Академический Документы
Профессиональный Документы
Культура Документы
RBS 3216
TEST INSTRUCTIONS
Copyright
Ericsson AB 2007 All Rights Reserved
Disclaimer
No part of this document may be reproduced in any form without the written
permission of the copyright owner.
The contents of this document are subject to revision without notice due to
continued progress in methodology, design, and manufacturing. Ericsson shall
have no liability for any error or damage of any kind resulting from the use
of this document.
Contents
Contents
1
Introduction
1.1
Purpose
1.2
Target Group
1.3
Prerequisites
1.4
Workflow
2.1
2.2
2.3
2.4
10
2.5
11
2.6
13
2.7
Checking Power
14
15
16
18
Revision History
18
6.1
Revision A
18
Reference List
19
Introduction
Introduction
This document describes how to check the installation of the RBS 3216 before
it is integrated with the radio network. Figure 1 on page 1 shows the cabinet
of the RBS 3216.
The RBS 3216 exists in three power versions: AC, 48 V DC, and +24 V DC.
BB000163b
Figure 1
1.1
Purpose
The checklists in this document are designed to help ensure the quality of the
RBS installation before integration with the radio network.
The checklists are primarily intended to be used if other checklists that
supersede them are not provided by the installation project.
1.2
Target Group
The target group for this information is installation personnel.
1.3
Prerequisites
This section describes the prerequisites that must be fulfilled before beginning
the checking procedure.
1.3.1
Documents
Before starting, ensure that the following documents are read and understood:
Also ensure that the latest versions of the following documents are available:
1.3.2
Tools
The tools required for the checking procedure are shown in Table 1 on page 2.
Table 1
Tool
Description
Product Number
Digital multimeter
- -48.7
48.7 VV
- 48.7 V
B0001659
Introduction
Tool
Description
Product Number
Torque wrench
set, 525 Nm
P012977A
1.3.3
Conditions
Ensure that the following conditions are met:
1.4
The External Alarm Unit (XALM) including External Alarm Connection Unit
(EACU) optional equipment is installed according to the site installation
documentation
The software is loaded and the RBS configured at the node production
center, that is, the Cabinet Equipment Configuration Wizard has been run
The installer has access and keys to the site and the RBS cabinet
Workflow
The workflow for checking the RBS installation consists of four main parts, as
shown in Figure 2 on page 4.
Checking after
Powering Up the RBS
Performing
Concluding Routines
P014008D
Figure 2
Workflow
2.1
Item
YES
1.
2.
3.
4.
5.
6.
7.
N/A
(1)
Item
8.
YES
N/A
(1)
Notes:
2.2
Item
YES
1.
2.
3.
4.
N/A
(1)
Notes:
2.3
2.3.1
Item
1.
2.
3.
4.
5.
6.
7.
Cabling undamaged
8.
9.
YES
N/A
(1)
2.3.2
Item
YES
1.
2.
3.
N/A
(1)
Notes:
2.3.3
Item
1.
2.
3.
4.
YES
N/A
(1)
Notes:
2.4
Cabinet Checklist
Item
YES
1.
2.
3.
5.
6.
7.
8.
N/A
(1)
Notes:
10
2.5
Item
1.
2.
4.
5.
6.
7.
8.
9.
YES
N/A
(1)
11
Item
YES
N/A
(1)
12
2.6
Item
1.
2.
3.
Cables undamaged
4.
5.
6.
7.
8.
YES
N/A
(1)
Notes:
13
2.7
Checking Power
This section contains checks for the power supply system and battery
equipment.
2.7.1
Item
YES
1.
2.
3.
N/A
(1)
5.
6.
7.
8.
Notes:
14
2.7.2
Batteries
Use Table 11 on page 15 to check the installation and earth grounding of
battery equipment.
Table 11
Battery Checklist
Item
1.
2.
Batteries undamaged
3.
4.
5.
6.
7.
8.
9.
YES
N/A
(1)
Notes:
15
Do!
Products not connected to ground risk being damaged by overvoltage or
overcurrent. Always connect products to ground according to instructions.
A
PSU 1
DCF
PSU 2
PSU 3
Energy Hazard
PDU
ACCU
G
F
BB000168a
Figure 3
16
PSU 1
DCF
PSU 2
PSU 3
Energy Hazard
PDU
ACCU
BB000282b
Figure 4
Table 12
Indicator Checklist
Pos.
Unit Part
FCU
PSU
CBU
YES
ET board
RAX board
TX board
RUIF
D
RU
FU
17
Revision History
This section presents changes that have been made for each release, in
addition to editorial changes such as corrections of spelling, grammar, and
layout.
6.1
Revision A
New document.
18
Reference List
Reference List
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
19