CONTENTS

DESCRIPTION

SL. N O.
01.

COLD S T A RT U P

02.

IN T EGRA T ED S T A RT U P P ROCED U RE COLD S T A RT U P

03.

H OT A N D W A RM S T A RT U P S .

04.

IN T EGRA T ED S T A RT U P P ROCED U RE W A RM S T A RT U P

05.

IN T EGRA T ED S T A RT U P P ROCED U RE H OT S T A RT U P .

06.

10.

S T A RT U P B Y CU RV ES FOR A B S OLU T E COLD S T A RT W IT H H P / LP B Y P A S S


S Y S T EM .
S T A RT U P CU RV ES A FT ER 48 H OU RS S H A T D OW N W IT H H P / LP B Y P A S S
S Y S T EM .
S T A RT U P P ROCED U RE A FT ER 8 H OU RS S H U T D OW N W IT H H P / LP B Y P A S S
S Y S T EM .
T ECH N ICA L D A T A LIM IT CU RV ES FOR T U RB IN E V A LV ES W A LL OF T H E
CA S IN G S H A FT S .
W A RM IN G U P A N D S T A RT IN G T H E T U RB IN E T EM P ERA T U RE CRIT ERIA .

11.

T ECH N ICA L D A T A REA CT IV E CA P A CIT Y CU RV E FOR T U RB O GEN ERA T ORS .

07.
08.
09.

COLDSTARTUP
(WithAuxSteamavailable)

Acoldstartupisbydefinition,oneofwhichthemaximumofHPcasingandHPshaftislessthan1500C.
Thisnormallymeansthattheunitisshutdownfromthemaximumloadformorethanfivedays.Ifmachine
isstartedfromambienttemperature(HPC/HPshafttempapprox.400C),heatingupofcastingisrequired.
Thisisaccomplishedbysoakingthemachineat360rpmatwarmingupsteamparameters(40kg/cm2,
3600C),tilltheTSEmarginaresatisfactory.
Therifleconstructionofthewaterwallcombinedwiththeboilercirculatingwaterpumpspermits
veryhighrateofpressurerisingofboiler.Anupperlimitof2000C/hrsaturationtemperaturegradientcan
beallowed,i.e.approximatelytheboilerpressurecanbebroughtto20kg/cm2withinanhourofcoldstart
up.ButactualtemperaturegradientislimitedbythethickwalledYpieceprovidedinthemainsteamand
HRHlines.Amainsteamlineheatingistobestartedasearlyaspossible(atapprox.4kg/cm2)as
maximumdifferentialtemperatureallowedbetweeninner(98%)andmidwalltemperature(50%)is
400C.Soboilerloadingisaccordinglyregulated.ItmaybepreferablytostartonlytwoCCpumpsinorder
tominimiseflashingindowncomers(andsubsequentvibration)whentheboilerwaterisinrangeof850Cto
1250C.Thethirdpumpshouldbestartedbeforedrumpressurereaches7kg/cm2tominimisethe
temperaturetransientsexperiencedbythepumpcasing(thisistoavoidfastloadoutbackontheboilerin
theeventofanyCCpumptripping).
Togettherollingparameters,normallytwoelevationoilgunsaretakenwithapprox.70to80t/hr
flowthroughHPLPbypass.AtthattimeM.S.parameterswouldbe40kg/cm2and3600C,HRHparameters
wouldbe12kg/cm2and3600C.
Assoonastheturbineloadinghasstarted,HP/LPbypassclosesandgetscompletelyclosedastheturbine
reachestheboilerload.Firstmillisputintooperationaround10%ofgeneratorload.Secondmillisputinto
operationaround25%whilethirdmillisat40%ofgeneratorload.Fourthandfifthmillsareputinto
operationat60%and80%ofgeneratorloadrespectively.Sixthmillistakentoreachfullgeneratorload.

DuringloadingtheRHoutletsteamtemperaturehastobekeptascloseaspossibletoSHoutletsteam
temperatureBurnertilt,SHspray,RHspraycontrolshastobeadjustedaccordingly.Theturbineloading
rateisdecidedbyaselectioncircuitwhichcomparestheexternalloadgradient,TSEmarginandtime
dependantgradient(setinternally)andfrequencyinfluence.
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

1/26

7/15/2015

TechnicalServices

INTEGRATEDSTARTUPPROCEDURE
COLDSTARTUP
(AUXILIARYSTEAMAVAILABLE)
REF.DRGNO.20BPE691
STEP

TIME

..

UNITCONDITION

OPERATION

ChargeAux.Steamheader
Boilerpr.0kg/cm2(g)
16ata,2600C,fromexisting
andAmbienttemperature
units.

NOTES

Chargesteamtofueloil
pumphouse,atomising
steamandtracingsteam
deaeratorwarmingup.

StarttankheatingofLSHS
oil.

StartoneLSHSpumpon
recirculationassoonasthe
sufficientoiltemperatureat
inletisachieved.

ChargeLSHStoboilerfront
andkeepitonlong
recirculation,withheaters
controlsetonAutoto
maintain1101290C.

Allthesteamtracinglines
andelectricaltracingsin
pumphouse&boilertobe
charged.

Fillwaterindrumupto
+200mm.

Ensurethatthesuctionand
dischargevalvesofallthe
CCpumpsareopenandthe
pumpsuctionanddischarge
linesarevented.

StartBearingcoolingwater
systempumpsforBoiler,
TurbineandTGauxiliaries.

Checkallcircuitshave
sufficientflow.Before
startingthepumps,the
emergencycoolingwater
tankleveltobecheckedand
madenormal.

Startinstrumentair
compressorandcheckthat
Checkthatallcircuitshave
allthelinestoBoilerandTG sufficientairpressure.
arecharged.

Startserviceaircompressor
andfilltheairreceivertanks
ofSRAPH&PRAPHarefilled.

EnsurethatpurgeairtoHEA
isopeninallcorners.

LineupAirandfluegas
circuitsforstartup.

ESPreadyinallrespects.

Furnacebottomashsystem
andsealthroughlinedup.

FSSSpanelreadyinall
respects.

EASTpanelreadyinall
respects.

Excitationpanelreadyinall
respects.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Checkdampersandgates
registerposition.

2/26

7/15/2015

TechnicalServices

GeneratorH2gaspressureis CheckpurityofH2gasis
normal.
4kg/cm2

Generatorstatorwater
Checkpurityofgenerator
systemreadyinallrespects. statorwaterisnormal.

H2coolingwatersystem
readyinallrespectswith
SLCon.

LP&HPchemicaldozing
systemisready.

CheckforlevelinHydrazine,
Ammoniaandphosphate
preparationtanks.

SADCpanelreadiness.

Checkforairpressureinall
thecornersandelevations.

Powersupplyforallthe
EnsureAux.airdampersand
valvesanddampersareON. modulating.

