RABAB HARWEEL POWER PLANT

B.

Al Hassan Engineering Co. S.A.O.G.


Project: Rabab Harweel Power Plant & HRSG Project
Client: Petroleum Development Oman
Contract: C311530

S/N

Items

UM

UEB-Unit-1Bldg.

UEB-Unit-2Bldg.

GTP-Bldg.

HRSG-Bldg.

Qty. as / DRW

Qty. as / DRW

Qty. as / DRW

Qty. as / DRW

A-001

Excavation of Fnd.s

Cum

516.53

516.53

260.18

489.41

A-002

Imported Soil Fill Well Graded Sub Base (TYP) Class "A"

Cum

Nil

Nil

Nil

Nil

A-003

Polythene Sheet 1000 Gauge (TYP)

sqm

134.56

134.56

78.40

178.55

A-004

P.C.C Concrete (C10)

Cum

6.73

6.73

3.92

8.93

A-005

Formwork Of Foundations

sqm

149.14

149.14

79.36

166.72

A-006

Structural Concrete of Foundations Grade (C35)

Cum

80.10

80.10

39.63

81.24

A-007

Waterproofing Nitocote PE-135 (Double Coat)

sqm

1005.76

1005.76

649.84

1296.07

A-008

Waterproofing Glassmat Sheet

sqm

502.88

502.88

324.92

648.04

Back Fill Well Graded Sub Base Material Class "B"

Cum

436.43

436.43

220.55

408.17

A-009

Formwork of Plinth Beam

sqm

22.95

22.95

38.68

127.43

A-010

Structural Concrete of Plinth Beams Grade-C35

Cum

2.65

2.65

4.46

16.60

A-011

Formwork for Pedestals/Columns Upto of Elevator

sqm

177.62

177.62

73.70

200.15

A-012

Structural Concrete for Columns Upto Elevator-C35

Cum

20.93

20.93

7.78

23.33

A-013

Formwork of Elevated Beams

sqm

865.01

865.01

505.35

969.40

A-014

Structural Concrete of Elevated Beams Grade-C35

Cum

111.08

111.08

65.83

129.18

A-015

Formwork of Elevated Slab

sqm

758.93

758.93

254.88

569.24

A-016

Structural Concrete of Elevated Slab Grade-C35

Cum

75.33

75.33

29.80

104.17

A-017

Formwork for Columns Upto Roof Slab

sqm

182.46

182.46

86.13

277.55

A-018

Structural Concrete for Columns Upto Roof Slab -(C-35)

Cum

23.36

23.36

13.42

30.44

A-019

Formwork of Roof Beams

sqm

626.02

626.02

356.04

537.45

A-020

Structural Concrete for Roof Beams Grade-C35

Cum

100.89

100.89

50.27

127.43

A-021

Formwork for Roof Slab

sqm

501.82

501.82

268.61

721.19

A-022

Structural Concrete for Roof Slab Grade C-35

Cum

75.27

75.27

40.29

108.18

A-023

Formwork of Petestal above Roof Slab

sqm

101.92

101.92

0.00

6.34

A-024

Structural Concrete of Pedestal above Roof Slab (C35)

Cum

16.67

16.67

0.00

1.88

A-025

Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

sqm

283.79

283.79

230.88

330.20

A-026

Structural Concrete for R.C Parapet Wall (C35)

Cum

17.74

17.74

14.43

20.64

A-027

Thermocoal / Polystrene Insulation 50 THK (TYP)

sqm

361

361

316

790

A-028

P1-24 -J10-(TYP)Bolts For Shed above Roof Slab

No.s

32

32

A-029

P5-16 - J3-(TYP) For Cross Over

No.s

32

32

A-030

Filler Board / Compressible Board / 25 mm THK. (TYP)

sqm

A-031

Filler Board / Compressible Board / 12 mm THK. (TYP)

sqm

A-032

Mesh - A393 (TYP) / 10 mm Pitch 200 C/C

sqm

A-033

Mesh - A252 (TYP)

sqm

A-034

UPVC Rain Water Pipe 160 (TYP)

A-002A

298.96

RM

45.21

45.21

50.44

76.23

REMOVEABLE PANELS BELOW ELEVATOR FLOOR


RP-001

3 mm M.S Wire Mesh Plastic Coated to 4mm dia 50x50 wire mesh tied with tie wire to RHS

sqm

137

137

95

104

RP-002

MS Flat - L - 50 X 50 X 6 (TYP)

RM

364

364

229

258

RP-003

MS Flat - L - 25 X 5 to fix chainlink Mesh (TYP)

RM

182

182

115

129

RP-004

MS Plate - L - 200 X 50 X 10 (TYP)

sqm

156

156

110

132

RP-005

MS Plate - L - 150 X 50 X 10 (TYP)

sqm

26

26

21

22

RP-006

GI Bolt & Nut- L - 12 X 40 (TYP)

No.s

104

104

81

88

RP-007

GI Bolt & Nut - 6 @ 500 C/C (TYP)

No.s

364

364

229

253

BW-001

100 THK Solid Block Work (TYP) / External Work / 390X90X190

sqm

327

327

298

738

BW-002

200 THK Solid Block Work (TYP) / External Work / 390X190X190

sqm

403

403

360

807

BW-003

200 THK Solid Block Work (TYP) / Internal Work / 390X190X190

sqm

199

199

32

432

BW-004

150 THK Solid Block Work (TYP) FIRE WALL up to 6.85 M Height / 390X140X190

sqm

GS-001

Galanised Steel Anchors at 400 CTC Vertically

No.s

704

704

480

1612

GS-002

Stainless Steel Butterfly Wall Ties at 400 CTC Vertically and 800 CTC Horizontally (TYP)

No.s

1173

1173

1027

2568

PLASTER (15 mm) Cement / Sand / Internal / WALL FINISHES

sqm

756

756

386

1351

Wash Sand / Internal

Cum

20

20

10

36

PWI-002

PVA Primer 7 Lit/Sq.M (One Coat) / Internal

Litr.

5293

5293

2704

9454

PWI-003

Decora Stucco Putty 5 Lit/Sq.M (One Coat) / Internal

Litr.

3781

3781

1931

6753

PWI-004

Royale Silk Emulsion 9 Lit/Sq.M (Two Coat) / Internal

Litr.

13610

13610

6952

24311

PWE-001

PLASTER (15 mm) Cement / Sand / W15 / External

sqm

524

524

376

702

Wash Sand / External

Cum

14

14

10

19

PWE-002

Tex Primer 6 Lit/Sq.M (One Coat) / W15 / External

Litr.

3142

3142

2257

4211

PWE-003

Heavy Texture (WMC) 1 Lit/Sq.M (Two Coat) / W15 / External

Litr.

1047

1047

752

1404

Ceramic Wall Tiles / (W2) / Toilet & Pantry

sqm

Nil

Nil

Nil

103

Ceramic Wall Tiles 152 X 152 X 5.5 - (W2) - No. of Tiles

No.s

Nil

Nil

Nil

4442

SOLID BLOCK WORK

GALANISED & STAINLESS STEEL ANCHORES

PAINT WORK (INTERNAL)


PWI-001
PWI-001A

PAINT WORK (EXTERNAL)

PWE-001A

CERAMIC WALL TILES


ST-001
ST-001A

ALKALI / ACID RESISTANT TILES


AT-001

Alkali / Acid Resistant Tiles - (W13) - Area

sqm

100

100

Nil

83

AT-001

Alkali / Acid Resistant Tiles 200 X 200 - (W13) - No. of Tiles

No.s

2488

2488

Nil

2082

FF-001

Non Slip Ceramic Floor Tiles - (F4)

sqm

Nil

Nil

Nil

15.45

FF-001

Non Slip Ceramic Floor Tiles - (F4) / No. of Tiles 152X152X9.5 mm Thk.

No.s

Nil

Nil

Nil

668.83

FF-002

Hardened & Sealed Granolithic Floor - (F8)

sqm

512.61

512.61

304.41

480.52

FLOOR FINISHING

FF-003

Raised Access Floor - Pedestal Floor - (F-12)

sqm

Nil

Nil

Nil

167.85

FF-004

Acid Resistant Tiles (F-14)

sqm

124.88

124.88

Nil

105.79

FF-005

External Float Finish With UV Resistant Floor Hardener - (F-16)

sqm

85.54

85.54

33.50

32.92

sqm

20.68

20.68

10.88

30.89

SKIRTING
SK-001

Coved Granolithic Integral With Floor - (S -7) CEILING

SE-001

Emulsion Painted Smooth Fair Face Concrete - (C2)

sqm

397.94

397.94

271.03

467.52

SE-002

Suspended Ceiling 600mm x 600mm Exposed Grid Self Finish Washable Mineral Fibre Lay in Panels - (C-5)

sqm

Nil

Nil

Nil

185.35

SE-003

Acid Resistant Paint On Smooth Fair Face Concrete - (C-12)

sqm

124.88

124.88

Nil

105.79

WATER PROOFING
WP-001

8. Separation layer of 500g Polythene sheet.

sqm

663

663

289

887

WP-002

7. Screed to falls. (Min. 50mm)

Cum

33

33

14

44

WP-003

6. 40x40 mm Bituthene fillet HC.

Cum

WP-004

5. Expanded polystyrene insulation 35Kg/Cu.M 75mm Thk. with 15mm rebate on edges.

sqm

663

663

289

887

WP-005

4. Concrete Slab 300x300x30 THK Above Roof Slab set in 20 Thk. screed.

No.s

7366

7366

3212

9856

WP-006

3. Bituthene 1200xHC with 150mm laps on primed screed to fall.

sqm

63

63

57

76

WP-007

2. 300x300 mm wide bituthene 1200xHC reinforcing strip in corner.

sqm

12

WP-008

1. Bituthene 1200xHC and solar shield turned into 25x25 chase and securely fixed and sealed with 20x20 wooden batten and
then pointed with servimastic.

RM

105

105

95

127

D-001

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE MARKED, TESTED,AND CERTIFIED TO EN1935, C/W,
SCREWS

PR

33

38

18

57

D-002

UNION PANIC LATCH - SILVER FINISH

No.s

11

D-003

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION 1X1 RIM CYLINDER - SILVER

No.s

11

D-004

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X 8MM ROSE - SSS

No.s

D-005

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM HEIGHT DOOR-NP

No.s

D-006

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT STANDARD HEIGHT DOOR-NP

No.s

D-007

DUST EXCLUDING SOCKET - CP

No.s

D-008

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

No.s

D-009

SEMI CIRCULAR FLOOR DOOR STOP - SSS

No.s

17

17

28

D-010

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

MTR

82

82

44

122

DOOR ITEMS

D-011

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

MTR

12

12

19

D-012

LEGGE ROLLER LATCH

No.s

D-013

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg. TESTEDTO 2 MILLION CYCLE

No.s

10

D-014

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM CENTRE, DEAD BOLT WITH SECURITY HARDENED 2
STEEL ROLLERS, SQURE FOREND & STRIKE PLATE -SS

No.s

D-015

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

Sets

D-016

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

No.s

10

D-017

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

No.s

D-018

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

MTR

D-019

KICKPLATE 1000X200X1.5MM SSS SQUARE CORNERS DRILLED & CSKC/W FLAT HEAD SCREWS

No.s

D-020

WALL MOUNTED DOOR STOPPER - SS

Sets

D-021

KICKPLATE 900X200X1.5MM SSS SQUARE CORNERS, DRILLED & CSKC/W FLAT HEAD SCREWS

No.s

D-022

SEMI CIRCULAR FLOOR DOOR STOP - SSS

No.s

No.s

Nil

250 mm - Glass Anodised Aluminium framed fixed having 6 mm THK. Inside with 12 mm air gap in Battery Room Supply &
Size by HVAC Vendor

No.s

Nil

A-034

Cage Ladder (TYP)

No.s

A-035

Insulation Material (TYP)

sqm

A-036

Isolation Material (TYP)

RM

A-037

Handrail (TYP)

LM

A-038

Removeable Handrail (TYP)

A-039

Self Contained Eye Wash Unit

No.s

A-040

Safty Shower (TYP)

No.s

A-042

Roof Gully As per Approved

No.s

A-043

Gate with PVC net 1.3 M HT.

No.s

A-044

Concrete Kerb 125x300 High

sqm

A-045

Water Proofing Membrane

sqm

A-046

12 THK. Plate with 2-M10 Expansion Bolts (TYP)

No.s

A-047

2 No.s Tank Anchor 50x4 THK. Flat.

No.s

A-048

Roof Sheeting

sqm

A-049

Polysulphide Sealent 25 THK x 25 Deep Joint

sqm

A-050

Flashing Plate 250x6 THK. To be fixed with Hilti Anchors.

sqm

A-051

Bituthene 1200 X HC and Solar Shield.

sqm

A-052

Potable Water Tank (Hold)

No.s

A-053

Insert Plate Location of Pipe Support. (Hold)

sqm

A-054

Gravel finishing 10 cm thk.

sqm

A-055

Supply and installation of Bored Piles 800 mm DIA (35MPa)

LM

A-056

Supply and installation of reinforced concrete pipes dia. 800 mm

LM

A-057

Compression test on working Piles 800 mm DIA

A-058

Failure Load test on Piles 800 mm DIA

A-059

Non-shrinking grout 25 mm thk.

sqm

A-060

Non-shrinking grout 40 mm thk.

sqm

A-061

Non-shrinking grout 50 mm thk.

sqm

A-062

Grout 25 mm thk.

sqm

A-063

Grout 50 mm thk.

sqm

VENTILATOR
V-001

G1 - Anoside Aluminium Frame With Spring Loaded Non Return Type Aluminium Louvers -To be Confirmed by HVAC Vendor
EXHAUST FAN

EF-001

LM

U
U

A-064

Grade Slab 150 THK.

Cum

A-065

Paving Work 150 THK.

Cum

A-066

Reinforced concrete curb Stone

LM
REBARS / REINFORCEMENT

Z-001

Foundations

kg.s

8662.500

8662.500

2552.520

5424.080

Z-002

Columns

kg.s

8463.180

8463.180

3490.350

8678.800

Z-003

Plinth Beams

kg.s

266.080

266.080

411.690

2170.350

Z-004

El. Beams

kg.s

16657.340

16657.340

7422.160

14347.000

Z-005

El. Slab

kg.s

8136.570

8136.570

3942.380

7831.310

Z-006

Lintels

kg.s

107.732

107.732

Z-007

Roof Beams

kg.s

13601.530

13601.530

5937.540

15306.820

Z-008

Roof Slab

kg.s

7749.370

7749.370

3483.730

10774.120

Z-009

Stairs

kg.s

2017.800

2017.800

934.200

740.360

Parapet Walls & Pedestals above Roof

kg.s
65662.102

65662.102

28174.570

65272.840

Total Rebar's weight (kg.s)


Prepared By:

Nadeem Javed
Quantity Supervisor (Civil)

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)


B.O.Q SUMMARY

Petroleum Development Oman (PDO)

Updated Date: 26/5/2015


GTG-Fnd.
Unit - 01

GTG-Fnd.
Unit -02

HRSG-F1,F2,F3- HRSG-F1,F2,F301
02

GT-Off Base
Fnd.s-01

GT-Off Base
Fnd.s-02

Qty. as / DRW

Qty. as / DRW

Qty. as / DRW

1013.96

1013.96

832.30

Qty. as / DRW

Qty. as / DRW

Qty. as / DRW

832.30

696.97

556.63

556.63

696.97

203.00

203.00

0.00

171.63

0.00

171.63

281.93

281.93

409.95

409.95
27.00

16.13

16.13

14.10

14.10

27.00

299.54

299.54

92.40

92.40

71.65

71.65

574.68

574.68

199.00

199.00

112.24

112.24

542.88

542.88

1574.52

1574.52

563.80

563.80

271.44

271.44

787.26

787.26

281.90

281.90

439.28

439.28

475.89

475.89

584.73

584.73

273.07

273.07

0.00

0.00

109.00

109.00

0.00

0.00

420.96

420.96

10.00

10.00

38991.550

38991.550

49057.000

49057.000

10555.000

10555.000

38991.550

38991.550

49057.000

49057.000

10555.000

10555.000

Checked By:

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


DWG NO. RBB 80 102184 CG 2331 00007 0001 5L 03
A-001

Excavation of Foundations

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

A-003

Polythene Sheet 1000 Gauge

3.10
3.90
3.50
2.70
2.10
2.10

P.C.C Concrete (C10)

Formwork Of Foundations

S. Concrete of Foundations Grade (C35)

195.56
56.28
158.64
80.92
11.47
13.67

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Total =

516.53

0.00

0.00

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

11
2
7
6
2
2
Total =

48.51
16.82
43.75
17.34
3.52
4.62
134.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

0.05
0.05
0.05
0.05
0.05
0.05

11
2
7
6
2
2
Total =

2.43
0.84
2.19
0.87
0.18
0.23
6.73

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

52.80
19.04
50.40
19.20
3.50
4.20
149.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

Formwork of Fnd.s (F1)


Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork' of Fnd.s (F4)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

A-006

11
2
7
6
2
2

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)

A-005

1.85
1.85
1.85
1.85
1.05
1.05

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

A-004

3.10
3.90
3.50
2.70
2.60
3.10

8.00
11.20
9.60
6.40
5.00
6.00

Cum

7 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


Concrete of Fnd.s (F1)
Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)

2.00
2.80
2.40
1.60
1.00
1.00

8 of 275

2.00
2.80
2.40
1.60
1.50
2.00

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

26.40
13.33
30.24
7.68
1.05
1.40
80.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


A-007

Waterproofing Protection (Coating/Painting)

sqm

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)
Bot. of Fnd.s (F1)
Bot. of Fnd.s (F2)
Bot. of Fnd.s (F3)
Bot. of Fnd.s (F4)
Bot. of Fnd.s (SF1)
Bot. of Fnd.s (SF2)
Top of Fnd.s (F1)
Top of Fnd.s (F2)
Top of Fnd.s (F3)
Top of Fnd.s (F4)
Top of Fnd.s (SF1)
Top of Fnd.s (SF2)
C1-F1
C2-F1
C3-F1
C4-F1
C3B-F2
C3C-F2
C1-F3
C2-F3
C3/C3B-F3
C3A-F4
C4-F4
C5-F4
C6-F4
C7-F4
Pedestal (SF1)
Pedestal (SF2)
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)

Double Coating
8.00
11.20
9.60
6.40
5.00
6.00
2.00
2.80
2.40
1.60
1.25
1.25
2.00
2.80
2.40
1.60
1.25
1.25
1.90
1.90
2.40
1.40
2.40
2.40
1.90
1.90
2.40
2.40
1.40
1.40
1.40
1.40
3.60
4.60
6.20
5.60
5.85

9 of 275

0.60
0.85
0.75
0.50
0.35
0.35
2.00
2.80
2.40
1.60
1.25
1.25
2.00
2.80
2.40
1.60
1.25
1.25
1.40
1.40
1.40
1.40
1.15
1.15
1.25
1.25
1.25
1.25
1.50
1.50
1.50
1.50
0.90
0.90
1.60
1.60
1.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

11
2
7
6
2
2
11
2
7
6
2
2
11
2
7
6
2
2
5
4
1
1
1
1
1
3
2
1
2
1
2
1
2
2
1
1
1
Total =

105.60
38.08
100.80
38.40
7.00
8.40
88.00
31.36
80.64
30.72
6.25
6.25
88.00
31.36
80.64
30.72
6.25
6.25
26.60
21.28
6.72
3.92
5.52
5.52
4.75
14.25
12.00
6.00
8.40
4.20
8.40
4.20
14.40
18.40
19.84
17.92
18.72
1,005.76

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


A-008

Waterproofing Glassmat Sheet

sqm

Single Layer

Glassmat Sheet = 942.98/2

A-002A

Back Fill Well Graded Sub Base Materials

Formwork of Plinth Beam At El. 99.8 FGL

(-)

S. Concrete of Plinth Beams At 99.8 (TOC) Grade (C35)

Formwork for Columns Upto El.102.00

0.00

516.53
80.10

1
1
Total =

516.53
80.10
436.43

0.00
0.00
0.00

0.00
0.00
0.00

6.20
5.60
5.85
6.20
5.60
5.85

0.30
0.30
0.30

1
1
1
2
2
2
Total =

1.86
1.68
1.76
6.20
5.60
5.85
22.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.20
5.60
5.85

0.30
0.30
0.30

0.50
0.50
0.50

1
1
1
Total =

0.93
0.84
0.88
2.65

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

32.30
6.18
25.84
18.53
8.16
7.80
7.80
4.76
7.80
7.56
7.56
9.80
4.90
9.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

PB1 - (300x500)
PB2 - (300x500)
PB3 - (300x500)

A-011

0.00

0.00

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)

A-010

0.00

502.88

Cum

Qty of Excavation = 516.53 Cu3


Qty of S. Concrete = 80.10 Cu3

A-009

502.88
Total =

0.50
0.50
0.50

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)

1.90
1.90
1.90
1.90
2.40
2.40
2.40
1.40
2.40
2.40
2.40
1.40
1.40
1.40

10 of 275

3.40
3.25
3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50

5
1
4
3
1
1
1
1
1
1
1
2
1
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

A-012

S. Concrete for Columns Upto El. 102 (G-C35)

1.40
3.60
4.60

Formwork of Elevated Beams At El. 102.00 (TOC)

1
2
2

4.90
6.12
7.82

0.00
0.00
0.00

0.00
0.00
0.00

Total =

177.62

0.00

0.00

5
1
4
3
1
1
1
1
1
1
1
2
1
2
1
2
2
Total =

3.57
0.68
2.86
2.05
1.22
1.17
1.17
0.42
1.17
1.13
1.13
0.86
0.43
0.86
0.43
0.77
1.02
20.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.62
1.70
1.77
0.70
1.80
2.00
2.21
2.05
2.09
0.60
0.60
0.38
1.90
1.76

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

A-013

3.50
0.85
0.85

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.35
0.60
0.60
0.60
0.35
0.35
0.35
0.35
0.30
0.30

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35
0.60
0.60
0.60
0.35
0.35
0.35
0.35
1.50
2.00

2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

3.40
3.25
3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50
3.50
0.85
0.85

sqm

FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)

11 of 275

1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)

5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18

12 of 275

0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.79
0.60
1.80
2.00
2.17
1.96
2.05
0.51
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.55
0.65
1.80
2.00
2.21
2.05
2.09
0.60
1.90
1.76
1.79
2.00
1.90
0.56
1.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)

5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75

13 of 275

0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.76
1.79
2.17
1.96
2.05
0.44
0.90
2.18
1.38
0.86
2.40
2.26
0.56
1.99
0.76
1.35
2.06
0.76
1.35
0.32
0.63
2.35
2.28
0.56
1.99
2.09
1.86
1.99
1.86
1.99
1.86
1.99
1.58
2.35
2.32
1.10
1.18
1.66
2.46
2.32
1.66

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)
FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)

7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98

14 of 275

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

2.46
2.32
1.68
2.46
2.32
0.36
1.53
2.24
2.12
0.65
2.49
5.65
5.90
2.33
7.21
7.98
8.86
8.19
8.37
2.40
2.40
1.50
7.59
7.02
7.17
2.38
7.21
7.98
8.68
7.84
8.19
2.03
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)

6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88

15 of 275

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
6.18
2.59
7.21
7.98
8.86
8.19
8.37
2.38
7.59
7.02
7.17
7.98
7.59
2.25
6.21
7.05
7.17
8.68
7.84
8.19
1.74
3.00
7.28
4.60
3.45
9.59
9.03
2.25
7.95
2.53
4.50
8.25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

A-014

S. Concrete of Elevated Beams At El. 102 (TOC) Grade (C35)

2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

2.53
4.50
1.26
2.52
9.42
9.14
2.25
7.95
8.37
7.44
7.95
7.44
7.95
7.44
7.95
6.30
9.42
9.28
4.38
4.71
6.65
9.84
9.28
6.65
9.84
9.28
6.72
9.84
9.28
1.44
5.10
7.45
7.05
2.18
865.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.37
0.85
0.89
0.35

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Cum

FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)

2.08
5.65
5.90
2.33

16 of 275

0.30
0.30
0.30
0.30

0.60
0.50
0.50
0.50

1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)

5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33

17 of 275

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35

0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.26
1.40
1.55
1.43
1.46
0.36
0.36
0.23
1.14
1.05
1.08
0.42
1.26
1.40
1.52
1.37
1.43
0.36
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
0.93
0.45
1.26
1.40
1.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)

5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20

18 of 275

0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.43
1.46
0.42
1.14
1.05
1.08
1.40
1.14
0.34
0.93
1.06
1.08
1.52
1.37
1.43
0.26
0.45
1.09
0.69
0.52
1.68
1.58
0.34
1.19
0.38
0.68
1.24
0.38
0.68
0.22
0.44
1.65
1.60
0.34
1.19
1.26
1.12
1.19
1.12
1.19
1.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

A-015

Formwork of Elevated Slab At El.102.000 (TOC)

6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

1.70
5.15
0.90
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80

14.38
18.05
5.33
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30

0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

1.19
1.10
1.65
1.62
0.66
0.71
1.16
1.72
1.62
1.16
1.72
1.62
1.18
1.72
1.62
0.22
0.77
1.12
1.06
0.33
111.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

24.44
92.96
9.59
16.53
8.43
5.30
2.70
99.32
9.85
7.34
10.26
3.90
0.88
124.76
3.64
4.80
11.91
1.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

Grid from A' to D / 1


Grid from A' to D / 1 to 2
Opening D to C / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Opening D to C / 2 to 3
Opening D to C / 2 to 3
Opening B to C / 2 to 3
Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to A" / 3 to 4

19 of 275

1
1
2
2
2
1
1
1
2
2
2
2
1
1
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

A-016

S. Concrete of Elevated Slab Grade (C35) At El. 102.000(TOC)

4.83
5.85
5.00
5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

0.89
15.65
1.00
0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

1.70
5.15
0.90
0.30
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00
5.85
5.85

14.38
18.05
5.33
1.73
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00
0.55
1.16

1
1
2
2
2
2
1
1
2
2
2
2
1
1
Total =

4.28
91.55
10.00
6.44
13.56
26.73
1.71
93.51
3.60
4.65
11.48
18.17
2.33
33.24
758.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.67
13.94
-0.72
-0.16
-1.24
-0.63
1.59
0.81
14.90
-0.74
-0.55
-0.77
-0.29
0.26
18.71
-0.27
-0.36
-0.89
-0.08
1.29
13.73
-0.75
-0.48
-1.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

Grid from A' to D / 1


Grid from A' to D / 1 to 2
Deduction Opening D to C / 1 to 2
Beams remaining of this opening
Deduction 300 mm THK Slab B to C / 1 to 2
Deduction 300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening B to C / 2 to 3
Deduction Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5

20 of 275

0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15

1
1
-1
-2
-1
-1
1
1
1
-1
-1
-1
-1
1
1
-1
-1
-1
-1
1
1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


Deduction Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

A-017

Formwork for Columns from 102.00 Upto 106.550

5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

Concrete for Columns Upto 106.55 Roof Slab (G-C35)

1.90
1.90
1.90
1.90
2.40
2.40
2.40
2.40
2.40
0.60
1.40

Formwork of Roof Beams At El. 106.550 (TOC)

-1
1
1
-1
-1
-1
-1
1
1
Total =

-2.01
0.51
14.03
-0.27
-0.35
-0.86
-1.36
0.70
4.99
75.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

43.23
8.65
34.58
25.94
10.92
10.92
10.92
10.92
10.92
2.73
12.74
182.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

4.78
0.96
3.82
2.87
1.64
1.64
1.64
1.64
1.64
1.64
1.11
23.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

A-019

0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

A-018

2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.60
0.60
0.60
0.35

sqm

21 of 275

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23

22 of 275

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.67
1.99
2.18
4.11
3.83
4.01
1.70
1.87
2.06
1.91
2.00
1.99
2.18
2.40
3.19
3.34
0.70
1.87
2.06
1.91
1.95
1.99
2.06
2.40
2.23
2.34
2.18
2.06
1.91
1.95
2.40
3.10
3.25
2.67
2.53
0.86
2.67
2.53
1.65
2.67
2.53

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)
RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)

4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68

23 of 275

0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1.31
1.31
7.29
4.23
7.71
4.34
0.89
0.74
1.12
1.12
1.11
1.11
0.98
7.10
2.53
2.67
7.95
8.72
9.59
8.93
9.35
6.81
7.47
8.22
7.65
8.01
7.95
8.72
9.59
11.48
12.02
2.79
7.47
8.22
7.65
7.80
7.95
8.23
9.59
8.93
9.35

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

A-020

S. Concrete of Roof Beams At El. 106.550 (TOC) Grade (C35)

6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

6.23
8.22
7.65
7.80
9.59
11.16
11.70
10.68
10.12
3.43
10.68
10.12
6.62
10.68
10.12
5.22
4.35
24.30
9.87
25.70
10.12
3.54
2.94
4.47
4.47
4.44
4.44
3.90
23.65
10.12
626.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.40
1.39
1.53
2.88
2.68
2.80
1.02
1.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23

24 of 275

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30

0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60

1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)

6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45

25 of 275

0.30
0.30
0.30
0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30

0.60
0.60
0.60
0.70
0.70
0.70
0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.23
1.15
1.20
1.39
1.53
1.68
2.87
3.00
0.42
1.12
1.23
1.15
1.17
1.39
1.44
1.68
1.56
1.64
1.09
1.23
1.15
1.17
1.68
2.79
2.93
1.87
1.77
0.60
1.87
1.77
1.16
1.87
1.77
0.78
0.65
7.29
2.96
7.71
3.03
0.53
0.44

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

A-021

Formwork of Elevated Slab At El.106.550 (TOC)

S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)

Formwork of Elevated Petestal above Roof

S. Concrete of Elevated Pedestal above Roof Slab (C35)

14.15
15.78
18.35
18.35
18.35

5.48
5.70
6.20
5.60
6.43

14.15
15.78
18.35
18.35
18.35

1
1
1
1
1
1
1
Total =

0.67
0.67
0.67
0.67
0.59
7.10
1.77
100.89

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
Total =

77.47
89.92
113.77
102.76
117.90
501.82

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
#REF!

0.15
0.15
0.15
0.15
0.15

1
1
1
1
1
Total =

11.62
13.49
17.07
15.41
17.68
75.27

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30
0.00

4
4
14
1
1
8
4
1
1
Total =

12.48
10.40
29.12
0.00
10.40
16.64
17.94
4.94
0.00
101.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

1.87
1.30

0.00
0.00

0.00
0.00

sqm

Pedestal-600x600 for Shed


P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700
P8-Hold

A-024

5.48
5.70
6.20
5.60
6.43

0.60
0.60
0.60
0.60
0.60
1.00
0.70

Cum

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

A-023

0.30
0.30
0.30
0.30
0.30
0.60
0.35

sqm

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

A-022

3.73
3.73
3.70
3.70
3.25
11.83
7.23

2.40
2.00
1.60
0.00
8.00
1.60
3.45
3.80
0.00

Cum

Pedestal-600x600 for Shed


P1-500x500

0.60
0.50

26 of 275

0.60
0.50

1.30
1.30

4
4

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700
P8-Hold

A-025

Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

0.40
0.00
2.00
0.40
1.35
1.20
0.00

S. Concrete of R.C Parapet Wall Grade (C35)

3 mm M.S Wire Mesh Plastic Coated to 4mm dia 50x50 wire mesh tied
with tie wire to RHS (TYP)

MS Flat - L - 50 X 50 X 6 (TYP)

MS Flat - L - 25 X 5 to fix chainlink Mesh (TYP)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.30
1.30
1.30

4
4
2
Total =

166.40
107.38
10.01
283.79

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1.30
1.30
1.30

2
2
1
Total =

10.40
6.71
0.63
17.74

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

17.90
18.10
29.00
11.20

1.80
1.80
1.80
1.80

1
1
1
1
Total =

32.22
32.58
52.20
20.16
137.16

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

28.00
66.00
44.00
44.00

2.00
2.00
2.00
2.00

1
1
1
1
Total =

56.00
132.00
88.00
88.00
364.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

28.00
66.00
44.00
44.00

1.00
1.00
1.00
1.00

28.00
66.00
44.00
44.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

32.00
20.65
3.85

0.13
0.13
0.13

Sqm

RM

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-003

2.91
0.00
5.20
1.66
2.63
1.09
0.00
16.67

Cum

Short wall grid 1 / AD


Short wall grid 6 / AD
Long wall grid D/1,6
Long wall grid A"B/1,2,3

RP-002

14
1
1
8
4
1
1
Total =

32.00
20.65
3.85

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

RP-001

1.30
0.00
1.30
1.30
1.30
1.30
0.00

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 3 / D to (both side)

A-026

0.40
0.00
2.00
0.40
0.38
0.70
0.00

RM

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

27 of 275

1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


Total =
RP-004

MS Plate - L - 200 X 50 X 10 (TYP)

MS Plate - L - 150 X 50 X 10 (TYP)

12.00
12.00
12.00
12.00

GI Bolt & Nut- L - 12 X 40 (TYP)

GI Bolt & Nut - 6 @ 500 C/C (TYP)

100 THK Solid Block Work El. Floor(TYP) / External

24.00
60.00
36.00
36.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

156.00

0.00

0.00

1
1
1
1

2.00
2.00
2.00
2.00

2.00
5.00
3.00
3.00

1
1
1
1
Total =

4.00
10.00
6.00
6.00
26.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

4.00
4.00
4.00
4.00

2.00
5.00
3.00
3.00

2
2
2
2
Total =

16.00
40.00
24.00
24.00
104.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

56.00
132.00
88.00
88.00

1.00
1.00
1.00
1.00

1
1
1
1
Total =

56.00
132.00
88.00
88.00
364.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

13.40
18.10
29.00
1.85
2.40
2.00
1.00

3.85
3.85
3.85
3.85
3.85
3.00
2.20

1
1
2
1
1
-5
-2
Total =

51.59
69.69
223.30
7.12
9.24
-30.00
-4.40
326.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

BW-001

2.00
5.00
3.00
3.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-007

0.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-006

0.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-005

182.00

Sqm

Short wall grid 1 / BD


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"
Deduction of doors D1
Deduction of doors D2

28 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


BW-002

200 THK Solid Block Work El. Floor (TYP) / External

Sqm

Short wall grid 1 / BD


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"
Long wall grid A/3,6 FGL to El. Floor
200 wall grid 4/AD Above Roof
200 wall grid C Above Roof
Deduction of doors D1
Deduction of doors D2

BW-003

200 THK Solid Block Work El. Floor (TYP) / Internal

50 THK Polystrene Insulation (TYP)

UPVC Rain Water Pipe 160 (TYP)

Galanised Steel Anchors at 400 CTC Vertically

Stainless Steel Butterfly Wall Ties at 400 CTC Vertically and 800 CTC
Horizontally (TYP)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14.50
18.25
6.05
1.00

3.85
3.85
3.85
2.20

2
1
1
-3
Total =

111.65
70.26
23.29
-6.60
198.61

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

13.40
18.10
29.00
1.85
2.40

3.85
3.85
3.85
3.85
3.85

1
1
2
1
1
Total =

51.59
69.69
223.30
7.12
9.24
360.94

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

6.85

1.10

6
Total =

45.21
45.21

0.00
0.00

0.00
0.00

11

2
Total =

704.00
704.00

0.00
0.00

0.00
0.00

3.25

1
Total =

1,173.06
1,173.06

0.00
0.00

0.00
0.00

No.s

Total Columns around the building = 15+1 no.s

GS-002

51.59
69.69
223.30
7.12
9.24
36.50
23.99
16.28
-30.00
-4.40
403.31

RM

Total No. of drains = 6

GS-001

1
1
2
1
1
1
1
1
-5
-2
Total =

Sqm

Short wall grid 1 / BD


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"

A-034

3.85
3.85
3.85
3.85
3.85
2.00
1.30
1.30
3.00
2.20

Sqm

Short Wall grid 2/3/A"B


Long wall grid C/3,6
200 wall grid B/2,3
Deduction of doors D3

A-027

13.40
18.10
29.00
1.85
2.40
18.25
18.45
12.53
2.00
1.00

32.00

10.63

No.s

Insulation area = 360.94 M2


1 M2 = 3.13 No.s required

360.94

29 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


PWI-001

Internal Render & Emulsion - (W1)

Sqm

SFC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
Battery Room above 1.5
Air Lock Room above 1.5

PWI-001A

Wash Sand /Internal

38.30
40.00
62.20
15.40
50.95
15.40

Alkali / Acid Resistant Tiles - (W13)

External Render & Heavy Texturised - (W15)

Wash Sand /External

Hardened & Sealed Granolithic Floor - (F8)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.015

1
Total =

20.42
20.42

0.00
0.00

0.00
0.00

50.95
15.40

1.50
1.50

1
1
Total =

76.43
23.10
99.53

0.00
0.00
0.00

0.00
0.00
0.00

100.60
5.03
18.25
18.45
12.53

3.85
3.85
2.00
1.30
1.30

1
1
1
2
2
Total =

387.31
19.35
36.50
47.97
32.57
523.69

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.015

1
Total =

14.14
14.14

0.00
0.00

0.00
0.00

72.10
84.00
230.44
11.40
42.50
31.05
18.02
23.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.30

Sqm

Cu.M

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s
FF-002

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sqm

Outer Long Wall & Short Wall


Short Wall grid 2,3
Long wall grid A/3,6 FGL to El. Floor
200 wall grid 4/AD Above Roof
200 wall grid C Above Roof

PWE-001A

147.46
154.00
239.47
59.29
119.73
36.19
756.14

756.14

Battery Room
Air Lock Room

PWE-001

1
1
1
1
1
1
Total =

Cu.M

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s
AT-001

3.85
3.85
3.85
3.85
2.35
2.35

523.69

0.30

5.15
6.00
18.85
5.70
21.25
15.53
5.68
11.55

14.00
14.00
12.23
2.00
2.00
2.00
3.18
2.00

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
External Passage 2M Wide grid 6
External Passage 2M Wide grid 1
External Passage grid A'B/1,2
External Passage 2M Wide grid D

30 of 275

1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


Total =
FF-004

Acid Resistant Tiles (F-14)

External Float Finish With UV Resistant Floor Hardener - (F-16)

18.85

Coved Granolithic Integral With Floor - (S -7) - SKIRTING

Emulsion Painted Smooth Fair Face Concrete - (C2) - CEILING

Acid Resistant Paint On Smooth Fair Face Concrete - (C-12)

Screed to falls. (Min. 50mm) - WATER PROOFING

0.00
0.00

0.00
0.00

Total =

124.88

0.00

0.00

3.08
0.36
3.08
0.36
4.25
2.00
0.36

2.00
12
1.50
12
2.08
3.08
11

2
2
2
2
3
2
2
Total =

12.32
8.64
9.24
8.64
26.46
12.32
7.92
85.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

38.30
40.00
62.16
15.40
50.95

0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

3.83
4.00
6.22
1.54
5.10
20.68

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

5.15
6.00
18.85
5.70

14.00
14.00
12.23
2.00

1
1
1
1
Total =

72.10
84.00
230.44
11.40
397.94

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

18.85

6.63

1
Total =

124.88
124.88

0.00
0.00

0.00
0.00

31.95

20.75

1
Total =

33.15
33.15

0.00
0.00

0.00
0.00

Sqm

Battery Room

WP-002

124.88
0.00

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room

SE-003

6.63

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
Battery Room

SE-001

0.00

Sqm

Treads (3080x2000) SF2


Riser
Treads (3080x1500) SF1
Riser
Landing El.102.00/104.200/106.550
Treads
Riser

SK-001

0.00

Sqm

Battery Room

FF-005

512.61

Cum

Roof Area

31 of 275

0.050

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


WP-001

Separation layer of 500g Polythene sheet.

Sqm

Roof Area

WP-004

Expanded polystyrene insulation 350Kg/Cu.M 75mm Thk. with 15mm


rebate on edges.

31.95

300x300x30 Thk. concrete slab set in 20 Thk. screed.

40x40 mm Bituthene fillet HC.

Bituthene 1200xHC with 150mm laps on primed screed to fall.

300x300 mm wide bituthene 1200xHC reinforcing strip in corner.

D-001

D1

Bituthene 1200xHC and solar shield turned into 25x25 chase and securely
fixed and sealed with 20x20 wooden batten and then pointed with
servimastic.
Roof Area
BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D1

UNION PANIC LATCH - SILVER FINISH

D1

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

662.96
662.96

0.00
0.00

0.00
0.00

20.75

31.95

20.75

0.090

1
Total =

7,366.25
7,366.25

0.00
0.00

0.00
0.00

105.40

0.040

0.040

1
Total =

0.17
0.17

0.00
0.00

0.00
0.00

105.40

0.00

0.600

1
Total =

63.24
63.24

0.00
0.00

0.00
0.00

2.40

0.00

0.600

6
Total =

8.64
8.64

0.00
0.00

0.00
0.00

105.40

1
Total =

105.40
105.40

0.00
0.00

0.00
0.00

6.00

5
Total =

30.00
30.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

5.00

0.00

0.00

PR

No.s

D1 = 2000 mm X 3000 mm

D-003

1
Total =

31.95

RM

D1 = 2000 mm X 3000 mm

D-002

0.00

sqm

Roof Area

WP-008

0.00

0.00

sqm

Roof Area

WP-007

0.00

662.96

Cum

Roof Area

WP-006

No.s

Roof Area

WP-003

662.96

Total =
Sqm

Roof Area

WP-005

20.75

No.s

D1 = 2000 mm X 3000 mm

1.00

32 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


Total =
D-004

D1

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X


8MM ROSE - SSS

1.00

5
Total =

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM


HEIGHT DOOR-NP

D-006

D1

1.00

D1

DUST EXCLUDING SOCKET - CP

D1

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

D1

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D1

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D1

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D1

LEGGE ROLLER LATCH

D2

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

0.00

0.00

5.00

0.00

0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

2.00

5
Total =

10.00
10.00

0.00
0.00

0.00
0.00

11.00

5
Total =

55.00
55.00

0.00
0.00

0.00
0.00

2.00

5
Total =

10.00
10.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

No.s

D1 = 2000 mm X 3000 mm

D-001

MTR

D1 = 2000 mm X 3000 mm

D-012

5.00

Total =

MTR

D1 = 2000 mm X 3000 mm

D-011

0.00

No.s

D1 = 2000 mm X 3000 mm

D-010

0.00

0.00

No.s

D1 = 2000 mm X 3000 mm

D-009

0.00

5.00

No.s

D1 = 2000 mm X 3000 mm

D-008

5.00

No.s

D1 = 2000 mm X 3000 mm

D-007

0.00

No.s

D1 = 2000 mm X 3000 mm
L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT
STANDARD HEIGHT DOOR-NP

0.00

No.s

D1 = 2000 mm X 3000 mm

D-005

5.00

PR

33 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


D2 = 1000 mm X 2200 mm

D-002

D2

UNION PANIC LATCH - SILVER FINISH

1.50

D2

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

D2

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

D2

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D2

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D2

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D3

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D015

D3

D3

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D3 = 1000 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

2.00

2
Total =

4.00
4.00

0.00
0.00

0.00
0.00

5.40

2
Total =

10.80
10.80

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.50

3
Total =

4.50
4.50

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

PR

D3 = 1000 mm X 2200 mm

D-014

2
Total =

MTR

D2 = 1000 mm X 2200 mm

D001

1.00

MTR

D2 = 1000 mm X 2200 mm

D-011

0.00

No.s

D2 = 1000 mm X 2200 mm

D-010

0.00

0.00

No.s

D2 = 1000 mm X 2200 mm

D-009

0.00

3.00

No.s

D2 = 1000 mm X 2200 mm

D-013

No.s

D2 = 1000 mm X 2200 mm

D-003

3.00

Total =

No.s

Sets

D3 = 1000 mm X 2200 mm

34 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Unit Electrical Building (Unit - 1)


D-016

D3

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

No.s

D3 = 1000 mm X 2200 mm

D-017

D3

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

2.00

D3

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

D3

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D3

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

D3

SEMI CIRCULAR FLOOR DOOR STOP - SSS

0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

5.40

3
Total =

16.20
16.20

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

MTR

D3 = 1000 mm X 2200 mm

D-009

0.00

0.00

MTR

D3 = 1000 mm X 2200 mm

D-018

0.00

6.00

No.s

D3 = 1000 mm X 2200 mm

D-010

No.s

D3 = 1000 mm X 2200 mm

D-013

6.00

Total =

No.s

D3 = 1000 mm X 2200 mm

35 of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

36 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

37 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

38 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

39 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

40 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

41 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

42 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

43 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

44 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

45 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

46 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

47 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

48 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

49 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

50 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

51 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

52 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

53 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

54 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

0.00
0.00

0.00%
0.00%

55 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

56 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

57 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

Remarks

3.125
0.32

58 of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

59 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

60 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

61 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

62 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

63 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

64 of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


DWG NO. RBB 80 102184 CG 2331 00007 0001 5L 03
A-001

Excavation of Foundations

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

3.10
3.90
3.50
2.70
2.10
2.10

3.10
3.90
3.50
2.70
2.60
3.10

1.85
1.85
1.85
1.85
1.05
1.05

195.56
56.28
158.64
80.92
11.47
13.67

0.00
0.00
0.00
0.00
0.00
0.00

Total =

516.53

0.00

11
2
7
6
2
2
Total =

48.51
16.82
43.75
17.34
3.52
4.62
134.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.05
0.05
0.05
0.05
0.05
0.05

11
2
7
6
2
2
Total =

2.43
0.84
2.19
0.87
0.18
0.23
6.73

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

52.80
19.04
50.40
19.20
3.50
4.20
149.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00

A-001
A-003

Polythene Sheet 1000 Gauge

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

2.10
2.90
2.50
1.70
1.10
1.10

2.10
2.90
2.50
1.70
1.60
2.10

A-003
A-004

P.C.C Concrete (C10)

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)
A-004
A-005

11
2
7
6
2
2

Formwork Of Foundations

sqm

Formwork of Fnd.s (F1)


Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork' of Fnd.s (F4)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

8.00
11.20
9.60
6.40
5.00
6.00

A-005

65 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
NR

Height

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


A-006

S. Concrete of Foundations Grade (C35)

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)

2.00
2.80
2.40
1.60
1.00
1.00

2.00
2.80
2.40
1.60
1.50
2.00

0.60
0.85
0.75
0.50
0.35
0.35

11
2
7
6
2
2
Total =

A-006
A-007

Waterproofing Protection (Coating/Painting)

sqm

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)
Bot. of Fnd.s (F1)
Bot. of Fnd.s (F2)
Bot. of Fnd.s (F3)
Bot. of Fnd.s (F4)
Bot. of Fnd.s (SF1)
Bot. of Fnd.s (SF2)
Top of Fnd.s (F1)
Top of Fnd.s (F2)
Top of Fnd.s (F3)
Top of Fnd.s (F4)
Top of Fnd.s (SF1)
Top of Fnd.s (SF2)
C1-F1
C2-F1
C3-F1
C4-F1
C3B-F2
C3C-F2
C1-F3
C2-F3
C3/C3B-F3
C3A-F4
C4-F4
C5-F4

0.00
0.00
0.00
0.00
0.00
0.00
0.00

105.60
38.08
100.80
38.40
7.00
8.40
88.00
31.36
80.64
30.72
6.25
6.25
88.00
31.36
80.64
30.72
6.25
6.25
26.60
21.28
6.72
3.92
5.52
5.52
4.75
14.25
12.00
6.00
8.40
4.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Double Coating
8.00
11.20
9.60
6.40
5.00
6.00
2.00
2.80
2.40
1.60
1.25
1.25
2.00
2.80
2.40
1.60
1.25
1.25
1.90
1.90
2.40
1.40
2.40
2.40
1.90
1.90
2.40
2.40
1.40
1.40

66 of 275

26.40
13.33
30.24
7.68
1.05
1.40
80.10

0.60
0.85
0.75
0.50
0.35
0.35
2.00
2.80
2.40
1.60
1.25
1.25
2.00
2.80
2.40
1.60
1.25
1.25
1.40
1.40
1.40
1.40
1.15
1.15
1.25
1.25
1.25
1.25
1.50
1.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

11
2
7
6
2
2
11
2
7
6
2
2
11
2
7
6
2
2
5
4
1
1
1
1
1
3
2
1
2
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


C6-F4
C7-F4
Pedestal (SF1)
Pedestal (SF2)
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)

1.40
1.40
3.60
4.60
6.20
5.60
5.85

1.50
1.50
0.90
0.90
1.60
1.60
1.60

2
2
2
2
2
2
2

A-007
A-008

Waterproofing Glassmat Sheet

sqm

2
1
2
2
1
1
1
Total =

8.40
4.20
14.40
18.40
19.84
17.92
18.72
1,005.76

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

502.88
502.88

0.00
0.00

1
1
Total =

516.53
80.10
436.43

0.00
0.00
0.00

1
1
1
2
2
2
Total =

1.86
1.68
1.76
6.20
5.60
5.85
22.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
Total =

0.93
0.84
0.88
2.65

0.00
0.00
0.00
0.00

32.30
6.18
25.84
18.53
8.16
7.80

0.00
0.00
0.00
0.00
0.00
0.00

Single Layer

Glassmat Sheet = 942.98/2


A-008
A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 516.53 Cu3


Qty of S. Concrete = 80.10 Cu3

(-)

516.53
80.10

A-002A
A-009

Formwork of Plinth Beam At El. 99.8 FGL

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)

6.20
5.60
5.85
6.20
5.60
5.85

0.30
0.30
0.30

6.20
5.60
5.85

0.30
0.30
0.30

0.50
0.50
0.50

A-009
A-010

S. Concrete of Plinth Beams At 99.8 (TOC) Grade (C35)

Cum

PB1 - (300x500)
PB2 - (300x500)
PB3 - (300x500)

0.50
0.50
0.50

A-010
A-011

Formwork for Columns Upto El.102.00

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)

1.90
1.90
1.90
1.90
2.40
2.40

67 of 275

3.40
3.25
3.40
3.25
3.40
3.25

5
1
4
3
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

2.40
1.40
2.40
2.40
2.40
1.40
1.40
1.40
1.40
3.60
4.60

3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50
3.50
0.85
0.85

1
1
1
1
1
2
1
2
1
2
2
Total =

7.80
4.76
7.80
7.56
7.56
9.80
4.90
9.80
4.90
6.12
7.82
177.62

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.40
3.25
3.40
3.25
3.40
3.25
3.25
3.40
3.25
3.15
3.15
3.50
3.50
3.50
3.50
0.85
0.85

5
1
4
3
1
1
1
1
1
1
1
2
1
2
1
2
2
Total =

3.57
0.68
2.86
2.05
1.22
1.17
1.17
0.42
1.17
1.13
1.13
0.86
0.43
0.86
0.43
0.77
1.02
20.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.62
1.70
1.77
0.70
1.80
2.00

0.00
0.00
0.00
0.00
0.00
0.00

A-011
A-012

S. Concrete for Columns Upto El. 102 (G-C35)

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C4-F1 - (350x350)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C4-F4 - (350x350)
C5-F4 - (350x350)
C6-F4 - (350x350)
C7-F4 - (350x350)
SF1 - (300x1500)
SF2 - (300x2000)

0.35
0.35
0.35
0.35
0.60
0.60
0.60
0.35
0.60
0.60
0.60
0.35
0.35
0.35
0.35
0.30
0.30

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.35
0.60
0.60
0.60
0.35
0.35
0.35
0.35
1.50
2.00

2.08
5.65
5.90
2.33
5.15
5.70

0.30
0.30
0.30
0.30
0.35
0.35

A-012
A-013

Formwork of Elevated Beams At El. 102.00 (TOC)

sqm

FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)

68 of 275

1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)

6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98

69 of 275

0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2.21
2.05
2.09
0.60
0.60
0.38
1.90
1.76
1.79
0.60
1.80
2.00
2.17
1.96
2.05
0.51
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.90
1.76
1.79
1.55
0.65
1.80
2.00
2.21
2.05
2.09

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)

1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50

70 of 275

0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.60
1.90
1.76
1.79
2.00
1.90
0.56
1.55
1.76
1.79
2.17
1.96
2.05
0.44
0.90
2.18
1.38
0.86
2.40
2.26
0.56
1.99
0.76
1.35
2.06
0.76
1.35
0.32
0.63
2.35
2.28
0.56
1.99
2.09
1.86
1.99
1.86
1.99
1.86
1.99
1.58

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)
FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)

6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33

71 of 275

0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

2.35
2.32
1.10
1.18
1.66
2.46
2.32
1.66
2.46
2.32
1.68
2.46
2.32
0.36
1.53
2.24
2.12
0.65
2.49
5.65
5.90
2.33
7.21
7.98
8.86
8.19
8.37
2.40
2.40
1.50
7.59
7.02
7.17
2.38
7.21
7.98
8.68
7.84
8.19
2.03
7.59

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)

5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60

72 of 275

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
7.59
7.02
7.17
6.18
2.59
7.21
7.98
8.86
8.19
8.37
2.38
7.59
7.02
7.17
7.98
7.59
2.25
6.21
7.05
7.17
8.68
7.84
8.19
1.74
3.00
7.28
4.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)
FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)

2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53
1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05

73 of 275

0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

3.45
9.59
9.03
2.25
7.95
2.53
4.50
8.25
2.53
4.50
1.26
2.52
9.42
9.14
2.25
7.95
8.37
7.44
7.95
7.44
7.95
7.44
7.95
6.30
9.42
9.28
4.38
4.71
6.65
9.84
9.28
6.65
9.84
9.28
6.72
9.84
9.28
1.44
5.10
7.45
7.05

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB102 - (300x500)

2.18

0.50

A-013

2
Total =

A-014

S. Concrete of Elevated Beams At El. 102 (TOC) Grade (C35)


FB1 - (300x600)
FB2 - (300x500)
FB3 - (300x500)
FB4 - (300x500)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (350x700)
FB8 - (350x700)
FB9 - (350x700)
FB10 - (300x600)
FB11 - (300x600)
FB11A - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (350x700)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)

0.00
0.00

0.37
0.85
0.89
0.35
1.26
1.40
1.55
1.43
1.46
0.36
0.36
0.23
1.14
1.05
1.08
0.42
1.26
1.40
1.52
1.37
1.43
0.36
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08
1.14
1.05
1.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum
2.08
5.65
5.90
2.33
5.15
5.70
6.33
5.85
5.98
2.00
2.00
1.25
6.33
5.85
5.98
1.70
5.15
5.70
6.20
5.60
5.85
1.45
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98
6.33
5.85
5.98

74 of 275

2.18
865.01

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.60
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (350x700)
FB46 - (350x700)
FB47 - (350x700)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (350x700)
FB52 - (300x600)
FB53 - (300x600)
FB54 - (300x600)
FB55 - (300x600)
FB56 - (300x600)
FB57 - (350x700)
FB58 - (350x700)
FB59 - (350x700)
FB60 - (300x600)
FB61 - (300x500)
FB62 - (300x500)
FB63 - (300x500)
FB64 - (300x600)
FB65 - (350x700)
FB66 - (350x700)
FB67 - (300x600)
FB68 - (300x600)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x600)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (350x700)
FB75 - (350x700)
FB76 - (350x700)
FB77 - (350x700)

6.33
5.85
5.98
5.15
1.85
5.15
5.70
6.33
5.85
5.98
1.70
6.33
5.85
5.98
5.70
6.33
1.88
5.18
5.88
5.98
6.20
5.60
5.85
1.45
3.00
7.28
4.60
2.88
6.85
6.45
1.88
6.63
2.53
4.50
6.88
2.53
4.50
0.90
1.80
6.73
6.53

75 of 275

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35

0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.60
0.70
0.70
0.60
0.60
0.50
0.50
0.60
0.50
0.50
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.14
1.05
1.08
0.93
0.45
1.26
1.40
1.55
1.43
1.46
0.42
1.14
1.05
1.08
1.40
1.14
0.34
0.93
1.06
1.08
1.52
1.37
1.43
0.26
0.45
1.09
0.69
0.52
1.68
1.58
0.34
1.19
0.38
0.68
1.24
0.38
0.68
0.22
0.44
1.65
1.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FB78 - (300x600)
FB79 - (300x600)
FB80 - (300x600)
FB81 - (300x600)
FB82 - (300x600)
FB83 - (300x600)
FB84 - (300x600)
FB85 - (300x600)
FB86 - (300x600)
FB87 - (350x700)
FB88 - (350x700)
FB89 - (350x700)
FB90 - (300x600)
FB91 - (300x600)
FB92 - (350x700)
FB92A - (350x700)
FB93 - (350x700)
FB94 - (350x700)
FB94A - (350x700)
FB95 - (350x700)
FB96 - (350x700)
FB96A - (350x700)
FB97 - (350x700)
FB98 - (300x600)
FB99 - (300x500)
FB100 - (300x500)
FB101 - (300x500)
FB102 - (300x500)

1.88
6.63
6.98
6.20
6.63
6.20
6.63
6.20
6.63
4.50
6.73
6.63
3.65
3.93
4.75
7.03
6.63
4.75
7.03
6.63
4.80
7.03
6.63
1.20
5.10
7.45
7.05
2.18

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30

1.70
5.15
0.90
1.67
1.67
1.07
1.07
5.70
0.93
0.90

14.38
18.05
5.33
4.95
2.53
4.95
2.53
17.43
5.33
4.08

A-014
A-015

Formwork of Elevated Slab At El.102.000 (TOC)

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

0.34
1.19
1.26
1.12
1.19
1.12
1.19
1.12
1.19
1.10
1.65
1.62
0.66
0.71
1.16
1.72
1.62
1.16
1.72
1.62
1.18
1.72
1.62
0.22
0.77
1.12
1.06
0.33
111.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

24.44
92.96
9.59
16.53
8.43
5.30
2.70
99.32
9.85
7.34

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

Grid from A' to D / 1


Grid from A' to D / 1 to 2
Opening D to C / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Opening D to C / 2 to 3
Opening D to C / 2 to 3

76 of 275

1
1
2
2
2
1
1
1
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


Opening B to C / 2 to 3
Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to C / 3 to 4
Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening B to C / 4 to 5
Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening B to C / 5 to 6
Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

0.95
0.75
0.90
6.33
2.60
4.80
4.83
1.80
4.83
5.85
5.00
5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

5.40
2.60
0.98
19.73
0.70
0.50
1.23
0.30
0.89
15.65
1.00
0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

1.70
5.15
0.90
0.30
1.67
1.67
1.07
1.07
5.70
0.93
0.90
0.95
0.75
0.90
6.33
2.60

14.38
18.05
5.33
1.73
4.95
2.53
4.95
2.53
17.43
5.33
4.08
5.40
2.60
0.98
19.73
0.70

2
2
1
1
2
2
2
2
1
1
2
2
2
2
1
1
2
2
2
2
1
1
Total =

A-015
A-016

S. Concrete of Elevated Slab Grade (C35) At El. 102.000(TOC)


Grid from A' to D / 1
Grid from A' to D / 1 to 2
Deduction Opening D to C / 1 to 2
Beams remaining of this opening
Deduction 300 mm THK Slab B to C / 1 to 2
Deduction 300 mm THK Slab A' to B / 1 to 2
300 mm THK Slab B to C / 1 to 2
300 mm THK Slab A' to B / 1 to 2
Grid from A" to D / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening D to C / 2 to 3
Deduction Opening B to C / 2 to 3
Deduction Opening B to C / 2 to 3
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 3 to 4
Deduction Opening B to C / 3 to 4

77 of 275

10.26
3.90
0.88
124.76
3.64
4.80
11.91
1.08
4.28
91.55
10.00
6.44
13.56
26.73
1.71
93.51
3.60
4.65
11.48
18.17
2.33
33.24
758.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.67
13.94
-0.72
-0.16
-1.24
-0.63
1.59
0.81
14.90
-0.74
-0.55
-0.77
-0.29
0.26
18.71
-0.27

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum
0.15
0.15
0.15
0.15
0.15
0.15
0.30
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15

1
1
-1
-2
-1
-1
1
1
1
-1
-1
-1
-1
1
1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


Deduction Opening B to C / 3 to 4
Deduction Opening B to C / 3 to 4
Deduction Opening B to A" / 3 to 4
300 mm THK Slab C to D / 2 to 3
Grid from A to D / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening B to C / 4 to 5
Deduction Opening A to B / 4 to 5
300 mm THK Slab A to B / 4 to 5
Grid from A to D / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening B to C / 5 to 6
Deduction Opening A to B / 5 to 6
300 mm THK Slab B to C / 5 to 6
Grid from A to D / 6

4.80
4.83
1.80
4.83
5.85
5.00
5.85
5.85
5.85
0.75
5.98
3.60
4.65
4.65
3.98
4.12
1.70

0.50
1.23
0.30
0.89
15.65
1.00
0.55
1.16
2.29
2.29
15.65
0.50
0.50
1.23
2.29
0.57
19.55

0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15
0.15
0.15
0.15
0.15
0.30
0.15

-1
-1
-1
1
1
-1
-1
-1
-1
1
1
-1
-1
-1
-1
1
1
Total =

-0.36
-0.89
-0.08
1.29
13.73
-0.75
-0.48
-1.02
-2.01
0.51
14.03
-0.27
-0.35
-0.86
-1.36
0.70
4.99
75.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1
1
1
1
1
2
Total =

43.23
8.65
34.58
25.94
10.92
10.92
10.92
10.92
10.92
2.73
12.74
182.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.78
0.96
3.82
2.87
1.64
1.64

0.00
0.00
0.00
0.00
0.00
0.00

A-016
A-017

Formwork for Columns from 102.00 Upto 106.550

sqm

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)
C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

1.90
1.90
1.90
1.90
2.40
2.40
2.40
2.40
2.40
0.60
1.40

A-017
A-018

Concrete for Columns Upto 106.55 Roof Slab (G-C35)

Cum

C1-F1 - (350x600)
C1-F3 - (350x600)
C2-F1 - (350x600)
C2-F3 - (350x600)
C3-F1 - (600x600)
C3-F3 - (600x600)

0.35
0.35
0.35
0.35
0.60
0.60

78 of 275

0.60
0.60
0.60
0.60
0.60
0.60

4.55
4.55
4.55
4.55
4.55
4.55

5
1
4
3
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


C3B-F3 - (600x600)
C3A-F4 - (600x600)
C3B-F2 - (600x600)
C3C-F2 - (600x600)
C6-F4 - (350x350)

0.60
0.60
0.60
0.60
0.35

0.60
0.60
0.60
0.60
0.35

A-018

4.55
4.55
4.55
4.55
4.55

1
1
1
1
2
Total =

A-019

Formwork of Roof Beams At El. 106.550 (TOC)

1.64
1.64
1.64
1.64
1.11

0.00
0.00
0.00
0.00
0.00

23.36

0.00

0.67
1.99
2.18
4.11
3.83
4.01
1.70
1.87
2.06
1.91
2.00
1.99
2.18
2.40
3.19
3.34
0.70
1.87
2.06
1.91
1.95
1.99
2.06
2.40
2.23
2.34
2.18
2.06
1.91
1.95
2.40
3.10
3.25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50

79 of 275

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)
RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)

7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23
2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23

80 of 275

0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.90
0.90
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

2.67
2.53
0.86
2.67
2.53
1.65
2.67
2.53
1.31
1.31
7.29
4.23
7.71
4.34
0.89
0.74
1.12
1.12
1.11
1.11
0.98
7.10
2.53
2.67
7.95
8.72
9.59
8.93
9.35
6.81
7.47
8.22
7.65
8.01
7.95
8.72
9.59
11.48
12.02
2.79
7.47

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)
RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23
4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

A-019
A-020

S. Concrete of Elevated Beams At El. 106.550 (TOC) Grade (C35)

81 of 275

Cum

0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

8.22
7.65
7.80
7.95
8.23
9.59
8.93
9.35
6.23
8.22
7.65
7.80
9.59
11.16
11.70
10.68
10.12
3.43
10.68
10.12
6.62
10.68
10.12
5.22
4.35
24.30
9.87
25.70
10.12
3.54
2.94
4.47
4.47
4.44
4.44
3.90
23.65
10.12
626.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


RB1 - (300x600)
RB2 - (350x700)
RB3 - (350x700)
RB4 - (600x700)
RB5 - (600x700)
RB6 - (600x700)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (350x700)
RB13 - (350x700)
RB14 - (350x700)
RB15 - (500x900)
RB16 - (500x900)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (300x600)
RB20 - (300x600)
RB21 - (300x600)
RB22 - (350x700)
RB23 - (350x700)
RB24 - (350x700)
RB25 - (350x700)
RB26 - (350x700)
RB27 - (350x500)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (350x700)
RB32 - (500x900)
RB33 - (500x900)
RB34 - (350x700)
RB35 - (350x700)
RB36 - (350x700)
RB37 - (350x700)
RB38 - (350x700)
RB39 - (350x700)
RB40 - (350x700)
RB41 - (350x700)

2.23
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
5.68
6.23
6.85
6.38
6.68
2.33
6.23
6.85
6.38
6.50
5.68
5.88
6.85
6.38
6.68
6.23
6.85
6.38
6.50
6.85
6.20
6.50
7.63
7.23
2.45
7.63
7.23
4.73
7.63
7.23

82 of 275

0.30
0.35
0.35
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.50
0.50
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.50
0.50
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.90
0.90
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.50
0.60
0.60
0.60
0.70
0.90
0.90
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.40
1.39
1.53
2.88
2.68
2.80
1.02
1.12
1.23
1.15
1.20
1.39
1.53
1.68
2.87
3.00
0.42
1.12
1.23
1.15
1.17
1.39
1.44
1.68
1.56
1.64
1.09
1.23
1.15
1.17
1.68
2.79
2.93
1.87
1.77
0.60
1.87
1.77
1.16
1.87
1.77

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


RB42 - (300x600)
RB43 - (300x500)
RB44 - (600x1000)
RB45 - (600x700)
RB46 - (600x1000)
RB47 - (600x700)
RB48 - (300x600)
RB49 - (300x600)
RB50 - (300x600)
RB51 - (300x600)
RB52 - (300x600)
RB53 - (300x600)
RB54 - (300x600)
RB55 - (600x1000)
RB56 - (350x700)

4.35
4.35
12.15
7.05
12.85
7.23
2.95
2.45
3.73
3.73
3.70
3.70
3.25
11.83
7.23

0.30
0.30
0.60
0.60
0.60
0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.35

5.48
5.70
6.20
5.60
6.43

14.15
15.78
18.35
18.35
18.35

5.48
5.70
6.20
5.60
6.43

14.15
15.78
18.35
18.35
18.35

0.60
0.50
1.00
0.70
1.00
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
1.00
0.70

A-020
A-021

Formwork of Elevated Slab At El.106.550 (TOC)

A-021
*

S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)

0.15
0.15
0.15
0.15
0.15

A-022
*

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
Total =

77.47
89.92
113.77
102.76
117.90
501.82

0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
Total =

11.62
13.49
17.07
15.41
17.68
75.27

0.00
0.00
0.00
0.00
0.00
0.00

12.48
10.40
29.12
0.00
10.40
16.64

0.00
0.00
0.00
0.00
0.00
0.00

Cum

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

A-023

0.78
0.65
7.29
2.96
7.71
3.03
0.53
0.44
0.67
0.67
0.67
0.67
0.59
7.10
1.77
100.89

sqm

Grid from B to D / 1 to 2
Grid from A" to D / 2 to 3
Grid from A to D / 3 to 4
Grid from A to D / 4 to 5
Grid from A to D / 5 to 6

A-022

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

Formwork of Elevated Petestal above Roof

sqm

Pedestal-600x600 for Shed


P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400

2.40
2.00
1.60
0.00
8.00
1.60

83 of 275

1.30
1.30
1.30
0.00
1.30
1.30

4
4
14
1
1
8

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


P6-1350x375
P7-1200x700
P8-Hold

3.45
3.80
0.00

1.30
1.30
0.00

17.94
4.94
0.00

0.00
0.00
0.00

Total =

101.92

0.00

1.30
1.30
1.30
0.00
1.30
1.30
1.30
1.30
0.00

4
4
14
1
1
8
4
1
1
Total =

1.87
1.30
2.91
0.00
5.20
1.66
2.63
1.09
0.00
16.67

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.30
1.30
1.30

4
4
2
Total =

166.40
107.38
10.01
283.79

0.00
0.00
0.00
0.00

1.30
1.30
1.30

2
2
1
Total =

10.40
6.71
0.63
17.74

0.00
0.00
0.00
0.00

17.90
18.10
29.00
11.20

1.80
1.80
1.80
1.80

1
1
1
1
Total =

32.22
32.58
52.20
20.16
137.16

0.00
0.00
0.00
0.00
0.00

28.00
66.00
44.00

2.00
2.00
2.00

56.00
132.00
88.00

0.00
0.00
0.00

A-023
A-024

S. Concrete of Elevated Pedestal above Roof Slab (C35)

Cum

Pedestal-600x600 for Shed


P1-500x500
P2-400x400
P3-Hold
P4-2000x2000
P5-400x400
P6-1350x375
P7-1200x700
P8-Hold

0.60
0.50
0.40
0.00
2.00
0.40
1.35
1.20
0.00

0.60
0.50
0.40
0.00
2.00
0.40
0.38
0.70
0.00

A-024
A-025

Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 3 / D to (both side)

32.00
20.65
3.85

A-025
A-026

S. Concrete for R.C Parapet Wall Grade (C35)

Cum

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

32.00
20.65
3.85

0.13
0.13
0.13

A-026
RP-001

3 mm M.S Wire Mesh Plastic Coated to 4mm dia 50x50 wire mesh tied
with tie wire to RHS (TYP)

Sqm

Short wall grid 1 / AD


Short wall grid 6 / AD
Long wall grid D/1,6
Long wall grid A"B/1,2,3
RP-001
RP-002

4
1
1

MS Flat - L - 50 X 50 X 6 (TYP)

RM

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2

84 of 275

1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


Grid 1 - Elevation - 4

44.00

2.00

RP-002
RP-003

MS Flat - L - 25 X 5 to fix chainlink Mesh (TYP)

MS Plate - L - 200 X 50 X 10 (TYP)

1.00
1.00
1.00
1.00

1
1
1
1
Total =

28.00
66.00
44.00
44.00
182.00

0.00
0.00
0.00
0.00
0.00

12.00
12.00
12.00
12.00

2.00
5.00
3.00
3.00

1
1
1
1
Total =

24.00
60.00
36.00
36.00
156.00

0.00
0.00
0.00
0.00
0.00

2.00
2.00
2.00
2.00

2.00
5.00
3.00
3.00

1
1
1
1
Total =

4.00
10.00
6.00
6.00
26.00

0.00
0.00
0.00
0.00
0.00

4.00
4.00
4.00
4.00

2.00
5.00
3.00
3.00

2
2
2
2
Total =

16.00
40.00
24.00
24.00
104.00

0.00
0.00
0.00
0.00
0.00

56.00
132.00
88.00
88.00

1.00
1.00
1.00
1.00

1
1
1
1
Total =

56.00
132.00
88.00
88.00
364.00

0.00
0.00
0.00
0.00
0.00

13.40

3.85

51.59

0.00

RP-004
*

MS Plate - L - 150 X 50 X 10 (TYP)

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4
RP-005
RP-006

GI Bolt & Nut- L - 12 X 40 (TYP)

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4
RP-006
RP-007

GI Bolt & Nut - 6 @ 500 C/C (TYP)

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4
RP-007
BW-001

0.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-005

0.00

364.00

28.00
66.00
44.00
44.00

RP-003
*

RM

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-004

88.00

Total =

100 THK Solid Block Work El. Floor(TYP) / External

Sqm

Short wall grid 1 / BD

85 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"
Deduction of doors D1
Deduction of doors D2

18.10
29.00
1.85
2.40
2.00
1.00

3.85
3.85
3.85
3.85
3.00
2.20

1
2
1
1
-5
-2
Total =

69.69
223.30
7.12
9.24
-30.00
-4.40
326.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00

13.40
18.10
29.00
1.85
2.40
18.25
18.45
12.53
2.00
1.00

3.85
3.85
3.85
3.85
3.85
2.00
1.30
1.30
3.00
2.20

1
1
2
1
1
1
1
1
-5
-2
Total =

51.59
69.69
223.30
7.12
9.24
36.50
23.99
16.28
-30.00
-4.40
403.31

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14.50
18.25
6.05
1.00

3.85
3.85
3.85
2.20

2
1
1
-3
Total =

111.65
70.26
23.29
-6.60
198.61

0.00
0.00
0.00
0.00
0.00

13.40
18.10
29.00
1.85
2.40

3.85
3.85
3.85
3.85
3.85

1
1
2
1
1
Total =

51.59
69.69
223.30
7.12
9.24
360.94

0.00
0.00
0.00
0.00
0.00
0.00

6.85

1.10

6
Total =

45.21
45.21

0.00
0.00

BW-001
BW-002

200 THK Solid Block Work El. Floor (TYP) / External

Sqm

Short wall grid 1 / BD


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"
Long wall grid A/3,6 FGL to El. Floor
200 wall grid 4/AD Above Roof
200 wall grid C Above Roof
Deduction of doors D1
Deduction of doors D2
BW-002
BW-003

200 THK Solid Block Work El. Floor (TYP) / Internal

Sqm

Short Wall grid 2/3/A"B


Long wall grid C/3,6
200 wall grid B/2,3
Deduction of doors D3
BW-003
A-027

50 THK Polystrene Insulation (TYP)

Sqm

Short wall grid 1 / BD


Short wall grid 6 / AD
Long wall grid D/1,6 & AA'/1,6
Short Wall grid 2/A"B
Short Wall grid 3/AA"
A-027
A-034

UPVC Rain Water Pipe 160 (TYP)

RM

Total No. of drains = 6


A-034

86 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


GS-001

Galanised Steel Anchors at 400 CTC Vertically

No.s

Total Columns around the building = 15+1 no.s

32.00

10.63

11

GS-001
GS-002

Stainless Steel Butterfly Wall Ties at 400 CTC Vertically and 800 CTC
Horizontally (TYP)

PWI-001

Internal Render & Emulsion Paint - (W1)

Alkali / Acid Resistant Tiles - (W13)

3.25

1
Total =

1,173.06
1,173.06

0.00
0.00

38.30
40.00
62.20
15.40
50.95
15.40

3.85
3.85
3.85
3.85
2.35
2.35

1
1
1
1
1
1
Total =

147.46
154.00
239.47
59.29
119.73
36.19
756.14

0.00
0.00
0.00
0.00
0.00
0.00
0.00

50.95
15.40

1.50
1.50

1
1
Total =

76.43
23.10
99.53

0.00
0.00
0.00

100.60
5.03
18.25
18.45
12.53

3.85
3.85
2.00
1.30
1.30

1
1
1
2
2
Total =

387.31
19.35
36.50
47.97
32.57
523.69

0.00
0.00
0.00
0.00
0.00
0.00

72.10
84.00
230.44
11.40
42.50
31.05
18.02
23.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sqm

Battery Room
Air Lock Room
AT-001
PWE-001

External Render & Heavy Texturised Paint - (W15)

Sqm

Outer Long Wall & Short Wall


Short Wall grid 2,3
Long wall grid A/3,6 FGL to El. Floor
200 wall grid 4/AD Above Roof
200 wall grid C Above Roof
PWE-001
FF-002

0.00

360.94

PWI-001
*

0.00

704.00

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
Battery Room above 1.5
Air Lock Room above 1.5

AT-001

No.s

Insulation area = 360.94 M2


1 M2 = 3.13 No.s required

GS-002

704.00

Total =

Hardened & Sealed Granolithic Floor - (F8)

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
External Passage 2M Wide grid 6
External Passage 2M Wide grid 1
External Passage grid A'B/1,2
External Passage 2M Wide grid D

5.15
6.00
18.85
5.70
21.25
15.53
5.68
11.55

87 of 275

14.00
14.00
12.23
2.00
2.00
2.00
3.18
2.00

1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


FF-002

Total =
FF-004

Acid Resistant Tiles (F-14)

18.85

6.63

External Float Finish With UV Resistant Floor Hardener - (F-16)

Coved Granolithic Integral With Floor - (S -7) - SKIRTING

Emulsion Painted Smooth Fair Face Concrete - (C2) - CEILING

2
2
2
2
3
2
2
Total =

12.32
8.64
9.24
8.64
26.46
12.32
7.92
85.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

38.30
40.00
62.16
15.40
50.95

0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

3.83
4.00
6.22
1.54
5.10
20.68

0.00
0.00
0.00
0.00
0.00
0.00

5.15
6.00
18.85
5.70

14.00
14.00
12.23
2.00

1
1
1
1
Total =

72.10
84.00
230.44
11.40
397.94

0.00
0.00
0.00
0.00
0.00

18.85

6.63

1
Total =

124.88
124.88

0.00
0.00

31.95

20.75

1
Total =

33.15
33.15

0.00
0.00

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
SE-001
SE-003

Acid Resistant Paint On Smooth Fair Face Concrete - (C-12)

Sqm

Battery Room
SE-003
WP-002

0.00

2.00
12.00
1.50
12.00
2.08
3.08
11.00

SK-001
*

124.88

Sqm

SPC Panel Room


Turbine Panel Room
Switchgear Room
Air Lock Room
Battery Room

SE-001

Total =

3.08
0.36
3.08
0.36
4.25
2.00
0.36

FF-005
*

0.00
0.00

Sqm

Treads (3080x2000)
Riser
Treads (3080x1500)
Riser
Landing El.102.00/104.200/106.550
Treads
Riser

SK-001

124.88
0.00

FF-004
*

0.00

Sqm

Battery Room

FF-005

512.61

Screed to falls. (Min. 50mm)

Cum

Roof Area
WP-002

88 of 275

0.050

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


WP-001

Separation layer of 500g Polythene sheet.

Sqm

Roof Area

31.95

20.75

WP-001
WP-004

Expanded polystyrene insulation 350Kg/Cu.M 75mm Thk. with 15mm


rebate on edges.

300x300x30 Thk. concrete slab set in 20 Thk. screed.

40x40 mm Bituthene fillet HC.

20.75

0.090

1
Total =

7,366.25
7,366.25

0.00
0.00

105.40

0.040

0.040

1
Total =

0.17
0.17

0.00
0.00

105.40

0.00

0.600

1
Total =

63.24
63.24

0.00
0.00

2.40

0.00

0.600

6
Total =

8.64
8.64

0.00
0.00

105.40

1
Total =

105.40
105.40

0.00
0.00

6.00

5
Total =

30.00
30.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

5.00

0.00

Cum

Roof Area

Bituthene 1200xHC with 150mm laps on primed screed to fall.

sqm

Roof Area
WP-006
WP-007

300x300 mm wide bituthene 1200xHC reinforcing strip in corner.

sqm

Roof Area
WP-007
WP-008

Bituthene 1200xHC and solar shield turned into 25x25 chase and securely
fixed and sealed with 20x20 wooden batten and then pointed with
servimastic.
Roof Area

RM

WP-008
D-001

D1

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

PR

D1 = 2000 mm X 3000 mm
D-001
D-002

D1

UNION PANIC LATCH - SILVER FINISH

No.s

D1 = 2000 mm X 3000 mm
D-002
D-003

D1

0.00
0.00

31.95

WP-003
WP-006

662.96
662.96

No.s

Roof Area

1
Total =

20.75

WP-005
WP-003

0.00

31.95

WP-004
*

0.00

662.96

Sqm

Roof Area

WP-005

662.96

Total =

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER
D1 = 2000 mm X 3000 mm

No.s
1.00

89 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


D-003

Total =
D-004

D1

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X


8MM ROSE - SSS

1.00

D-004

5
Total =

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM


HEIGHT DOOR-NP
D1 = 2000 mm X 3000 mm

D-006

D1

1.00

DUST EXCLUDING SOCKET - CP

5.00

0.00

5.00

0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

2.00

5
Total =

10.00
10.00

0.00
0.00

11.00

5
Total =

55.00
55.00

0.00
0.00

2.00

5
Total =

10.00
10.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

D-007
D1

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

No.s

D1 = 2000 mm X 3000 mm
D-008
D-009

D1

SEMI CIRCULAR FLOOR DOOR STOP - SSS

No.s

D1 = 2000 mm X 3000 mm
D-009
D-010

D1

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

MTR

D1 = 2000 mm X 3000 mm
D-010
D-011

D1

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

MTR

D1 = 2000 mm X 3000 mm
D-011
D-012

D1

LEGGE ROLLER LATCH

No.s

D1 = 2000 mm X 3000 mm
D-012
D-001

D2

No.s

D1 = 2000 mm X 3000 mm

D-008

0.00

Total =

D-006
D1

0.00

5.00

No.s

D1 = 2000 mm X 3000 mm

D-007

5.00

No.s

D-005
L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT
STANDARD HEIGHT DOOR-NP

0.00

No.s

D1 = 2000 mm X 3000 mm

D-005

5.00

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

90 of 275

PR

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


D2 = 1000 mm X 2200 mm

1.50

3.00

0.00

Total =

3.00

0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

2.00

2
Total =

4.00
4.00

0.00
0.00

5.40

2
Total =

10.80
10.80

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

1.50

3
Total =

4.50
4.50

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

D-001
D-002

D2

UNION PANIC LATCH - SILVER FINISH

No.s

D2 = 1000 mm X 2200 mm
D-002
D-003

D2

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

No.s

D2 = 1000 mm X 2200 mm
D-003
D-013

D2

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

No.s

D2 = 1000 mm X 2200 mm
D-013
D-009

D2

SEMI CIRCULAR FLOOR DOOR STOP - SSS

No.s

D2 = 1000 mm X 2200 mm
D-009
D-010

D2

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

MTR

D2 = 1000 mm X 2200 mm
D-010
D-011

D2

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

MTR

D2 = 1000 mm X 2200 mm
D-011
D-001

D3

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

PR

D3 = 1000 mm X 2200 mm
D-001
D-014

D3

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D3 = 1000 mm X 2200 mm

No.s

D-014
D-015

D3

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS


D3 = 1000 mm X 2200 mm

D-015

91 of 275

Sets

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: Unit Electrical Building

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Q
Height

NR

NP

Qty. as per IFC

Prev. Month

Unit Electrical Building (Unit -2)


D-016

D3

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

No.s

D3 = 1000 mm X 2200 mm

2.00

6.00

0.00

Total =

6.00

0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

5.40

3
Total =

16.20
16.20

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

D-016
D-017

D3

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

No.s

D3 = 1000 mm X 2200 mm
D-017
D-013

D3

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

No.s

D3 = 1000 mm X 2200 mm
D-013
D-010

D3

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

MTR

D3 = 1000 mm X 2200 mm
D-010
D-018

D3

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

MTR

D3 = 1000 mm X 2200 mm
D-018
D-009

D3

SEMI CIRCULAR FLOOR DOOR STOP - SSS

No.s

D3 = 1000 mm X 2200 mm
D-009

92 of 275

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Actual Qty. On
Plot

Unit Electrical Building (Unit - 2)


Actual Work At Site
Excavation for Foundations
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

32.25

21.05

1.85

1,255.90
0.00
0.00
0.00
0.00
0.00

Total =

1,255.90

11
2
7
6
2
2
Total =

5.32
1.80
4.73
1.94
0.41
0.53
14.74

P.C.C Concrete - C10


2.20
3.00
2.60
1.80
1.20
1.20

93 of 275

2.20
3.00
2.60
1.80
1.70
2.20

0.10
0.10
0.10
0.10
0.10
0.10

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

94 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

95 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

96 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

97 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

98 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

99 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

101 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

102 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

103 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

104 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

105 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

106 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

107 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

108 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

109 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

110 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
#REF!

0.00
0.00
0.00
0.00
0.00
#REF!

0.00%
0.00%
0.00%
0.00%
0.00%
#REF!

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

111 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

#REF!

#REF!

#REF!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

112 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

113 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

114 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

115 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

116 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

117 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

118 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)


0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

119 of 275

Actual Qty. On
Plot

Petroleum Development Oman (PDO)

Executed Quantities
This Month

Cum. To Date

Progress
%

Dimensions (m)
Remarks

Length

Width

Height

NR

NP

Unit Electrical Building (Unit - 2)

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

120 of 275

Actual Qty. On
Plot

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building

A-001

Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (SF2)

A-003

Polythene Sheet 1000 Gauge

3.00
3.35
2.70
3.18
2.10

P.C.C Concrete (C10)

Formwork Of Fnd.s

Structure Concrete Grade (C35)

111.60
104.37
22.60
14.00
7.61

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Total =

260.18

0.00

0.00

2.00
2.35
1.70
2.18
1.10

2.00
2.35
1.70
1.10
2.45

8
6
2
2
1
Total =

32.00
33.14
5.78
4.79
2.70
78.40

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

2.00
2.35
1.70
2.18
1.10

2.00
2.35
1.70
1.10
2.45

0.05
0.05
0.05
0.05
0.05

8
6
2
2
1
Total =

1.60
1.66
0.29
0.24
0.13
3.92

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.55
0.65
0.40
0.30
0.30

8
6
2
2
1
Total =

33.44
35.10
5.12
3.69
2.01
79.36

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

15.88
19.74
2.05
1.25

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

sqm

Formwork of Fnd.s (F1)


Formwork of Fnd.s (F2)
Formwork of Fnd.s (F3)
Formwork of Fnd.s (SF1)
Formwork of Fnd.s (SF2)

A-006

8
6
2
2
1

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (SF1)
Blinding of Fnd.s (SF2)

A-005

1.55
1.55
1.55
1.05
1.05

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (SF2)

A-004

3.00
3.35
2.70
2.10
3.45

7.60
9.00
6.40
6.15
6.70

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (SF1)

1.90
2.25
1.60
2.08

121 Of 275

1.90
2.25
1.60
1.00

0.55
0.65
0.40
0.30

8
6
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Concrete of Fnd.s (SF2)

A-007

Waterproofing Protection (Coating/Painting)

1.00

Waterproofing Glassmat Sheet

0.30

sqm

0.71

0.00

0.00

Total =

39.63

0.00

0.00

8
6
2
2
1
8
6
2
2
1
8
6
2
2
1
8
8
6
2
2
1
1
1
1
1
Total =

66.88
70.20
10.24
7.38
4.02
57.76
60.75
10.24
8.30
4.70
57.76
60.75
10.24
8.30
4.70
31.28
25.76
21.42
7.28
17.14
9.54
24.72
22.88
22.88
24.72
649.84

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

324.92
324.92

0.00
0.00

0.00
0.00

1
1
Total =

260.18
39.63
220.55

0.00
0.00
0.00

0.00
0.00
0.00

Double Coating

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)
Bot. of Fnd.s (F1)
Bot. of Fnd.s (F2)
Bot. of Fnd.s (F3)
Bot. of Fnd.s (SF1)
Bot. of Fnd.s (SF2)
Top of Fnd.s (F1)
Top of Fnd.s (F2)
Top of Fnd.s (F3)
Top of Fnd.s (SF1)
Top of Fnd.s (SF2)
C1- (F1)
C3- (F1)
C2- (F2)
C4- (F3)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (SF2)
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)

A-008

2.35

7.60
9.00
6.40
6.15
6.70
1.90
2.25
1.60
1.00
1.00
1.90
2.25
1.60
1.00
1.00
1.70
1.40
1.70
1.40
4.76
5.30
7.73
7.15
7.15
7.73

sqm

0.55
0.65
0.40
0.30
0.30
1.90
2.25
1.60
2.08
2.35
1.90
2.25
1.60
2.08
2.35
1.15
1.15
1.05
1.30
0.90
0.90
1.60
1.60
1.60
1.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Single Layer

Glassmat Sheet = 554.64/2

A-002A

Back Fill Well Graded Sub Base Materials


Qty of Excavation = 260.18 Cu3
Qty of S. Concrete = 39.63 Cu3

Cum
(-)

122 Of 275

260.18
39.63

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


A-009

Formwork of Plinth Beam At El. 99.4 FGL

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)
PB3-Side - (300x500)

A-010

S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)

Formwork for Columns Upto 101.6

S. Concrete for Columns Upto 101.6 Grade (C35)

Formwork of Elevated Beams At El. 101.600 (TOC)

0.30
0.30
0.30
0.30

2.32
2.15
2.15
2.32
7.73
7.15
7.15
7.73
38.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.50
0.50
0.50
0.50

1
1
1
1
Total =

1.16
1.07
1.07
1.16
4.46

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

2.30
3.00
1.70
2.55
0.85
0.85

4
5
6
2
2
1
Total =

15.64
21.00
17.34
7.14
8.08
4.51
73.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.30
3.00
1.70
2.55
0.85
0.85

4
5
6
2
2
1
Total =

1.61
1.84
1.78
0.89
1.06
0.60
7.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.34
1.65

0.00
0.00

0.00
0.00

0.50
0.50
0.50
0.50

1.70
1.40
1.70
1.40
4.75
5.30

Cum

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

A-013

7.73
7.15
7.15
7.73

1
1
1
1
2
2
2
2
Total =

sqm

C1-F1 - (350x500)
C3-F1 - (350x350)
C2-F2 - (350x500)
C4-F3 - (350x350)
SF1 - (300x2075)
SF2 - (300x2350)

A-012

0.30
0.30
0.30
0.30

Cum

PB1 - (300x500)
PB2 - (300x500)
PB3 - (300x500)
PB4 - (300x500)

A-011

7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73

0.35
0.35
0.35
0.35
0.30
0.30

0.50
0.35
0.50
0.50
2.08
2.35

3.83
4.70

0.35
0.35

sqm

FB1 - (350x600)
FB2 - (350x600)

123 Of 275

1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


FB3 - (350x700)
FB4 - (350x700)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (350x700)
FB34 - (350x700)
FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)

7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13

124 Of 275

0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2.70
2.50
2.50
2.70
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32
0.62
2.70
2.50
2.50
2.70
0.62
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32
2.32
2.15
2.15
2.32
0.62
2.70
2.50
2.50
2.70
0.62
1.70
1.74
1.10
1.74
1.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)
FB1 - (350x600)
FB2 - (350x600)
FB3 - (350x700)
FB4 - (350x700)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)

1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67
3.83
4.70
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15

125 Of 275

0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

0.41
0.62
0.73
1.74
1.10
0.73
1.74
1.10
1.74
1.10
1.70
4.59
6.58
10.82
10.01
10.01
10.82
9.27
8.58
8.58
9.27
9.27
8.58
8.58
9.27
2.49
10.82
10.01
10.01
10.82
2.49
9.27
8.58
8.58
9.27
9.27
8.58
8.58
9.27
9.27
8.58

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


FB31 - (300x600)
FB32 - (300x600)
FB33 - (350x700)
FB34 - (350x700)
FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)

A-014

S. Concrete of Elevated Beams At El. 101.600 (TOC) Grade (C35)

7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13
1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67

0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.60

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total =

8.58
9.27
2.49
10.82
10.01
10.01
10.82
2.49
6.80
6.96
4.38
6.96
4.38
1.63
2.49
2.49
6.96
4.38
2.49
6.96
4.38
6.96
4.38
6.80
505.35

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.80
1.15
1.89
1.75
1.75
1.89
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

FB1 - (350x600)
FB2 - (350x600)
FB3 - (350x700)
FB4 - (350x700)
FB5 - (350x700)
FB6 - (350x700)
FB7 - (300x600)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x600)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)

3.83
4.70
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73

126 Of 275

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


FB15 - (350x700)
FB16 - (350x700)
FB17 - (350x700)
FB18 - (350x700)
FB19 - (350x700)
FB20 - (350x700)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (300x600)
FB25 - (300x600)
FB26 - (300x600)
FB27 - (300x600)
FB28 - (300x600)
FB29 - (300x600)
FB30 - (300x600)
FB31 - (300x600)
FB32 - (300x600)
FB33 - (350x700)
FB34 - (350x700)
FB35 - (350x700)
FB36 - (350x700)
FB37 - (350x700)
FB38 - (350x700)
FB39 - (300x600)
FB40 - (350x700)
FB41 - (350x700)
FB42 - (350x700)
FB43 - (350x700)
FB44 - (350x700)
FB45 - (300x600)
FB46 - (350x600)
FB47 - (350x700)
FB48 - (350x700)
FB49 - (350x600)
FB50 - (350x700)
FB51 - (350x700)
FB52 - (350x700)
FB53 - (350x700)
FB54 - (300x600)

1.78
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
7.73
7.15
7.15
7.73
1.78
7.73
7.15
7.15
7.73
1.78
5.67
4.97
3.13
4.97
3.13
1.16
2.08
2.08
4.97
3.13
2.08
4.97
3.13
4.97
3.13
5.67

127 Of 275

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30

0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
0.70
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.70
0.60
0.60
0.70
0.70
0.60
0.70
0.70
0.70
0.70
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

0.43
1.89
1.75
1.75
1.89
0.43
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39
1.39
1.29
1.29
1.39
0.43
1.89
1.75
1.75
1.89
0.43
1.02
1.22
0.77
1.22
0.77
0.28
0.37
0.44
1.22
0.77
0.44
1.22
0.77
1.22
0.77
1.02
65.83

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


A-015

Formwork of Elevated Slab At El.101.600 (TOC)

sqm

Grid from A to C / 1
Grid from A to C / 1 to 2
Around opening A to C / 1 to 2
Around opening A to C / 1 to 2
Around opening A to C / 1 to 2
Grid from A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Around opening A to C / 2 to 3
Grid from A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Around opening A to C / 3 to 4
Grid from A to C / 4 to 5
Around opening A to C / 4 to 5
Around opening A to C / 4 to 5
Around opening A to C / 4 to 5
Grid from A to B / 5 to
Grid from 2 to 3' / C to

A-016

S. Concrete of Elevated Slab Grade (C35) At El. 101.60(TOC)

4.97
6.70
7.52
11.65
14.58
6.70
3.78
6.42
14.69
11.66
6.70
6.42
3.83
11.66
14.69
6.70
6.12
11.66
14.54
4.97
8.58

1.78
7.73
0.15
0.15
0.15
7.15
0.15
0.15
0.15
0.15
7.15
0.15
0.15
0.15
0.15
7.73
0.15
0.15
0.15
1.75
2.00

4.97
6.70
3.06
5.43
1.76
2.93
0.98
6.70
0.59
0.80
2.74
5.43
1.83
0.96
2.93

1.78
7.73
0.90
0.40
1.05
0.48
1.05
7.15
0.90
0.70
0.48
0.40
1.05
1.05
0.48

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

8.82
51.76
1.13
1.75
2.19
47.91
0.57
0.96
2.20
1.75
47.91
0.96
0.57
1.75
2.20
51.76
0.92
1.75
2.18
8.70
17.15
254.88

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.32
7.76
-0.41
-0.33
-0.28
-0.21
-0.15
7.19
-0.08
-0.08
-0.20
-0.33
-0.29
-0.15
-0.21

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

Grid from A to C / 1
Grid from A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Deduction opening A to C / 1 to 2
Grid from A to C / 2 to 3
Deduction opening A to C / 2 to 3(Part-1)
Deduction opening A to C / 2 to 3(Part-2)
Deduction opening A to C / 2 to 3
Deduction opening A to C / 2 to 3
Deduction opening A to C / 2 to 3(Part-1)
Deduction opening A to C / 2 to 3(Part-2)
Deduction opening A to C / 2 to 3(Part-3)

128 Of 275

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1
1
-1
-1
-1
-1
-1
1
-1
-1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Grid from A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4
Deduction opening A to C / 3 to 4(Part-1)
Deduction opening A to C / 3 to 4(Part-2)
Deduction opening A to C / 3 to 4(Part-3)
Grid from A to C / 4 to 5
Deduction opening A to C / 4 to 5(Part-1)
Deduction opening A to C / 4 to 5(Part-2)
Deduction opening A to C / 4 to 5
Deduction opening A to C / 4 to 5(Part-1)
Deduction opening A to C / 4 to 5(Part-2)
Deduction opening A to C / 4 to 5(Part-3)
Grid from A to B / 5 to
Grid from 2 to 3' / C to

A-017

Formwork of Columns from 101.6 to 105.950

6.70
2.74
1.56
5.43
1.76
1.21
2.93
6.70
1.46
0.80
5.43
1.76
0.96
2.93
4.97
8.58

S. Concrete for Columns Upto 105.950 (G-C35)

1.70
1.70
1.40

Formwork of Roof Beams At El. 105.950 (TOC)

1
-1
-1
-1
-1
-1
-1
1
-1
-1
-1
-1
-1
-1
1
1
Total =

7.19
-0.20
-0.16
-0.33
-0.28
-0.19
-0.21
7.76
-0.15
-0.11
-0.33
-0.28
-0.15
-0.21
1.30
2.57
29.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.35
4.35
4.35

4
6
2
Total =

29.58
44.37
12.18
86.13

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

6.65
6.05
6.90

4
6
2
Total =

4.66
6.35
2.42
13.42

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1.65
2.70
2.50
2.50
2.70
1.11
1.11
1.02
1.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

C1-F1 - (350x500)
C2-F2 - (350x500)
C4-F3 - (350x350)

A-019

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

sqm

C1-F1 - (350x500)
C2-F2 - (350x500)
C4-F3 - (350x350)

A-018

7.15
0.48
0.70
0.40
1.05
1.05
0.48
7.73
0.70
0.90
0.40
1.05
1.05
0.48
1.75
2.00

0.35
0.35
0.35

0.50
0.50
0.50

4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

sqm

RB1 - (350x600) bottom of beam


RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)

129 Of 275

1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)
RB1 - (350x600) both side of beam
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)

3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55

130 Of 275

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.60
0.85
0.85
0.85
0.85
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1.02
1.02
1.11
1.11
2.70
2.50
2.50
2.70
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
2.99
5.64
13.13
12.16
12.16
13.13
4.43
4.43
4.08
4.08
4.08
4.08
4.43
4.43
13.13
12.16
12.16
13.13
14.54
14.54
14.54
14.54
10.26

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

A-020

S. Concrete of Elevated Beams At El. 105.950 (TOC) Grade (C35)

8.55
8.55
8.55
8.55
8.55
8.55

Formwork of Elevated Slab At El.106.550 (TOC)

2
2
2
2
2
2
Total =

14.54
10.26
14.54
14.54
14.54
14.54
356.04

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.60
0.85
0.85
0.85
0.85
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.60
0.85
0.60
0.85
0.85
0.85
0.85

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

0.99
2.30
2.13
2.13
2.30
0.66
0.66
0.61
0.61
0.61
0.61
0.66
0.66
2.30
2.13
2.13
2.30
2.54
2.54
2.54
2.54
1.80
2.54
1.80
2.54
2.54
2.54
2.54
50.27

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

RB1 - (350x600)
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

A-021

0.85
0.60
0.85
0.85
0.85
0.85

4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

sqm

131 Of 275

0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Grid from A to C / 1 to 5
Grid from 2' to 3' / C to
RB1 - (350x600) Deduction bottom of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)
RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

A-022

S. Concrete of Elevated Slab Grade (C35) At El. 106.550(TOC)

32.15
6.05
4.70
7.73
7.15
7.15
7.73
3.69
3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

9.90
2.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

32.15
6.05
4.70
7.73
7.15
7.15
7.73
3.69

9.90
2.35
0.35
0.35
0.35
0.35
0.35
0.30

1
1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Total =

318.29
14.22
-1.65
-2.70
-2.50
-2.50
-2.70
-1.11
-1.11
-1.02
-1.02
-1.02
-1.02
-1.11
-1.11
-2.70
-2.50
-2.50
-2.70
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
-2.99
268.61

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47.74
2.13
-0.25
-0.41
-0.38
-0.38
-0.41
-0.17

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

Grid from A to C / 1 to 5
Grid from 2' to 3' / C to
RB1 - (350x600) Deduction volume of beams
RB2 - (350x850)
RB3 - (350x850)
RB4 - (350x850)
RB5 - (350x850)
RB6 - (300x600)

132 Of 275

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1
1
-1
-1
-1
-1
-1
-1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


RB7 - (300x600)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (350x850)
RB15 - (350x850)
RB16 - (350x850)
FB17 - (350x850)
RB18 - (350x850)
RB19 - (350x850)
RB20 - (350x850)
RB21 - (350x850)
RB22 - (350x600)
RB23 - (350x850)
RB24 - (350x600)
RB25 - (350x850)
RB26 - (350x850)
RB27 - (350x850)
RB28 - (350x850)

3.69
3.40
3.40
3.40
3.40
3.69
3.69
7.73
7.15
7.15
7.73
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55
8.55

A-023

Formwork of Elevated Petestal above Roof

sqm

A-024

S. Concrete of Elevated Pedestal above Roof Slab (C35)

Cum

A-025

Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

sqm

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

A-026

S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

32.15
9.90
2.35

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

1.30
1.30
1.30

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Total =

-0.17
-0.15
-0.15
-0.15
-0.15
-0.17
-0.17
-0.41
-0.38
-0.38
-0.41
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
-0.45
40.29

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

0.00

0.00

#REF!

Total =

0.00

#REF!

#REF!

4
4
4
Total =

167.18
51.48
12.22
230.88

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

10.45
3.22
0.76

0.00
0.00
0.00

0.00
0.00
0.00

Cum

Long Way (both side)


Short Way (both side)
Short Wall grid 2'&3' (both side)

32.15
9.90
2.35

133 Of 275

0.13
0.13
0.13

1.30
1.30
1.30

2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Total =
RP-001

3 mm M.S Wire Mesh Plastic Coated to 4mm dia 50x50 wire mesh tied
with tie wire to RHS (TYP)

MS Flat - L - 50 X 50 X 6 (TYP)

8.55
31.15
4.60

MS Flat - L - 25 X 5 to fix chainlink Mesh (TYP)

MS Plate - L - 200 X 50 X 10 (TYP)

MS Plate - L - 150 X 50 X 10 (TYP)

GI Bolt & Nut- L - 12 X 40 (TYP)

0.00
0.00
0.00

0.00
0.00
0.00

Total =

95.13

0.00

0.00

1.00
66.00
24.00
24.00

1.00
2.00
2.00
2.00

1
1
1
1
Total =

1.00
132.00
48.00
48.00
229.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1.00
66.00
24.00
24.00

1.00
1.00
1.00
1.00

1
1
1
1
Total =

1.00
66.00
24.00
24.00
115.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1.00
12.00
12.00
12.00

2.00
5.00
2.00
2.00

1
1
1
1
Total =

2.00
60.00
24.00
24.00
110.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1.00
2.00
2.00
2.00

1.00
4.00
3.00
3.00

1
1
1
1
Total =

1.00
8.00
6.00
6.00
21.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1.00
4.00
4.00

1.00
4.00
3.00

1.00
32.00
24.00

0.00
0.00
0.00

0.00
0.00
0.00

No.s

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2
Grid 1 - Elevation - 4

RP-006

30.78
56.07
8.28

2
1
1

No.s

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2
Grid 1 - Elevation - 4

RP-005

1.80
1.80
1.80

RM

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2
Grid 1 - Elevation - 4

RP-004

0.00

RM

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2
Grid 1 - Elevation - 4

RP-003

0.00

Sqm

Short wall grid 1 & 5


Long wall grid C
grid 2',3'

RP-002

14.43

No.s

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2

134 Of 275

1
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Grid 1 - Elevation - 4

RP-007

GI Bolt & Nut - 6 @ 500 C/C (TYP)

4.00

100 THK Solid Block Work El. Floor(TYP) / External

200 THK Solid Block Work El. Floor (TYP) / External

200 THK Solid Block Work El. Floor (TYP) / Internal

50 THK Polystrene Insulation (TYP)

0.00

0.00

0.00

1.00
132.00
48.00
48.00

1.00
1.00
1.00
1.00

1
1
1
1
Total =

1.00
132.00
48.00
48.00
229.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

8.55
31.15
2.30
5.05
2.00
1.00
1.00

3.55
3.55
3.55
3.55
3.00
2.20
2.20

2
2
2
1
-2
-1
-2
Total =

60.71
221.17
16.33
17.93
-12.00
-2.20
-4.40
297.53

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8.55
31.15
2.30
5.05
31.15
2.00
1.00
1.00

3.55
3.55
3.55
3.55
2.00
3.00
2.20
2.20

2
2
2
1
1
-2
-1
-2
Total =

60.71
221.17
16.33
17.93
62.30
-12.00
-2.20
-4.40
359.83

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9.00
1.00

3.85
2.20

1
-1
Total =

34.65
-2.20
32.45

0.00
0.00
0.00

0.00
0.00
0.00

8.55
31.15
2.30

3.55
3.55
3.55

60.71
221.17
16.33

0.00
0.00
0.00

0.00
0.00
0.00

Sqm

Short Wall grid 3/A C


Deduction of doors D3

A-027

0.00

81.00

Sqm

Short wall grid 1 & 5


Long wall grid A & C
Short Wall grid 2' & 3'
Long Way grid C'/2' & 3'
Long Way grid A/1,5
Deduction of doors D1
Deduction of doors D2
Deduction of doors D3

BW-003

Sqm

Short wall grid 1 & 5


Long wall grid A & C
Short Wall grid 2' & 3'
Long Way grid C'/2' & 3'
Deduction of doors D1
Deduction of doors D2
Deduction of doors D3

BW-002

24.00

Total =
No.s

Grid A - Elevation - 1
Grid C - Elevation - 3
Grid 5 - Elevation - 2
Grid 1 - Elevation - 4

BW-001

3.00

Sqm

Short wall grid 1 & 5


Long wall grid A & C
Short Wall grid 2' & 3'

135 Of 275

2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Long Way grid C'/2' & 3'

A-034

UPVC Rain Water Pipe 160 (TYP)

5.05

Galanised Steel Anchors at 400 CTC Vertically

Stainless Steel Butterfly Wall Ties at 400 CTC Vertically and 800 CTC
Horizontally (TYP)

Internal Render & Emulsion Paint - (W1)

Wash Sand /Internal

External Render & Heavy Texturised Paint - (W15)

Wash Sand /External

Hardened & Sealed Granolithic Floor - (F8)

7
Total =

50.44
50.44

0.00
0.00

0.00
0.00

10

2
Total =

480.00
480.00

0.00
0.00

0.00
0.00

316.13

3.25

1
Total =

1,027.42
1,027.42

0.00
0.00

0.00
0.00

47.70
47.70
13.40

3.55
3.55
3.55

1
1
1
Total =

169.34
169.34
47.57
386.24

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.015

1
Total =

10.43
10.43

0.00
0.00

0.00
0.00

3.85
3.85

1
1
Total =

313.78
62.37
376.15

0.00
0.00
0.00

0.00
0.00
0.00

0.015

1
Total =

10.16
10.16

0.00
0.00

0.00
0.00

130.82
130.82
9.40
23.98
9.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

9.88

Cu.M
386.24

0.30

Sqm
81.50
16.20

Cu.M

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s
FF-002

1.10

Sqm

Outer Long Wall & Short Wall


Short Wall grid 2,3

PWE-001A

0.00

No.s

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s
PWE-001

0.00

0.00

24.00

Switchgear Room unit-1


Switchgear Room unit-2
Air Lock Room

PWI-001A

No.s

Insulation area = 298.20 M2


1 M2 = 3.13 No.s required
PWI-001

0.00

316.13

6.55

Total Columns around the building = 11+1 no.s

GS-002

17.93

Total =
RM

Total No. of drains = 7

GS-001

3.55

376.15

0.30

15.30
15.30
4.70
6.00
4.00

8.55
8.55
2.00
2.00
2.35

Sqm

Switchgear Room unit-1


Switchgear Room unit-2
Air Lock Room
Passage grid 1 & 5
Passage grid C

136 Of 275

1
1
1
2
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Total =
FF-005

External Float Finish With UV Resistant Floor Hardener - (F-16)

Coved Granolithic Integral With Floor - (S -7) - SKIRTING

3.08
0.37
3.08
0.37

Emulsion Painted Smooth Fair Face Concrete - (C2) - CEILING

Screed to falls. (Min. 50mm) - WATER PROOFING

Separation layer of 500g Polythene sheet.

Expanded polystyrene insulation 350Kg/Cu.M 75mm Thk. with 15mm


rebate on edges.

300x300x30 Thk. concrete slab set in 20 Thk. screed.

0.00
0.00
0.00
0.00

Total =

33.50

0.00

Err:522

0.10
0.10
0.10

1
1
1
Total =

4.77
4.77
1.34
10.88

0.00
0.00
0.00
0.00

0.00
0.00
0.00
Err:522

1
1
1
Total =

130.82
130.82
9.40
271.03

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1
1
Total =

13.86
0.59
14.46

0.00
0.00
0.00

0.00
0.00
0.00

15.30
15.30
4.70

8.55
8.55
2.00

31.15
5.05

8.90
2.35

31.15
5.05

8.90
2.35

1
1
Total =

277.24
11.87
289.10

0.00
0.00
0.00

0.00
0.00
0.00

31.15
5.05

8.90
2.35

1
1
Total =

277.24
11.87
289.10

0.00
0.00
0.00

0.00
0.00
0.00

31.15
5.05

8.90
2.35

1
1
Total =

3,080.39
131.86
3,212.25

0.00
0.00
0.00

0.00
0.00
0.00

0.050
0.050

Sqm

Sqm

Roof Area
Roof Area

WP-005

0.00
0.00
0.00
0.00

Cum

Roof Area
Roof Area

WP-004

12.78
8.99
7.24
4.49

2
2
1
1

Sqm

Roof Area
Roof Area

WP-001

2.08
12
2.35
12

47.70
47.70
13.40

Switchgear Room Unit-1


Switchgear Room Unit-2
Air Lock Room

WP-002

0.00

Sqm

Switchgear Room unit-1


Switchgear Room unit-2
Air Lock Room

SE-001

0.00

Sqm

External grid-1 & 5 (Treads)


Riser
Out side grid C- (Treads)
Riser

SK-001

304.41

No.s

Roof Area
Roof Area

137 Of 275

0.090
0.090

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


WP-003

40x40 mm Bituthene fillet HC.

Cum

Roof Area
Roof Area

WP-006

Bituthene 1200xHC with 150mm laps on primed screed to fall.

80.10
14.80

300x300 mm wide bituthene 1200xHC reinforcing strip in corner.

D-001

D1

Bituthene 1200xHC and solar shield turned into 25x25 chase and securely
fixed and sealed with 20x20 wooden batten and then pointed with
servimastic.
Roof Area
Roof Area
BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D1

UNION PANIC LATCH - SILVER FINISH

D1

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

D1

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X


8MM ROSE - SSS

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM


HEIGHT DOOR-NP

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT


STANDARD HEIGHT DOOR-NP

0.15

0.00

0.00

0.600

1
Total =

56.94
56.94

0.00
0.00

0.00
0.00

0.600

4
Total =

5.76
5.76

0.00
0.00

0.00
0.00

80.10
14.80

1
1
Total =

80.10
14.80
94.90

0.00
0.00
0.00

0.00
0.00
0.00

6.00

2
Total =

12.00
12.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

0.00

No.s

No.s

No.s

No.s

D1 = 2000 mm X 3000 mm

D-006

Total =

PR

D1 = 2000 mm X 3000 mm

D-005

0.00
0.00

RM

D1 = 2000 mm X 3000 mm

D-004

0.00
0.00

2.40

D1 = 2000 mm X 3000 mm

D-003

1
1

sqm

D1 = 2000 mm X 3000 mm

D-002

0.13
0.02

94.90

Roof Area

WP-008

0.040
0.040

sqm

Roof Area

WP-007

0.040
0.040

No.s

138 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


D1 = 2000 mm X 3000 mm

D-007

D1

DUST EXCLUDING SOCKET - CP

1.00

D1

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

D1

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D1

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D1

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D1

LEGGE ROLLER LATCH

D2

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D-015

D2

D2

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D2 = 1000 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

2.00

2
Total =

4.00
4.00

0.00
0.00

0.00
0.00

11.00

2
Total =

22.00
22.00

0.00
0.00

0.00
0.00

2.00

2
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.50

1
Total =

1.50
1.50

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

PR

D2 = 1000 mm X 2200 mm

D-014

2
Total =

No.s

D1 = 2000 mm X 3000 mm

D-001

1.00

MTR

D1 = 2000 mm X 3000 mm

D-012

0.00

MTR

D1 = 2000 mm X 3000 mm

D-011

0.00

0.00

No.s

D1 = 2000 mm X 3000 mm

D-010

0.00

2.00

No.s

D1 = 2000 mm X 3000 mm

D-009

No.s

D1 = 2000 mm X 3000 mm

D-008

2.00

Total =

No.s

Sets

D2 = 1000 mm X 2200 mm

139 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


D-016

D2

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

No.s

D2 = 1000 mm X 2200 mm

D-017

D2

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

2.00

D2

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

D2

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D2

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

D2

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D3

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D-015

D3

D3

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D3 = 1000 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

D3

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

5.40

1
Total =

5.40
5.40

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.50

3
Total =

4.50
4.50

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

6.00

0.00

0.00

No.s

Sets

D3 = 1000 mm X 2200 mm

D-016

1
Total =

PR

D3 = 1000 mm X 2200 mm

D-014

1.00

No.s

D2 = 1000 mm X 2200 mm

D-001

0.00

MTR

D2 = 1000 mm X 2200 mm

D-009

0.00

0.00

MTR

D2 = 1000 mm X 2200 mm

D-018

0.00

2.00

No.s

D2 = 1000 mm X 2200 mm

D-010

No.s

D2 = 1000 mm X 2200 mm

D-013

2.00

Total =

No.s

D3 = 1000 mm X 2200 mm

2.00

140 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTP Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GTP Control Building


Total =
D-017

D3

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

1.00

3
Total =

D3

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

D3

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

1.00

D3

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

D3

SEMI CIRCULAR FLOOR DOOR STOP - SSS

0.00

0.00

3.00

0.00

0.00

3.00

0.00

0.00

Total =

3.00

0.00

0.00

5.40

3
Total =

16.20
16.20

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

1.00

3
Total =

3.00
3.00

0.00
0.00

0.00
0.00

MTR

D3 = 1000 mm X 2200 mm

D-009

3.00

MTR

D3 = 1000 mm X 2200 mm

D-018

0.00

No.s

D3 = 1000 mm X 2200 mm

D-010

0.00

No.s

D3 = 1000 mm X 2200 mm

D-013

6.00

No.s

D3 = 1000 mm X 2200 mm

141 Of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

142 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

143 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

144 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

145 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

146 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

147 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

148 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

149 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

150 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

151 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

152 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

153 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

#REF!

0.00%

#REF!

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

154 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

155 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

156 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

157 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

Err:522

Err:522

0.00
0.00
0.00
Err:522

0.00%
0.00%
0.00%
Err:522

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

158 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

159 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

160 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

161 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

162 Of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building

A-001

Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F2A)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F3A)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (F5)
Excavation of Fnd.s (SF1)
Excavation of Fnd.s (LF)

A-003

Polythene Sheet 1000 Gauge

RBB 81 102184 CG 2331 00006 0001 5L 04


2.85
3.15
3.15
3.45
3.45
3.50
2.65
2.10
1.40

sqm

Polythene of Fnd.s (F1)


Polythene of Fnd.s (F2)
Polythene of Fnd.s (F2A)
Polythene of Fnd.s (F3)
Polythene of Fnd.s (F3A)
Polythene of Fnd.s (F4)
Polythene of Fnd.s (F5)
Polythene of Fnd.s (SF1)
Polythene of Fnd.s (LF)
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.05
0.25

11
8
2
4
1
1
6
3
2
Total =

138.49
123.04
30.76
73.80
18.45
18.99
65.31
19.18
1.40
489.41

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11
8
2
4
1
1
6
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

37.65
36.98
9.25
24.01
6.00
6.25
16.34
6.27
0.80
2.56
2.07
2.05
2.06
1.88
2.42
2.45
2.72
2.76
2.72
2.45
2.05
2.94
2.05
1.82
178.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RBB 81 102184 CG 2331 00006 0001 5L 04


1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.10
0.40
6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

163 Of 275

2.85
3.15
3.15
3.45
3.45
3.50
2.65
2.90
2.00

1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.90
1.00
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.45
0.45
0.45
0.40
0.45
0.45
0.45
0.45

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


A-004

P.C.C Concrete (C10)

Cum

Blinding of Fnd.s (F1)


Blinding of Fnd.s (F2)
Blinding of Fnd.s (F2A)
Blinding of Fnd.s (F3)
Blinding of Fnd.s (F3A)
Blinding of Fnd.s (F4)
Blinding of Fnd.s (F5)
Blinding of Fnd.s (SF1)
blinding of Fnd.s (LF)
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)

A-005

Formwork Of Fnd.s

RBB 81 102184 CG 2331 00006 0001 5L 04


1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.10
0.40
6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

sqm

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F2A)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F3A)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (F5)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (LF)

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

11
8
2
4
1
1
6
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

1.88
1.85
0.46
1.20
0.30
0.31
0.82
0.31
0.04
0.13
0.10
0.10
0.10
0.09
0.12
0.12
0.14
0.14
0.14
0.12
0.10
0.15
0.10
0.09
8.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11
8
2
4
1
1
6
3
2
Total =

42.35
42.64
10.66
28.20
7.05
8.16
20.46
5.04
2.16
166.72

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RBB 81 102184 CG 2331 00006 0001 5L 04


7.00
8.20
8.20
9.40
9.40
9.60
6.20
5.60
2.40

164 Of 275

1.85
2.15
2.15
2.45
2.45
2.50
1.65
1.90
1.00
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.45
0.45
0.45
0.40
0.45
0.45
0.45
0.45

0.55
0.65
0.65
0.75
0.75
0.85
0.55
0.30
0.45

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


A-006

Structure Concrete Grade (C35)

Cum

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F2A)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F3A)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (F5)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (LF)

A-007

Waterproofing Protection (Coating/Painting)

RBB 81 102184 CG 2331 00006 0001 5L 04


1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.00
0.30

sqm

Concrete of Fnd.s (F1)


Concrete of Fnd.s (F2)
Concrete of Fnd.s (F2A)
Concrete of Fnd.s (F3)
Concrete of Fnd.s (F3A)
Concrete of Fnd.s (F4)
Concrete of Fnd.s (F5)
Concrete of Fnd.s (SF1)
Concrete of Fnd.s (LF)
Bot. of Fnd.s (F1)
Bot. of Fnd.s (F2)
Bot. of Fnd.s (F2A)
Bot. of Fnd.s (F3)
Bot. of Fnd.s (F3A)
Bot. of Fnd.s (F4)
Bot. of Fnd.s (F5)
Bot. of Fnd.s (SF1)
Bot. of Fnd.s (LF)
Top of Fnd.s (F1)
Top of Fnd.s (F2)
Top of Fnd.s (F2A)
Top of Fnd.s (F3)
Top of Fnd.s (F3A)
Top of Fnd.s (F4)
Top of Fnd.s (F5)
Top of Fnd.s (SF1)
Top of Fnd.s (LF)

0.55
0.65
0.65
0.75
0.75
0.85
0.55
0.30
0.45

Double Coating
7.00
8.20
8.20
9.40
9.40
9.60
6.20
5.60
2.40
1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.00
0.30
1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.00
0.30

165 Of 275

1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.80
0.90

18.53
21.85
5.46
16.57
4.14
4.90
7.93
1.62
0.24
81.24

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

84.70
85.28
21.32
56.40
14.10
16.32
40.92
10.08
4.32
67.38
67.24
16.81
44.18
11.05
11.52
28.83
10.80
1.08
67.38
67.24
16.81
44.18
11.05
11.52
28.83
10.80
1.08

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Double Coating
0.55
0.65
0.65
0.75
0.75
0.85
0.55
0.30
0.45

1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.80
0.90
1.75
2.05
2.05
2.35
2.35
2.40
1.55
1.80
0.90

11
8
2
4
1
1
6
3
2
Total =

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

11
8
2
4
1
1
6
3
2
11
8
2
4
1
1
6
3
2
11
8
2
4
1
1
6
3
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


C1-F1
C2-F1
C3-F1
C5-F3
C3-F3
C4-F2
C5-F3
C1-F2
C2-F2
C3-F2
C6-F2a
C7-F2a
C4-F2
C5-F2
C1-F2
C2-F2
C3-F2
C6-F2a
C7-F2a
C6-F4
C7-F3a
C8-F5
C3-F5
C2-F5
PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)

1.70
1.70
1.70
1.90
1.70
1.90
1.90
1.70
1.70
1.70
2.20
2.20
1.90
1.90
1.70
1.70
1.70
2.20
2.20
2.20
2.20
1.40
1.40
1.40
6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

166 Of 275

1.15
1.15
1.15
0.95
0.95
1.05
0.90
1.15
1.15
1.15
1.05
1.05
1.05
0.95
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.70
1.70
1.70
1.70
1.70
1.70
1.70
1.70

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

1
3
7
3
1
2
1
1
1
3
1
1
2
1
1
1
3
1
1
1
1
4
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

3.91
11.73
27.37
10.83
3.23
7.98
3.42
3.91
3.91
11.73
4.62
4.62
7.98
3.61
3.91
3.91
11.73
5.06
5.06
5.06
5.06
12.88
6.44
3.22
20.48
16.58
16.38
16.48
15.04
19.36
19.60
20.57
20.83
20.57
20.83
15.50
22.24
15.50
13.74
1,296.07

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


A-008

Waterproofing Glassmat Sheet

sqm

Single Layer

Glassmat Sheet = 1022.38/2

A-002A

Back Fill Well Graded Sub Base Materials

Formwork of Plinth Beam At El. 100.3 FFL

0.00

0.00

648.04

0.00

0.00

1
1
Total =

489.41
81.24
408.17

0.00
0.00
0.00

0.00
0.00
0.00

1.92
1.55
1.54
1.55
1.41
1.82
1.84
2.12
2.14
2.12
2.14
1.60
2.29
1.60
1.41
6.40
5.18
5.12
5.15
4.70
6.05
6.13
8.47
8.58
8.47
8.58
6.38
9.16
6.38

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

Qty of Excavation = 489.41 Cu3


Qty of S. Concrete = 81.24 Cu3

A-009

648.04
Total =

(-)

sqm

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)
PB1-Side - (300x500)
PB2-Side - (300x500)
PB3-Side - (300x500)
PB4-Side - (300x500)
PB5-Side - (300x500)
PB6-Side - (300x500)
PB7-Side - (300x500)
PB8-Side - (350x500)
PB9-Side - (350x500)
PB10-Side - (350x500)
PB11-Side - (300x500)
PB12-Side - (350x500)
PB13-Side - (350x500)
PB14-Side - (350x500)

489.41
81.24

RBB 81 102184 CG 2331 00006 0001 5L 04


6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04
6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56

167 Of 275

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


PB15-Side - (350x500)

A-010

S. Concrete of Plinth Beams At 99.4 (TOC) Grade (C35)

4.04

Cum

PB1-Bottom - (300x500)
PB2-Bottom - (300x500)
PB3-Bottom - (300x500)
PB4-Bottom - (300x500)
PB5-Bottom - (300x500)
PB6-Bottom - (300x500)
PB7-Bottom - (300x500)
PB8-Bottom - (350x500)
PB9-Bottom - (350x500)
PB10-Bottom - (350x500)
PB11-Bottom - (300x500)
PB12-Bottom - (350x500)
PB13-Bottom - (350x500)
PB14-Bottom - (350x500)
PB15-Bottom - (350x500)

A-011

Formwork for Columns Upto El.102.2

0.70

5.66

0.00

0.00

Total =

127.43

0.00

0.00

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

0.96
0.78
0.77
0.77
0.71
0.91
0.92
1.48
1.50
1.48
1.50
1.12
1.60
1.12
0.99
16.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.35
3.35
3.35
3.15
3.15
3.35
3.25
3.25
3.25
3.25
3.25
3.25
3.05
3.15
3.35
3.35
3.35

1
3
7
3
1
2
1
1
1
3
1
1
1
1
4
1
2
Total =

5.70
17.09
39.87
17.96
5.99
12.73
6.18
6.18
6.18
18.53
7.15
7.15
6.71
6.93
18.76
5.70
11.39
200.15

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RBB 81 102184 CG 2331 00006 0001 5L 04


6.40
5.18
5.12
5.15
4.70
6.05
6.13
6.05
6.13
6.05
6.13
4.56
6.54
4.56
4.04

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

sqm

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)
C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)
C2-F5 -(350x500)
C3-F5 -(600x600)

1.70
1.70
1.70
1.90
1.90
1.90
1.90
1.90
1.90
1.90
2.20
2.20
2.20
2.20
1.40
1.70
1.70

168 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


A-012

S. Concrete for Columns Upto 102.2 (G-C35)

Cum

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)
C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)
C2-F5 -(350x500)
C3-F5 -(600x600)

A-013

Formwork of Elevated Beams At El. 102.200 (TOC)

0.35
0.35
0.35
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.60
0.60
0.60
0.60
0.35
0.35
0.35

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.60

6.85
5.18
5.12
5.15
4.68
6.05
6.13
5.28
5.22
1.50
6.45
5.20
1.50
2.88
6.45
5.28
5.22
5.13
4.68

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

3.35
3.35
3.35
3.15
3.15
3.35
3.25
3.25
3.25
3.25
3.25
3.25
3.05
3.15
3.35
3.35
3.35

1
3
7
3
1
2
1
1
1
3
1
1
1
1
4
1
2
Total =

0.59
1.76
4.10
2.13
0.71
1.51
0.73
0.73
0.73
2.19
0.98
0.98
0.92
0.95
2.35
0.59
1.41
23.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.40
1.81
1.79
1.80
1.64
2.12
1.84
1.58
1.57
0.45
1.94
1.56
0.45
0.86
1.94
1.58
1.57
1.54
1.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)
FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)

169 Of 275

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)
FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)
FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)

6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.20
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.20
5.22
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22

170 Of 275

0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.94
1.58
1.57
1.56
0.53
2.26
1.85
1.83
1.82
1.64
2.12
2.14
0.53
1.94
1.58
1.57
1.56
1.94
1.58
1.56
1.57
1.64
2.12
2.14
0.53
1.94
1.58
1.57
1.56
1.94
1.58
1.57
1.56
0.53
2.22
1.81
1.79
1.80
1.94
1.58
1.57

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)
FB67 - (350x950)
FB68 - (300x500)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)
FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)
FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)
FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)

5.20
1.50
6.45
5.28
5.22
5.13
4.68
1.50
6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.56
6.54
7.15
1.65
4.56
6.54

171 Of 275

0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.56
0.53
2.26
1.85
1.83
1.79
1.64
0.45
1.94
1.58
1.83
1.82
0.55
0.57
1.52
2.11
1.18
0.22
0.60
1.60
2.29
2.50
0.60
1.60
2.39
2.60
0.58
1.60
2.04
2.60
0.58
1.60
2.39
2.60
0.58
1.37
1.96
2.15
0.50
1.37
1.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)
FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)
FB114 - (300x500)
FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)
FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)
FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)

7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93
3.30
3.85
1.93
7.15
2.60
6.10
6.85
5.18
5.12
5.15
4.68
6.05
6.13
5.28
5.22
1.50
6.45
5.20
1.50
2.88
6.45
5.28
5.22
5.13
4.68
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22

172 Of 275

0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.35
0.30
0.35
0.35
0.30
0.30
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.60
0.60
0.50
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

2.50
0.53
1.11
0.99
1.60
2.29
2.50
0.58
1.16
1.16
0.67
2.50
0.78
1.83
10.28
7.77
7.68
7.73
7.01
11.50
11.64
6.34
6.26
1.50
7.74
6.24
1.80
3.45
7.74
6.34
6.26
6.15
7.01
7.74
6.34
6.26
6.24
2.25
9.68
7.92
7.83

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)
FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)
FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)
FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)
FB67 - (350x950)
FB68 - (300x500)

5.20
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.20
5.22
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.13
4.68
1.50

173 Of 275

0.75
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.50

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

7.80
8.88
11.50
11.64
2.25
7.74
6.34
6.26
6.24
7.74
6.34
6.24
6.26
8.88
11.50
11.64
2.25
7.74
6.34
6.26
6.24
7.74
6.34
6.26
6.24
2.25
9.53
7.77
7.68
7.73
7.74
6.34
6.26
6.24
2.25
9.68
7.92
7.83
7.69
8.88
1.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)
FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)
FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)
FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)
FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)
FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)

6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.56
6.54
7.15
1.65
4.56
6.54
7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93

174 Of 275

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.00
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.75
0.50
0.60
0.00
0.60
0.95
0.95
0.40

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

6.45
5.28
5.22
5.20
1.58
1.90
5.06
7.04
3.93
0.72
0.00
6.84
11.77
12.87
2.59
6.84
12.27
13.37
2.48
6.88
12.27
13.37
2.48
6.88
12.27
13.37
2.48
6.84
9.81
10.73
2.48
8.66
12.43
10.73
1.78
4.44
0.00
5.47
12.43
13.59
1.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)
FB114 - (300x500)

A-014

S. Concrete of Elevated Beams At El. 102.200 (TOC) Grade (C35)

3.30
3.85
1.93
7.15
2.60
6.10

0.40
0.40
0.95
0.95
0.50
0.50

2
2
2
2
2
2
Total =

2.64
3.08
3.66
13.59
2.60
6.10
969.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.80
1.36
1.34
1.35
1.23
2.01
1.75
0.95
0.94
0.23
1.16
0.94
0.27
0.52
1.16
0.95
0.94
0.92
1.05
1.16
0.95
0.94
0.94
0.39
1.69
1.39
1.37
1.37
1.55
2.01
2.04
0.39

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

FB1 - (350x750)
FB2 - (350x750)
FB3 - (350x750)
FB4 - (350x750)
FB5 - (350x750)
FB6 - (350x950)
FB7 - (300x950)
FB8 - (300x600)
FB9 - (300x600)
FB10 - (300x500)
FB11 - (300x600)
FB12 - (300x600)
FB13 - (300x600)
FB14 - (300x600)
FB15 - (300x600)
FB16 - (300x600)
FB17 - (300x600)
FB18 - (300x600)
FB19 - (300x750)
FB20 - (300x600)
FB21 - (300x600)
FB22 - (300x600)
FB23 - (300x600)
FB24 - (350x750)
FB25 - (350x750)
FB26 - (350x750)
FB27 - (350x750)
FB28 - (350x750)
FB29 - (350x950)
FB30 - (350x950)
FB31 - (350x950)
FB32 - (350x750)

6.85
5.18
5.12
5.15
4.68
6.05
6.13
5.28
5.22
1.50
6.45
5.20
1.50
2.88
6.45
5.28
5.22
5.13
4.68
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.20
4.68
6.05
6.13
1.50

175 Of 275

0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.60
0.60
0.50
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.95
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB33 - (300x600)
FB34 - (300x600)
FB35 - (300x600)
FB36 - (300x600)
FB37 - (300x600)
FB38 - (300x600)
FB39 - (300x600)
FB40 - (300x600)
FB41 - (350x950)
FB42 - (350x950)
FB43 - (350x950)
FB44 - (350x750)
FB45 - (300x600)
FB46 - (300x600)
FB47 - (300x600)
FB48 - (300x600)
FB49 - (300x600)
FB50 - (300x600)
FB51 - (300x600)
FB52 - (300x600)
FB53 - (350x750)
FB54 - (350x750)
FB55 - (350x750)
FB56 - (350x750)
FB57 - (350x750)
FB58 - (300x600)
FB59 - (300x600)
FB60 - (300x600)
FB61 - (300x600)
FB62 - (350x750)
FB63 - (350x750)
FB64 - (350x750)
FB65 - (350x750)
FB66 - (350x750)
FB67 - (350x950)
FB68 - (300x500)
FB69 - (300x500)
FB70 - (300x500)
FB71 - (300x500)
FB72 - (300x500)
FB73 - (300x500)

6.45
5.28
5.22
5.20
6.45
5.28
5.20
5.22
4.68
6.05
6.13
1.50
6.45
5.28
5.22
5.20
6.45
5.28
5.22
5.20
1.50
6.35
5.18
5.12
5.15
6.45
5.28
5.22
5.20
1.50
6.45
5.28
5.22
5.13
4.68
1.50
6.45
5.28
5.22
5.20
1.58

176 Of 275

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.35
0.35
0.35

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.95
0.95
0.95
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.95
0.50
0.50
0.50
0.50
0.50
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.16
0.95
0.94
0.94
1.16
0.95
0.94
0.94
1.55
2.01
2.04
0.39
1.16
0.95
0.94
0.94
1.16
0.95
0.94
0.94
0.39
1.67
1.36
1.34
1.35
1.16
0.95
0.94
0.94
0.39
1.69
1.39
1.37
1.35
1.55
0.23
0.97
0.79
0.91
0.91
0.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB74 - (300x500)
FB75 - (300x500)
FB76 - (300x500)
FB77 - (300x500)
FB77A - (300x500)
FB78 - (350x750)
FB79 - (350x750)
FB80 - (350x900)
FB81 - (350x900)
FB82 - (350x750)
FB83 - (350x750)
FB84 - (350x900)
FB85 - (350x900)
FB86 - (350x750)
FB87 - (350x750)
FB88 - (300x900)
FB89 - (350x900)
FB90 - (350x750)
FB91 - (350x750)
FB92 - (350x900)
FB93 - (350x900)
FB94 - (350x750)
FB95 - (300x750)
FB96 - (300x750)
FB97 - (300x750)
FB98 - (300x750)
FB99 - (300x950)
FB100 - (300x950)
FB101 - (350x750)
FB102 - (300x500)
FB103 - (300x600)
FB104 - (300x600)
FB105 - (350x950)
FB106 - (350x950)
FB107 - (350x950)
FB108 - (300x400)
FB109 - (350x400)
FB110 - (300x400)
FB111 - (350x950)
FB112 - (350x950)
FB113 - (300x500)

1.90
5.06
7.04
3.93
0.72
1.73
4.56
6.54
7.15
1.73
4.56
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.59
6.82
7.43
1.65
4.56
6.54
7.15
1.65
4.56
6.54
7.15
1.78
3.70
3.30
4.56
6.54
7.15
1.93
3.30
3.85
1.93
7.15
2.60

177 Of 275

0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.35
0.35
0.35
0.30
0.35
0.30
0.35
0.35
0.30

0.50
0.50
0.50
0.50
0.50
0.00
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.90
0.90
0.75
0.75
0.75
0.75
0.75
0.95
0.95
0.75
0.50
0.60
0.00
0.60
0.95
0.95
0.40
0.40
0.40
0.95
0.95
0.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.29
0.76
1.06
0.59
0.11
0.00
1.20
2.06
2.25
0.45
1.20
2.15
2.34
0.43
1.20
1.84
2.34
0.43
1.20
2.15
2.34
0.43
1.03
1.47
1.61
0.37
1.30
1.86
1.88
0.27
0.67
0.00
0.96
2.17
2.38
0.23
0.46
0.46
0.64
2.38
0.39

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FB114 - (300x500)

6.10

0.30

0.50

1
Total =

A-015

S. Concrete of Elevated Slab Grade (C35) At El. 102.20(TOC)

0.00

0.00

0.00

0.00

518.74
188.63
51.36
3.96
33.00
15.88
-180.87
-6.20
-2.36
-2.36
-1.38
-0.72
-0.34
-22.70
-2.47
-2.47
-0.72
-0.34
-1.12
-2.53
-0.29
-1.78
-0.29
-1.51
-0.58
-4.56
-2.58
-1.85
-1.50
-0.48
-0.30
569.24

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

85.39

0.00

0.00

sqm

Grid from A to D / 1 to 5
Grid from B' to D / 5' to 8
Grid from B' to A / 5' to 6
Grid from B' to A / 5 Stair small portion
Grid from A to C' / 1 Out side portion
Grid from D to B' / 8 Out side portion
Dedution Total Beams Area=180.87 M2
Dedution Total Opening Area
No.1 between 1,2/A,D
No.1 between 1,2/A,D
No.1 between 1,2/A,D
No.1 between 1,2/A,D
No.1 between 1,2/A,D
No.1 between 1,2/A,D
No.1 between 2,3/A,D
No.1 between 2,3/A,D
No.1 between 2,3/A,D
No.1 between 2,3/A,D
No.1 between 2,3/A,D
No.1 between 2,3/A,D
No.1 between 3,4/A,D
No.1 between 3,4/A,D
No.1 between 3,4/A,D
No.1 between 3,4/A,D
No.1 between 3,4/A,D
No.1 between 3,4/A,D
No.1 between 4,5/A,D
No.1 between 4,5/A,D
No.1 between 4,5/A,D
No.1 between 4,5/A,D
No.1 between 4,5/A,D
No.1 between 4,5/A,D

1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6

A-016

Formwork of Elevated Slab At El.102.200 (TOC)

0.92
129.18

21.75
10.35
9.60
1.80
18.08
8.70
180.87

23.85
18.23
5.35
2.20
1.83
1.83
1.00

3.03
4.76
4.76
2.78
1.04
0.69
5.28
4.97
4.97
1.05
0.69
2.26
3.58
0.59
2.50
0.59
3.05
1.18
2.23
3.65
3.70
3.03
0.30
0.75

2.05
0.50
0.50
0.50
0.69
0.50
2.15
0.50
0.50
0.69
0.50
0.50
0.71
0.50
0.71
0.50
0.50
0.50
2.05
0.71
0.50
0.50
0.80
0.20

1
1
1
1
1
1
-1
-1
-1
-1
-1
-1
-1
-2
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-2
-2
Total =

Cum

El. Slab Grade C35 Total Area = 569.24 M2

569.24

178 Of 275

0.15

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


45 % 200 Thk. Slab Out of = 569.24 M2
7 % 300 Thk. Slab Out of = 569.24 M2

A-017

Formwork for Columns from 102.20 Upto bottom of beams

256.16
39.85

Concrete for Columns Upto 106.55 Roof Slab (G-C35)

1
1

12.81
5.98

0.00
0.00

0.00
0.00

Total =

104.17

0.00

0.00

1
3
7
3
1
2
1
1
1
3
1
1
1
1
4
1
2
Total =

7.74
23.21
54.15
25.94
8.65
17.29
8.65
8.65
8.65
25.94
10.01
10.01
10.01
10.01
25.48
7.74
15.47
277.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.80
2.39
5.57
2.39
1.02
2.05
1.02
1.02
1.02
3.07
1.37
1.37
1.37
1.37
2.23

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)
C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)
C2-F5 -(350x500)
C3-F5 -(600x600)

A-018

0.05
0.15

1.70
1.70
1.70
1.90
1.90
1.90
1.90
1.90
1.90
1.90
2.20
2.20
2.20
2.20
1.40
1.70
1.70

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

Cum

C1-F1 - (350x500)
C2-F1 - (350x500)
C3-F1 - (350x500)
C5-F3 - (450x500)
C3-F3 - (450x500)
C4-F2- (450x500)
C5-F2 -(450x500)
C1-F2 -(450x500)
C2-F2 -(450x500)
C3-F2 -(450x500)
C6-F2a -(600x500)
C7-F2a -(600x500)
C6-F4 -(600x500)
C7-F3a -(600x500)
C8-F5 -(350x350)

0.35
0.35
0.35
0.35
0.45
0.45
0.45
0.45
0.45
0.45
0.60
0.60
0.60
0.60
0.35

179 Of 275

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.35

4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55
4.55

1
3
7
3
1
2
1
1
1
3
1
1
1
1
4

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


C2-F5 -(350x500)
C3-F5 -(600x600)

0.35
0.35

0.50
0.50

4.55
4.55

1
2
Total =

A-019

Formwork of Roof Beams At El. 106.550 (TOC)

0.80
1.59

0.00
0.00

0.00
0.00

30.44

0.00

0.00

2.44
1.97
1.95
1.99
1.81
2.24
2.33
2.09
1.69
1.67
1.70
1.55
1.92
2.00
2.09
1.69
1.67
1.70
1.81
2.24
2.33
1.81
2.24
2.33
2.09
1.69
1.67
1.70
1.55
1.92
2.00
2.44
1.97
1.95
1.99
1.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

sqm

RB1 - (350x750)
RB2 - (350x750)
RB3 - (350x750)
RB4 - (350x750)
RB5 - (350x750)
RB6 - (350x750)
RB7 - (350x750)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (300x600)
RB15 - (300x600)
RB16 - (300x600)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (350x750)
RB20 - (350x750)
RB21 - (350x750)
RB22 - (350x600)
RB23 - (350x600)
RB24 - (350x600)
RB25 - (300x600)
RB26 - (300x600)
RB27 - (300x600)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (300x600)
RB32 - (350x750)
RB33 - (350x750)
RB34 - (350x750)
RB35 - (350x750)
RB36 - (300x600)

6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18

180 Of 275

0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.300

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


RB37 - (300x600)
RB38 - (300x600)
RB39 - (300x600)
RB40 - (300x600)
RB41 - (300x600)
RB42 - (300x600)
RB43 - (300x600)
RB44 - (300x600)
RB45 - (300x600)
RB46 - (350x750)
RB47 - (350x750)
RB48 - (350x750)
RB49 - (350x750)
RB50 - (350x750)
RB51 - (350x750)
RB52 - (350x750)
RB53 - (350x750)
RB54 - (350x750)
RB55 - (350x750)
RB56 - (350x900)
RB57 - (450x1300)
RB58 - (350x900)
RB59 - (450x1300)
RB60- (350x900)
RB61 - (450x1300)
RB62 - (300x750)
RB63 - (300x750)
RB64 - (300x750)
RB65 - (300x750)
RB66 - (300x750)
RB67 - (300x750)
RB68 - (350x750)
RB69 - (350x750)
RB70 - (350x750)
RB71 - (350x900)
RB72 - (350x750)
RB73 - (350x750)
RB74 - (350x750)
RB75 - (350x750)
RB76 - (350x750)
RB77 - (350x750)

6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.31
7.04
7.90
5.31
15.19
5.31
15.19
5.31
15.19
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
4.62
2.43
7.23

181 Of 275

0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.450
0.350
0.450
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.92
2.00
2.09
1.69
1.67
1.70
1.55
1.92
2.00
2.44
1.97
1.95
1.99
1.81
2.24
2.33
1.86
2.46
2.77
1.86
6.84
1.86
6.84
1.86
5.32
1.59
2.11
2.37
1.59
2.11
2.37
1.86
2.46
2.77
1.86
2.46
2.77
1.86
1.62
0.85
2.53

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


RB1 - (350x750)
RB2 - (350x750)
RB3 - (350x750)
RB4 - (350x750)
RB5 - (350x750)
RB6 - (350x750)
RB7 - (350x750)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (300x600)
RB15 - (300x600)
RB16 - (300x600)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (350x750)
RB20 - (350x750)
RB21 - (350x750)
RB22 - (350x600)
RB23 - (350x600)
RB24 - (350x600)
RB25 - (300x600)
RB26 - (300x600)
RB27 - (300x600)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (300x600)
RB32 - (350x750)
RB33 - (350x750)
RB34 - (350x750)
RB35 - (350x750)
RB36 - (300x600)
RB37 - (300x600)
RB38 - (300x600)
RB39 - (300x600)
RB40 - (300x600)
RB41 - (300x600)

6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57

182 Of 275

0.750
0.75
0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.23
4.22
4.18
4.26
3.88
4.80
4.99
4.19
3.38
3.34
3.41
3.11
3.84
3.99
4.19
3.38
3.34
3.41
3.88
4.80
4.99
3.11
3.84
3.99
4.19
3.38
3.34
3.41
3.11
3.84
3.99
5.23
4.22
4.18
4.26
3.11
3.84
3.99
4.19
3.38
3.34

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


RB42 - (300x600)
RB43 - (300x600)
RB44 - (300x600)
RB45 - (300x600)
RB46 - (350x750)
RB47 - (350x750)
RB48 - (350x750)
RB49 - (350x750)
RB50 - (350x750)
RB51 - (350x750)
RB52 - (350x750)
RB53 - (350x750)
RB54 - (350x750)
RB55 - (350x750)
RB56 - (350x900)
RB57 - (450x1300)
RB58 - (350x900)
RB59 - (450x1300)
RB60- (350x900)
RB61 - (450x1300)
RB62 - (300x750)
RB63 - (300x750)
RB64 - (300x750)
RB65 - (300x750)
RB66 - (300x750)
RB67 - (300x750)
RB68 - (350x750)
RB69 - (350x750)
RB70 - (350x750)
RB71 - (350x900)
RB72 - (350x750)
RB73 - (350x750)
RB74 - (350x750)
RB75 - (350x750)
RB76 - (350x750)
RB77 - (350x750)

A-020

S. Concrete of Elevated Beams At El. 106.550 (TOC) Grade (C35)

5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.31
7.04
7.90
5.31
15.19
5.31
15.19
5.31
15.19
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
4.62
2.43
7.23

0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.90
1.30
0.90
1.30
0.90
1.30
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.90
0.75
0.75
0.75
0.75
0.75
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

3.41
3.11
3.84
3.99
5.23
4.22
4.18
4.26
3.88
4.80
4.99
3.98
5.28
5.93
4.78
19.75
4.78
19.75
4.78
19.75
3.98
5.28
5.93
3.98
5.28
5.93
3.98
5.28
5.93
4.78
5.28
5.93
3.98
3.46
1.82
5.42
537.45

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.83
1.48

0.00
0.00

0.00
0.00

Cum

RB1 - (350x750)
RB2 - (350x750)

6.98
5.63

183 Of 275

0.350
0.350

0.750
0.75

1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


RB3 - (350x750)
RB4 - (350x750)
RB5 - (350x750)
RB6 - (350x750)
RB7 - (350x750)
RB8 - (300x600)
RB9 - (300x600)
RB10 - (300x600)
RB11 - (300x600)
RB12 - (300x600)
RB13 - (300x600)
RB14 - (300x600)
RB15 - (300x600)
RB16 - (300x600)
FB17 - (300x600)
RB18 - (300x600)
RB19 - (350x750)
RB20 - (350x750)
RB21 - (350x750)
RB22 - (350x600)
RB23 - (350x600)
RB24 - (350x600)
RB25 - (300x600)
RB26 - (300x600)
RB27 - (300x600)
RB28 - (300x600)
RB29 - (300x600)
RB30 - (300x600)
RB31 - (300x600)
RB32 - (350x750)
RB33 - (350x750)
RB34 - (350x750)
RB35 - (350x750)
RB36 - (300x600)
RB37 - (300x600)
RB38 - (300x600)
RB39 - (300x600)
RB40 - (300x600)
RB41 - (300x600)
RB42 - (300x600)
RB43 - (300x600)

5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
6.98
5.63
5.57
5.68
5.18

184 Of 275

0.350
0.350
0.350
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300

0.75
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.75
0.75
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1.46
1.49
1.36
1.68
1.75
1.26
1.01
1.00
1.02
0.93
1.15
1.20
1.26
1.01
1.00
1.02
1.36
1.68
1.75
1.09
1.34
1.40
1.26
1.01
1.00
1.02
0.93
1.15
1.20
1.83
1.48
1.46
1.49
0.93
1.15
1.20
1.26
1.01
1.00
1.02
0.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


RB44 - (300x600)
RB45 - (300x600)
RB46 - (350x750)
RB47 - (350x750)
RB48 - (350x750)
RB49 - (350x750)
RB50 - (350x750)
RB51 - (350x750)
RB52 - (350x750)
RB53 - (350x750)
RB54 - (350x750)
RB55 - (350x750)
RB56 - (350x900)
RB57 - (450x1300)
RB58 - (350x900)
RB59 - (450x1300)
RB60- (350x900)
RB61 - (450x1300)
RB62 - (300x750)
RB63 - (300x750)
RB64 - (300x750)
RB65 - (300x750)
RB66 - (300x750)
RB67 - (300x750)
RB68 - (350x750)
RB69 - (350x750)
RB70 - (350x750)
RB71 - (350x900)
RB72 - (350x750)
RB73 - (350x750)
RB74 - (350x750)
RB75 - (350x750)
RB76 - (350x750)
RB77 - (350x750)

A-021

Formwork of Elevated Slab At El.107.500 (TOC)

6.40
6.65
6.98
5.63
5.57
5.68
5.18
6.40
6.65
5.31
7.04
7.90
5.31
15.19
5.31
15.19
5.31
15.19
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
7.04
7.90
5.31
4.62
2.43
7.23

0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.450
0.350
0.450
0.350
0.350
0.300
0.300
0.300
0.300
0.300
0.300
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350
0.350

20.75
165.87

42.75
1.00

0.60
0.60
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.90
1.30
0.90
1.30
0.90
1.30
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.90
0.75
0.75
0.75
0.75
0.75
0.75

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

1.15
1.20
1.83
1.48
1.46
1.49
1.36
1.68
1.75
1.39
1.85
2.07
1.67
8.89
1.67
8.89
1.67
6.91
1.19
1.58
1.78
1.19
1.58
1.78
1.39
1.85
2.07
1.67
1.85
2.07
1.39
1.21
0.64
1.90
127.43

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
-1
Total =

887.06
-165.87
721.19

0.00
0.00
0.00

0.00
0.00
0.00

sqm

Grid from A to D / 1 to 8
Deduction of beams Area = 165.87 M2

185 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


A-022

S. Concrete of Elevated Slab Grade (C35) At El. 107.500(TOC)

Cum

Total Slab Area = 721.19 M2

A-023

Formwork of Elevated Petestal above Roof

721.19

S. Concrete of Elevated Pedestal above Roof Slab (C35)

Formwork for R.C Parapet Wall 125 THK. 1300 (H)(TYP)

S. Concrete of R.C Parapet Wall Grade (C35)

3 mm M.S Wire Mesh Plastic Coated to 4mm dia 50x50 wire mesh tied
with tie wire to RHS (TYP)

MS Flat - L - 50 X 50 X 6 (TYP)

0.00

0.40
0.55
0.55
0.55
0.55

1
1
1
1
1
Total =

3.20
0.66
0.66
0.94
0.88
6.34

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.40
0.55
0.55
0.55
0.55

1
1
1
1
1
Total =

1.60
0.05
0.05
0.10
0.08
1.88

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

1.30
1.30

4
4
Total =

222.30
107.90
330.20

0.00
0.00
0.00

0.00
0.00
0.00

1.30
1.30

2
2
Total =

13.89
6.74
20.64

0.00
0.00
0.00

0.00
0.00
0.00

9.45
19.75
28.50

1.80
1.80
1.80

1
1
1
Total =

17.01
35.55
51.30
103.86

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

58.00
1.00

2.00
2.00

116.00
2.00

0.00
0.00

0.00
0.00

2.00
0.30
0.30
0.50
0.50

sqm
42.75
20.75

Cum
42.75
20.75

0.13
0.13

Sqm

Short wall grid 8


Short wall grid 1
Long wall grid A

RP-002

0.00

0.00

2.00
0.30
0.30
0.35
0.30

Long Way (both side)


Short Way (both side)

RP-001

Cum

Long Way (both side)


Short Way (both side)

A-026

0.00

108.18

8.00
1.20
1.20
1.70
1.60

Water Tank Pedestal-2000x2000


P1-300x300
P2-300x300
C2-350x500
C6-300x500

A-025

108.18

Total =
sqm

Water Tank Pedestal-2000x2000


P1-300x300
P2-300x300
C2-350x500
C6-300x500

A-024

0.15

RM

Grid A - Elevation - 1
Grid D - Elevation - 3

186 Of 275

1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Grid 8 - Elevation - 2
Grid 1 - Elevation - 4

26.00
44.00

2.00
2.00

1
1

52.00
88.00

0.00
0.00

0.00
0.00

258.00

0.00

0.00

58.00
1.00
26.00
44.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

129.00

0.00

0.00

Total =
RP-003

MS Flat - L - 25 X 5 to fix chainlink Mesh (TYP)

RM

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-004

MS Plate - L - 200 X 50 X 10 (TYP)

58.00
1.00
26.00
44.00

MS Plate - L - 150 X 50 X 10 (TYP)

GI Bolt & Nut- L - 12 X 40 (TYP)

GI Bolt & Nut - 6 @ 500 C/C (TYP)

100 THK Solid Block Work El. Floor(TYP) / External Work

1
1
1
1
Total =

60.00
12.00
24.00
36.00
132.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

2.00
2.00
2.00
2.00

5.00
1.00
2.00
3.00

1
1
1
1
Total =

10.00
2.00
4.00
6.00
22.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

4.00
4.00
4.00
4.00

5.00
1.00
2.00
3.00

2
2
2
2
Total =

40.00
8.00
16.00
24.00
88.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

96.00
1.00
68.00
88.00

1.00
1.00
1.00
1.00

1
1
1
1
Total =

96.00
1.00
68.00
88.00
253.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

BW-001

5.00
1.00
2.00
3.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-007

12.00
12.00
12.00
12.00

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-006

1
1
1
1

No.s

Grid A - Elevation - 1
Grid D - Elevation - 3
Grid 6 - Elevation - 2
Grid 1 - Elevation - 4

RP-005

1.00
1.00
1.00
1.00

Sqm

187 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Short wall grid 1 & 8
Long wall grid A
Long wall grid D
A, B' & 6, 8
Deduction of doors D1
Deduction of doors D2
Deduction of doors D4

BW-002

200 THK Solid Block Work El. Floor (TYP) External Work

200 THK Solid Block Work El. Floor (TYP) / Internal

50 THK Polystrene Insulation (TYP)

UPVC Rain Water Pipe 160 (TYP)

Galanised Steel Anchors at 400 CTC Vertically

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

19.75
23.48
41.75
45.12
41.75
2.00
1.00
2.80

4.55
4.55
4.55
6.95
1.65
3.00
2.20
3.00

2
1
1
1
1
-4
-5
-2
Total =

179.73
106.81
189.96
313.58
68.89
-24.00
-11.00
-16.80
807.17

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

19.75
23.48
17.90
1.00
2.80

4.55
4.55
4.55
2.20
3.00

2
1
2
-4
-1
Total =

179.73
106.81
162.89
-8.80
-8.40
432.23

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

19.75
23.48
41.75
45.12

4.55
4.55
4.55
6.95

2
1
1
1
Total =

179.73
106.81
189.96
313.58
790.08

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

7.70

1.10

9
Total =

76.23
76.23

0.00
0.00

0.00
0.00

RM

Total No. of drains = 9

GS-001

179.73
106.81
189.96
313.58
-24.00
-11.00
-16.80
738.28

Sqm

Short wall grid 1 & 8


Long wall grid A
Long wall grid D
A, B' & 6, 8

A-034

2
1
1
1
-4
-5
-2
Total =

Sqm

Short wall grid 5 & 6


Long wall grid B
Long Way grid B'
Deduction of doors D3
Deduction of doors D5

A-027

4.55
4.55
4.55
6.95
3.00
2.20
3.00

Sqm

Short wall grid 1 & 8


Long wall grid A
Long wall grid D
A, B' & 6, 8
Grid D below Elevated Floor
Deduction of doors D1
Deduction of doors D2
Deduction of doors D4

BW-003

19.75
23.48
41.75
45.12
2.00
1.00
2.80

No.s

188 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Total Columns around the building = 30+1 no.s

GS-002

Stainless Steel Butterfly Wall Ties at 400 CTC Vertically and 800 CTC
Horizontally (TYP)

62.00

Internal Render & Emulsion Paint - (W1)

790.08

Wash Sand /Internal

Ceramic Wall Tiles - (W2)

Alkali / Acid Resistant Tiles - (W13)

External Render & Heavy Texturised Paint - (W15)

Wash Sand /External

0.00

3.25

1
Total =

2,567.76
2,567.76

0.00
0.00

0.00
0.00

75.38
40.10
29.05
29.75
10.00
43.55
14.00
55.52

4.50

4.50
4.50
4.50
4.50
4.50
6.70
4.50
3.00

1
1
1
1
1
1
1
1
Total =

339.21
180.45
130.73
133.88
45.00
291.79
63.00
166.56
1,350.61

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,350.61

0.30

0.015

1
Total =

36.47
36.47

0.00
0.00

0.00
0.00

11.30
11.50

4.50
4.50

1
1
Total =

50.85
51.75
102.60

0.00
0.00
0.00

0.00
0.00
0.00

55.52

1.50

1
Total =

83.28
83.28

0.00
0.00

0.00
0.00

123.00
22.88

5.25
2.45

1
1
Total =

645.75
56.04
701.79

0.00
0.00
0.00

0.00
0.00
0.00

0.015

1
Total =

18.95
18.95

0.00
0.00

0.00
0.00

Sqm

Outer Long Wall & Short Wall


Outer Long Wall 6 to 8 / A to B'

PWE-001A

0.00

0.00

Sqm

Battery Room

PWE-001

0.00

1,612.00

Sqm

Pantry
Toilet

AT-001

Cu.M

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s
ST-001

1,612.00

Total =

Sqm

Switchgear Room
Auxiliary Room
Control Room
Internal Passage
Internal Passage
Air handling unit (AHU) Room
Office
Battery Room above 1.5 M

PWI-001A

13

No.s

Insulation area = 730.96 M2


1 M2 = 3.13 No.s required
PWI-001

12.38

Cu.M

Dry Morter for 1 Cu.M = 0.30 Cu.M


1 Cu.M = 28.8 Bag.s

701.79

189 Of 275

0.30

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


FF-001

Non Slip Ceramic Floor Tiles - (F4)

Sqm

Pantry
Toilet

FF-002

Hardened & Sealed Granolithic Floor - (F8)

3.00
2.00

Raised Access Floor - Pedestal Floor - (F-12)

Acid Resistant Tiles (F-14)

External Float Finish With UV Resistant Floor Hardener - (F-16)

Coved Granolithic Integral With Floor - (S -7) - SKIRTING

0.00
0.00

Total =

15.45

0.00

0.00

23.20
3.50
12.53
8.10

14.49
3.50
9.25
2.00

1
1
1
1
Total =

336.17
12.25
115.90
16.20
480.52

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12.60
5.13
12.88

7.45
9.40
2.00

1
1
1
Total =

93.87
48.22
25.76
167.85

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

23.20

4.56

Total =

105.79
0.00
105.79

0.00
0.00
0.00

0.00
0.00
0.00

2
2
1
1
Total =

12.77
8.89
6.64
4.62
32.92

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

7.54
4.01
2.91
2.98
1.00
4.36
1.40
5.55

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sqm

Treads (3360x1900)
Riser
Treads (3360x1975)
Riser

SK-001

0.00
0.00

Sqm

Battery Room

FF-005

7.95
7.50

Sqm

Auxiliary Room
Control Room
Internal Passage

FF-004

1
1

Sqm

Switchgear Room
Office
Air handling unit (AHU) Room
External Passage

FF-003

2.65
3.75

3.36
0.34
3.36
0.36

1.90
13
1.98
13

75.38
40.10
29.05
29.75
10.00
43.55
14.00
55.52

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

Sqm

Switchgear Room
Auxiliary Room
Control Room
Internal Passage
Internal Passage
Air handling unit (AHU) Room
Office
Battery Room

190 Of 275

1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Toilet

SE-001

Emulsion Painted Smooth Fair Face Concrete - (C2) - CEILING

11.50

Suspended Ceiling 600mm x 600mm Exposed Grid Self Finish Washable


Mineral Fibre Lay in Panels - (C-5)

Acid Resistant Paint On Smooth Fair Face Concrete - (C-12)

Screed to falls. (Min. 50mm) - WATER PROOFING

Separation layer of 500g Polythene sheet.

Expanded polystyrene insulation 350Kg/Cu.M 75mm Thk. with 15mm


rebate on edges.

300x300x30 Thk. concrete slab set in 20 Thk. screed.

40x40 mm Bituthene fillet HC.

14.49
9.25
2.65
3.75

1
1
1
1
Total =

336.17
115.90
7.95
7.50
467.52

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12.60
5.13
12.88
3.50
3.50

7.45
9.40
2.00
1.50
3.50

1
1
1
1
1
Total =

93.87
48.22
25.76
5.25
12.25
185.35

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

23.20

4.56

1
Total =

105.79
105.79

0.00
0.00

0.00
0.00

42.75

20.75

1
Total =

44.35
44.35

0.00
0.00

0.00
0.00

42.75

20.75

1
Total =

887.06
887.06

0.00
0.00

0.00
0.00

42.75

20.75

1
Total =

887.06
887.06

0.00
0.00

0.00
0.00

42.75

20.75

0.090

1
Total =

9,856.25
9,856.25

0.00
0.00

0.00
0.00

127.00

0.040

0.040

0.20

0.00

0.00

0.050

No.s

Roof Area

WP-003

23.20
12.53
3.00
2.00

Sqm

Roof Area

WP-005

0.00

Sqm

Roof Area

WP-004

0.00

0.00

Cum

Roof Area

WP-001

0.00

30.89

Sqm

Battery Room

WP-002

Sqm

Auxiliary Room
Control Room
Internal Passage
Internal Passage
Office

SE-003

1.15

Total =
Sqm

Switchgear Room
Air handling unit (AHU) Room
Pantry
Toilet

SE-002

0.10

Cum

Roof Area

191 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Total =
WP-006

Bituthene 1200xHC with 150mm laps on primed screed to fall.

127.00

0.600

1
Total =

300x300 mm wide bituthene 1200xHC reinforcing strip in corner.

WP-008

A-032

Mesh - A393 (TYP)

2.40

D1

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D1

UNION PANIC LATCH - SILVER FINISH

D1

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

D1

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X


8MM ROSE - SSS

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM


HEIGHT DOOR-NP

D1

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT


STANDARD HEIGHT DOOR-NP

0.600

11.52

0.00

0.00

11.52

0.00

0.00

1
Total =

127.00
127.00

0.00
0.00

0.00
0.00

2.4
Total =

298.96
298.96

0.00
0.00

0.00
0.00

6.00

4
Total =

24.00
24.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

9.675

No.s

No.s

No.s

No.s

D1 = 2000 mm X 3000 mm

D-006

0.00

PR

D1 = 2000 mm X 3000 mm

D-005

0.00

0.00

Total =

12.88

D1 = 2000 mm X 3000 mm

D-004

0.00

76.20

sqm

D1 = 2000 mm X 3000 mm

D-003

0.00

127.00

D1 = 2000 mm X 3000 mm

D-002

76.20

RM

A-393 - T & B (B/W)

D-001

0.00

sqm

Roof Area
Bituthene 1200xHC and solar shield turned into 25x25 chase and securely
fixed and sealed with 20x20 wooden batten and then pointed with
servimastic.
Roof Area

0.00

sqm

Roof Area

WP-007

0.20

No.s

192 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


D1 = 2000 mm X 3000 mm

D-007

D1

DUST EXCLUDING SOCKET - CP

1.00

D1

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

D1

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D1

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D1

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D1

LEGGE ROLLER LATCH

D2

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D2

UNION PANIC LATCH - SILVER FINISH

D2

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

2.00

4
Total =

8.00
8.00

0.00
0.00

0.00
0.00

11.00

4
Total =

44.00
44.00

0.00
0.00

0.00
0.00

2.00

4
Total =

8.00
8.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.50

5
Total =

7.50
7.50

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

No.s

D2 = 1000 mm X 2200 mm

D-003

4.00
4.00

PR

D2 = 1000 mm X 2200 mm

D-002

4
Total =

No.s

D1 = 2000 mm X 3000 mm

D-001

1.00

MTR

D1 = 2000 mm X 3000 mm

D-012

0.00

MTR

D1 = 2000 mm X 3000 mm

D-011

0.00

0.00

No.s

D1 = 2000 mm X 3000 mm

D-010

0.00

4.00

No.s

D1 = 2000 mm X 3000 mm

D-009

No.s

D1 = 2000 mm X 3000 mm

D-008

4.00

Total =

No.s

D2 = 1000 mm X 2200 mm

193 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


D-013

D2

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

No.s

D2 = 1000 mm X 2200 mm

D-009

D2

SEMI CIRCULAR FLOOR DOOR STOP - SSS

1.00

D2

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D2

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D3

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D-015

D3

D3

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D3 = 1000 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

D3

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

D3

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

D3

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

10.00
10.00

0.00
0.00

0.00
0.00

5.40

5
Total =

27.00
27.00

0.00
0.00

0.00
0.00

1.00

5
Total =

5.00
5.00

0.00
0.00

0.00
0.00

1.50

4
Total =

6.00
6.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

2.00

4
Total =

8.00
8.00

0.00
0.00

0.00
0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

4.00

0.00

0.00

No.s

No.s

D3 = 1000 mm X 2200 mm

D-013

5
Total =

Sets

D3 = 1000 mm X 2200 mm

D-017

2.00

No.s

D3 = 1000 mm X 2200 mm

D-016

0.00

PR

D3 = 1000 mm X 2200 mm

D-014

0.00

0.00

MTR

D2 = 1000 mm X 2200 mm

D-001

0.00

5.00

MTR

D2 = 1000 mm X 2200 mm

D-011

No.s

D2 = 1000 mm X 2200 mm

D-010

5.00

Total =

No.s

D3 = 1000 mm X 2200 mm

1.00

194 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Total =
D-010

D3

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

5.40

4
Total =

D3

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

D3

SEMI CIRCULAR FLOOR DOOR STOP - SSS

1.00

D4

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D4

UNION PANIC LATCH - SILVER FINISH

D4

UNION KNOB OPERATED OUTSIDE ACCESS DEVICE WITH UNION


1X1 RIM CYLINDER - SILVER

D4

PULL HANDLE - 22 X 300MM CENTRES - CONCEALED FIX ON 50 X


8MM ROSE - SSS

D4

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT3000MM


HEIGHT DOOR-NP

D4

L/A FLUSH BOLT 172X25MM (309MM) SIZE:LENGTH TO SUIT


STANDARD HEIGHT DOOR-NP

D4

BRITON O/H DOOR CLOSER ADJ.POWER 2-6 WITH BACKCHECK SES

0.00

0.00

4.00

0.00

0.00

1.00

4
Total =

4.00
4.00

0.00
0.00

0.00
0.00

8.00

2
Total =

16.00
16.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

No.s

D4 = 2800 mm X 3000 mm

D-008

No.s

D4 = 2800 mm X 3000 mm

D-006

4.00

Total =

No.s

D4 = 2800 mm X 3000 mm

D-005

0.00

No.s

D4 = 2800 mm X 3000 mm

D-004

0.00

0.00

No.s

D4 = 2800 mm X 3000 mm

D-003

0.00

21.60

PR

D4 = 2800 mm X 3000 mm

D-002

21.60

No.s

D3 = 1000 mm X 2200 mm

D-001

0.00

MTR

D3 = 1000 mm X 2200 mm

D-009

0.00

MTR

D3 = 1000 mm X 2200 mm

D-018

4.00

No.s

195 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


D4 = 2800 mm X 3000 mm

D-009

D4

SEMI CIRCULAR FLOOR DOOR STOP - SSS

1.00

D4

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

D4

PANIC THRESHOLD SEAL C/WTUBULAR GASKET - ALUM

D4

LEGGE ROLLER LATCH

D5

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D-015

D5

D5

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D5 = 1000 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

D5

BRITON 52X8MM OVAL PROFILE CYLINDERESCUTCHEON - SSS

D5

OVAL DOUBLE CYLINDER 71MM3 KEYED STD.DIFFER SNP

4.00
4.00

0.00
0.00

0.00
0.00

11.80

2
Total =

23.60
23.60

0.00
0.00

0.00
0.00

2.80

2
Total =

5.60
5.60

0.00
0.00

0.00
0.00

1.00

2
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.50

1
Total =

1.50
1.50

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

2.00

1
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

Sets

No.s

D5 = 1000 mm X 2200 mm

D-017

2
Total =

No.s

D5 = 1000 mm X 2200 mm

D-016

2.00

PR

D5 = 1000 mm X 2200 mm

D-014

0.00

No.s

D4 = 2800 mm X 3000 mm

D-001

0.00

0.00

MTR

D4 = 2800 mm X 3000 mm

D-012

0.00

2.00

MTR

D4 = 2800 mm X 3000 mm

D-011

No.s

D4 = 2800 mm X 3000 mm

D-010

2.00

Total =

No.s

D5 = 1000 mm X 2200 mm

196 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


D-013

D5

BRITON O/H DOOR CLOSER SESDOOR WEIGHT UPTO 80 Kg.


TESTEDTO 2 MILLION CYCLE

No.s

D5 = 1000 mm X 2200 mm

D-010

D5

BULB SEAL SELF ADHESIVECOLOUR: DARK BRONZE

1.00

D5

THRESHOLD PROFILE RAW ALUM FINWITH EPDM GASKET REF.9112

D5

KICKPLATE 1000X200X1.5MM SSS SQUARE CORNERS DRILLED &


CSKC/W FLAT HEAD SCREWS

D5

SEMI CIRCULAR FLOOR DOOR STOP - SSS

D6

BALL BEARING BUTT HINGES SSS 4" X 4" X 3 MM, GRADE 13, CE
MARKED, TESTED,AND CERTIFIED TO EN1935, C/W, SCREWS

D-015

D6

D6

BRITON DUAL PROF CYL SASH LOCKCASE 57MM B.SET & 57MM
CENTRE, DEAD BOLT WITH SECURITY HARDENED 2 STEEL
ROLLERS, SQURE FOREND & STRIKE PLATE -SS
D6 = 900 mm X 2200 mm

22MM DIA LEVER HANDLE ON CONCELAED FIX ROSE - SS

D6

BATHROOM TRUN & INDICATOR SET

D6

WALL MOUNTED DOOR STOPPER - SS

5.40
5.40

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

2.00

1
Total =

2.00
2.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.50

1
Total =

1.50
1.50

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

1
Total =

1.00
1.00

0.00
0.00

0.00
0.00

1.00

0.00

0.00

Sets

Sets

D6 = 900 mm X 2200 mm

D-021

1
Total =

No.s

D6 = 900 mm X 2200 mm

D-020

5.40

PR

D6 = 900 mm X 2200 mm

D-014

0.00

No.s

D5 = 1000 mm X 2200 mm

D-001

0.00

0.00

No.s

D5 = 1000 mm X 2200 mm

D-009

0.00

1.00

MTR

D5 = 1000 mm X 2200 mm

D-019

MTR

D5 = 1000 mm X 2200 mm

D-018

1.00

Total =

No.s

D6 = 900 mm X 2200 mm

1.00

197 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG Control Building

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG Control Building


Total =
D-022

D6

KICKPLATE 900X200X1.5MM SSS SQUARE CORNERS, DRILLED &


CSKC/W FLAT HEAD SCREWS

2.00

1
Total =

D6

SEMI CIRCULAR FLOOR DOOR STOP - SSS

0.00

0.00

2.00

0.00

0.00

2.00

0.00

0.00

1.00

0.00

0.00

1.00

0.00

0.00

No.s

D6 = 900 mm X 2200 mm

D-009

1.00

No.s

D6 = 900 mm X 2200 mm

1.00

1
Total =

198 Of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

199 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

200 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

201 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

202 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

203 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

204 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

205 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

206 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

207 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

208 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

209 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

210 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

211 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

212 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

213 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00%

214 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

215 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

216 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

217 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

218 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

219 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Progress
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

220 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

221 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

222 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

223 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

224 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

225 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

226 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

227 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

228 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

229 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

230 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

231 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

232 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

233 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

234 Of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-1 Foundation

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GAS TURBINE GENERATOR - GTG-1


DWG NO. RBB 80 102184 CG 2331 00015 0001 5L 04
A-001

Excavation Of Fnd.

Cum

Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.

A-002

Imported Soil Fill Well Graded Sub Base

10.99
18.05
3.54
3.14

Polythene Sheet 100 Gauge

P.C.C Concrete (C10)

Formwork Of Fnd.

283.63
650.71
47.07
32.55

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

1,013.96

0.00

0.00

9.49
16.55
2.04
1.64
69.19

4.30
6.60
1.99
0.83
1.00

1
1
1
1
1
Total =

65.29
174.80
6.49
2.18
307.88
556.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

9.69
13.32
3.63
1.84
2.24

4.50
7.15
7.15
1.13
2.11

1
1
1
1
1
Total =

43.60
95.26
25.95
2.08
4.74
171.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

9.49
13.12
3.43
1.64
2.04

4.30
6.95
6.95
0.93
1.91

0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

4.08
9.12
2.38
0.15
0.39
16.13

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

4.19
4.19
3.40
3.40
3.00
1.77

1
2
1
1
1
1
Total =

18.03
84.63
47.16
52.09
56.56
41.06
299.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.60
1.60
1.60
1.60
4.45

Cum

Blinding Concrete - C10


Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10

A-005

1
1
1
1

sqm

Polythene Sheet Sheet 100 Gauge


Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge

A-004

4.45
4.45
4.45
4.45

Cum

Well Graded Sub Base Soil


Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil

A-003

5.80
8.10
2.99
2.33

sqm

Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.

4.30
10.09
13.87
15.32
18.85
23.20

235 of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-1 Foundation

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

GAS TURBINE GENERATOR - GTG-1


A-006

Structure Concrete Grade C35

Cum

Foundation Concrete C35


Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35/El.102.220(TOC)
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35

A-007

Waterproofing Protection (Coating/Painting)

6.24
0.80
2.45
13.12
2.56
3.43
2.04
1.64

Waterproofing Glassmat Sheet

4.19
4.19
4.19
3.40
1.77
3.00
3.00
3.00

sqm

1
1
1
1
1
1
1
1
Total =

112.57
12.41
44.14
310.10
11.26
67.90
11.72
4.58
574.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

52.36
6.71
20.53
89.24
9.04
20.58
12.24
9.84
53.68
5.92
21.05
182.41
7.51
47.67
4.10
542.88

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

271.44
271.44

0.00
0.00

0.00
0.00

1
1
Total =

1,013.96
574.68
439.28

0.00
0.00
0.00

0.00
0.00
0.00

420.96

0.00

0.00

420.96

0.00

0.00

Double Coating

Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.

A-008

4.30
3.70
4.30
6.95
2.49
6.60
1.91
0.93

6.24
0.80
2.45
13.12
2.56
3.43
2.04
1.64
6.24
0.80
2.45
13.12
2.04
3.43
1.64

4.19
4.19
4.19
3.40
1.77
3.00
3.00
3.00
4.30
3.70
4.30
6.95
1.84
6.95
1.25

sqm

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Single Layer

Glassmat Sheet = 542.88/2

A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 1013.96 Cu3


Qty of S. Concrete = 574.68 Cu3

A-030

Filler Board 50 mm THK. Compressible (TYP)

(-)

1,013.96
574.68

sqm

Filler Board Around 2.9 M deep 25 mm THK

72.58

2.900

2
Total =

236 of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

237 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00

0.00%

238 of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-2 Foundation

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

GAS TURBINE GENERATOR - GTG-2


DWG NO. RBB 80 102184 CG 2331 00015 0001 5L 04
A-001

Excavation Of Fnd.

Cum

Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.
Excavation Of Fnd.

A-002

Imported Soil Fill Well Graded Sub Base

10.99
18.05
3.54
3.14

Polythene Sheet 100 Gauge

P.C.C Concrete (C10)

Formwork Of Fnd.

Structure Concrete Grade C35

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

1,013.96

0.00

0.00

9.49
16.55
2.04
1.64
69.19

4.30
6.60
1.99
0.83
1.00

1
1
1
1
1
Total =

65.29
174.80
6.49
2.18
307.88
556.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

9.69
13.32
3.63
1.84
2.24

4.50
7.15
7.15
1.13
2.11

1
1
1
1
1
Total =

43.60
95.26
25.95
2.08
4.74
171.63

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

9.49
13.12
3.43
1.64
2.04

4.30
6.95
6.95
0.93
1.91

0.10
0.10
0.10
0.10
0.10

1
1
1
1
1
Total =

4.08
9.12
2.38
0.15
0.39
16.13

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

4.19
4.19
3.40
3.40
3.00
1.77

1
2
1
1
1
1
Total =

18.03
84.63
47.16
52.09
56.56
41.06
299.54

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

112.57
12.41

0.00
0.00

0.00
0.00

1.60
1.60
1.60
1.60
4.45

sqm

Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
Formwork Of Fnd.
A-006

283.63
650.71
47.07
32.55

Cum

Blinding Concrete - C10


Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10
Blinding Concrete - C10

A-005

1
1
1
1

sqm

Polythene Sheet Sheet 100 Gauge


Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge
Polythene Sheet Sheet 100 Gauge

A-004

4.45
4.45
4.45
4.45

Cum

Well Graded Sub Base Soil


Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil
Well Graded Sub Base Soil

A-003

5.80
8.10
2.99
2.33

4.30
10.09
13.87
15.32
18.85
23.20
Cum

Foundation Concrete C35


Foundation Concrete C35

6.24
0.80

239 of 275

4.30
3.70

4.19
4.19

1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GTG-2 Foundation

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
NR

Height

NP

Qty. as per IFC

Prev. Month

This Month

GAS TURBINE GENERATOR - GTG-2


Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35/El.102.220(TOC)
Foundation Concrete C35
Foundation Concrete C35
Foundation Concrete C35

A-007

Waterproofing Protection (Coating/Painting)

2.45
13.12
2.56
3.43
2.04
1.64

Waterproofing Glassmat Sheet

4.19
3.40
1.77
3.00
3.00
3.00

sqm

1
1
1
1
1
1
Total =

44.14
310.10
11.26
67.90
11.72
4.58
574.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =

52.36
6.71
20.53
89.24
9.04
20.58
12.24
9.84
53.68
5.92
21.05
182.41
7.51
47.67
4.10
542.88

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

271.44
271.44

0.00
0.00

0.00
0.00

1
1
Total =

1,013.96
574.68
439.28

0.00
0.00
0.00

0.00
0.00
0.00

420.96

0.00

0.00

420.96

0.00

0.00

Double Coating

Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.
Bot. of Fnd.

A-008

4.30
6.95
2.49
6.60
1.91
0.93

6.24
0.80
2.45
13.12
2.56
3.43
2.04
1.64
6.24
0.80
2.45
13.12
2.04
3.43
1.64

4.19
4.19
4.19
3.40
1.77
3.00
3.00
3.00
4.30
3.70
4.30
6.95
1.84
6.95
1.25

sqm

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Single Layer

Glassmat Sheet = 542.88/2

A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 1013.96 Cu3


Qty of S. Concrete = 574.68 Cu3

A-030

Filler Board 50 mm THK. Compressible (TYP)

(-)

1,013.96
574.68

sqm

Filler Board Around 2.9 M deep 25 mm THK

72.58

2.900

2
Total =

240 of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

241 of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00

0.00%

242 of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG-Fnds. Unit - 1

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG - Unit - 1
DWG NO. RBB 81 102184 CG 2331 00016 0002 5L 03
A-001

Excavation of Fnd.s

Cum

Excavation of Fnd.s (F1)


Excavation of Fnd.s (F2)
Excavation of Fnd.s (F3)
Excavation of Fnd.s (F4)
Excavation of Fnd.s (F4A)
Excavation of Fnd.s (F5)
Excavation of Fnd.s (F6)
Excavation of Fnd.s (F7)
Excavation of Fnd.s (F8)
Excavation of Fnd.s (F9)
Excavation of Fnd.s (F10)
Excavation of Fnd.s (F11)
Excavation of Fnd.s (F12)
Excavation of Fnd.s (F13)
Excavation of Fnd.s (F14)
Excavation of Fnd.s (F14A)
Excavation of Fnd.s (F15)
Excavation of Fnd.s (LF1)
Excavation of Fnd.s (SF1)

A-002

Imported Soil Fill Well Graded Sub Base

20.00
12.50
13.00

Polythene Sheet 100 Gauge

P.C.C Concrete (C10)

1
1
1

Total =

451.00
128.13
253.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
832.30

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20.00
12.50
13.00

11.00
5.00
9.50

9.10
3.10
11.10

18.10
10.60
7.60

9.10
3.10

18.10
10.60

0.50
0.50
0.50

1
1
1
Total =

110.00
31.25
61.75
203.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1
1
1
Total =

164.71
32.86
84.36
281.93

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

8.24
1.64

0.00
0.00

0.00
0.00

sqm

F1
F2
F3

A-004

2.05
2.05
2.05

Cum

Well Graded Sub Base Soil of Fnd.s (F1)


Well Graded Sub Base Soil of Fnd.s (F2)
Well Graded Sub Base Soil of Fnd.s (F3)

A-003

11.00
5.00
9.50

Cum

F1
F2

243 Of 275

0.05
0.05

1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG-Fnds. Unit - 1

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG - Unit - 1
F3

A-005

Formwork Of Fnd.

11.10

Structure Concrete Grade C35

54.00
27.00
37.00

F1
F1
F1
F1
F1
F1
F1
F1
F1
F2
F2
F2
F3

Waterproofing Protection (Coating/Painting)

4.22

0.00

0.00

Total =

14.10

0.00

0.00

1.00
0.60
0.60

1
1
1
Total =

54.00
16.20
22.20
92.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.70
0.30
0.60
0.60

1
1
1
1
Total =

113.40
17.20
18.90
49.50
199.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1
1
1
1
1
1
1
1
1

108.00
32.40
44.40
324.00
63.00
165.00
324.00
63.00
165.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-4

-2.23
-2.23
-4.77
-4.77
-4.55
-4.55
-2.03
-2.03
-21.54
-1.13
-3.36
-2.02
-6.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

F1
F1
F2
F3

A-007

0.05

sqm

F1
F2
F3
A-006

7.60

18.00
6.37
10.50
11.00

9.00
9.00
3.00
7.50

sqm

Waterproofing F1 side
Waterproofing F2 side
Waterproofing F3 side
Bot. of Fnd.F1
Bot. of Fnd.F2
Bot. of Fnd.F3
Top. of Fnd.F1
Top. of Fnd.F2
Top. of Fnd.F3
Deduction Pedestals Area
P1A
P1B
P1C
P1D
P1E
P1F
P1G
P1H
P1J
P2A
P2B
P2C
P3

Double Coating
54.00
27.00
37.00
18.00
10.50
11.00
18.00
10.50
11.00
1.30
1.30
1.40
1.40
1.40
1.40
1.30
1.30
16.57
0.90
2.00
1.20
1.10

244 Of 275

1.00
0.60
0.60
9.00
3.00
7.50
9.00
3.00
7.50
1.32
1.32
2.62
2.62
2.50
2.50
1.20
1.20
0.90
1.20
1.20
1.10

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.40
1.40
1.40
1.40

2
2
2
2
2
2
2
2
2

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG-Fnds. Unit - 1

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG - Unit - 1
F3
F3
F1
F1
F1
F1
F1
F1
F1
F1
F1
F2
F2
F2
F3
F3
F3

A-008

P3A
P3B
P1A - Around Pedestals
P1B
P1C
P1D
P1E
P1F
P1G
P1H
P1J
P2A
P2B
P2C
P3
P3A
P3B

Waterproofing Glassmat Sheet

1.10
0.90
5.24
5.24
8.04
8.04
7.80
7.80
5.00
5.00
16.57
3.60
6.40
4.80
4.40
4.40
3.60

1.10
0.90

1.40
1.40
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.40
1.40
1.40
1.40
1.40
1.40

sqm

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

-4
-4
1
1
1
1
1
1
1
1
1
1
1
1
4
4
4
Total =

-6.78
-4.54
13.62
13.62
20.90
20.90
20.28
20.28
13.00
13.00
43.08
10.08
17.92
13.44
49.28
49.28
40.32
1,574.52

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

787.26
787.26

0.00
0.00

0.00
0.00

1
1
Total =

706.29
230.40
475.89

0.00
0.00
0.00

0.00
0.00
0.00

14.91
14.91
22.87
22.87
22.19
22.19
14.23
14.23
20.88
5.04
8.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Single Layer

Glassmat Sheet = 1574.52/2

A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 706.29 Cu3


Qty of S. Concrete = 230.40 Cu3

A-011

*
F1
F1
F1
F1
F1
F1
F1
F1
F1
F2
F2

Formwork for Columns/Pedestals

(-)

706.29
230.40

sqm

P1A
P1B
P1C
P1D
P1E
P1F
P1G
P1H
P1J
P2A
P2B

5.24
5.24
8.04
8.04
7.80
7.80
5.00
5.00
16.57
3.60
6.40

245 Of 275

2.85
2.85
2.85
2.85
2.85
2.85
2.85
2.85
1.26
1.40
1.40

1
1
1
1
1
1
1
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: HRSG-Fnds. Unit - 1

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

HRSG - Unit - 1
F2
F3
F3
F3

A-012

P2C
P3
P3A
P3B

*
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F2
F2
F2
F3
F3
F3

S. Concrete for Columns/Pedestals

4.80
4.40
4.40
3.60

1.40
1.68
1.68
1.68

1
4
4
4

6.72
29.48
29.48
24.12

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

273.07

0.00

0.00

1
1
1
1
1
1
1
1
1
-4
1
1
1
4
4
4
Total =

4.88
4.88
10.44
10.44
9.96
9.96
4.44
4.44
31.50
-10.08
1.13
3.36
2.02
8.11
8.11
5.43
109.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

P1A
P1B
P1C
P1D
P1E
P1F
P1G
P1H
P1J
Deduction R.Triangle portion
P2A
P2B
P2C
P3
P3A
P3B

1.30
1.30
1.40
1.40
1.40
1.40
1.30
1.30
5.00
2.00
0.90
2.00
1.20
1.10
1.10
0.90

246 Of 275

1.32
1.32
2.62
2.62
2.50
2.50
1.20
1.20
5.00
0.90
1.20
1.20
1.10
1.10
0.90

2.85
2.85
2.85
2.85
2.85
2.85
2.85
2.85
1.26
1.26
1.40
1.40
1.40
1.68
1.68
1.68

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

247 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

248 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

249 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

250 Of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GT Off Base Fnd.s

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Executed Quantities

Length

Width

Height

4.25
3.80
3.80
3.80
3.80
3.80
15.00
8.15
5.50
3.30

4.25
3.80
3.80
3.80
3.80
3.80
16.88
5.49
8.30
5.35

1.50
1.50
1.50
1.50
1.50
1.10
0.20
0.20
3.40
3.40

NR

NP

Qty. as per IFC

Prev. Month

This Month

Fin Fan Coolers Fnd.s / Lube Oil & Water recovery Pit

DWG NO. RBB 80 102184 CX 2397 00066 0001 5L 03


A-001

*
A

A-003

*
A

*
A

Imported Soil Fill Well Graded Sub Base

Polythene Sheet 100 Gauge

P.C.C Concrete (C10)

7
6
2
1
1
1
1
1
1
1
Total =

189.66
129.96
43.32
21.66
21.66
15.88
50.64
8.95
155.21
60.03
696.97

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1
1
Total =

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

7
6
2
1
1
1
1
1
1
1
Total =

38.66
21.66
7.22
3.61
3.61
3.61
254.70
45.56
23.04
8.28
409.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.93
1.08
0.36
0.18
0.18
0.18

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Cum

sqm

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

A-004

Cum

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

A-002

Excavation of Fnd.s

2.35
1.90
1.90
1.90
1.90
1.90
15.00
8.15
3.60
2.40

2.35
1.90
1.90
1.90
1.90
1.90
16.98
5.59
6.40
3.45

2.35
1.90
1.90
1.90
1.90
1.90

2.35
1.90
1.90
1.90
1.90
1.90

Cum

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5

251 Of 275

0.05
0.05
0.05
0.05
0.05
0.05

7
6
2
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GT Off Base Fnd.s

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Executed Quantities

Length

Width

Height

15.00
8.15
19.60
11.30

16.98
5.59
6.30
3.35

0.05
0.05
0.05
0.05

NR

NP

Qty. as per IFC

Prev. Month

This Month

Fin Fan Coolers Fnd.s / Lube Oil & Water recovery Pit
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

A-005

*
A

*
A

*
A

9.00
7.20
7.20
7.20
7.20
7.20
59.76
24.28
19.60
11.30

Waterproofing Protection (Coating/Painting)

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

27.00

0.00

0.00

0.35
0.35
0.35
0.35
0.35
0.35
0.15
0.15
0.30
0.30

7
6
2
1
1
1
1
1
1
1
Total =

22.05
15.12
5.04
2.52
2.52
2.52
8.96
3.64
5.88
3.39
71.65

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.35
0.35
0.35
0.35
0.35
0.35
0.15
0.15
0.30
0.30

7
6
2
1
1
1
1
1
1
1
Total =

12.40
6.80
2.27
1.13
1.13
1.13
33.35
5.61
37.04
11.36
112.24

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

22.05
15.12
5.04
2.52
2.52
2.52
8.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cum

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

A-007

Structure Concrete Grade C35

12.74
2.28
6.17
1.89

sqm

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

A-006

Formwork Of Fnd.

1
1
1
1

2.25
1.80
1.80
1.80
1.80
1.80
14.00
7.50
19.60
11.30

2.25
1.80
1.80
1.80
1.80
1.80
15.88
4.99
6.30
3.35

sqm

Fin Fan Coolers Fnd.s F1/F1A/P1


Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D

Double Coating
9.00
7.20
7.20
7.20
7.20
7.20
59.76

252 Of 275

0.35
0.35
0.35
0.35
0.35
0.35
0.15

7
6
2
1
1
1
1

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GT Off Base Fnd.s

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Fin Fan Coolers Fnd.s / Lube Oil & Water recovery Pit
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s
Fin Fan Coolers Fnd.s F1/F1A/P1
Fin Fan Coolers Fnd.s F2/P1A
Fin Fan Coolers Fnd.s F2/P2
Fin Fan Coolers Fnd.s F2/P3
Fin Fan Coolers Fnd.s F2/P4
Fin Fan Coolers Fnd.s F4/P5
Fin Fan Coolers Fn.s 1 to 3 / A to D
Fin Fan Coolers Fn.s 1 to 2 / A to E
Lube Oil Pit Fnd.s
Lube Oil Pit Fnd.s

B
A

A-008

Waterproofing Glassmat Sheet

24.28
19.60
11.30
2.25
1.80
1.80
1.80
1.80
1.80
14.00
7.50
19.60
11.30

sqm

0.15
0.30
0.30
2.25
1.80
1.80
1.80
1.80
1.80
15.88
4.99
6.30
3.35

1
1
1
7
6
2
1
1
1
1
1
1
1
Total =

3.64
5.88
3.39
35.44
19.44
6.48
3.24
3.24
3.24
222.32
37.43
123.48
37.86
563.80

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

281.90
281.90

0.00
#REF!

0.00
#REF!

1
1
Total =

696.97
112.24
584.73

0.00
0.00
0.00

0.00
0.00
0.00

Total =

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Single Layer

Glassmat Sheet = 1574.52/2

A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 696.97 Cu3


Qty of S. Concrete = 112.24 Cu3

A-011

A-012

Formwork for Columns/Pedestals

S. Concrete for Columns/Pedestals

(-)

sqm

Cum

253 Of 275

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GT Off Base Fnd.s

Petroleum

Location
Package

Sec.

Dimensions (m)
Descriptions

UM

Coeff.

Length

Width

Executed Quantities
Height

NR

NP

Qty. as per IFC

Prev. Month

This Month

Fin Fan Coolers Fnd.s / Lube Oil & Water recovery Pit

Total =

254 Of 275

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

255 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

256 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
#REF!

0.00%
#REF!

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

257 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

258 Of 275

Remarks

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GSU-GT Step Up Transformer Foundations

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Executed Quantities

Length

Width

Height

3.90
4.10
14.76
5.80

3.90
4.10
11.73
7.00

2.00
2.00
1.30
2.15

NR

NP

Qty. as per IFC

Prev. Month

This Month

GSU - Transformer Fnd.s / Fire Wall / Gantry Fnd.s

DWG NO. RBB 80 102184 CX 2397 00066 0001 5L 03


A-001

*
A

Excavation of Fnd.s

Cum

Fire Wall Fnd.s F2


Fire Wall Fnd.s F1
GSU Transformer Fnd.
Gantry Fnd.s

5
1
1
2

152.10
33.62
225.08
174.58

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

585.38

0.00

0.00

Total =

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

5
1
1
2
Total =

40.00
9.24
126.41
39.78
215.43

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.05
0.05
0.05
0.05

5
1
1
2
Total =

2.00
0.46
6.32
1.99
10.77

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.45
1.25
0.95
0.95
0.50

4
1
1
1
2
Total =

13.68
56.23
42.73
18.05
17.60
148.29

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

6.50

0.00

0.00

Total =
A-002

Imported Soil Fill Well Graded Sub Base

Cum
1
1

A-003

*
A

*
A

P.C.C Concrete (C10)

Formwork Of Fnd.

Structure Concrete Grade C35

4.00
4.20
9.83
5.10

2.00
2.20
12.86
3.90

4.00
4.20
9.83
5.10

sqm

Fire Wall Fnd.s


GSU Transformer Fnd.
GSU Transformer Fnd. In side of Outer
GSU Transformer Fnd. In side
Gantry Fnd.s
A-006

2.00
2.20
12.86
3.90

Cum

Fire Wall Fnd.s F2


Fire Wall Fnd.s F1
GSU Transformer Fnd.
Gantry Fnd.s

A-005

sqm

Fire Wall Fnd.s F2


Fire Wall Fnd.s F1
GSU Transformer Fnd.
Gantry Fnd.s

A-004

Polythene Sheet 100 Gauge

7.60
44.98
44.98
19.00
17.60
Cum

Fire Wall Fnd.s

1.90

259 Of 275

1.90

0.45

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GSU-GT Step Up Transformer Foundations

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Executed Quantities

Length

Width

Height

12.76
44.98
5.70
3.80

9.73
0.20
3.80
5.00

0.60
0.95
0.95
0.50

NR

NP

Qty. as per IFC

Prev. Month

This Month

GSU - Transformer Fnd.s / Fire Wall / Gantry Fnd.s


GSU Transformer Fnd.
GSU Transformer Fnd. Out side
GSU Transformer Fnd. Inner side
Gantry Fnd.s

A-007

Waterproofing Protection (Coating/Painting)

sqm

Waterproofing Glassmat Sheet

74.49
8.55
20.58
19.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Total =

129.11

0.00

0.00

4
2
4
2
4
2
4
2
1
1
1
Total =

27.36
35.20
32.00
79.56
28.88
76.00
25.60
19.04
112.45
58.47
24.70
519.26

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total =

259.63
259.63

0.00
0.00

0.00
0.00

1
1
Total =

521.34
129.11
392.23

0.00
0.00
0.00

0.00
0.00
0.00

4
2
2
2
2
2
2
2
Total =

80.00
15.49
23.32
15.49
23.32
11.62
17.49
10.36
197.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Double Coating

Fire Wall Fnd.s (Sides)


Gantry Fnd.s (Sides)
Fire Wall Fnd.s (Bot.)
Gantry Fnd.s (Bot.)
Fire Wall Fnd.s (Top)
Gantry Fnd.s (Top)
Fire Wall Fnd.s (Col.)
Gantry Fnd.s (Col.)
GSU Transformer Fnd. Out side
GSU Transformer Fnd. Inner side of Outer
GSU Transformer Fnd. Inner side

A-008

1
1
1
2

7.60
17.60
2.00
3.90
1.90
3.80
2.00
2.80
44.98
44.98
19.00

0.45
0.50
2.00
5.10
1.90
5.00
1.60
1.70
1.25
0.65
0.65

sqm

2
2
2
2
2
2
2
2
2
2
2

Single Layer

Glassmat Sheet = 1574.52/2

A-002A

Back Fill Well Graded Sub Base Materials

Cum

Qty of Excavation = 521.34 Cu3


Qty of S. Concrete = 129.11 Cu3

A-011

Formwork for Columns/Pedestals

(-)

521.34
129.11

sqm

Fire Wall Fnd.s


Fire Wall - PB1/PB2/PB3
Fire Wall - PB4/PB5/PB6/PB7/PB8
Fire Wall - TB1/TB2/TB3
Fire Wall - TB4/TB5/TB6/TB7/TB8
Fire Wall - B1/B2/B3
Fire Wall - B4/B5/B6/B7/B8
Gantry Fnd.s

2.00
12.91
19.44
12.91
19.44
12.91
19.44
2.80

260 Of 275

10.00
0.60
0.60
0.60
0.60
0.45
0.45
1.85

RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

CIVIL WORKS
Project
Client
Contract
Title

PS Item
Code

: Rabab Harweel Power Plant & HRSG Project


: Petroleum Development Oman
: C311530
: GSU-GT Step Up Transformer Foundations

Petroleum

Location
Package

Dimensions (m)
Descriptions

Sec.

UM

Coeff.

Executed Quantities
NR

NP

Qty. as per IFC

Length

Width

Height

Prev. Month

This Month

0.40
12.91
19.44
12.91
19.44
12.91
19.44
0.70

0.60
0.30
0.30
0.30
0.30
0.30
0.30
0.70

10.00
0.60
0.60
0.60
0.60
0.45
0.45
1.85

4
1
1
1
1
1
1
2
Total =

9.60
2.32
3.50
2.32
3.50
1.74
2.62
1.81
27.42

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.85
6.85

2
2
Total =

244.34
170.02
414.36

0.00
0.00
0.00

0.00
0.00
0.00

GSU - Transformer Fnd.s / Fire Wall / Gantry Fnd.s


A-012

S. Concrete for Columns/Pedestals

Cum

Fire Wall Fnd.s


Fire Wall - PB1/PB2/PB3
Fire Wall - PB4/PB5/PB6/PB7/PB8
Fire Wall - TB1/TB2/TB3
Fire Wall - TB4/TB5/TB6/TB7/TB8
Fire Wall - B1/B2/B3
Fire Wall - B4/B5/B6/B7/B8
Gantry Fnd.s

BW-004

150 THK Solid Block Work For Fire Wall (TYP)

Sqm

Fire Wall Grid 4


Fire Wall Grid 3

17.84
12.41

261 Of 275

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00%

262 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

263 Of 275

Remarks

Petroleum Development Oman (PDO)

Executed Quantities
Cum. To Date

Progress
%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

264 Of 275

Remarks

RECONCILIATION REPORT FOR GTG 1 & GTG 2 (LIST OF GOODS)


RABAB HARWEEL POWER PLANT PROJECT(E1348)
S/N

UOM

Piece

2
3

Piece
Piece

4
5

Piece
Piece

6
7

Piece
Piece

8
9
10

Piece
Piece
Piece

11

Piece
Piece

11A
12

Piece
Piece

13
14

Piece
Piece

15
16

Piece
Piece

17

Piece

18

Piece

19

Piece

20
21
22

Piece
Piece
Piece

23
24

Piece
Piece

25
26

Piece
Piece

27
28

Piece
Piece

29
30

Piece
Piece

31
32

Piece
Piece

33
34
35

Piece
Piece
Piece

36
37

Piece
Piece

38
39

Piece
Piece

40
41

Piece
Piece

42
43

Piece
Piece

44
45

Piece
Piece

Designation
UPN 10.24x3.54 (260x90)
UPN 10.24x3.54 (260x90)

Length/Lg=359.34 (9127.21)
Length/Lg=120.72 (3066.41)

Standard

Drawing #

Qty.As
DRW

Qty./GE/
Received

No.s

Net Total
Qty.

2
2

2
2

4
4

1
2

2
2

2
4

3
3

2
2

6
6

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Angle/Corniere 1.97x1.97x0.2(50x50x5) Length/Lg=154.44 (3922.7)


Angle/Corniere 1.97x1.97x0.2(50x50x5) Length/Lg=140.16 (3560)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.94 (100)


Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=9.84 (250)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.54 (90)


Angle/Corniere 4.72x3.15x0.39(120x80x10) Length/Lg=3.54 (90)
Plate/Plat 6.69x6.69(170x170) Thickness/Ep.=0.39(10)

S235 JR/EN 10025


S235 JR/EN 10025
S235 JR/EN 10025

N 91-036194
N 91-036194
N 91-036194

Plate/Plat 4.72x2.36(120x60) Thickness/Ep.=0.39(10)


Plate/Plat 3.15x3.15(80x70) Thickness/Ep.=0.35(9)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.08(2)


Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.04(1)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Expan. Balt/Cheville expan. HILTI FBR Mo.47-3.94 (12-100)


Screw/vis H - Mo.47x1.57 (12x40)

ISO 4017

N 91-036194
N 91-036194

Nut/Ecrau H - Mo.47(12) 8.8 - A2L


Angle/Corniere 2.36x2.36x0.34 (60x60x6) Length/Lg=7.48(190)

ISO 4032
S235 JR/EN 10025

N 91-036194
N 91-036194

22
22
4

Tapering Pin/ Goupille 0.47(12)


Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=118.95(3021.3)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 91-036194

Folder Sheet / Tole Pliee 7.24x4.72 (184x120) Th/Ep=0.32(8) or / ou Angle bar/Corniere


6.89x2.95x0.35 (175x75x9) Lg=4.72(120)

S235 JR/EN 10025

Plate/Plat 7.68x3.94(195x100) Thickness/Ep.=0.39(10)


Plate/Plat 3.94x3.94(100x100) Thickness/Ep.=0.2(5)
Plate/Plat 4.72x3.94(120x100) Thickness/Ep.=0.2(5)

2
1
2
3
3
2
2
4
12

12
12

2
2

24
24

20
20

2
2

40
40

12
22

2
2

24
44

22
4

2
2

44
8

36
3

36
3

2
2

72
6

N 91-036194

18

18

36

S235 JR/EN 10025


S235 JR/EN 10025
S235 JR/EN 10025

N 91-036194
N 91-036194
N 91-036194

22
18
22

22
18
22

2
2
2

44
36
44

Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=145.75(3702)


UAP 7.87x2.95(200x75) Length Lg=120.87(3070)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-036194
N 131E7982

1
1

UAP 7.87x2.95(200x75) Length Lg=120.87(3070)


UAP 7.87x2.95(200x75) Length Lg=67.17(1706)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

1
1

UAP 7.87x2.95(200x75) Length Lg=67.17(1706)


Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=104.33(2650)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

1
1

Screw/vis H - Mo.47x1.57 (12x40)


Nut/Ecrau H - Mo.47(12) 8.8 - A2L

ISO 4017
ISO 4032

N 131E7982
N 131E7982

35
35

35
35

2
2

70
70

Steel Plate/Tole acier 6.3x0.39(160x10)/Length Lg=6.3(160)


Steel Plate/Tole acier 6.3x0.39(160x10)/Length Lg=6.3(160)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

2
2

Steel Plate/Tole acier 6.41x0.39(163x10)/Length Lg=10.55(268)


Tapering Pin/ Goupille 0.47(12)
HEB 5.51(140) /Length Lg=79.53(2020)

S235 JR/EN 10025


S235 JR/EN 10025
S235 JR/EN 10025

N 131E7982
N 131E7982
N 131E7982

4
15
4

4
15
4

2
2
2

8
30
8

Steel Plate/Tole acier 7.83x0.39(200x10)/Length Lg=7.87(200)


Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=101.38(2575)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

4
4

4
4

2
2

8
8

Steel Plate/Tole acier 1.97x0.39(50x10)/Length Lg=1.97(50)


Steel Plate/Tole acier 5.51x0.39(140x10)/Length Lg=17.72(450)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

2
4

2
4

2
2

4
8

Expan. Balt/Cheville expan. HILTI HSL Mo.47-1.97 (12-50)


Steel Plate/Tole acier 9.450x0.39(240x10)/Length Lg=9.45(240)

S235 JR/EN 10025

N 131E7982
N 131E7982

10
4

10
4

2
2

20
8

Screw/vis H - Mo.47x1.57 (12x40)


Nut/Ecrau H - Mo.47(12) 8.8 - A2L

ISO 4017
ISO 4032

N 131E7982
N 131E7982

30
30

30
30

2
2

60
60

Angle bar/Corniere 5.91x3.54x0.39 (150x90x10) Length/Lg=12.36(314)


Steel Plate/Tole acier 12.2x0.39(310x10)/Length Lg=12.36(314)

S235 JR/EN 10025


S235 JR/EN 10025

N 131E7982
N 131E7982

6
3

6
3

2
2

12
6

Steel Plate/Tole acier 2.76x0.2(70x5)/Length Lg=2.76(70)

S235 JR/EN 10025

N 131E7982

12

12

24

12
20
20
12

46
47

Piece
Piece

48
49

Piece
Piece

50
51

Piece
Piece

52
53

Piece
Piece

54
55

Piece
Piece

56
57
58

Piece
Piece
Piece

59
60

Piece
Piece

61
62

Piece
Piece

63
64

Piece
Piece

65
66

Piece
Piece

67
68

Piece
Piece

69
70

Piece
Piece

71
72
73

Piece
Piece
Piece

74
75

Piece
Piece

76
77

Piece
Piece

78
79

Piece
Piece

80
81

Piece
Piece

82
83

Piece
Piece

84
85

Piece
Piece

86
87
88

Piece
Piece
Piece

89
90

Piece
Piece

91
92

Piece
Piece

93
94

Piece
Piece

95
96

Piece
Piece

97

Piece

Steel Plate/Tole acier 2.76x0.2(70x5)/Length Lg=4.13(105)

S235 JR/EN 10025

N 131E7982

12

12

24

Steel Plate/Tole acier 8.19x0.39(208x10)/Length Lg=12.2(310)


Screw/vis H - Mo.79x4.72 (20x120)

S235 JR/EN 10025


ISO 4017

N 131E7982
N 131E7982

3
30

3
30

2
2

6
60

Nut/Ecrau H - Mo.79(20) 8.8 - 2L


UPN 8.66x3.15 (220x80) Length/Lg=176.97(4495)

ISO 4032
S235 JR/EN 10025

N 131E7982
N 91-027185

60
4

60
4

2
2

120
8

UPN 8.66x3.15 (220x80) Length/Lg=115.04(2922)


Angle bar/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=155.87(3959)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

2
2

2
2

2
2

4
4

UPN 8.66x3.15 (220x80) Length/Lg=115.04(2922)


Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=77.6(1971)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

2
2

2
2

2
2

4
4

Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=3.35(85)


Angle/Corniere 1.97x1.97x0.2 (50x50x5) Length/Lg=158.39(4023)
Steel Plate/ 6.69x6.69(170x170)/Thickness Ep=0.39(10)

S235 JR/EN 10025


S235 JR/EN 10025
S235 JR/EN 10025

N 91-027185
N 91-027185
N 91-027185

2
1
8

2
1
8

2
2
2

4
2
16

Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=5.71(145)


Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=6.3(160)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

2
2

2
2

2
2

4
4

Angle/Corniere 4.72x3.15x0.32 (120x80x8) Length/Lg=5.91(150)


Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.35(9)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

2
8

2
8

2
2

4
16

Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.08(2)


Plate/Plat 3.15x2.76(80x70) Thickness/Ep.=0.04(1)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

16
16

16
16

2
2

32
32

Plate/Plat 4.72x2.36(120x60) Thickness/Ep.=0.39(10)


Plate/Plat 10.24x3.94(260x100) Thickness/Ep.=0.39(10)

S235 JR/EN 10025


S235 JR/EN 10025

N 91-027185
N 91-027185

8
1

8
1

2
2

16
2

Screw/vis H - Mo.47x1.57 (12x40)


Nut/Ecrau H - Mo.47(12) 8.8 - A2L

ISO 4017
ISO 4032

N 91-027185
N 91-027185

30
50

30
50

2
2

60
100

N 91-027185
N 91-027185

22
10

22
10

2
2

44
20

Tapering Pin/ Goupille 0.47(12)


Expan. Bolt/cheville expansible HILTI FBR Mo.47x3.94(12-100)
Plate/Plat 10.63x5.91(270x150) Thickness/Ep.=0.39(10)
Screw/vis H - Mo.47x1.97 (12x50)
Plate/Plat 2.76x2.76(70x70) Thickness/Ep.=0.2(5)

S235 JR/EN 10025


ISO 4017
S235 JR/EN 10025

N 91-027185
N 91-027185
N 91-027185

4
20
12

4
20
12

2
2
2

8
40
24

Plate/Plat 3.94x2.76(100x70) Thickness/Ep.=0.2(5)


G1
Plate/Plat

S235 JR/EN 10025


145B9035-F

N 91-027185
N 218D2880

12
1

12
1

2
2

24
2

G2
G3

Plate/Plat
Plate/Plat

145B9035-A
145B9035-B

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

G4
G5

Plate/Plat
Plate/Plat

145B9035-C
145B9035-D

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

G6
G7

Plate/Plat
Plate/Plat

145B9035-E
145B9035-F1

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

G8
G9

Plate/Plat
Plate/Plat

145B9035-A1
145B9035-B1

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

G10
G11
G12

Plate/Plat
Plate/Plat
Plate/Plat

145B9035-C1
145B9035-D1
145B9035-E1

N 218D2880
N 218D2880
N 218D2880

1
1
1

1
1
1

2
2
2

2
2
2

G13
G14

Exp.Peg/Cheville Hilti FBR (M12x100)


Tracking Plate / Plat DE Tracage

145B9035-PII

N 218D2880
N 218D2880

12
1

12
1

2
2

24
2

G15
G16

Tracking Plate / Plat DE Tracage


Tracking Plate / Plat DE Tracage

145B9035-PII
145B9035-PII

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

G17
G18

Tracking Plate / Plat DE Tracage


Jacking Screw / Vis De Reglage

145B9035-PII
145B9035-P6

N 218D2880
N 218D2880

1
41

1
43

2
2

2
86

G19
G20

Washer / Rondelle
Strip Locking / Frein Decrou

145B9035-P7
145B9035-P9

N 218D2880
N 218D2880

20
23

23
24

2
2

46
48

G21
G22

Setting Plate / Tole De Montage


Foundation Bolt/Boulon DE Foundation

145B9035-P8
145B9035-P12

N 218D2880
N 218D2880

41
5

43
6

2
2

86
12

G23
G24

Foundation Bolt/Boulon DE Foundation


Nut / Ecrou H-M2.05 (52) -8-A2L

145B9035-P10
ISO 4032

N 218D2880
N 218D2880

19
22

20
22

2
2

40
44

98
99

Piece
Piece

100
101

Piece
Piece

102
103

Piece
Piece

104
105

Piece
Piece

106
107

Piece
Piece

108
109
110

Piece
Piece
Piece

111
112

Piece
Piece

113
114

Piece
Piece

115
116

Piece
Piece

117
118

Piece
Piece

119
120

Piece
Piece

121
122

Piece
Piece

123
124
125

Piece
Piece
Piece

126
127

Piece
Piece

128
129
130
131
132

Piece
Piece
Piece
Piece
Piece

133
134

Piece
Piece

135
136
137

Piece
Piece
Piece

138
139

Piece
Piece

140
141

Piece
Piece

142
143

Piece
Piece

144
145

Piece
Piece

146
147

Piece
Piece

148
149

Piece
Piece

150

Piece

LG30

Plate/Plat

91-318802-P1

N 218D2880

LG31
LG32

Plate/Plat
Washer / Rondelle

91-318802-P2
91-318802-P4

N 218D2880
N 218D2880

1
13

1
14

2
2

2
28

LG33
LG34

Jacking Screw / Vis De Reglage


Strip Locking / Frein Decrou

91-318802-P3
91-318802-P6

N 218D2880
N 218D2880

14
13

15
14

2
2

30
28

LG35
LG36

Setting Plate / Tole De Montage


Tracking Plate / Plat DE Tracage

91-318802-P5
91-318802-P7

N 218D2880
N 218D2880

14
1

15
1

2
2

30
2

LG37
LG38

Tracking Plate / Plat DE Tracage


Tracking Plate / Plat DE Tracage

91-318802-P7
91-318802-P7

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

LG39
LG40
LG41

Tracking Plate / Plat DE Tracage


Tracking Plate / Plat DE Tracage
Tracking Plate / Plat DE Tracage

91-318802-P7
91-318802-P7
91-318802-P7

N 218D2880
N 218D2880
N 218D2880

1
1
1

1
1
1

2
2
2

2
2
2

T50
T51

Plate/Plat
Plate/Plat

91-318755-P3
91-318755-P3

N 218D2880
N 218D2880

2
2

2
2

2
2

4
4

T52
T53

Plate/Plat
Plate/Plat

91-318755-P3
91-318755-P1

N 218D2880
N 218D2880

2
1

2
1

2
2

4
2

T54
T55

Plate/Plat
Plate/Plat

91-318755-P3
91-318755-P3

N 218D2880
N 218D2880

2
2

2
2

2
2

4
4

T56
T57

Plate/Plat
Plate/Plat

91-318755-P2
91-318755-P3

N 218D2880
N 218D2880

1
2

1
2

2
2

2
4

T59
T60

Washer / Rondelle
Foundation Bolt/Boulon DE Foundation

91-318755-P5
91-318755-P8

N 218D2880
N 218D2880

13
13

13
13

2
2

26
26

T61
T62

Jacking Screw / Vis De Reglage


Setting Plate / Tole De Montage

91-318755-P5
91-318755-P6

N 218D2880
N 218D2880

44
44

44
44

2
2

88
88

T63
T64
T65

Strip Locking / Frein Decrou


Exp.Peg/ Hilti FBR.47x3.94 (M12x100)
Plate/Plat 1.77x7.87x1.18(45x200x30)

91-318755-P7

N 218D2880
N 218D2880
N 218D2880

13
11
12

13
11
12

2
2
2

26
22
24

T66
T67

Tracking Plate / Plat DE Tracage


Tracking Plate / Plat DE Tracage

91-318755-P9
91-318755-P9

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

T68
T69

Tracking Plate / Plat DE Tracage


Tracking Plate / Plat DE Tracage

91-318755-P9
91-318755-P9

N 218D2880
N 218D2880

1
1

1
1

2
2

2
2

T70
G
G1

Tracking Plate / Plat DE Tracage


Sheet 2 of 2
Sheet 2 of 2

91-318755-P9
N 91-208588
N 91-208588

N 218D2880

1
1
1

1
1
1

2
2
2

2
2
2

H
H1

Sheet 2 of 2
Sheet 2 of 2

N 91-208588
N 91-208588

1
1

1
1

2
2

2
2

T9
T10
T11

Sheet 2 of 2
Sheet 2 of 2
Sheet 3 of 3

N 91-205723
N 91-205723
N 91-205723

1
1
1

1
1
1

2
2
2

2
2
2

T12
T13

Sheet 3 of 3
Sheet 3 of 3

N 91-205723
N 91-205723

1
1

1
1

2
2

2
2

T14
LG1

Sheet 3 of 3
Sheet 5 of 5

N 91-205723
N 247C3167

1
2

1
2

2
2

2
4

LG2
LG3

Sheet 5 of 5
Sheet 5 of 5

N 247C3167
N 247C3167

2
2

2
2

2
2

4
4

LG4
LG5

Sheet 5 of 5
Sheet 5 of 5

N 247C3167
N 247C3167

2
2

2
2

2
2

4
4

LG6
LG7

Sheet 5 of 5
Sheet 3 of 4

N 247C3167
N 247C3167

2
1

2
1

2
2

4
2

LG8
LG9

Sheet 3 of 4
Sheet 3 of 4

N 247C3167
N 247C3167

1
1

1
1

2
2

2
2

LG10
LG11

Sheet 2 of 4
Sheet 2 of 4

N 247C3167
N 247C3167

1
1

1
1

2
2

2
2

151

Piece

LG12

Sheet 2 of 4

N 247C3167

152

Piece

LG13

Sheet 2 of 4

N 247C3167

OR GTG 1 & GTG 2 (LIST OF GOODS)


WER PLANT PROJECT(E1348)
Weight(Kg) Net Total
/Unit
Wt.(Kg)
700.000
232.800

2800
931.2

14.800
26.800

29.6
107.2

3.900
11.100

23.4
66.6

1.300

10.4

8.000

64

6.000
4.800

144
115.2

2.000
2.200

80
88

0.120
0.220

2.88
9.68

0.220
4.000

9.68
32

0.360
34.200
1.600

25.92
205.2
57.6

24.200
5.400
8.800

1064.8
194.4
387.2

14.000

28

67.500

270

37.500

150

10.000

20

0.100
0.100

7
7

3.400

27.2

3.500
0.100
68.200

28
3
545.6

3.100
9.700

24.8
77.6

0.200
4.800

0.8
38.4

0.100
2.300

2
18.4

0.100
0.100

6
6

5.600
7.300

67.2
43.8

0.200

4.8

0.200

4.8

4.700
0.100

28.2
6

0.083
131.100

10
1048.8

86.000
14.900

344
59.6

86.000
7.400

344
29.6

1.000
15.100
1.900

4
30.2
30.4

1.900
1.900

7.6
7.6

1.900
0.300

7.6
4.8

0.100
0.006

3.2
0.2

0.500
1.600

8
3.2

0.100
0.100

6
10

0.100
0.100

4.4
2

3.100
0.100
0.100

24.8
4
2.4

0.200
123.000

4.8
246

91.000
250.000

182
500

250.000
250.000

500
500

250.000
135.000

500
270

91.000
250.000

182
500

250.000
250.000
250.000

500
500
500

3.500
0.690

84
1.38

0.690
0.690

1.38
1.38

20.640
0.805
0.061
0.030

41.28
69.23
2.8
1.44

0.565
26.000

48.59
312

39.000
0.800

1560
35.2

198.000

396

147.000
1.450

294
40.6

0.427
0.030

12.8
0.84

0.603
0.690

18.08
1.38

0.690
0.690

1.38
1.38

0.690
0.690
0.690

1.38
1.38
1.38

25.000
25.000

100
100

25.000
165.000

100
330

25.000
25.000

100
100

147.000
25.000

294
100

1.700
1.700

44.2
44.2

0.320
0.656

28.12
57.72

0.107
0.300
3.140

2.78
6.6
75.36

0.170
0.170

0.34
0.34

0.170
0.170

0.34
0.34

0.170

0.34

Prepared By:

Checked By:

Checked By:

Approved By:

Nadeem Javed
Quantity Supervisor(Civil)

Construction Civil Engineer

Lead Civil Engineer

Construction Manager

Approved By:

Project Manager

S/N

Item(Size)

UEB-Bldg

GTP-Bldg

HRSG-Bldg

Total

D1-(2000x3000)

11

D2-(1000x2000)

D3-(1000x2200)

10

D4-(2800x3000)

D5-(1000x2200)

D6-(900x2200)