00
6.00
5.00
0.25
0.25
0.25
0.85
length
width
height, inside
thickness of concrete wall
thickness of bottom slab
thickness of top slab
reservoir bottom slab is
m
m
m
m
m
m
m
from NGL
wall
16mm dia grade 40 vertical bars spaced @
12mm dia grade 40 horizontal bars spaced @
12mm dia grade 40 top and bottom bars spaced @
Gravel bedding
0.1 m
0.15
0.20
0.20
G1
Volume of Concrete:
wall:
31.25 m3
top slab:
10.5 m
bot. slab:
10.5 m3
total:
5000 php/cu.m
52.25 m3
261250
Volume of excavation:
39.9 m3
Volume of G1 for gravel bedding
4.62 m3
Rebs:
wall 1 & 2
16mm vertical bars
12mm hor. bars
Additional len
Length of distribution
41 pcs @ 6.0 m
165 pcs @ 6.0 m
1600 m
200 households
4.5 m
100 mm dia main line
75 mm dia distribution line
4m
400 pcs
225 pcs
200 pcs
800 pcs
200 pcs
200 pcs
m
m
m
OC
OC
OC both ways
0.25 m
Reservoir P
0.85 m
Reservoir Ele
6.00 m
0.25 m
7.00 m
Top slab
0.25 m
5.00 m
NGL
Bottom slab
eservoir Elevation
0.25 m
Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation
Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Installation of Main Pipes 0.5 m from NGL for tank outlet
Concreting of Walls
Curing
stripping of formworks and Scaffoldings
Cleaning
Installation of Pipes
s
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Concreting
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Curing
Stripping of formworks for Top Slab
Testing of Pipe Connections for leakages
Troubleshooting
Punch listing
Manpower
Equipment
WEEK 1
WEEK 2
1 2 3 4 5 6 7 8 9 10
Laborer
3 3
Surveyor, Laborer
4 4
Laborer
Laborer
Laborer
Jack Hammer
Plate Compactor
Laborer
Laborer
Laborer
Laborer
Concrete Vibrator
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Project Manager
Project Manager
Project Manager
Jack Hammer
Jack Hammer
Fusion Welding Machine/ Generator
Fusion Welding Machine/ Generator
Fusion Welding Machine/ Generator
4
3
WEEK 2
WEEK 3
WEEK 4
WEEK 5
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
3
2
2
2
2
2
2
2
3
4
2
3
3
2
4
5
EK 5
WEEK 6
WEEK 7
WEEK 8
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
4
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
4
3
3
3
4
3
3
3
4
3
3
3
3
2
1
3
2
1
WEEK 9
WEEK 9
WEEK 10
WEEK 11
59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
3
2
1
3
2
1
1
3
1
3
3
3
3
4
2
2
2
2
2
CODE
100
100.01
100.02
200
200.01
300
300.01
300.02
300.03
300.04
400
400.01
500
500.01
500.02
500.03
500.04
500.05
500.06
500.07
500.08
500.09
500.1
500.11
600
600.01
600.02
600.03
600.04
600.05
600.06
600.07
600.08
700
800
900
Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation
Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Concreting of Walls
Cleaning
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Stripping of formworks
Installation of Pipes
Installation of Main Pipes 0.5 m from NGL for tank outlet
Excavation for Main Pipes 0.5 m from NGL
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Testing of Pipe Connections for leakages
Troubleshooting
Punch listing
CODE
100
100.01
100.02
200
200.01
300
300.01
300.02
300.03
300.04
400
400.01
500
500.01
500.02
500.03
500.04
500.05
600.01
500.06
500.03
500.11
500.07
600
600.02
600.03
600.04
600.05
600.06
600.07
600.08
500
500.08
500.09
500.1
500.03
500.11
700
800
900
Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation
Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Installation of Main Pipes 0.5 m from NGL for tank outlet
Concreting of Walls
Curing
stripping of formworks and Scaffoldings
Cleaning
Installation of Pipes
Excavation for Main Pipes 0.5 m from NGL
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Concreting
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Curing
Stripping of formworks for Top Slab
Testing of Pipe Connections for leakages
Troubleshooting
Punch listing
Non Working Days
Planned Work
WEEK 1
3 4 5
WEEK 2
9 10 11 12 13 14 15 16
6
51
0.0335195531
0.2849162011
0.0167597765
2
2
2
2
0.0111731844
0.0111731844
0.0111731844
0.0111731844
0.0111731844
0.0112
2
1
6
2
2
1
1
6
1
1
0.0111731844
0.0055865922
0.0335195531
0.0111731844
0.0111731844
0.0055865922
0.0055865922
0.0335195531
0.0055865922
0.0055865922
0.0112
10
10
10
10
10
10
6
0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0335195531
1
1
1
6
1
2
0.0055865922
0.0055865922
0.0055865922
0.0335195531
0.0055865922
0.0111731844
WEEK 3
0.0335195531
0.0335195531
0.0335195531
0.0167598
0.0112
0.0112
0.0112
0.0112
2
6
0.0111731844
0.0335195531
179
3.3519553073
3.3519553073
1
1
2
3
4
5
6
7
8
9
10
11
3.3519553073
12.8491620112
20.6703910615
28.4916201117
35.1955307263
46.9273743017
60.3351955307
70.3910614525
84.9162011173
97.7653631285
100
9.4972067039
12.8491620112
2
7.8212290503
20.670391061
3
WEEK 3
WEEK 4
WEEK 5
WEEK 6
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
0.0335195531
0.0335195531
0.0335195531
0.0335195531
0
0.0167598
0.0167598
0.0112
0.0112
0
0
0.0279329609
0
0
0
0.0223463687
0.0223463687
0.0223463687
7.8212290503
20.6703910615
3
7.8212290503
28.4916201117
4
6.7039106145
35.1955307263
5
11.7318435754
46.9273743017
6
WEEK 6
WEEK 7
WEEK 8
WEEK 9
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
0335195531
0.0223463687
0.0223463687
0.0223463687
0.0335195531
0.0335195531
0.0335195531
0.0335195531
0.0335195531
0.0223463687
0.0223463687
0.0335195531
0.0335195531
0.0335195531
0.0335195531
0
0
0.0112
11.7318435754
46.9273743017
6
0.0112
13.4078212291
60.3351955307
7
10.0558659218
70.3910614525
8
14.5251396648
84.9162011173
9
EK 9
WEEK 10
WEEK 11
63 64 65 66 67 68 69 70 71 72 73 74 75
0.0167598
0.0223463687
0.0223463687
0.0112
0
0.0279329609
0
0
0
0.0335196
0.2849162
0
0.0167598
0
0.0111732
0.0111732
0.0111732
0.0111732
0
0.0111732
0
0.0111732
0.0055866
0.0335196
0.0111732
0.0111732
0.0055866
0.0055866
0.0335196
0.0055866
0.0055866
0
0.0558659
0.0558659
0.0558659
0.0558659
0.0558659
0.0558659
0.0335196
0
0.0055866
0.0055866
0.0055866
0.0335196
0.0055866
0.0111732
396648
011173
9
0.0111732
0.0335196
0.0335195531
12.8491620112
97.7653631285
10
2.2346368715
100
11