Supplyforallauxiliariesof
SG,TurbineandGeneratoris
ensured.

ReadinessofHPbypass
panelinallrespects.

Ensuretheoilunitisrunning
andallthebypassandspray
valvesareclosed.

StartoneoftheCCpumps.

Ensuredrumlevelis+200
mm,andthedrumairvents
areclosed.

StartthesecondCCpump.

Ensuredrumlevelisnormal.

Startscannerairfan.

Startboththesecondaryair
preheaters.

Ensurethatalltheinletand
outletairgasdampersare
open.

Startboththeprimaryair
preheaters.

Ensurethatthegasdampers
areclosed.

StartonesetofIDandFD
fans.

Adjust30%airflow,and
furnacedraftminus5to10
mmWCL.

Chargesteamcoilpreheater
concernedwiththerunning
FDfans.

InitiateBoilerPurge
(duration5minutes).

Putluboiltemperature
controlleron.

StartoneJOP.

Luboilsystemstopped.

Generatorprotectionpanel
readyinallrespects.

Afterpurgecompletion
Boilertripvalveswillget
reset.
Also,afterpurge,adjustthe
windboxdamperstoget30
40mmWCL.Windboxdp.

Startonevapourextraction
CheckoillevelinMOT.
fan,keepotherfanstandby.
Lineupluboilcoolerand
thrustbearingfilterStart
oneAOP.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

PutonSLCsforotherAOP
andEOP.
CheckoutautostartofAOP
andEOP.

PutonSLCsforotherJOP
andDCJOP.
CheckoutautostartofJOP
3/26

7/15/2015

TechnicalServices

andDCJOP.

PutoffSLCsJOP1,2&3.
StoprunningJOP.

Opengatevalvegearing.

StartoneJOPandswitchon
SLCsforJOPs.

SwitchonSLCgatevalve
gearing.

M/c.comesonbarring.

MOTlevel50mmoiltemp.
450CJOPheaderpr.140
kg/cm2speed80100rpm.

Thesequentialoperation
narratedaboveonLuboil
systemstoppedis
achievedbySGCmode.

Iftheprogrammegets
interrupted,thestepand
criteriatobecheckedandto
befulfilledforthe
programmetoproceed
further.

M/conbarring.

Startcentrifugewithboth
heaters

FRFsysteminstopped
condition.

CheckFRFtanklevel.

+200mm.

LineupFRFcoolerand
duplexfiltersin32bar
systemstartoneCEP.Check
autostartofstandbyCEP.

Establishcontrolfluidsupply
FRFtanklevelO(normal).
tovariousservices.

StartoneVEF.

Startonerecirculationpump
andincludeoneFiltersearth
andultrafine.

SwitchonFRFheaterand
keepSLCONfor
temperaturecontrol,and
controlfluidpumps.

SwitchONcontrolfluidSGC.

FRFtemperature550C.

FRFsystem,SGCison.

Thesequentialoperation
narratedaboveinFRF
systemstoppedconditionis
achievedbySGCFRFsystem
onstartingprogramme
mode.

01

oo

Boilerreadyforlightup
andTurbineonTurning
gear.

Start4burnersinAB
elevationwithLSHS.

SH&RHdrainsareopen.

MSVsclosedanddrains
beforeMSVopen.

Regulateoilpressureto810 Ensureatomisingsteam
kg/cm2.
pressureabout6kg/cm2.
After30minutes,take
additionalburners,soasto
ensureadrummetal
temperatureraiseofabout
20C/min.

Iftheprogrammegets
interruptedthestepand
criteriatobecheckedand
fulfilledfortheprogramme
toproceedfurther.
CheckthatSH&RHvents
areopen.

Insertfurnaceprobeand
ensurethatthetemperature
isbelow5350C.
Checkdrumlevelandgive
blowdown.
KeepopentheEco.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

4/26

7/15/2015

TechnicalServices

Startmotordrivenfeed
pumponrecirculation.

Chargethefeedlineupto
feedcontrolstation.

Chargeheatingsteamto
deaeratorfromAux.PRDS.

Startcondensatepumpsand
feedtodeaeratorasand
Checkhotwelllevel.
whenrequired.

Starthotwellmakeup
pumpsandfeedhotwellas
andwhenrequired.

Aux.PRDSsteam15kg/cm2
(g)2600C

CWsystemischarged.

CWboxestoensure
ventilatingofwaterboxes.

Startoneglandsteam
exhausterfan.

Lineupvacuumpumpsand
startonebyoneGradually Ensureglandsteam
admitglandsteamwhen
admissiontemperatureis
condenservacuumreaches alwaysabove2000C.
0.2kg/cm2(g).

Vacuumbuildingcanbedone
throughSGCvacuumon
startingprogrammemode,
glandsteamexhausterhas
tobestartedmanually.

Openalldrainsconnectedto
flashtanksandflashboxes
connectedtocondenser.

recirculationvalvewhen
thereisnofeedingtodrum.
Checkdeaeratorlevel.

OpenHPBPwarmupvalves.

SwitchonSLCdrains.

02

60'

CloseSH&RHheader
drains.

OpenMSVbypasslines.

MS,HRH,&CRHlineswill
getwarmedup.

100

Boilerpressure5kg/cm2.

Switchonautomaticcontrol
interfaceofLPbypass.

Assoonasthefixedset
pointreaches12kg/cm2,it
seizes.
Automaticcontrolinterface
getsswitchedoffwhenthe
hotreheatsteampressure
reaches13kg/cm2i.e.after
synchronisation.

03

Vacuum09kg/cm2(g).

Boilerpressure2kg/cm2 CloseSH&RHheadervents.

OpenMainsteamvalves.

OpenHPbypass.

StartthirdC.C.pumpwhen
boilerpressurereaches9
kg/cm2.

TakeadditionalgunsinCD& Airheatersootblowingtobe
EFelevation.
carriedout.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

5/26

7/15/2015

TechnicalServices

CloseHPBPwarmupvalves.

AROLLINGTHROUGHHYDRAULICGOVERNOR
Boilerpressure:15
kg/cm2
04

150

Temperature:1802000C
HRHPressure:8
12Kg/cm2

OpenHPESVs&IPESVsfor
warmingupbyoperating
startingdeviceto
approximately42%.

Checkandensurethatspeed
setpointiszeroandspeeder
gearis0%position.

EnsureTSEinfluenceis
switchedonandavailable
marginsaregreaterthan=
30 0K.

M.S.Pr.50kg/cm2
Raisethespeedsetpointof
EHCto3200rpm

IftheoilsystemofEHCis
isolatedatspeedGov.rack,
speedsetpointneednotbe
raised.

Graduallyraisethestarting
devicetobringthespeedto
360rpm

Startingdeviceposition
approximately56%.

TurbinereadyforRolling.

