Академический Документы
Профессиональный Документы
Культура Документы
Method Statement
PE Calculation (where
applicable)
Material Submission
Runner/Studs/Tracks
Boards
Compound
Accessories
Test reports
Sample Submission
Runner/Studs/Tracks
Boards
Compound
Accessories
1.2
1.3
1.4
1.5
Section 3
Section 3
Section 2
Section 3
Section 2
Section 3
Section 2
Section 3
Conform to
Specification
Date:
Approved By
Conform to
Specification
Conform to
Specification
Prior to
Start Work
Approved
Submission
Approved
Submission
Approved
Submission
Prior to
Start Work
Prior to
Start Work
Approved
Submission
Prior to
Start Work
Approved
Submission
Records
Page 1
Each type of
Dry Wall
Each type of
Dry Wall
Stages
APPENDIX C
Conform to
Prior to
Specification
Start Work
& Construction
Drawings
Each type of
Dry Wall
Each type of
Dry Wall
Date:
Date:
Review
BR / ADOS
Verified By:
Review
BR / ADOS
Prepared By:
Review
Review
Review
Inspection
Method
BR / QPDW /
ADOS
BR / ADOS
BR / ADOS
1.1
PeopleIn
Charge
Activity
S/No
Project:
Scope of work: Dry Wall
APPENDIX C
BR / ADOS
Visual / Testing
Visual /
Specifications
Section 3
Section 4
Section 4
Requirement
Reference
Date:
2.3
BR / ADOS
Visual /
Specifications
Date:
Storage of Material
Runner / Studs / Tracks
Boards
Compound
Accessories
2.2
BR / ADOS
Verified By:
2.1
PeopleIn Inspection
Charge
Method
Prepared By:
Activity
S/No
Project:
Scope of work: Dry Wall
Date:
Approved By
Conform to
Specification
Conform to
Specification
Conform to
Specification
Prior to
Start Work
Prior to
Start Work
Prior to
Start Work
Delivery
Document
Delivery
Document
Delivery
Document
Records
Page 2
Random
Selection
Each
Delivery
Each
Delivery
APPENDIX C
APPENDIX C
62
63
Method of Installation
Framing Works
4.1
4.2
4.3
BR / ADOS
BR / ADOS
BR / ADOS
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Section 6
Section 6
Section 6
Section 6
Section 2
Section 3
Requirement
Reference
Date:
Approved By
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Specification
Checklist
Before
Checklist
Closing Any
Board
Before
Installation
Checklist
Approved
Submission
Prior to
Start Work
Before
Installation
Approved
Submission
Prior to
Start Work
Records
Page 3
Each
Location
Each
Location
Each
Location
Each
Location
Each
Location
Date:
Installation
BR / ADOS
Visual /
Specifications
Date:
Mock Up Unit
3.2
BR / ADOS
Verified By:
Method of Installation
3.1
PeopleIn Inspection
Charge
Method
Prepared By:
Preparation
Activity
S/No
Project:
Scope of work: Dry Wall
APPENDIX C
4.7
4.8
BR / ADOS
BR / ADOS
BR / ADOS
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Section 6
Section 6
Section 6
Section 6
Section 6
Date:
Approved By
Conform to
Approved
Drawings &
Specification
Conform to
CONQUAS
Standards
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Records
Page 4
Each M&E
Service
Each
Location
Each M&E
Service
Each type of
Dry Wall
Every
Opening
Date:
4.6
BR / ADOS
Visual /
Measurement
Date:
Lateral Bracing
4,5
BR / ADOS
Verified By:
Openings
4.4
PeopleIn Inspection
Charge
Method
Prepared By:
Installation (Continued)
Activity
S/No
Project:
Scope of work: Dry Wall
APPENDIX C
64
65
4.11
4.12
BR / ADOS
BR / ADOS
BR / QPDW /
ADOS
Visual
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Section 6
Section 6
Section 6
Section 6
Section 6
Conform to
Approved
Material &
Sample
Conform to
Approved
Material &
Sample
Date:
Approved By
Conform to
CONQUAS
Standards
Conform to
Approved
Material &
Sample
After
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Checklist
Checklist
Checklist
Checklist
Checklist
Page 5
Each
Location
Each Unit
Each Unit
Each Unit
Records
APPENDIX C
Date:
Inspection by PE (where
applicable)
4.11
BR / ADOS
Visual /
Measurement
Date:
4.10
BR / ADOS
Verified By:
4.9
PeopleIn Inspection
Charge
Method
Prepared By:
Installation (Continued)
Activity
S/No
Project:
Scope of work: Dry Wall
APPENDIX C
Visual
Section 7
Section 10
Section 6
Date:
Approved By
Conform to
Specification
Conform to
Specification
& CONQUAS
Standards
Conform to
Specification
After Final
Repair Done
After On
Site Testing
After Final
Closing of
Board
Checklist
Checklist
Checklist
Page 6
Each type of
Dry Wall
Each type of
Dry Wall
Each type of
Dry Wall
Records
APPENDIX C
Date:
BR / ADOS
Visual
Date:
Protection
4.15
BR / ADOS
Visual/
Specification/
Measurement
Verified By:
4.14
BR / ADOS
PeopleIn Inspection
Charge
Method
Prepared By:
Performance Test
Installation (Continued)
Activity
4.13
S/No
Project:
Scope of work: Dry Wall
APPENDIX C
66