Introduction
Purpose
Scope
Requirements
Fire Protection
Contents of Fire
Fire Prevention
Control Fuel and Ignition Sources
Fire Fighting
Procedure for Emergency Plan
Emergency Organization
Planning
PAGE NO
03
03
03
03
03
03
04
04
05
05
05
06
06
06
06
07
Facilities
Emergency Response Team
Responsibilities of Emergency Team
Emergency Procedure Implementation
Action In Case Of Fire
Medical Emergency Plan
Management Responsibilities
Trainings
Appendix 1
08
08
08
09
10
Page 3 of 13
1.
Rev. 00
Aug 01,2012
Introduction
An emergency causing serious injuries, loss of life and any damage to property
required immediately preventive corrective action for rescue to employees and
assets. To ensure the awareness regarding emergency, a plan is established for
creating awareness among employees at site/establishment. Although this plan
cannot eliminate the potential to hazards but minimize the severity of emergency.
2.
Purpose
The purpose of this plan is to provide:
Rapid notification to appropriate EKL personnel and its subcontractor (if
any) if a fire or other major emergency situation occurs during construction
work at Makori Project Site.
An organizational structure capable of responding immediately to
situations.
The primary goal of this plan is to ensure rapid, orderly response with
appropriate personnel and equipment so that personal injury, property loss
and adverse environmental impact from fire and other emergency
occurrences are minimized. It must be understood that it is not a substitute
for maintaining HSE requirements.
3.
Scope
This Plan outlines response organization and response requirements for each
team member and procedures to be followed during a fire or any other
emergency situation at Makori Project site. This plan will be applicable to all
employees, work facilities including offices at site/establishment.
Following is a list of some of the possible emergencies or disaster situations,
which would require invoking of this plan:
Fire or Explosion
Toxic Gas Release
Burst Gas Pipeline
Failure of Equipment
Scaffolding Collapse
Medical Emergency
Earth Quake
Terrorist Attack
Spill
Any other unforeseen situation
4. REQUIREMENTS:
4.1
Page 4 of 13
Rev. 00
Aug 01,2012
Fire Prevention
No matter how well prepared an organization may be to fight fire. It is
better if the fire never starts in the first place. The importance of good fire
prevention techniques therefore cannot be over emphasized and it is
essential that all potential sources of fire are identified and either
eliminated or controlled.
4.2.1
Electrical short-circuiting
engineering kinetics (pvt.) ltd.
Page 5 of 13
Rev. 00
Aug 01,2012
Sparks from hot jobs like welding, cutting and grinding etc.
Smoking
Open flames from gas cutting etc.
Fire Fighting
Adequate fire fighting arrangements can help in controlling the fire in the
incipient stage. There are three methods of extinguishing fires:
1.
2.
3.
The Fire Fighting arrangements at Makori Project Site are mainly first-aid
equipments i.e. Fire Extinguishers and/or Fire/Sand buckets. It must be
appreciated that these first-aid fire-fighting measures are good for fighting
small fires only. If the fire escalates, the fire-fighting exercise should be left
to the professional fire-fighting equipment and agencies like Fire Brigade.
5.
EMERGENCY ORGANIZATION:
To organize emergency plan following basic requirements are assumed to
ensure the responsibilities to handle emergencies at Makori project site.
Site Manager, I/C Administration and I/C HSE is responsible for any
emergency at Makori project site to ensure the following
Immediate emergency communication to client, as required.
Keep coordination with client regarding emergency
engineering kinetics (pvt.) ltd.
Page 6 of 13
Rev. 00
Aug 01,2012
PLANNING:
Most important element for emergency procedure is proper planning for
potentials to risk that can occur at Makori Project site which include
following.
Establishing and maintaining effective communication among
employees and emergency services centre / nearby hospital or
care centre.
Analyzing risk nature and occurrence
Liaison with local emergency services and authorities
Approaching to the nearby hospital in a minimum safe time hrough a
proper route.
5.3
FACILITIES:
In order to meet an emergency facilities at Makori Project site are,
5.4
5.5
Team Leader/Warden
Dty. Team Leader/Dty. Warden
First Aider
Fire Man/Fighter
Assistants
Warden/Team Leader
a)
Page 7 of 13
b)
c)
d)
e)
f)
g)
h)
i)
Rev. 00
Aug 01,2012
Ensure turn off, main supplies of power and other utilities (if
any).
Coordinate activities of Emergency Response Team.
Ensure that all personnel have evacuated to the Assembly
Point.
Take roll call at Assembly Point.
Arrange for the rescue of any person reported entrapped.
Liaise with Client and local fire brigade, as per requirement.
Hand over control of fire fighting activities to the fire brigade
on its arrival.
Decide when the emergency is over and give an All Clear
signal.
Page 8 of 13
Rev. 00
Aug 01,2012
7.
8.
Page 9 of 13
Rev. 00
Aug 01,2012
h. In case of serious injury the area engineer/ Incharge HSE shall report to
Schlumberger HSE Manager at Makori.
9.
MANAGEMENT RESPONSIBILITIES:
To ensure that all the activities regarding emergency including Facilities,
Implementations, Monitoring, Audits & Inspections and Trainings are well in place
& being carried out regularly as per planning to meet any emergency. Followings
are responsible at Makori Project site.
1. Site Manager
2. I/C Administration
3. I/C HSE
Emergency Exit Routes and Assembly Points should be marked properly.
10.
TRAININGS:
10.1
10.2
10.3
10.4
All project site team shall be given training in Emergency Response Plan.
Members of the Emergency Response Team shall have sufficient
knowledge and awareness to discharge their responsibilities and know
where to obtain additional professional support.
Team members / firemen shall be given appropriate training in the
selection and use of portable, hand-held fire extinguishers.
Emergency Drills (as per site requirements) will be conducted to exercise
the practice that what to do in case of real emergency to avoid any
seriousness.
Page 10 of 13
Rev. 00
Aug 01,2012
Appendix-1
Project Name:
Project No.:
Inspected By:
No.
01.
Area:
Accident/Incident Type
- Clean?
b.
c.
- Not Slippery?
- provided?
b.
- Regularly emptied?
- Clean and tidy?
b.
- Function properly?
c.
- Need repairing/painting?
04.
05.
07.
08.
09.
10.
16.
17.
18.
19.
20.
21.
11.
12.
13.
14.
15.
a.
(N/A)
a.
06.
(N)
a.
03.
(Y)
a.
02.
Date:
- Leaked?
engineering kinetics (pvt.) ltd.
Page 11 of 13
Remarks
b.
22.
24.
25.
26.
23.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
Rev. 00
Aug 01,2012
Sr. No
Name
Position
03458226622
Page 12 of 13
Mr.Rana Zahid
Mech.Suptd
HSE Officer
Admin Oficer
Team Assistants
Mr. Qudratullah
Team Assistants
Rev. 00
Aug 01,2012
03469264624
03026712129
03467887470
03465561102
03469291970
03064559445
03038521570
Page 13 of 13