NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

JOBCARD NO

PLATFORM

LOCATION

DRAWINGS

PHASE

CAT

Pre-SD
Pre-SD
Pre-SD

L&R
L&R
L&R

Pre-SD
Pre-SD
Pre-SD
SD

GEN
GEN
GEN
GEN

Pre-SD
Pre-SD
Pre-SD
Post-SD/Decom
Post-SD
Post-SD

SCAFF
REMOVE
INSTALL
INSTALL
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD
Post-SD

SCAFF
GEN
INSTALL
REMOVE
WELDING
NDT
INSTALL
REMOVE
INSTALL
TP
DESCAFF

Pre-SD
SD
SD
SD
SD

SCAFF
GEN
SPADING
REMOVE
WELDING

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71

SD
SD
SD
Post-SD
Post-SD

NDT
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103

Pre-SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
SPADING
REMOVE
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
SPADING
REMOVE
INSTALL
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

SD
SD
SD

GEN
GEN
GEN

SCOPE DESCRIPTION / JOBCARDS TITLE


Lift-up & move pipe spools (SD) to laydown area
Lift-up & move manual valves (SD) to laydown area
Lift-up & move gaskets & stud bolts (SD) to laydown area
Washdown
Washdown
Washdown
Washdown

at drip pans below CD prior to SD


at drip pans below MD prior to SD
open drain header prior to SD
closed drain header

Erect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) & new spools installation
Removal of pipe spool at Line 150-D-008-1101 (TP-007/008)
Partially install spool c/w gaskets & bolting set at Line 150-D-008-1101/11432 (TP-007/008)
Install final spool of Line 150-D-008-1101/11432 (TP-007/008) c/w valve, gaskets & bolting sets
Touch-up painting at new Line 150-D-008-1101/11432 (TP-007/008)
Dismantle scaffolds after installation of new spools for Line 150-D-008-1101/11432 (TP-007/008)
Erect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) & new spools installation
Washdown & purge Line 250-PL-101-6101X (TP-003/004)
Install spading at Line 250-PL-101-6101X (TP-003/004)
Removal of pipe spool (Cold Cut) at Line 250-PL-101-6101X (TP-003/004)
Welding at field joints of Line 250-PL-101-6101X/61432 (TP-003/004)
NDT at field joints of Line 250-PL-101-6101X/61432 (TP-003/004)
Install spools and associated valves, c/w gaskets & bolting set at Line 250-PL-101-6101X/61432 (TP-003/004)
Remove spading at Line 250-PL-101-6101X (TP-003/004)
Install PS-0003-003 (250-PL-101-6101X/61432)
Touch-up painting at new Line 250-PL-101-6101X/61432 (TP-003/004)
Dismantle scaffolds after installation of new spools for Line 250-PL-101-6101X/61432 (TP-003/004)
Erect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) & new spools installation
Washdown & purge Line 200-PL-011-1101X (TP-011/012)
Install spading at Line 200-PL-011-1101X (TP-011/012)
Removal of pipe spool (Cold Cut) at Line 200-PL-011-1101X (TP-011/012)
Welding at field joint of Line 200-PL-011-1101X/11432 (TP-012)

RG

RS

NDT at field joint of Line 200-PL-011-1101X/11432 (TP-012)


Install spools and associated valves, c/w gaskets & bolting set at Line 200-PL-011-1101X/11432 (TP-011/012)
Remove spading at Line 200-PL-011-1101X (TP-011/012)
Touch-up painting at new Line 200-PL-011-1101X/11432 (TP-011/012)
Dismantle scaffolds after installation of new spools for Line 200-PL-011-1101X/11432 (TP-011/012)
Erect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new spools installation
Purge Line 50-V-002-1101 (TP-001/002)
Install spading at Line 50-V-002-1101 (TP-001/002)
Removal of pipe spool (Cold Cut) at Line 50-V-002-1101 (TP-001/002)
Welding at field joints of Line 50-V-002-1101/11432 (TP-001/002)
NDT at field joints of Line 50-V-002-1101/11432 (TP-001/002)
Install spools and associated valves, c/w gaskets & bolting set at Line 50-V-002-1101/11432 (TP-001/002)
Remove spading at Line 50-V-002-1101 (TP-001/002)
Touch-up painting at new Line 50-V-002-1101/11432 (TP-001/002)
Dismantle scaffolds after installation of new spools for Line 50-V-002-1101/11432 (TP-001/002)
Erect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) & new spools installation
Washdown & purge Line 80-DD-001-11430 (TP-013/014)
Install spading at Line 80-DD-001-11430 (TP-013/014)
Removal of pipe spool (Cold Cut) at Line 80-DD-001-11430 (TP-013/014)
Welding at field joint of Line 80-DD-001-11430/11432 (TP-014)
NDT at field joint of Line 80-DD-001-11430/11432 (TP-014)
Install spools and associated valves, c/w gaskets & bolting set at Line 80-DD-001-11430/11432 (TP-013/014)
Remove spading at Line 80-DD-001-11430 (TP-013/014)
Touch-up painting at new Line 80-DD-001-11430/11432 (TP-013/014)
Dismantle scaffolds after installation of new spools for Line 80-DD-001-11430/11432 (TP-013/014)
Erect scaffolds for removal of spool at Line 80-D-007-1101X (TP-015/016/017/020) & new spools installation
Washdown & purge Line 80-D-007-1101X (TP-015/016/017/020)
Install spading at Line 80-D-007-1101X (TP-015/016/017/020)
Removal of pipe spool (Cold Cut) at Line 80-D-007-1101X (TP-015/016/017/020)
Welding at field joints of Line 80-D-007-1101X/11432 (TP-016/017)
NDT at field joints of Line 80-D-007-1101X/11432 (TP-016/017)
Install spools and associated valves, c/w gaskets & bolting set at Line 80-D-007-1101X/11432 (TP-015/016/017/020)
Remove spading at Line 80-D-007-1101X (TP-015/016/017/020)
Touch-up painting at new Line 80-D-007-1101X/11432 (TP-015/016/017/020)
Dismantle scaffolds after installation of new spools for Line 80-D-007-1101X/11432 (TP-015/016/017/020)

Erect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) & new spools installation
Install spading at Line 150-BD-004-1101X (TP-005/006)
Removal of pipe spool at Line 150-BD-004-1101X (TP-005/006)
Install spools and associated valves, c/w gaskets & bolting set at Line 150-BD-004-1101X/11432 (TP-005/006)
Remove spading at Line 150-BD-004-1101X (TP-005/006)
Touch-up painting at new Line 150-BD-004-1101X/11432 (TP-005/006)
Dismantle scaffolds after installation of new spools for Line 150-BD-004-1101X/11432 (TP-005/006)
Erect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP-009/010) & new spools installation
Install spading at Line 50-IA-1003-1808/13411 (TP-009/010)
Removal of pipe spool (Cold Cut) at Line 50-IA-1003-1808/13411 (TP-009/010)
Thread at field joints of Line 50-IA-1003-1808/13411 (TP-009/010)
Install spools and associated valves, c/w gaskets & bolting set at Line 50-IA-1003-1808/13411 (TP-009/010)
Remove spading at Line 50-IA-1003-1808/13411 (TP-009/010)
Touch-up painting at new Line 50-IA-1003-1808/13411 (TP-009/010)
Dismantle scaffolds after installation of new spools for Line 50-IA-1003-1808/13411 (TP-009/010)
Erect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) & new spools installation
Washdown & purge Line 50-P-13512-11432 (TP-021/022)
Install spading at Line 50-P-13512-11432 (TP-021/022)
Removal of pipe spool (Cold Cut) at Line 50-P-13512-11432 (TP-021/022)
Welding at field joints of Line 50-P-13512-11432 (TP-022)
NDT at field joints of Line 50-P-13512-11432 (TP-022)
Install spools and associated gaskets & bolting set at Line 50-P-13512-11432 (TP-021/022)
Remove spading at Line 50-P-13512-11432 (TP-021/022)
Touch-up painting at new Line 50-P-13512-11432 (TP-021/022)
Dismantle scaffolds after installation of new spools for Line 50-P-13512-11432 (TP-021/022)
Washdown at drip pans below CD prior to start-up
Washdown at drip pans below MD prior to start-up
Washdown open drain header prior to start-up

TRADES
FW

BP

MW

SF

SWL

PF

PWL

IF

IT

ELE

NDT

WH

CC

HBT

VR

TOTAL MHRS

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

JOBCARD NO

PLATFORM

LOCATION

DRAWINGS

PHASE

CAT

Post-SD
Post-SD
Post-SD
Post-SD

L&R
L&R
L&R
L&R

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL
INSTALL
LT
PS
DHBT
TP
DHBT

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
WELDING
NDT
HT
INSTALL
LT
INSTALL
INSTALL
INSTALL
HBT
PS
DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
DHBT
NDT
HT
INSTALL
LT
TP
DHBT

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
INSTALL
LT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
HBT
WELDING
NDT
HT
INSTALL

59

Post-SD

LT

60

Post-SD

PS

61
62
63
64
65
66
67
68
69

Post-SD
Post-SD
Post-SD

DHBT
TP
DHBT

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
INSTALL
INSTALL
INSTALL
INSTALL

70

Post-SD

LT

71

Post-SD

HBT

72

Post-SD

PS

73
74
75
76
77
78
79
80
81
82
83
84

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
HBT
WELDING
NDT
HT
INSTALL
LT

85

Post-SD

PS

86
87
88
89
90

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD

SCAFF

91

Post-SD

HBT

92
93
94
95
96

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

WELDING
NDT
HT
REMOVE
INSTALL

97

Post-SD

PS

98
99

Post-SD
Post-SD

PS
PS

100

Post-SD

DHBT

101
102
103
104
105
106
107
108
109
110
111
112
113
114

Post-SD
Post-SD

TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
REMOVE
HBT
WELDING
NDT
HT
INSTALL
LT
PS
DHBT

115
116
117
118
119
120
121
122
123
124

Post-SD
Post-SD
Post-SD

TP
INSTALL
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL

125

Post-SD

PS

126
127
128
129
130
131
132
133
134
135

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL

136

Post-SD

PS

137
138
139
140
141
142
143
144
145
146

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL

147

Post-SD

PS

148
149
150
151
152
153
154
155
156
157
158
159

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
INSTALL
LT
HBT
PS
DHBT
TP
DESCAFF

TRADES
SCOPE DESCRIPTION / JOBCARDS TITLE
Lift-up
Lift-up
Lift-up
Lift-up

&
&
&
&

move
move
move
move

pipe spools (Post-SD) to laydown area


manual valves (Post-SD) to laydown area
MOV-13504, MOV-13505 & ABV-1351 to laydown area
gaskets & stud bolts (Post-SD) to laydown area

Erect scaffolds for installation of Line 250-P-13501-6YYYYX


Set-up safety habitat for field joints welding of Line 250-P-13501-6YYYYX and pipe supports installation
Prelay spools of Line 250-P-13501-6YYYYX and field joints welding
NDT at field joints of Line 250-P-13501-6YYYYX
Hydrotesting for Test Pack, TKP-A-HT-P-001 (250-P-13501-6YYYYX)
Install MOV-13504, MOV-13505 & ABV-1351
Install associated manual valves of Line 250-P-13501-6YYYYX & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-001 (250-P-13501-6YYYYX)
Install Pipe Supports for Line 250-P-13501-6YYYYX (PS-0003-001-PSD, PS-0002-001-PSD, PS-0002-005-PSD, PS-0002-006-PSD)
Dismantle safety habitat after field joints welding of Line 250-P-13501-6YYYYX and pipe supports installation
Touch-up Painting for Line 250-P-13501-6YYYYX
Dismantle scaffolds after installation of Line 250-P-13501-6YYYYX
Erect scaffolds for installation of Line 200-P-13500-61432
Remove 8'' x 600# blind flange at TP-102 (200-PL-101-6101X/61432)
Prelay spools of Line 200-P-13500-61432 and field joints welding
NDT at field joints of Line 200-P-13500-61432
Hydrotesting for Test Pack, TKP-A-HT-P-002 (200-P-13500-61432 )
Install spools of Line 200-P-13500-61432 and associated manual valves, gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-002 (200-P-13500-61432)
Install sampling point DBB valve, SP-13508 and return line DBB valve, SP-13509 for H2S Analyzer.
Install injection DBB valves, SP-13505/13507
Install corossion coupon (SP-13504), scale corrosion coupon (SP-13503), bioprobe (SP-13502) and sampling DBB valve (SP-13501)
Set-up safety habitat for pipe supports installation of Line 200-P-13500-61432
Install Pipe Support for Line 200-P-13500-61432 (PS-0003-007-PSD)
Dismantle safety habitat after pipe support installation of Line 200-P-13500-61432
Touch-up Painting for Line 200-P-13500-61432
Dismantle scaffolds after installation of Line 200-P-13500-61432
Erect scaffolds for installation of Line 150-P-13503-61432 & 50-P-13504-61432
Set-up safety habitat for field joints welding of Line 150-P-13503-61432 & 50-P-13504-61432
Prelay spools of Line 150-P-13503-61432 & 50-P-13504-61432 and field joints welding
Dismantle safety habitat after field joints welding of Line 150-P-13503-61432 & 50-P-13504-61432
NDT at field joints of Line 150-P-13503-61432 & 50-P-13504-61432
Hydrotesting for Test Pack, TKP-A-HT-P-003 (150-P-13503-61432 & 50-P-13504-61432)
Install associated manual valves of Line 150-P-13503-61432 & 50-P-13504-61432 and associated gaskets & bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-003 (150-P-13503-61432 & 50-P-13504-61432)
Touch-up Painting for Line 150-P-13503-61432 & 50-P-13504-61432
Dismantle scaffolds after installation of Line 150-P-13503-61432 & 50-P-13504-61432
Erect scaffolds for installation of Line 50-V-62100-61432 & 50-V-62101-61432
Install spools of Line 50-V-62100-61432 & 50-V-62101-61432 and associated manual valves, gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, TKP-A-LT-V-001 (50-V-62100-61432 & 50-V-62101-61432)
Touch-up Painting for Line 50-V-62100-61432 & 50-V-62101-61432
Dismantle scaffolds after installation of Line 50-V-62100-61432 & 50-V-62101-61432
Erect scaffolds for installation of Line 50-V-62102-11432 & 50-V-62103-11432
Remove 2'' x 150# blind flange at TP-101 (50-V-002-1101/11432)
Set-up safety habitat for field joints welding of Line 50-V-62102-11432 & 50-V-62103-11432 and pipe supports installation
Prelay spools of Line 50-V-62102-11432 & 50-V-62103-11432 and field joints welding
NDT at field joints of Line 50-V-62102-11432 & 50-V-62103-11432
Hydrotesting for Test Pack, TKP-A-HT-V-002 (50-V-62102-11432 & 50-V-62103-11432)
Install associated manual valves of Line 50-V-62102-11432 & 50-V-62103-11432 & associated gaskets and bolting sets

