HIGH PRIORITY ITEMS
AA - Placeholder for unknowns
Drawing
Location
Description
General view
address-Level 3 East : ii. Level 3 East Concourse l. Water pools away from floor drain
along Grid N7
A 00104 A3 Corridor 3
4W-AC3/4W-AC3
A 00103 B3 PC 9 10
3W-BAD/3W-BAD
1W-703/1W-703
3E-CL/3E-CL
A 00103 C3 gradin 2
3E-CG2/3E-CG2
address-Significant wear slab cracking parallel to installed saw cuts was observed in
the area of SE elevator 5.
Not to specification/drawings-Surface defects.
A 00103 C3 gradin 1
3E-CG1/3E-CG1
A 00103 C3 gradin 4
3E-CG4/3E-CG4
A 00103 C3 gradin 4
3E-CG4/3E-CG4
A 00103 C3 gradin 4
3E-CG4/3E-CG4
A 00103 B3 Stair F
3W-106/3W-106
address-Cracks observed at landings and in treads, along long axis of stair. Cracks
also generating at lowest landing at joint between structural steel support and concrete
foundation support. (Cannon SVR 022)
A 00103 D3 stairs
3E-104/3E-104
A 00105 A3 corridor 2
5W-201/5W-201
A 00101 A3 Exercise
STORAGE
1W-303/1W-303
2302
2739
2817
5876
MEDIUM PRIORITY ITEMS
AA - Placeholder for unknowns
491
AA - Placeholder for unknowns
509
540
542
561
562
563
A 00103 A3 Stairs A
address-Cracks observed at landings and in treads, along long axis of stair. Cracks
also generating at lowest landing at joint between structural steel support and concrete
foundation support. (Cannon SVR 022)
587
588
591
677
682
694
711
ID
712
790
794
817
819
820
Type
Arch - Substantial - Door Hardware
Arch - Substantial - Design issues
AA - Placeholder for unknowns
AA - Placeholder for unknowns
AA - Placeholder for unknowns
AA - Placeholder for unknowns
Arch - Occupancy - Gypsum Board
823
825 Arch - Substantial - Painting
826 Mech - Substantial - Sheet Metal
Elec - Substantial - Building Automation
827 System
Elec - Substantial - Audio Visual & Sound
829 Systems
831 Arch - Substantial - Painting
AA - Placeholder for unknowns
833
835 AA - Placeholder for unknowns
836 AA - Placeholder for unknowns
850 Arch - Substantial - Masonry Units
853 General - Substantial - Final Clean
Arch - Substantial - Design issues
919
922 AA - Placeholder for unknowns
972 AA - Placeholder for unknowns
AA - Placeholder for unknowns
1349
1379 Elec - Substantial - AV System
Arch - Substantial - Architectural Woodwork
Drawing
A 00101 A3 Exercise
STORAGE
A 00103 A3 gradin 1
A 00103 B3 Mech
A 00103 B3 Prepa area
A 00103 A3 First aid
A 00103 B3 Prepa area
A 00103 B3 Prepa area
Location
3W-G1/3W-G1
3W-409/3W-409
3W-407/3W-407
3W-405/3W-405
3W-407/3W-407
3W-407/3W-407
3W-404/3W-404
3W-404/3W-404
3W-404/3W-404
Description
Not to specification/drawings-Latch plate missing - non-rated door
A 00103 A3 TR
A 00103 A3 Prepa area
3W-302/3W-302
3W-403/3W-403
3W-403/3W-403
3W-403/3W-403
3W-401/3W-401
3W-PCX1/3W-PCX1
1W-602/1W-602
General view
A 00102 C3 Stairs
A 00103 C3 spectator
concourse
A 00103 C3 Food prep
General view
FOP/FOP
2E-20X/2E-20X
3E-CQA/3E-CQA
General view
General view
Design Issue-13) 1) bottom stair on exterior club stairs is extremely short. Please have
Cannon and PDC verify. Concrete was cast to raise the railing, S and N stairs Level 4.
General view
1453
1454
1460
1461
ID
Type
AA - Placeholder for unknowns
Drawing
General view
Location
Building - General/Building - General
Description
address-12.) 11) wiring mesh for the speaker to be submitted
Level 6.1
6.1W/Level 6.1
address-11.) 1) Guard rails Level 6.1 : CoH requests a review of safety standards for
cleaning purposes ONSS to provide mesh to prevent people climbing.
General view
General view
General view
General view
Design Issue-11.) 8) List of obstructed view seats to be sent to the CoH 24 on the
lower East.
address-2.)7) Column Level 3 West issue with the vertical pipe to be closed?
Fastening to be reviewed
Design Issue-17.) 5) visiting coaches change room, not as per drawing: Millwork to be
reviewed.
Not to specification/drawings-17.) 6) Electrical/ smart boards in TC Offices...was this
fixed as per layout provided by TiCats? Quote for plug modification to be sent to IOS.
General view
General view
General view
General view
Design Issue-17.) 8) Seat count/ obstructed views- currently, TiCats have sat in each
seat and counted more than 700 obstructed seats (count continues). Cannon to
review.
address-17.) 14) n/s power- understanding the variation was not submitted however
understand that there are power and data capabilities in the existing light standardsplease confirm. No power/ data provision. VD required.
address-General Notes of Sept 30/14 , 2) Letter from AHU Factory to confirm the
warranty to AHU after smoke fire.
address-16.3 Upper East VOM area- stair depth (safety issue?)
General view
General view
General view
General view
1469
1470
1471
1474
1480
1481
1482
1483
1494
1498
1499
1507
1510
1520
1527
FF&E - Substantial - Kitchen Equipment
1531
1535
1536
1537
ID
Type
FF&E - Substantial - Kitchen Equipment
Drawing
Location
A 00102 D3 Concessions areas 2E-406/2E-406
1538
1543
2E-403/2E-403
2E-400/2E-400
3E-400/3E-400
3E-400/3E-400
3E-405/3E-405
3E-405/3E-405
3E-405/3E-405
3E-405/3E-405
3E-405/3E-405
3E-405/3E-405
3W-407/3W-407
Building - General/Building - General
General view
A 00104 A3 stairs H
4W-105/4W-105
A 00104 A3 stairs H
4W-105/4W-105
A 00104 A3 stairs H
4W-105/4W-105
A 00104 A3 Stairs G
4W-102/4W-102
A 00104 A3 Stairs G
4W-102/4W-102
2E-400/2E-400
3E-400/3E-400
Description
Not to specification/drawings-Pop and ice machine not operational at time of
inspection
Not to specification/drawings-Stainless steel trims missing on concession side for pop
lines
Not to specification/drawings-Stainless steel chase for pop lines missing
address-Hot heated drawers to be commissioned
Not to specification/drawings-Pop and ice machine not operational at time of
inspection
Not to specification/drawings-Stainless steel chase for pop lines missing
Not to specification/drawings-Pop and ice machine not operational at time of
inspection
Not to specification/drawings-Stainless steel trims missing on concession side for pop
lines
Not to specification/drawings-Stainless steel chase for pop lines missing
Not to specification/drawings-Pop and ice machine not operational at time of
inspection
Not to specification/drawings-One (1) popcorn holder broken
Not to specification/drawings-Stainless steel trims missing on concession side for pop
lines
Not to specification/drawings-Stainless steel chase for pop lines missing
Not to specification/drawings-Stainless steel chase for pop lines missing
Not to specification/drawings-Warmer 708 is not set in place as per drawing
Not to specification/drawings-Cup dispensers are missing
review-Level one East: 1.1 SE Stair J North concrete guard has through-wall cracks in
several locations. Pin and take a picture
review-Level One East: 3. SE Stair J crack across first landing, aligned with transition
from steel to concrete support structure below no relief cut or movement joint as per
NW Stair J and NE Stair M radiates. Pin and take a picture
1684
1845
1847
1848
1862
1863
ID
Type
AA - Placeholder for unknowns
Drawing
A 00105 A3 Stairs G
Location
5W-102/5W-102
5W-332/5W-332
General view
General view
General view
General view
General view
General view
address-2. Level 2 East iv. a. Remove oversized sealant infill between door frame and
concrete curb, infill with concrete and seal to door frame. confirm work is complete
General view
General view
General view
General view
General view
General view
General view
General view
General view
address-Level 3 East : I. General: a. Fill all CMU wall inside corners and movement
joints flush with sealant c/w backer rod as required by width/depth
address-Level 3 East : ii. Level 3 East Concourse e. Repair cracks in wear slab
radiating from Elevator 6 shaft
address-Level 3 East : ii. Level 3 East Concourse k. Repair cracks in wear slab
including at heads of seating access aisles adjacent to Grid N1, Grid N7, Grid S2 to
Stair N2 three cracks at North corner and door of Elevator 5. Lobby
address-Level 3 East : ii. Level 3 East Concourse n. At Stair N1, JM has left his/ her
initials in the concrete repair
Not to specification/drawings-2.3 West Building 1 Level 1 West xvi. 1W-325 Vestibule
b. Seal the t-bar along the East corridor
Not to specification/drawings-2.3 West Building 1 Level 1 West xvi. 1W-325 Vestibule
c. Fill the concrete block wall where it meets the floor. Confirm required work is
complete.
address-2.4 East Building 1. Level 1 East: Stair J: a. At least one crack in concrete
running up the bottom flight
address-2.4 East Building 1. Level 1 East: Stair J: b. Crack across lower landing where
concrete aligned with concrete support wall below
address-2.4 East Building 1. Level 1 East: Stair J: h. Seal joint flush at transition from
stair concrete to wear slab concrete
1864
Arch - Substantial - Washroom Accessories
1962
2110 AA - Placeholder for unknowns
AA - Placeholder for unknowns
2111
General - Substantial - Final Clean
2156
AA - Placeholder for unknowns
2159
AA - Placeholder for unknowns
2249
AA - Placeholder for unknowns
5W-105/5W-105
5W-105/5W-105
2251
Description
address-Hole in corner of pad, cracking and rough finish. Wearing slab affected only not a waterproofing or structural issue
Not to specification/drawings-Replace scratched stall door.
address-Rough patches around column
address-Pad seams rough and cracked. Wearing slab affected only - not a
waterproofing or structural issue
Not to standards-Bldg General: 2.1 xiv: remove rust stains, oil, weld scorches, and
other foreign material stains on finished concrete floors
address-Bldg General: 2.1 xvii: install backer rod and sealant at joints between tops of
CMU walls and concrete /precast slabs
address-2. Level 2 East ii : South East Accessible Seating Platform: f. At front slab
edge metal panels, seal all edges typical
address-Level 2 East: South East Accessible Seating Platform h. Crack in concrete
wear slab from bottom of Stair R7 to infill wall below Stair J. Wearing slab affected only
- not a waterproofing or structural issue
Not to specification/drawings-2. Level 2 East ii : South East Accessible Seating
Platform I. Install sealant at tops and sides of refinished metal infill panels throughout
2252
2265
2292
2295
2301
2304
2330
2331
2344
2345
2349
ID
Type
AA - Placeholder for unknowns
Drawing
General view
Location
Building - General/Building - General
General view
General view
General view
General view
A 00106 A3 stair G
6W-102/6W-102
A 00106 A3 corridor 2
6W-AC2/6W-AC2
2E-201A/2E-201A
2E-205/2E-205
2E-QA/2E-QA
2E-208/2E-208
2352
2353
2354
Description
address-2.4 East Building 1. Level 1 East: Stair M : d. Seal joints in concrete curbs at
mid- landing repair cracks in curbs
address-2.4 East Building 1. Level 1 East: Stair M : e. Patch concrete around column
base L2 head of lower flight
address-2.4 East Building 1. Level 1 East: Stair M : f. Repair cracks in L2 concrete
wear slab at floor drain adjacent to head of lower flight
Not to specification/drawings-2.4 East Building 1. Level 1 East: Stair M : h. Install
flashing against side wall of Elevator 6 shaft, at upper flight concrete block wall
2355
Struc - Substantial - Metal Stairs and
2357 Balustrades
AA - Placeholder for unknowns
2358
AA - Placeholder for unknowns
2360
2490 AA - Placeholder for unknowns
2497 AA - Placeholder for unknowns
Elec - Substantial - AV System
2508
Arch - Substantial - Signage and Graphics
2516
2541 AA - Placeholder for unknowns
2560 AA - Placeholder for unknowns
AA - Placeholder for unknowns
2667
AA - Placeholder for unknowns
2669
AA - Placeholder for unknowns
2733
2828 FF&E - Substantial - Kitchen Equipment
Arch - Substantial - Design issues
2842
Mech - Substantial - Air Handling Units
2869
2876 AA - Placeholder for unknowns
Elec - Substantial - Other
2888
3021 AA - Placeholder for unknowns
Arch - Substantial - Gypsum Board
3039
Arch - Substantial - Gypsum Board
3042
A 00103 A3 PCX
3W-PCX1/3W-PCX1
A 00106 A3 corridor 2
6W-AC2/6W-AC2
A 00106 A3 B elevator vestibule 6W-202/6W-202
address-OSG-1 change 1 lid that has no holes to holes. Confirm work has been
complete
Not to specification/drawings-Pop lines incomplete
Design Issue-Sound attenuation - confirm with BKL if this is a concern.
A 00104 A3 Bar
4W-309/4W-309
A 00104 A3 Group sales suite B 4W-315/4W-315
A 00101 B3 Uniform laundry
storage
A 00103 C3 spectator WR
A 00106 A3 hawkers room
1W-401/1W-401
A 00102 D3 Stairs
A 00102 D3 Spectator WR
male
A 00102 D3 Spectator WR
female
2E-104/2E-104
2E-307/2E-307
2E-306/2E-306
3E-304/3E-304
Exterior of West Stands
ID
Type
Arch - Substantial - Gypsum Board
3049
Mech - Substantial - Gas Fired Units
Drawing
Location
A 00102 C3 Spectators WR
2E-302/2E-302
female
A 00102 D3 Concessions areas 2E-406/2E-406
3073
AA - Placeholder for unknowns
5W-30X/5W-30X
1W-323/1W-323
1W-375/1W-375
General view
General view
3105
Arch - Substantial - Tiling
3111
5W-332/5W-332
Building - General/Building - General
3146
3167
3168
3176
3203
3215
Exterior East Stands/Exterior East
Stands
3222
Arch - Substantial - Sheet Metal Flashing and A 00101 D3 elevators
3227 Trim
AA - Placeholder for unknowns
A 00101 D3 elevators
1E-205/1E-205
1E-205/1E-205
3228
AA - Placeholder for unknowns
3229
AA - Placeholder for unknowns
3230
AA - Placeholder for unknowns
3232
AA - Placeholder for unknowns
3236
Arch - Substantial - Masonry Units
3239
3240 AA - Placeholder for unknowns
General view
Description
Not to specification/drawings-Mud trim. Both sides of washroom.
Not to specification/drawings-L 2 NE Concession- gas regulator needs to be minimum
1m away from electrical equipment, currently it is about 850mm from future light
fixture.
address-Door hardware complete per code. Additional hardware requested through
Change Order.
grout missing / inadequate-Grouting required
Not to specification/drawings-East Side: sprinkler exit from East side to West side,
labelling still required.
Not to specification/drawings-West SIde: TMV-1 for showers for visitors 1W-322 and
1W-332 will need temperature gauge provided for discharge supply (for visual
temperature delivery)*
Not to specification/drawings-West SIde: TMV-1 for shower rms 1W-375, 1W-382, 1W391, 1W-395 will need temperature gauge provided for discharge supply (for visual
temperature delivery)*
address-West Building: 1. Building Exterior: I. Stair A and South facade: a. Prefinished
metal flashing over masonry veneer not installed slab edge.
address-Level 6 West: ii. Concrete exterior floor cracks adjacent to Elevator 4
Brackets loose/missing-2.4 East Building: III. Elevator 5 and vestibule 1E-201: b.
Attach standpipe plate to wall
address-2.4 East Building: iv. West wall of East parking: a. Veneer block not installed
to underside of slab deck above, c/w exposed spray insulation detail for closure
required
Not to specification/drawings-2.4 East Building 1. Building Exterior V. D. Seal to
underside of slab edge at Stair M install prefinished metal flashing.
address-2.4 East Building 1. Building Exterior v. e. Above door E1E-205, the thermal
barrier continuity appears incomplete , with veneer block as cold bridge. Jog in wall
east of door not as per drawings.
address-2.4 East Building 1. Building Exterior vi. North facade: a. Resolve stair M open
block air space at east end
address-2.4 East Building 1. Building Exterior vi. North facade: b. Overhead door H1E200 requires soffit, and vapor/thermal/air barrier continuity.
address-L6W Elevator 4 lobby , slab crack
address-East Bldg Exterior L1E exposed interior block partition
Not to specification/drawings-West Bldg Exterior: Door 1W-202 repair block work.
Confirm required work is complete.
address-West Bldg Exterior: Door 1W-202 requires soffit, insulation continuity
ID
Type
AA - Placeholder for unknowns
Drawing
General view
3246
Mech - Substantial - Diffusers, Registers,
3291 Grilles, Louvers, Vents
Arch - Substantial - Glass and Glazing
Location
Exterior East Stands/Exterior East
Stands
Description
address-19. 7 Gas Valve at North East to be protected: issue of code for access to be
clarified.
Not to specification/drawings-West Side L1 : Compactor Bay 1W-513 : Damper
actuator not installed. Remove cover on transfer grille on opposite wall.
Not to specification/drawings-East Level 1: Players Equipment Storage windows to be
transaction type as scheduled. Installed window to be changed out for transaction
window.
address-General : East head wall cracks to be monitored and repaired. Dirt and
equipment marks to be cleaned. East head wall repairs required at mis- aligned rail
fasteners and other locations
address-West Stands : level 4 head wall, precast repairs required due to damage
during construction activities, four locations. Coordinate repair
address-Grandstand coating at east stands between N6 and N7 (Stair R6 aisle) shows
irregular surface texture and coverage, footprints, and other deformations in the
coating. Area shall be resurfaced.
address-2West finish trim and window closures required atLevel 2 offices , Area A
Confirm work is complete
Not to specification/drawings-2E-309 Fire hose cabinet outside of 309 , contractor
review and correct angle of fire hose connection for proper operation and clearance.
A 00101 A3 Laundry
1W-306/1W-306
General view
FOP/FOP
General view
General view
General view
2E-309/2E-309
General view
FOP/FOP
address-FOP : manhole covers have domed tops, covers should be replaced with flat
tops that are flush with players walking surface. Confirm work is complete
A 00103 A3 Merchandise
A 00103 A3 PCX
A 00103 B3 PC 9 10
A 00103 B3 PC 9 10
3W-400/3W-400
3W-PCX1/3W-PCX1
3W-BAD/3W-BAD
3W-BAD/3W-BAD
A 00103 B3 PC 9 10
General view
3W-BAD/3W-BAD
North Plaza
General view
General view
A 00102 D3 Stairs
2E-104/2E-104
3307
3312
3313
3342
3343
3344
3346
3442 AA - Placeholder for unknowns
3469 Arch - Substantial - Painting
3477 AA - Placeholder for unknowns
AA - Placeholder for unknowns
3479
3481 AA - Placeholder for unknowns
Elec - Substantial - Other
3490
Arch - Substantial - Fixed Audience Seating
3529
3532
3537
ID
Type
Ext - Substantial - Security Fences
Drawing
General view
Location
Exterior East Stands/Exterior East
Stands
General view
A 00101 D3 elevators
1E-205/1E-205
3W-407/3W-407
A 00106 A3 spectator WR
female
A 00105 A3 Stairs G
6W-301/6W-301
A 00101 C3 Janitors
A 00101 C3 FOP Storage
Community
A 00101 D3 For Equip Storage
Events
A 00101 D3 End zone
A 00103 C3 spectator WR
1E-509/1E-509
1E-502
address-Cannon Design Architects Field Report # 37: 4. Level 5 West III. Stairs G and
H: a. Repair cracks in many treads at 1/3 points
address-Fill gap between wall and access cover. who is doing this work?
review-Repair broken slabs at base of column. Confirm repair is complete.
G1E-500/G1E-500
address-Seal conduit return above/ near 1E-604 doors. Who is to do this work?
1E-305/1E-305
3E-400/3E-400
4W-300/4W-300
7W-301/7W-301
A 00107 A3 broadcast
A 00101 B3 Suite 3 washroom
7W-602/7W-602
1W-374/1W-374
3W-303
A 00103 A3 First aid
A 00103 A3 Prepa area
A 00107 A3 Security spotters
booth
A 00103 C3 spectator WR
A 00103 C3 Food prep
A 00103 C3 lift
A 00103 C3 lift
A 00103 C3 lift
3W-303/3W-303
3W-405A/3W-405A
3W-403/3W-403
7W-500/7W-500
3E-304/3E-304
3E-402/3E-402
3E-CL/3E-CL
3E-CL/3E-CL
3E-CL/3E-CL
3547
3631
Description
Not to specification/drawings-Cannon Design Architects Field Report #32:
Observations of work in progress 2.1 General: East Side: I. Perimeter security fencing
post at North parking entrance is damaged and bent.
address-the City rejected the green- stained concrete paving at the south end of the
plaza
address-Cannon Design Architects Report # 34: 35.2. East Building: General : 2. Level
2 Elevator 5 Lobby : a remove oversized sealant infill between door frame and
concrete curb infill with concrete and seal to door frame. Confirm work is complete
3674
3708
3741
AA - Placeholder for unknowns
3789
3829 AA - Placeholder for unknowns
AA - Placeholder for unknowns
3864
AA - Placeholder for unknowns
3871
3899 Arch - Substantial - Painting
Mech - Substantial - Hydronic Piping Systems
3900
Arch - Substantial - Architectural Woodwork
3956
Arch - Substantial - Tiling
3960
3969 Arch - Substantial - Door Hardware
AA - Placeholder for unknowns
4053
4214 Arch - Substantial - Painting
4218 Arch - Substantial - Tiling
4237 Elec - Substantial - Other
Arch - Substantial - Architectural Woodwork
4523
4566 AA - Placeholder for unknowns
4581 AA - Placeholder for unknowns
4599 AA - Placeholder for unknowns
4600 AA - Placeholder for unknowns
4601 AA - Placeholder for unknowns
5W-102/5W-102
ID
Type
AA - Placeholder for unknowns
Drawing
Location
A 00102 D3 Concessions areas 2E-405/2E-405
Description
address-Trim temporary conduit flush to wall and patch.
address-seal pipe cuts at wall. Confirm what work, if any, is required here.
Building Signage
General view
Building Signage
General view
General view
General view
Building Signage
Building Signage
Building Signage
General view
Building Signage
General view
Building Signage
General view
Building Signage
General view
Building Signage
General view
General view
General view
Building Signage
Building Signage
Building Signage
General view
Building Signage
General view
Building Signage
General view
Building Signage
General view
Building Signage
General view
Building Signage
General view
General view
Building Signage
Building Signage
4627
4628
Arch - Substantial - Painting
4630
4713 AA - Placeholder for unknowns
Arch - Substantial - Signage and Graphics
5244
Arch - Substantial - Signage and Graphics
5245
5246 Arch - Substantial - Signage and Graphics
5247 Arch - Substantial - Signage and Graphics
Arch - Substantial - Signage and Graphics
5248
Arch - Substantial - Signage and Graphics
5249
Arch - Substantial - Signage and Graphics
5250
Arch - Substantial - Signage and Graphics
5251
Arch - Substantial - Signage and Graphics
5254
5256 Arch - Substantial - Signage and Graphics
5257 Arch - Substantial - Signage and Graphics
Arch - Substantial - Signage and Graphics
5258
Arch - Substantial - Signage and Graphics
5260
Arch - Substantial - Signage and Graphics
5261
Arch - Substantial - Signage and Graphics
5263
5264
ID
Type
Arch - Substantial - Signage and Graphics
Drawing
General view
Location
Building Signage
General view
Building Signage
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
General view
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
General view
General view
General view
General view
General view
General view
General view
Site Services Drawing
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Building Signage
Site Services/Site Services
1W-310/1W-310
5269
5270
5271
5273
5274
5276
5277
5278
5279
5281
5282
5284
5285
5286
5287
5288
5289
5292
5293
5294
5295
5296
5297
5298
7W-303/7W-303
1W-375/1W-375
General view
General view
5301
5303
5306
Elec - Substantial - Other
5313
Arch - Substantial - Design issues
Description
Not to specification/drawings-INT-6.0 G1_FR-CA Change Service Client to Services
clients
Not to specification/drawings-INT-6.2 G3_FR-CA promenade suprieure instead of
Promanade
Not to specification/drawings-INT-7.0 G1_FR-CA Ascenseur
Not to specification/drawings-INT-7.1 G1_FR-CA Ascenseur
Not to specification/drawings-INT-7.1 G1_FR-CA Salon des joueurs
Not to specification/drawings-INT-7.1 G1_FR-CA Stockage de vlos
Not to specification/drawings-INT-9.0 G2_FR-CA SORTIE instead of sortie
Not to specification/drawings-INT-9.0 G2_FR-CA Vestiaires
Not to specification/drawings-INT-10.0 G2_FR-CA Tribune de la presse
Not to specification/drawings-INT-10.0 G2_FR-CA promenade
Not to specification/drawings-INT-10.0 G2_FR-CA Niveau suite
Not to specification/drawings-INT-10.0 G2_FR-CA Niveau suite
Not to specification/drawings-INT-10.0 G2_FR-CA Salle du club
Not to specification/drawings-INT-10.0 G2_FR-CA Promenade infrieure
Not to specification/drawings-INT-10.0 G2_FR-CA salle de presse
Not to specification/drawings-INT-10.0 G2_FR-CA Vestiaires d'quipe
Not to specification/drawings-INT-10.0 G2_FR-CA PROMENADE SUPRIEURE
5877
Arch - Substantial - Preformed Metal Wall
6223 System
Arch - Substantial - Preformed Metal Wall
6224 System
ID
6225
6226
6227
6228
Type
Arch - Substantial - Preformed Metal Wall
System
Arch - Substantial - Preformed Metal Wall
System
Arch - Substantial - Preformed Metal Wall
System
Arch - Substantial - Preformed Metal Wall
System
Elec - Substantial - Communications
Drawing
General view
Location
Building - General/Building - General
General view
General view
General view
A 00102 A3 Director US
scouting office
A 00106 A3 spectator
concourse
A 00105 A3 B private suite 12
2W-324/2W-324
Description
Not to specification/drawings-Suspected thermal bridge at local joints on Level 07 East
Elevation, South end
Not to specification/drawings-Suspected thermal bridge at east Stands, north Elevator
Tower (north elevation shown)
Not to specification/drawings-Suspected thermal bridge at local joints on Level 07 East
Elevation, North End
Not to specification/drawings-Suspected thermal bridge at southeast corner of
southwest elevator tower
Not to specification/drawings-Placement of data outlets is unacceptable to tenant.
6W-201/6W-201
5W-327/5W-327
7W-303/7W-303
5W-202/5W-202
2W-601/2W-601
Design Issue-Head room issue with brace on south wall of elevator lobby. Levels 4, 5,
& 6?
address-Studio rooms 2W-601, 2W-602, 2W-603 per room data sheet to have
multilevel and dimmer light switching. Switching requires programming.
address-Door to exterior is not accessible - threshold too high, width insufficient.
General view
General view
A 00102 C3 Portable
concession
A 00102 D3 empty 2
2E-204/2E-204
6234
AA - Placeholder for unknowns
6240
Elec - Substantial - Other
6250
AA - Placeholder for unknowns
6255
6258
6262
6263
6264
6265
6266
6272
AA - Placeholder for unknowns
2E-20E/2E-20E
6274
AA - Placeholder for unknowns
6279
AA - Placeholder for unknowns
6280
Arch - Substantial - Design issues
6281
6282 AA - Placeholder for unknowns
AA - Placeholder for unknowns
6286
AA - Placeholder for unknowns
6290
A 00102 C3 Spectators WR
2E-301/2E-301
male
A 00102 C3 Concessions prepa 2E-407/2E-407
area
A 00107 A3 stairs D
7W-400/7W-400
address-2E 301 washroom, install concrete grout between curbs and door frames
A 00103 C3 PC X
A 00103 D3 stairs
3E-PCX/3E-PCX
3E-104/3E-104
A 00101 A3 Exercise
STORAGE
1W-303/1W-303
address-3E Concourse, remove rust stains including along field side curb
address-Level 1E stair M remove staining of concrete, including mid landings and
apparent paint at movement joint at lowest mid landing
address-Level 1W Stair A and south facade, holes in masonry joints
ID
Type
AA - Placeholder for unknowns
Drawing
A 00107 A3 broadcast
Location
7W-602/7W-602
A 00103 A3 PCX 2
A 00101 B3 Main Electrical
Room
General view
3W-PCX2/3W-PCX2
1W-703/1W-703
5W-303/5W-303
1E-604/1E-604
6W-304/6W-304
3W-QA/3W-QA
7W-303/7W-303
1W-706/1W-706
1W-601/1W-601
1W-601/1W-601
1W-702/1W-702
1W-702/1W-702
1W-702/1W-702
6291
6292 AA - Placeholder for unknowns
Elec - Substantial - Other
6297
Elec - Substantial - Other
6300
Elec - Substantial - Other
6301
6311 Elec - Substantial - Other
AA - Placeholder for unknowns
6368
AA - Placeholder for unknowns
6370
Elec - Substantial - Other
6373
Elec - Substantial - Other
6375
Elec - Substantial - Communications
6417
Elec - Substantial - Communications
4W-501
Description
address-PDC Report - Level 6 W, broadcast room, work counter supports are not
casework panels
address-Level 3 W exterior, repainting, IMP marks.
Not to specification/drawings-Any missing arc flash hazard labels shall be installed as
indicated in final arc flash study. SVR 017
Not to specification/drawings-SVR 017-Contractor to ensure panel schedules are
typed.
Not to specification/drawings-SVR 017-Circuit labelling is not in the correct format in
Suite S3.
Not to specification/drawings-Lighting control panel wiring ongoing in 1E-604
address-Accessibility Report 2.13 - 6W-304 Universal Toilet Room is provided with a
vending machine that is mounted too high and is not cane detectable.
address-Accessibility Report 2.17 - Concession stands have protrusions on either end
that extend into the path of travel
Not to specification/drawings-SVR-15 Booths in general: Pot Lights have not been
installed in a straight line
Not to specification/drawings-SVR-15 Some panel directories are hand-written. Panel
directory shall be neat and type-written
Not to specification/drawings-SVR-001 1W-706 BIX IDC blocks shall be clearly
labelled per specification
Not to specification/drawings-SVR-001 (1W-601) Empty patch panel positions are not
closed. Contractor shall place blank plates where connectors have not been installed.
6420
Elec - Occupancy - Communications
6421
Elec - Substantial - Communications
6424
Elec - Substantial - Communications
1W-601/1W-601
1W-707/1W-707
6425
Elec - Substantial - Communications
6430
Elec - Substantial - Communications
6431
Elec - Substantial - Communications
1W-702/1W-702
1W-702/1W-702
6432
6433
6434
ID
Type
Elec - Substantial - Communications
Drawing
A 00101 A3 Warm up area
Location
1W-360/1W-360
1W-361/1W-361
1W-360/1W-360
1W-360/1W-360
1W-360/1W-360
A 00102 B3 TR
2W-705/2W-705
A 00102 A3 2W701
2W-701/2W-701
A 00103 A3 Spectators WC
3W-300/3W-300
A 00104 A3 EL
4W-502/4W-502
A 00104 A3 TR
4W-500
A 00105 A3 TR
5W-500/5W-500
A 00105 A3 B corridor TR EL
5W-502/5W-502
A 00107 A3 TR
7W-603/7W-603
A 00107 A3 TR
7W-603/7W-603
1E-603/1E-603
1E-603/1E-603
A 00101 D3 elevators
1E-606/1E-606
A 00101 D3 elevators
1E-606/1E-606
A 00101 B3 Green RM
changing
1W-391/1W-391
6439
6441
6442
6443
6444
6451
6456
6465
6469
6474
6479
6482
6486
6488
6489
6490
6493
6494
6497
Description
Not to specification/drawings-SVR-001 1W-700; All optical fibre patch panels shall be
labelled and unused ports shall be capped
Not to specification/drawings-SVR-001 1W-700 : Every copper BIX patch panel shall
be labelled as per specification
Not to specification/drawings-SVR-001 1W-700: Multipair cabling from MER to 1W700 and 1W-702 is not OSP. Cabling shall be removed and replaced.
Not to specification/drawings-SVR-001 1W-700: Multipair cabling from MER stops on
level one room 1W-700 before travelling to above floors. Contractor shall install
cabling continuously from MER to each TR
Not to specification/drawings-SVR-001 1W700: Multipair cabling from MER stops on
level one room 702 before travelling to above floors. Contractor shall install cabling
continuously from MER to each TR.
Not to specification/drawings-SVR-001 2W-705 : Every copper BIX patch panel shall
be labelled per specification
Not to specification/drawings-SVR-001 2W-701: Every copper BIX patch panel shall
be labelled per specification
Not to specification/drawings-SVR-001 3W-600 : Every copper BIX patch panel shall
be labelled per specification.
Not to specification/drawings-SVR-001 4W-503: Every copper BIX patch panel shall
be labelled per specification.
Not to specification/drawings-SVR-001 4W-500: Every copper BIX patch panel shall
be labelled as per specification
Not to specification/drawings-SVR-001 5W-500: Every copper BIX patch panel shall
be labelled as per specification
Not to specification/drawings-SVR-001 5W-502: Every copper BIX patch panel shall
be labelled as per specifications
Not to specification/drawings-SVR-003 7W-603: all optical fibre patch panels shall be
labelled and unused ports shall be capped
Not to specification/drawings-SVR-003 7W-603: every copper BIX patch panel shall be
labelled as per specifications
Not to specification/drawings-SVR-001 1E-602: all optical fibre patch panels shall be
labelled and unused ports shall be capped.
Not to specification/drawings-SVR-001 1E-602: 25th pair on copper voice back bone
cable has not been terminated as per specifications. Terminate 24th and 25th at port
24 of patch panel.
Not to specification/drawings-SVR-001 1E 606: all optical fibre patch panels shall be
labelled per specification
Not to specification/drawings-SVR-001 1E-606: every copper BIX patch panel shall be
labelled per specifications
Not to specification/drawings-M-SVR 21 item 28 TMV-1 (thermostatic mixing valves)
for visitors changing/shower rooms 1-W 322 and 323 need to be reviewed for
temperature discharge of 35C/95F .
ID
Type
Fire - Substantial - Sprinkler System
Drawing
A 00105 A3 TR
Location
5W-501/5W-501
Description
Not to specification/drawings-M-SVR 23 Item 71 5W-501 : single upright; Sprinkler
Engineer to confirm coverage on either side of beam and distance of head from ceiling
A 00105 A3 TR
5W-501/5W-501
1W-503/1W-503
1W-703/1W-703
6501
6502
6503
Fire - Substantial - Standpipe and Hose
6506 System
Mech - Substantial - HVAC Air Filtration
6542
LOW PRIORITY ITEMS
Ext - Substantial - Landscaping
6W-502/6W-502
General view
3509
Ext - Substantial - Concrete Paving
5426