INFORME DE FASE II
DISEOS DEL PLAN EMERGENTE
VOLUMEN 3
MEMORIA TCNICA: DISEO DE LA ESTACIN DE BOMBEO Y LNEA
DE IMPULSIN DESDE EL POZO BUENOS AIRES HASTA TANQUE
CONCENTRADOR DE LA CRUZ (INCLUYE EVALUACIN DE LA LINEA
POZOS N 3 - N 9 BUENOS AIRES HASTA LA CRUZ); UNIDAD DE
AEREACIN-OXIGENACIN.
Pgina 1
PLAN
EMERGEN
TE
INDICE
No. DESCRIPCIN
PG.
4
4
9
9
10
10
10
10
14
16
16
18
21
25
26
26
26
28
29
34
Pgina 2
PLAN
EMERGEN
TE
7. TUBERAS DE PRESIN
8. DISEO DE LA ESTACION DE BOMBEO
9. DATOS REQUERIDOS P/ SELECCIONAR LAS BOMBAS CENTRIFUGAS
10. CURVA CARACTERISTICA DEL SISTEMA
11. DISEO DE LA LINEA DE IMPULSION
12. ANLISIS DEL FENMENO DEL GOLPE DE ARIETE
13. DISEO DE LOS ANCLAJES
14. INSTALACIN DE VLVULAS DE AIRE
15. VLVULAS DE DESAGE
39
46
50
51
51
53
54
55
55
1.- OBJETIVO
El presente documento tiene como objetivo fijar los parmetros, y establecer criterios
para el diseo del sistema de bombeo de agua potable desde el Pozo Buenos Aires
hasta La Cruz, como parte del Plan Emergente de agua potable para la ciudad de
Catamayo.
Se propone extender la lnea de impulsin existente (2012) entre el antiguo Pozo
N 8, que enlazara con el Pozo N 9, y Pozo N 3, por lo tanto se realiza una
evaluacin hidrulica integral.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 3
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 4
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 5
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 6
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 7
PLAN
EMERGEN
TE
Los sectores que se servirn con la Reserva de Cruz, y Reserva de la Loma de Los
Gentiles, son los siguientes:
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 8
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 9
PLAN
EMERGEN
TE
6. PERIODO DE BOMBEO
El nmero de horas de bombeo y el nmero de arranques en un da,
depende del rendimiento de la fuente, el consumo de agua, la disponibilidad de
energa y el costo de operacin.
Por razones econmicas y operativas, es conveniente adoptar un periodo de bombeo
de 24 horas diarias. Se instalar un radar para desconexin automtica, en caso de
que el nivel dinmico de bombeo se site 3 metros por encima de la cota de
instalacin de la Bomba Sumergible.
7. TIPO DE ABASTECIMIENTO
Se ha considerado el siguiente caso: El sistema de abastecimiento de agua incluye
reservorio de almacenamiento proyectado para La Loma de Los Gentiles, con
capacidad de 1.000 m3.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 10
POZO 3
LA CRUZ
LOS GENTILES
POZO 9
POZO 3
LA CRUZ
1.302,56
1.302,56
1.302,56
POZO 9
POZO 3 + POZO 9
COTA
1.188,23
1.199,82
1.199,82
1.213,68
88,89 2.200,00
1.366,06
1.366,06
1.366,06
POZO 9
POZO 3 + POZO 9
1.188,23
1.199,82
1.199,82
1.213,68
177,83 3.701,08
166,24 3.043,08
166,24 3.043,08
152,38 2.593,08
HOR.
LONG.
114,33 3.308,00
102,74 2.650,00
30,00
30,00
30,00
30,00
hs
30,00
30,00
30,00
30,00
hs
1.193,180
1.366,063
10,00
10,00
10,00
10,00
hlleg
hf
TDH
TDH
es tim
6,00
6,00
6,00
6,00
TDH
547,76
501,06
496,72
449,78
6,00
6,00
6,00
6,00
7,40
4,56
3,04
2,59
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
1.366,06
LOS GENTILES
1.188,23
HOR.
LONG.
177,83 3.701,41
COTA ENTREGA
E.BOMBEO h es ttica
COTA
30,00
hs
10,00
hlleg
TDH
es tim
hf
TDH
6,00
5,55
428,004
301,188
190,224
110,964
160 2333
160 1642
1037
605
m3/dia BOMBAS
78,94
50,81
31,81
16,80
BHP
HP
40+40
40+40
40
30
40
h/d
1,6HFD 24
1,6PVC 24
1,6 PVC 24
1,6 PVC 24
HP ins tal.repotenciacionMpa
2.333
1.642
1.037
605
m3/dia
758,68
711,34
706,35
659,41
27,00
19,00
12,00
7,00
428,004
301,188
190,224
110,964
160
160
2333
1642
1037
605
Q (l/s ) Q (gal/min)
D (m m) m 3/dia BOMBAS
109,33
72,14
45,24
24,64
BHP
40+40
40+40
40
30
50
50
50
C-40HFD 24
C-40HFD 24
C-40HFD 24
2.333
1.642
1.037
605
h/d m 3/dia
C-40HFD 24
repotenciacionMpa
HP
Se complmenta esta alternativa con la repotenciacin de la E.B.: La Pilastra-Piedras Blancas, con un ramal a Gentiles
TDH
es tim
752,61
8,00
126,816
100
691
m 3/dia BOMBAS
32,14
BHP
HP
40
691
h/d m 3/dia
C-40HFD 24
repotenciacionMpa
PLAN
EMERGEN
TE
CONCLUSIN: se tendra que instalar una linea completa; y la estacin de bomebo La Cruz a Gentiles. (ms caro )
229,39
CONCLUSIN: se tendra que cambiar el tramo de salida de los Pozos 3 y 9 (aprox: .m); Cambiar a HFD
231,24
216,81
215,28
200,98
OXID. T.R.+Pm
27,00
19,00
12,00
7,00
24 horas
Efic= 75%
CONCLUSIN: se tendra que extender la impulsin hasta Buenos aires-Pozo 8. La tuberia (Pozo 8 a La Cruz), resiste la presin.
166,95
152,72
151,39
137,09
hf
6,62
3,98
2,65
2,20
BHP
Donde:Q
BHP = Q x TDH
OXID. T.R.+Pm
10,00
10,00
10,00
10,00
hlleg
OXID. T.R.+Pm
27
12
l/s
1.366,06
POZO 3
LOS GENTILES
HOR.
102,74 2.650,00
COTA ENTREGA
E.BOMBEO h es ttica
1.302,56
POZO 3
LA CRUZ
COTA ENTREGA
E.BOMBEO h es ttica
COTA
POZO 8
393,08LA CRUZ
1.302,564
3.308,00LA CRUZ
1.199,822
1.213,679
LONG.
COTA
1.188,230
2.200,00POZO 3
450,00POZO 9
658,00BUENOS AIRES
POZO 9
BUENOS AIRES
LONGITUD
Pgina 11
PLAN
EMERGEN
TE
Sumergible
160 m.c.a.
8 litros/seg.
6
4 NPT
Roscada
70%
Acero Inoxidable 304-316
Acero Inoxidable 304-316
Agua de pozo subterrneo
1000kg/m3
Ambiente +/-24C
Con tuerca y casquillo de montaje cnico de acero
Vlvula de retencin:
inoxidable 304-316
Incorporada a partir de la ltima etapa.
MOTOR ELECTRICO
TIPO:
POTENCIA:
VOLTAJE:
RPM:
FRECUENCIA:
FACTOR DE SERVICIO:
TIPO DE SERVICIO:
TIPO DE ARRANQUE:
GRADO DE PROTECCION:
MATERIAL DE CONSTRUCCION:
Sumergible
40HP (Segn requerimiento de la bomba)
220V Trifsico
3450
60Hz
1.15
Continuo (24 horas al da)
Estrella/Tringulo
IP 68
Acero Inoxidable 304-316
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 12
PLAN
EMERGEN
TE
Pgina 13
PLAN
EMERGEN
TE
Pgina 14
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 15
PLAN
EMERGEN
TE
ANEXO 1:
CALCULO DELTIEMPO DE LLENADO RESERVA LA CRUZ
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 16
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 17
77,2178,641.188,271
98,57
101,081.189,554
102,67
105,201.189,153
102,86
105,401.189,197
3+209,763,84 4,02
3+205,664,10 4,12
3+205,470,19 0,20
10
11
12
H-W
140,8140
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.190,36
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.191,74
280,071.193,236
25,0725,11 277,42
3+030,91
140,8140
3+055,98
17,3617,37 252,35
254,961.191,856
1,50
PVC UPSE 160/1,6160
Mpa 140,8140
1,50 1.189,77
210,92
213,521.190,996
3+073,3424,0724,07 234,99
237,591.191,271
3+097,410,00 0,00
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.189,50
3+097,4124,2024,20 210,92
213,521.190,996
PV C UPSE 160/1,6160
Mpa
1.189,50
3+121,6118,3718,37 186,72
189,321.190,762
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.189,36
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.189,33
3+139,98
13,7213,72 168,35
170,951.190,855
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.188,42
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.187,94
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.187,94
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.187,70
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.188,05
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.186,83
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.186,11
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.186,77
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.187,50
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.188,40
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.188,28
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.187,50
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.188,15
1,50
PV C UPSE 160/1,6160
Mpa
1.187,45
PV C UPSE 160/1,6160
Mpa 140,8140
1,50 1.186,94
3+153,7013,4513,48 154,63
157,231.190,828
112,80
115,371.189,436
3+195,535,30 5,30
m .s .n.m
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
0,51
13
m /s
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
0,76
14
19
20
21
m .s .n.m m ca
r e gulada
Pt. BOMBA
163,78
18
m ca
PROFUNDIDAD BOMBA
(25,00)
17
m ca
163,160,585
163,160,532
163,160,495
163,160,444
163,160,444
163,160,393
163,160,355
163,160,326
163,160,298
163,160,238
163,160,227
163,160,221
163,160,217
163,160,216
163,160,208
163,160,200
163,160,192
163,160,183
163,160,177
163,160,163
163,160,154
163,160,152
163,160,134
163,160,132
163,160,131
163,160,131
163,160,054
163,160,034
163,160,022
163,160,011
137,04134,69
138,42136,12
139,01136,74
139,28137,07
139,28137,07
139,51137,35
139,42137,30
139,45137,35
140,36138,29
140,84138,83
141,05139,06
140,84138,85
141,08139,09
141,12139,14
140,72138,75
141,91139,94
141,94139,98
142,67140,71
140,58138,64
142,01140,07
141,28139,36
140,38138,45
140,49138,59
140,51138,61
141,28139,37
140,63138,73
141,20139,38
141,33139,53
141,83140,04
142,04140,26
138,78137,01
O.K
1326,42137,81
O.K
1326,48139,19
O.K
1326,51139,77
O.K
1326,56140,05
O.K
1326,56140,05
O.K
1326,61140,28
O.K
1326,65140,19
O.K
1326,68140,21
O.K
1326,71141,12
O.K
1326,77141,61
O.K
1326,78141,82
O.K
1326,79141,61
O.K
1326,79141,84
O.K
1326,79141,89
O.K
1326,80141,49
O.K
1326,81142,67
O.K
1326,81142,71
O.K
1326,82143,43
O.K
1326,83141,35
O.K
1326,84142,77
O.K
1326,85142,05
O.K
1326,85141,14
O.K
1326,87141,26
O.K
1326,87141,28
O.K
1326,88142,04
O.K
1326,88141,39
O.K
1326,95141,97
O.K
1326,97142,10
O.K
1326,98142,60
O.K
1327,00142,80
O.K
1327,01139,54
16
163,160,000
15
m ca PT (m .c.a)
m ca
Carga
NOM
. INT.
COEF.
Golpe Pre s in
P rdidas
Pre s inPre s in
Re gulacion
Cota
Sobr e
V e loc.
pre s ionpi ezom.
(m m ) (m m ) C
Arie te Trabajode carga
Es ttica
dinm ica
P resi n
PV C UPSE 160/1,6160
Mpa 140,8140
(1,77)
1.190,00
CDIGO
TUBERA
3+167,1528,3828,38 141,18
143,751.189,921
107,50
110,061.189,225
3+200,832,64 2,65
104,86
107,411.189,435
94,7397,07 1.188,367
3+213,603,51 3,51
3+203,472,00 2,01
91,2293,551.188,334
86,7589,03 1.187,610
3+217,114,47 4,53
3+221,582,84 3,52
83,9185,51 1.189,692
72,9374,30 1.188,996
3+224,420,05 0,06
3+231,122,96 3,00
72,1473,101.189,900
3+236,190,63 0,63
3+235,400,79 1,20
63,7964,75 1.189,784
62,6663,62 1.189,763
3+244,541,13 1,13
3+245,670,28 0,81
62,3862,811.189,001
3+245,950,45 0,79
25,7125,75 1.189,076
61,9362,02 1.189,647
16,2116,251.188,945
3+246,4021,5621,59
3+282,629,50 9,50
10,3910,39 1.188,444
3+297,945,25 5,25
3+292,122,87 2,90
l/s
6,000
m .s .n.m
CAUDAL = 8,00
3+303,195,14 5,14
3+308,33
Nudo
22
Tube a
Re s is te
INT. e
24
25
D
26
k /cm 2 (m m ) m m
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
2,06E+04
2,76E+01
140,8 9,6
28
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
27
C
30
PE+GA
0,76 137,81
0,76 139,19
0,76 139,77
0,76 140,05
0,76 140,05
0,76 140,28
0,76 140,19
0,76 140,21
0,76 141,12
0,76 141,61
0,76 141,82
0,76 141,61
0,76 141,84
0,76 141,89
0,76 141,49
0,76 142,67
0,76 142,71
0,76 143,43
0,76 141,35
0,76 142,77
0,76 142,05
0,76 141,14
0,76 141,26
0,76 141,28
0,76 142,04
0,76 141,39
0,76 141,97
0,76 142,10
0,76 142,60
0,76 142,80
31
A nclaje opcional
3,6386
Anclaje opcional
3,6753
A nclaje opcional
3,6908
A nclaje opcional
3,6981
Anclaje opcional
3,6981
A nclaje opcional
3,7043
A nclaje opcional
3,7019
A nclaje opcional
3,7026
A nclaje opcional
3,7267
Anclaje opcional
3,7395
A nclaje opcional
3,7451
A nclaje opcional
3,7396
Anclaje opcional
3,7459
A nclaje opcional
3,7470
Anclaje opcional
3,7364
A nclaje opcional
3,7679
A nclaje opcional
3,7688
Anclaje opcional
3,7880
A nclaje opcional
3,7327
A nclaje opcional
3,7705
A nclaje opcional
3,7512
A nclaje opcional
3,7272
Anclaje opcional
3,7303
A nclaje opcional
3,7308
A nclaje opcional
3,7511
Anclaje opcional
3,7339
A nclaje opcional
3,7491
A nclaje opcional
3,7526
A nclaje opcional
3,7659
A nclaje opcional
3,7713
Anclaje opcional
3,6847
30
33
3+030,91
4
3+200,83
3
3+245,67
2
3+303,19
1
32
Et = e m puje
REQUIERIM IENTO
ANCLAJES
N
total
DE ANCLAJES
RECOM ENDADOS
(Kg/cm 2) POR EM PUJE
0,76 139,54
29
Tie m po Golpe
Ce le ridad
Fas e (T) Arie te
2,06E+04
2,76E+01
140,8 9,6
23
Kg/m 2
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
PLAN
EMERGEN
TE
Pgina 18
296,44
299,931.193,180
3+011,890,00 0,00
2+982,88
29,0129,01 325,45
328,951.193,497
2+965,14
17,7417,74 343,19
346,691.193,771
2+948,85
16,2916,29 359,48
362,981.194,073
2+924,75
24,1024,10 383,58
387,091.194,540
2+904,64
20,1120,12 403,69
407,201.195,142
2+904,640,00 0,00
2+888,893,64 3,64
431,86
435,381.195,500
2+876,470,00 0,00
2+856,11
20,3620,37 452,22
455,751.196,079
2+838,57
17,5417,55 469,76
473,301.196,630
2+838,570,00 0,00
2+796,45
25,1825,19 511,88
515,431.197,630
2+774,09
22,3622,36 534,24
537,791.197,971
2+758,63
15,4615,46 549,70
553,251.198,325
2+714,315,86 5,86
635,02
638,641.199,187
637,84
641,461.199,219
640,63
644,431.200,248
643,23
647,031.200,309
646,16
649,961.200,381
651,64
655,451.200,507
2+673,313,02 3,02
2+670,492,82 2,82
2+667,702,79 2,97
2+665,102,60 2,60
2+662,172,93 2,93
2+656,695,48 5,48
657,011.199,822
2+655,281,41 1,57 653,05
632,00
635,621.199,261
2+676,333,25 3,30
2+679,5820,9120,92 628,75
632,321.199,820
594,02
597,581.199,081
2+700,49
13,8213,82 607,84
611,401.199,309
2+714,310,00 0,00
2+720,17
10,7510,75 588,16
591,721.199,021
594,02
597,581.199,081
2+730,92
15,4615,47 577,41
580,971.198,911
534,24
537,791.197,971
2+774,090,00 0,00
2+746,38
12,2512,25 561,95
565,511.198,472
534,24
537,791.197,971
2+774,090,00 0,00
2+821,63
16,9416,94 486,70
490,241.197,032
469,76
473,301.196,630
2+876,47
12,4212,42 431,86
435,381.195,500
419,44
422,961.195,247
2+892,53
12,1112,11 415,80
419,311.195,117
403,69
407,201.195,142
0,13
3+011,89
13,1613,25 296,44
299,931.193,180
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
0,13
283,28
286,691.194,709
3+025,052,69 2,78
280,59
283,911.195,399
3+027,743,17 3,84
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
0,20
163,160,051
163,160,051
163,160,050
163,160,050
163,160,050
163,160,050
163,160,049
163,160,049
163,160,049
163,160,047
163,160,046
163,160,046
163,160,046
163,160,045
163,160,044
163,160,043
163,160,042
163,160,042
163,160,042
163,160,040
163,160,038
163,160,037
163,160,037
163,160,035
163,160,034
163,160,034
163,160,033
163,160,032
163,160,031
163,160,031
163,160,030
163,160,028
163,160,027
163,160,025
163,160,023
163,160,023
163,160,022
163,160,022
130,45128,63
129,77127,95
129,90128,08
129,97128,15
130,03128,21
131,06129,24
131,09129,27
131,02129,20
130,46128,64
130,97129,15
131,20129,38
131,20129,38
131,26129,44
131,37129,55
131,80129,99
131,95130,14
132,31130,49
132,31130,49
132,31130,49
132,65130,84
133,24131,44
133,65131,84
133,65131,84
134,20132,39
134,78132,97
134,78132,97
135,03133,23
135,16133,36
135,13133,33
135,13133,33
135,74133,94
136,20134,41
136,51134,71
136,78134,98
137,10135,30
137,10135,30
135,57133,78
134,88133,09
O.K
1326,96130,65
O.K
1326,96129,97
O.K
1326,96130,09
O.K
1326,96130,17
O.K
1326,96130,23
O.K
1326,96131,26
O.K
1326,96131,29
O.K
1326,96131,21
O.K
1326,96130,65
O.K
1326,96131,17
O.K
1326,96131,39
O.K
1326,96131,39
O.K
1326,96131,45
O.K
1326,96131,56
O.K
1326,96132,00
O.K
1326,96132,15
O.K
1326,97132,50
O.K
1326,97132,50
O.K
1326,97132,50
O.K
1326,97132,84
O.K
1326,97133,44
O.K
1326,97133,84
O.K
1326,97133,84
O.K
1326,97134,40
O.K
1326,97134,97
O.K
1326,97134,97
O.K
1326,97135,23
O.K
1326,97135,36
O.K
1326,98135,33
O.K
1326,98135,33
O.K
1326,98135,93
O.K
1326,98136,40
O.K
1326,98136,70
O.K
1326,98136,98
O.K
1326,98137,29
O.K
1326,98137,29
O.K
1326,98135,77
O.K
1326,98135,08
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
2,06E+04
2,76E+01
277,2 18,9
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
14,60 455,44
0,20 130,65
0,20 129,97
0,20 130,09
0,20 130,17
0,20 130,23
0,20 131,26
0,20 131,29
0,20 131,21
0,20 130,65
0,20 131,17
0,20 131,39
0,20 131,39
0,20 131,45
0,20 131,56
0,20 132,00
0,20 132,15
0,20 132,50
0,20 132,50
0,20 132,50
0,20 132,84
0,20 133,44
0,20 133,84
0,20 133,84
0,20 134,40
0,20 134,97
0,20 134,97
0,20 135,23
0,20 135,36
0,20 135,33
0,20 135,33
0,20 135,93
0,20 136,40
0,20 136,70
0,20 136,98
0,20 137,29
0,20 137,29
0,20 135,77
0,20 135,08
Anclaje opcional
3,4638
Anclaje opcional
3,4456
Anclaje opcional
3,4490
Anclaje opcional
3,4509
Anclaje opcional
3,4525
Anclaje opcional
3,4798
Anclaje opcional
3,4807
Anclaje opcional
3,4787
Anclaje opcional
3,4639
Anclaje opcional
3,4774
A nclaje opcional
3,4835
A nclaje opcional
3,4835
A nclaje opcional
3,4851
A nclaje opcional
3,4880
A nclaje opcional
3,4996
A nclaje opcional
3,5035
A nclaje opcional
3,5129
A nclaje opcional
3,5129
A nclaje opcional
3,5129
A nclaje opcional
3,5220
A nclaje opcional
3,5379
A nclaje opcional
3,5485
A nclaje opcional
3,5485
A nclaje opcional
3,5632
A nclaje opcional
3,5785
A nclaje opcional
3,5785
A nclaje opcional
3,5853
A nclaje opcional
3,5887
A nclaje opcional
3,5880
A nclaje opcional
3,5880
A nclaje opcional
3,6040
A nclaje opcional
3,6164
A nclaje opcional
3,6244
A nclaje opcional
3,6317
A nclaje opcional
3,6401
A nclaje opcional
3,6401
A nclaje opcional
3,5995
A nclaje opcional
3,5812
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
PLAN
EMERGEN
TE
Pgina 19
l/s
1,50
1,50
479,35 479,411.207,605
561,08 561,171.209,620
617,67 617,761.210,444
617,70 617,791.210,445
630,57 630,671.210,756
678,13 678,231.211,389
758,35 758,461.212,257
817,21 817,331.213,679
0,03 0,03
4,07 4,07
0,36 0,36
7,33 7,33
1,11 1,11
2+037,58
2+033,51
2+033,15
2+025,82
2+024,71
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
432,52 432,611.221,284
438,95 439,041.221,370
523,63 523,751.223,284
547,43 547,581.224,498
552,22 552,371.224,455
555,52 555,671.224,601
572,19 572,351.225,143
6,43 6,43
4,79 4,79
3,30 3,30
1+282,55
0+748,33
4,48 4,48
1+285,85
0,01 0,01
1+399,12
1089,741090,031.236,159
0+413,84
0+409,36
1,50
1,50
1,50
1,50
1,32 1,68
2,38 3,48
2,52 2,92
2,66 3,17
2,40 2,88
2,03 2,41
3,37 3,89
0,64 0,78
1,56 1,91
2,69 3,12
2,51 2,91
2,83 3,38
2,48 2,87
0,19 0,22
7,58 7,99
0+100,13
0+097,75
0+095,23
0+092,57
0+090,17
0+088,14
0+084,77
0+084,13
0+082,57
0+079,88
0+077,37
0+074,54
0+072,06
0+071,87
0+064,29
1.302,94 PVC UPSE 250/ 1,0 MPa250
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
3308,333324,30
1,50
0,85 2,87
1,50
0+000,00
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1,50
1773,781783,351.298,531
1766,201775,371.296,011
1766,011775,141.295,896
1763,531772,271.294,447
1760,701768,891.292,603
1758,191765,981.291,121
1755,501762,861.289,534
1753,941760,941.288,431
1753,301760,161.287,979
1749,931756,281.286,045
1747,901753,871.284,751
1745,501750,991.283,166
1742,841747,821.281,438
1740,321744,901.279,965
1,50
1,50
1737,941741,421.277,425
1,50
1,50
1,50
1,50
1,50
1428,711429,291.250,140
1424,231424,801.249,934
1,50
239,42 239,461.216,663
5,08 5,08
1,50
218,81 218,831.215,984
1,50
1,50
l/s
1,50
27,00
1,50
1,50
1,50
1,50
1,50
1,50
1.213,679
CAUDAL =
629,46 629,561.210,771
622,13 622,231.210,666
1,50
1,50
1,50
1+838,07
1,50
621,77 621,871.210,637
1,50
1,50
1,50
1.199,822
20,00
10,31 1.200,219
10,31
CAUDAL =
2+655,28
277
140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
230,8 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
277,2 140
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,051
101,97 3,710
101,97 3,708
101,97 3,664
101,97 3,594
101,97 3,580
101,97 3,580
101,97 3,575
101,97 3,570
101,97 3,566
101,97 3,561
101,97 3,558
101,97 3,557
101,97 3,551
101,97 3,547
101,97 3,543
101,97 3,538
101,97 3,534
101,97 3,529
101,97 3,527
101,97 3,485
101,97 3,429
101,97 3,202
163,16 1,452
163,16 1,449
163,16 1,449
163,16 1,202
163,16 1,198
163,16 0,999
163,16 0,900
163,16 0,820
163,16 0,807
163,16 0,805
163,16 0,801
163,16 0,784
163,16 0,721
163,16 0,717
163,16 0,653
163,16 0,574
163,16 0,559
163,16 0,506
163,16 0,397
0,397
163,16 0,397
163,16 0,372
163,16 0,338
163,16 0,318
163,16 0,318
163,16 0,315
163,16 0,314
163,16 0,313
163,16 0,313
163,16 0,289
163,16 0,254
163,16 0,240
163,16 0,194
163,16 0,139
163,16 0,055
21,59
25,83
27,63
31,75
34,27
34,38
35,83
37,67
39,16
40,74
41,85
42,30
44,23
45,53
47,11
48,84
50,31
52,85
53,89
63,35
68,33
75,84
80,14
80,34
80,34
94,12
94,31
16,11
20,36
22,19
26,38
28,92
29,03
30,48
32,33
33,82
35,41
36,52
36,97
38,91
40,21
41,80
43,53
45,01
47,55
48,59
58,10
63,13
70,87
76,91
77,12
77,12
91,15
91,34
100,10 97,33
101,56 98,89
105,13 102,54
105,68 103,10
105,82 103,25
105,78 103,21
106,99 104,44
108,91 106,42
108,99 106,51
110,61 108,18
113,61 111,27
114,29 111,96
113,96 111,69
116,60 114,43
116,60 114,43
118,02 115,88
118,89 116,78
119,52 117,43
119,51 117,42
119,61 117,53
119,64 117,56
119,83 117,75
119,83 117,75
120,66 118,60
122,67 120,65
123,53 121,52
125,23 123,26
127,31 125,41
130,06 128,23
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01230,8
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
2,06E+042,76E+01277,2
5,00ALTURA AEREADOR/OXIGENADOR
II
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
9,6
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
18,9
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
11,07
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
14,60
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
600,78
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
455,44
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,73
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
0,49
22,32
26,56
28,35
32,47
34,99
35,11
36,56
38,40
39,88
41,47
42,57
43,03
44,96
46,25
47,84
49,57
51,04
53,58
54,62
64,08
69,06
76,57
80,80
81,01
81,01
94,78
94,98
100,76
102,23
105,80
106,34
106,49
106,44
107,66
109,57
109,66
111,27
114,28
114,96
114,63
117,26
117,26
118,51
119,38
120,01
120,00
120,10
120,13
120,32
120,33
121,15
123,16
124,02
125,72
127,81
130,55
2,5043Anclaje opcional
2,6579Anclaje opcional
2,6968Anclaje opcional
2,7916Anclaje opcional
2,8060Anclaje opcional
2,8098Anclaje opcional
2,8087Anclaje opcional
2,8409Anclaje opcional
2,8917Anclaje opcional
2,8940Anclaje opcional
2,9369Anclaje opcional
3,0167Anclaje opcional
3,0347Anclaje opcional
3,0260Anclaje opcional
3,0959Anclaje opcional
3,0959Anclaje opcional
3,1337Anclaje opcional
3,1567Anclaje opcional
3,1735Anclaje opcional
3,1731Anclaje opcional
3,1759Anclaje opcional
3,1767Anclaje opcional
3,1818Anclaje opcional
3,1818Anclaje opcional
3,2037Anclaje opcional
3,2572Anclaje opcional
3,2799Anclaje opcional
3,3250Anclaje opcional
3,3804Anclaje opcional
3,4533Anclaje opcional
LA LINEA FUNCIONARIA SIN PROBLEMAS, PARA UN CAUDAL ACUMULADO DE 32 l/s (Pozo N 9 - 12 l/s; Pozo N 3 - 7 l/s; Pozo Buenos Aires: 13 l/s)
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,65
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,45
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
0,33
Pgina 20
PLAN
EMERGEN
TE
ANEXO 3:
CALCULO ESTACION DE BOMBEO:
Pgina 21
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 22
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 23
PLAN
EMERGEN
TE
ANEXO 4:
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 24
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 25
PLAN
EMERGEN
TE
1. OBJETO
Estas disposiciones proporcionan al Ingeniero Sanitario un conjunto de criterios
bsicos para el diseo de estaciones de bombeo de agua para consumo humano y
de aguas residuales.
2. ALCANCE
Las presentes disposiciones se refieren a estaciones de bombeo de aguas claras
3. DEFINICIONES
Estacin de bombeo. Conjunto de estructuras, equipos y accesorios que permiten
elevar el agua desde un nivel inferior a uno superior, o que introducen energa de
presin en un sistema hidrulico.
Cmara hmeda. Ambiente en el cual se ha dispuesto el lquido, tambin se le
conoce con el nombre de pozo de succin.
Cmara seca. Ambiente en el cual se han dispuesto los equipos de bombeo.
Elevacin esttica de succin. Es la distancia vertical existente, desde el nivel
de suministro del lquido, al eje de la bomba, cuando esta se encuentra por encima
del nivel de suministro.
Columna esttica de succin. Es la distancia vertical existente, desde el nivel
de suministro del lquido, al eje de la bomba, cuando esta se encuentra por debajo
del nivel de suministro.
