Xuan Thanh
Appendix E
Time Schedules & Main Activities
Sec. 10 - Page 1 of 32
Date: 30-06-2015
Rev.: 1
APPENDIX E
TIME SCHEDULES
&
MAIN ACTIVITIES
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Xuan Thanh
Appendix E
Time Schedules & Main Activities
Sec. 10 - Page 2 of 32
Date: 30-06-2015
Rev.: 1
INTRODUCTION
PRELIMINARY PROJECT SCHEDULE
2
2.1
2.2
MILESTONE SCHEDULE
DELIVERY SCHEDULE CLARIFICATIONS
DELIVERY SCHEDULE AND MAIN ACTIVITIES OF NORMAL AND
OPTIONAL SERVICES
4
4.1
4.2
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Xuan Thanh
1.
Appendix E
Time Schedules & Main Activities
Sec. 10 - Page 3 of 32
Date: 30-06-2015
Rev.: 1
INTRODUCTION
The applicable phases of the design works are given in Appendix A, paragraphs 1 & 3, to
which Appendix E.2. shall comply.
Milestone dates are only stated for the applicable phases (in case that only one design phase
is applicable, milestones for main respectively detailed design will be the same).
The final design works shall comply to the Clarification of terms for delivery schedule
described under Appendix A.3.4.2
The main activities for each department, building or structure are further described under
E.2.2.
(The activity IDs stated in the schedules can be used as reference when making the work
programme mentioned under E.3., Design Execution Master Plan).
Delivery dates can be specified in at least four different categories and a combination
thereof:
- Milestone Dates for each Design Phase split into different work categories as per E.2.
- Delivery Dates for each Department split into main activities as per E.2.2
- Milestone Dates for each work category and if found applicable a few of the activities
under each department as per E.2.2.
- Milestone Dates for Optional Work as per E.2.3. The delivery schedule may also be used
for optional work if found applicable by the Client. The Milestone Dates for Optional
service will be agreed and signed by both parties at a later date.
As per default Milestone dates are defined under E.2. to which Dates under E.2.2 makes
reference.
In cases where the nature of the works (design or execution) makes it appropriate to make
exemptions for the default situation, other dates for specific
departments/buildings/structures will be stated in E.2.2. and E.2.3 respectively and in such
cases they will prevail over general dates stated in E.2.
Such specific dates shall be defined during final contract negotiations.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
2.
Appendix E
Xuan Thanh
Sec. 10 - Page 4 of 32
Date: 30-06-2015
Rev.: 1
MILESTONE SCHEDULE
No
Item
Weeks after
Notice to Proceed
Main Design:
0.1
Notice to proceed
0.2
xx
xx
xx
for
xx
0.3
0.4
0.5
Detailed Design:
0.6
Notice to proceed
0.7
xx
0.8
xx
xx
0.10
xx
0.11
xx
0.12
xx
0.13
xx
Note
0.9
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Xuan Thanh
2.1
Appendix E
Time Schedules & Main Activities
Sec. 10 - Page 5 of 32
Date: 30-06-2015
Rev.: 1
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
2.2
Appendix E
Xuan Thanh
Sec. 10 - Page 6 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans - ???
Milestones Dates
week
1528
1528
200
205
210
215
220
225
1531
1534
1537
1539
1539
1537
805
Calculation 205-225
1539
305
310
315
320
1542
1544
1546
1546
810
Calculation 305-320
1546
405
410
415
1538
1540
1541
815
Calculation 405-415
1542
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1548
1545
1547
800
Calculations Final
1548
1539
1546
1542
1547
1548
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 7 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans
Milestones Dates
week
1531
1534
200
205
210
215
1531
1534
1535
1535
805
Calculation 205-215
1536
305
310
1534
1535
810
Calculation 305-310
1536
405
410
415
1534
1535
1535
815
Calculation 405-415
1536
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1540
1543
1545
800
Calculations Final
1546
1536
1536
1536
1545
1546
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 8 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans - ???
Milestones Dates
week
1530
1532
200
205
210
1530
1536
1537
805
Calculation 205-210
1538
305
310
1541
1542
810
Calculation 305-310
1543
405
410
415
1541
1541
1542
420
425
815
Calculation 405-415
1543
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1545
1548
1550
800
Calculations Final
1551
1538
1543
1543
1550
1551
1
2
3
4
5
Description
1542
1543
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 9 of 32
Date: 30-06-2015
Rev.: 1
Description
Layout
Concrete Sub-S Pile plan
Milestones Dates
Week
1529
1532
210
215
1535
1537
805
Calculation 205-215
1537
305
310
315
1536
1538
1539
810
Calculation 305-315
1540
405
410
415
425
1544
1545
1546
1546
815
Calculation 405-415
1547
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1545
1550
1602
800
Calculations Final
1603
1537
1540
1547
1602
1603
1
2
3
4
5
1529
1533
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 10 of 32
Date: 30-06-2015
Rev.: 1
Description
Layout
Concrete Sub-S Pile plan
Milestones Dates
Week
1531
1533
210
1535
805
Calculation 205
1537
305
310
1534
1536
810
Calculation 305
1538
405
410
1545
1548
415
815
Calculation 405-415
1550
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1551
1602
1602
800
Calculations Final
1603
1537
1538
1550
1602
1603
1
2
3
4
5
1531
1533
1549
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 11 of 32
Date: 30-06-2015
Rev.: 1
Description
Milestones Dates
100
105
Layout
Concrete Sub-S Pile plan
Week
1530
1533
200
205
210
215
220
1530
1535
1536
1537
1538
805
Calculation 205-220
1539
305
310
315
1540
1541
1542
810
Calculation 305-315
1543
405
410
415
1545
1547
1548
815
Calculation 405-415
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding and block work
1545
1550
1601
800
Calculations
1602
1539
1543
1549
1601
1602
1
2
3
4
5
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 12 of 32
Date: 30-06-2015
Rev.: 1
311 and 312 Raw Mill Feed 1 and Raw Mill Feed 2
Activity
ID
100
105
Layout
Concrete Sub-S Pile plans - ???
Milestones Dates
week
1525
1525
200
205
210
215
1525
1533
1535
1537
805
Calculation 205-215
1538
305
310
315
1542
1547
1549
810
Calculation 305-315
1551
405
410
415
420
425
435
1545
1545
1547
1549
1551
1602
815
Calculation 405-440
1603
505
605*
705
Remaining concrete
Remaining Steel
Cladding and block work
1604
1605
1606
800
Calculations Final
1606
1538
1551
1603
1606
1606
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 13 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plan
Milestones Dates
Week
1531
1532
200
205
210
220
225
230
235
1531
1532
1533
1535
1537
1539
1539
805
Calculation 205-235
1540
305
310
315
320
1540
1540
1541
1541
810
Calculation 305-320
1542
405
410
415
420
425
1543
1543
1543
1544
1544
815
Calculation 405-425
1545
505
605*
705
Remaining concrete
Remaining steel
Cladding and block work
1548
1550
1550
800
Calculations
1551
1540
1542
1545
1550
1551
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 14 of 32
Date: 30-06-2015
Rev.: 1
Description
Layout
Concrete Sub-S Pile plan
Milestones Dates
Week
1527
1530
1527
1532
1532
1532
240
805
Calculation 205-240
1538
305
310
315
320
325
1534
1536
1536
1538
1538
810
Calculation 305-325
1539
405
410
415
420
425
1542
1543
1544
1544
1546
430
435
425
815
Calculation 405-435
1548
505
605*
705
Remaining concrete
Remaining steel
Cladding
1549
1552
1601
800
Calculations
1602
1538
1539
1548
1601
1602
220
225
230
235
1
2
3
4
5
1534
1534
1536
1536
1537
1546
1547
1547
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 15 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plan
Milestones Dates
Week
1530
1536
200
205
210
215
220
1530
1535
1538
1540
1542
805
Calculation 205-220
1544
305
310
315
320
1536
1538
1539
1541
810
Calculation 305-320
1542
405
410
420
425
430
435
440
445
1542
1543
1544
1546
1546
1547
1547
1548
815
Calculation 405-435
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1549
1552
1601
800
Calculations
1602
1544
1542
1549
1601
1602
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 16 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1541
205
1541
805
Calculation 205
1542
405
410
1549
1550
815
Calculation 405-410
1551
505
605*
705
Remaining concrete
Remaining steel
Cladding
1544
1601
1602
800
Calculations
1603
1542
NA
1551
1601
1602
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 17 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1531
105
1531
200
205
Dredging
Concrete Sub-S for jetty and access bridges
1533
1534
805
1534
305
Concrete Super-S
1536
810
Calculation 305
1537
425
Secondary SS
1540
815
Calculation 425
1541
505
605*
705
Remaining concrete
Remaining steel
Completion, fenders, bollards etc.
1538
1542
1542
800
Calculations
1542
1534
1538
1542
NA
1542
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 18 of 32
Date: 30-06-2015
Rev.: 1
Description
Milestones Dates
Layout
1539
205
1539
805
Calculation 205
1540
305
1545
810
Calculation 305
1546
405
1545
815
Calculation 405
1546
505
605*
705
Remaining concrete
Remaining steel
Cladding
1547
1548
1548
800
Calculations
1549
1540
1546
1546
1548
1549
1
2
3
4
5
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 19 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 20 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 21 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 22 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 23 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 24 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 25 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 26 of 32
Date: 30-06-2015
Rev.: 1
Layout
Milestones Dates
Week
1543
205
1543
805
Calculation 205
1544
305
1548
810
Calculation 305
1549
405
1548
815
Calculation 405
1549
505
605*
705
Remaining concrete
Remaining steel
Cladding
1550
1551
1551
800
Calculations
1552
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 27 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans
Milestones Dates
Week
1537
1537
205
210
1540
1540
805
1541
305
310
1550
1550
810
Calculation 305
1551
405
1601
815
Calculation 405
1602
505
605*
705
Remaining concrete
Remaining steel
Cladding
1552
1603
1604
800
Calculations
1605
1544
1549
1549
1551
1552
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 28 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans
Milestones Dates
Week
1537
1537
205
1537
805
1538
305
Concrete Super SS
1548
810
Calculation 305
1549
405
1550
815
Calculation 405
1552
505
605*
705
Remaining concrete
Remaining steel
Cladding
1552
1603
1604
800
Calculations
1605
1538
1549
1552
1604
1605
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 29 of 32
Date: 30-06-2015
Rev.: 1
Layout
Concrete Sub-S Pile plans
Milestones Dates
Week
1537
1537
205
1537
805
1538
305
Concrete Super SS
1548
810
Calculation 305
1549
405
1550
815
Calculation 405
1552
505
605*
705
Remaining concrete
Remaining steel
Cladding
1552
1603
1604
800
Calculations
1605
1538
1549
1552
1604
1605
1
2
3
4
5
Description
* Remaining steel includes all remaining ladders, stairs, purlins, minor platforms, gear/motor supports and so on
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Appendix E
Xuan Thanh
Sec. 10 - Page 30 of 32
Date: 30-06-2015
Rev.: 1
2.3
OPTIONAL SERVICES
Activity
Description
Milestones Dates
Week
ID
M6
NA
M7
NA
M8
NA
M8
NA
M8
NA
900
To be
clarified
M5
To be
clarified
M9
NA
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
Xuan Thanh
Appendix E
Time Schedules & Main Activities
Sec. 10 - Page 31 of 32
Date: 30-06-2015
Rev.: 1
4.1
and can be used for Basic Design and for starting the Main Design activities.
Main issue drawings: The term Main issue drawings means drawings which are
incomplete, as regards detailed information, but which are final in respect of the items
below, and can be used for the finalisation of the Main Design and for starting the
Detailed Design.
d.
e.
f.
g.
Less essential details such as minor openings and recesses, foundations for small
machinery and small drive stations are not included at this stage.
In case where the client is to approve general arrangement drawings, such approval is
normally based on the Basic issue drawings.
Detail issue drawings: The term Detail issue drawings means drawings, where most of
the missing information on the Basic issue drawings is added
The drawings will still be incomplete as regards various minor details and equipment, but
these missing details will not generally affect the civil design, as they normally become
available before the conclusion of this stage.
Every time a drawing is updated, the alteration is shown encircled, and the drawing is
given a new index.
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx
Project:
4.2
Appendix E
Xuan Thanh
Sec. 10 - Page 32 of 32
Date: 30-06-2015
Rev.: 1
FLS GA SCHEDULE
The FLS GA schedule will be finalized during contract negotiations in conjunction with the
Consultants Design Execution Master Plan.
Dep. No.
PLANT DEPARTMENTS
111
PRODUCTION DEPARTMENTS
Limestone crushing
NA
201523
201528
NA
NA
NA
201526
201525
201526
201533
201530
201536
211
231 &241
311 & 312
461,462 & 465
471&481
NA
NA
NA
NA
NA
201526
201526
201526
201523
201523
201531
201531
201534
201530
201528
NA
201523
201530
NA
NA
NA
NA
NA
NA
201528
201527
201525
201525
201528
201523
201535
201535
201535
201535
201535
201531
483
export
051- 592-593
741
742
762
801
951
Compressor room 1
Compressor room 2
Water Treatment
Laboratory
Weigh bridge
O:\Turnkey Proposals\20 TP Design Contracts\2871445344 - Xuan Thanh\01 - Design Contract\Lilama\Sec 10 Appendix E June 2015_Rev 1.docx