Вы находитесь на странице: 1из 156

Registration Department Tamil Nadu RFP for SI Selection Volume I

Tender Reference No. 001/Regn/2013

Tender For Selection of System Integrator (SI) to


Design, Develop, Test, Install, Operate, Maintain & Manage
Registration Application

Tender For Selection Of


VOLUME
System Integrator (Si)
To I
Design, Develop, Test, Install,
Operate, Maintain & Manage
Registration Application
Registration Department
GoTN

Volume II

Registration Department - GoTN


March 2013
Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai - 600028

Registration Department Tamil Nadu RFP for SI Selection Volume I

Table of Contents

1.

Invitation to Bidders / Important dates .............................................................................. 5

2.

Pre-Qualification Requirements ......................................................................................... 8

3.

Project Profile................................................................................................................ 13

4.

Overview of Registration Department ............................................................................... 16


i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.

Overview of Property Registration in Tamil Nadu State ........................................................... 16


Key Stakeholders .............................................................................................................. 16
Current Organization Structure ........................................................................................... 18
Overview of Human Resources of the Department ................................................................. 19
Roles and Responsibilities of DR and SR ............................................................................... 20
Functional Structure and their responsibilities........................................................................ 21
Citizen Impact of the Department ........................................................................................ 22
Revenue generated by the department ................................................................................ 23
Services offered by the department ..................................................................................... 23

5.

Envisaged Registration Application Architecture ................................................................. 25

6.

Scope of Work Phase I ................................................................................................ 32


x.
xi.
xii.
xiii.
xiv.
xv.
xvi.
xvii.
xviii.
xix.
xx.
xxi.
xxii.
xxiii.
xxiv.
xxv.
xxvi.
xxvii.
xxviii.
xxix.

7.

Project Deliverables........................................................................................................... 33
Design, Development, Testing & Acceptance of Registration Application Software ...................... 34
Application Implementation, Testing & Acceptance ................................................................ 35
Data Migration.................................................................................................................. 37
Site Preparation ................................................................................................................ 38
Staggered Hardware Supply, Installation & Commissioning ..................................................... 39
Centralized Help Desk........................................................................................................ 42
Connectivity ..................................................................................................................... 46
Primary Data Centre, Disaster Recovery Setup ...................................................................... 48
Change management & Capacity Building ............................................................................. 54
Security & Performance Audit ............................................................................................. 57
Pilot Implementation ......................................................................................................... 57
State-wide Roll-Out ........................................................................................................... 57
Stabilization Period............................................................................................................ 58
Go-Live ........................................................................................................................... 58
Buy-back ......................................................................................................................... 58
Scalability, software upgrades............................................................................................. 58
High availability of application services ................................................................................. 59
Integration with Mobile Service gateway .............................................................................. 59
Interoperability requirements.............................................................................................. 59

Scope of Work - Phase II ................................................................................................ 60


xxx. Registration Application Operate, Maintain & Manage ............................................................. 61
xxxi. Facility Management Services (FMS) .................................................................................... 61
xxxii. Operation & Maintenance ................................................................................................... 62
xxxiii. SDC, DRC and Near-line DRC management & maintenance ..................................................... 63
xxxiv. Manpower Outsourcing ...................................................................................................... 63
xxxv. Power backup management Maintenance of DG sets ........................................................... 65
xxxvi. Periodic Security and Performance Testing & conformance...................................................... 65
xxxvii. SLA monitoring ................................................................................................................. 65
xxxviii. O&M Phase Extension and Knowledge Transfer ..................................................................... 66

8.

Responsibility Matrix for Different Stakeholders ................................................................. 67

9.

Implementation Schedule ............................................................................................... 70

10.

Resource Requirement ................................................................................................... 71

11.

Service Level Agreement ................................................................................................ 73


xxxix. Operations SLA Criteria Pilot Offices (valid upto completion of roll-out): ................................. 76
xl.
Operations SLA Criteria Post State-wide application Roll-Out ................................................. 77

12.

Instruction to Bidders ..................................................................................................... 83


xli.
xlii.

Advice to the bidders ......................................................................................................... 83


Sale of bid document......................................................................................................... 83

Registration Department Tamil Nadu RFP for SI Selection Volume I


xliii.
xliv.
xlv.
xlvi.
xlvii.
xlviii.
xlix.
l.
li.
lii.
liii.
liv.
lv.
lvi.
lvii.
lviii.
lix.
lx.
lxi.
lxii.
lxiii.
lxiv.
lxv.
lxvi.
lxvii.
lxviii.
lxix.
lxx.
lxxi.
lxxii.

13.

Schedule of Tender Process................................................................................................ 83


83
Procedure for Submission of Bids ........................................................................................ 84
Cost to Bid ....................................................................................................................... 87
Earnest money refund ....................................................................................................... 87
Clarification on Tender Document ........................................................................................ 87
Language of Bids .............................................................................................................. 87
Documents Comprising the Bids .......................................................................................... 87
Bid Prices ........................................................................................................................ 88
Firm Prices ....................................................................................................................... 88
Bidder Qualification ........................................................................................................... 89
Period of Validity of Bids .................................................................................................... 89
Local / Site Conditions ....................................................................................................... 89
Modification and Withdrawal of Bids .................................................................................... 90
Opening of Pre qualification Bids ......................................................................................... 90
Opening of Technical Bids .................................................................................................. 90
Evaluation of Bids ............................................................................................................. 90
Negotiations with the successful Bidder .............................................................................. 101
Post Qualification and Award Criteria ................................................................................. 101
Right to Vary Scope of Contract at the time of Award ........................................................... 102
Right to Accept Any Bid and to Reject Any or All Bids ........................................................... 102
Notification of Award - Letter of Acceptance ....................................................................... 102
Forfeiture of Earnest Money Deposit .................................................................................. 102
Signing of Contract ......................................................................................................... 102
Release of Work Order..................................................................................................... 103
Bank Guarantee for Contract Performance .......................................................................... 103
Contract Period............................................................................................................... 103
Rejection Criteria ............................................................................................................ 103
Concessions permissible under statutes .............................................................................. 104
Income tax liability .......................................................................................................... 104

Model Master Service Level Agreement ..........................................................................105


lxxiii. Definitions: .................................................................................................................... 105
lxxiv. Interpretation ................................................................................................................. 106
lxxv. Conditions Precedent ....................................................................................................... 107
lxxvi. Representations & Warranties ........................................................................................... 107
lxxvii. Execution of Work Order .................................................................................................. 109
lxxviii. Assigning of Tender Whole or In Part................................................................................. 109
lxxix. Scope of work/contract .................................................................................................... 109
lxxx. General Requirement....................................................................................................... 109
lxxxi. Deviations...................................................................................................................... 110
lxxxii. Training......................................................................................................................... 110
lxxxiii. Licenses ........................................................................................................................ 110
lxxxiv. Storage & Risk................................................................................................................ 110
lxxxv. Duration of the contract:.................................................................................................. 110
lxxxvi. Contract Performance Guarantee/Security Deposit ............................................................... 111
lxxxvii. System Integrators Obligations ........................................................................................ 111
lxxxviii.
System Integrators Representative .............................................................................. 112
lxxxix. Reporting Progress.......................................................................................................... 112
xc.
Knowledge of Site Conditions............................................................................................ 113
xci. System Integrators Team ................................................................................................ 113
xcii. Contract administration.................................................................................................... 114
xciii. Right of Monitoring, Inspection and Periodic Audit ............................................................... 114
xciv. Registration Department - Tamil Nadu Obligations ............................................................... 115
xcv. Information Security........................................................................................................ 115
xcvi. Ownership of Equipment .................................................................................................. 115
xcvii. Insurance ...................................................................................................................... 116
xcviii. Indemnity ...................................................................................................................... 116
xcix. Confidentiality ................................................................................................................ 117
c.
Term and Extension of the Contract................................................................................... 117
ci.
Prices ............................................................................................................................ 118
cii.
Alteration/Variation ......................................................................................................... 118
ciii. Change Order................................................................................................................. 118
civ. Procedures for Change Order............................................................................................ 119
cv.
Change of Size/Quantities ................................................................................................ 120

Registration Department Tamil Nadu RFP for SI Selection Volume I


cvi. Conditions for extra work/change order.............................................................................. 120
cvii. Suspension of Work ........................................................................................................ 120
cviii. Tenure of Contract .......................................................................................................... 120
cix. Payment Schedule .......................................................................................................... 121
cx.
Penalty for Non-Fulfilment of Service Level Agreement ......................................................... 122
cxi. Events of Default by the System Integrator......................................................................... 122
cxii. Consequences in Event of Default ..................................................................................... 122
cxiii. Terminate the Contract .................................................................................................... 123
cxiv. Termination ................................................................................................................... 123
cxv. Consequences of Termination ........................................................................................... 124
cxvi. Penalty .......................................................................................................................... 125
cxvii. Liquidated Damages for Non-Fulfillment of Commissioning Schedule ...................................... 125
cxviii. Compliance with Statutory Requirements............................................................................ 125
cxix. Arbitration ..................................................................................................................... 125
cxx. Special Terms................................................................................................................. 125
cxxi. Dispute Resolution .......................................................................................................... 126
cxxii. Limitation of the System Integrators Liability towards the Registration Department - Tamil Nadu126
cxxiii. Conflict of interest........................................................................................................... 127
cxxiv. Severance...................................................................................................................... 127
cxxv. Governing Language ....................................................................................................... 127
cxxvi. No Claim Certificate ...................................................................................................... 127
cxxvii. Publicity ........................................................................................................................ 127
cxxviii.Force Majeure ................................................................................................................ 127
cxxix. Exit Management ............................................................................................................ 128
cxxx. Exit Management Purpose ................................................................................................ 128
cxxxi. Transfer of Assets ........................................................................................................... 129
cxxxii. Cooperation and Provision of Information ........................................................................... 129
cxxxiii.Confidential Information, Security and Data ........................................................................ 129
cxxxiv. Employees ..................................................................................................................... 129
cxxxv. Rights of Access to Information......................................................................................... 129
cxxxvi. Exit Management Plan ..................................................................................................... 129
cxxxvii.
General.................................................................................................................... 130

14.

Annexures ...................................................................................................................132
cxxxviii. Annexure I - Specifications of Hardware for buy-back ..................................................... 132
cxxxix. Annexure II SRO office list for Tamil Nadu State ............................................................... 137

Registration Department Tamil Nadu RFP for SI Selection Volume I

1. Invitation to Bidders / Important dates


The invitation to bid is for selection of system integrator (SI) to design, develop, test, install, operate,
maintain & manage registration application for a period of five years from the date of Go-Live. The
bidders are advised to study the tender document carefully. Submission of bids shall be deemed to
have been done after careful study and examination of the tender document with full understanding of
its implications. This section provides general information about the Issuer and important dates.
Issuer
TN Registration Department
Contact Person
IG Registration

Address for Bid Submission and Correspondence


Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai - 600028
Phone: 044 - 24640160
Fax: 044 - 24642774
Mail ID: tn.igrtender@gmail.com; igr@tnreginet.net; igrchennai@gmail.com,
Web-Site: http://www.tnreginet.net

Registration Department Tamil Nadu RFP for SI Selection Volume I


Key Events & Dates
Table 1 - Tender Schedule
Tender Reference No:

001/Regn/2013

Non-refundable Tender fee

Rs.10,000/- through demand draft / bankers pay order


from a nationalized / scheduled bank, drawn in favour of
Accounts Officer, O/o IG of Registration payable at
Chennai. Demand Draft / bankers pay order should be
obtained only after issue of tender notification. In case
the tender is downloaded from the website then there
shall be no charge for tender fee.

Availability on website

Website for Tender Downloading


http://www.tenders.tn.gov.in/
http://www.tnreginet.net

EMD

Rs. 1,00,00,000/- in the form of Demand Draft / bankers


pay order/irrevocable Bank Guarantee in favour of
Accounts Officer, O/o IG of Registration payable at
Chennai from a nationalized / scheduled bank. Demand
Draft / bankers pay order should be obtained only after
issue of tender notification.

Last date to send in requests for


clarifications on the tender

Pre-Bid Queries shall be sent to following email ID


tender@tnreginet.net & tn.igrtender@gmail.com as
per format attached in Vol-II, section 2.15 on or
before 01/04/2013

Time, Date and Venue for Pre- Bid


Conference

11:00 Hrs, 03/04/2013


Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai 600028

Last date for submission of bids and venue

Opening of bids and Venue

03.00 PM, 22/04/2013,


Office of IG Registration,
100, Santhome High Road, Pattinapakkam, Chennai
600028
04.00 PM, 22/04/2013,
Office of IG Registration,
rd
Conference Hall, 3 Floor
100, Santhome High Road, Pattinapakkam,
Chennai 600028

Presentation by short-listed bidders, if


required

To Be Declared Later

Declaration of short-list of bidders for


commercial bid

To Be Declared Later

Opening of commercial bids

To Be Declared Later

Language of the bid

This bid should be filled in English language only. If any


supporting documents are to be submitted, in any other
language other than English, then translation of the
same in English language, attested by the bidder,
should be attached.
6

Registration Department Tamil Nadu RFP for SI Selection Volume I

Registration Department Tamil Nadu RFP for SI Selection Volume I

2. Pre-Qualification Requirements
The bidder must possess the requisite experience, strength and capabilities in providing the services
necessary to meet the requirements, as described in the tender document. The bidder must also
possess the technical know-how and the financial wherewithal that would be required to successfully
provide the services sought by the Registration Department for the entire period of the contract. The
bids must be complete in all respect and should cover the entire scope of work as stipulated in the
Tender document else the bids shall be summarily rejected.
The invitation to bid is open to all bidders who qualify the eligibility criteria as given below:
Sl.#

Pre-Qualification Criteria

Documents to be attached

The Bidder (Prime ) should be registered

i.

under the Companies Act, 1956, should be in


doing business in India for at least 5 years

copy

of

Certificate

of

Incorporation of the company

ii.

st

Work Orders confirming year &


st

(as on 31 December 2012)

date (dated after 31 December

i. Bidder (prime) should have experience

1.

2007) and IT related services

in IT related services (application

(application

software

development

development

and

maintenance) for a period exceeding 5


st

years (as on 31 December 2012).

software
and

maintenance).

iii.

Memorandum of Association
(MoA)

and

Articles

of

Associations (AoA) articulating


the bidders core services being
in the field of IT related services
as specified in (ii) above.
The Bid can be submitted by an individual
2

company or with a Consortium Partner . In


case of consortium the same shall not
consist

of

more

than

two

companies/

corporations in total i.e. including the prime


bidder.

i. Memorandum
i.

2.

Memorandum

of

of

(MoU)/agreement

Understanding
among

the

Understanding (MoU)/agreement

members signed by the Authorized

between the prime bidder &

Signatories of the companies dated

consortium partner in Rs 100

prior to the submission of the bid to be

non judicial stamp paper.

submitted in original.
ii. A

copy

of

Incorporation,
Articles
1

of

Certificate

Memorandum and

Associations

of

The Prime bidder is the single point of contact and holds complete responsibility for the project.
Consortium Partner shall mean a company with complementing skills which supports the Prime bidder in
certain specific activities of the project.

of
the

Registration Department Tamil Nadu RFP for SI Selection Volume I


ii.

The details of the Consortium

consortium partner should also be

with clear mention about roles

furnished.

and responsibilities of each


partner

iii.

and

one

partner

iii. The

MoU/agreement

shall

clearly

specify the prime bidder, stake of

nominated as Prime Bidder.

each member and outline the roles

The consortium partners cant be

and

a member of another consortium

member.

responsibilities

of

each

that is also participating in this


tender.

iv. Power of Attorney (PoA)/ Delegation


of Powers (DOP)/Board Resolution
listing the names of staff(s) who are
Authorized to sign the MOU & tender
documents shall be submitted by Prime
& Consortium Partners (if any), a copy
of the same must be attached.
v. An

undertaking

authorized

letter

signatory

signed
should

by
be

submitted by the Prime & Consortium


partner stating that they shall not be a
part of any other consortium or as
Prime Bidder for this RFP
I. Bidder

(Prime)

and

the

consortium

A copy of the valid ISO certificate.

partner (if any) must have enterprise


level ISO 9001:2008 certification (as on
st

31 December 2012)
II. Also,

the

mandatorily

Prime
have

bidder
ISO

should

27001:2005

certification at least for software division


3.