Columna esttica de descarga. Es la distancia vertical existente, desde el eje de la
bomba al punto de entrega libre del lquido.
Columna esttica total. Es la distancia vertical existente, desde el nivel de suministro
hasta el nivel de descarga libre del lquido.
Columna de friccin. Es aquella necesaria para vencer la resistencia que oponen las
tuberas, vlvulas y accesorios, que van a la bomba o salen de ella.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 26
PLAN
EMERGEN
TE
Pgina 27
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 28
PLAN
EMERGEN
TE
Los pisos de las cmaras secas subterrneas tendrn una pendiente mnima del 2%,
hacia un sumidero, en el cual se dispondr una bomba, de accionamiento manual o
preferiblemente elctrica de accionamiento automtico, para disponer las aguas
provenientes de fugas de bombas, vlvulas, etc. La descarga de esta bomba se
llevar por encima del nivel mximo del pozo de succin.
En lugares adecuados del edificio se dispondr de gabinetes y extintores de
incendios, por lo menos uno de estos dispositivos ir en el local de los motores.
Para el clculo estructural de los edificios, cmaras y cimentaciones, se tomarn en
cuenta aspectos tales como: geolgicos, mecnica de suelos, esfuerzos
ssmicos, efectos de cargas, impactos, vibraciones, etc. que originen los
motores.
5. DISPOSICIONES ESPECFICAS
5.1. CMARA SECA Y CMARA HMEDA.
Las estaciones de bombeo, excepto las estaciones reforzadoras, podrn estar
constituidas por uno o dos tipos de cmaras. En caso de estaciones con dos tipos de
cmaras, la una servir para la disposicin del lquido y del dispositivo de succin de
la bomba (cmara hmeda o pozo de succin) y la otra servir para alojar los
equipos de bombeo (cmara seca). En el caso de estaciones de un solo tipo de
cmara, en esta se dispondrn el lquido, el dispositivo de succin y los equipos
de bombeo.
En estaciones de bombeo de aguas claras, el fondo del pozo de succin tendr una
pendiente del 2% al 5% hacia el sumidero, en el cual ir la succin de las bombas,
para de esa forma facilitar su vaciado y evitar la acumulacin de slidos.
El rea horizontal de la tolva, que as se forma, no ser mayor que lo necesario para
una adecuada instalacin y funcionamiento de la succin.
En el bombeo de aguas claras, los pozos de succin contarn con accesos
convenientes y del tipo cubierto, para evitar toda posibilidad de contaminacin del
lquido desde el exterior.
Las cmaras de bombas, o cmaras secas, tendrn accesos que permitan una fcil
circulacin.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 29
PLAN
EMERGEN
TE
Pgina 30
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 31
PLAN
EMERGEN
TE
Pgina 32
PLAN
EMERGEN
TE
peligrosas. Por tanto el proyecto debe prever por lo menos sistemas de alarmas para
los siguientes casos:
a) Un nivel excesivamente alto en el pozo de succin, que sea superior al nivel de
arranque de la ltima bomba, en secuencia normal.
b) Un nivel excesivamente bajo en el pozo de succin, correspondiente al nivel
mnimo de sumergencia, el cual se encuentra por debajo del nivel de parada de las
bombas.
c) Un nivel excesivamente alto en el depsito de entrega del lquido,
correspondiente a valores de niveles que permitan que el lquido salga por los
desbordes.
Para los casos en que se produzcan situaciones como las indicadas en los literales b
y c del numeral anterior, se debe disear un sistema de emergencia que desconecte
el funcionamiento de los motores.
Si los equipos de bombeo se han diseado para funcionamiento con velocidad
variable, se debe prever una alarma que reaccione cuando falle el sistema de control
de la velocidad.
Cuando se ha dispuesto de ms de dos bombas, la bomba de reserva se la puede
hacer funcionar, por medio de un alternador automtico, con las otras bombas, para
de esa manera reducir el nivel del pozo de succin.
Para los proyectos de gran magnitud, especialmente aquellos en los cuales existen
grandes distancias entre las fuentes de suministro y los puntos de entrega del
lquido, el diseo debe comprender controles parciales y totales, con transmisin de
disposiciones de operacin a travs de telecomunicaciones del tipo confiable y que
cuenten adems con sistemas computarizados. Para estos casos se deber preparar
los manuales de operacin y mantenimiento, as como las caractersticas requeridas
por el personal que laborar en dichos sistemas.
6. TUBERAS, VLVULAS Y ACCESORIOS.
6.1. TUBERAS DE SUCCIN Y DESCARGA.
En estaciones de bombeo la velocidad del agua, en las boquillas de succin y de
descarga de la bomba, estar preferentemente entre 3 m/s a 4,25 m/s. Se
pueden utilizar velocidades mayores, en esos puntos de la bomba, para cargas
totales de bombeo superiores a los 30 m.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 33
PLAN
EMERGEN
TE
de
expansin
que
permitan
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 34
PLAN
EMERGEN
TE
Pgina 35
PLAN
EMERGEN
TE
Se debe tener cuidado que el lquido no llegue a la succin de las bombas con
velocidades excesivas en direcciones ortogonales a la direccin de la succin. Para
esto se disearn pantallas deflectoras.
Se debe dejar un espacio libre de por lo menos 3/4 D, siendo D el dimetro de la
boca de succin de la bomba, a cada lado de la succin de la bomba y un espacio
comprendido entre D/2 a D/4, entre la boca de succin y el fondo del pozo de
succin.
6.2. VLVULAS
En las lneas de conduccin de aguas claras, la clave del tubo deber alinearse con
la clave de la vlvula, para reducir a un mnimo el atrapamiento de aire.
En estaciones de bombeo donde exista columna esttica de succin, se deber
instalar una vlvula de compuerta, entre la bomba y el pozo de succin, para permitir
la remocin de la bomba.
En el lado de descarga de una bomba se instalarn, en ese orden, los siguientes
accesorios: una vlvula de retencin y una vlvula de compuerta.
En estaciones de bombeo de aguas claras, con elevacin esttica de succin y que
carezcan de dispositivos de cebado, se instalar una vlvula de pie.
En la descarga de bombas verticales tipo sifn se deber instalar vlvulas
Aliviadoras o de admisin de aire, que se dispondr en la parte superior del sifn.
En estaciones de bombeo con elevacin esttica de succin, se debe evitar el uso de
vlvulas de compuerta en la tubera de succin; si se lo hace es mejor colocar el
vstago de la vlvula en posicin horizontal o vertical hacia abajo.
Las vlvulas de retencin a base de disco con vaivn es preferible que se las instale
horizontalmente,
cuando
se
estn
manejando
lquidos
con
slidos
sedimentables.
6.3. PROTECCIN CONTRA GOLPE DE ARIETE.
En todo proyecto de estaciones de bombeo se deber incluir un anlisis
detallado de la magnitud y de los posibles efectos del golpe de ariete, en las
instalaciones de la estacin y en la tubera de bombeo.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 36
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 37
PLAN
EMERGEN
TE
7. TUBERAS DE PRESIN
El trazado de la conduccin a presin, en planta, debe estar constituido por tramos
rectos, o por segmentos rectos seguidos de cambios de direccin. En perfil, estar
preferentemente constituido por tramos rectos.
Cuando se impongan cambios de pendiente, a consecuencia del relieve del terreno,
se evitar multiplicarlos excesivamente, especialmente en conducciones de gran
dimetro, a fin de facilitar el montaje de tuberas y accesorios.
Las conducciones formadas por segmentos rectos podrn ser
mediante la deflexin de los tubos en sus juntas o accesorios especiales.
curvadas
En lo posible, hay que evitar los terrenos inestables o los suelos, cuyo anlisis revele
una corrosividad especial. Si a pesar de todo, es necesario atravesarlos, conviene
localizar la conduccin con el mejor alineamiento posible y disear medidas de
seguridad que minimicen los riesgos de daos.
Cuando una tubera se encuentre sumergida, hay que observar las siguientes
condiciones: El tipo de tubo, juntas, materiales y apoyos debe ser el adecuado a esa
forma de instalacin; garantizando la estanqueidad del conducto, su estabilidad y
resistencia al impacto.
El tiempo mnimo para la reparacin de una tubera debe asumirse considerando el
material, dimetro, condiciones de instalacin, trazado, disponibilidad de
accesos y medios para la eliminacin de los daos, pero no menos de 6 horas.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 38
PLAN
EMERGEN
TE
Pgina 39
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 40
PLAN
EMERGEN
TE
Tal perfil, con subidas lentas y bajadas rpidas, facilita la reunin del aire en los
puntos altos, al mismo tiempo que contrarresta el arrastre eventual de bolsas de
aire y la produccin de golpes de ariete.
Se evitar disear las conducciones a presin, con subidas rpidas y bajadas lentas.
En terrenos planos hay que evitar pendientes nulas, por cuanto, pequeos
hundimientos pueden producir puntos altos no previstos.
La pendiente mnima en terrenos planos, ser de al menos 0,05%.
Las vlvulas de purga de aire, de
accionamiento automtico, deben instalarse
sistemticamente en los puntos altos de las conducciones, a fin de eliminar cualquier
formacin de bolsas de aire o vacos.
Se debe ubicar tambin vlvulas de aire, en la parte superior de los tramos de
mantenimiento, y su accionamiento puede ser manual.
Las ventosas de extraccin de aire se deben instalar en todos los sitios donde se
prevea una vlvula de extraccin de aire.
Se puede prescindir de la instalacin de ventosas, en aquellos casos en que se
garantice la expulsin del aire conjuntamente con el agua.
Se recomienda utilizar ventosas de: 25 mm de dimetro, para tuberas de hasta 500
mm;
Si es imposible evitar en el trazado tramos horizontales seguidos de tramos
descendentes, hay que prever ventosas o purgadores de aire, en los extremos de
los primeros.
Si es necesario se instalarn puntos de purga de aire suplementarios, aguas abajo
de los aparatos de cierre, tales como vlvulas de compuerta y de retencin,
susceptibles a cerrarse en el momento del vaciado o del llenado de la conduccin.
Las vlvulas de vaciado se instalarn al final de cada tramo de mantenimiento, as
como tambin en los puntos bajos, donde se prevea su utilizacin para lavado.
La instalacin de vlvulas de vaciado en los puntos bajos de la conduccin debe
permitir el vaciado total del tramo de la tubera.
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 41
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 42
PLAN
EMERGEN
TE
cierre de
se puede
medidas
de aire,
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 43
PLAN
EMERGEN
TE
Pgina 44
PLAN
EMERGEN
TE
Cuando se utilice tubera de hierro fundido, hay que prever un apoyo por cada tubo,
el mismo que debe ubicarse detrs del enchufe o campana.
Cuando se utilice tubera de acero de planchas soldadas, la distancia entre apoyos
se determinar en base a clculos que consideren que sobre los apoyos actan el
peso propio de la tubera y el rozamiento de la tubera con el apoyo, el mismo que
produce esfuerzos de compresin y traccin, proporcionales a la temperatura.
Los anclajes, destinados a impedir el movimiento de la tubera, deben prever uniones
mviles al inicio del ramal descendente.
En el diseo de anclajes, se debe considerar todas las fuerzas trasmitidas por la
tubera y equilibrarlas, a fin de garantizar su permanencia inamovible.
8.
Pgina 45
PLAN
EMERGEN
TE
Viene dado por la diferencia de elevacin entre el eje de la bomba y el nivel mnimo
del agua en la fuente o captacin, afectado por la perdida de carga en el lado de la
succin.
Hs = hs + hpfs
Donde
hs: altura de succin, esto es, altura del eje de la bomba sobre el nivel
inferior del agua
hpfs: Perdida de carga por friccin en la succin,
Debe considerarse que la carga de succin est limitada por la carga neta de succin
positiva (NPSH), adems, que debe existir un sumergimiento mnimo de la tubera de
succin en el agua.
de la bomba, su valor,
el fabricante. El NPSH
bomba para mantener un
referencia, generalmente
Para evitar el riesgo de la cavitacin por presin de succin, se debe cumplir que:
NPHS disponible
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 46
PLAN
EMERGEN
TE
Es la energa del lquido en la cota de referencia de la bomba, esta puede ser de dos
tipos: NPSH requerida, y NPSH disponible.
NPSH REQUERIDA. Es un dato bsico, caracterstico de cada tipo de bomba y se
determina por pruebas y clculos; se define como la energa para llenar la parte de
aspiracin, y vencer las prdidas por rozamiento con el aumento de la velocidad
desde la conexin de aspiracin de la bomba hasta el punto donde se seala ms
energa, vara segn el diseo de la bomba, tamao de esta y condiciones de
servicio, es una informacin suministrada por el fabricante de la bomba.
NPSH DISPONIBLE. Depende del diseo de la instalacin, es una particularidad
independiente del tipo de bomba es por tanto calculable y se define como la energa
que tiene el lquido en la toma de aspiracin de la bomba independientemente del
tipo de sta y por encima de la energa del lquido y debido a su presin de vapor.
En su determinacin intervienen los cuatros factores siguientes:
(1) Hp, altura correspondiente a la presin absoluta sobre la superficie del lquido en
el cual aspira la bomba. Dicha presin ser la atmosfrica correspondiente a la altitud
del lugar donde esta instalada la bomba si el depsito es abierto, o la presin
absoluta existente en el interior del calentador, o el depsito cerrado del cual la
bomba toma el lquido.
(2) Hz, altura en metros de la superficie del fluido con respecto a la lnea central del
rbol del rodete, ya sea por encima o por debajo del mismo.
(3) Hvp, altura correspondiente a la tensin del vapor del lquido a la temperatura
existente, y (4) Hf, prdida de la altura a causa del rozamiento y turbulencia entre la
superficie del lquido y la platina de aspiracin de la bomba.
La altura en la aspiracin es la suma algebraica de estos factores. Cualquier trmino
que tienda a reducir la altura total de aspiracin es considerado negativo. Si el nivel
de la superficie est por encima de la lnea central del rbol del rodete se considera
positivo; si est por debajo, negativo. La tensin del vapor y las prdidas debidas al
rozamiento y la turbulencia son siempre negativas ya que disminuyen la altura total
de aspiracin. Luego, la ecuacin de la altura en la aspiracin es:
H sv H p H z H vp H f
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 47
PLAN
EMERGEN
TE
V 2 su
2g
Obsrvese que la altura en la aspiracin debida a la velocidad
no figura en la
ecuacin. Hsv, que es la altura neta en la aspiracin, aparecer bajo dos formas en la
platina de aspiracin, es decir, como altura de velocidad y como altura de presin.
Puesto que la expresin da la altura total y no la altura equivalente a la presin
V 2 su
2g
esttica, el trmino
no est incluido.
Si la bomba aspira agua fra de un depsito abierto a nivel del mar, sin prdidas de
rozamiento o por turbulencia, la altura mxima de aspiracin ser aproximadamente
de 10.33 metros. Este caso ideal no se da nunca en la prctica, siendo la altura
mxima de aspiracin muy inferior a la indicada.
Para que una bomba funcione correctamente sin cavitacin es conveniente que la
altura disponible del sistema sea igual o mayor que la altura requerida en la
aspiracin mas una cierta reserva. En muchos casos viene obligada una estrecha
cooperacin entre el proyectista de la instalacin y el constructor de la bomba,
pudiendo implicar el desarrollo de estudios econmicos previos la obtencin de la
solucin definitiva.
8.5. CARGA DE IMPULSIN
Est dada por la diferencia de elevacin entre el nivel mximo de las aguas en el sitio
de llegada y el eje de las bombas ms la prdida de carga del lado de la tubera de
impulsin.
Hi = hi + hpf
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 48
PLAN
EMERGEN
TE
Donde:
hi: Altura de impulsin, o sea, la altura del nivel superior en relacin al eje de la
bomba.
hpf: Prdida de carga en la tubera de impulsin
8.6. POTENCIA DEL EQUIPO DE BOMBEO
El clculo de la potencia de la bomba y del motor debe realizarse con la siguiente
frmula:
Pb = Qb Hb
3960 Efic.
Donde:
Pb: Potencia de la bomba y del motor (HP)
Qb: Caudal de bombeo (gal/min)
Hb: Altura manomtrica total (pies)
Efic: Eficiencia del sistema de bombeo
Efic.= Efic(motor)xEficiencia(bomba)
La bomba seleccionada debe impulsar el volumen de agua para la altura dinmica
deseada, con una eficiencia () mayor a 70%.
Pgina 49
PLAN
EMERGEN
TE
Pgina 50
PLAN
EMERGEN
TE
Donde
V = Velocidad media del agua en (m/s)
D = Dimetro de la Tubera
Qb = Caudal de bombeo.(m3/s)
Pgina 51
PLAN
EMERGEN
TE
Hf = k * V2 / 2*g
En donde k depende del accesorio por donde transita el flujo como ( codos,
vlvulas, entradas, salidas, reducciones, tes, yes, uniones)
Pgina 52
PLAN
EMERGEN
TE
En los cambios de alineacin horizontal y/o vertical se generan esfuerzos que deben
ser absorbidos por los anclajes, los cuales pueden ser de hormign ciclpeo o de
hormign simple.
Se determina el empuje total de la tubera que generan empujes estticos y
dinmicos hacia los anclajes debidos a la presin esttica y dinmica de acuerdo a la
siguiente expresin
Et = 2 * * A * { H + v2 /2g} sen ( /2)
En donde
= peso especfico del agua (kg/m3) A = rea de la seccin del tubo (m2) H =
altura de la columna de agua (m) Et = empuje total
= ngulo externo formado por las directrices de la curvatura
En estos casos siempre se debe calcular el empuje total y comparar con el esfuerzo
o peso del anclaje adoptado, ya que se realiza por medio de tanteos si el empuje
total es mayor al peso del anclaje adoptado hay que cambiar las dimensiones caso
contrario esta correcto.
13.1. ANCLAJE DE CODO HORIZONTAL
Las uniones y accesorios de empate deben estar fuera del bloque
13.2. ANCLAJE DE CODO VERTICAL SUPERIOR
El anclaje debe ser mnimo al empuje de la tubera
En este caso se coloca platinas fundidas al hormign
Pgina 53
PLAN
EMERGEN
TE
Consultor Ing. Patricio Costa; Fiscalizador Ing. Ronny Carrin; Administrador Ing. Richard Vaca
Pgina 54