Span Of Slab :
Imposed load :
Live Load
Floor Finish
Total
Trial Depth :
2m =
=
=
=
5 kN/m2
1.75 kN/m2
7 kN/m2
Love/d Ratiao
rb =
26
Assuming pt
=
For M 20 and
Fe
=
Allowable Love/d Ratio ra
2000 m
26 36.40
Sapn
=
ra
2000 m
36.40
= 54.945 mm
20 mm
100 mm
=
=
Design Moment :
Say
60 mm
80 mm
1000 mm
25
0.1 =
=
Total
=
15 kN/m
3 kN/m
7.00 kN/m
10 kN/m
Wl2
10
Mumax
6 kNm
2.77 N/mm2
=
11 kNM
SAFE
>
6 kNm
1-
1 - 4.6 x Mu.max
fck x b d2
Main Steel :
Required Pt
0.5 fck
fy
100
Pt
Required Ast =
0.260
Ptxbd
100
8 mm
0.30 %
Provide
>
208 mm2
SAFE
Dia bar
ast =
Spacing S =
1000 x ast
Ast
50.27mm2
241.68 mm
240 mm
3d =
8 mm
Provide =
Required Pt
0.260
Dia bar
ast =
Required steel =
SAFE
240 mm
225 mm
>
C/C
0.30 %
50 mm2
120.00mm2
Spacing S =
1000 x ast
Ast
416.67 mm
5d =
300 mm
Provide =
= 15.00 kN
kTuc.bd
500 mm
300 mm
C/C
Tuc Depend on Pt =
100Ast/(bd)
Assuming 50% of bars only continued to the support
Ast1 = (1000 ast/s)/2 =
111.71mm2
Pt =
(100 xAst1)/bd
Pt =
0%
k = 1.3 For D =
Tuc =
100 mm
0.24 N/mm2
24.96 kN
SAFE
>
15.00 kN
2.92 kNm
Shear force V =
Assuming Lo =
0.4 x
7.125
0.45 x
7.500
6.23 kN
<= 14.35 mm
Since Actual Diameter of bar is less than
14.35 mm the slab is safe in development length.
the bars must be embedded into the suppoet by atleast Ld/3 distance and a U-hook must be
Provided.
Span Of Slab :
Imposed load :
Live Load
Floor Finish
Total
Trial Depth :
=
=
=
5.00 kN/m2
1.75 kN/m2
7 kN/m2
Love/d Ratiao
rb =
26
Assuming pt
=
For M 20 and
Fe
=
Allowable Love/d Ratio ra
26
36.40
2000 m
36.40
20 mm
100 mm
=
=
Design Moment :
( End fixity)
Mumax
54.95 mm
Say
80 mm
1000 mm
25
0.1 =
=
Total
=
15 kN/m
3 kN/m
7.00 kN/m
10 kN/m
Wl2
10
=
6.00 kNm
2.77 N/mm2
=
19 kNM
SAFE
>
6 kNm
1-
1 - 4.6 x Mu.max
fck x b d2
Main Steel :
Required Pt
0.5 fck
fy
100
Niketan Consultants
Pt
Required Ast =
0.260
Ptxbd
100
Provide
10 mm
SAFE
0.30 % Provided.
208 mm2
0.12 %
of gross area
0 mm2
Dia bar
Spacing S =
>
ast =
1000 x ast
Ast
78.54mm2
377.60 mm
240 mm
3d =
Provide =
Required Pt
8 mm
Required steel =
Dia bar
ast =
0.12 %
0.260
SAFE
240 mm
150 mm
>
C/C
0.30 %
50 mm2
120.00mm2
Spacing S =
1000 x ast
Ast
416.67 mm
300 mm
Provide =
200 mm
500 mm
C/C
5d =
15.00 kN
kTuc.bd
Niketan Consultants
(100 xAst1)/bd
Pt =
0.33 %
k = 1.3 For D =
100 mm
Tuc =
( 0.85
Tuc
Tuc =
0.8 fck (
6
1+5
but >=
7.04
0.404
0.40 N/mm2
41.60 kN
SAFE
>
15.00 kN
2.92 kNm
Shear force V =
Assuming Lo =
<= 14.35 mm
0.4 x
7.125
0.45 x
7.500
6.23 kN
10 mm
SAFE
Niketan Consultants
0.500 m
=
=
=
5 kN/m2
1.75 kN/m2
7 kN/m2
Love/d Ratiao
rb =
26
Assuming pt
=
For M 20 and
Fe
=
Allowable Love/d Ratio ra
26
36.40
Sapn
=
ra
500 m
36.40
= 13.736 mm
20 mm
100 mm
=
=
Design Moment :
( End fixity)
Mumax
Say
20 mm
1000 mm
0.1 =
=
Total
=
=
15 kN/m
500 m
25
3 kN/m
7.00 kN/m
10 kN/m
Wl2
10
=
0 kNm
0.1 x 0.05
=
x 24 x 0.3
=
0.04 kNM
B.M Due to Wt of Water Pipe
Total B.M
=
1.63 kNM
Check For Concrete Depth
Ru.max =
2.77 N/mm2
Niketan Consultants
Mur.max
19 kNM
SAFE
>
0 kNm
1-
1 - 4.6 x Mu.max
fck x b d2
Main Steel :
Required Pt
Pt
Required Ast =
0.5 fck
fy
0.071
Ptxbd
100
Provide
8 mm
Dia bar
Spacing S =
SAFE
>
100
0.30 % Provided.
57 mm2
0.12 % of gross area
0 mm2
ast =
1000 x ast
Ast
50.27mm2
881.93 mm
240 mm
Required Pt
8 mm
Required steel =
=
Spacing S =
3d =
Dia bar
Provide =
0.071
ast =
SAFE
240 mm
150 mm
>
C/C
0.30 %
50 mm2
416.67 mm
300 mm
5d =
Provide =
500 mm
200 mm
C/C
Niketan Consultants
wL
=
3.75 kN
2
Shear resistance of Slab Consrete Vuc =
kTuc.bd
Tuc Depend on Pt =
100Ast/(bd)
Assuming 50% of bars only continued to the support
Ast1 = (1000 ast/s)/2 =
167.57mm2
Pt =
(100 xAst1)/bd
Pt =
0.21 %
k = 1.3 For D =
100 mm
Tuc =
( 0.85
1+5
0.8 fck (
but >=
Tuc
Tuc =
0.333 N/mm2
34.63 kN
SAFE
>
3.75 kN
7.125
0.45 x
7.500
6.23 kN
Assuming Lo =
200 Including anchor Value of U-hook
<= 6.58 mm
Since Actual Diameter of bar is less than
6.58 mm the slab is safe in development length.
the bars must be embedded into the suppoet by atleast Ld/3 distance and a U-hook must be
Provided.
Niketan Consultants
DESIGN OF BEAM
Span
7.00 m =
7000.00 mm
Assume b = 230 mm
D = 600 mm
dc= 50 mm
Using M 20 &
Rumax =
Fe ###
Grades
d = 550 mm
2.77
N/mm2
2.875 kN/M
22.500 kN/M
Mu.max =
wu l2/12
=
Mur.max =
91.88 kNM
Ru.max x b d2
192.72 kNM
SAFE
>
91.88 kNM
Main Steel :
Req.Ast =
0.5 fck
fy
1-
1 - 4.6 x Mu.max
fck x b d2
bd
462.92mm2
Provide
16 dia bar
Nor of bars
201.062mm2
2.3024 Say 3 Nors
148 mm
wu L /2 =
230 mm
Clear cover + # / 2 =
>
78.750 kN
n1 =
3
SAFE
33 mm <
50 mm
SAFE
2 bars of #16mm =
402.12mm2
Pt = 0.32 %
Tuc =
0.40 N/mm2
Vuc=
50.600 kN
Shear resistance minimum stirrups
Vusv.min = 0.35 bd
=
44.275 kN
Shear resistance of R.C meber with Minimum Stirrups
Vur.min =
Provide
94.875 kN >
6 mm Dia Fe
Pitch s =
78.750 kN
Asv fy/(0.4b) =
153.7 mm
150.0 mm
<
56.55mm2 )
Say 150.0 mm
0.75 x 550 mm and ###
0.5( 1.5 (
=
2.875
10.00 x/ 2)) x
81.113 kN
47
752.0 mm
402.12mm2
SAFE
SAFE
=
0.87fy Ast d(1-(Ast fy )/(fck bd))
=
74.58 kNM
V= Vu.max=
78.750 kN
Lex=
Lex =
Available Ld =
Ld/3 - bs/2
135.7 mm
1366.9 mm
>
752.0 mm
SAFE
1.35
For Fe 415
35.1
199.4 mm
<
550.0 mm
SAFE
Design Of Beam
.
Span
7.000 m =
7000.00 mm
Assume b = 230 mm
D = 500 mm
dc=
Using M 20 &
Rumax =
Fe ###
Grades
0.4
0.4
4.0
0.4
Wu =
wu =
0.6 x
0.5
25x
2.77
400
1000
d = 440 mm
mm Dia Pipe =
=
=
=
=
=
Kg/m
125.7
151.2
276.900
10.00
10.00
0.4
Total
N/mm2
2.300 kN/M
60 mm
kg/m
2.77 kN/M
6.00 kN/M
5.00 kN/M
2.300 kN/M
16.07 kN/M
1.5 x
16.07
24.105 kN/M
Mu.max =
wu l2/10
=
Mur.max =
118.11 kNM
Ru.max x b d2
Req Depth =
123.34 kNM
Mu
Rumax x b
SAFE
118.11
2.77 x
Cover =
Overall Depth =
490.566
>
230
60
118.11 kNM
430.566
mm
mm
Say
500
mm
Main Steel :
Req.Ast =
0.5 fck
fy
1-
1 - 4.6 x Mu.max
fck x b d2
bd
Niketan Consultants
743.85mm2
Niketan Consultants
230
###
###
Provide
0.1
= ###
mm2
16 dia bar
201.062mm2
Nor of bars
3.70
16
16 mm
189 mm
>
743.85mm2
Say 4 Nors
`-
<
230 mm
Clear cover + / 2 =
4
SAFE
33 mm <
60 mm
SAFE
Pt = 0.79 %
Tuc =
( 0.85
Tuc =
Tuc =
0.8 fck (
1+5
6
= 0.8 fck / (6.89 pt)
2.94
0.571
but >=
0.571 N/mm2
Niketan Consultants
Vuc=
57.785 kN
Shear resistance minimum stirrups
Vusv.min = 0.35 bd
=
35.420 kN
Shear resistance of R.C meber with Minimum Stirrups
Vur.min =
Vud =
93.205 kN >
84.368 kN
Vumax - wu(bs/2 + d)
Vud =
84.37
24.11 x
( 115 +
440.0 ) =
70.989 kN
70.99
57.79
13.20 kN
Rquired Spacing =
###
Asv =
100.531 mm2
0.87 x
415 x
13 x
100.53 x 440.00
1000
Provide =
1228.5
300
mm
mm c/c
804.25mm2
=
0.87fy Ast d(1-(Ast fy )/(fck bd))
=
106.70 kNM
V= Vu.max=
84.368 kN
Lex=
Ld/3 - bs/2
Where bs = Width of Support 230 mm
Lex =
135.7 mm
Available Ld =
1779.8 mm
>
752.0 mm
SAFE
Check For Serviceability (Deflection) :
Required Pt %=
=
0.74 %
1.35
For Fe 415
SAFE
Niketan Consultants
0.50
16.070 kN x
56.245 kN
0.50
16.070 kN
56.245 kN
230
16
=
=
Assume Section b x D in mm =
250
16
mm
0.5
1.25
1
3
15
### x
###
0.30 X
221.520 kN
5000.00 /
25 X 15.00 =
33.75 kN
25
1.44 kN
300
X1
16.6667
For the
Lowest
Column
Long column
1.25
L eff /
48 b
16.6667
=
48
0.903
Area of Conrete
300
2x
Cr =
Let
Asc=
Pu =
=
5.000 M
0.23 x
0.25 X
=
147.680 kN
Total load
Ultimate Load
Slenderness ratio Leff/b =
0.25
5.00 M
0.00 M
Self wt of column
=
0.3
x
Self wt of Total Column and Bracing beams =
=
5
5
( 300
Asc)
mm2
300
Asc)
190
Asc )
147.680 kN
( 300.0 x
300
Asc)
190
Asc )
163.543743
185
Asc
Asc =
300
-286456.257
-1548.4
mm2
Niketan Consultants
(12 / 4=
3.0 )
5 mm
8 mm ties =
Pitch :
P less than or equal to
P less than or equal to
=
=
Adopt a pitch of
150
### mm
16x =
48x =
### mm
### mm
mm C/C
Niketan Consultants
147.68
Af =
Provide
1.2
1.2
147.7 + 14.77
162.448 kN
162.448
200
Lf = (D - b)/2 +
=
kN
901.1
0.812
m2
( (D - b)/2)2 + Af
mm
mm
1.44
Pu =
mm2
>
0.812
mm2
221.52 kN
221.52
=
1.44
153.83
kN/mm2
1200.0 - ###
2
450.00 m
= X1
1200.0 - ###
2
450.00 m
= Y1
Pu
221.52
Max.B.M x=
kN
221.52 x
450
1.2
26.91 kN.M
Niketan Consultants
Max.B.M x=
221.52 x
1.2
26.91 kN.M
Niketan Consultants
Max.B.M y=
450
221.52 x
1.2
=
=
26.91 kN.M
50
230 + 50 x 2 =
380 + 50 x 2 =
330.00 mm
480.00 mm
26.91
2.77 x
B.M
Ru.max x b'
x 10
330
Say
Assume bar diameter
10 mm
Effective depth =
250.0
250.00 mm
78.54mm2
Ast1 =
Clear Cover = 40 mm
Required Cover =
Clear Cover +
171.58 mm
55.0 mm
+ 55.0 =
305.0 mm
Say
325.0 mm
270.0 mm
150.0 mm
d =
325 -
( 325 -
150 ) x (
( 450
A=
( 300
+ 540 ) x
2
= 3360
( 150 - 55 )
2
50 )
3360.00
2 =
3360
- 50 )
-
271.1
910896
55
= 271.1 mm
mm2
ks T'uc
T' uc =
0.25
Bc =
Bc =
ks =
Width / Length
fck
= 0.25
20
1.118
N/mm2
1.000
( 0.5 + Bc)
but = < 1
Niketan Consultants
= 0.5 + 1.000
1.500
> 1
Niketan Consultants
Tuc2 =
ks T'uc
= 1.000 x 1.118
1.118
N/mm2
Tuc2 x A
1.118
x 910896
1000
1018.38
kN
Design Shear :
Vud = wu ( L x B - Peripheral Length area)
= 153.83
( 1.440
kN
112.91
if
0.706 )
<
1018.38
112.9112
SAFE
Area Of Steel
Main Steel :
=
0.5 fck
fy
Astx
0.5 x 20
415
1 -
1 -
1 - 1 - 4.6 x Mu.max x bd
fck x b d2
x 330 x ### =
296.683477
= 296.7mm2
Spacing of bar =
Nor of Bars =
Sapcing =
10
mm
Sapcing =
10
mm
1000 x 78.54mm2
296.70mm2
4
= ( 1200 at
150
50
4
mm C/C
= 264.71183
287.50
mm
mm
Area Of Steel
Main Steel :
=
Asty
0.5 fck
fy
1 - 1 - 4.6 x Mu.max x bd
fck x b d2
Niketan Consultants
Niketan Consultants
0.5 x 20
415
1 -
1 -
x 480 x ### =
289.614003
= 289.61mm2
Spacing of bar =
Nor of Bars =
Sapcing =
10
mm
Sapcing =
10
mm
Required Ld =
Ld =
1000 x 78.54mm2
289.61mm2
4
= 271.19229 mm
= ( 1200 at
47
150
For M 20
50
4
mm C/C
287.50
mm
Fe 415
470.00 mm
Available Ld =
450 mm
>
470.00 mm
UNSAFE
Spacing of bar =
Nor of Bars =
Sapcing =
10
296.70
309.8867 mm2
1000 x 78.54mm2
309.89mm2
4
mm
= ( 1200 -
= 253.44477 mm
50
4
10
at
150
287.500
mm
mm C/C
= 230 + 2 x 270.0
770.0 mm
d' =
325
50.0 )
-
55
173.8 mm
Niketan Consultants
Pt =
1200
x (150 -
191618.00mm2
100 Ast/A'
55.0 )
+ (173.8 -
770 )
= 0.16 %
Shear strength of concrete in one way shear
Tuc =
( 0.85 0.8
fck ( 1 + 5 - 1 )
6
but >=
0.296
0.296 N/mm2
c
= 0.296 N/mm2
for Pt =
0.16 %
c x A'
56.72 kN
Design shear
Vud = wu x L ( X1 - d) =
33.23 kN
<
56.72 kN
SAFE
Niketan Consultants
DESIGN OF COLUMN
Load on column =
81.113 kN
81.113 kN
162.226 kN