Академический Документы
Профессиональный Документы
Культура Документы
1. Study Each part of the task scientifically and develop a best method to perform it.
2. Carefully select workers and train them to perform a task usingthe scientifically
developed methode.
3. Co-operate fully with workers to ensure they use the proper methode.
4. Divide work and responsibility so management is responsible for planning work
methods using scientific principles and workers are responsible for executing the work
accordingly.
• Systematically analyze the relationship between the worker and task and
redesign processes to ensure maximum efficiency e.g. use a bigger shovel so
more grain can be lifted with each action.
• Have written procedures for each task and ensure they are followed by
supervision and quality control.
• Get maximum prosperity for employer and employee alike by linking pay and
other rewards directly to work output.
• Select workers with the right skills and abilities for the specific task and
thoroughly train them to follow the procedures.