Holdthespeedat360rpm
forabout35to40mts.

Ensureclosureofgatevalve
gearingat240rpm.Monitor
bearingvibrations,shaft
vibrations,TSEmargins,
bearingtemperature&
Turbosupervisoryreadingsat
360rpm.

M.S.Pr.50
kg/cm2/3500C.Turbine
runningat360rpm.

Raisethespeedupto2400
rpmthroughstartingdevice
attherateof600rpm.

EnsuretrippingofJOPat540
rpm.

Raisefurtherspeedupto
3000rpmthroughspeeder
gear.

Startingdevicewillbeat
90%.

M.S.temp.3500C
05

300
H.R.H.Pr.12kg/cm2
HRHtemp.:3500C

06

360

Monitoringbearing
temperatureandvibrations,
shaftvibrations,TSE
marginsandTurbovisory
readings,Sealoil,Primary
waterandgastemperatures
&Generatorwinding
temperature.

EnsuretrippinfofAOPat
2950rpm.

Speedergearpositionwillbe
approximatelyat50to60%.

07

370

MSPr.50kg/cm2.
Temperature:3500C
Turbinerunningat3000
rpm.

PutAVRonAuto.

Closefieldbreaker.

Setmanuallythegenerator
voltagetogridvoltage.

Synchronisethegenerator
withgrid.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

6/26

7/15/2015

TechnicalServices

Pickup50MWloadby
operatingspeedergear.

EnsureclosureofHPBP
steamvalves&spray
valves.

IncreaseHPBPsetpoint.

DrainpotdrainsofMS,CRH
Closeotherdrains,M.S.
&HRHandextractionsteam
HRH,keepingSLCdrainson. lineswilloperateasperthe
actuationoflevelswitches.

BROLLINGTHROUGHEHC.
04

150'

MSPr.:15kg/cm2.
Temperature:1802000C
HRH
Pressure:8to12kg/cm2.

OpenHPESVs&IPESVsfor
warmingupbyoperating
startingdeviceto
approximately42%.

CheckandensurethatTSE
influencesisswitchedonand
availablemarginsare
greaterthan 300K.
Checkandensurethatspeed
setpointiszeroandspeeder
gearis0%position.

MSPressure:50kg/cm2
MSTemperature:3500C
05

300'

HRHPressure:12kg/cm2

Raisethestartingdeviceto
about70%.

Checkandensureopeningof
valvesinHP/IPsecondary
fluidlinestoEHCatspeed
controlrack.

Iftrackingdeviceisswitched
ON,startingdeviceposition
willautomaticallytrackthe
EHCposition

HRHTemperature:
3500C.
TurbineReadyforrolling

Raisethespeedsetpointto
360rpmandwatchthe
actualspeed.

Raisethespeedergearto
100%

Holdthespeedat360rpm
forabout35to40mts.

MSPressure:50kg/cm2
06

360'
MSTemperature:3500C

Turbinespeed:360rpm.

Raisethespeedsetpointto
3000rpm.

Ensureclosureofgatevalve
gearingat240rpm.
Monitoringbearing
vibrations,bearing
temperatures,shaft
vibrations,TSEmarginsand
Turbovisoryreadings.

Ensuretrippingofjackingoil
pumpat540rpm.

Therateofaccelerationwill
be600to850rpm.

Monitorbearingvibration
andtemperatures,shaft
vibrations,Turbovisory
readingsandTSEmargins

Monitorandcontrol,SEALoil
temperatures,Primarywater
temp.Hydrogengas
temperatureandwinding
temperature.

EnsuretrippingofAOPat
2950rpm.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

7/26

7/15/2015

TechnicalServices

MSPressure:50kg/cm2
07

370'

PutAVRonauto,CloseField
Breaker.

Setmanuallygenerator
voltagetogridvoltage.

MSTemperature:3500C
Turbinespeed:3000rpm.

Speedsetpointwillraise
automaticallyby8rpmand
loadwillbepickedupto
20MW.

Synchronisethegenerator
withgrid.

Raisethespeedsetpoint
andpickuptheloadto50
MW.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalves&spray
valves.

CloseotherdrainsofMS,
CRH,HRH,keepingSLC
drains'ON'.

DrainpotdrainsofMS,CRH,
HRHandextractionsteam
lineswilloperateasperthe
actuationoflevelswitches.

CROLLINGTHROUGHSGCTURBINE.
MSPressure:15kg/cm2
04

150'

MSTemp.:1802000C
HRHPressure:12kg/cm2

Switchonthestartup
programmeofSGC
Turbine.

EnsureTSEinfluenceis
switchedon.

Iftheprogrammeinterrupts
theparticularstepand
criteriatobecheckedand
correctedfortheprogramme
toproceedfurther.

Alloperationsasexplained
underEHCrollingwillbe
carriedoutbySHCTurbine
programmesequentially.

MSPressure:50kg/cm2
MSTemperature:3500C
05

300'

HRHPressure:12kg/cm2

Turbinespeedwillberaised
to360rpmthroughSGC
Programme.

Ensureclosureofgatevalve
gearingat240rpm.

HRHTemp.:3500C.
TurbineReadyforrolling

Monitorbearingvibration,
bearingtemperature,shaft
vibration,TSEmarginsand
Turbovisoryreadings.

Toachievetheprogramme
asperthestartingcurve,the
mainsteamtemperature
shouldbemaintained
steadilytillloadingupto50
MW.

MSPressure:50kg/cm2
06

360'

MSTemperature:3500C

Turbinespeedwillberaised
upto3000rpmthroughSGC
programme.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

EnsuretrippingofJOPat540
rpm.
8/26

7/15/2015

TechnicalServices

Turbinerunningat360
rpm.

MSPressure:50kg/cm2
07

370'

MSTemperature:3500C
Turbinespeed:3000rpm.

EnsuretrippingofAOPat
2950rpm.

Monitorbearingtempand
vibrations,shaftvibrations,
TSEmarginsandturbovisory
readingssealoil,primary
water,Hydrogengasand
Generatorwinding
temperatures.

SGCprogrammewillswitch
ONfieldbreaker,putAVRon EnsureSGCstartup
auto,synchroniseandpick
programmeiscompleted.
uploadupto20MW.

Raisethespeedsetpoint
andpickuptheloadupto50
MW.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalvesandspray
valves.

CloseotherdrainsofM.S.
CRHandHRH,keepingSLC
drainsON.

DrainpotdrainsofMS,CRH,
HRHextractionsteamlines
willoperateasperthe
actuationoflevelswitches.

Load:55MW
08

390'

M.S.:54kg/cm2/3500C
HRH:12kg/cm2/3400C

BeforestartingP.A.fan,
StartsealairfanandPAfan ensurethatairandgas
andtakefirstmillinservice. dampersofPrimaryAir
Preheatersareopen.

ChargeESPfields

EnsureAshhandlingsystem
isready.

StartthesecondsetofID&
FDfans.

MakereadySH&RHspray
systems.

CutinL.P.heaters2&3.

Ensureswitchingonofload
controllerabove60MW.

Cutoutheatingsteamfrom
Aux.P.R.D.S.toDeaerator.

PegDeaeratorfromCRH
steamgraduallyupto2
kg/cm2.

Cutinautocontrollers.

Load:55MW

M.S.:54kg/cm2/3500C
HRH:12kg/cm2/3400C

ChargeAux.PRDSstation
fromCRH.Cutinsprayand
maintainatemperatureof
2500C.

Ensureenergizingofsolenoid
intrimmingdeviceatand
above100MWload.

PegDeaeratorgraduallyto4 Raisethepressuresetpoint
ofDeaeratorpressure
kg/cm2.
controllergradually.

CutinIIndmillandcutin
autocontrollers.

Startwithdrawingoilsupport Ensurefireballscanner
gradually.
healthiness

Controlmainsteamand
reheatsteamtemperatures
byusingsprayifrequired.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

9/26

7/15/2015

TechnicalServices

Load:160MW
10

440'

M.S.:90kg/cm2/3800C
HRH:20kg/cm2/3800C

Increasethewindboxto
furnacedifferentialpressure
to100mmW.C.byadjusting
SADC.

Steamflow:580t/hr.

ChargeH.P.heaters5A,5B,
6Aand6B.

Putcontrollersonauto.

StartfirstTDBFP&second
CEP.

ChargeDeareatorpegging
EnsureDeareatorPressure
steamflowCRHtoExtraction
controllerremainsasauto.
around200MWload.

Load:250MW
M.S.:120kg/cm2/4200C
11

480'
HRH:26kg/cm2/3400C

CutinIIIrdmillandcutin
autocontrollers.

Steamflow:820t/hr.

StartsecondP.A.Fan.

BeforestartingP.A.fan
ensurethatairandgas
dampersofPAPHsareopen.

Load:320MW
M.S.:125kg/cm2/3500C
12

510'

HRH:2830
kg/cm2/3400C

CutinIVthmillandcutin
autocontrollers.

Steamflow:1040t/hr.

Cutofoilsupport
completely.

Ensurehealthinessoffire
ballscanners.

Load:405MW
M.S.:145kg/cm2/4600C
13

CutinVthmillandcutin
autocontrollers.

CutinsecondTDBFPand
switchoffmotordrivenBFP.

Iffullloadisnotreachedcut
inVIthmillalongwithits
controllers.Increasetheset
M.S.:170kg/cm2/4750C pointofSH&RHspray
controllerssuchthatrated
2
0
HRH:40.5kg/cm /475 C parametesareachieved
gradually.

550'
HRH:33kg/cm2/4600C
Steamflow:1310t/hr.

Load:500MW

14

590'

Load:405MW
M.S.:145kg/cm2/4600C
15

670'

HRH:33kg/cm2/4600C
Steamflow:1310t/hr.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

10/26

7/15/2015

TechnicalServices

WARMANDHOTSTARTUPS
(WithAux.SteamAvailable).
A warm start up is, by definition, one which the maximum of HP casing/HP shaft temperature is
between1500Cand3500C.Thisnormallymeansthattheunitisshutdownfromthemaximumloadforone
to four days. Depending upon the absolute temperature of HP casing and HP shaft, steam parameters are
derived.AhotstartupisbydefinitiononewhichthemaximumofHPcasing/shafttemperatureismorethan
3500C.InthiscasetogettherollingparameterstwomillsaretakenintoservicekeepingHP,LPbypassin
operation. (Again the flow rate is restricted by the Y pieces constraints i.e., 400C). In both the cases,
curves are given to derive the rolling parameters. In case when machine is rolled through EAST, curve
generators,calculateandgivepermissiveforrolling.

INTEGRATEDSTARTUPPROCEDURE
WARMSTARTUP(AFTER48HOURSSHUTDOWN).
STEP

TIMEIN
MINUTES

UNITCONDITION

OneCCpumpinoperation
andscannerfanin
operation.

BothSAPHsandPAPHsin
operation.

Turbineonbearinggear
withAOP,JOPandsealoil
pumpsinoperation.

Controlfluidsystemready
inallrespects.One
circulatingpumpin
operationwithoneearth
filterandultrafinefilterin
circuit.

Generatorgassystem,
sealoilsystemand
primarywatersystemin
operation.

Bearingcoolingwater
systeminoperation.

HTandLTauxiliaries
powersupplyavailable.

HPbypasssystemreadyin
allrespects.

ESPreadyinallrespects.

EASTpanelsreadyinall
respects.

Furnacebottomash
systemandsealtrough
linedup.

Vacuumpumpslinedup
andreadyforoperation.

Glandsteamandleak
steamcontrollersarelined
upandreadyfor
operation.

OPERATION
MotoroperatedBFPisrun
asandwhenrequiredto
maintainthedrumlevel.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

NOTES.

11/26

7/15/2015

TechnicalServices

Generatorprotectionpanel
andexciterpanelsreadyin
allrespects.

Boilerdrumpressure=0
kg/cm2.SH
temperaturebetween
1300Cand1500C.

1.Chargeauxiliarysteam
headerfromexistingunits.
Pr.16atatemp.2600C.

2.Chargesteamtofueloil
pumphouse,atomising
steamandtracingsteam.

3.Starttankheatingof
LSHSoil.

4.StartoneLSHSpumpon
recirculationassoonas
sufficientoiltemp.atinlet
isachieved.

Startinstrumentoil
compressorandserviceair
compressorsandcheckthat
alllinestoboilerandTG
arecharged.

ChargeLSHSpumptoboiler
frontandkeepitonlong
recirculationwithheaters
controlsetonautoto
maintain1200C.

Startcirculatingwater
pumpforcondenserand
deaeratethecondenser
waterboxes.

StartsecondCCPump.

StartonesetofIDandFD
fans.

Initiateboilerpurge.

StartoneCEPandkeepthe
hotwellmakeupinservice.

Startoneofthecontrolfluid
pumpsandkeepthesecond
asautostandby.

Keepthecontrolfluid
temperaturecontrolon
auto.

Ensurerunningofmotor
drivenBFPcontinuouslyfor
maintainingdrumlevel.

Lineupmainsteam,CRH
andHRHsteamlinesfor
chargingbyopening
respectivelinedrains.

LineupFSSSpanelsinall
respects

Chargeheatingsteamline
toDeaeratorfromAux.
PRDS.

01

oo

SH&RHdrainsareopen.

MSVsclosedanddrains
beforeMSVopen.

Boilerreadyforlightup
andturbineonturning
gear.

Start4burnersinAB
elevationwithLSHS.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

CheckthatSH&RHvents
areopen.

12/26

7/15/2015

TechnicalServices

Ensureatomisingsteam
pressureofabout6
kg/cm2

EnsuremotoroperatedBFP
isinservice.

StartGlandsteam
Exhauster.

Startonebyonevacuum
pumps.

Admitglandsteamwhen
vacuumreaches0.2
kg/cm2.

Ensureglandsteam
admissiontemperatureis
alwaysabove2000C.

Vacuumbuildingcanbe
donethroughSGCvacuum
onstartingprogramme
mode.Glandsteam
exhausterhastobestarted
manually.

Openalldrainsconnectedto Ensurecondenservacuum
flashtanksandflashboxes
of0.8kg/cm2.
connectedtocondenser.

SwitchonSLCdrains.

CloseSH&RHheadervents Ensureboilerpressureis
anddrains.
2kg/cm2.

OpenHPBPwarmingup
valves.

OpenMSVbypasslines.

SwitchAutomaticcontrol
interfaceofLPbypass.

Assoonasthefixedset
pointreaches12kg/cm2,it
seizes.

Automaticcontrolinterface
getsswitchedoffwhenthe
hotreheatsteampressure
reaches13kg/cm2(i.e.)
aftersynchronisation.

OpenMainsteamstop
valves.

EnsureMS,CRH&HRH
linesgetwarmedup.

OpenHPbypassandclose
theHPBPwarmupvalves.

EnsureBoilerpressureis
5kg/cm2.

StartthirdCCpump.

EnsureBoilerpressureis
9kg/cm2.

PutHPbypasscontrolleron
autoandvarythesetpoint EnsureBoilerpressureis
accordingtothegradientof 10kg/cm2
pipelinetemperatures.

PutHPbypassspraycontrol
onauto.

Takeadditionalguns
accordingtothe
requirement.

Airheatersootblowingto
becarriedout.

AROLLINGTHROUGHHYDRAULICGOVERNOR.
MS:50kg/cm2/3650C
02

180'

HRH:12kg/cm2/3250C
Bypasssteamflow:
170t/hr.

OpenHPESVandIPESVfor
warmingupbyoperating
startingdevicetoapprox.
42%

Checkandensurethat
speedsetpointiszeroand
speedergearis0%.

EnsureTSEinfluenceis
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

13/26

7/15/2015

TechnicalServices

switchedonandavailable
marginsaregreaterthan
300K.

MS:60kg/cm2/4000C
03

210'

HRH:12kg/cm2/3500C
Bypasssteamflow:
200t/hr.

IftheoilsystemofEHCis
Raisethespeedsetpointof isolatedatspeedGov.
EHCto3200rpm.
rack,speedsetpointneed
notberaised.

Graduallyrisethestarting
Startingdeviceposition
devicetobringthespeedto
approximately56%.
360rpm.

Holdthespeedat360rpm
forabout5minutes.

04

215'

Turbinerunningat360
rpm.

Ensureclosureofgate
valvegearingat240rpm.
Monitorbearingvibrations,
shaftvibrations,TDE
margins,bearingtemp.&
Turbovisoryreadingsat
360rpm.

Raisethespeedupto2400
EnsuretrippingofJOPat
rpmthroughstartingdevice
540rpm.
attherateof600rpm.
Raisefurtherspeedupto
3000rpmthroughspeeder
gear.

Startingdevicewillbeat
90%.

Monitorbearingtemp&
vibrations,shaft
vibrations,TSEmargins
andTurbovisoryreadings.
Sealoil,Primarywater
andgastemperatures&
Generatorwinding
temperature.

EnsuretrippingofAOPat
2950rpm.

Speedergearpositionwill
beapprox.at50to60%.

05

220'

Turbinerunningat3000
rpm

PutAVRonauto.

Closefieldbreaker.

Setmanuallythegenerator
voltagetogridvoltage.

Synchronisethegenerator
withgrid.Pickup50MW
loadbyoperatingspeeder
gear.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalves&spray
valves.

Closeotherdrains,M.S.
HRH,keepingSLCdrains
on.

DrainpotdrainsofMS,
CRH,andHRHand
extractionsteamlineswill
operateasperthe
actuationoflevelswitches.

Furtherloadraisingwillbe
donebyoperatingthe
speedergearaccordingto
thestartupcurve.

BROLLINGTHROUGHEHC
MS:50kg/cm2/3650C
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

14/26

7/15/2015

TechnicalServices

HRH:12kg/cm2/3250C
02

180'

Bypasssteamflow:
170t/hr.

OpenHPESVsandIPESVs
forwarmingupby
operatingstartingdeviceto
approx.42%.

CheckandensurethatTSE
influenceisswitchedon
andavailablemarginsare
greaterthan 300K.

Checkandensurethat
speedsetpointiszeroand
speedergearis0%.

Raisethestartingdeviceto
about70%.

Checkandensureopening
ofvalvesinHP/IP
secondaryfluidlinesto
EHCatspeedcontrolrack.

MS:60kg/cm2/4000C
HRH:12kg/cm2/3500C
03

210'

Bypasssteamflow:
200t/hr.
Turbinereadyforrolling.

Iftrackingdeviceis
Raisethespeedsetpointto
switchedonstartingdevice
360rpmandwatchthe
positionwillautomatically
actualspeed.
tracktheEHCposition

Raisethespeedergearto
100%.

Ensureclosureofgate
valvegearingat240rpm.

Holdthespeedat360rpm
forabout5minutes.

Monitorbearingvibrations
bearingtemperatures,
shaftvibrations,TSE
margins&turbovisory
readings.

04

215'

Turbinerunningat360rpm.

Raisethespeedsetpointto EnsuretrippingofJacking
3000rpm.
oilpumpat340rpm.

Monitorbearingvibrations
andtemps,shaftvibration,
turbovisoryreadingsand
TSEmargins.

EnsuretrippingofAOPat
2950rpm.

05

225'

PutAVRonautocloseField
breaker.

Setmanuallygenerator
voltagetogridvoltage.

Speedsetpointwillbe
raiseautomaticallyby
about8rpm&loadwillbe
pickedupto20MW.

Turbinespeed:3000rpm.

Synchronisethegenerator
withgrid.

Raisethespeedsetpoint
andpickuptheloadto50
MW.

IncreaseHPBPsetpoints.

EnsureclosureofHPBP
steamvalvesandspray
valves.

CloseotherdrainsofMS,
CRH,andHRHkeepingSLC
drainsON.

DrainpotdrainsofMS,
CRH,HRHandextraction
steamlineswilloperateas
pertheactuationoflevel
switches.

CROLLINGTHROUGHSGCTURBINE.
MS:50kg/cm2/3650C
02

180'

HRH:12kg/cm2/3250C
Bypasssteamflow:

Switchonthestartup
programmeofSGC
Turbine.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

EnsureTSEinfluenceis
switchedon.

15/26

7/15/2015

TechnicalServices

170t/hr.

Iftheprogramme
interruptstheparticular
stepandcriteriatobe
checkedandcorrectedfor
theprogrammetoproceed
further.

Alloperationsasexplained
underEHCrollingwillbe
carriedoutbySGC
Turbineprogramme
sequentially.

MS:50kg/cm2/3650C
HRH:12kg/cm2/3250C
03

210'

Bypasssteamflow:
170t/hr.

Turbinespeedwillberaised
Ensureclosureofgate
to360rpmthroughSGC
valvegearingat240rpm.
Programme.

Turbinereadyforrolling.

Monitorbearingvibration,
bearingtemp,shaft
vibration,TSEmarginsand
Turbovisoryreadings.

Toachievetheprogramme
asperthestartingcurve,
themainsteam
temperatureshouldbe
maintainedsteadilytill
loadingupto50MW.

MS:60kg/cm2/4000C
04

215'

Turbinerunningat360
rpm.

Turbinespeedwillberaised EnsuretrippingofJOPat
upto3000rpmthroughSGC 540rpm.Ensuretripping
Programme.
ofA.O.P.at2950rpm.

MS:60kg/cm2/4000C
05

225'

Turbinespeed:3000rpm.

Monitorbearingtemp&
vibrations,shaft
vibrations,TSEmarginand
turbovisoryreadings,seal
oil,primarywater,
Hydrogengasand
Generatorwinding
temperatures.

SGCprogrammewillswitch
ONfieldbreaker,putAVR
EnsureSGCStartup
onauto,synchroniseand
programmeiscompleted.
pickuploadupto20MW.

Raisethespeedsetpoint
andpickuploadupto50
MW.

IncreaseHPBPsetpoint

EnsureclosureofHPBP
steamvalvesandspray
valves.

CloseotherdrainsofM.S.,
CRHandHRH,keepingSLC
drainsON.

DrainpotdrainsofM.S.,
CRH,HRHandExtraction
steamlineswilloperateas
pertheactuatoroflevel
switches.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

16/26

7/15/2015

TechnicalServices

Load:60MW
06

230'

MS:60kg/cm2/4100C

CutinL.P.heaters2and3.

Ensureswitchingonof
loadcontrollerat60MW.

HRH:14kg/cm2/3600C

Cutoutheatingsteamfrom
Aux.PRDStoDeaerator.

PegDeaeratorfromCRH
steamgraduallyupto2
kg/cm2.

Cutinallautocontrollers.

StartsealairfanandP.A.
fan

Cutinfurtheroilgunsfor
raisingparameters.

BeforestartingP.A.fan,
ensurethatairandgas
dampersofPrimaryAir
Preheatersareopen.

Load:110MW
MS:80kg/cm2/4200C
07

245'

HRH:19kg/cm2/3800C

Cutin1stcoalmillandcut
inAutocontrollers.

MakereadySH&RHspray
system.

ChargeESPFields.

EnsureAshhandling
systemisready.

ChargeAux.PRDSstation
fromCRH.Cutinsprayand
maintainatemperatureof
2500C.

Mainsteamflow:470t/hr.
Trimmingdeviceisin
OFF.

Raisethepressureset
pointofDeaerator
pressurecontroller
gradually

PegDeaeratorgradually
upto4kg/cm2.

CutinH.P.heatersandput
thelevelcontrolsonauto.

StartfirstTDBFPand
secondCEParoundaloadof
170MW.

Increasethewindboxto
furnacediff.pressureto
100mm.W.C.byadjusting
SADC.

CutinIIndmillandcutin
autocontrollers.

Load:200MW
MS:100kg/cm2/4350C
08

270'
HRH:19kg/cm2/4000C
Mainsteamflow:750t/hr.

Startwithdrawingoil
supportgradually.

Controlmainsteamand
reheatsteamtemperature
byusingsprayifrequired.

ChangeDeaeratorpegging
steamfromCRHto

EnsureDeaeratorpressure

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensurehealthinessoffire
ballscanners.

17/26

7/15/2015

TechnicalServices

Extractionsteam.

CutinIIIrdmillandcutin
autocontrollers.
StartsecondP.A.fan.

controllerremainsonauto.

BeforestartingP.A.fan
ensurethatairandgas
dampersofPAPHare
open.

Load:320MW
MS:125kg/cm2/4500C
09

300'
HRH:30kg/cm2/4300C

CutinIVthmillandcutin
autocontrollers.

Mainsteamflow:1080t/hr.

Cutoffoilsupport
completely.

Ensurehealthinessoffire
ballscanners.

CutinVthcoalmillandcut
inautocontrollers.

StartsecondTDBFPand
switchoffmotordrivenBFP.

CutinVIthcoalmillandcut
inautocontrollers.

Checkallparametersatfull
loadandensurethemwithin
limits.

IncreasethesetpointofSH
&RHspraycontrollerssuch
thatratedparametersare
achieved.

Load:500MW
MS:170kg/cm2/4800C
10

340'
HRH:40.5kg/cm2/4800C
Mainsteamflow:1620t/hr.

Load:500MW
MS:170kg/cm2/5350C

11

420'
HRH:40.5kg/cm2/5350C
Mainsteamflow:1570t/hr.

INTEGRATEDSTARTUPPROCEDURE
HOTSTARTUP(AFTER8HOURSSHUTDOWN)

STEP

TIMEIN
MINUTES.

UNITCONDITION

OPERATION

MotoroperatedBFPisrun
TwoCCpumpsinoperation asandwhenrequiredto
andscannerfanin
maintainthedrumlevel.If
operation.
necessaryBFPshouldbe
keptrunningcontinuously.

BothSAPHsandPAPHsin
operation.

NOTES.

Turbineonbarringgear
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

18/26

7/15/2015

TechnicalServices

Controlfluidpumpin
operation.Onecirculating
pumpinoperationwithone
earthfilterandultrafine
filterincircuit.

Generatorgassystem,
sealoilsystemand
primarywatersystemin
operation.

Bearingcoolingwater
systeminoperation.

Condensercirculating
watersysteminoperation.

Serviceairandinstrument
aircompressorsin
operation.

Onecondensatepumpin
operationandhotwell
makeupinservice.

Aux.steamheader
chargedfromexistingunits
(16ata2600C).

LSHSpumpinoperationon
longrecirculationupto
boilerfrontwithheaters
controlseton

HPbypasssystemreadyin
allrespects.

LP&HPandchemical
dosingsystemready.

ESPpanelsreadyinall
respects.

EASTpanelsreadyinall
respects.

Furnacebottomash
systemandsealtrough
linedup.

Vacuumpumpslinedup
andreadyforoperation.

Glandsteamandleak
steamcontrollersarelined
upandreadyfor
operation.

Generatorprotectionpanel
andexciterpanelsreadyin
allrespects.

FSSSpanelreadyinall
respects.

BoilerdrumPr.75kg/cm2
SH.Temp.between4150C
and4300C.

Startoneglandsteam
exhauster.

Startonebyonevacuum
pumps.

withAOP,JOPandsealoil
pumpsinoperation.

Lineupmainsteam,CRH
andHRHsteamlinesfor
chargingbyopening
respectivelinedrains.

Admitglandsteamwhen
vacuumreaches0.2

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

EnsureMSVisclosed.

Ensureglandsteam
admissiontemperatureis
19/26

7/15/2015

TechnicalServices

kg/cm2.

alwaysabove2000C.

Vacuumbuildingcanbe
donethroughSGCvacuum
onstartingprogramme
mode.Glandsteam
exhausterhastobestarted
manually.

Openalldrainsconnectedto Ensurecondenservacuum
flashtanksandflashboxes
of0.8kg/cm2.
connectedtocondenser.

Ensurecondenservacuum
of0.8kg/cm2.

OpenHPBPwarmingup
valves.

SwitchAutomaticcontrol
interfaceofLPbypass.

Assoonasthefixedset
pointreaches12kg/cm2,
itseizes.
Automaticcontrolinterface
getsswitchedoffwhenthe
hotreheatsteampressure
reaches13kg/cm2(i.e.)
aftersynchronisation.

StartbothID&FDfans

Initiateboilerpurge.

Chargeheatingsteamline
toDeaeratorfromAux.
PRDS.

01

oo

Boilerreadyforlightup
andturbineonturning
gear.

StartthirdCCpump.

Start4burnersinAB
elevationwithLSHS.

Ensuredifferentialtemp.is
withinpermissiblelimits.
Ensurerunningofmotor
drivenBFPcontinuouslyfor
maintainingdrumlevel.

Ensureatomisingsteam
pressureofabout
6kg/cm2.

DrumPr.75kg/cm2
SH.Temp.4150Cand
4300C.

EnsuremotoroperatedBFP
isinservice.

OpendrainsbeforeMSV.

OpenMSVbypasslines.

OpenMainsteamstop
valves.

OpenHPbypassandclose
theHPBPwarmupvalves.

PutHPbypasscontrollers
onautoandvarytheset
pointaccordingtothe
gradientofpipeline
temperatures.

PutHPbypassspraycontrol
onauto.

Takeadditionalguns
accordingtothe
requirement.

StartbothP.A.fansand
sealairfans.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

EnsureMS,CRH,HRHlines
gotwarmedup.

Airheatersootblowingto
becarriedout.
BeforestartingP.A.Fans
ensurethatairandgas
dampersofPrimaryair
20/26

7/15/2015

TechnicalServices

preheatersareopen.

Lineupmillingsystemfor
starting.

AROLLINGTHROUGHHYDRAULICGOVERNOR
MS:85kg/cm2/4850C
02

40'

HRH:12kg/cm2/4400C

Cutinfirstcoalmill&cutin MakereadySHandRH
autocontrollers.
spraysystem.

Bypasssteamflow:
280t/hr.

EnsureAshhandling
systemisready.

ChargeESPfields.

Increasethewindboxto
furnacediff.Pressureto
100mmW.C.byadjusting
S.A.D.C.

Cutinsecondmillandcutin
autocontrollers.

PegthedeaeratorfromCRH
graduallyupto2kg/cm2.

OpenHPESVsandIPESVs
Checkandensurethat
forwarmingupby
speedsetpointiszeroand
operatingstartingdeviceto
speedergearisat0%.
approximately42%.

EnsureTSEinfluenceis
switchedonandavailable
marginsaregreaterthan
300K.

MSPressure:85kg/cm2
MSTemperature:5000C
HRHPressure:12kg/cm2
03

50'

HRHTemperature:4500C.

IftheoilofEHCisisolated
Raisethespeedsetpointof atspeedGov.rack,speed
EHCto3200rpm.
setpointneednotbe
raised.

Bypasssteamflow:
360t/hr.
TurbineReadyforrolling

04

Ensureclosureofgate
valvegearingat240rpm.

Monitoringbearing
vibrations,shaft
vibrations,TSEmargins,
bearingtemp&
Turbovisoryreadingsat
360rpm.

Raisespeedupto2400rpm
Turbinerunningat360rpm. throughstartingdeviceat
therateof600rpm.

52'

Graduallyraisethestarting
Startingdeviceposition
devicetobringthespeedto
approximately56%.
360rpm

Raisefurtherspeedupto
300rpmthroughspeeder
gear.

EnsuretrippingofJOPat
540rpm.
Startingdevicewillbeat
90%.
Monitorbearingtempand
vibrations,shaft

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

21/26

7/15/2015

TechnicalServices

vibrations,TSEmargins
andturbovisoryreadings.
SealoilPrimarywaterand
gastemperaturesand
Generatorwinding
temperature.

EnsuretrippingofAOPat
2950rpm.

Speedergearpositionwill
beapproximatelyat50to
60%.

05

56'

Turbinerunningat
3000rpm

PutAVRonauto.

Closefieldbreaker.

Setmanuallythegenerator
voltagetogridvoltage.

SynchronisetheGenerator
withgrid.Pickup50MW
loadbyoperatingspeeder
gear.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalves&spray
valves.

Closeotherdrains,M.S.
CRH,HRH,keepingSLC
drainson.

DrainpotdrainsofMS,
CRH,andHRHand
extractionsteamlineswill
operateasperthe
actuationoflevelswitches.

Furtherloadraisingwillbe
donebyoperatingthe
speedergearaccordingto
thestartupcurve.

BROLLINGTHROUGHEHC
MSPressure:85kg/cm2
MSTemperature:4850C
02

40'

HRHPressure:12kg/cm2

Cutinfirstcoalmill&cutin MakereadySH&RHspray
autocontrollers.
systems.

HRHTemperature:4400C.
Bypasssteamflow:
280t/hr.

EnsureAshhandling
systemisready.

ChargeESPfields.

Increasethewindboxto
furnacediff.Pressureto
100mmW.C.byadjusting
S.A.D.C.

Cutinsecondmillandcutin
autocontrollers.

PegthedeareatorfromCRH
graduallyupto2kg/cm2.

OpenHPESVsandIPESVs
Checkandensurethat
forwarmingupby
speedsetpointiszeroand
operatingstartingdeviceto
speedergearisat0%.
approximately42%.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

EnsureTSEinfluenceis
switchedonandavailable
marginsaregreaterthan
22/26

7/15/2015

TechnicalServices

300K.
MSPressure:85kg/cm2
MSTemperature:5000C
03

50'

HRHPressure:12kg/cm2
HRHTemperature:4500C.

Raisethestartingdeviceto
about70%.

Checkandensureopening
ofvalvesinHP/IP
secondaryfluidlinesto
EHCatspeedcontrolrack.

TurbineReadyfor
rolling.Bypasssteam
flow:360t/hr.

Iftrackingdeviceis
Raisethespeedsetpointto
switchedonstartingdevice
360rpmandwatchthe
positionwillautomatically
actualspeed.
tracktheEHCposition.

Raisethespeedergearto
100%.

Ensureclosureofgate
valvegearingat240rpm.

Holdthespeedat360rpm
forabout5minutes.

Monitorbearingvibrations,
bearingtemperatures,
shaftvibrations,TSE
marginsandturbovisory
readings.

04

52'

Turbinereadingat360
rpm.

Raisethespeedsetpointto EnsuretrippingofJacking
300rpm.
oilpumpat540rpm.

Therateofacceleration
willbe600to800rpm2.

Monitorbearingvibrations
andtemperatures,shaft
vibration,turbovisory
readingsandTSEmargins.

Monitorandcontrol,seal
oiltemperatures,primary
watertemperature.
Hydrogengastemperature
andwindingtemperature.

EnsuretrippingofAOPat
2950rpm.

05

56'

PutAVRonautoClosefield
breaker.

SetManuallygenerator
voltagetogridvoltage.

Turbinespeed:3000rpm.

Speedsetpointwillbe
raisedautomaticallyby
about8rpmandloadwill
bepickedupto20MW.

Synchronisethegenerator
withgrid.

Synchronisethegenerator
withgrid.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalvesandspray
valves.

CloseotherdrainsofMS.
CRHandHRH,keepingSLC
drainsON.

DrainpotdrainsofMS,
CRH,HRHandextraction
steamlineswilloperateas
pertheactuationoflevel
switches.

CROLLINGTHROUGHSGCTURBINE.
MS:85kg/cm2/4850C
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

23/26

7/15/2015

TechnicalServices

02

40'

HRH:12kg/cm2.

Cutinfirstcoalmill&cutin MakereadySH&RHspray
autocontrollers.
systems.

Bypasssteamflow:
280t/hr.

EnsureAshhandling
systemisready.

ChargeESPfields.

Increasethewindboxto
furnacediff.Pressureto
100mmW.C.byadjusting
S.A.D.C.

Cutinsecondmillandcutin
autocontrollers.

PegthedeaeratorfromCRH
graduallyupto2kg/cm2.

Switchonthestartup
EnsureTSEinfluenceis
programmeofSGCTurbine. switchedON.

Iftheprogramme
interrupts,theparticular
stepandcriteriatobe
checkedandcorrectedfor
theprogrammetoproceed
further.

Alloperationsasexplained
underEHCrollingwillbe
carriedoutbySGCTurbine
programmesequentially.

Turbinereadyforrolling.
MS:85kg/cm2/5000C
03

50'

HRH:12kg/cm2/4500C

Turbinespeedwillberaised
Ensureclosureofgate
to360rpmthroughSGC
valvegearingat240rpm.
programme.

Bypasssteamflow:
360t/hr.

04

52'

Turbinereadingat360
rpm.

Monitorbearingvibration,
bearingtemperature,shaft
vibration,TSEmarginsand
Turbovisoryreadings.

Toachievetheprogramme
asperthestartupcurve,
themainsteam
temperatureshouldbe
maintainedsteadilytill
loadingof50MW.

Turbinespeedwillberaised
EnsuretrippingofJOPat
upto3000rpmthrough
540rpm.
SGCprogramme.

EnsuretrippingofAOPat
2950rpm.

Monitorbearing
temperatureand
vibrations,shaft
vibrations,TSEmargins,
Turbovisoryreadings,seal
oil,primarywater,
Hydrogengasand
Generatorwinding
temperatures.

Turbinespeed:3000rpm.
MS:85kg/cm2/5000C

SGCProgrammewillswitch

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

24/26

7/15/2015

TechnicalServices

05

56'

HRH:12kg/cm2/4500C
Bypasssteamflow:
360t/hr.

ONfieldbreaker,putAVR
onautosynchroniseand
pickuploadupto20MW.

EnsureSGCstartup
programmeiscompleted.

Raisethespeedsetpoint
andpickuploadupto50
MW.

IncreaseHPBPsetpoint.

EnsureclosureofHPBP
steamvalves&spray
valves.

CloseotherdrainsofM.S,
CRHandHRH,keepingSLC
drainsON.

DrainpotdrainsofMS,
CRH,HRHandExtraction
steamlineswilloperateas
pertheactuationoflevel
switches.

CutinL.P.heaters2and3.

Ensureswitchingonof
loadcontrollerat60MW.

LOAD:60MW.
06

60'

MS:85kg/cm2/5000C
HRH:16kg/cm2/4700C

Cutoutheatingsteamfrom
Aux.PRDStoDeaerator.

Raisethegenerator
pressurefrom2kg/cm2to
4kg/cm2.

Cutinautocontroller.

Startwithdrawingoil
supportgradually.

Raisethepressureset
pointofDeaerator
pressurecontroller.

Ensurehealthinessoffire
ballscanners.

LOAD:150MW.
MS:100kg/cm2/5000C
07

65'

ChargeAux.PRDSstation
fromCRH.Cutinsprayand
maintainatemperatureof
0
Mainsteamflow:1620t/hr. 250 C.
HRH:20kg/cm2/4800C

Trimmingdeviceisin
OFF.

CutinH.P.heatersandput
thelevelcontrolsonauto.

StartfirstTDBFPand
secondCEParoundaloadof
170MW.

Controlmainsteamand
reheatsteamtemperature
byusingsprayifrequired.

Changedeaeratorpegging
steamfromCRHto
Extractionsteam.

EnsureDeaeatorpressure
controllerremainsonauto.

CutinIIIrdmillandcutin
autocontrollers.

CutinIVthmillandcutin
autocontrollers.

LOAD:230MW.
MS:120kg/cm2/5000C
08

70'
HRH:20kg/cm2/4950C
Mainsteamflow:820t/hr.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

25/26

7/15/2015

TechnicalServices

Cutoffoilsupport
completely.

Ensurehealthinessoffire
ballscanners.

CutinVthcoalmillandcut
inautocontrollers.

StartsecondTDBFPand
switchoffmotordrivenBFP.

CutinVIthcoalmillandcut
inautocontrollers.

Checkallparametersatfull
loadandensurethemwithin
limits.

IncreasethesetpointofSH
&RHspraycontrollerssuch
thatratedparametersare
achieved.

LOAD:500MW.
MS:170kg/cm2/5000C
09

86'
HRH:40.5kg/cm2/5000C
Mainsteamflow:1620t/hr.

LOAD:500MW.
MS:170kg/cm2/5000C

10

135'

HRH:40.5kg/cm2/4800C
Mainsteamflow:1570
t/hr.

********************

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm