JASA KONSULTANSI PERANCANGAN JALUR PIPA

POINT A POINT B SLS A

ELECTRICAL CABLE SIZING CALCULATION


Document no:
SLS - 40 - ELE - CAL - 002

10-Apr-2013

DRAFT IFB

DQ

JPD

DS

20-Mar-2013

Issued for Review

DQ

JPD

DS

PREPARED

CHECKED

APPROVAL

REV

DATE

DESCRIPTION

APPROVAL
PT. DEPRIWANGGA

NO part of this document may be reproduced, in any form or by any means, except as permitted by
the Author

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

2 of 10

REVISION SHEET

Page

Revision

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Page

Revision

Page

Revision

Page

Revision

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

3 of 10

COMMENT SHEET

No.

Reference / Paragraph / Section

COMPANY
BY
POSITION
DATE

PT. Pertamina Gas

PT. Depriwangga

Comment

Response

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

4 of 10

TABLE OF CONTENTS

REVISION SHEET .................................................................................................................. 2


COMMENT SHEET ................................................................................................................. 3
TABLE OF CONTENTS .......................................................................................................... 4
1.

2.

Introduction ...................................................................................................................... 5
1.1

Background ............................................................................................................... 5

1.2

Objectives ................................................................................................................. 5

1.3

Scope ........................................................................................................................ 5

1.4

Associated Document ............................................................................................... 5

Glossary of Terms ............................................................................................................ 6


2.1

3.

4.

Abbreviations ............................................................................................................ 6

Basis and Assumptions .................................................................................................... 6


3.1

Design Basis ............................................................................................................. 6

3.2

Cable Sizing Criteria.................................................................................................. 8

Sizing Calculation ............................................................................................................. 9


4.1

Sample Cable Sizing and Voltage Drop Calculation .................................................. 9

4.2

Overall Cable Sizing and Voltage Drop Calculation ................................................. 10

5.

Conclusion and Result ................................................................................................... 10

6.

Attachments ................................................................................................................... 10

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

5 of 10

1. Introduction
1.1 Background
This document covers calculation of cable sizing for electrical loads in Arun NGL Area 19. The
facility is located in Lhokseumawe, Aceh and operated by PERTAMINA GAS., hereinafter is
referred to as COMPANY.
The purpose of calculation is to provide cable sizing requirement for AC and DC electrical loads.
At this point of time, some parameters used in this calculation are only rough estimation. It is
VENDORS responsibility to verify this calculation to meet COMPANY requirement to run the
facilities operable and safely. The VENDOR shall be required to update this document, once
specific information has been defined. Should there be discrepancies or anomalies between
documents, VENDOR shall clarify and responsible for the revision of the documents and
consequences thereof.

1.2 Objectives
This document provides calculations to determine cable and breaker sizing for AC and DC loads
in Area 19 related to FEED 75 KM pipeline project from point B Arun to SLS A Development.
1.3 Scope
This assessment of electrical calculation is for FEED 75 KM pipeline project from point B Arun to
SLS A Development of PERTAMINA GAS.
1.4 Associated Document
Project Document:
-

SLS-40-GEN-DBS-0001

Project Design Basis

SLS-40-ELE-CAL-004

Electrical Calculation Power Consumption

SLS-40-ELE-DWG-003

Electrical Overall Single Line Diagram

International Standards used in this report of cathodic protection system calculation are as
follows:
-

IEC 60364-5-52

Electrical installations of buildings - Selection and erection of


electrical equipment - Wiring systems

IEC 60228

Conductors of Insulated Cables

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

6 of 10

2. Glossary of Terms
2.1 Abbreviations
AC

Alternating Current

DC

Direct Current

HVAC

Heating, Ventilation, and Air-Conditioning

IEC

International Electrotechnical Commission

kW

Kilo Watt

MDP

Main Distribution Panel

3. Basis and Assumptions


3.1 Design Basis
3.1.1

Correction Factors for Cable Ampacity


Ampacity (current carrying capacity) of cable is subject to be affected by ambient temperature
and its installation arrangement. Therefore the standard ampacity shall be multiplied by
correction factors to accommodate those effects.
Temperature correction factor will be applied to cables passing outdoor area, where the
ambient temperature is assumed at 40C (Project Design Basis article 7.2.2). The temperature
inside Electrical Room and Control Room will be maintained using Air Conditioner, hence the
correction factor is not applied to indoor cables. Based on Table A.52-14 of IEC 60364-5-52
(Attachment 3), the correction factor for ambient temperature of 40C is 0.91.
Ampacity of cable is also derated when more than one circuit or more than 1 multi-core cable
are arranged in groups. For this calculation, it is assumed that 4 multi-core cables are installed
in perforated tray. According to Table A.52-17 of IEC 60364-5-52 (Attachment 4), the
correction factor for this arrangement is 0.77. Therefore the overall correction factor is:
F = Ft . F g
Where

3.1.2

: overall correction factor

Ft

: correction factor for ambient temperature

Fg

: correction factor for cable grouping consideration

Full load current of equipment


1) 3-Phase Load

I FL

P .1000
3.VLL . . cos .

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

7 of 10

Where:
IFL

full load current (Amp)

power (kW)

VLL

line to line voltage (Volt)

Efficiency

cos

power factor

2) 1 Phase Load

I FL

P . 1000
V. . Cos

Where:
IFL

full load current (Amp)

power (kW)

line to neutral voltage (Volt)

Efficiency

cos

power factor

3) DC Load

I FL

P . 1000
VDC

Where:

3.1.3

IFL

full load current (Amp)

power (kW)

VDC

voltage (Volt)

Voltage Drop Calculation


1) AC Voltage Drop at Steady State
The steady state voltage drop for AC system is given by the following formula:

VD k. I FL (R.cos X.Sin ).

L 100% 1
.
.
1000 V n

VD VDSpec
Where:
VD spec :

Specified allowable voltage drop

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

8 of 10

VD

Voltage drop (%)

Voltage (Volt); line-to-line voltage for 3-phase system, or line- to-neutral


voltage for 1-phasesystem

IFL

Full load current (A)

Resistance of the cable (Ohm per 1000 m)

Reactance of the cable (Ohm per 1000 m)

cos

Power factor

Cable length (m)

Number of cable in parallel

Constant; 3 for 3-phase system, or 2 for 1- phase system

2) DC Voltage Drop at Steady State (1-Phase Load)


The steady state voltage drop for AC system is given by the following formula:

VD k. I FL .R.cos .

L 100% 1
.
.
1000 V n

VD VDSpec
Where:
VD spec :

Specified allowable voltage drop

VD

Voltage drop (%)

Voltage (Volt); line-to-line voltage for 3-phase system, or line- to-neutral


voltage for 1-phasesystem

IFL

Full load current (A)

Resistance of the cable (Ohm per 1000 m)

Cable length (m)

Number of cable in parallel

Constant; or 2 for DC system

Cable size shall be upgraded to bigger size or add more number of cables in parallel when
VD is greater than the specified allowable voltage drop value.
3.2 Cable Sizing Criteria
3.2.1

Permissible Derated Ampacity Cable


Cable ampacity is corrected by derated factor and the derated ampacity shall be larger than the
design current.

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

9 of 10

( I c x F) I FL
Where:

3.2.2

Ic

cable ampacity (A)

correction factor

IFL

full load current (A)

Permissible Voltage Drop


The permissible voltage drop at end load shall be limited to the following value.

LV motor feeder at steady state : 5%

LV motor feeder at starting motor : 15%

Non motor feeders

: 3%

For this FEED 75 KM pipeline project from point B Arun to SLS A Development, there is no
motor load, hence the allowable voltage drop is limited to 3% for all loads.

4. Sizing Calculation
4.1 Sample Cable Sizing and Voltage Drop Calculation
The sample cable sizing and voltage drop calculation presented here is based on catalogue from
cable vendor (GT Cable). The actual manufacturers data shall apply after the equipment vendor
is selected and the type of cables is decided.
3-phase load
Cable Tag : HVAC-P-L-01 (from Main Distribution Panel to Sub Distribution Panel HVAC))
Power

: 10.5 kW

Voltage

: 400 Volt

: 1

cos

: 0.8

Cable Length

: 25 m

Full load current

I FL

P .1000
3.VLL . . cos .
10 . 5 . 1000
3 . 400 .1. 0.8

= 18.9 A
Cable ampacity

18.9 A

Jasa Konsultansi Perancangan


& Feasibility Study
Jalur Pipa Transmisi Gas Arun - Belawan
TITLE

DOCUMENT NUMBER

REV

PAGE

Electrical Cable Sizing


Calculation

SLS - 40 - ELE - CAL - 002

10 of 10

Based on vendor catalogue (GT Cable), ampacity (A) for 4/C 6mm Copper conductors is 69 A.
Therefore the derated ampacity (Aderated) for 1 cable run is:
Aderated

= A . Ft . Fg
= 69 . 1 . 0.77
= 53 A

Number of cable
To fulfill the design current, the number of cable shall be:

I FL
18.9

0.357 1 cable
A derated
53
2

Hence the proposed cable for connecting MDP to HVAC Distribution Panel is 1 x 4/C 16mm .
Voltage drop
The voltage drop is calculated as follows:

VD k. I FL (R.cos X.Sin ).

L 100% 1
.
.
1000 V n

3 x 18.9 (3.972 x 0.8 0.083 x 0.6) x

25 100% 1
.
.
1000 400 1

= 0.69%
2

Based on the calculated voltage drop, the selected cable (1 x 4/C 16mm ) is acceptable.
4.2 Overall Cable Sizing and Voltage Drop Calculation
Complete calculations of cable sizing and voltage drop can be found in Attachment 1.

5. Conclusion and Result

Based on calculations presented in Attachment 1, the result of Cable Sizing and Voltage Drop
Calculation are considered satisfactory and hence acceptable as per cable sizing criteria

The data used for Cable Sizing and Voltage Drop Calculation is preliminary information that
showing minimum requirements. Contractor shall review, verify, design and finalize during
detail engineering

6. Attachments
Attachment-1: Cable Sizing and Voltage Drop Calculation.
Attachment-2: Electrical Properties from Vendor Catalogue (GT Cable)
Attachment-3: Table A.52-14 of IEC 60364-5-52
Attachment-4: Table A.52-17 of IEC 60364-5-52