1

Minutes of the 82nd meeting of State Environment Impact Assessment Authority held
on. 09.03.2015, under the Chairpersonship Mrs. Saroj Siwatch IAS (Retd.),
Chairperson, SEIAA held in the meeting room of office of SEIAA Haryana, Sector-2
Panchkula, regarding Environmental Clearance under EIA Notification dated
14.9.2006.
The full Authority is present. The Cases recommended by SEAC for
Environmental Clearance or otherwise as listed in the Agenda item circulated vide letter
No. 253-255 dated 04.03.2015 were discussed. Following decisions were taken:Item No. [1] Environmental Clearance for construction of Affordable Group
Housing Colony at Sector-84, Village Kheri Kalan, Tehsil
Tigaon,
Faridabad, Haryana by M/s SRS Hitech Projects Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Affordable Group Housing Colony at Sector-84, Village Kheri Kalan, Tehsil Tigaon,
Faridabad on a total plot area of 20234.25 sqm (5 acre). The total built up area shall be
51075.633 sqm. The Group Housing project shall have 7 Residential towers with
basement + Stilt + Podium Tower A1 (GF + 18 Floors), Tower A2 to A7 (GF + 14
Floors), Commercial, Anganwadi cum Crche and Community Hall. The Group Housing
project shall have 816 Dwelling Units. The maximum height of the building shall be 45
meter. The total water requirement shall be 601 KLD. The fresh water requirement shall
be 405 KLD. The waste water generation shall be 506 KLD, which will be treated in the
STP of 580 KLD capacity. The total power requirement shall be 4282 KVA which will be
supplied by DHBVN. The Project Proponent has proposed to develop green belt on
20.20% of project area (15.20% tree plantation + 5% landscaping). The Project
Proponent proposed to construct 05 rain water harvesting pits. The solid waste generation
will be 1933 kg/day. The bio-degradable waste will be treated in the project area by
adopting appropriate technology. The total parking spaces proposed are 449 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Forest land, recycle and reuse of water, parking plan, traffic circulation etc. The
representative of the project proponent submitted copy of EDC/IDC paid to HUDA for
the services for supply of water, sewerage connection and drainage system, NOC of
airport Authority regarding height clearance and NOC from

DFO regarding Non

involvement of Forest land. It was noticed that the project proponent in the layout plan
has earmarked space for STP out of the zoned area and the dimensions of set back and
internal roads were also not marked on the plan. The representative of the project
proponent was also advised to provide community hall of 4000 sq.ft area and provision
for basement for solid waste management facility. The representative of the project

proponent submitted the revised plan marked A/1 82 nd showing STP in the zoned area,
dimensions of internal roads (6 meter), width of set-back, community hall of 4000 sq.ft
and provision for basement. The representative of the project proponent intimated that
with the addition of basement the built up area shall now the 51075.633 sqm.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following conditions in addition to the usual conditions in practice.
[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction.

[2]

The project proponent shall provide green area on terrace and roof top.

[3]

The project proponent shall install solar panel for energy conservation.

[4]

The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.

[5]

The project proponent shall implement the revised plan marked A/1 82 nd
showing STP in the zoned area, dimensions of internal roads (6 meter), width of
set-back, community hall of 4000 sq.ft and provision for basement.

Item No. [2] Environmental Clearance for the IT Unit at Village-Mauza


Ballabgarh, Sec-5, Distt.- Faridabad, Haryana by M/s SRS
Retreat
Services Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of IT Unit
at Village-Mauza Ballabgarh, Sec-5, Distt.- Faridabad, Haryana on a total plot area of
12719.26 sqm (3.143 Acres) transferred by Director Industries and Commerce Haryana in
favour of project proponent. The total built up area shall be 50097.251 sqm. The
proposed Project shall comprise of Two Towers consisting of Tower A (GF + 6 Floors),
Tower B (GF + 11 Floors). The maximum height of the building shall be 48 meter. The
total water requirement shall be 131 KLD. The fresh water requirement shall be 41 KLD.
The waste water generation shall be 113 KLD, which will be treated in the 2 No. of STPs
of 150 KLD capacities. The total power requirement shall be 4202.1 KVA which will be
supplied by DHBVN. The Project Proponent has proposed to develop green belt on 30%
of project area (20% tree plantation + 10% landscaping). The Project Proponent proposed

to construct 04 rain water harvesting pits. The solid waste generation will be 707 kg/day.
The bio-degradable waste will be treated in the project area by adopting appropriate
technology. The total parking spaces proposed are 944 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Forest land, recycle and reuse of water, parking plan, traffic circulation etc. It was noticed
that the land has been transferred in favour of project proponent by Director of Industries
and Commerce vide letter dated 19.08.2009. The representative of the project proponent
submitted copy of EDC paid to Commissioner Municipal Corporation Faridabad for the
services for supply of water, sewerage connection and drainage system, NOC of airport
Authority regarding height clearance. The representative of the project proponent was
advised to modify the Entry and Exit ramp for smooth movement of vehicles. The
representative of the project proponent was also advised to demarcate the dimension of
set-back. The representative of the project proponent submitted revised plan marked A2/82nd (Modification of Exit and Entry ramp and showing 6 meter wide set-back).
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following conditions in addition to the usual conditions in practice.
[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction.

[2]

The project proponent shall provide green area on terrace and roof top.

[3]

The project proponent shall install solar panel for energy conservation.

[4]

The project proponent shall implement the revised plan marked A-2/82 nd
(Modification of Exit and Entry ramp and showing 6 meter wide set-back).

[5]

The project proponent shall maintain a collection center for E-waste and it shall be
disposed of to only registered and authorized dismantler / recycler as per existing
E-waste Management Rules 2011.

Item No. [3] Environmental Clearance for the Residential Housing Board Colony
located at Jind Road, Rohtak, Haryana by Housing Board
Rohtak.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Residential Housing Board Colony located at Jind Road, Rohtak, Haryana by Housing
Board Rohtak on a total plot area of 59185.93 sqm. The total built up area shall be
109272.97 sqm. The proposed Project shall comprise of 23 Blocks consisting of 02
Blocks of Type A (Stilt + GF+ 6 Floors), 03 Blocks of Type B (Stilt + GF + 7 Floors), 16
Blocks of Type C (Stilt + GF + 8 Floors), 02 Blocks of EWS (GF + 3 Floors), 02
Nursery School, Community Center and Commercial Area. The maximum height of the
building shall be 28.2 meter. The total water requirement shall be 766 KLD. The fresh
water requirement shall be 443 KLD. The waste water generation shall be 544 KLD,
which will be treated in the STP of 650 KLD capacity. The total power requirement shall
be 10634.5 KVA which will be supplied by DHBVN. The Project Proponent has
proposed to develop green belt on 33.19% of project area (22.94% tree plantation +
10.23% landscaping). The Project Proponent proposed to construct 14 rain water
harvesting pits. The solid waste generation will be 2818.5 kg/day. The bio-degradable
waste will be treated in the project area by adopting appropriate technology. The total
parking spaces proposed are 1203 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC from DFO regarding non
applicability of Forest land, recycle and reuse of water, parking plan, HT line, traffic
circulation etc. The representative of the project proponent submitted the assurance of
HUDA for supply of water along and NOC from DFO regarding non applicability of
Forest land. It was noticed that the zoning plan submitted by project proponent shows
that the zoning line is not connected with the main road and access to the Group Housing
project was also not clear. The representative of the project proponent informed that the
gate no. 1 and gate no. 2 shown in the plan are a abutting to the PWD boundary and PWD
boundary is National Highway which will serve the approach to the Colony. The
representative of the project proponent was asked to submit an undertaking in this regard.
It was also noticed that the gate no. 1 is following under the ROW of HT line. The
representative of the project proponent clarified that the electricity department has no
objection for the same and requisite permission shall be obtained from electricity
department before the operation of this project. The representative of the project
proponent also submitted an undertaking in this regard. It was observed that the project
proponent has not made any provision for parking in the EWS block. The representative

of the project proponent clarified that additional stilt car parking shall be provided in the
EWS block to accommodate 60 ECS and submitted an undertaking in this regard.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

The project proponent shall make provision for stilt parking in the EWS block to
accommodate 60 ECS and shall submit a plan before the start of construction.

[2]

The project proponent shall not provide mechanical parking in the Group Housing
project.

[3]

The project proponent shall develop all the common public utility services as
approved in the layout plan for the residents along with the development of
dwelling units.

[4]

The project proponent shall not raise any construction activity in the ROW
reserved/acquired for High Tension Wire passing through the project area and
shall maintain horizontal and vertical ROW as required under Indian Electricity
Rules, 1956/DHBVN latest instructions.

Item No. [4] Environmental Clearance for the proposed Commercial Complex
with Multiplex and Hotel Project on land measuring 6.075
Acres at
Sector 25, Hisar By pass, Hisar, Haryana by M/s Aerens
Goldsouk
Projects (Hissar) Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Commercial Complex with Multiplex and Hotel Project on land measuring 6.075 Acres
at Sector 25, Hisar By pass, Hisar, Haryana on a total plot area of 24584.65 sqm. The
total built up area shall be 73069.55 sqm. The proposed Project shall comprise of 2
Blocks with basement i.e. Block 1 Shopping Complex (GF + 3 Floors) and Block 2 Hotel
Block (GF + 8 Floors) etc. The maximum height of the building shall be 30 meter. The
total water requirement shall be 106.79 KLD. The fresh water requirement shall be 42.86
KLD. The waste water generation shall be 64 KLD, which will be treated in the STP of
85 KLD capacity. The total power requirement shall be 4500 KVA which will be supplied
by DHBVN. The Project Proponent has proposed to develop green belt on 15.10% of
project area (10.05% tree plantation + 5.05% landscaping). The Project Proponent
proposed to construct 06 rain water harvesting pits. The solid waste generation will be
320 kg/day. The bio-degradable waste will be treated in the project area by adopting
appropriate technology. The total parking spaces proposed are 816 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
forest land, recycle and reuse of water, parking plan, traffic circulation etc. The project

proponent submitted revised fresh water requirement, STP and water balance diagram.
The representative of the project proponent submitted the assurance of HUDA for supply
of water along with copies of EDC/IDC paid to HUDA for the services for supply of
water, sewerage connection and drainage system NOC from Tehsildar regarding non
applicability of Forest land. The representative of the project proponent was asked to get
the NOC from DFO concerned regarding non-involvement of forest land as Tehsildar is
not competent body to issue NOC regarding non-involvement of forest land. The
representative of the project proponent assured the Authority to submit the NOC from
DFO regarding non-involvement of Forest land within 2-3 days. The representative of the
project proponent submitted NOC dated 12.03.2015 regarding non-involvement of forest
land issued by Forest Department and submitted the same on 12.03.2015.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

Vertical fenestration shall not exceed 40% of total wall area.

[2]

The project proponent shall provide green area on terrace and roof top.

[3]

The project proponent shall not use fresh water for HVAC and DG cooling. Air
based HVAC system should be adopted and only treated water shall be used by
project proponent for cooling, if it is at all needed.

[4]

The project proponent shall install solar panel for energy conservation.

[5]

Corporate Environment and Social Responsibility (CSER) shall be laid down by the
project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI Office
Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry of
Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit statement
shall be submitted in the compliance. Environment related work proposed to be
executed under this responsibility shall be undertaken simultaneously. The project
proponent shall select and prepare the list of the work for implementation of CSER
of its own choice and shall submit the same before the start of construction.

[6]

The project proponent shall construct culvert of appropriate size on the water course
in approach road to the project.

Item No. [5] Environmental Clearance for expansion of Hotel Project at Sector-60,
Gurgaon by M/s Toucan Real Estates Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed expansion of Hotel Project
at Sector-60, Gurgaon on a total plot area of 12818.39 sqm (3.17 Acres). The total built
up area shall be 57016.4 sqm. The proposed Project shall comprise 3 Blocks + 2
basements + Stilt + GF + 11 floors. The maximum height of the building shall be 49.225
meter. The total water requirement shall be 386.99 KLD. The fresh water requirement

shall be 205.47 KLD. The waste water generation shall be 238.64 KLD, which will be
treated in the STP of 285 KLD and ETP of 85 KLD capacity
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration. The representative of the project proponent present in the
meeting to consider their case in the next meeting as their consultant cannot attend the
meeting due to ill health and Architect is also not available. The representative of the
project proponent submitted copy of request dated 05.03.2015 requesting the SEIAA to
consider their case in the next meeting.
After detailed deliberations, the Authority decided to defer this case to the next
meeting as requested by project proponent vide letter dated 05.03.2015.
Item No. [6] Environmental Clearance for construction of Commercial Colony
(3.962 Acres) located at Village-Nakhnaula, Sector-86, DistrictGurgaon, Haryana by M/s Bestech India Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Commercial Colony (3.962 Acres) located at Village-Nakhnaula, Sector-86, DistrictGurgaon, Haryana on a total plot area of 16033.520 sqm (3.962 acres). The total built up
area shall be 57016.4 sqm. The proposed Project shall comprise Retail area and Office
area with 3 basements + GF+ 15 floors. The maximum height of the building shall be
59.85 meter. The total water requirement shall be 184 KLD. The fresh water requirement
shall be 54 KLD. The waste water generation shall be 148 KLD, which will be treated in
the separate 2 STPs of 180 KLD (100 KLD + 80 KLD) capacity. The total power
requirement shall be 4530 KW which will be supplied by DHBVN. The Project
Proponent has proposed to develop green belt on 30.67% of project area (23.553% tree
plantation + 7.12% landscaping). The Project Proponent proposed to construct 04 rain
water harvesting pits. The solid waste generation will be 1477.65 kg/day. The biodegradable waste will be treated in the project area by adopting appropriate technology.
The total parking spaces proposed are 798 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Aravalli Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic
circulation etc. The representative of the project proponent submitted the assurance of
HUDA for supply of water along with copies of EDC/IDC paid to HUDA for the services
for supply of water, sewerage connection and drainage system, NOC from DC Gurgaon
regarding non applicability of Aravalli Notification and NOC from AAI regarding height
clearance. It was found that gas pipe line is passing through the project area separating
the project area in 2 pockets and in the zoning plan ROW has been left. The zoning plan

also demarcates zoned area of project area in to different pockets. It was noticed that the
project proponent has proposed the crossing over of services by intercepting the ROW
reserve for gas pipe line. The representative of the project proponent was advised either
to submit NOC from GAIL allowing passing of services lines intercepting reserved ROW
or revise the plan showing independent services in two different pockets without
intercepting the ROW reserved for gas pipe line. The representative of the project
proponent agreed to provide independent services in different pockets without
intercepting the reserved ROW and submitted a plan in the meeting. It was noticed that in
the affidavit submitted the project proponent has kept both the options open i.e. to make
provision for separate services in case GAIL do not allow the passing of services
intercepting ROW.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

Vertical fenestration shall not exceed 40% of total wall area.

[2]

The project proponent shall provide green area on terrace and roof top.

[3]

The project proponent shall not use fresh water for HVAC and DG cooling. Air
based HVAC system should be adopted and only treated water shall be used by
project proponent for cooling, if it is at all needed.

[4]

The project proponent shall install solar panel for energy conservation.

[5]

The project proponent shall provide separate infrastructure facilities in 2


pockets without intercepting the ROW reserved for gas pipe line or shall seek
NOC from the GAIL for passing the services line intercepting ROW reserved for
gas pipe line.

[6]

Corporate Environment and Social Responsibility (CSER) shall be laid down by the
project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI Office
Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry of
Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit statement
shall be submitted in the compliance. Environment related work proposed to be
executed under this responsibility shall be undertaken simultaneously. The project
proponent shall select and prepare the list of the work for implementation of CSER
of its own choice and shall submit the same before the start of construction.

Item No. [7] Environmental Clearance for Expansion of Central University of


Haryana at village Jant-pali, Mahendergarh, Haryana by
Central
University of Haryana.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the Expansion of Central
University of Haryana at village Jant-pali, Mahendergarh, Haryana with the proposal as
given under:

Particulars

Existing

Expansion

Plot area

57,715.00 sqm

20,14,277.32 sqm

20,71,992.32 sqm

Built up area
Building height
Green Area (32.49%)

29,688.00 sqm
29.4 meter
17,314.65 sqm

6,82,367.43 sqm

7,12,055.43 sqm
6,02,016.59 sqm

Building details

4
Blocks,
Administrative
Block, Teaching
Block,
Boys
Hostel and Girls
Hostel.

5,84,701.94 sqm
4 blocks i.e. Academic
block, Residential Quarters,
Controller of Examination,
Central
Library,
Convention Center, Guest
House Alumni, Senior
Secondary School, Shops,
Bank,
Post
Office,
Community
Center,
Banquet Hall, Temple, Milk
booth
3715 KLD
2204 KLD
1896 KLD

9927 kg/day
6869 ECS

10293 kg/day
7118 ECS

Total Water Requirement 199 KLD


Fresh Water
104 KLD
Waste water
83 KLD
STP capacity

100 KLD

Power requirement
RWH pits
Solid wastes generation
Proposed parking

975 KVA
47 Nos.
366 kg/day
249 ECS

Total

3914 KLD
2308 KLD
1979 KLD
3 STPs of 100 KLD,
2 STPs of 1500 KLD &
1500 KLD & 800
800 KLD
KLD
8775 KVA
9750 KVA (DHBVN)

In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Forest land, recycle and reuse of water, parking plan, traffic circulation etc. The
representative of the project proponent submitted an undertaking with the declaration that
they will meet with the fresh water requirement from canal water supply from Jant-Pali
minor canal. The representative of the project proponent also informed the Authority that
Registrar Central University Haryana is nominated as Nodal Officer responsible for
implementation of all conditions of Environmental Clearance letter and NOC from DFO
regarding Non involvement of Forest land. The representative of the project proponent
was advised not to raise any construction in the nallah or Dohan River and shall ensure
that natural drainage system is not obstructed from anywhere within the whole campus.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

The project proponent shall maintain the distance between STP and water supply
line.

10

[2]

Registrar Central University Mahendergarh nominated as Nodal officer shall be


responsible for implementation

of all conditions of Environmental Clearance

letter.
[3]

The project shall operationalise only after the permission of competent Authority
is obtained for canal water supply to the University Campus and treated canal
water shall be within the limits specified for drinking water.

[4]

The project proponent shall not raise any construction in the Nallah or Dohan
River and shall ensure that natural drainage system is not obstructed from
anywhere within the whole campus.

[5]

The project proponent shall not discharge or through any liquid/solid waste in the
Nallah/Dohan River.

[6]

The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.

Item No. [8] Environmental Clearance for proposed Eye Hospital located at
Village- Ullahawas, District-Gurgaon, Haryana by Rajiv Gandhi
Charitable Trust.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Eye
Hospital located at Village- Ullahawas, District-Gurgaon, Haryana on a plot area of
19477.70 sqm. The total built up area of 30704.28 sqm. The proposed project shall
comprise of 2 Basements + Lower ground floor, Upper ground floor + Maximum 03
floors. The proposed project shall comprise of Operation Theater, OPD, Staff Facilities,
Patient Wards, Administration, Mechanical, Hospital Support Facilities and Parking. The
maximum height of the building is 21 meters. The total water requirement shall be 375
KLD. The fresh water requirement shall be 241 KLD. The domestic waste water
generation shall be 149 KLD, which will be treated in the STP of 175 KLD capacity. The
total power requirement shall be 1700 KW which will be supplied by DHBVN. The
Project Proponent has proposed to develop green belt on 30.24% of project area (24.78%
tree plantation + 5.225% landscaping). The Project Proponent proposed to construct 06
rain water harvesting pits. The solid waste generation will be 377 kg/day. The biodegradable waste will be treated in the project area by adopting appropriate technology.
The total parking spaces proposed area 353 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding water requirement, quality of water,
green belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Aravalli Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic
circulation etc. The representative of the project proponent submitted the assurance of

11

HUDA for supply of water along with copies of EDC/IDC paid to HUDA for the services
for supply of water, sewerage connection and drainage system, NOC from DC Gurgaon
regarding non applicability of Aravalli Notification. It was found that the present
proposed layout plan submitted by the project proponent with revised application now
conform to the revised zoning plan.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following conditions in addition to the usual conditions in practice
[1]

The project proponent shall provide sound reduction techniques during day time.

[2]

The project proponent shall dispose of Bio-Medical waste as per BioMedical (Management & Handling) rules 1998.

[3]

The project proponent is responsible for compliance of all conditions in


Environmental Clearance letter and project proponent can not absolve himself
/herself of the responsibility by shifted it to any contractor engaged by project
proponent.

[4]

The green space (21%) of plot area shall be developed before the project site is
revisited after removal of all deficiencies by end of November, 2014.

[5]

Corporate Environment and Social Responsibility (CSER) shall be laid down by the
project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI Office
Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry of
Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit statement
shall be submitted in the compliance. Environment related work proposed to be
executed under this responsibility shall be undertaken simultaneously. The project
proponent shall select and prepare the list of the work for implementation of CSER
of its own choice and shall submit the same before the start of construction.

[6]

Vertical fenestration shall not exceed 40% of total wall area.

[7]

The project proponent shall provide green area on terrace and roof top.

[8]

The project proponent shall not use fresh water for HVAC and DG cooling. Air
based HVAC system should be adopted and only treated water shall be used by
project proponent for cooling, if it is at all needed.

[9]

The project proponent shall install solar panel for energy conservation.

[10]

The project proponent shall not install any tube well without permission of
CGWB.

[11]

The project proponent shall not dispose off any solid or liquid waste in the Nallah.

Item No. [9] Environmental Clearance for construction of Residential Group


Housing Colony Measuring 10.10 Acres at Village-Harsaru,
Sector-88
A, Gurgaon-Manesar Urban Complex, Haryana by M/s
Vaibhav
Warehousing Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of

12

Residential Group Housing Colony Measuring 10.10 Acres at Village-Harsaru, Sector-88


A, Gurgaon-Manesar Urban Complex, Haryana on a total plot area of 40873.185 sqm
(10.10 Acres). The total built up area shall be 118923.363 sqm. The Group Housing
Project shall comprise of 8 Towers with Basement, Tower 1, 4 &7 (GF+27Floors). Tower
2, 3 & 6 (GF+22 Floors), Tower 5 (GF+ 17 Floors), Tower 8 (GF+ 15 Floors),
Community building (G+1), Community Shopping, EWS (G+6) etc. The maximum
height of the building shall be 97.70 meter. The total water requirement shall be 501
KLD. The fresh water requirement shall be 285 KLD. The waste water generation shall
be 348 KLD, which will be treated in the STP of 420 KLD capacity. The total power
requirement shall be 6530.7 KVA which will be supplied by DHBVN. The Project
Proponent has proposed to develop green belt on 35.08% of project area (22.086% tree
plantation + 13% landscaping). The Project Proponent proposed to construct 11 rain
water harvesting pits. The solid waste generation will be 1495 kg/day. The bio-degradable
waste will be treated in the project area by adopting appropriate technology. The total
parking spaces proposed are 1227 ECS & 183 Scooter parking.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. Detailed discussions were held regarding existence of revenue rasta, water
requirement, quality of water, green belt development plan, Ambient Air Quality, NOC
regarding non-involvement of Aravalli Notification dated 07.05.1992, recycle and reuse
of waste water, parking plan, traffic circulation etc. The representative of the project
proponent submitted the assurance of HUDA for supply of water and copies of EDC/IDC
paid to HUDA/Town & Country Planning Department for the services for supply of
water, sewerage connection and drainage system, NOC from DC Gurgaon regarding non
applicability of Aravalli Notification and NOC from AAI regarding height clearance. It
was noticed that the project area is intercepted by revenue rasta. The representative of the
project proponent clarified that they are not going to raise any construction or providing
services line in the pocket B separated by the existence of revenue rasta as entire FAR for
the total project has been utilized in the proposed project in pocket-A and no civil
construction will be raised in pocket-B. The representative of the project proponent
further clarified that the pocket-B shall be kept as green belt. The traffic circulation plan
submitted by the project proponent was also not found in order. The representative of the
project proponent was advised to provide additional ramp for Entry and Exit for
basement 1 & 2 for smooth movement of vehicles. The Representative of the project
proponent submitted revised traffic circulation plan marked A/9 82 nd showing additional
Entry and Exit ramp for basement 1 & 2.

13

After detailed deliberations, the Authority decided to agree with the


recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction.

[2]

The project proponent shall implement the revised traffic circulation plan marked
A/9 82nd showing additional Entry and Exit ramp for basement 1 & 2.

[3]

The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.

[4]

The project proponent shall provide helipad facility as required under NBC norms
and shall seek permission of helipad from AAI accordingly.

[5]

The project proponent shall ensure that no construction activity is undertaken


either on surface or below or above surface of revenue rasta passing through the
project area.

[6]

The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.

[7]

The project proponent shall provide boosting arrangement and multistage pumping
with standby arrangement after getting the same approved from HUDA.

[8]

The project proponent shall not raise any construction in pocket-B of the project
area as shown in the plan and shall develop the same in green belt.

Item No. [10] Environmental Clearance for construction of Industrial / Logistics /


Assembling park project at Village Luhari, Distt-Jhajjar,
Haryana by
M/s HCY Industrial Parks Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Industrial / Logistics / Assembling park project at Village Luhari, Distt-Jhajjar, Haryana
on a total plot area of 103271.20 sqm (25.51 acre). The total built up area shall be

14

56270.14 sqm. The project will comprise of sheds, office, guard room, drivers waiting
etc. The maximum height of the building shall be 12 meter. The total water requirement
shall be 76 KLD. The fresh water requirement shall be 37 KLD. The waste water
generation shall be 49 KLD, which will be treated in the STP of 60 KLD capacity. The
total power requirement shall be 1500 KVA which will be supplied by UHBVN. The
Project Proponent has proposed to develop green belt on 23.54% of project area (12%
tree plantation + 11.54% landscaping). The Project Proponent proposed to construct 25
rain water harvesting pits. The solid waste generation will be 300 kg/day. The biodegradable waste will be treated in the project area by adopting appropriate technology.
The total parking spaces proposed are 619 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. It was noticed that the Town and Country Planning Department has granted
NOC to the project proponent as the proposed project is out of the controlled area. The
representative of the project proponent submitted an undertaking that the current project
is out-side CLU and out of Notified controlled area. Detailed discussions were held
regarding water requirement, quality of water, green belt development plan, Ambient Air
Quality, NOC regarding non-involvement of Forest land, recycle and reuse of water,
parking plan, traffic circulation etc. The representative of the project proponent submitted
NOC from DFO concerned regarding non-involvement of Forest land and permission of
CGWA for withdrawal of ground water required for the project. It was noticed that the
project proponent has proposed to use already existing road connecting to Indospace
FWS Industrial Park Pvt. Ltd. as access to their unit. The representative of the project
proponent also submitted proof showing that both the unit i.e Indospace FWS Industrial
Park Pvt. Ltd. and M/s HCY Industrial Parks Pvt. Ltd. belongs to same Directors and are
sister companies. The representative of the project proponent further assured the
Authority that they will provide RO system for purification of water. The representative
of the project proponent submitted an undertaking that non-explosive, non-Hazardous
nature products shall be stored in the proposed Ware house and no agriculture produce
shall be stored in the Ware house.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following conditions in addition to the usual conditions in practice
[1]

The project proponent shall ensure approach road is widened, strengthened and
maintained as per requirements fixed by PWD and district administration

[2]

The project proponent shall provide RO System for purification of water making it
fit for drinking purpose.

15

[3]

The project proponent shall store only non-agro, non-polluting, non-Inflammable


and non-Hazardous items /products in the warehouse.

[4]

The project proponent shall install STP of 60 KLD for treatment of waste water.

[5]

Pollution control measures for oil/diesel waste due to large no of Trucks involved
in transportation shall be made.

[6]

The project proponent shall get approval of scheme for firefighting from the
concerned Authority before commissioning the project.

[7]

The project proponent shall control fugitive emission due to loading, unloading
and other operations. In no case any truck/other vehicle should be parked on the
road side.

[8]

The project proponent shall use only treated water for Horticulture.

[9]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction

Item No. [11] Environmental Clearance for expansion of Group Housing Project
(20.625 Acres) at Village Ullawas, Sector-60 & 63-A, Gurgaon,
Haryana by M/s High Responsible Realtors Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the expansion of Group
Housing Project (20.625 Acres) at Village Ullawas, Sector-60 & 63-A, Gurgaon, Haryana
with the proposal as given under:
Particulars
Total Plot Area
Built up area
No. of Blocks
Type of Towers
Dwelling Units
EWS Units
Height
Green belt (36.075%)
Total water requirement
Fresh water requirement
Waste water generation
STP Capacity
Power requirement
RWH pits
Solid waste management
Proposed parking

Existing
18.10 Acres
205852.85 sqm
6 Blocks
5 Mid Rise Tower
790 unit
140 unit
26067.67 sqm
1048 KLD
456 KLD
658 KLD
800 KLD
6558.04 KW
18 pits
3115.26 kg/day
1857 ECS

Expansion
2.525 Acres
21668 sqm
1 Block
1 Mid Rise Tower
104 unit
18 unit
147.1 meter
3644.35 sqm
88 KLD
105 KLD
23 KLD
100 KLD
-443.62 KW DHBVN
1 pit
339.72 kg/day
378 ECS

Total
20.625 Acres
227520.85 sqm
7 Block
6 Mid Rise Tower
894 unit
158 unit
29712.02 sqm
1136 KLD
561 KLD
681 KLD
900 KLD
6114.42 KW
19 pits
3801 kg/day
2235 ECS

16

In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of consultant. It was observed that the project
proponent has submitted copy of letter of Intent dated 05.09.2014 issued by Town and
Country Planning Department for grant of license for the additional area measuring 2.525
acre but the Town and Country Planning Department has not granted license for the same.
The representative of the project proponent submitted a letter requesting to defer their
case till they submit copy of license.
After detailed deliberations the request of the project proponent was accepted and
the representative of the project proponent was informed that their case will be taken up
for consideration only after the submission of license as has been requested by them.
Accordingly the case was deferred.
Item No. [12] Environmental Clearance for expansion of Group Housing Project
(15.556 Acre) at Sector-2, Vill-Gwal Pahari, Gurgaon, Haryana
by
M/S Nucleus Conbuild Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the expansion of Group
Housing Project (15.556 Acre) at Sector-2, Vill-Gwal Pahari, Gurgaon, Haryana with the
proposal as given under:
Particulars

Existing

Expansion

Total

Plot Area

11.06875 acres
(44811.36 sqm)

4.5 Acres
(18210.82 sqm)

15.556 acres
(62952.79 sqm)

Area as per Zoning

8.57 Acres
(34681.50 sqm)

10715.69 sqm

13.07 Acres
(52892.32 sqm)

Area of One Level


Basement (d)

23496.63 sqm

34206.63 sqm

34212.32 sqm

Built up area (c+d)

117816.70 sqm

4716.98 sqm

152023.34 sqm

Green Area

22110.21 sqm

4716.98 sqm

26827.19 sqm

Maximum Height

104.3 meter

Number of Towers

4 + (34 DU-EWS) 2 + (15 DU-EWS)

6+ (49 DU-EWS)

Dwelling Units

188 nos. (main


DU) &
34 nos. (EWS)

87 nos.( main DU) & 15


nos. (EWS)

275 nos. (main DU)


&
49 nos. (EWS)

5 BHK Units

8 Nos

- 7 Nos.

1 Nos

4 BHK Units

90 Nos.

47 Nos.

137 Nos.

3 BHK Units

90 Nos.

47 Nos.

137 Nos.

Total Parking Provided

630 ECS

116 ECS

746 ECS

Power Requirement

3576.04 KW

-361.92 sqm(DHBVN)

3214.12 KW

Total Water Requirement 288 KLD

135 KLD

423 KLD

Fresh Water

123 KLD

118 KLD

241 KLD

Waste Water Generation

188 KLD

20 KLD

208 KLD

STP Capacity

225 KLD

75 KLD

300 KLD

Treated/Recycled Water

165 KLD

17 KLD

182 KLD

17

Total Solid Waste

800.39 Kg/day

445.52 Kg/day

1245.91 kg/day

Nos. of RWH Pits

11 Pits

5 Pits

16 Pits

In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. It was noticed that the SEAC has appraised this project under category 8 (b)
the TORs were approved on 07.10.2014 and base line data was collected from Sep. 2014
to Dec. 2014 and EIA report was submitted on 26.12.2014. Detailed discussions were
held regarding existence of revenue rasta, water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of waste water, parking plan, traffic
circulation etc. The representative of the project proponent submitted the assurance of
HUDA for supply of water and copies of EDC/IDC paid to HUDA/Town & Country
Planning Department for the services for supply of water, sewerage connection and
drainage system, NOC from DC Gurgaon regarding non applicability of Aravalli
Notification and NOC from AAI regarding height clearance. It was noticed that in the
existing environmentally cleared area revenue rasta is passing through. The representative
of the project proponent informed the Authority that they have not raised construction in
the already EC granted project as yet and shall not intercept the revenue rasta as per the
condition imposed in the EC letter. The representative of the project proponent further
clarified that the services in the already EC granted area will be laid only after seeking
permission of competent Authority for laying of services and submitted an undertaking in
this regard. The traffic circulation plan submitted by the project proponent was not
satisfactory. The representative of the project proponent was advised to modify the traffic
circulation plan by avoiding U turn for smooth movement of vehicles. The
representative of the project proponent submitted revised traffic circulation plan marked
A/12 82nd without U turn movement.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work

18

for implementation of CSER of its own choice and shall submit the same before
the start of construction.
[2]

The project proponent shall implement the revised traffic circulation plan marked
A/12 82nd without U turn movement.

[3]

The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.

[4]

The project proponent shall provide helipad facility as required under NBC norms
and shall seek permission of helipad from AAI accordingly.

[5]

The project proponent shall ensure that no construction activity is undertaken


either on surface or below or above surface of revenue rasta passing through the
project area.

[6]

The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.

[7]

The project proponent shall provide boosting arrangement and multistage pumping
with standby arrangement after getting the same approved from HUDA.

Item No. [13] Revised EC for proposed Expansion/Modernisation of Group


Housing project (12.958) Sector-86, Village-Nawada Fatehpur,
Gurgaon, Haryana by M/S DLF Limited.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation

stated

therein.

The

Project

Proponent

has

proposed

the

Expansion/Modernisation of Group Housing project (12.958) Sector-86, Village-Nawada


Fatehpur, Gurgaon, Haryana with the proposal as given under:
Items

Earlier EC

Revised Proposal

52439.16 sq.m
(12.958 acres.)
Built up area (sq. m) 140000 sq. m

52439.16 sq.m (
12.958 acres.)
180000 sq. m

Shop/Retail/
Community Centre

816.728 sq. m

Plot area

Swimming Pool
Green Area (sq. m)

294.17 sq. m

Variation
No change
+40,000 sq. m
+ 522.55 sq. m

1133.51 sq. m
1255 sq. m
+ 121.49 sq. m
Total Green Area Green Area
- 4195.92 sq. m,
21763 sq. m (41.5%)
17567.08 sq.m (33.5%) *Lawn area is decreasing due
Organized
Green/Lawn Organized Green/Lawn to8654 sq. m (16.5%)
4457.32 sq. m (8.5%)
Increase in ground
Water Body 2621 sq. Water Body 2621 sq.m coverage
m(5%)
(5%)
- Addition of services areas
Tree Plantation 10487 sq. Tree Plantation 10487 i.e. HSD tank, cooling
m (20%)
sq. m (20%)
towers, garbage collection,
Gas tanks, meter area.
- Additional surface parking
- Sand pit areas added for

19

kids play.

Number of Floors

Total Number of
Units

2 Basement + Stilt+ 19
upper Floors
Main Dwelling Units
674
EWS Units 120
Domestic Servant Unit
68

2 Basement + Stilt+ 19
No change
upper Floors
Main Dwelling Units
674
EWS Units 120
No change
Domestic Servant Unit
68

Building height (m) 59.65 m

59.65 m

No Change

Total Towers

10

10

No Change

Total Water

823 KLD

796 KLD

-27 KLD

Fresh Water

379 KLD

422 KLD

+43 KLD

Waste Water
STP

720 KLD

554 KLD
720 KLD

Power requirement

4510 KW

8400 KW

Solid Waste

1998.45 kg/day

2030.95 kg/day

RWH

7 RWH pits with 2 bore 7 RWH pits with 2 bore


No Change
holes in each pits i.e. 14 holes in each pits i.e. 14

ECS Provided

1353

1442

No Change
+ 3890 (*Changed as per
DHBVN circular dated D9/2014)
32.5 kg/day

+ 89

In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. It was noticed that the SEAC has appraised this project under category 8 (b)
the TORs were approved 28.10.2014 and base line data was collected from Sep. 2014 to
Dec. 2014 and EIA report was submitted on 24.12.2014. Detailed discussions were held
regarding existence of revenue rasta, water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of waste water, parking plan, traffic
circulation etc. The representative of the project proponent submitted the assurance of
HUDA for supply of water and copies of EDC/IDC paid to HUDA/Town & Country
Planning Department for the services for supply of water, sewerage connection and
drainage system, NOC from DC Gurgaon regarding non applicability of Aravalli
Notification and NOC from AAI regarding height clearance.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord revision/modification of Environment Clearance
dated 26.06.2013 granted to this project by imposing the following condition in addition
to the usual conditions in practice.

20

[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction.

[2]

The project proponent shall revise the RWH calculations @ 45 mm/hr and shall
submit the same before the start of construction.

[3]

The project proponent shall ensure that no construction activity is undertaken


either on surface or below or above surface of revenue rasta passing through the
project area.

[4]

The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch; for awareness of public. Sign board shall also display the
message that this is public rasta/road and any citizen can use it. There shall not be
any gate with or without guards on revenue rasta.

[5]

The project proponent shall provide helipad facility as required under NBC norms
and shall seek permission of helipad from AAI accordingly.

[6]

The Project Proponent shall obtain NOC from nearest fire station before the start
of construction.

[7]

The project proponent shall provide all the safety measures for the workers during
construction of high rise building.

[8]

The project proponent shall ensure structural integrity of high rise building during
any seismic activity.

[9]

The project proponent is responsible for compliance of all conditions in


Environmental Clearance letter and project proponent can not absolve
himself /herself of the responsibility by shifted it to any contractor engaged by
project proponent.

Item No. [14] Environmental Clearance for construction of Group Housing Colony
in the revenue estate of Village Kadarpur & Maidawas,
DistrictGurgaon, Sector-63 A, Gurgaon Manesar Urban
Complex by M/s
Mahamaya Exports Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Colony in the revenue estate of Village Kadarpur & Maidawas, DistrictGurgaon, Sector-63 A, Gurgaon Manesar Urban Complex on a total plot area of
56757.071 sqm. The total built up area shall be 143428.761 sqm. The Group Housing

21

project shall have 3 Residential towers with basement, 3 towers of Tower A (S + 19), 4
towers of Tower B (S + 22), 4 towers of Tower C (G+19), EWS (G + 7), Convenient
Shopping (G), Community building (G +1) & and 2 nursery schools (G + 1). The Group
Housing project shall have 686 Dwelling Units, 124 EWS Units and 84 Domestic servant
Units. The maximum height of the building shall be 71.20 meter. The total water
requirement shall be 724 KLD. The fresh water requirement shall be 419 KLD. The
waste water generation shall be 508 KLD, which will be treated in the STP of 600 KLD
capacity. The total power requirement shall be 7985.699 KVA which will be supplied by
DHBVN. The Project Proponent has proposed to develop green belt on 44.69% of project
area (30% tree plantation + 14.69% landscaping). The Project Proponent proposed to
construct 14 rain water harvesting pits. The solid waste generation will be 2256 kg/day.
The bio-degradable waste will be treated in the project area by adopting appropriate
technology. The total parking spaces proposed are 1345 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of consultant representative of the project
proponent. It was observed that the project proponent has submitted a letter dated
09.03.2015 requesting for deferment of their case to the next meeting as they are not able
to present their project proposal because of certain for unavoidable circumstances.
After detailed deliberations the request of the project proponent dated 09.03.2015
requesting for deferment of their case to the next meeting was accepted and the case was
deferred accordingly.
Item No. [15] Environmental Clearance for construction of Group Housing Project
(17.806 Acre) at Sector-4, Village Khaika, Tehsil Sohna,
Gurgaon,
Haryana by M/s Faith Buildtech Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Project (17.806 Acre) at Sector-4, Village Khaika, Tehsil Sohna,
Gurgaon,Haryana on a total plot area of 72058.21 sqm (17.806 Acres). The total built up
area shall be 182730.87 sqm. The Group Housing Project shall comprise of 14 Towers
consisting of Ground Floor plus 14 Floors in each tower, EWS (Ground Floor plus 7
Floors, Nursery School etc. The maximum height of the building shall be 50.95 meter.
The total water requirement shall be 999 KLD. The fresh water requirement shall be 519
KLD. The waste water generation shall be 576 KLD, which will be treated in the STP of
700 KLD capacity. The total power requirement shall be 8.8 MW which will be supplied
by DHBVN. The Project Proponent has proposed to develop green belt on 30% of project
area (20% tree plantation + 10% landscaping). The Project Proponent proposed to
construct 18 rain water harvesting pits. The solid waste generation will be 3127.65
kg/day. The bio-degradable waste will be treated in the project area by adopting
appropriate technology. The total parking spaces proposed are 2093 ECS.

22

In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of representative of the project proponent and
consultant. It was noticed that the SEAC has appraised this project under category 8 (b)
the TORs were approved 05.11.2014 and base line data was collected from Sep. 2014 to
Dec. 2014 and EIA report was submitted on 30.12.2014. Detailed discussions were held
regarding existence of revenue rasta, water requirement, quality of water, green belt
development plan, HT line, Ambient Air Quality, NOC regarding non-involvement of
Aravalli Notification dated 07.05.1992, recycle and reuse of waste water, parking plan,
traffic circulation etc. The representative of the project proponent submitted the assurance
of HUDA for supply of water and copies of EDC/IDC paid to HUDA/Town & Country
Planning Department for the services for supply of water, sewerage connection and
drainage system, NOC from DC Gurgaon regarding non applicability of Aravalli
Notification and NOC from AAI regarding height clearance. It was noticed that the
Panchayat Department has transferred the revenue rasta area to the project proponent
which have now become the part of the project area. It was noticed that the project
proponent has not made any provision for parking in the Primary School. The
representative of the project proponent was advised to revise the parking plan and make
provision for parking in the Primary School. The representative of the project proponent
agreed and submitted revised plan Marked A/15 82 nd meeting showing provision for 25
ECS and Buses in the Primary School area.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1]

Corporate Environment and Social Responsibility (CSER) shall be laid down by


the project proponent (2% shall be earmarked) as per guidelines of MoEF, GoI
Office Memorandum No. J-11013/41/2006-IA.II(I) dated 18.05.2012 and Ministry
of Corporate Affairs, GoI Notification Dated 27.02.2014. A separate audit
statement shall be submitted in the compliance. Environment related work
proposed to be executed under this responsibility shall be undertaken
simultaneously. The project proponent shall select and prepare the list of the work
for implementation of CSER of its own choice and shall submit the same before
the start of construction.

[2]

The project proponent shall implement the revised traffic circulation plan marked
A-15 82nd (provision for 25 ECS and Buses in the Primary School area).

[3]

The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.

23

[4]

The project proponent shall ensure that no construction activity is undertaken


either on surface or below or above surface of revenue rasta passing through the
project area.

[5]

The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.

[6]

The project proponent shall provide boosting arrangement and multistage pumping
with standby arrangement after getting the same approved from HUDA.

Item No. [16] Environmental Clearance for Affordable group hosing colony (10
acres) in the revenue estate of village Hayatpur, Sector -90,
Gurgaon,
Haryana by M/s Aster Infrahome Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Affordable group hosing colony (10 acres) in the revenue estate of village Hayatpur,
Sector -90, Gurgaon, Haryana on a total plot area of 40519.149 sqm (10 acre). The total
built up area shall be 94525.98 sqm. The Group Housing project shall have 13 residential
towers consisting of Tower 1 (Ground+14 Floors), Tower 2 (Ground +14 Floors), Tower
3 (Ground +14 Floors), Tower 4 (Ground +14 Floors), Tower 5 (Ground +14 Floors),
Tower 6 (Ground +14 Floors), Tower 7 (Ground +14 Floors), Tower 8 (Ground +9
Floors), Tower 9 (Ground +14 Floors), Tower 10 (Ground +14 Floors), Tower 11 (Ground
+14 Floors), Tower 12 (Ground +14 Floors), Tower 13 (Ground +14 Floors),
Commercial, community, crche, etc. The maximum height of the building shall be 50.35
meter. The total water requirement shall be 1195 KLD. The fresh water requirement shall
be 799 KLD. The waste water generation shall be 982 KLD, which will be treated in the
STP of 1180 KLD capacity. The total power requirement shall be 3510 KW which will be
supplied by DHBVN. The Project Proponent has proposed to develop green belt on
21.54% of project area (15.54% tree plantation + 6% landscaping). The Project
Proponent proposed to construct 11 rain water harvesting pits. The solid waste generation
will be 4323 kg/day. The bio-degradable waste will be treated in the project area by
adopting appropriate technology. The total parking spaces proposed are 916 ECS.
In the todays meeting the recommendation of SEAC and the project details were
taken up for consideration in the presence of consultant and representative of the project
proponent. It was observed that the project proponent has submitted a letter dated
09.03.2015 requesting for adjournment of their case due to lack of few important
documents which they will obtained within 2 or 3 days and requested to consider their
case in the next meeting.

24

After detailed deliberations the request of the project proponent dated 09.03.2015
requesting for adjournment of their case was accepted and it was decided to defer the
case to the next meeting.
Additional Agenda:
The Chairperson also granted permission to consider the following agenda items
in this meeting.
Item No. [17] Environmental Clearance for Proposed Amendments in EC Proposed
Group Housing project at Village- Dharuhera, Sector-3, DistrictRewari, Haryana by M/S Brihaspati Construction Pvt. Ltd.
It was noticed that the SEAC in its 117th meeting held on 18.02.2015 unanimously
decided to refer back this case to SEIAA for taking appropriate action at their level. The
case was taken up in the todays meeting and it was found that the SEIAA on the basis of
decision taken in its 76th meeting held on 13.10.2014 decided to refer back this case to the
SEAC with the advice to consider the proposal for amendment of environmental
clearance as well as extension of validity of environmental clearance on the basis of
application/documents dated 15.04.2014 submitted by the project proponent. The file is
in original was sent to Secretary SEAC on 07.11.2014.
It was noticed by the Authority that the SEAC has referred back this case to
SEIAA on the grounds that The SEAC could not hold any meeting from 25 th November
2014 up to January 2015 due to absence of Secretary SEAC which was appointed by the
Government on 19th January, 2015. Now there is no time left with the SEAC for detail
consideration of this case as it cannot be included in the agenda at the end of the tenure of
SEAC. The grounds on the basis of which the SEAC has referred back the case was not
found in accordance with the prescribed procedure and therefore not sustainable. The
Authority was of the view that the SEIAA considers the cases recommended by SEAC
for environmental clearance or otherwise.
After detailed deliberations, the Authority decided to refer back this case to the
SEAC with the advice to appraise the project proposal and send clear cut
recommendations to the SEIAA within stipulated period as prescribed in the Notification.
Item No. [18] Environmental Clearance for expansion of Industrial Building for
testing of vehicles (R & D Centre) at Plot No. 1, Sector-33 B33C
IMT, Rohtak by M/s Maruti Suzuki India Ltd.
It was noticed that the SEAC in its 117th meeting held on 18.02.2015 unanimously
decided to refer back this case to SEIAA for taking appropriate action at their level. The
case was taken up in the todays meeting and it was found that the SEIAA on the basis of
decision taken in its 77th meeting held on 14.11.2014 decided to refer back this case to the
SEAC with the advice to appraise the project for according ex-post fact environment
clearance as per the procedure prescribed in the Notification in compliance to the
Honble High Court orders and direct the project proponent to submit revised project

25

details i.e. Form-I, Form-IA required for ex-post facto of the project. The file is in
original was sent to Secretary SEAC on 24.11.2014.
It was noticed by the Authority that the SEAC has referred back this case to
SEIAA on the grounds that The SEAC could not hold any meeting from 25 th November
2014 up to January 2015 due to absence of Secretary SEAC which was appointed by the
Government on 19th January, 2015. Now there is no time left with the SEAC for detail
consideration of this case as it cannot be included in the agenda at the end of the tenure of
SEAC. The grounds on the basis of which the SEAC has referred back the case was not
found in accordance with the prescribed procedure and therefore not sustainable. The
Authority was of the view that the SEIAA considers the cases recommended by SEAC
for environmental clearance or otherwise.
After detailed deliberations, the Authority decided to refer back this case to the
SEAC with the advice to appraise the project proposal and send clear cut
recommendations to the SEIAA within stipulated period as prescribed in the Notification.
Item No. [19] Revision in EC for Residential Colony TDI City located at Sec-58,
59, 60, 61, 63 & 64 Sonepat-Kundli, Haryana by M/s TDI
Infrastructure Ltd.
It was noticed that the SEAC in its 117th meeting held on 18.02.2015 unanimously
decided to refer back this case to SEIAA for taking appropriate action at their level. The
case was taken up in the todays meeting and it was found that the SEIAA on the basis of
decision taken in its 77th meeting held on 14.11.2014 decided that application for revision
of environment clearance submitted by the project proponent may be forwarded to
Secretary SEAC for appraisal and recommendation along with file. The file is in original
was sent to Secretary SEAC on 24.11.2014.
It was noticed by the Authority that the SEAC has referred back this case to
SEIAA on the grounds that The SEAC could not hold any meeting from 25 th November
2014 up to January 2015 due to absence of Secretary SEAC which was appointed by the
Government on 19th January, 2015. Now there is no time left with the SEAC for detail
consideration of this case as it cannot be included in the agenda at the end of the tenure of
SEAC. The grounds on the basis of which the SEAC has referred back the case was not
found in accordance with the prescribed procedure and therefore not sustainable. The
Authority was of the view that the SEIAA considers the cases recommended by SEAC
for environmental clearance or otherwise.
After detailed deliberations, the Authority decided to refer back this case to the
SEAC with the advice to appraise the project proposal and send clear cut
recommendations to the SEIAA within stipulated period as prescribed in the Notification.
Item No. [20] Environment Clearance for expansion of Group Housing Project
(37.512 + 3.93 Acres =41.442 Acres) located at Sector 67-A,
Village
Dhumaspur & Maidawas, District Gurgaon, Haryana by
M/s
Precision Realtors Pvt. Ltd.

26

The SEAC has recommended to file this case on the grounds that the project
proponent not submitted copy of additional license for the expansion of the project area.
The project proponent in the Year 2012 submitted request to the Town & Country
Planning Department for grant of license. The SEAC further observed that some Writ
Petition are pending in the Honble High Court and the Court has granted stay on
issuance of license/CLU in District Gurgaon.
Finding no reasons to disagree with the recommendation of SEAC the SEIAA
decided to file this case with the decision that the project proponent shall submit fresh
application for environment clearance only after the receipt of valid license.
*********