RG

RS

FW

BP

MW

SF

SWL

PF

PWL

IF

IT

Reinstatement Leak Test for Test Pack, TKP-A-LT-V-002 (50-V-62102-11432 & 50-V-62103-11432)
Install Pipe Supports for Line 50-V-62102-11432 & 50-V-62103-11432 (PS-0003-009-PSD, PS-0003-014-PSD, PS-0003-013-PSD, PS-0003-012-PSD,
PS-0003-011-PSD)
Dismantle safety habitat after field joints welding of Line 50-V-62102-11432 & 50-V-62103-11432 and pipe supports installation
Touch-up Painting for Line 50-V-62102-11432 & 50-V-62103-11432
Dismantle scaffolds after installation of Line 50-V-62102-11432 & 50-V-62103-11432
Erect scaffolds for installation of Line 80-D-65101-61432
Install spools of Line 80-D-65101-61432 & associated manual valves, gaskets and bolting sets
Install spools of Line 80-D-65102-61432 & associated manual valves, gaskets and bolting sets
Install spools of Line 80-D-65103-61432 & associated manual valves, gaskets and bolting sets
Install spools of Line 80-D-65104-61432 & associated manual valves, gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-CD-001 (80-D-65101-61432, 80-D-65102-61432, 80-D-65103-61432 & 80-D-65104-61432)
Set-up safety habitat for pipe supports installation of Line 80-D-65101-61432
Install Pipe Supports for Line 80-D-65101-61432 (PS-0003-006-PSD, PS-0003-003-PSD, PS-0003-005-PSD, PS-0003-004-PSD, PS-0003-002-PSD)
Dismantle safety habitat after pipe supports installation of Line 80-D-65101-61432
Touch-up Painting for Line 80-D-65101-61432, 80-D-65102-61432, 80-D-65103-61432 & 80-D-65104-61432
Dismantle scaffolds after installation of Line 80-D-65101-61432
Erect scaffolds for installation of Line 80-D-65100-11432
Remove 3'' x 150# blind flange at TP-103 (150-BD-004-1101X/11432)
Set-up safety habitat for field joints welding of Line 80-D-65100-11432 and pipe supports installation
Prelay spools of Line 80-D-65100-11432 and field joints welding
NDT at field joints of Line 80-D-65100-11432
Hydrotesting for Test Pack, TKP-A-HT-CD-001 (80-D-65100-11432)
Install associated manual valve of Line 80-D-65100-11432 & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-CD-002 (80-D-65100-11432)
Install Pipe Supports for Line 80-D-65100-11432 (PS-0003-010-PSD, PS-0002-008-PSD, PS-0002-009-PSD, PS-0002-010-PSD, PS-0002-012-PSD,
PS-0002-013-PSD)
Dismantle safety habitat after field joints welding of Line 80-D-65100-11432 and pipe supports installation
Touch-up Painting for Line 80-D-65100-11432
Dismantle scaffolds after installation of Line 80-D-65100-11432
Erect scaffolds for installation of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432
Set-up safety habitat for field joints welding of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and pipe
supports installation
Prelay spools of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and field joints welding
NDT at field joints of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432
Hydrotesting for Test Pack, TKP-A-HT-D-001 (80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432)
Remove 3'' x 150# blind flange at TP-104 (150-D-008-1101/11432)
Install associated gaskets and bolting sets of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432
Install Pipe Supports for Line 80-D-64100-11432 (PS-0002-008-PSD, PS-0002-009-PSD, PS-0002-010-PSD, PS-0002-012-PSD, PS-0002-013-PSD,
PS-0002-014-PSD, PS-0002-015-PSD)
Install Pipe Supports for Line 50-D-64109-11432 (PS-0002-003-PSD, PS-0002-004-PSD, PS-0002-016-PSD)
Install Pipe Supports for Line 50-D-64110-11432 (PS-0002-002-PSD)
Dismantle safety habitat after field joints welding of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432 and
pipe supports installation
Touch-up Painting for Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432
Dismantle scaffolds after installation of Line 80-D-64100-11432, 50-D-64109-11432, 50-D-64101-11432 & 50-D-64110-11432
Erect scaffolds for installation of Line 50-IA-54000-13411
Remove 2'' x 150# blind flange at TP-105 (50-IA-1003-1808/13411)
Temporary remove existing gratings for installation of Line 50-IA-54000-13411
Set-up safety habitat for field joints welding of Line 50-IA-54000-13411 and pipe supports installation
Prelay spools of Line 50-IA-54000-13411 and field joints welding
NDT at field joints of Line 50-IA-54000-13411
Hydrotesting for Test Pack, TKP-A-HT-IA-001 (50-IA-54000-13411)
Install associated manual valve of Line 50-IA-54000-13411 & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-IA-001 (50-IA-54000-13411)
Install Pipe Supports for Line 50-IA-54000-13411 (PS-0004-004-PSD, PS-0004-003-PSD, PS-0004-002-PSD, PS-0004-001-PSD)
Dismantle safety habitat after field joints welding of Line 50-IA-54000-13411 and pipe supports installation

Touch-up Painting for Line 50-IA-54000-13411


Reinstate removed gratings after installation of Line 50-IA-54000-13411
Dismantle scaffolds after installation of Line 50-IA-54000-13411
Erect scaffolds for installation of Line 50-C-68100-13411
Set-up safety habitat for field joints welding of Line 50-C-68100-13411 and pipe supports installation
Prelay spools of Line 50-C-68100-13411 and field joints welding
NDT at field joints of Line 50-C-68100-13411
Hydrotesting for Test Pack, TKP-A-HT-C-001 (50-C-68100-13411)
Install associated gaskets and bolting sets for Line 50-C-68100-13411
Install Pipe Supports for Line 50-C-68100-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD,
PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)
Dismantle safety habitat after field joints welding of 50-C-68100-13411 and pipe supports installation
Touch-up Painting for Line 50-C-68100-13411
Dismantle scaffolds after installation of Line 50-C-68100-13411
Erect scaffolds for installation of Line 50-C-68101-13411
Set-up safety habitat for field joints welding of Line 50-C-68101-13411 and pipe supports installation
Prelay spools of Line 50-C-68101-13411 and field joints welding
NDT at field joints of Line 50-C-68101-13411
Hydrotesting for Test Pack, TKP-A-HT-C-002 (50-C-68101-13411)
Install associated gaskets and bolting sets for Line 50-C-68101-13411
Install Pipe Supports for Line 50-C-68101-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD,
PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)
Dismantle safety habitat after field joints welding of Line 50-C-68101-13411 and pipe supports installation
Touch-up Painting for Line 50-C-68101-13411
Dismantle scaffolds after installation of Line 50-C-68101-13411
Erect scaffolds for installation of Line 50-C-68102-13411
Set-up safety habitat for field joints welding of Line 50-C-68102-13411 and pipe supports installation
Prelay spools of Line 50-C-68102-13411 and field joints welding
NDT at field joints of Line 50-C-68102-13411
Hydrotesting for Test Pack, TKP-A-HT-C-003 (50-C-68102-13411)
Install associated gaskets and bolting sets for Line 50-C-68102-13411
Install Pipe Supports for Line 50-C-68102-13411 (PS-0004-001-PSD, PS-0004-002-PSD, PS-0004-003-PSD, PS-0004-004-PSD, PS-0003-015-PSD,
PS-0003-016-PSD, PS-0003-017-PSD, PS-0003-018-PSD, PS-0003-019-PSD, PS-0003-020-PSD, PS-0003-021-PSD)
Dismantle safety habitat after field joints welding of Line 50-C-68102-13411 and pipe supports installation
Touch-up Painting for Line 50-C-68102-13411
Dismantle scaffolds after installation of Line 50-C-68102-13411
Erect scaffolds for installation of Line 50-UN-59100-61432
Install spools of Line 50-UN-59100-61432 & associated manual valves, gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-UN-001 (50-UN-59100-61432)
Set-up safety habitat for pipe supports installation of Line 50-UN-59100-61432
Install Pipe Supports for Line 50-UN-59100-61432 (PS-0003-008-PSD)
Dismantle safety habitat after pipe supports installation of Line 50-UN-59100-61432
Touch-up Painting for Line 50-UN-59100-61432
Dismantle scaffolds after installation of Line 50-UN-59100-61432

TRADES
ELE

NDT

WH

CC

HBT

VR

TOTAL MHRS

DRAWINGS

PHASE

CAT

SCOPE DESCRIPTION / JOBCARDS TITLE

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

L&R
L&R
L&R

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
SPADING
HBT
REMOVE
DHBT
REMOVE
HBT
WELDING
DHBT
DE-SPADING
DESCAFF

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
INSTALL
REMOVE
INSTALL
DESCAFF

Erect scaffolds for removal of Line 250-PL-101-6101X/61432


Close ball valve 250VB-13508 at Line 250-PL-101-6101X/61432
Remove Line 250-PL-101-6101X/61432
Blind-off ball valve 250VB-13508/TP-205 (250-PL-101-6101X/61432)
Dismantle scaffolds after removal of Line 250-PL-101-6101X/61432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
INSTALL
REMOVE
INSTALL
DESCAFF

Erect scaffolds for removal of Line 50-V-002-1101/11432


Close ball valve 50VB-62105 (50-V-002-1101/11432)
Remove Line 50-V-002-1101/11432
Blind-off ball valve 50VB-62105/TP-203 (50-V-002-1101/11432)
Dismantle scaffolds after removal of Line 50-V-002-1101/11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
REMOVE
INSTALL
INSTALL
DESCAFF

Erect scaffolds for removal of Line 80-DD-001-11430/11432


Temporary remove existing grating (for removal of Line 80-DD-001-11430/11432)
Remove Line 80-DD-001-11430/11432
Blind-off TP-200 (80-DD-001-11430/11432)
Reinstate grating after removal of Line 80-DD-001-11430/11432
Dismantle scaffolds after removal of Line 80-DD-001-11430/11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
INSTALL
REMOVE
INSTALL
INSTALL
DESCAFF

Erect scaffolds for removal of Line 80-D-007-1101X/11432


Temporary remove existing grating (for removal of Line 80-D-007-1101X/11432)
Close ball valve 80VB-62106 & 80VB-62107 (80-D-007-1101X/11432)
Remove Line 80-D-007-1101X/11432 (TP-201/202)
Blind-off TP-201/202 (80-D-007-1101X/11432)
Reinstate grating after removal of Line 80-D-007-1101X/11432 (TP-201/202)
Dismantle scaffolds after removal of Line 80-D-007-1101X/11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
REMOVE
INSTALL
HBT
WELDING
NDT
HT
INSTALL

Erect scaffolds for installation of Line 50-P-13513-11432


Remove spool at Line 50-PL-13512-11432/TP-213
Remove flexible hose at TP-212 (50-PL-001-1101)
Tie-in A-6511 to TP-212 (50-PL-001-1101)
Set up safety habitat for field joint welding of Line 50-P-13513-11432
Prelay spools of Line 50-P-13513-11432 and field joints welding
NDT at field joints of Line 50-P-13513-11432
Hydrotesting for Test Pack, TKP-A-HT-P-010 (50-P-13513-11432)
Install associated gaskets and bolting sets of Line 50-P-13513-11432

Lift-up & move pipe spools (Decom) to laydown area


Lift-up & move manual valves (Decom) to laydown area
Lift-up & move gaskets & stud bolts (Decom) to laydown area
Erect scaffolds for removal of Line 250-PL-010-6101X/61432
Install spading at PL-210
Set up safety habitat for oxy-cutting of long spools (250-PL-010-6101X/61432)
Oxy-cutting at Line 250-PL-010-6101X/61432 & spools rig-down
Dismantle safety habitat after Oxy-cutting at Line 250-PL-010-6101X/61432
Cold cut at TP-204 & spools removal of Line 250-PL-010-6101X/61432
Set up safety habitat for field joint welding at TP-204 (250-PL-010-6101X/61432)
Welding at TP-204 (250-PL-010-6101X/61432) and blind-off 10'' x 600# WN flange
Dismantle safety habitat after field joints welding at TP-204 (250-PL-010-6101X/61432)
Remove spading at PL-210
Dismantle scaffolds after removal of Line 250-PL-010-6101X/61432

RG

RS

FW

BP

MW

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

LT
DHBT
TP
DESCAFF

Reinstatement Leak Test for Test Pack, TKP-A-LT-P-010 (50-P-13513-11432)


Dismantle safety habitat after field joints welding of Line 50-P-13513-11432
Touch-up Painting for Line 50-P-13513-11432
Dismantle scaffolds after installation of Line 50-P-13513-11432

Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE

Post-SD/Decom

HBT

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

WELDING
NDT
HT

Post-SD/Decom

INSTALL

Post-SD/Decom

LT

Post-SD/Decom

PS

Post-SD/Decom

DHBT

Post-SD/Decom
Post-SD/Decom

TP
DESCAFF

Erect scaffolds for installation of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)
Remove 3'' x 150# blind flange at TP-208 (80-D-65100-11432)
Set up safety habitat for field joint welding of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208) and pipe supports
installation
Prelay spools of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208) and field joints welding
NDT at field joints of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)
Hydrotesting for Test Pack, TKP-A-HT-P-011 (50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432)
Install associated manual valves of Line 50-P-13507-11432, 50-P-13508-11432 and 50-D-65105-11432 (TP-208) & associated gaskets and
bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-011 (50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432)
Install Pipe Supports for Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (PS-0002-004-DCOM, PS-0002-005-DCOM, PS0002-006-DCOM)
Dismantle safety habitat after field joints welding of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 and pipe supports
installation
Touch-up Painting for Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)
Dismantle scaffolds after installation of Line 50-P-13507-11432, 50-P-13508-11432 & 50-D-65105-11432 (TP-208)

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
INSTALL
REMOVE
HBT
WELDING
NDT
HT
INSTALL
LT

Post-SD/Decom

PS

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

DHBT
TP
DESCAFF

Erect scaffolds for installation of Line 50-P-13505-11432


Ensure ball valve 50VB-13531 (TP-211) is closed
Remove 2'' x 150# blind flange at TP-211
Set up safety habitat for field joint welding of Line 50-P-13505-11432 & pipe supports installation
Prelay spools of Line 50-P-13505-11432 and field joints welding
NDT at field joints of Line 50-P-13505-11432
Hydrotesting for Test Pack, TKP-A-HT-P-012 (50-P-13505-11432)
Install associated manual valves of Line 50-P-13505-11432 & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-012 (50-P-13505-11432)
Install Pipe Supports for Line 50-P-13505-11432 (PS-0002-013-DCOM, PS-0002-002-DCOM, PS-0002-001-DCOM, PS-0003-001-DCOM, PS0004-005-DCOM)
Dismantle safety habitat after field joints welding of Line 50-P-13505-11432 and pipe supports installation
Touch-up Painting for Line 50-P-13505-11432
Dismantle scaffolds after installation of Line 50-P-13505-11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
HBT
WELDING
NDT
HT
INSTALL
LT
PS
DHBT
TP
DESCAFF

Erect scaffolds for installation of Line 50-P-13506-11432


Set up safety habitat for field joint welding of Line 50-P-13506-11432 & pipe supports installation
Prelay spools of Line 50-P-13506-11432 and field joints welding
NDT at field joints of Line 50-P-13506-11432
Hydrotesting for Test Pack, TKP-A-HT-P-013 (50-P-13506-11432)
Install associated manual valves of Line 50-P-13506-11432 & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, TKP-A-LT-P-013 (50-P-13506-11432)
Install Pipe Supports for Line 50-P-13505-11432 (PS-0002-004-DCOM, PS-0002-005-DCOM)
Dismantle safety habitat after field joints welding of Line 50-P-13506-11432 & pipe supports installation
Touch-up Painting for Line 50-P-13506-11432
Dismantle scaffolds after installation of Line 50-P-13506-11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
INSTALL
HBT
PS
DHBT
TP
DESCAFF

Erect scaffolds for installation of Line 50-D-64107-11432


Remove 2'' x 150# blind flange at TP-207 (80-D-64100-11432)
Install spool of Line 50-D-64107-11432 and associated gaskets & bolting sets.
Set up safety habitat for pipe support installation of Line 50-D-64107-11432
Install Pipe Supports for Line 50-D-64107-11432 (PS-0002-012-DCOM)
Dismantle safety habitat after pipe support installation of Line 50-D-64107-11432
Touch-up Painting for Line 50-D-64107-11432
Dismantle scaffolds after installation of Line 50-D-64107-11432

Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE

Post-SD/Decom

HBT

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

WELDING
NDT
HT

Post-SD/Decom

INSTALL

Post-SD/Decom

INSTALL

Post-SD/Decom

PS

Post-SD/Decom

DHBT

Post-SD/Decom
Post-SD/Decom

TP
DESCAFF

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
GEN
SPADING
HBT
REMOVE
WELDING
DHBT
DE-SPADING
TP
DESCAFF

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
HBT
WELDING
NDT
HT
INSTALL
PS
DHBT
TP
DESCAFF

Erect scaffolds for installation of Line 80-V-62104-11432


Set up safety habitat for field joint welding of Line 80-V-62104-11432 and pipe supports installation
Prelay spools of Line 80-V-62104-11432 and field joints welding
NDT at field joints of Line 80-V-62104-11432
Hydrotesting for Test Pack, TKP-A-HT-V-001 (80-V-62104-11432)
Install associated gaskets and bolting sets of Line 80-V-62104-11432
Install Pipe Supports for Line 80-V-62104-11432 (PS-0002-011-DCOM, PS-0002-010-DCOM)
Dismantle safety habitat after field joints welding of Line 80-V-62104-11432 and pipe supports installation
Touch-up Painting for Line 80-V-62104-11432
Dismantle scaffolds after installation of Line 80-V-62104-11432

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
DESCAFF

Erect scaffolds for removal of A-6810's vent tubing


Remove vent tubing of A-6810
Dismantle scaffolds after removal of A-6810's vent tubing

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
REMOVE
INSTALL
TP
DESCAFF

Erect scaffolds for installation of 50-IA-54000-13411


Remove 2'' x 150# blind flange at TP-214 (50-IA-54000-13411)
Install final spool of Line 50-IA-54000-13411 (TP-214)
Touch-up Painting for Line 50-IA-54000-13411 (TP-214)
Dismantle scaffolds after installation of Line 50-IA-54000-13411 (TP-214)

Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

SCAFF
INSTALL
LT
INSTALL
LT
INSTALL
LT

Erect scaffolds for installation of Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411


Install final spool of Line 50-C-68100-13411 (TP-215) and associated gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, TKP-A-LT-C-001 (50-C-68100-13411)
Install final spool of Line 50-C-68101-13411 (TP-216) and associated gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, TKP-A-LT-C-002 (50-C-68101-13411)
Install final spool of Line 50-C-68102-13411 (TP-217) and associated gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, TKP-A-LT-C-003 (50-C-68102-13411)

Erect scaffolds for installation of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)
Remove 3'' x 150# blind flange at TP-206 (80-D-64100-11432)
Set up safety habitat for field joint welding of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206) and pipe supports
installation
Prelay spools of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206) and field joints welding
NDT at field joints of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)
Hydrotesting for Test Pack, TKP-A-HT-D-001 (50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)
Install associated manual valve, gaskets and bolting sets of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (TP-206)
Install sampling connection, SP-6510 (80-D-64108-11432)
Install Pipe Supports for Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 (PS-0002-009-DCOM, PS-0002-008-DCOM)
Dismantle safety habitat after field joints welding of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432 and pipe supports
installation
Touch-up Painting for Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432
Dismantle scaffolds after installation of Line 50-D-64103-11432, 50-D-64105-11432 & 80-D-64108-11432
Erect scaffolds for installation of Line 100-V-018-1101/11432 (TP-209/210)
Purge Line 100-V-018-1101
Install spading at Line 100-V-018-1101
Set up safety habitat for oxy-cutting & field joint welding at TP-209/210 (100-V-018-1101)
Oxy-cutting at TP-209/210 (100-V-018-1101)
Field joint welding at TP-209/210 (100-V-018-1101) & install spool
Dismantle safety habitat after field joints welding of Line 100-V-018-1101/11432 (TP-209/210)
Remove spading at Line 100-V-018-1101
Touch-up Painting for Line100-V-018-1101/11432 (TP-209/210)
Dismantle scaffolds after installation of Line 100-V-018-1101/11432 (TP-209/210)

Post-SD/Decom
Post-SD/Decom

TP
DESCAFF

Touch-up Painting for Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411


Dismantle scaffolds after installation of Line 50-C-68100-13411, 50-C-68101-13411 & 50-C-68102-13411

TRADES
SF

SWL

PF

PWL

IF

IT

ELE

NDT

PHASE

CAT

Pre-SD
Pre-SD
Pre-SD

L&R
L&R
L&R

Pre-SD
Pre-SD
SD

GEN
GEN
GEN

Pre-SD

SCAFF

SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
INSTALL
DE-SPADING
PS
TP

Post-SD

DESCAFF

SD
SD
Post-SD
Post-SD

REMOVE
INSTALL
PS
TP

SD
SD
Post-SD

REMOVE
INSTALL
PS

Post-SD

TP

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVAL
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
Post-SD
Post-SD

SCAFF
REMOVE
INSTALL
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
REMOVE
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING

Post-SD
Post-SD
Post-SD

PS
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

Pre-SD
SD
SD
SD
SD
SD
SD
SD
Post-SD
Post-SD

SCAFF
GEN
SPADING
REMOVE
WELDING
NDT
INSTALL
DE-SPADING
TP
DESCAFF

SCOPE DESCRIPTION / JOBCARDS TITLE


Lift-up & move pipe spools (SD) to laydown area
Lift-up & move manual valves (SD) to laydown area
Lift-up & move gaskets & stud bolts (SD) to laydown area
Washdown at drip pans below CD prior to SD
Washdown open drain header prior to SD
Washdown closed drain header
Erect scaffolds for removal of spool at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018) & new spools installation
Washdown & purge Line 12''-P-016-6101X (TP-006/018)
Install spading at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018)
Removal of pipe spool (Cold Cut) at Line 250-P-13305-6101X (TP-005) & 12''-P-016-6101X (TP-006/018)
Welding at field joints of Line 12''-P-016-6101X/61432 (TP-006/018)
NDT at field joints of Line 12''-P-016-6101X/61432 (TP-006/018)
Install spools and associated valves, c/w gaskets & bolting set at Line 250-P-13305-6101X/61432 (TP-005)
Install ABV-802 at Line 250-P-13305-6101X/61432 (TP-005)
Remove spading at Line 250-PL-101-6101X (TP-003/004)
Install Pipe Supports for Line 250-P-13305-6101X/61432 (TP-005) (PS-0003-003-SD, PS-0003-005-SD, PS-0003-002-SD)
Touch-up painting at new Line 250-P-13305-6101X/61432 (TP-005) & 12''-P-016-6101X/61432 (TP-006/018)
Dismantle scaffolds after installation of new spools for Line 250-P-13305-6101X/61432 (TP-005) & 12''-P-016-6101X/61432 (TP-006/018)

Removal of pipe spool at Line 80-P-13304-6101X (TP-007/008)


Install spools and associated valves, c/w gaskets & bolting set at Line 80-P-13304-61432 (TP-007/008)
Install Pipe Support for Line 80-P-13304-61432 (TP-007/008) (PS-0003-001-SD)
Touch-up painting at new Line 80-P-13304-61432 (TP-007/008)
Remove 8'' x 600# blind flange at TP-004 (12''-P-016-6101X)
Install spools and associated valves, c/w gaskets & bolting set at Line 200-P-13301-61432 (TP-004)
Install Pipe Support for Line 200-P-13301-61432 (TP-004) (PS-0003-004-SD)

RG

RS

Touch-up painting at new Line 200-P-13301-61432 (TP-004)


Erect scaffolds for removal of spool at Line 50-V-62404-61430/11430 (TP-012/013) & new spools installation
Purging Line 50-V-62404-61430/11430 (TP-012/013)
Install spading at Line 50-V-62404-61430/11430 (TP-013)
Removal of pipe spool (Cold Cut) at 50-V-62404-61430/11430 (TP-013)
Welding at field joints of Line 50-V-62404-61430/11432 (TP-013)
NDT at field joints of Line 50-V-62404-61430/11432 (TP-013)
Install spools and associated valves, c/w gaskets & bolting set at Line 50-V-62404-61430/11430 (TP-012/013)
Remove spading at Line 50-V-62404-61430/11430 (TP-012/013)
Touch-up painting at new Line 50-V-62404-61430/11430 (TP-012/013)
Dismantle scaffolds after installation of new spools for Line 50-V-62404-61430/11430 (TP-012/013)
Erect scaffolds for removal of blind flange & valve installation at Line 2''-VH-6203-11430/11432
Remove 2'' x 150# blind flange at TP-009 (2''-VH-6203-11430/11432)
Install 2'' x 150# ball valve c/w gaskets & bolting sets at TP-009 (2''-VH-6203-11430/11432)
Touch-up painting at new valve (2''-VH-6203-11430/11432)
Dismantle scaffolds after removal of blind flange & valve installation for Line 2''-VH-6203-11430/11432
Erect scaffolds for removal of spool at Line 3''-D-052-1101X (TP-014/015) & new spools installation
Washdown & purge Line 3''-D-052-1101X (TP-014/015)
Install spading at Line 3''-D-052-1101X (TP-014/015)
Removal of pipe spool (Cold Cut) at Line 3''-D-052-1101X (TP-014/015)
Welding at field joints of Line 3''-D-052-1101X (TP-014/015)
NDT at field joints of Line 3''-D-052-1101X (TP-014/015)
Install spools c/w gaskets & bolting set at Line 3''-D-052-1101X (TP-014/015)
Remove spading at Line 3''-D-052-1101X (TP-014/015)
Touch-up painting at new Line 3''-D-052-1101X (TP-014/015)
Dismantle scaffolds after installation of new spools for Line 3''-D-052-1101X (TP-014/015)
Erect scaffolds for removal of spool at Line 2''-D-002-6101X/11430 (TP-010/011) & new spools installation
Washdown & purge Line 2''-D-002-6101X/11430 (TP-010/011)
Install spading at Line 2''-D-002-6101X/11430 (TP-010/011)
Removal of pipe spool (Cold Cut) at Line 2''-D-002-6101X/11430 (TP-011)
Welding at field joints of Line 2''-D-002-6101X/11430 (TP-011)
NDT at field joints of Line 2''-D-002-6101X/11430 (TP-011)
Install spools and associated valves c/w gaskets & bolting set at Line 2''-D-002-6101X/11430 (TP-011)
Remove spading at Line 2''-D-002-6101X/11430 (TP-010/011)

Install Pipe Support for Line 2''-D-002-6101X/11430 (TP-010/011) (PS-0003-006-SD)


Touch-up painting at new Line 2''-D-002-6101X/11430 (TP-010/011)
Dismantle scaffolds after installation of new spools for Line 2''-D-002-6101X/11430 (TP-010/011)
Erect scaffolds for removal of spool at Line 2''-PD-6411-11430 (TP-002/003) & new spools installation
Washdown & purge Line 2''-PD-6411-11430 (TP-002/003)
Install spading at Line 2''-PD-6411-11430 (TP-002/003)
Removal of pipe spool (Cold Cut) at Line 2''-PD-6411-11430 (TP-002/003)
Welding at field joints of Line 2''-PD-6411-11430 (TP-002/003)
NDT at field joints of Line 2''-PD-6411-11430 (TP-002/003)
Install spools and associated valve c/w gaskets & bolting set at Line 2''-PD-6411-11430 (TP-002/003)
Remove spading at Line 2''-PD-6411-11430 (TP-002/003)
Touch-up painting at new Line 2''-PD-6411-11430 (TP-002/003)
Dismantle scaffolds after installation of new spools for Line 2''-PD-6411-11430 (TP-002/003)
Erect scaffolds for removal of spool at Line 2''-D-6506-11430/11432 (TP-019/020) & new spools installation
Washdown & purge Line 2''-D-6506-11430/11432 (TP-019/020)
Install spading at Line 2''-D-6506-11430/11432 (TP-019/020)
Removal of pipe spool (Cold Cut) at Line 2''-D-6506-11430/11432 (TP-019)
Welding at field joints of Line 2''-D-6506-11430/11432 (TP-019)
NDT at field joints of Line 2''-D-6506-11430/11432 (TP-019)
Install spools c/w gaskets & bolting set at Line 2''-D-6506-11430/11432 (TP-019/020)
Remove spading at Line 2''-D-6506-11430/11432 (TP-019/020)
Touch-up painting at new Line 2''-D-6506-11430/11432 (TP-019/020)
Dismantle scaffolds after installation of new spools for Line 2''-D-6506-11430/11432 (TP-019/020)

TRADES
FW

BP

MW

SF

SWL

PF

PWL

IF

NO

JOBCARD NO

PLATFORM

LOCATION

DRAWINGS

PHASE

CAT

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Post-SD
Post-SD
Post-SD
Post-SD

L&R
L&R
L&R
L&R

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL
INSTALL
LT
PS
DHBT
TP
DESCAFF

Post-SD
Post-SD

SCAFF
REMOVE

21

Post-SD

HBT

22
23
24

Post-SD
Post-SD
Post-SD

WELDING
NDT
HT

25

Post-SD

INSTALL

26
27

Post-SD
Post-SD

LT
INSTALL

28

Post-SD

INSTALL

29

Post-SD

PS

30

Post-SD

DHBT

31
32
33
34
35
36
37
38
39
40
41

Post-SD
Post-SD

TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL
LT
PS

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
HBT
WELDING
NDT
HT
INSTALL
LT
PS
DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
HBT
WELDING
NDT
HT
INSTALL
INSTALL
INSTALL
INSTALL

68

Post-SD

LT

69
70
71

Post-SD
Post-SD
Post-SD

PS
DHBT
TP

72

Post-SD

DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
REMOVE
HBT
WELDING
NDT
HT
INSTALL
LT
PS
DHBT
TP
DESCAFF

Post-SD
Post-SD

SCAFF
REMOVE

73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

89

Post-SD

HBT

90
91
92
93
94

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

WELDING
NDT
HT
INSTALL
LT

95

Post-SD

PS

96
97
98
99
100
101
102
103
104
105

Post-SD
Post-SD
Post-SD

DHBT
TP
DESCAFF

Post-SD
Post-SD
Post-SD
Post-SD
Post-SD
Post-SD

SCAFF
INSTALL
LT
HBT
PS
DHBT

106
107

Post-SD
Post-SD

TP
DESCAFF

TRADES
SCOPE DESCRIPTION / JOBCARDS TITLE
Lift-up
Lift-up
Lift-up
Lift-up

&
&
&
&

move
move
move
move

pipe spools (Post-SD) to laydown area


manual valves (Post-SD) to laydown area
MOV-13304, MOV-13305 & ABV-1330 to laydown area
gaskets & stud bolts (Post-SD) to laydown area

Erect scaffolds for installation of Line 250-P-13300-6YYYYX


Set-up safety habitat for field joints welding of Line 250-P-13300-6YYYYX and pipe supports installation
Prelay spools of Line 250-P-13300-6YYYYX and field joints welding
NDT at field joints of Line 250-P-13300-6YYYYX
Hydrotesting for Test Pack, WLDP-C-HT-P-001 (250-P-13300-6YYYYX)
Install MOV-13304, MOV-13305 & ABV-1330
Install associated manual valves of Line 250-P-13300-6YYYYX & associated gaskets and bolting sets
Reinstatement Leak Test for Test Pack, WLDP-C-LT-P-001 (250-P-13300-6YYYYX)
Install Pipe Supports for Line 250-P-13300-6YYYYX (PS-0002-001-PSD, PS-0002-002-PSD, PS-0002-003-PSD)
Dismantle safety habitat after field joints welding of Line 250-P-13300-6YYYYX and pipe supports installation
Touch-up Painting for Line 250-P-13300-6YYYYX
Dismantle scaffolds after installation of Line 250-P-13300-6YYYYX & pipe supports
Erect scaffolds for installation of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432
Remove 8'' x 600# blind flange at TP-103 (200-P-13301-61432)
Set-up safety habitat for field joints welding of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and pipe supports
installation
Prelay spools of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and field joints welding
NDT at field joints of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432
Hydrotesting for Test Pack, WLDP-C-HT-P-002 (200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432)
Install associated manual valves c/w gaskets & bolting sets for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432
Reinstatement Leak Test for Test Pack, WLDP-C-LT-P-002 (200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432)
Install sampling point DBB valve, SP-13505 and return line DBB valve, SP-13506 for H2S Analyzer.
Install corossion coupon (SP-13304), scale corrosion coupon (SP-13303), bioprobe (SP-13302) and sampling DBB valve (SP-13301)
Install Pipe Support for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 (PS-0003-004-PSD, PS-0003-003-PSD, PS-0003001-PSD, PS-0003-006-PSD)
Dismantle safety habitat after field joints welding of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432 and pipe supports
Touch-up Painting for Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432
Dismantle scaffolds after installation of Line 200-P-13301-61432, 200-P-13302-61432 & 50-P-13303-61432
Erect scaffolds for installation of Line 50-V-62400-61432 & 50-V-62401-61432
Set-up safety habitat for field joints welding of Line 50-V-62400-61432 & 50-V-62401-61432 and pipe supports installation
Prelay spools of Line 50-V-62400-61432 & 50-V-62401-61432 and field joints welding
NDT at field joints of Line 50-V-62400-61432 & 50-V-62401-61432
Hydrotesting for Test Pack, WLDP-C-HT-V-001 (50-V-62400-61432 & 50-V-62401-61432)
Install associated manual valves of Line 50-V-62400-61432 & 50-V-62401-61432 and associated gaskets & bolting sets
Reinstatement Leak Test for Test Pack, WLDP-C-LT-V-001 (50-V-62400-61432 & 50-V-62401-61432)
Install Pipe Support for Line 50-V-62400-61432 & 50-V-62401-61432 (PS-0003-014-PSD,PS-0003-013-PSD)

RG

RS

FW

BP

MW

SF

SWL

PF

PWL

IF

IT

Dismantle safety habitat after field joints welding of Line 50-V-62400-61432 & 50-V-62401-61432 and pipe supports
Touch-up Painting for Line 50-V-62400-61432 & 50-V-62401-61432
Dismantle scaffolds after installation of Line 50-V-62400-61432 & 50-V-62401-61432
Erect scaffolds for installation of Line 50-V-62402-11432 & 50-V-62403-11432
Remove 2'' x 150# blind flange at TP-104 (2''-VH-6203-11430/11432)
Set-up safety habitat for field joints welding of Line 50-V-62402-11432 & 50-V-62403-11432 and pipe supports installation
Prelay spools of Line 50-V-62402-11432 & 50-V-62403-11432 and field joints welding
NDT at field joints of Line 50-V-62402-11432 & 50-V-62403-11432
Hydrotesting for Test Pack, WLDP-C-HT-V-002 (50-V-62402-11432 & 50-V-62403-11432)
Install gaskets & bolting sets of Line 50-V-62402-11432 & 50-V-62403-11432
Reinstatement Leak Test for Test Pack, WLDP-C-LT-V-002 (50-V-62402-11432 & 50-V-62403-11432)
Install Pipe Support for Line 50-V-62402-11432 & 50-V-62403-11432 (PS-0003-011-PSD,PS-0003-012-PSD)
Dismantle safety habitat after field joints welding of Line 50-V-62402-11432 & 50-V-62403-11432 and pipe supports
Touch-up Painting for Line 50-V-62402-11432 & 50-V-62403-11432
Dismantle scaffolds after installation of Line 50-V-62402-11432 & 50-V-62403-11432
Erect scaffolds for installation of Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-61432
Set-up safety habitat for field joints welding of Line 50-D-65400-61432 and pipe supports installation
Prelay spools of Line 50-D-65400-61432 and field joints welding
NDT at field joints of Line 50-D-65400-61432
Hydrotesting for Test Pack, WLDP-C-HT-CD-001 (50-D-65400-61432)
Install associated valves c/w gaskets & bolting sets of Line 50-D-65400-61432
Install associated valves c/w gaskets & bolting sets of Line 50-D-65402-61432
Install associated valves c/w gaskets & bolting sets of Line 50-D-65403-61432
Install associated valves c/w gaskets & bolting sets of Line 50-D-65404-61432
Reinstatement Leak Test for Test Pack, WLDP-C-LT-CD-001 (50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-6540461432)
Install Pipe Support for Line 50-D-65400-61432 (PS-0003-007-PSD,PS-0003-008-PSD)
Dismantle safety habitat after field joints welding of Line 50-D-65400-61432 and pipe supports
Touch-up Painting for Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-61432
Dismantle scaffolds after installation of Line 50-D-65400-61432, 50-D-65402-61432, 50-D-65403-61432 & 50-D-65404-61432

Erect scaffolds for installation of Line 50-D-65401-11432


Remove 2'' x 150# blind flange at TP-102 (2''-PD-6411-11430/11432)
Set-up safety habitat for field joints welding of Line 50-D-65401-11432 and pipe supports installation
Prelay spools of Line 50-D-65401-11432 and field joints welding
NDT at field joints of Line 50-D-65401-11432
Hydrotesting for Test Pack, WLDP-C-HT-CD-002 (50-D-65401-11432)
Install gaskets & bolting sets of Line 50-D-65401-11432 (TP-102)
Reinstatement Leak Test for Test Pack, WLDP-C-LT-CD-002 (50-D-65401-11432)
Install Pipe Support for Line 50-D-65401-11432 (PS-0002-009-PSD,PS-0002-007-PSD, PS-0002-008-PSD, PS-0002-006-PSD)
Dismantle safety habitat after field joints welding of Line 50-D-65401-11432 and pipe supports
Touch-up Painting for Line 50-D-65401-11432
Dismantle scaffolds after installation of Line 50-D-65401-11432
Erect scaffolds for installation of Line 50-D-64400-11432 & 50-D-64401-11432
Remove 2'' x 150# blind flange at TP-101 (2''-D-6506-11430/11432)

Set-up safety habitat for field joints welding of Line 50-D-64400-11432 & 50-D-64401-11432 and pipe supports installation
Prelay spools of Line 50-D-64400-11432 & 50-D-64401-11432 and field joints welding
NDT at field joints of Line 50-D-64400-11432 & 50-D-64401-11432
Hydrotesting for Test Pack, WLDP-C-HT-OD-001 (50-D-64400-11432 & 50-D-64401-11432)
Install gaskets & bolting sets of Line 50-D-64400-11432 & 50-D-64401-11432
Reinstatement Leak Test for Test Pack, WLDP-C-LT-CD-002 (50-D-64400-11432 & 50-D-64401-11432)
Install Pipe Support for Line 50-D-64400-11432 & 50-D-64401-11432 (PS-0002-002-PSD,PS-0002-003-PSD, PS-0002-004-PSD, PS-0002-009PSD)
Dismantle safety habitat after field joints welding of Line 50-D-64400-11432 & 50-D-64401-11432 and pipe supports
Touch-up Painting for Line 50-D-64400-11432 & 50-D-64401-11432
Dismantle scaffolds after installation of Line 50-D-64400-11432 & 50-D-64401-11432
Erect scaffolds for installation of Line 50-UN-59100-61432
Install spools of Line 50-UN-59100-61432 and associated valves c/w gaskets & bolting sets.
Reinstatement Leak Test for Test Pack, WLDP-C-LT-UN-001 (50-UN-59100-61432)
Set-up safety habitat for pipe supports installation of Line 50-UN-59100-61432
Install Pipe Support for Line 50-UN-59100-61432 (PS-0003-010-PSD)
Dismantle safety habitat after pipe support installation of Line 50-UN-59100-61432
Touch-up Painting for Line 50-UN-59100-61432
Dismantle scaffolds after installation of Line 50-UN-59100-61432

ELE

NDT

WH

CC

HBT

VR

TOTAL MHRS

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

JOBCARD NO

PLATFORM

LOCATION

DRAWINGS

PHASE
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom
Post-SD/Decom

CAT
L&R
SCAFF
HBT
REMOVE
DHBT
REMOVE
HBT
WELDING
DHBT
DESCAFF
SCAFF
INSTALL
REMOVE
INSTALL
DESCAFF
SCAFF
INSTALL
REMOVE
INSTALL
DESCAFF
SCAFF
REMOVE
INSTALL
REMOVE
INSTALL
INSTALL
DESCAFF
SCAFF
REMOVE
REMOVE
INSTALL
INSTALL
DESCAFF
SCAFF
REMOVE
INSTALL
DESCAFF
GEN
GEN

SCOPE DESCRIPTION / JOBCARDS TITLE


Lift-up & move blind flanges, gaskets & stud bolts (Decom) to laydown area
Erect scaffolds for removal of Line 10''-P-010-6101X/61432
Set up safety habitat for oxy-cutting of long spools (10''-P-010-6101X/61432)
Oxy-cutting at Line 10''-P-010-6101X/61432 & spools rig-down
Dismantle safety habitat after Oxy-cutting at Line 10''-P-010-6101X/61432
Cold cut at TP-201 & spools removal of Line 10''-P-010-6101X/61432
Set up safety habitat for field joint welding at TP-201 (10''-P-010-6101X/61432)
Welding at TP-201 (10''-P-010-6101X/61432) and blind-off 10'' x 600# WN flange
Dismantle safety habitat after field joints welding at TP-201 (10''-P-010-6101X/61432)
Dismantle scaffolds after removal of Line 10''-P-010-6101X/61432
Erect scaffolds for removal of Line 200-P-13305-61432
Close ball valve 200VB-13310 at Line 200-P-13305-61432
Remove Line 200-P-13305-61432
Blind-off ball valve 200VB-13310 (Line 200-P-13305-61432/TP-202)
Dismantle scaffolds after removal of Line 200-P-13305-61432
Erect scaffolds for removal of Line 80-P-13304-61432
Close ball valve 80VB-13322 (80-P-13304-61432)
Remove Line 80-P-13304-61432
Blind-off ball valve 580VB-13322 (80-P-13304-61432/TP-204)
Dismantle scaffolds after removal of Line 80-P-13304-61432
Erect scaffolds for removal of Line 2''-D-002-6101X/11430/11432
Temporary remove existing grating (for removal of Line2''-D-002-6101X/11430/11432)
Close ball valve 50VB-65408 (2''-D-002-6101X/11430/11432)
Remove Line 2''-D-002-6101X/11430/11432
Blind-off ball valve 50VB-65408/TP-203 (2''-D-002-6101X/11430/11432)
Reinstate grating after removal of Line 2''-D-002-6101X/11430/11432
Dismantle scaffolds after removal of Line 2''-D-002-6101X/11430/11432
Erect scaffolds for removal of Line 3''-D-052-1101X/11432
Temporary remove existing grating (for removal of Line 3''-D-052-1101X/11432)
Remove Line 3''-D-052-1101X/11432 (TP-206)
Blind-off TP-206 (3''-D-052-1101X/11432)
Reinstate grating after removal of Line 3''-D-052-1101X/11432 (TP-206)
Dismantle scaffolds after removal of Line 3''-D-052-1101X/11432
Erect scaffolds for removal of Line 50-V-62404-61430
Remove Line 50-V-62404-61430 (TP-205)
Blind-off TP-205 (50-V-62404-61430)
Dismantle scaffolds after removal of Line 50-V-62404-61430 (TP-205)
Washdown at drip pans below CD prior to demobilization
Washdown open drain header prior to demobilization

TRADES
RG

RS

FW

BP

MW

SF

SWL

PF

PWL

IF

IT

ELE

NDT

WH

CC

HBT

VR

TOTAL MHRS