1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2011 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2011 (HARIAN)
PERAK
NO.

CATEGORY OF WORKERS / KATEGORI PEKERJA

Maximum

Minimum

RM

RM

SELANGOR

Common
July 11
RM

Common
Jan 11
RM

Maximum

Minimum

RM

RM

KUALA LUMPUR

Common
July 11
RM

Common
Jan 11
RM

Maximum

Minimum

RM

RM

Common
July 11
RM

Common
Jan 11
RM

General construction worker - building (helper)

1.1.1

General constr. worker Building, Local (helper)

70.00

47.00

60.25

60.83

60.00

45.00

53.50

54.00

65.00

45.00

55.10

56.10

1.1.2

General constr. worker Building,Foreign (helper)

55.00

35.00

45.00

54.75

52.00

30.00

40.30

42.00

50.00

30.00

41.00

42.30

Concretor

2.1.1

Concretor, Skilled, Local

156.00

73.00

112.00

102.50

120.00

60.00

90.00

92.00

120.00

40.00

87.00

92.00

2.1.2

Concretor, Skilled, Foreign

93.50

52.00

74.67

75.67

80.00

50.00

64.70

66.70

80.00

38.00

60.80

62.80

2.2.1

Concretor, Semi-skilled,Local

93.00

52.00

73.83

67.17

90.00

40.00

63.50

68.00

90.00

40.00

61.80

64.80

2.2.2

Concretor, Semi-skilled, Foreign

65.50

41.50

50.25

52.08

70.00

40.00

51.70

54.70

60.00

33.00

48.60

51.10

Bricklayer

3.1.1

Bricklayer, Skilled, Local

114.50

73.00

88.50

88.50

130.00

60.00

92.00

93.00

120.00

60.00

87.00

88.50

3.1.2

Bricklayer,Skilled, Foreign

93.50

57.00

74.92

77.58

85.00

55.00

67.00

68.00

80.00

40.00

64.00

65.00

3.2.1

Bricklayer,Semi-skilled, Local

94.00

52.00

69.33

70.25

95.00

50.00

69.50

73.50

90.00

48.00

63.30

63.80

3.2.2

Bricklayer, Semi-skilled, Foreign

70.50

41.50

54.83

55.58

70.00

45.00

53.10

56.00

60.00

33.00

48.80

52.30

Plasterer

4.1.1

Plasterer, Skilled, Local

109.00

83.00

94.42

94.42

150.00

70.00

102.50

104.00

180.00

70.00

103.50

106.50

4.1.2

Plasterer, Skilled, Foreign

99.00

70.00

83.00

84.83

90.00

60.00

74.30

73.00

80.00

60.00

69.00

69.50

4.2.1

Plasterer, Semi-skilled, Local

98.00

65.00

76.75

73.17

100.00

55.00

72.00

70.00

120.00

50.00

73.00

76.50

4.2.2

Plasterer, Semi-skilled,Foreign

77.00

52.00

63.67

64.67

70.00

45.00

55.50

57.00

60.00

45.00

52.00

54.50

Tiler

5.1.1

Tiler, Skilled, Local

99.00

78.00

89.33

89.33

155.00

70.00

117.50

118.00

150.00

74.00

110.00

120.00

5.1.2

Tiler, Skilled, Foreign

82.00

67.50

73.50

74.17

105.00

55.00

78.00

69.00

100.00

45.00

66.00

69.50

5.2.1

Tiler, Semi-skilled, Local

85.00

63.00

71.83

69.92

105.00

50.00

75.00

79.00

130.00

50.00

76.30

78.50

5.2.2

Tiler, Semi-Skilled, Foreign

67.50

45.00

55.92

58.08

90.00

45.00

61.20

53.00

65.00

40.00

49.30

53.00

Barbender

6.1.1

Barbender, Skilled,Local

114.50

73.00

89.25

88.50

125.00

70.00

91.50

94.00

150.00

70.00

97.00

99.00

6.1.2

Barbender,Skilled, Foreign

82.00

52.00

69.58

70.75

85.00

50.00

66.00

67.00

80.00

50.00

63.50

65.50

6.2.1

Barbender,Semi-skilled, Local

87.50

52.00

70.92

70.75

90.00

40.00

66.00

69.00

90.00

50.00

64.50

66.50

6.2.2

Barbender, Semi-skilled, Foreign

65.50

36.00

53.83

53.92

65.00

40.00

51.50

53.50

65.00

38.00

49.80

53.30

Carpenter-Formwork

7.1.1

Carpenter-Formwork, Skiiled, Local

156.00

83.00

105.00

95.00

140.00

80.00

102.50

107.00

150.00

70.00

98.50

102.00

7.1.2

Carpenter-Formwork,Skilled, Foreign

93.50

57.00

77.08

71.17

85.00

50.00

68.60

69.10

80.00

45.00

63.00

65.50

7.2.1

Carpenter-Formwork, Semi-skilled, Local

93.00

55.00

76.00

74.17

95.00

55.00

72.50

75.50

90.00

50.00

63.00

65.00

7.2.2

Carpenter-Formwork, Semi-skilled,Foreign

70.50

41.50

56.92

55.58

70.00

40.00

52.50

55.00

60.00

35.00

48.00

51.50

2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2011 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2011 (HARIAN)
PERAK
NO.

CATEGORY OF WORKERS / KATEGORI PEKERJA

Maximum

Minimum

RM

RM

SELANGOR

Common
July 11
RM

Common
Jan 11
RM

Maximum

Minimum

RM

RM

KUALA LUMPUR

Common
July 11
RM

Common
Jan 11
RM

Maximum

Minimum

RM

RM

Common
July 11
RM

Common
Jan 11
RM

Carpenter-Joinery

8.1.1

Carpenter-Joinery, Skilled, Local

160.00

95.00

110.00

100.00

150.00

80.00

116.00

116.00

150.00

70.00

110.00

109.50

8.1.2

Carpenter-Joinery, Skilled,Foreign

152.00

70.00

81.00

71.67

90.00

55.00

70.10

72.60

120.00

50.00

68.50

71.50

8.2.1

Carpenter-Joinery,Semi-skilled, Local

155.00

70.00

82.00

72.50

100.00

55.00

74.50

78.00

85.00

50.00

65.60

69.50

8.2.2

Carpenter-Joinery, Semi-Skilled, Foreign

125.00

50.00

67.00

57.50

70.00

40.00

53.30

56.00

60.00

40.00

50.00

54.00

Roofer

9.1.1

Roofer, Skilled, Local

104.00

73.00

89.58

90.17

135.00

70.00

94.00

100.50

135.00

70.00

99.50

100.50

9.1.2

Roofer,Skilled, Foreign

87.50

62.50

77.67

77.67

85.00

50.00

69.00

70.00

100.00

48.00

68.80

70.80

9.2.1

Roofer,Semi-skiiled, Local

86.00

62.50

74.58

70.58

90.00

50.00

68.10

71.10

80.00

50.00

67.50

68.50

9.2.2

Roofer, Skilled, Foreign

77.00

52.00

62.92

62.92

65.00

45.00

51.60

53.50

70.00

38.00

50.00

54.30

10

Steel Structure Fabricator

10.1.1 Steel Structure Fabricator, Skilled, Local

114.00

80.00

100.00

93.17

150.00

60.00

110.00

111.50

180.00

70.00

127.30

116.80

10.1.2 Steel Structure Fabricator, Skilled, Foreign

92.50

62.50

81.08

77.33

100.00

40.00

77.00

80.00

110.00

60.00

82.50

82.00

10.2.1 Steel Structure Fabricator, Semi-Skilled, Local

92.50

62.50

81.08

77.33

100.00

40.00

72.50

76.50

120.00

50.00

78.00

79.50

10.2.2 Steel Structure Fabricator, Semi-skilled, Foreign

77.00

41.50

63.83

61.17

75.00

30.00

54.50

59.50

75.00

45.00

54.50

58.50

11.1.1 General Welder, Skilled, Local

83.00

62.50

74.17

74.17

165.00

85.00

123.50

117.00

150.00

70.00

114.60

117.10

11.1.2 General Welder, Skilled, Foreign

77.00

57.00

68.17

68.17

130.00

60.00

86.50

77.00

100.00

50.00

74.00

77.50

11.2.1 General Welder, Semi-skilled, Local

70.50

52.00

61.67

61.67

110.00

60.00

79.50

78.00

120.00

40.00

69.00

78.00

11.2.2 General Welder, Semi-skilled, Foreign

60.50

47.00

53.08

53.08

85.00

45.00

59.80

58.00

75.00

38.00

51.80

58.50

11

12

General Welder

Plumber-Building & Sanitary

12.1.1 Plumber-Building & Sanitary, Skilled, Local

93.50

73.00

81.17

81.17

130.00

70.00

96.50

98.00

150.00

70.00

108.00

98.00

12.1.2 Plumber-Building & Sanitary, Skilled, Foreign

73.00

52.00

60.00

60.00

100.00

40.00

70.50

72.00

100.00

48.00

70.30

72.80

12.2.1 Plumber-Building & Sanitary, Semi-skilled, Local

77.00

52.00

67.33

67.33

90.00

40.00

72.00

75.00

120.00

50.00

74.50

75.00

12.2.2 Plumber-Building & Sanitary, Semi-skilled, Foreign

55.00

41.50

47.75

47.75

65.00

30.00

49.50

53.50

75.00

38.00

50.80

54.30

13.1.1 Plumber-Reticulation, Skilled, Local

93.50

73.00

81.17

81.17

130.00

70.00

97.00

98.00

130.00

70.00

103.00

103.00

13.1.2 Plumber-Reticulation, Skilled, Foreign

67.50

52.00

59.08

59.08

100.00

40.00

67.50

70.50

100.00

48.00

74.80

76.30

13.2.1 Plumber-Reticulation, Semi-skilled, Local

77.00

62.50

69.08

69.08

90.00

40.00

70.50

68.00

100.00

50.00

67.00

68.00

13.2.2 plumber-reticulation, semi-skilled, foreign

55.00

41.50

47.75

47.75

80.00

30.00

51.50

55.00

80.00

35.00

51.00

55.00

14.1.1 Building Wiring Installer, Semi-skilled, Local

73.00

57.00

64.25

64.25

120.00

60.00

87.50

90.50

150.00

60.00

83.50

86.50

14.2.1 Building Wiring Installer, Semi-skilled, Foreign

65.50

41.50

53.00

53.00

100.00

50.00

66.20

62.00

75.00

50.00

59.50

62.00

13

14

Plumber-Reticulation

Building Wiring Installer

2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2011 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2011 (HARIAN)
PERAK
NO.

CATEGORY OF WORKERS / KATEGORI PEKERJA

SELANGOR

Common
July 11
RM

4200.00

1960.00

2985.40

2816.40

1906.00

2600.00

1500.00

2057.00

1872.00

3539.00

3540.00

4500.00

1800.00

3063.50

3272.00

2547.00

2550.00

3500.00

1300.00

2333.00

2410.00

70.00

94.50

95.50

155.00

70.00

108.30

100.00

50.00

68.50

70.50

110.00

50.00

77.50

79.50

90.00

50.00

68.00

72.00

120.00

50.00

76.50

72.00

56.67

80.00

45.00

54.20

57.50

90.00

40.00

57.50

61.50

1800.00

2893.00

2600.00

1300.00

1896.00

2758.17

2749.50

4600.00

2400.00

2385.00

1885.00

3500.00

1300.00

90.00

105.00

95.00

125.00

70.00

85.00

75.00

90.00

100.00

60.00

79.17

73.33

85.00

50.00

65.83

1924.00

1352.00

1681.33

16.1.1 Electrical Wireman PW4, Skilled, Local

2977.00

2431.00

16.2.1 Elactrical Wireman PW4, Skilled, Foreign

2834.00

2158.00

17.1.1 Scaffolder - Prefabricated, Skilled, Local

160.00

17.1.2 Scaffolder - Prefabricated, Skilled, Foreign

130.00

17.2.1 Scaffolder - Prefabricated, Semi-skilled, Local


17.2.2 Scaffolder - Prefabricated,Semi-skilled, Foreign
18

2895.00

4200.00

1742.00

2002.00

17

RM

1681.42

2132.00

15.2.1 Electrical Wireman PW2, Skilled, Foreign

Common
Jan 11
RM

RM

1928.42

15.1.1 Electrical Wireman PW2, Skilled, Local

Common
July 11
RM

Minimum

RM

RM

Common
Jan 11
RM

Maximum

RM

RM

16

KUALA LUMPUR

Common
July 11
RM

Minimum

Minimum

15

Common
Jan 11
RM

Maximum

Maximum

Electrical Wireman PW2 (Monthly Salary)

Electrical Wireman PW4 (Monthly Salary)

Scaffolder - Prefabricated

Scaffolder - Tubular

18.1.1 Scaffolder - Tubular, Skilled, Local

100.00

65.00

81.67

87.50

120.00

70.00

93.00

94.50

140.00

65.00

95.50

95.00

18.1.2 Scaffolder - Tubular, Skilled, Foreign

85.00

55.00

68.33

68.33

90.00

55.00

69.00

72.50

100.00

55.00

75.50

73.00

18.2.1 Scaffolder - Tubular, Semi-skilled, Local

90.00

45.00

66.67

68.33

90.00

50.00

71.00

73.50

80.00

45.00

63.00

67.00

18.2.2 Scaffolder - Tubular, Semi-skilled, Foreign

80.00

40.00

55.00

55.00

80.00

35.00

52.50

56.00

70.00

35.00

50.50

52.50

19.1.1 Painter - Building, Skilled, Local

87.00

67.50

76.92

74.92

120.00

65.00

90.50

92.50

120.00

60.00

90.50

93.00

19.1.2 Painter - Building, Skilled, Foreign

75.00

57.00

65.08

65.08

85.00

50.00

67.00

68.50

80.00

45.00

67.00

67.50

19.2.1 Painter - Building, Semi-skilled, Local

67.00

50.00

57.08

59.17

90.00

45.00

66.80

68.50

100.00

50.00

62.50

67.50

19.2.2 Painter - Building, Semi- skilled, Foreign

60.00

47.00

54.00

54.00

70.00

40.00

53.20

54.50

70.00

35.00

49.00

52.00

20.1.1 General Construction Worker - Civil, Local

75.50

50.00

62.50

60.92

70.00

45.00

57.50

59.00

75.00

40.00

56.80

57.60

20.1.2 General Construction Worker - Civil, Foreign

60.00

35.00

46.67

50.75

65.00

30.00

44.50

45.50

55.00

32.00

44.50

46.00

19

20

Painter - Building

General Construction Worker - Civil (Helper)