NFPA-110 Chapter 8: Routine and Operational Testing Checklist


Page 1
Equipment Description

Project
Company / Owner
Address:
Contact:
Phone:

Chapter 8.1.1 General


The routine maintenance and operation testing program shall be based on all of the following:
Manufacturer's recommendations, Instruction Manuals, Minimum Requirements of NFPA-110 Chapter 8, and AHJ
8.2.1. Are there two sets of instruction manuals
for all the major components of the EPSS

NO
YES

8.2.2. Are there two sets of manuals on all Level 1


equipment? One at equipment and one stored elsewhere?

NO
YES

8.2.3. Are special tools required for routine maintenance


available onsite and available for use when needed?

NO
YES

8.2.4. Are manufacturer's recommended spare


parts inventoried in a secure location on site?

NO
YES

8.3.1.-2. Has the EPSS been maintained to ensure to a


reasonable degree that the system is reliable?

NO
YES

8.3.3. Has a written schedule for routine maintenance


and operational testing of the EPSS been established?

NO
YES

8.3.4. Is a permanent record of the EPSS inspections,


tests, exercising, operation, and repairs available?

NO
YES

8.3.5. Has a written schedule for routine maintenance


and operational testing of the transfer switch evident?

NO
YES

8.3.6. Has a written schedule for routine maintenance


and operational testing of the paralleling gear evident?

NO
YES

8.3.7.* Is a permanent record of weekly inspections and


maintenance of the storage batteries available?

NO
YES

8.3.8. Is a permanent record of annual inspections


of the fuel quality by ASTM standards available?

NO
YES

(Only if applicable)

Prime Power Services


8225 Troon Circle
Austell, Georgia 30168
855-436-7774 Emergency
770-381-2424 Office
770-381-2438 Fax

NFPA-110 Chapter 8: Routine and Operational Testing Checklist


Page 2

8.4.1. Is a permanent record available that the


EPSS has been inspected weekly?

NO
YES

8.4.2. Is a permanent record available that the


EPSS has been exercised under 30% load monthly?

NO
YES

8.4.2.3 Systems that do not meet 30% monthly must be


annually load banked 50% for 30min & 75% for 60Min

NO
YES

8.4.4 Does permanent record also include


"cold start" testing?

NO
YES

8.4.6. Is a permanent record available that the


transfer switch(s) are operated monthly?

NO
YES

8.4.7. Is a permanent record available that the


low voltage circuit breakers are exercised annually?
(circuit breakers above 600V are exercised every 2 years)?

NO
YES

8.4.9. Is a permanent record available that the EPSS


every three years has run with 30% connected load for 4 hours?

NO
YES

Additional Notes or Comments

Name of person completing report?

Print:
Signature
Firm:
email: