DESIGN OF U/S WING WALLS AND STABILITY ANALYSIS FOR DROP AT KM10.

150-D22
1.90
206.157
w3

w1

2.723

w4

PH

3.173
w2
Pv
A

0.60

1.30

2.4

e =

2.1

2.4
(B)

0.5
Kv =
Kh =

0.04
0.158

Magnitude in Tonnes

L.A in 'M'

Moment in
T.M.

0.25
w5

202.984

Taking moments about ' A '

S.No.

Force
w1
1

X
c =

0.25
0.450
B

203.434

0.6X2.723X2.4

3.921

0.300

1.176

w2

0.5X1.3X2.723X2.4

4.248

1.033

4.389

w3

0.5X1.3X2.723X2.1

3.717

1.467

5.451

Pv

0.04X2.1X2.723X2.723

0.623

PH

0.158X2.1X2.723X2.723

2.460

1.089

Total
Load(W)
=
Lever Arm=Total Moment/ Total load =
eccentricity = 0.50 X base width - Leveer arm =(e)=
B/6 =
0.317

Stresses in Concrete = W/B(1 (6e)/B) =

Total
Moment=

12.509

0.667
0.283
0.283
8.905

M
M
Hence O K
T/M2(Max)

and

-2.680

8.338
T.M.

3.474
T/M2(Min)

Taking moments about ' B '

S.No.

Force
w1
1
2

w2

Magnitude in Tonnes

L.A in 'M'

Moment in
T.M.

0.6X2.723X2.4

3.921

0.550

2.157

0.5X1.3X2.723X2.4

4.248

1.283

5.451

w3

0.5X1.3X2.723X2.1

3.717

w4

0.25X2.723X2.1

w5

6
7

1.717

6.381

1.430

2.275

3.252

2.4X0.45X2.4

2.592

1.200

3.110

Pv

0.04X2.1X3.173X3.173

0.846

PH

0.158X2.1X3.173X3.173

1.269

-4.240

Total
Load(W)
=
Lever Arm=Total Moment/ Total load =
eccentricity = 0.50 X base width - Leveer arm =(e)=
B/6 =
0.400

Stresses in Soils = W/B(1 (6e)/B) =

3.341

Total
Moment=

16.753 T
0.962
0.238
0.238
11.139

M
M
Hence O K
T/M2(Max)

16.112
T.M.

and

2.822
T/M2(Min)

DESIGN OF D/S WING WALLS AND STABILITY ANALYSIS FOR DROP AT KM10.150 D-22
1.1
205.157
w3

w1

1.550

w4

PH

2.000
w2
Pv
A

0.60

0.50

0.25
0.450
B

203.607
0.25

w5
1.6
(B)

203.157

Taking moments about ' A '

S.No.

Force
w1
1

Magnitude in Tonnes

X
c =

2.4

e =
0.5
Kv =
Kh =

2.1

L.A in 'M'

0.04
0.158
Moment in
T.M.

0.6X1.55X2.4

2.232

0.300

0.670

w2

0.5X0.5X1.55X2.4

0.930

0.767

0.713

w3

0.5X0.5X1.55X2.1

0.814

0.933

0.760

Pv

0.04X2.1X1.55X1.55

0.202

PH

0.158X2.1X1.55X1.55

Total
Load(W)
=
Lever Arm=Total Moment/ Total load =
eccentricity = 0.50 X base width - Leveer arm =(e)=
B/6 =
0.183

Stresses in Concrete = W/B(1 (6e)/B) =

0.797

0.620
Total
Moment=

4.178

0.394
0.156
0.156
4.134

M
M
Hence O K
T/M2(Max)

and

-0.494

1.648
T.M.

1.030
T/M2(Min)

Taking moments about ' B '

S.No.

Force
w1
1

Magnitude in Tonnes

L.A in 'M'

Moment in
T.M.

0.6X1.55X2.4

2.232

0.550

1.228

w2

0.5X0.5X1.55X2.4

0.930

1.017

0.946

w3

0.5X0.5X1.55X2.1

0.814

1.183

0.963

w4

0.25X1.55X2.1

0.814

1.475

1.200

w5

1.6X0.45X2.4

1.728

0.800

1.382

Pv

0.04X2.1X2X2

0.336

PH

0.158X2.1X2X2

0.800

-1.062

Total
Load(W)
=
Lever Arm=Total Moment/ Total load =
eccentricity = 0.50 X base width - Leveer arm =(e)=
B/6 =
0.267

Stresses in Soils = W/B(1 (6e)/B) =

1.327

6.854 T
0.680
0.120
0.120
6.219

M
M
Hence O K
T/M2(Max)

Total
Moment=

and

4.657
T.M.

2.348
T/M2(Min)

DESIGN OF1.00M DROP AT KM 10.150 OF D-22 OF AMRP PRROJECT


DATA
1. Discharge
2. F.S.L
3. F.S.D
4. Canal Bed Width
5. C.B.L.
6. Drop Height
7. Velocity
8. Surface Fall
9. Side Slopes ( I / O )
10. T.B.L.
11. G.L.
12. Top Width of Bank ( L / R )
U/S TEL
U/S FSL

U/S
1.08
205.557
0.8
1.9
204.757
1
0.436
1in3500
1.5:1/2:1
206.157
205.035
2.70/5.00

205.567
205.557

M
M
M

D/S
1.08
204.557
0.8
1.9
203.757
0.436
1in3500
1.5:1/2:1
205.157
205.035
2.70/5.00

Cumecs
M
M
M
M
M
M/Sec

M
M
M

0.7
0.48

U/S CBL

Cumecs
M
M
M
M
M
M/Sec

205.090
0.333

204.757

D/S FSL

204.557

1
0.3

203.757
203.584
0.750
0.9

0.45
3.5

3.0
202.757
0.45

Velocity Head (ha) =v2/2g

=
(Q) =
(B) =
=
=

0.010
1.08
1.9
1.9
0.8

M
Cumecs
M
M
M

U/S TEL = U/S FSL+ha


Assume Bt as

Head over crest (D) = ( QX(Bt)1/6/ (1.835 X B ))3/5 =


Height of Crest above B.L.= Crest level-U/S CBL=
( D1 ) = CrestLevel - D/S CBL
=
Top Width or Thickness of Crest =0.55(D1)1/2 =
(Bt)
or Say
Cistern:
( HL )=U/S TEL- D/S FSL
=

0.48
0.333
1.33
0.64
0.70

M
M
M

Elevation of Crest = ( U/S TEL-D )


=
205.090

Discharge at Km 2.45
Throat Width of Drop
Canal Bed Width
FSD at U/S

Depth of cistern =(HLD)0.5/4

Length of Cistern = 5 (HLD)

0.5

Base Width of Drop

=
or Say
=

Bt = 0.55(Crestlevel-CisternLevel)
M
=
0.68 (as per CWC manual)
H =Crest Level -Cistern Level =
1.51

1.010 M
0.17 M
3.467364 M
3.5 M
0.90 M

Total Length of Impervious Floor on D/S =2(D1+1.30)+Drop=

6.266798

or Say

0.9 M

or Say

6.5 M

By Khosla's Exit Gradiant Method :


Depth of D/S Cut off wall (d) = D/S FSD/2 +0.60=
GE =(H/d)X 1/()
= b/d=
7.4
GE = 0.233005

0.30

(1-E)

1 M
= (1+(1+2))/2 =

4.233631

Hence OK

A
B
0.90

3.5

3.00
7.40

x = E =

(1/)cos-1((-1)/) =
0.223
Thickness of Apron = ((D+D1)/0.3048)
A =
Pressure
Head
@
A
=
HX
=
0.91
1.36
= 2.436657 ft. =
A
Floor Thickness=
0.731 M or Say
0.75
0.7
B =
Pressure
Head
@
B
=
HX
=
0.54
0.81
M
B
Floor Thickness=
0.434 M or Say
0.45
How ever provide floor thicknesses as
0.750 and
0.45 m
including 15 cm thick wearing coat
This Drop is designed as unflumed Drop to avoid the unfavourable scour on the d/s .
Approach :
The side walls shall be splayed straight at an angle of 45 0 from the u/s edge
of the crest extending by 1.00 m into the earthen bank from the FSL line.
U/S protection:
2.00m long bed pitching shall be provided on u/s bed,sloping down towards the
crest wall at 1:10 slope and two drain pipesof 100mm at u/s bed level in the
crest wall so as to drain out the u/s bed during the closure of the canal
U/S curtain wall = u/s FSD/3 +0.60
=
0.866667 or say
1 m
However provide 0.30m X 1.00m curtainwall
300 mm thick rough stone dry packing shall be provided for u/s bed pitching
and u/s side revetment.
D/S Expansion:
No d/s expansion is contemplated because the drop is not flumed. The side walls
shall be straight and parallel up to the end of the floor and shall be kept vertical.
D/S Protection:
Length of bed Protection = 3 X d/s FSD
=
3.000 m
Side Protection is same as Bed protection.
300 mm thick rough stone dry packing shall be provided for d/s bed pitching
and d/s side revetment.
D/S Curtain wall = d/s FSD/2 +0.60 =
1.00 m
Scour Depth(R) =1.345 ( q2/f)1/3

q = Q/b = 0.568421
R= 0.80625416
Maximum ScourDepth =2.00R=
1.61
Maximum Scour Level = d/s FSL - Max.Scour Depth =

f=

202.94

1.5

1.00
0.3

205.567 M
0.68 M

( U/S TEL-D )

vel-CisternLevel)0.50
(as per CWC manual)
M