SCHOOL OF CHEMICAL ENGINEERING

Design of a shell and tube


hydrocarbon preheater
Group : 3
MODULE CODE: ENCH3EC

Name: Waseem Amra


Student Number: 210512847
Date: 30/09/2013
Academic Supervisors:

Mr. C.A Baah


Dr S.L Kiambi

STATEMENT OF AUTHORSHIP

DESIGN OF A SHELL AND TUBE HYDROCARBON PREHEATER

by

Waseem Amra
I hereby declare that this design and the associated report is my own work (except where formally
acknowledged in the section headed (Acknowledgements)

Student Number:

Signature: ..

Date: .

Abstract
This report serves as a guideline to the design of a shell and tube heat exchanger for the client
ABC chemicals, who wish to embark on the expansion of their current facilities. The objective
entails the preheating of a hydrocarbon binary mixture of hexane and n-heptane, via the heating
fluid dowtherm-A, which is sent to a distillation column. The design follows the standards of the
Tubular Exchanger Manufactures Association (TEMA) and the exchanger is of TEMA type AFT.
Using the specified information given by ABC Chemicals the heat exchanger is designed to
operate under worse conditions, which is taken as winter and corresponds to the hydrocarbon
binary mixture to be heated from 19 to 77.15 C. The heat duty of the heat exchanger was
calculated to be 1456.87 kW. Estimation of the heat transfer coefficient on the tube and shell side
was done using the Sieder-Tate and Bell Delaware method, respectively. The overall heat transfer
coefficient was determined by an iterative procedure which converged to a value of 220.43
W/m2.K after six iterations. The pressure drops on the tube and shell side were evaluated using
Franks adaption and the Bell Delaware method, respectively. It was found that the pressure drop
on the tube side was within specification however the pressure drop on the shell side was low.
Mechanical design of the heat exchanger was performed in order to evaluate the effects of internal
pressure on the vessel hence corresponding minimum thickness and flanges were able to be sized
for the vessel. A technical drawing was also done and is provided in the Appendix. Cost analysis
was performed using two methods: mass-basis of the exchanger and Purohits method. Purohits
method was selected as it takes into account several factors which the mass-basis does not include.

Table of contents
Abstract .......................................................................................................................................................... i
1. Introduction .............................................................................................................................................. 1
2. Theoretical Background ............................................................................................................................ 2
2.1. Background: ....................................................................................................................................... 2
2.2. Physical Properties: ............................................................................................................................ 2
2.3. Thermal Design: ................................................................................................................................. 3
2.3.1. Mass Balance: ............................................................................................................................. 3
2.3.2. Energy Balance: ........................................................................................................................... 3
2.3.3. Velocity, tube and shell specifics: ............................................................................................... 4
2.3.4. Estimation of heat transfer coefficients: .................................................................................... 5
2.3.5. Pressure Drop.............................................................................................................................. 6
2.4. Mechanical Design: ............................................................................................................................ 7
2.5. Costing: .............................................................................................................................................. 8
3. Results ....................................................................................................................................................... 9
4. Discussion................................................................................................................................................ 11
5. Conclusion ............................................................................................................................................... 15
Appendix A Nomenclature ....................................................................................................................... A1
Appendix B - References ............................................................................................................................. B1
Appendix C Process Instrumentation Diagram ........................................................................................ C1
Appendix D Source Data ..........................................................................................................................D1
Appendix E - Sample Calculations ............................................................................................................... E1
Appendix F Technical Drawing ................................................................................................................. F1

1. Introduction
A major process in industry is the heating of fluids. Generally this operation is done in a shell
and tube heat exchanger. Optimisation of such a unit is of high importance as this process is a
major contributor to operational costs. Hence, when designing a shell and tube heat exchanger
consideration is taken to minimise fabrication and operational cost. (Geankoplis, 1993)
The client, ABC chemicals, wishes to introduce a new chemical into the market and have
decided to expand on their current facilities. This expansion involves the installation of a new
distillation tower for the separation of a binary mixture of hexane and n-heptane. Further the
client wishes to install a heat exchanger before the line of the distillation tower, which will
preheat the mixture before entry into the distillation tower. This will lead to better separation as
the mixture components will be closer to their boiling points. (Seader, Henley, & Roper, 2010).
The process description is as follows: A hydrocarbon binary mixture of hexane and n-heptane is
sent to a fractionating column which operates isobarically at 101.3 kPa absolute pressure. 38500
kg/hr of the binary mixture is pumped from a storage tank to a shell and tube preheater and then
to the fractionating column. This stream contains 46.4 and 53.6 mass percentage. The
temperature of the fluid in the storage tank depends on the time of year and averages from 19C
in winter to 32C in summer. The preheater increases the fluid temperature to 77.15C. The
binary mixture is heated by dowtherm-A from a hot reservoir. The temperature of the dowthermA in the hot reservoir is maintained at 98.7C. The dowtherm-A leaves the preheater at 54.45C
and is then pumped to a cold reservoir. The distillate is condensed and cooled in a condenser.
Table (6) shows the stream data for the heat exchanger and column.

The objective task is to design the preheater before the column. The design entails the use of a
rear end head type setup for pull-through with floating head. This report serves to show the steps
involved in the designing of the preheater.

1|Page

2. Theoretical Background
2.1. Background:
The shell and tube heat exchanger is the most common type of heat transfer equipment used in industry. The
design consists of a bundle of tubes enclosed in a cylindrical shell, with the ends of the tubes fitted in tube
sheets that separate the shell and tube side fluids. The advantage of this construction is as follows:
1.

A large surface area in a small volume.

2.

It is easily cleaned.

3.

There is a wide range of materials used for fabrication, hence caters for most processes.

4.

Good mechanical layout.

Functioning of this unit is as follows: Process fluids flow through the shell and tube side. Heat transfer
between these fluids is through conduction through the tube wall and convection through the films at the outer
and inner tube walls.
Following TEMA standards a heat exchanger is divided into three parts. These are: the front end, shell, and
rear end. Figure (1) shows the divided sections:

Figure 1

Choice of each section depends on the process conditions, which is outlined in the discussion.

2.2. Physical Properties:


The evaluation of physical properties for the binary mixture was estimated using the following mixing rules:
2|Page

Property

Equation

Equation no.

Heat Capacity (J/kg.K)

(2.1)

Density (kg/m3)

(2.2)

Conductivity (W/m.K)
(

)
(

Viscositiy (Pas.s)
(

(2.3)
( )
)

(2.4)
)

(2.5)

Table 1 Mixing Rules

Use of the mixing rules is valid as the system operates under ideal conditions and the chemical constituents of
the binary components are similar.

2.3. Thermal Design:


The procedure adopted in this report is outlined in figure (8).
2.3.1. Mass Balance:

The mass balance of the exchanger, following the conservation of mass, reduces to a simple in=out as there is
no accumulation or generation terms.
2.3.2. Energy Balance:

The primary objective for this design is to determine the required heat transfer surface area for a specified
heat duty using the available temperature differences. (Sinnott, 2005)
(2.6)
(2.7)
Equation (2.6) gives the heat transfer duty of the exchanger and equation (2.7) gives the heat duty of either the
shell/tube side. The overall heat transfer coefficient ( ) is the sum of several individual resistances and is
defined as follows:

3|Page

(2.8)
The driving force for the transfer is the temperature difference between the fluids. For counter-current flow
heat exchangers the driving force is taken as the logarithmic mean temperature difference and is defined as
follows:
(

) (
(
(

(2.9)

)
)

However the nature of counter-current flow assumes several other factors to be constant - overall heat transfer
coefficient, and that the temperature difference of the streams are not excessively large. Hence, a correction
factor is applied to allow for the departure from true counter-current flow and the temperature difference is
found using the following equations:
The correction factor

is found via parameters R and S, which is used to find

(2.10)
from correction charts,

shown in figure (2).


(2.11)

(2.12)

Once the heat duty is known it is possible to compute the surface area off heat transfer, assuming an initial
value for the overall heat transfer coefficient. Using equation (2.6) rearranged:
(2.13)
2.3.3. Velocity, tube and shell specifics:

Velocity of each side has to be determined in order to proceed with the estimation of heat transfer coefficients.
Using the determined heat transfer area the number of tubes and number of tubes per pass can be determined
using the following equations:
(2.14)
(2.15)

(2.16)
Dimensions of the tubes are chosen from the Standard of the Tubular Manufacturers Association (TEMA)
handbook.
4|Page

The tube velocity is then determined using the following equation:

(2.17)

Tube side velocity has an optimum range between 1-2 m/s recommended by Sinnott(2005). With the amount
of tubes known, the computation of the tube bundle, pitch and shell diameter can be found using the following
( )

equations:

(2.18)
(2.19)

(2.20)
Where

is the bundle diameter clearance found from figure (3). Bundle diameter clearance is taken into

account as spaces must be left in the pattern of tubes on the tube sheet to accommodate the pass partition
plates. The bundle diameter clearance depends on what rear end head type configuration is used. The
parameters

and

depend on what tube arrangement has been chosen.

The shell side velocity is determined by first assuming a baffle spacing ( ) and baffle cut( ). Baffle spacing
is taken as a ratio between 0.2 1 times the diameter of the shell and typically a baffle cut of 25% is used.
Shell side velocity is determined using the following equations:
(

(2.21)

(2.22)
(2.23)
Optimum range for shell side pressure drop: 0.3 1 m/s (Sinnott, 2005)
2.3.4. Estimation of heat transfer coefficients:
Since heat is transferred via convection the heat transfer coefficients for each side have to be determined,
which in turn allows for the overall heat transfer coefficient to be estimated.Correlations are used to determine
the heat transfer coefficients with the help of the following dimensionless numbers:
Prandtl Number:

(2.24)

Reynolds Number:

(2.25)

Tube side: Estimation of the tube side heat transfer coefficient is found using the Sieder-Tate correlation:
(

(2.26)
5|Page

Shell side:
Estimation of the shell-side heat transfer coefficient is found using the Bell Delaware Method:
(2.27)
In Bell Delaware method the heat-transfer coefficient is estimated from correlations for flow over ideal tubebanks, and the effects of leakage, bypassing and flow in the window zone are allowed for by applying
correction factors. (Sinnott, 2005)
The ideal cross flow coefficient (

) is determined by the following equation:

( )
The correction factors

and

(2.28)

depend on various structural parameters which is shown in Table (3).

The tube row correction factor ( ) and window correction factor (


respectively. The bypass correction factor (

) is found from figure (4) and figure (5),

) and leakage correction ( ) are determined using the following

equations:
*

(
*

) )+

(2.29)

(2.30)

2.3.5. Pressure Drop


The tube side and shell side pressure drop were determined using Franks Adaption and the Bell Delaware
method, respectively. Recommended ranges for pressure drops of liquids according to Sinnott (2005) are as
follows:
Viscosity (mN s/m2)

Pressure (kPa)

< 1 mN s/m2

35kPa

1 to 10 mN s/m2

50-70 kPa
Table 2 Pressure Ranges

Franks Adaption is as follows:

( )(

(2.31)

6|Page

For the shell-side the pressure drops in the cross-flow and window zones are determined separately, and
summed to give the total shell-side pressure drop.
(2.32)
(

(
*

(2.33)

)
(

(2.35)

(
The bypass (

) and leakage (

(2.34)

(2.36)

) correction factors are determined in the same manner as for the heat

transfer coefficients.
(

(2.37)

(2.38)

(2.39)

(2.40)

(2.41)
(2.42)

(2.43)

(2.44)

(2.45)

(2.46)

)
)

(2.47)

(2.48)

Table 3 Parameters for Bells Method

2.4. Mechanical Design:


For a vessel under internal pressure the minimum thickness of the cylindrical shell, taking corrosion into
account, is given by the following equation:
(2.49)

7|Page

The minimum thickness for a torispherical head is determined using the following equation:
(

(2.50)

The minimum thickness for a flat end is determined using the following equation:

(2.51)

Tube plates separate the shell and tube side fluids and are the main support of the shell and tube heat
exchanger. They are exposed to the pressures on both sides and are designed to withstand maximum
differential pressure. The ligament efficiency of tube plates is given by:
(2.52)
Minimum thickness of the plates to resist bending is:

(2.53)

Minimum thickness of the plates to resist shear stress is:


(2.54)
The Harker equation is used to evaluate the nozzle diameter and is given by:
(2.55)
Standard flanges are used and are sized according to nozzle diameters. Dimensions for the flanges are
provided in any standard neck flange table.

2.5. Costing:
The cost of the heat exchanger was evaluated using two methods. These are Purohits method and a mass
basis method. Purohits method includes the effects of the shell and tube diameter, tube construction, wall
gage, pitch, layout angle and length. The mass basis method is used by finding the volume of the equipment
and multiplying it by density.

(2.56)

The summation term takes into account the volumes of the shell, tubes, domed heads, flanges and tube
plates. Analysis for the volume of equipment is shown in Table (11) in Appendix E. The price of carbon
steel is taken as

/kg.

8|Page

3. Results
Equipment No. (Tag) H-101
Descript. (Func) Hydrocarbon PREHEATER
Sheet No. 1

Heat Exchanger data sheet

1
2
3
4
5
6
7
8
9
10

Operating data
SIZE
SHELLS PER UNIT
SURFACE PER UNIT

7.32m long

TYPE
No. OF UNITS

SHELL AND TUBE


1

270 m2
Performance of one Unit
SHELL SIDE
HYDROCARBON MIXTURE
38500
IN
OUT
none
38500

FLUID CIRCULATING
TOTAL FLUID ENTERING (kg/h)
VAPOUR (kg/h)
LIQUID (kg/h)
SPECIFIC GRAVITY LIQUID (pref=
998kg/m3)
VISCOSITY LIQUID (Pa.s)
SPECIFIC HEAT (J/kg.K)
THERMAL CONDUCTIVITY
(W/m.K)
TEMPERATURE (C)
OPERATING PRESSURE (kPa)
VELOCITY (m/s)
NO. OF PASSES
PRESSURE DROP (kPa)
FOULING COEFFICIENT (W/m2.K)
HEAT EXCHANGED (kW)

OUT

1.016
0.00132
1734

0.1219

0.1216

101.3
0.48
2
CALC
.
5000

11
12

None
68364

77.15

35
1457

IN

0.6503
0.00027
2343

19

ALLO
W

TUBE SIDE
DOWTHERM-A
68364

13
14
15
16

98.7

17
18
19
20

54.45
101.3
1.04
4

ALLO
W

37

70

CALC.
2000

MTD CORRECTED (C)

21

65

22
23
24
25
26
27
28

24.6

Construction of one Shell


DESIGN PRESSURE (kPa)
DESIGN TEMPERATURE (C)
TUBES
No.
SHELL
TUBE SHEET
STATIONARY
BAFFLES

614

111
100

OD (mm)
ID (mm)

19.05
827

TYPE

LONG BAFFLE
TYPE
MATERIAL OF
CONSTRUCTION
SHELL SIDE
CORROSION ALLOWANCE SHELL SIDE
WEIGHT OF ONE UNIT EMPTY (tonnes)

THICKNESS(mm) 3.4036
THICKNESS
5
FLOATING
Y
HEAD
SPACING(mm) &
SEGMENTED
CUT
LONGITUDINA
L
SEAL
CARBONSTEEL
TUBE SIDE
2
6.72

LENGT
H

7.32

PITCH (mm)

23.81

30
31

32

413mm, 25%

33

ALL-METAL T4 SEAL
CARBON-STEEL
TUBE SIDE

34
2

PRESSURE
CROWN RADIUS
KNUCKLE RADIUS

827
82.7

mm
mm

38

FLAT-END
PRESSURE
THICKNES
S

35
36
37

Heads
TORISPHERICAL
111 kPa

29

111

kPa

11.64

mm

39
40
41

9|Page

THICKNESS

42
43

mm

44
Tube Plate
45
DIFFERENTIAL PRESSURE
THICKNESS
DIAMETER

111
16.3
827

46
47
48

kPa
mm
mm

49
Flanges and Nozzles
50
PRESSURE
NOMINAL SIZE
OUTER DIAMETER
BRANCH THICKNESS
d1
D
b
h1
d4
f
BOLTING
d2
k
d3
h2
r

SHELL
111
250
139.7
8
139.7
375
22
60
365
3
M16
22
335
290
15
12

TUBE
111
350
355.6
12
355.6
490
22
62
415
4
M20
22
445
385
15
12

51
52
53
54
56
57
58
59
60
61
62
63
64
65
66
67
68
69

kPa
mm
mm
mm
mm
mm
mm
mm
mm

mm
mm
mm
mm
mm

Table 4 - TEMA SHEET

COSTING
Exchanger cost (R)

668249.6

Insulation cost ( R)

53459.97

Installation cost ( R)

173744.9

Total cost ( R)

895454.5

Table 5 - Costing

10 | P a g e

4. Discussion
The heat exchanger specified by the client was a shell and tube type heat exchanger. There are several
other types of heat exchangers that could be chosen, such as the double-pipe and cross-flow heat
exchanger. However, the shell and tube type heat exchanger is the most common type of heat transfer
equipment used in industry (Geankoplis, 1993). The shell and tube type heat exchanger is preferred over
others due to several advantageous factors. The setup of a shell and tube type heat exchanger gives a large
surface area in a small volume. Since the vessel is cylindrical in nature, and often has domed ends, it
enables good pressure operation. Due to its high frequency in industry there is a wide range of fabrication
techniques, which are well established, and there is a wide range of materials which can be used for
construction. Further, and one of the most important factors, a shell and tube type heat exchanger is easily
cleaned since it can be dismantled easily, hence allows it to cater for fluids which are corrosive in nature
(Sinnott, 2005).
The client specified that a rear end head type configuration for pull-through with floating head design be
selected. In this type of configuration the tube sheets are made small enough so that it and its gasketed
bonnet may be pulled completely through the shell. This allows for ease of inspection and cleaning on the
shell-side (Wolverine, 2007). A disadvantage of the pull-through design is that the clearance between the
outermost tubes in the bundle and the shell must be made greater to accommodate the floating head
flange, allowing fluid to bypass the tubes. For the front end stationary head type a channel and removable
cover was selected. This type of configuration allows for ease of cleaning for the tube-side (Hyprotech,
2002).

The heat exchanger is designed to operate under worst conditions, which is in winter where the fluid has
to be heated from 19 to 77.15 C. This corresponds to the maximum possible heat duty that could occur as
this is the greatest temperature difference achieved.

The Dowtherm-A heating fluid was chosen to be place in the tube-side and the hydrocarbon binary mixture
was placed in the shell-side. The factors involved in deciding the choice of fluid allocation are: Corrosivity,
fouling, temperatures, pressures, viscosity and flowrate. Both fluids are considered non-corrosive, hence
corrosivity was not considered as a determining factor in fluid allocation. The fouling factor of the DowthermA at 0.0002 m2.K/W is lower than that of the binary mixture, which is 0.0005 m2.K/W. Generally, the more
fouled fluid is put in the tube-side, however the pull-through with floating head allows for ease of cleaning in
11 | P a g e

the shell-side therefore this factor was catered for. Further the Dowtherm-A temperature and mass flowrate is
higher than that of the binary mixture, which is favoured for in selection of the tube-side. Allocating fluids
with the lowest flowrate to the shell side generally gives the most economical design (Sinnott, 2005). Both
streams operate at the same pressure hence this was not a determining factor. Hence, the factors contributing
for the dowtherm-A to be in the tube-side outweighed the factors of the binary mixture in the tube-side.
The physical properties of the fluids were determined using mixing rules, equations (2.1 2.5). The pure
component properties for the binary mixture, which consists of hexane and n-heptane, are acquired from
Perrys Chemical Engineers handbook. All properties are taken at the mean temperature of the inlet and outlet
stream. Mixing rules are acceptable for the binary mixture as the chemical nature of the components are
similar, as well as the system behaves ideally.

The procedure adopted for the thermal design is shown in figure (8). The counter-current flow arrangement
was chosen for the heat exchanger. Although there are other types of flow arrangements, such as co-current
and cross flow, the counter-current arrangement proves to be the most effective. The selected tube arrangement
is for a square pattern. This provides further ease of cleaning of the tubes. All dimensions within the design
were selected keeping in accordance with the TEMA standards. The tube dimensions selected were for a 19.05
mm (

) outer diameter of BWG gage 10. Tube length of 7.32 m (24ft.) was chosen. Hence, the heat

exchanger fitted in the allocated space of 10 by 5 m, and was chosen to be in the horizontal position.
The given specifications by the client made it possible to determine the heat duty of the exchanger. The
unspecified mass flowrate for dowtherm-A was then determined and found to be 18.99 kg/s which is higher
than the shell-side flowrate. Evaluation of the temperature correction factor was done using figure (2). The
parameters R and S did not fall within the correction chart for a one-shell and single-tube pass heat exchanger.
Hence, the correction factor was found on a two-shell pass with multiple of four passes, which is figure (2).
Four tube passes was selected for the design of the heat exchanger. The overall heat transfer coefficient was
first assumed as 180 W/m2.K, which allowed for the heat transfer area to be evaluated. The range for the
overall heat transfer coefficient of dowtherm and heavy oils is 50 to 300 W/m2.K (Sinnott, 2005). The design
was then iterated, following the procedure in figure (8), until convergence yielded a zero percentage error
between the assumed and calculated overall heat transfer coefficient. The iteration is shown in Table (5) and
the overall heat transfer converged at the value of 220.43 W/m2.K. The use of equation (2.8) takes into account
fouling coefficients and the material of construction.
The velocity of the tube-side was found to be 1.036 m/s which just fell within the range of 1 2 m/s
(Sinott, 2005). An increase in the tube-side velocity in principle is possible if a smaller tube is chosen
12 | P a g e

however the amount of tubes with the bundle will increase, which in turn will increase fabrication costs.
Furthermore, the pressure drop will become excessively large leading to the minimum thickness which is
required for the vessel under internal pressure to increase, increasing fabrication costs. The heat transfer
coefficient on the tube-side was determined using the Sieder-Tate correlation. The Sieder-Tate correlation
provides an accurate representation for the convective heat transfer coefficient. dowtherm-A is considered
a non viscous liquid, hence for non-viscous liquids the viscosity ratio of equation (2.26) is taken as unity
(Sinnott, 2005). The velocity on the shell-side was found to be 0.48 m/s which falls in the range of 0.3 to
1.0 m/s (Sinnott, 2005). Baffle spacing of 413 mm was selected using the factor discussed in Section
(2.3.3). This yielded a total of 17 baffles. The baffle spacing is acceptable as it is above the minimum
required baffle spacing of 165.4 mm and the selected spacing falls within the optimum range of 0.3 0.5
times the diameter of the shell, which corresponds to 248.1 to 413 mm. The shell-side heat transfer
coefficient was determined using the Bell Delaware method. The Bell Delaware method is estimated from
correlations which take into account flow over ideal tube-banks, the effects of leakage, bypassing and
flow in the window zone and is allowed for by applying correction factors (Sinnott, 2005).
The tube-side pressure drop was evaluated using Franks Adaption, which is the most realistic pressure
drop estimation (Sinnott, 2005). The pressure drop on the tube-side was found to be 64.6 kPa. This falls
within the range given in Table (2). The pressure drop on the shell-side was estimated using the Bell
Delaware method. The pressure drop was calculated to be 2.43 kPa which does not fall within the ranges
of Table (2). However, the Bell Delaware method is a highly inaccurate representation of pressure drop
for a divided shell. For such designs, a divided-flow model based on Tinkers work should be used.
Devores method can also be considered, providing the exchanger layout conforms with those covered in
his work (Sinnott, 2005). As a cross-check estimation of the shell-side pressure drop using Kerns method
was evaluated and this yielded a pressure drop of 37.53 kPa, which lies in Table (2). Hence Kerns
method is a better approximation for a divided shell. Calculation of the overall heat transfer coefficient
takes into account fouling factors on each side.

The shell diameter was determined to be 827 mm. Hence the L/D ratio fell within the optimum range.
Carbon steel was the selected material for the construction of both the shell and tube side, since both the
fluids are considered non-corrosive. The calculated total number of tubes is 614, with 153 tubes per pass.
The TEMA type for this design is A-F-T. Where A is the channel and removable cover, F represents
two-shell pass and allows for true counter-current flow and T represents pull-through with floating head.

13 | P a g e

Recommendation of a rear end head type of a U-tube is advised as there is an ease in bundle removal and
is the simplest design.
The mechanical design followed the standards of PD5500 and ASME8 heat exchanger design. For the
shell under internal pressure of 111 kPa, it required a minimum calculated thickness of 2.27 mm, inclusive
of corrosion allowance. However, according to the standards of PD5500, the minimum thickness of a
shell, less than 1 m in diameter, under internal pressure and which must be able to withstand its own
weight and any incidental loads is 5 mm, inclusive of corrosion allowance. Hence 5 mm was chosen. For
TEMA type AFT the channel and removable cover and pull-through with floating head requires a flat end
and a domed head. A torispherical domed head was selected as the heat exchanger is a low pressure
system. The torispherical head was designed with crown radius equal to the shell diameter and 10% of the
crown radius was used as the knuckle diameter to ensure a ratio of knuckle of crown to radii greater than
0.06 to prevent buckling (Sinnott, 2005). The minimum thickness required for the torispherical head is
2.417 mm, inclusive of corrosion. For ease of fabrication purposes, the thickness of the head is taken as
the same thickness of the shell wall. The minimum thickness of the flat end was evaluated to be 13.64
mm, inclusive of corrosion allowance. The tube thicknesses under internal pressure was found to be less
than the value used in the thermal design, hence the thermal design thickness was used. One could reduce
costs by reducing the thickness of the tubes, however this would lower the tube velocity. The nozzle
diameter was evaluated using the inlet-velocity relationship to area and Harkers equation. The nozzle
diameters using Harkers equation was small for the corresponding inlet flowrate hence the inlet-velocity
relationship to area was used to determine the diameter of the nozzles. Because there was no phase change
and change in velocity, an assumption was made that the outlet nozzle sizes are the same as the inlet.
Appropriate flanges were sized for the nozzles. The tube plate minimum thickness was evaluated by
considering two factors i.e. bending and shear stress. However, the value calculated for both of these
factors was less than the standard sized thickness of 16.3 mm. Hence the standard size of 16.3 mm,
inclusive of corrosion allowance, was used.

Costing was determined using two methods. These were the mass-basis method, in which the volume of
each component was determined and multiplied by the density, and Purohits method. The estimated costs
take into account insulation, installation and labour of the vessel (Purohit, 1983). The mass-basis method
yielded a cost price of R 1121186 and Purohits method yielded a cost of R 895454.5. Purohits method
was selected as it takes into account several factors which the mass-basis method does not account for.

14 | P a g e

5. Conclusion

A shell and tube heat exchanger of TEMA type AFT was selected where A represents a
channel and removable cover, F two-shell pass with longitudinal baffle and T
represents pull-through with floating head design.

With the choice of winter conditions selected as worst operating conditions the heat duty
was determined to be 1456.87 kW.

Dowtherm-A was selected to be placed in the tubes.

Evaluation of the thermal design estimated the use of 614 tubes with 4 tube passes.

The overall heat transfer coefficient was found to be 220.43 W/m2.K

Mechanical design of the exchanger yielded appropriate minimum thicknesses and sizing
of nozzles and flanges.

Purohits method was selected for cost analysis and the total cost of the heat exchanger is
R 895454.5.

15 | P a g e

Appendix A Nomenclature

Nu
b
pt

Heat transfer area (m2)


Clearance area between the bundle and the shell(m2)
Total leakage area(m2)
Area of a pass (m2)
Maximum area for cross flow in the shell (m2)
Shell-to-baffle clearance area (m2)
Tube to baffle clearance area (m2)
Area of the window-zone (m2)
Bundle Cut (%)
Baffle Cut (%)
Design Factor
Baffle-to-shell clearance
Diametrical tube=to=baffle=clearance (mm)
Stress concentration factor
Tube internal diameter (m)
Tube outer diameter (m)
Shell diameter
Bundle Diameter (m)
Minimum thickness (mm)
Design stress
Temperature correction factor
Heat transfer coefficient (W/m2.K)
Height from baffle cord to top of tube bundle (m)
Baffle cut height (m)
Heat transfer factor
Friction factor
Thermal conductivity (W/m.K)
Baffle spacing (m, mm)
Tube length (m)
Mass flow rate (kg/s)
Number of constrictions in the cross flow section
Number of sealing strips
Number of tubes
Number of tubes per pass
Number of tubes in the window zone
Number of restrictions for cross flow in the window
zone
Nusselts Number (Dimensionless)
Angle subtended by baffle chord (rads)
Pitch (mm)

Pr
Pi

Prandtl number (Dimensionless)


Operating pressure (kPa)

A
Ab
AL
Apass
As
Asb
Atb
AW
Bb
BC
Cph
cS
ct
Cs
di
do
DS
Db
e
f
Ft
h
Hb
Hc
jf
jt
k
lb
L
m
NCV
Ns
Nt
Ntp
NW
Nwv

A1 | P a g e

P
Q
Ra
Ra

RC
RK
RW
SA
t1
t2
T1
T2
TLM
tp
us
ut
uw
uz
Uo
V
Vtube
VBI

wall

Maximum pressure difference (kPa)


Heat Duty (kW)
Bundle cross sectional area to the total bundle cross
sectional area
Bundle cross sectional area to the total bundle cross
sectional area
Crown radius (m)
Knuckle radius (m)
Ratio of the number of tubes in the window zone to
the total number of tubes
Surface area (m2)
Cold inlet temperature (C)
Cold outlet temperature (C)
Hot inlet temperature (C)
Hot outlet temperature (C)
Logarithmic mean temperature difference (C)
Minimum thickness to resist bending/shear
stress(mm)
Velocity in the shell-side (m/s)
Velocity in the tube-side (m/s)
Velocity in the window zone (m/s)
Geometric mean velocity (m/s)
Overall heat transfer coefficient (W/m2K)
Volume (m3)
Volumetric flowrate in tubes (m3/s)
Viscosity blending index
Ligament efficiency
Viscosity (Pa.s)
Viscoisty at the wall (Pa.s)
Density (kg/ m3)
Table 6

A2 | P a g e

Appendix B - References
Anonymous. (2006). Overview of Pressure Vessel Design to AS 1210. Chicago: Proplin.
Barbee, J., Davis , M., Davis, S., & Gaddis, D. (2007). Standards of the Tubular Exchanger
Manufactures Association. New York: Tubular Exchanger Manufactures Association.
Geankoplis. (1993). Transport Processes and Unit Operations. New Jersey: Prentice-Hall
International.
Harding, J. (2009). Economics of New Reactors and Alternatives. Washington DC: Harding Consulting
.
Hyprotech. (2002). Shell-and-Tube Heat Exchangers. London: HTFS.
Lestina, T., & Serth, R. W. (2010). Process Heat Transfer: Principles, Applications and Rules of Thumb.
London: Academic Press.
Perry, R. H., & Green, D. W. (2008). Perry's Chemical Engineers' Handbook. New York: McGraw-Hill.
Purohit, G. P. (1983). Estimating costs of shell-and-tube heat exchangers. New York: Fluor Corp.
Seader, J. D., Henley, E. J., & Roper, D. K. (2010). Speration Process Principles. Utah: John Wiley &
Sons, Inc.
Sinnott, R. K. (2005). Chemical Engineering Design. Oxford: Elsevier Butterworth-Heinemann.
Wolverine . (2007). Construction of Shell and Tube Heat Exchangers. Wolverine Tube Heat Transfer
Data Book, 36.

B1 | P a g e

Appendix C Process Instrumentation


Diagram
Included in the Group Hazop

C1 | P a g e

Appendix D Source Data

Figure 2 Temperature correction chart for a two shell pass with


multiple of 4 tube passes (Sinnott, 2005)
Figure 3 Bundle diameter clearance (Sinnott, 2005)

Figure 4 Row correction factor chart (Sinnott, 2005)

Figure 5 Window correction factor (Sinnott, 2005)

Figure 7 Coefficient for Fl pressure drop (Sinnott, 2005)


Figure 6 Baffle geometrical factors (Sinnott, 2005)

D1 | P a g e

Figure 8 Thermal Design Algorithm (Sinnott, 2005)

Figure 9 Tube-gage cost multiplier (Purohit, 1983)

D2 | P a g e

Appendix E - Sample Calculations


Evaluation of physical properties:

Component

Mass Fraction
Mass (kg/hr) Molecular
Moles (kmol/hr) Mole
(wi)
weight(g/kmol)
Fraction (xi)
0.464
17864
0.08618
207.29
0.502
0.536
20636
0.1002
205.95
0.498

Hexane
n-Heptane

Table 6 Cold stream data

DOWTHERM-A
Heat Capacity (J/kg.K)

1733.73

Density (kg/m3)

1014.29

Conductivity (mW/m.K)

129.6

Viscosity (mPas.s)

1.32
Table 7 Properties of dowtherm-A

Properties acquired from () and (Perrys)


Hexane

n-Heptane

Heat Capacity (J/kg.K)

2354.16

2332.71

Density (kg/m3)

633.08

659.71

Conductivity (mW/m.K)

118.5

125.4

Viscosity (Pas.s)

2.37x10-4

3.06x10-4

Table 4 Pure properties of hexane and n-heptane

( )

For hexane:

Similarly for n-heptane:


( (

))

( (

))
E1 | P a g e

Similarly for n-heptane:


(

))

MIXTURE PROPERTIES
Heat Capacity (J/kg.K)
Density (kg/m3)
Conductivity (W/m.K)
Viscositiy (Pas.s)

)
)

))

2342.66
649.02
0.1219
2.71x10-4
Table 5 Properties of the binary mixture

Thermal Design:

The following design sequence follows the algorithm from shown in figure (8) with the exception
of step 2, as it was done in the evaluation of properties.
Mass Balance:

Energy Balance:
According to step 1 of figure (8) the heat duty and unspecified mass flowrate are found using
equations (2.6) & (2.7):
(

)(

With the heat duty found the unspecified mass flowrate of the shell side can be found using
equation (2.7) rearranged:

Following steps 3 & 4 of figure (8) the required area of heat transfer is required. First equations (2.9
2.12) are to evaluated:
(

)
(
(

)
)
)

)
(
(

)
)
)

E2 | P a g e

The parameters

and

need to be found to estimate

cannot be read off the plot for a one shell pass with multiple of 2 tube passes hence

was

read off the plot for two shell passes with multiple of four tube passes, shown in figure (2).
.Therefore:
(

The required heat transfer area can now be determined using equation (2.6) rearranged. An
initial value for

has to be assumed. The range for Dowtherm and heavy oils is 50-300

W/m2K. An iterative procedure is used to determine the required heat transfer area until the
percentage difference between the (

) and (

) is in the range 0-30%.

(Sinnott, 2005)
An initial value of the overall heat transfer coefficient (
W/m2K and yielded a calculated value of (

) was assumed to be 180

) of 203.302 W/m2K. This produced a

percentage error of 12.95%. To reduce this percentage error the calculated overall heat transfer
coefficient of the first iteration was then used as the initial overall heat transfer coefficient in the
next iteration

until the percentage error was close to 0%. Table (5) shows the iterative

procedure.
Iteration No.
1
2
3
4
5
6

(W/m2K)
180
203.30
213.54
217.72
219.37
220.02

(W/m2K)
203.30
213.54
217.72
219.37
220.02
220.43

Percentage Error(%)
12.94
5.04
1.96
0.76
0.294
0

Table 6 - Iterations

Iteration no.6 is the last iteration as the value converged at

W/m2K.The following

calculations are based on iteration no.6. The required heat transfer area can now be determined
using equation (2.6) rearranged:

Velocity, tube and shell specifics:

Step 6, 7 and 8: To determine the velocity of the tube side, standard tube dimensions have to be
chosen. Table (6) shows the tube dimensions chosen for this design.
E3 | P a g e

Outer
diameter, do
(m)
0.019050

B.W.G. Gage

Wall Thickness (m)

Inner diameter, di
(m)

do/di

10

0.003404

0.012243

1.556017

Tube
Length
(m)
7.32

Table 7 Tube Dimensions

The area of a single tube is found using equation (2.15):


(

)(

The total number of tubes is found using equation (2.14):

The amount of tubes per pass is found next. Number of tube passes (
number of tubes per pass was found using equation (2.16):

The area of a pass (

) for this design is 4. The

) can now be evaluated:


(

The volumetric flowrate in a single tube is found via the following equation:

Using equation (2.17) the tube side velocity is evaluated:

The tube-side velocity is acceptable as it falls within the optimum range given in Section (2.3.3).
The bundle diameter was then determined. A tube arrangement for a 90 degree was selected
hence the parameters and
are 0.158 and 2.263, respectively. Using equation (2.18):
(

The type of rear end configuration for this design is a Pull-through with floating head (TEMA
type-T) and corresponds to a bundle diameter clearance (BDC) of 0.092 m, as shown in figure
(Sinnott, 2005). The diameter of the shell is then evaluated using equation (2.19):

E4 | P a g e

The pitch is found using equation (2.20):


The baffle spacing ( ) and baffle cut (
(

) were selected as follows:


)

The velocity of the shell side is calculated as follows:


(

)(

)(

The shell-side velocity is acceptable as it falls within the optimum range given in Section
(2.3.3.).
Estimation of heat transfer coefficients:

Steps 9, 10 and 11 are used to determine the tube and shell heat transfer coefficients.
Tube side:
Evaluation of the tube-side heat transfer coefficient is calculated using the Sieder-Tate method
as follows:
(

)(

)(

)(

( )

The viscosity term is taken as unity as the fluid is non-viscous as well as the temperature
difference between the wall and the fluids are not excessively large. The tube-side heat transfer
coefficient is determined by equation (2.26) rearranged:
(

Shell-side:As discussed in Section (2.3.4.) the Bell Delaware method is used to determine the
shell-side heat transfer coefficient.

E5 | P a g e

The ideal cross flow coefficient (

) is determined by the following equation:


(

)(

)
(

)(

The heat transfer factor is read off figure (12.31) of (Sinnott, 2005). Hence, the ideal cross flow
coefficient is:
(

)(

)(

) ( )
)

(
To evaluate the correction factors

and

the structural parameters have to be determined. Using

equations (2.37 2.48) the parameters are determine


(
(

)
)

(
)

))

)
)

Table 8 Parameters for Bells method

E6 | P a g e

The parameters

and

are read off figure (6). The velocity in the window-zone

using the following equation:

is determined

The baffle-to-shell-clearance( ) is evaluated using the following equation:


mm
For a Re > 2000, figure (4) is used to determine the tube row correction factor
constrictions encountered in the cross-flow section (

. The number of

) was found to be 17. For this

the tube row

correction factor was determined to be:


The window correction factor (

) is found from figure (5). For a corresponding

correction factor was determined to be:


*

equation (2.29):

of 0.3 the window

The bypass correction factor (

) )+

) is determined using

( )

) )+

One sealing strip was used for 5 vertical rows


The leakage correction factor ( ) is determined using equation (2.30):
(
*
Where

))

is obtained from figure (7).

The shell-side heat transfer coefficient can now be determined using equation (2.27):
(

)(

)(

)(

)(

Finally, the overall heat transfer coefficient can be determined using equation (2.8):
(

(
(

)
)

Pressure Drop:
E7 | P a g e

Step 12 of figure (8).


Tube Side: The tube-side pressure drop was determined using Franks Adaption, described by
the following equation:
[

[ (

( )(

)( )

)(

)(

The friction factor ( ) is obtained from figure (12.36) of (Sinnott, 2005). This pressure drop is
applicable as it falls in the range given in Table (2).
Shell-side: The shell-side pressure drop was determined using Bell Delaware method. The
pressure drops in the cross-flow and window zones are determined separately, and summed to
give the total shell-side pressure drop.
The cross-flow pressure drop is determined using equations (2.32-2.36):
(

)(

The bypass correction factor for pressure drop (


with the only difference being:

)(

( )

) is determined using equation (2.29) again,

The leakage correction factor for pressure drop ( ) is determined using equation (2.30) again,
with the only difference being
is obtained from figure (7) and corresponds to 0.65.
The bypass and leakage correction factors for pressure drop are given below.

Hence the cross-flow pressure drop is:


(

)(

)(

The pressure drop in the window zone and end zone is found using equation (2.34) and equation
(2.35), respectively.
(

)
(
*

(
)

)(
(

( ))
(
)*

)(
)

+(

E8 | P a g e

The number of baffles (Nb) needs to be determined, followed by the total-shell side pressure
drop using equation (2.36).
[( )
(

[(

]
(

)(

This pressure drop is not within the range given in Table (2).
Mechanical Design:

The operating conditions of the heat exchanger is given in Table (8) as well as the material of
construction parameters of the shell.
Operating Pressure, P (N/mm2)

0.111

Shell inner diameter, Di (m)

0.827

Design Temperature (C)

98.7

Type

CarbonSteel

Tensile strength (N/mm2)

460

Design stress at design temperature (N/mm2), f

170.26

Table 9 Mechanical design parameters

The minimum thickness of the cylindrical shell is found using equation (2.49):
(

)(

)
(

Taking corrosion considerations into account 2 mm is added to the minimum thickness


However for a vessel approximately 1m in shell diameter, according to TEMA standards, the
minimum thickness, to ensure that any vessel is stable and can support its own weight or any incidental loads, is
5mm. Hence, the thickness of the cylindrical shell is taken as 5mm.
Domed ends: Torispherical head
Torispherical head
Crown Radius, Rc (equal to shell diameter)

0.827 m

Knuckle Radius, Rk (10% of crown radius)

0.0827 m

Length of shell, Lshell

8.174 m

Joint factor (no joints in head)

Stress concentration factor, Cs

1.54
Table 10 Domed head factors

The stress concentration factor Cs is determined using the following equation:


E9 | P a g e

The minimum thickness for a torispherical head is found using equation (2.50):
(

)(

( )(

)(

)(

)
Take as the same

Adding 2mm for corrosion allowance:

thickness as the wall


Flat end: The minimum thickness for a flat end is determined using the following equation:

Adding 2mm for corrosion allowance:


Tube plates:

Max differential pressure in heat exchanger:


factor Cph for a welded plate = 0.45; Dp=Di
allowable shear stress = 0.5(170.26) = 85.13 N/mm2
Minimum thickness of the plates to resist bending is :

Design
Maximum

Minimum thickness of the plates to resist shear stress is:

Generally the greater value between equations (2.53) & (2.54) is selected, however, both the
values are not greater than the standard minimum plate thickness, Hence, the standard minimum
plate thickness is used.

(2mm was added for corrosion allowance)

Nozzle Diameters: Nozzle diameters were sized according to the inlet-velocity relationship to area and
also by using the Harkers equation, equation (2.55).
Method

Shell nozzle diameter(mm)

Tube nozzle diameter(mm)

Inlet-velocity

208.66

303.35

Harker

130.75

67.40

Table 11 Nozzle diameters

E10 | P a g e

Flanges: Flanges were sized according to the nozzle diameters. Dimensions for the flanges are
provided in any standard neck flange table. Shown in the results
Costing:

To determine the cost, the volume of each component has to be found:


Volume of the tube bundle (m3)

0.7518

Volume of the cylindrical shell (m3)

Volume of 2 tube plates (m3)

0.0477

0.0118

Volume of flat end (m3)

0.00633

Volume of 4 flanges ( 2 for the shell + 2 for the tube) (m3)

0.00706

Torispherical head
Surface area of crown (m2)

0.8327

Surface area of knuckle (m2)

(
(

Volume of a torispherical head (m3)

0.0416

)
)

0.00437

Table 12 Volumes of equipment

Where the height of the torispherical head is determined using the following equation:
(

)(

The density of carbon steel:

)(

Total cost has to include insulation, installation and labour costs and is shown below:

)
)

E11 | P a g e

Purohits Method:
Tema Type parameters
Channel and Removable cover (A)
f = 1.03
Two-shell pass with longitudinal
Baseline = 1.15
baffle (F)
r = 1.05
Pull-through with floating head (T)
1
(Based on a square tube
arrangement)
Table 13 TEMA type parameters

Purohits method involves the use of cost factors based on the TEMA type, shown in Table(12),
and is used to determine a base cost of the unit. Purohits method adopts the use of American
units. The following equations are used to determine the base price:
( ) (

)
(

(
)(

)
)(

Since a TEMA shell type E a correction of the shell type was found using Table (5) of (Purohit,
1983). Correction for the shell type ( ) was found to be:
With the tube length being < 20 ft. and no expansion joint used the correction factor for tube length and
expansion joint were not used. More than 2 tube passes were used hence a correction factor tube pass
(
) was used.
Since pressures were less than 150 psig and carbon steel was fully used correction factors for design
pressure and material of construction were not used. Material of construction was neglected since Purohits
equations are based on carbon-steel. Since BWG gage of 10 was used a correction factor for tube gage
(
)(
determined using the following equation
:
)
(

The total correction factors were totalled:


The total cost of the exchanger was found using the following equations:
( (

) )

)( )

Where A is the area of heat transfer and N is the number of shells. Since Purohits method is based on
costing in 1982 todays price was determined using cost indices.
(
(
(

)
)

Purohits method is inclusive of labour


costs. The cost index for 1982 was taken from (Sinnott, 2005) and for 2013 was taken from (Harding, 2009).
E12 | P a g e

Appendix F Technical Drawing

F1 | P a g e