therefore
C
0.618
Sheet: 2 of 4
Date: October 2000
Revision: R0
=
=
So,
Step-4
Therefore, R50(tc)
I
0.540
0.420
(R50(tc)/tc)
K . R50(1)
11.700 cm
5.203 cm/hr
= 2.78.C.I.A
= 106.958
cumec
= 107.000
cumec
Or,
Q50
Calculation of tp (Time from the center of unit rain fall duration to the peak of U.H.
tp
0.376*[{L*Lc}/{sqrt(Se)}]^0.434
= 0.789
hr
Step-2
Qp
Step-3
1.215 * A
------------(tp)^0.691
17.122
cumec
Step-3
hr
=
=
So,
Therefore, R50(tc)
Step-4
0.380
0.420
8.233 cm
Qp * R50(tc)
140.968 cumec
Or,
Q50=
141.000 cumec
Reference 1 "Flood Estimation Methods For Catchments Less Than 25 sq km in Area", Bridges And Floods
Wing Report No. RBF-16, March - 1990
Sheet: 3 of 4
Date: October 2000
Revision: R0
Chainage
(m)
1
0.000
0.100
3.000
6.000
9.125
12.250
15.375
18.500
21.500
24.400
24.500
H.F.L
(G.T.S)
2
12.234
Actual
Modified
Bed Level Bed Level
(m)
(m)
3
4
13.484
10.384
10.134
10.334
10.684
10.434
10.384
10.184
10.034
10.334
13.484
13.484
10.384
10.134
10.334
10.684
10.434
10.384
10.184
10.034
10.334
13.484
Height
h
5
Average
Height
h'
6
Horizontal
Distance
x
7
Area
6x7
0.000
1.850
2.100
1.900
1.550
1.800
1.850
2.050
2.200
1.900
0.000
0.925
1.975
2.000
1.725
1.675
1.825
1.950
2.125
2.050
0.950
0.100
2.900
3.000
3.125
3.125
3.125
3.125
3.000
2.900
0.100
0.093
5.728
6.000
5.391
5.234
5.703
6.094
6.375
5.945
0.095
Total
Area of Cross-Section, A
Wetted Perimeter, P
Hydraulic Mean Depth, R = A/P=
Longitudinal Slope, S
Velocity of Stream, V
Discharge, Q = A x V
=
=
=
=
=
=
Say,
Difference
Wetted
in h
Perimeter
h"
sqrt(7*7+9*9)
9
10
1.850
0.250
0.200
0.350
0.250
0.050
0.200
0.150
0.300
1.900
1.853
2.911
3.007
3.145
3.135
3.125
3.131
3.004
2.915
1.903
46.657
28.128
46.657 Sq m
28.128
m
1.659
m
0.0025
2.336 m/sec (Manning's coeff., n =
108.981 m3/sec
109.000 cumec
0.030 )
R L (m)
13.000
12.000
11.000
10.000
0.000
5.000
10.000
15.000
20.000
25.000
30.000
R D (m)
Original X-Section
Rechannelised X-Section
Sheet: 4 of 4
Date: October 2000
Revision: R0
Appendix 1.1(ii)
Calculation
Recommendation
A)
B)
107.00 cumec
141.00 cumec
109.00 cumec
141.000 cumec
141.000 cumec
Chainage
(m)
1
0.000
0.100
3.000
6.000
9.125
12.250
15.375
18.500
21.500
24.400
24.500
H.F.L
(G.T.S)
2
12.580
Actual
Modified
Bed Level Bed Level
(m)
(m)
3
4
13.484
10.384
10.134
10.334
10.684
10.434
10.384
10.184
10.034
10.334
13.484
13.484
10.384
10.134
10.334
10.684
10.434
10.384
10.184
10.034
10.334
13.484
Height
h
5
Average
Height
h'
6
Horizontal
Distance
x
7
Area
6x7
0.000
2.196
2.446
2.246
1.896
2.146
2.196
2.396
2.546
2.246
0.000
1.098
2.321
2.346
2.071
2.021
2.171
2.296
2.471
2.396
1.123
0.100
2.900
3.000
3.125
3.125
3.125
3.125
3.000
2.900
0.100
0.110
6.731
7.038
6.472
6.316
6.784
7.175
7.413
6.948
0.112
Total
Area of Cross-Section, A
Wetted Perimeter, P
Hydraulic Mean Depth, R = A/P=
Longitudinal Slope, S
Velocity of Stream, V
Discharge, Q = A x V
Recommended HFL =
=
=
=
=
=
=
Say,
Difference
Wetted
in h
Perimeter
h"
sqrt(7*7+9*9)
9
10
2.196
0.250
0.200
0.350
0.250
0.050
0.200
0.150
0.300
2.246
55.099
55.099 Sq m
28.819
m
1.912
m
0.0025
2.568 m/sec (Manning's coeff., n =
141.491 m3/sec
141.000 cumec
2.198
2.911
3.007
3.145
3.135
3.125
3.131
3.004
2.915
2.248
28.819
0.030 )
12.580
R L (m)
13.000
12.000
11.000
10.000
0.000
5.000
10.000
15.000
R D (m)
20.000
25.000
30.000
Original X-Section