Академический Документы
Профессиональный Документы
Культура Документы
To Buy this Tutorial Copy & paste below link in your Brower
http://studentoffortune.biz/downloads/581-entire-class-milestones-graded-material/
Or Visit Our Website
Visit : www.studentoffortune.biz
Email Us : studentoffortunetutorials@gmail.com
The purpose of the preliminary investigation phase is threefold. First, it answers the question, Is
this project worth looking at? To answer this question, this phase must define the scope of the
project and the perceived problems, opportunities, and directives that triggered the project.
In this milestone, you will prepare a Request for System Services, which is the trigger for the
preliminary investigation phase. Also, you will use fact-finding techniques to extract and analyze
information from an interview to determine project scope, level of management commitment,
and project feasibility for the Client Technology Tracking System (CTTS). With these facts and
facts obtained from the Case Background, you will have the necessary information to complete
the Problem Statement Matrix.
Milestone 1 Instructions
For this milestone, you will be using the following templates/resources:
Click here for Template A
Click here for Template B
Milestone 2 Instructions
For this milestone, you will be using the following templates/resources:
Click here for Template C
Be sure to read the Project area of each Assignment section, as they talk directly to the milestone
tasks. Also, for review purposes, note that typical milestone solutions will be posted on
Wednesday morning of the following week. This is necessary as it is important.
Deliverables:
Entity Relationship Diagram in Third Normal Form
Context Diagram
Event Decomposition Diagram
Four Event Diagrams of Your Choosing
System Diagram
Primitive Data Flow Diagram
Review all of the milestone project steps below. Post questions in the Milestone Virtual Lab
Forum discussion area.
Milestone 5
The purpose of this milestone is to normalize the data model created in Milestone 4, along with
additional data requirements, to be in third normal form. This work has already been completed
for you and you should have accessed the deliverable and include as part of your Milestone 3.
Note that there are no points for this milestone.
Milestone 5 Instructions
IS581 Milestone 11&12 Case study Coastline Systems Consulting
Process modeling is a technique for organizing and documenting the structure and flow of data
through a systems processes and/or the logic, policies, and procedures to be implemented by a
systems processes. In this milestone, we focus on using and constructing data flow diagrams
(DFDs) and decomposition diagrams to perform process modeling. Data flow diagrams are tools
that depict the flow of data through a system and the work or processing performed by that
system. A decomposition diagram is a DFD planning tool that shows the top-down functional
decomposition and structure of a system. During this milestone, you will first construct a context
diagram to establish project scope and boundaries. Secondly, you will draw an event
decomposition diagram to partition the system into logical subsystems and/or functions. Thirdly,
you will draw event diagrams to model individual processes. Finally, you will construct a system
data flow diagram that shows the big picture of the system, and a primitive data flow diagram for
a single event process.
Milestone 6 Instructions