Вы находитесь на странице: 1из 32

Item No.

1
S.no
1
2
3

Scarifying
Chainage
From
To
18+000
20+060
20+799
22+550
22+550
22+750

Side

Nos

Length
2060
1751
200

Bredth

Depth

3.66
3.66
5.5
Total

Item No.2
S.no
1
2
3

Reworking
Chainage
From
To
18+000
20+060
20+799
22+550
22+550
22+750

Side

Nos

Length
2060
1751
200

Bredth

Depth

3.66
3.66
5.5
Total

Item No.3
S.no
1
2
3
4

Item No.5
S.no
1
2

3
4
5
6
7
8
9
10

Earth work Excavation


Chainage
From
To
18+000
19+920
21+300
22+550
22+550
22+750
18+560
18+854
Deduct Culvert Gap

Side

Nos

B/S
B/S
B/S

Length
2
2
2
1
2

1920
1250
200
294
-8.1

Bredth
2.195
2.195
1.695
10
2.195

Depth
0.26
0.26
0.26
0.325
0.26
Total

G.S.B. (Coarse)
Chainage
From
To
18+000
18+560
18+854
19+920
19+920
20+060
20+799
20+929
20+930
21+300
21+300
22+550
22+550
22+750
18+560
18+854
22+160
22+260
22+265
22+453
Bell mouth portion
Deduct Culvert Gap

Side
B/S
B/S

B/S
B/S

Nos

Length
2
2
1
1
1
2
2
1
1
1
4
2
4

560
1066
140
130
370
1250
200
294
100
188
30
-8.1
-14.88

Bredth

Depth

4.934
4.934
14.2
14.2
14
4.934
4.015
10
7.5
7.5
4.934
4.934
14

0.15
0.15
0.2
0.2
0.15
0.15
0.15
0.15
0.2
0.2
0.15
0.15
0.15
Total

ItemNo.6

G.S.B(Close)

S.no
1
2
3
4
5
6
7
8
9

Chainage
From
To
18+000
18+560
18+854
19+920
19+920
20+060
20+799
20+929
21+300
22+550
22+550
22+750
20+930
21+300
Bell mouth portion
Deduct Culvert Gap

Side

Nos

B/S
B/S

Length
2
2
1
1
2
2
1
4
2
4

B/S
B/S

560
1066
140
130
1250
200
370
30
-8.1
-14.88

Bredth

Depth

1.67
1.67

0.11
0.11
0.2
0.2
0.11
0.11
0.11
0.11
0.11
0.11

1.67
0.75
7
1.25
1.67
7
Total

Item No.7
S.no
1
2
3
4

W.M.M.
Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Bell mouth portion
Deduct Culvert Gap

Side

Nos

Length

560
1206
1951
30
-22.98

Bredth

Depth

7.0
7.0
7
1.25
7

0.25
0.25
0.25
0.25
0.25
Total

Item No.8
S.no
1
2
3

Prime Coat
Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Bell mouth portion
Deduct Culvert Gap

Side

Nos

Length

560
1206
1951
30
-22.98

Bredth

Depth

7.0
7.0
7
1.25
7
Total

Item No.9
S.no
1
2
3

Tack coat
Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Bell mouth portion
Deduct Culvert Gap

Side

Nos

Length
2
2
2
4
2

560
1206
1951
30
-22.98

Bredth

Depth

7.0
7.0
7
1.25
7
Total

Item No.10 B.M.

S.no
1
2
3

Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Bell mouth portion
Deduct Culvert Gap

Side

Nos

Length

Bredth

560
1206
1951
30
-22.98

Depth

7.0
7.0
7
1.25
7

0.05
0.05
0.05
0.05
0.05
Total

Item No.11 S.D.B.C.


S.no
1
2
3

Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Bell mouth portion
Deduct Culvert Gap

Side

Nos

Length

Bredth

560
1206
1951
30
-22.98

7.0
7.0
7
1.25
7

Depth
0.025
0.025
0.025
0.025
0.025
Total

Item No.12 Shoulder


S.no
1
2
3

Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750
Deduct Culvert Gap

Side

Nos

Length
2
2
2
2

Bredth

560
1206
1951
-22.98

Depth

1.00
1.00
1.00
1.00

0.10
0.10
0.10
0.10
Total

Item No.20 Road marking


S.no
1
2
3

Chainage
From
To
18+000
18+560
18+854
20+060
20+799
22+750

Side

Nos

Length

Bredth

560
1206
1951

Depth

0.10
0.10
0.10

Total
50% of the total Quantity
Add 30% for Curve and Junctions
Total
Item No.21 C&G
S.no

Chainage
From
To
18+000
20+060

Side

Nos

Length
2

2060

Bredth
3.05

Depth

20+799
22+550

22+550
22+750

2
2

1751
200

3.05
2.63
Total

Item
Item
Item
Item

No.22 RCC M15 km,5km,200m Stones


No.22.1
200 meter stones
No.22.2
ordinary km stones
No.22.3
5km stones

Item No.23
Guard posts of 1.0mts height
Item No.24 Sign Boards
24.1 900mmEquilateral Triangular
24.2 600mmCircular
24.3 Route marker
Item No.25.1
Place indicator(1200X800)
Item No43 DLC
S.no

Chainage
From
To
18+560
18+854

Side

Nos

Length
1

Bredth

294

Depth

10

0.1

Total
Item No44 PQC
S.no

Chainage
From
To
18+560
18+854

Side

Nos

Length
1

Bredth

294

Depth
9

0.25

Total
Item No45 1:2:4 Plain cement concrete
S.no

Chainage
From
To
18+560
18+854

Side

Nos

Length
1

Bredth

294

Depth
1

Total

0.25

Quantity

Remarks

7539.6
6408.66
1100
15048.26 Sqm

Quantity

Remarks

8.1

7539.6
6408.66
1100
15048.26 Sqm

Quantity

Remarks

2191.488
1426.75
176.28
955.5 Rigidpavement
-9.24534
4740.7727 Cum

Quantity

Remarks

828.912
1577.893
397.600
369.200
777.000 Fullwidth
1850.250
240.900
441.000 Rigidpavement
150.000 Profilecorrection
282.000 Profilecorrection
88.81 Av. Breadth
-11.990
-124.992
6866.5856 Cum

7.44

Quantity

Remarks

205.744
391.6484
0.000
0.000
459.25
33
284.9 Fullwidth
16.50 Av. Breadth
-2.97594
-45.8304
1342.2361 Cum

Quantity

Remarks

980.00
2110.50
3414.25
37.50 Av. Breadth
-40.22
6502.04 Cum

Quantity

Remarks

3920.00
8442.00
13657.00
150.00 Av. Breadth
-160.86
26008.14 Sqm

Quantity

Remarks

7840.00
16884.00
27314.00
150.00 Av. Breadth
-321.72
51866.28 Sqm

22.98

1883
2863.00
1951

Quantity

Remarks

196.00
422.10
682.85
7.50 Av. Breadth
-8.04
1300.41 Cum

Quantity

Remarks

98.00
211.05
341.43
3.75 Av. Breadth
-4.02
650.20 Cum

Quantity

Remarks

112.00
241.20
390.20
-4.60
738.80 Cum

Quantity

Remarks

56
120.6
195.1
371.7
185.85
55.755
241.605 Sqm

Quantity
12566

Remarks

188.3
286.30

10681.1
1052
24299.1 Sqm
20 Nos
4 Nos
1 Nos

740 Nos

4
1
4

Quantity

Remarks

294
294 Sqm

Quantity

Remarks

661.5
661.5 Sqm

Quantity
73.5
73.5 Sqm

Remarks

22.98

1751

1st interm Deviation Statement for Improvement to Ba


Name of contractor:-

Arati Infratech Pvt.Ltd.,

Itemof work grouped under "Sub-heads"


and "Sub-works" of agreement

Unit

Rate

SQM
SQM
CUM
CUM
CUM
CUM
CUM
SQM
SQM
CUM
CUM
CUM
CUM
CUM
SQM
CUM
CUM
CUM
SQM
SQM
SQM

3.45
5.05
47.32
22.9
1556.02
1403.4
1560.16
30.53
11.09
7001.62
9485.88
481.2
61.89
132.36
12.31
436.89
1132
351.75
159.1
494.9
2.76

NOS
NOS
NOS
NOS

458.64
1644.93
2661.88
311.27

NOS
NOS
NOS

4509.7
3964.96
3859.26

AGT ITEM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22.1
22.2
22.3
23
24
24.1
24.2
24.3
25
25.1
26
26.1
26.2

Scarifying the existing bituminous road surface as


per
approved
and
technical
specification
Reworking
thedrawing
scarified
bituminous
surface
revision
)and
dierction
of Engineer
in
suitably
after
supplementing
the
base
materials
charge.
Loosening to a depth of 150 mm levelling and
compacting
original
supporting
Providing and
layingground
Granular
Sub base of coarse
graded
grading
-11
stone
screening
materials
as
Providing and laying Granular Sub base
of close
graded
grading
-11Macadam
stone screening
materials
as
Providing
Wet Mix
using crushed
stone
aggregate
as per
approved
drawimng
and
Providing and
applying
primer
coat to prepared
surface
of and
granular
basetack
withcoat
slowonsetting
bitumen
Providing
applying
the prepared
bitumen surface
setting Macadam
bitumen using
Providing
50mm with
thickrapid
Bituminous
crushed stone
materiala
and VG-30
Providing
25mmgrade
thick -11
Semi
Dense Bituminous
concrete using
crushed
stone with
grade
-11
Providing
compacted
shoulder
granular
materials by using
moorum ofwith
approved
quality
Construction
of embankment
approved
materials deposited
at site from
cutting and
Construction
of embankment
withroad
approved
materials obtained
from
borrow
Furnishing
and laying
turfing
withpits
live with
rodsall
of lifts
perennial
turf forming
grass on
embankment
Gravel
backing
to revetment
and
slopes suchslope
as
providing
filter
materials
(using
gravel
)
Rough stone dry packing in aprons and revetment
a
nd stone
pitching
in slopes
with hard
graniteand
Labour
for rough
stone
dry packing
in aprons
revetments
, stone
pitching
inslopes
boulder
Grouting aprons
and
revertments
23 and
cm deep
with
cc
(1:4:8)
using
25mm
size
hard
stone
granite
Providing road marking with hot applied
thermoplastic
compound
2.5mm
thick including
Clearing and grubbing
road
land including
uprooting
tank fixing
vegetation
,grass,
bushes,
Providing and
RCC M-15
grade
5th Km
stone
ordinary
km
stone
and
200
metre
stone
200metre stone
Ordinary km stone
5TH kilometrse stone
Providing and fixing RCC (1:2:4) guard posts of
1.00 mtrs and
height
andof15Retro
cm daimetre
including
Providing
fixing
-reflectorised
cautionery
,mandatory
and informatory sign as per
900mm
Equilateral
Triangular
600mm circular
Rcute marker sign 450*600mm
Providing and fixing of Retro -reflectorised
direction
place
identification
sign as per
Direction and
/place
indication
sign (1200*800mm)
Dismantling of prestress/rcc/cement concrete
structures
/stone masonary
structure including
Cement conceret
M-15 &m-20
RCC M-20 & above

SQM

9,973.33

CUM
CUM

240.08
613.62

26.3
27
28
29
30
30.1
30.2
31
31.1
31.2
31.3
32
33
34
35
36
37
38
39
40
41
42
43

44

45

RR stone masonary
Earth work in excavation in hard soil or gravelly
soil
for CDfilling
works
,retaining
wall
/toe wallquality
etc., as
Providing
clean
sand of
approved
in
foundation
trenches
of
structures
as
per
approved
Providing and laying cement concrete (1:3:6) in
foudation
retaining
wall toe
wall concrete
,CD works etc
Providing of
and
laying plain
cement
gardeM-15
in retaining wall toe wall ,CD works etc
In foundation
In Sub- structure
Providing and laying Reinforced cement concrete
garde
M-25 in foundation / sub structure /super
In foundation
In Sub- structure
In super structure
Providing and laying Reinforced cement concrete
gardeM-30
M-20grade
in parapet
& kerb
of (excluding
CD works etc
RCC
in wearing
coat
costs
of reinforcement
as per
drawing
Providing
and laying
150mm
thickand
flattechnical
hard granite
stone
embaded
with
cement
concrete
if grade
M-in
Providing and fixing in position drainage
spouts
deck
slab with
daimetre
GI pipes
Supplying
and 100mm
fixing, cutting,
bending
,binding
straightening
,placinh
HYSD
bars
confirming
Providing fitting and fixing 25mm thick salitexto
bituminous
boardholes
in expansion
joint,retaining
for finished
Providing weep
in CD works
walls
etc
with
100
mm
dia
AC
pipe
as
per
approved
Providing and laying of filter media /metal spall
backing
the rear
siedwith
of abutment
retaining
Providibgin TWO
coats
synthetic and
enamel
paints
of foundation
approved quality
and media
shade with
of approved
Filling in
and plinth
excavated
watering
and remaining
Sand fillingearth
in subincluding
base and
compacting
by using
vibrator
roller
aaaat
OMC
as
per
drawing
and
Providing dry lean concrete sub base by semimechanized method with coarse and fine
aggregates confirming to IS:383 the size of coarse
aggregate not exceeding 25mm ,aggregate
cement ratio not to exceed 15:1 ,aggregate
gardation as per table no600-1,cement contenet
Providing un reinforced dowel jointed cement
not be less than 150kg/cum including curing and
concrete
pavement
M-35 bydrawing
semi mechanized
compacting
to the required
and
method
over
a
prepared
sub
base
as
per
specifications including cost of and conveyance
of
approved
design
,using
43 grade
notin
less
all materials
as per
direction
of thecement
Engineer
charge.
than 40kg/ cum ,coarse and fine aggregate not
exceeding 25mm compacted and longitudinal
joints and cost and conveayance of all materials
,sealent primer finishing to lines as per approved
drawing inthe dierection of Engineer in charge.
Providing cement concrete (1:2:4) in foundation

CUM
CUM
CUM
CUM

167.23
89.90
236.10
4,047.42

CUM
CUM

4,402.67
4,555.06

CUM
CUM
CUM
CUM
CUM
CUM
NOS
MT
SQM
RM
CUM
SQM
CUM
CUM

5,716.75
6,699.78
6,639.88
5,407.93
5,617.00
2,578.66
335.70
65,849.51
1,212.00
100.390
1,041.740
46.60
49.450
299.84

CUM

3,520.88

CUM

6,122.96

CUM

5,344.90

with 12mm HGCB chips as per approved drawing


and technical specifications as per section
900,1000,1700,2100MORT&H (4th revision) in the
direction of Engineer in chrage.

46

47

Providing and laying of filter media /material spall


backing in the rear side of retaining wall or weep
holes to90mm size broken stone stone aggregate
to the soil and bigger size towards the wall weep
holes compacted to an firm cindition complete as
per section 900& 2500 of MORT&H specification
Random rubble stone masonary with cement
for roads and bridge work (4th revsion) as per
direction
of Engineer
in charge
.
mortar (1:4)
in foundation
and plinth
as per
approved drawing and technical specification as
per section 900,1000,&1400 of MORT&H

CUM

648.05

CUM

2,845.46

CUM

5,344.90

SQM

145.61

CUM
CUM

4,419.60
4,741.30

specification for roads and bridge work (4th


48

49

revsion) as per direction of Engineer in charge .


Providing and laying plain cement concrete(1:2:4)
in foundation of retaining wall toe wall ,CD works
etc complete as per drawing and technical
specification using High strength approved quality
cement and black hard grante stone crushed
metal as per section 900,1000,1700,2100 of
specifications for road and bridge work of ministry
of road transport &high ways (4th revision) and
including costs of all materials ,labour ,T&P, taxes
royally
complete
in all
respect
and as mortar
per
Cementetc
plaster
20mm
thick
with cement
direction of the Engineer in charge.
(1:4) over Random rubble hard granite stone
masonary in foundation and plinth as per
approvedcdrawing and technical specification as
per section 900,1400,1000,of MORT&H
specification for roads and bridge work (4th

revsion) as per direction of Engineer in charge .


50 substitute/Extra itemProviding and laying plain
cement concrete gardeM-15 in retaining wall toe
wall ,CD works etc complete as per drawing and
technical specification using High strength
approved quality cement and coarse granite
aggregate confirming to table no:1000-1 with form
work as per section 900,1000,1700,2100/2200 of
specifications for road and bridge work of ministry
of road transport &high ways (4th revision) and
including costs of all materials ,labour ,T&P, taxes
etc complete in all respect and as per
50.1 royally
In foundation
of the Engineer in charge.
50.2 direction
In Sub- structure
Total value of work (A)

Less Amount due to tender rate is 1.12% Less over SOR


Deviation Amount
Or Say
Figure (F) in words:- Rupees Forty Nine Lakh Fifty Five Thousand One Hundred Forty Three Only

Asst. Engineer
Dharmagarh R&B Sec-II

Superintending Engineer
Balangir (R&B) Circle,Balangir

or Improvement to Baldhaimal-Dharamgarh Road (SH-52) from 18/000km to 22/750km


Reference to Agrt No. - 75/P1/2014-15

As per Agrement

As per Execution

Quantity

Amount

Quantity

Amount

14909.18
13833.14
6102.11
6430.74
5920.36
1327.68
6475.75
25903
25903
1295.15
647.58
736
5932.11
20853
10076
1220.97
2121.82
320
5124.18
216.39
22273.9

51436.671
69857.357
288751.8452
147263.946
9212198.5672
1863266.112
10103206.12
790818.59
287264.27
9068148.143
6142866.1704
354163.2
367138.2879
2760103.08
124035.56
533429.5833
2401900.24
112560
815257.038
107091.411
61475.964
0
9172.8
6579.72
2661.88
230339.8
0
18038.8
15859.84
15437.04
0
19946.66
0
2410.4032
58827.7494

15048.26
15048.26

51916.497
75993.713

4740.77266

224333.3622712

20
4
1
740
4
4
4
2
10.04
95.87

20
4
1
740

0
10684544.4941916
1883694.086604
10144214.9256
794028.5142
575197.0452
9104955.65934
6167752.37658
355512.4848
367138.2879
3987477.36
124035.56
579167.5974
3001282.92
112560
815257.038
119570.3145
67065.516
0
9172.8
6579.72
2661.88
230339.8

4
4
4

18038.8
15859.84
15437.04

19946.66
0
2410.4032
58827.7494

6866.58558
1342.23606
6502.04
26008.14
51866.28
1300.41
650.20
738.80
5932.11
30126
10076
1325.66
2651.31
320
5124.18
241.605
24299.1

10.04
95.87

456.98
2641.39
328.9
241.53

456.98
3145.74
477.24
269.632

232.8
156
151
16.32
21.04
21.11
4
97.84
110
789
437.52
92.6
576.68
441

76420.7654
237460.961
77653.29
977573.3526
0
6360537.349
5104263.5842
0
1330859.4
1045165.68
1002621.88
88257.4176
118181.68
54435.5126
1342.8
6442716.0584
133320
79207.71
455782.0848
4315.16
28516.826
132229.44

332.09
273.07
324.84
16.32
29.33
30.5
4
136.449
110
789
437.52
130.6
650.68
441

76420.7654
282802.026
112676.364
1091313.94944
0
0
0
0
1898475.5075
1829508.9246
2156898.6192
88257.4176
164746.61
78649.13
1342.8
8985099.78999
133320
79207.71
455782.0848
6085.96
32176.126
132229.44

294

1035138.72

294

1035138.72

588

3600300.48

588

3600300.48

118.19

631713.731

118.19

631713.731

1444.7
1120.57

0
0

42.53

27561.5665

42.53

27561.5665

470

1337366.2

676.8

1925807.328

10

53449

14.4

76966.56

800

116488

1152

167742.72

874.79
950.56

3866221.884
4506890.128

0
0

0
0
76594385.498

83,058,308.79

930,253.06
82128055.73

857857.12
75736528.38

e Hundred Forty Three Only

Assistant Executive Engineer


Dharmagarh(R&B)Sub - Division
Dharmagada

191842.489

8/000km to 22/750km under SHDP scheme for the year 2013-2014

Excess Deviation

Less Deviation

0
0

0
0

0
1472346
20428
41009
3210
287933
36808
24886
1349
0
1227374
0
45738
599383
0
0
12479
5590
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Reason for Excess or less

Raising done from20/800


to21/250

Raising done from20/800


to21/250
4Nos of 2x2 mtr Box culvert
changed
into
6x3
Box
4Nos
of 2x2
mtr
Boxmtr
culvert
culverts
changed into 6x3 mtr Box
culverts

0
45341
35023
113741
0
0
0
0
567616
784343
1154277
0
46565
24214
0
2542384
0
0
0
1771
3659
0

0
0
0
0
6,360,537.35
5,104,264
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

changed into 6x3 mtr Box


culverts
New 6x3
R.C.C
Drains
changed. into
mtr
Box
culverts
.
New
R.C.C
Drains
changed into 6x3 mtr Box
culverts . New R.C.C Drains
As per work done
As per work done
4Nos of 2x2 mtr Box culvert
changed
into
6x3
Box
4Nos
of 2x2
mtr
Boxmtr
culvert
culverts
changed
into
6x3
Box
4Nos
of 2x2
mtr
Boxmtr
culvert
culverts
changed into
6x3 mtr Box
culverts
4Nos of 2x2 mtr Box culvert
changed
into
6x3
Box
4Nos
of 2x2
mtr
Boxmtr
culvert
culverts
changed into 6x3 mtr Box
culverts
changed into 6x3 mtr Box
culverts . New R.C.C Drains

4Nos of 2x2 mtr Box culvert


changed
into
6x3
Box
4Nos
of 2x2
mtr
Boxmtr
culvert
culverts
changed into 6x3 mtr Box
culverts

588441

4Nos of 2x2 mtr Box culvert


changed into 6x3 mtr Box
culverts

23518

4Nos of 2x2 mtr Box culvert


changed into 6x3 mtr Box
culverts

51255

4Nos of 2x2 mtr Box culvert


changed into 6x3 mtr Box
culverts

0
0

-3,866,221.88
-4,506,890

9,760,678.46

3,091,688.92

As per work done


As per work done

6,668,989.54
74,692.68
6594296.85
6594297

(6.54%excess over agrement value of 75736528.00 is here b


reccomended for approval)

Executive Engineer
Kalahandi (R&B) Division
Bhawanipatna

Chief Engineer
DPI & Roads
Odisha ,Bhubneswar

014

Remarks

ement value of 75736528.00 is here by