Академический Документы
Профессиональный Документы
Культура Документы
AFRICA:
Oshore
Oil
and
Gas
Ac:vi:es
Outline
Mandate, vision and mission
The regulatory framework: Role of
PASA
The regulatory framework: Phakisa
Offshore exploration activities
Conventional Resources
Conclusion
Petroleum
Agency
SA
2014
The
oil
and
gas
lab
has
idenFed
specic
iniFaFves
with
a
phased
roll-out
Phase
III:
Long
term
First
results
by
Mar
2025
Phase
II:
Medium
term
First
results
by
Mar
2019
Phase
I:
Ini:al
short-term
targets
First
results
by
Mar
2016
Develop/implement
local
content
roadmap
(2016)
Develop/implement
skills
strategy
roadmap
(2016)
Enhance
environmental
governance
capacity
of
the
Oil
and
Gas
regulator
Drill
exploration
wells
1940s
1960s
Soekor (Formed by
government) in 1965onshore Karoo, Algoa and
Zululand Basins
1970-1980
Petroleum Agency SA
1999 and PetroSA
2001 (Merger of Soekor
and Mossgas)
1990
Licensing Round
held in 1994Offshore areas
open to international
investors
2000
Mineral and
Petroleum
Resources
Development Act
passed- 2002
operational 2004
Exploration drilling was most active from 1981 to 1991 during which some 181 exploration
wells were drilled. The Bredasdorp Basin has been the focus of most seismic and drilling
activity since 1980.
Petroleum
Agency
SA
2014
Oshore explora:on
The image part with relationship ID rId18 was not found in the file.
Conven:onal
resources
Recent
acFviFes
and
developments
West Coast
Sunbird
(76%)
PetroSA
(24%)
Thombo
(75%)
Afren
(25%)
OK Energy
Shell Interna:onal
PetroSA
(50%)
Sasol
(50%)
Shallow-water
Cairn India, PetroSA,
Thombo, Afren, Sasol
Sunbird - Production
right around Ibhubesi
Mid-Basin Sungu
Sungu
Deep-water BHP
Billiton and Shell
Southern basin
Anadarko and
PetroSA
New
Age
Imaforce
Rhino
Oil
PetroSA
(20%)
Anadarko
(80%)
Silver
Wave
Energy
P50 estimate:
OIP 10.2 Billion BBL
GIP 27.7 TCF
Petroleum
Agency
SA
2014
76%
24%
South Coast
PetroSA
South
Coast
PetroSA
CNR
(50%)
Total
(50%)
Impact
Africa
ExxonMobil
Total
Paddavissie drilling
Totals Brulpadda-1AX well in Block 11B/12B was spudded on
21 July 2014
The well was drilled to 1835m (~500m below mud line)
Suspended on 27 September
Work programme renegotiated to continue drilling this current
or next year
P50 estimate:
OIP 9.55 Billion BBL
GIP 25.7 TCF
Petroleum
Agency
SA
2014
South
Coast
F-O
gas
eld
C
D
S
E
East
Coast
ExxonMobil
(75%)
Impact
Africa
(25%)
Silver
Wave
SASOL
ENI
ExxonMobil
(75%)
Impact
Africa
(25%)
ExxonMobil
Silver Wave
P50 estimate:
OIP 2 Billion BBL
GIP 8 TCF
Conclusion