Project:

Xuan Thanh

Project No: 1445334

Appendix E
Time Schedules & Main Activities

Sec. 10 - Page 1 of 32
Date: 30-06-2015
Rev.: 1

APPENDIX E

TIME SCHEDULES
&
MAIN ACTIVITIES

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Xuan Thanh

Project No: 1445334

Appendix E
Time Schedules & Main Activities

Sec. 10 - Page 2 of 32
Date: 30-06-2015
Rev.: 1

This appendix contains the following:


1
1.1

INTRODUCTION
PRELIMINARY PROJECT SCHEDULE

2
2.1
2.2

MILESTONE SCHEDULE
DELIVERY SCHEDULE CLARIFICATIONS
DELIVERY SCHEDULE AND MAIN ACTIVITIES OF NORMAL AND
OPTIONAL SERVICES

DESIGN EXECUTION MASTER PLAN

4
4.1
4.2

FLS GENERAL ARRANGEMENT DRAWING SCHEDULE


CLARIFICATION
FLS GA SCHEDULE

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Xuan Thanh

Project No: 1445334

1.

Appendix E
Time Schedules & Main Activities

Sec. 10 - Page 3 of 32
Date: 30-06-2015
Rev.: 1

INTRODUCTION
The applicable phases of the design works are given in Appendix A, paragraphs 1 & 3, to
which Appendix E.2. shall comply.
Milestone dates are only stated for the applicable phases (in case that only one design phase
is applicable, milestones for main respectively detailed design will be the same).
The final design works shall comply to the Clarification of terms for delivery schedule
described under Appendix A.3.4.2
The main activities for each department, building or structure are further described under
E.2.2.
(The activity IDs stated in the schedules can be used as reference when making the work
programme mentioned under E.3., Design Execution Master Plan).
Delivery dates can be specified in at least four different categories and a combination
thereof:
- Milestone Dates for each Design Phase split into different work categories as per E.2.
- Delivery Dates for each Department split into main activities as per E.2.2
- Milestone Dates for each work category and if found applicable a few of the activities
under each department as per E.2.2.
- Milestone Dates for Optional Work as per E.2.3. The delivery schedule may also be used
for optional work if found applicable by the Client. The Milestone Dates for Optional
service will be agreed and signed by both parties at a later date.
As per default Milestone dates are defined under E.2. to which Dates under E.2.2 makes
reference.
In cases where the nature of the works (design or execution) makes it appropriate to make
exemptions for the default situation, other dates for specific
departments/buildings/structures will be stated in E.2.2. and E.2.3 respectively and in such
cases they will prevail over general dates stated in E.2.
Such specific dates shall be defined during final contract negotiations.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Project No: 1445334

2.

Appendix E

Xuan Thanh

Time Schedules & Main Activities

Sec. 10 - Page 4 of 32
Date: 30-06-2015
Rev.: 1

MILESTONE SCHEDULE
No

Item

Weeks after
Notice to Proceed

Main Design:
0.1

Notice to proceed

0.2

Completion of Main Earth Work drawings including


Piling Plans (if piling is applicable):

xx

Completion of Concrete Foundation measurement drawings


for all building and structures:

xx

Completion of Concrete/Block work/cladding Superstructure measurement


Drawings for all building and structures:

xx

Completion of structural steel elements and all steel profile types


all buildings and structures:

for
xx

0.3
0.4
0.5

Date Month Year

Detailed Design:
0.6

Notice to proceed

0.7

Completion of Piling details (if applicable):

xx

0.8

Completion of Concrete Foundation Reinforcement and Details


drawings:

xx

Completion of Concrete/Block work Superstructure Reinforcement


and Details drawings:

xx

0.10

Completion of all structural steel and steel profile details:

xx

0.11

Completion of all Architectural Details (if applicable):

xx

0.12

Completion of all General Works / Infrastructural Works:

xx

0.13

Completion of all Documentation:

xx

Note

All weeks are relative to the Notice to Proceed

0.9

Date Month Year

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Xuan Thanh

Project No: 1445334

2.1

Appendix E
Time Schedules & Main Activities

Sec. 10 - Page 5 of 32
Date: 30-06-2015
Rev.: 1

DELIVERY SCHEDULE CLARIFICATIONS


Clarification of terms for delivery schedule can be found in Appendix A.3.4.2
Milestones for Main-, & Detailed Design:
The milestones identifies the last delivery day for design work included in the consultants
scope mentioned or not under any specific activity number.
Milestone dates are only stated if they differ from the general dates stated under E.2.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Project No: 1445334

2.2

Appendix E

Xuan Thanh

Time Schedules & Main Activities

Sec. 10 - Page 6 of 32
Date: 30-06-2015
Rev.: 1

DELIVERY SCHEDULE AND MAIN ACTIVITIES OF NORMAL SERVICES

111 Limestone crushing


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans - ???

Milestones Dates
week
1528
1528

200
205
210
215
220
225

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundations incl. basement and tunnel
Concrete Sub-S Foundation for conveyor and transfer station
Concrete Sub-S Retaining wall I
Concrete Sub-S Retaining wall II
Ramps - ????

1531
1534
1537
1539
1539
1537

805

Calculation 205-225

1539

305
310
315
320

Concrete Super-S incl. hopper and retaining walls


Concrete Super-S Transfer stations
Concrete Super-S Retaining wall I
Concrete Super-S Retaining wall II

1542
1544
1546
1546

810

Calculation 305-320

1546

405
410
415

Main SS incl. Roof and support of overhead travelling crane


Main SS Conveyor bridge incl. stair tower at transfer tower
Secondary SS Minor platforms and stairs

1538
1540
1541

815

Calculation 405-415

1542

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1548
1545
1547

800

Calculations Final

1548

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1539
1546
1542
1547
1548

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 7 of 32
Date: 30-06-2015
Rev.: 1

112 & 212 - Clay & Gypsum crusher


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans

Milestones Dates
week
1531
1534

200
205
210
215

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundations incl. basement and tunnel
Concrete Sub-S Foundation for conveyors and transfer stations
Ramps - ????

1531
1534
1535
1535

805

Calculation 205-215

1536

305
310

Concrete Super-S incl. hopper and retaining walls


Concrete Super-S Transfer stations

1534
1535

810

Calculation 305-310

1536

405
410
415

Main SS incl. Roof and support of overhead travelling crane


Main SS Conveyor bridges incl. stair tower at transfer tower
Secondary SS Minor platforms and stairs

1534
1535
1535

815

Calculation 405-415

1536

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1540
1543
1545

800

Calculations Final

1546

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1536
1536
1536
1545
1546

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 8 of 32
Date: 30-06-2015
Rev.: 1

131 Limestone storage


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans - ???

Milestones Dates
week
1530
1532

200
205
210

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundations incl. basement and tunnel
Concrete Sub-S Foundation for conveyors and transfer stations

1530
1536
1537

805

Calculation 205-210

1538

305
310

Concrete Super-S Storage building


Concrete Super-S Transfer station

1541
1542

810

Calculation 305-310

1543

405
410
415

1541
1541
1542

420
425

Main SS Storage roof


Main SS Conveyor bridge to Dept. 111
Main SS Conveyor bridges to Dept. 311 incl. transfer station roof
and stair tower at transfer tower
Main SS Transfer station on top of Dept.311
Secondary SS Minor platforms and stairs

815

Calculation 405-415

1543

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1545
1548
1550

800

Calculations Final

1551

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1538
1543
1543
1550
1551

1
2
3
4
5

Description

1542
1543

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 9 of 32
Date: 30-06-2015
Rev.: 1

132 & 232 - Marl/Clay storage,


(242 Gypsum transport to Cement mil included)
Activity
ID
100
105
200
205

Description
Layout
Concrete Sub-S Pile plan

Milestones Dates
Week
1529
1532

210
215

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundations storage building incl. basement and
tunnel
Concrete Sub-S Foundation for partition walls
Concrete Sub-S Foundation for conveyors and transfer stations

1535
1537

805

Calculation 205-215

1537

305
310
315

Concrete Super-S Storage building


Concrete Super-S Partition walls
Concrete Super-S Transfer stations

1536
1538
1539

810

Calculation 305-315

1540

405
410
415
425

Main SS Storage roof


Main SS Conveyor bridge to Dept. 512/513
Main SS Conveyor bridges to Dept. 311
Secondary SS Minor platforms and stairs

1544
1545
1546
1546

815

Calculation 405-415

1547

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1545
1550
1602

800

Calculations Final

1603

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1537
1540
1547
1602
1603

1
2
3
4
5

1529
1533

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 10 of 32
Date: 30-06-2015
Rev.: 1

211 Coal intake and transport to storage


Activity
ID
100
105
200
205

Description
Layout
Concrete Sub-S Pile plan

Milestones Dates
Week
1531
1533

210

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Crane foundation, conveyor and transfer station at
Jetty
Concrete Sub S Conveyors and transfer stations to Dept. 231

1535

805

Calculation 205

1537

305
310

Concrete Super-S Transfer station at Jetty


Concrete Super S Transfer stations

1534
1536

810

Calculation 305

1538

405
410

1545
1548

415

Main SS Conveyor at Jetty to transfer tower


Main SS Conveyors to Dept. 231 incl. stair towers to transfer
stations
Secondary SS Minor platforms and stairs

815

Calculation 405-415

1550

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1551
1602
1602

800

Calculations Final

1603

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1537
1538
1550
1602
1603

1
2
3
4
5

1531
1533

1549

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 11 of 32
Date: 30-06-2015
Rev.: 1

231 Coal storage


Activity
ID

Description

Milestones Dates

100
105

Layout
Concrete Sub-S Pile plan

Week
1530
1533

200
205
210
215
220

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundation for storage building incl. belt take-up
Concrete Sub-S Foundation for partition walls
Concrete Sub-S Foundation for transfer stations incl. tunnel
Concrete Sub-S Foundation belt conveyors

1530
1535
1536
1537
1538

805

Calculation 205-220

1539

305
310
315

Concrete Super-S Storage building


Concrete Super-S Partition walls
Concrete Super-S Transfer stations

1540
1541
1542

810

Calculation 305-315

1543

405
410
415

Main SS Storage building roof


Main SS Conveyor bridges incl. Stair tower at transfer station
Secondary SS minor platforms and stairs

1545
1547
1548

815

Calculation 405-415

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding and block work

1545
1550
1601

800

Calculations

1602

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1539
1543
1549
1601
1602

1
2
3
4
5

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 12 of 32
Date: 30-06-2015
Rev.: 1

311 and 312 Raw Mill Feed 1 and Raw Mill Feed 2
Activity
ID
100
105

Layout
Concrete Sub-S Pile plans - ???

Milestones Dates
week
1525
1525

200
205
210
215

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundations for Silos
Concrete Sub-S Foundation for Feed building incl. stair tower
Concrete Sub-S Foundation for Transfer stations and conveyors

1525
1533
1535
1537

805

Calculation 205-215

1538

305
310
315

Concrete Super-S Silos


Concrete Super-S Feed Building
Concrete Super-S Transfer stations

1542
1547
1549

810

Calculation 305-315

1551

405
410
415
420
425
435

Main SS Feed Building


Main SS Stair tower
Main SS Top of Silos
Main SS Top of existing silos
Main SS Conveyor bridge
Secondary SS Minor platforms, stairs & duct supports

1545
1545
1547
1549
1551
1602

815

Calculation 405-440

1603

505
605*
705

Remaining concrete
Remaining Steel
Cladding and block work

1604
1605
1606

800

Calculations Final

1606

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1538
1551
1603
1606
1606

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 13 of 32
Date: 30-06-2015
Rev.: 1

461 & 462 Coal Mill 1 & 2


(Dept. 465 and 241 included)
Activity
ID
100
105

Layout
Concrete Sub-S Pile plan

Milestones Dates
Week
1531
1532

200
205
210
220
225
230
235

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Foundation for Mill and Mill building
Concrete Sub-S Foundation for Silo building
Concrete Sub-S Foundations for filter support
Concrete Sub-S Foundations for dosing buildings (Dept. 465)
Concrete Sub-S Foundation for fan, duct supports
Concrete Sub-S Foundations for stair towers

1531
1532
1533
1535
1537
1539
1539

805

Calculation 205-235

1540

305
310
315
320

Concrete Super-S Mill building


Concrete Super-S Silo building
Concrete Super-S Filter support
Concrete Super-S Dosing buildings (Dept. 465)

1540
1540
1541
1541

810

Calculation 305-320

1542

405
410
415
420
425

Main SS Mill building roof


Main SS Stair towers
Main SS Transfer station on top of silo building (Dept. 241)
Main SS Duct supports
Secondary SS Minor platforms, stairs & duct support

1543
1543
1543
1544
1544

815

Calculation 405-425

1545

505
605*
705

Remaining concrete
Remaining steel
Cladding and block work

1548
1550
1550

800

Calculations

1551

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1540
1542
1545
1550
1551

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 14 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

471/481 Clinker transport and clinker storage


Activity
ID
100
105
200
205
210
215

Description
Layout
Concrete Sub-S Pile plan

Milestones Dates
Week
1527
1530
1527
1532
1532
1532

240

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Silo foundation and extraction tunnels
Concrete Sub-S Clinker transport
Concrete Sub-S Off-spec silo found & ground floor slab incl. stair
tower.
Concrete Sub-S Foundations bridge (extraction) incl. belt take-up
Concrete Sub-S Foundation transfer platform
Concrete Sub-S Tunnel from existing clinker transport
Concrete Sub-S Foundation bridge to dept. 512&513 incl. Transfer
Station
Concrete Sub-S Foundation for recycling duct (Dept. 441)

805

Calculation 205-240

1538

305
310
315
320
325

Concrete Super -S Silo wall tensioning cables (for purchase)


Concrete Super-S Silo wall
Concrete Super S Off-spec silo wall
Concrete Super S Off-spec silo roof
Concrete Super S Transfer station

1534
1536
1536
1538
1538

810

Calculation 305-325

1539

405
410
415
420
425

1542
1543
1544
1544
1546

430
435
425

Main SS Silo roof incl. penthouse (Dept. 471)


Main SS Clinker transport
Main SS Off-spec silo roof (beams & lost formwork)
Main SS Stair tower
Main SS Conveyor bridges to Dept. 512/513 incl supports for
recycling duct (Dept. 441)
Main SS Transfer platform incl. stair,
Main SS Conveyor from existing clinker transport
Secondary SS Minor platforms, stairs & duct support

815

Calculation 405-435

1548

505
605*
705

Remaining concrete
Remaining steel
Cladding

1549
1552
1601

800

Calculations

1602

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1538
1539
1548
1601
1602

220
225
230
235

1
2
3
4
5

1534
1534
1536
1536
1537

1546
1547
1547

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 15 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

483 Clinker storage for clinker transport


Activity
ID
100
105

Layout
Concrete Sub-S Pile plan

Milestones Dates
Week
1530
1536

200
205
210
215
220

Preliminary Concrete Sub-S for excavation


Concrete Sub-S Silos foundation and extraction tunnels
Concrete Sub-S Foundation transfer platform incl. clinker intake
Concrete Sub-S Clinker transport to Jetty
Concrete Sub-S Loading and clinker transport at Jetty

1530
1535
1538
1540
1542

805

Calculation 205-220

1544

305
310
315
320

Concrete Super-S Silos wall tensioning cables (for purchase)


Concrete Super-S Silos wall
Concrete Super S Conveyor bridges and transfer stations
Concrete Super-S Loading clinker at Jetty

1536
1538
1539
1541

810

Calculation 305-320

1542

405
410
420
425
430
435
440
445

Main SS Silo roof incl. penthouse


Main SS Clinker transport intake
Main SS Stair tower
Main SS Conveyor bridges from Dept. 471/481
Main SS Transfer platform incl. stair,
Main SS Conveyor clinker transport to Jetty
Main SS Conveyor clinker transport at Jetty
Secondary SS Minor platforms, stairs & duct support

1542
1543
1544
1546
1546
1547
1547
1548

815

Calculation 405-435

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1549
1552
1601

800

Calculations

1602

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1542
1549
1601
1602

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 16 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

051 Cable bridge


Activity
ID
100

Layout

Milestones Dates
Week
1541

205

Concrete Sub-S foundations for cable bridges

1541

805

Calculation 205

1542

405
410

Main SS Cable bridges


Secondary SS Minor platforms and stairs

1549
1550

815

Calculation 405-410

1551

505
605*
705

Remaining concrete
Remaining steel
Cladding

1544
1601
1602

800

Calculations

1603

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1542
NA
1551
1601
1602

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 17 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

091 Jetty I and II


Activity
ID
100

Layout

Milestones Dates
Week
1531

105

Concrete Sub-S Pile plan

1531

200
205

Dredging
Concrete Sub-S for jetty and access bridges

1533
1534

805

Calculation 105, 200, 205

1534

305

Concrete Super-S

1536

810

Calculation 305

1537

425

Secondary SS

1540

815

Calculation 425

1541

505
605*
705

Remaining concrete
Remaining steel
Completion, fenders, bollards etc.

1538
1542
1542

800

Calculations

1542

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1534
1538
1542
NA
1542

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 18 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

191 Substation - Limestone crushing


Activity
ID
100

Description

Milestones Dates

Layout

1539

205

Concrete Sub-S foundations for substation

1539

805

Calculation 205

1540

305

Concrete Super -S Substation building

1545

810

Calculation 305

1546

405

Secondary SS Minor platforms and stairs

1545

815

Calculation 405

1546

505
605*
705

Remaining concrete
Remaining steel
Cladding

1547
1548
1548

800

Calculations

1549

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1540
1546
1546
1548
1549

1
2
3
4
5

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 19 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

192 & 193 Substations - Clay crushing & Additive crushing


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 20 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

194 Substation - Limestone storage


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 21 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

195 Substation - Clay/Additive storage


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 22 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

196 Substation Coal storage


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 23 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

197 Substation Coal unloading


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 24 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

592 & 593 Substation Cement mill 1 & 2


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundations for substation

1543

805

Calculation 205

1544

305

Concrete Super -S Substation building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 25 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

741 Compressor room 1


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundation

1543

805

Calculation 205

1544

305

Concrete Super -S Compressor room building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 26 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

742 Compressor room 2


Activity
ID
100

Layout

Milestones Dates
Week
1543

205

Concrete Sub-S foundation

1543

805

Calculation 205

1544

305

Concrete Super -S Compressor room building

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1548

815

Calculation 405

1549

505
605*
705

Remaining concrete
Remaining steel
Cladding

1550
1551
1551

800

Calculations

1552

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 27 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

762 Water distribution plant


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans

Milestones Dates
Week
1537
1537

205
210

Concrete Sub-S foundations for water tank


Concrete Sub-S foundations for pump room

1540
1540

805

Calculation 205- 210

1541

305
310

Concrete Super -S Water tank


Concrete Super -S Pump house

1550
1550

810

Calculation 305

1551

405

Secondary SS Minor platforms and stairs

1601

815

Calculation 405

1602

505
605*
705

Remaining concrete
Remaining steel
Cladding

1552
1603
1604

800

Calculations

1605

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1544
1549
1549
1551
1552

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 28 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

Dept. 801 & 954 Central control building & Laboratory


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans

Milestones Dates
Week
1537
1537

205

Concrete Sub-S foundations

1537

805

Calculation 205- 210

1538

305

Concrete Super SS

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1550

815

Calculation 405

1552

505
605*
705

Remaining concrete
Remaining steel
Cladding

1552
1603
1604

800

Calculations

1605

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1538
1549
1552
1604
1605

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Sec. 10 - Page 29 of 32
Date: 30-06-2015
Rev.: 1

Time Schedules & Main Activities

951 Weigh bridge


Activity
ID
100
105

Layout
Concrete Sub-S Pile plans

Milestones Dates
Week
1537
1537

205

Concrete Sub-S foundations

1537

805

Calculation 205- 210

1538

305

Concrete Super SS

1548

810

Calculation 305

1549

405

Secondary SS Minor platforms and stairs

1550

815

Calculation 405

1552

505
605*
705

Remaining concrete
Remaining steel
Cladding

1552
1603
1604

800

Calculations

1605

Completion of all foundation design


Completion of all RC design
Completion of all structural steel design
Completion of all architectural design
Completion of all documentation

1538
1549
1552
1604
1605

1
2
3
4
5

Description

* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Appendix E

Xuan Thanh

Project No: 1445334

Time Schedules & Main Activities

Sec. 10 - Page 30 of 32
Date: 30-06-2015
Rev.: 1

2.3
OPTIONAL SERVICES
Activity

Description

Milestones Dates
Week

ID
M6

4.1 Shop drawings

NA

M7

4.2 Steel lists

NA

M8

4.3 Small electrical Installations for Service Departments

NA

M8

4.4 Technical Installations for Service Departments

NA

M8

4.5 Fire and lightning Installations for General Works

NA

900

4.6 As-Built Drawings

To be
clarified

M5

4.7 Final Detailed Quantities

To be
clarified

M9

4.8 Authority Approval Building Construction


Permission

NA

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Xuan Thanh

Project No: 1445334

Appendix E
Time Schedules & Main Activities

Sec. 10 - Page 31 of 32
Date: 30-06-2015
Rev.: 1

DESIGN EXECUTION MASTER PLAN


The delivery schedule and main activities of normal services sec. 2.2 will be transferred in
to Progress report after ending the negotiations of this and contract signing between the
Consultant and the Client. Further reporting and any changes to the schedule after this will
be transferred by Client only to the progress report.

FLS GENERAL ARRANGEMENT DRAWING SCHEDULE

4.1

CLARIFICATION (of sequential progression)


The following contains a clarification of the terms used:
Basic issue drawings: The term Basic issue drawings means drawings which are
incomplete as regard detailing but which gives information regarding:
a.
b.
c.

Main dimensions of buildings.


Location of main machinery and equipment with corresponding loads.
Floor loads in general

and can be used for Basic Design and for starting the Main Design activities.

Main issue drawings: The term Main issue drawings means drawings which are
incomplete, as regards detailed information, but which are final in respect of the items
below, and can be used for the finalisation of the Main Design and for starting the
Detailed Design.
d.
e.
f.
g.

Main dimensions of buildings.


Location of machinery and equipment with corresponding loads.
Floor loads, openings and recesses.
Reference numbers for each machine for legend.

Less essential details such as minor openings and recesses, foundations for small
machinery and small drive stations are not included at this stage.
In case where the client is to approve general arrangement drawings, such approval is
normally based on the Basic issue drawings.
Detail issue drawings: The term Detail issue drawings means drawings, where most of
the missing information on the Basic issue drawings is added
The drawings will still be incomplete as regards various minor details and equipment, but
these missing details will not generally affect the civil design, as they normally become
available before the conclusion of this stage.
Every time a drawing is updated, the alteration is shown encircled, and the drawing is
given a new index.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx

Project:

Project No: 1445334

4.2

Appendix E

Xuan Thanh

Time Schedules & Main Activities

Sec. 10 - Page 32 of 32
Date: 30-06-2015
Rev.: 1

FLS GA SCHEDULE

The FLS GA schedule will be finalized during contract negotiations in conjunction with the
Consultants Design Execution Master Plan.

Dep. No.

PLANT DEPARTMENTS

111

PRODUCTION DEPARTMENTS
Limestone crushing

NA

201523

201528

112 & 212


131
132 & 232 incl
242

Clay & Gypsum crusher


Limestone storage
Marl/Clay storage

NA
NA
NA

201526
201525
201526

201533
201530
201536

211
231 &241
311 & 312
461,462 & 465
471&481

Coal intake and crushing


Coal storage and coal transport
Raw Mill Feed 1 & 2
Coal mill and coal dosing
Clinker Transport and clinker
storage
Clinker silo for

NA
NA
NA
NA
NA

201526
201526
201526
201523
201523

201531
201531
201534
201530
201528

NA

201523

201530

NA
NA
NA
NA
NA
NA

201528
201527
201525
201525
201528
201523

201535
201535
201535
201535
201535
201531

483

Drawings available in week.


Basic issue Main issue Detail issue

export

051- 592-593
741
742
762
801
951

All Substations and cable routing

Compressor room 1
Compressor room 2
Water Treatment
Laboratory
Weigh bridge

O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx