Академический Документы
Профессиональный Документы
Культура Документы
CONTRACT ID CODE
3. EFFECTIVE DATE
0002
PAGE OF P AGES
26-Sep-2013
CODE
6. ISSUED BY
N33191
CODE
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)
CODE
FACILIT Y CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICIT AT IONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer
is extended,
X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter,
provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is not,
14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter
where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
TEL:
EMAIL:
BY
(Signature of person authorized to sign)
EXCEPTION T O SF 30
APPROVED BY OIRM 11-84
N33191-13-R-1240
0002
Page 2 of 4
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
N33191-13-R-1240
Renovation of Sevastopol School #5, Ukraine
Questions and Answers
QUESTION: With regards to picture #108: In page 43 (technical specifications ver.002) write:
Red: Additional area requiring roof repair included in Option-4. Red: actually roof repairs?
ANSWER: This is a mistake in the contract specifications. Red corresponds to complete faade
restoration, described in paragraph 1.7.1 and clarified in picture#108-b of the Technical
Specifications. It does not correspond to roof repair.
QUESTION: With regards to picture #108: Blue: Area requiring only faade restoration - it`s
actually only requiring faade?
ANSWER: Yes, this is described in paragraph 1.7.2 of the Technical Specifications. It does not
include new windows or doors, but includes faade restoration and painting the windows and
doors.
QUESTION: With regards to picture #108: Blue - I understand correctly: the blue area to repair
the faade is different from a green area. Green area - it`s full renovation and Blue area - repair
of individual regions.
ANSWER: The green area corresponds to the area included under contract option -2. Contract
option-4 does not include any work in the green area.
The blue areas include the work described in paragraph 1.7.2 of the Technical Specifications.
Under this contract option, it is not required to replace the doors or windows. It must be noted
that the blue areas in the central building include areas within contract option-3. Therefore, if
contract option 3 and 4 are awarded, the blue section in the contract wing will require faade
restoration and window replacement. If only contract option 3 is awarded, only the windows in
the central wing will require replacement, but no faade restoration. If only option 4 is awarded,
N33191-13-R-1240
0002
Page 3 of 4
the blue areas of the central wing would have the faade restored, but the windows and doors
only painted.
QUESTION: With regards to picture #107: In this picture #107: In the green belt must be
replaced only the window? Provided in this Green area renovation in faade?
ANSWER: Under contract option-3 only the window replacement is included. No work on the
faade is included under this contract option.
QUESTION: Past Performance Questionnaire - This document must be completed by the client
of our company?
ANSWER: The Past Performance Questionnaire should be completed by the client(s) of the
design and construction projects that were completed by your company.