(as on 31st December 2012)


Note: In case the certificate is due for
renewal, the bidder should ensure that the
renewed certificate is made available at the
time of signing of contract. In case the same
is not provided till signing of contract then,
the department shall award the contract with
the next eligible Bidder after negotiation.

4.

The Bidder (Prime) should have a CMMi

Valid CMMi Level -V certificate. The

level V Certificate

ceritificate should be valid as on 31st


December 2012.

Registration Department Tamil Nadu RFP for SI Selection Volume I

5.

The Bidder (Prime) and consortium partner

Declaration in this regard by the authorized

shall not be under a Declaration of Ineligibility

signatory of the prime bidder and the

for

consortium partner as per format provided in

corrupt

or

fraudulent

practices

or

blacklisted with any of the Government

Volume II section 2.1

agencies in the State of Tamil Nadu.


The Bidder (Prime) should meet the following
criteria for the last three financial years i.e.
FY: 2009-2010, FY: 2010-2011, FY: 20112012.
i.
6.

Bidder

(prime)

should

have

Copy of the audited Balance

average Turnover over INR 250

Sheet of the company showing

crores for the last 3 years with

turnover of the company for last

a minimum Turnover of INR

three years.

100 cr
ii.

i.

ii.

Certificate from the Company

The Bidder (Prime) should have

Secretary/Statutory

average net worth of at least

ascertaining

INR 30 crores

worth.

an

Auditors

average

net

The consortium partner should meet the


following criteria for the last three financial
years i.e. FY: 2009-2010, FY: 2010-2011,
FY: 2011-2012.
i.
7.
ii.

Consortium Partner should have

i. Copy of the audited Balance

average total turnover over INR 125

Sheet of the company showing

crores for the last 3 years.

turnover of the company for last

Consortium Partner should have

three years.

average net worth of at least INR

ii.

15 crores

Certificate from the Company


Secretary/Statutory

Auditors

ascertaining a average net worth.


The Bidder (prime) should have on their role

i.

st

HR Department certifying the

as on 31 December 2012, the following


i.

8.
ii.

Minimum 500 IT professionals with prior

number of technically qualified

experience for over 5 years in software

professionals

Development

&

number of projects completed by

should have completed at least 2

the resource in the company for

successful IT related projects.

each

Minimum 10 IT professionals with prior

mentioned here.

&

implementation

experience for over 5 years in Database


Administration

iii.

Certificate from prime bidders

with

relevant

DBA

ii.

of

along

the four

with

the

categories

For S.Nos. ii. to iii., certificate


from

prime

bidders

HR

certifying

the

certifications

Department

Minimum 25 IT professionals with prior

number of technically qualified

10

Registration Department Tamil Nadu RFP for SI Selection Volume I


experience for over 5 years in IT

professionals

networking

relevant

with

valid

CCNA

certificate
iv.

along

with

the

of

the

certificate

resource in the company.

Minimum 10 IT professionals with prior

iii.

For S.Nos. iv., certificate from

experience for over 10 years in project

prime bidders HR Department

Management

certifying

possessing

valid

the

number

technically

PMP/PRINCE certification.

of

qualified

professionals along with number


of years of experience of the
resource in the company.
The Bidder (Prime) must have IT System

Copy of work order

Integrators

successfully

Completion Certificate from the Client

completed for at least one eGovernance

Certificate from the company

project

experience
with

in

State

or

Central

secretary certifying

Government/Government-undertaking/PSUs

st

value of the project

in last 5 years (as on 31 December 2012) in

(excluding site preparation &

India.

Electrical works cost) for

Note:
9.

successfully completed
Project

should

be

successfully

projects)

completed.

Project

should

geographically

cover

multiple

coverage of the project


should be for multiple

locations such as

geographically locations

Towns/Districts/States in India

such as

Project value should be a minimum

Towns/Districts/States in

of Rs. 20 Crores (excluding Site

India

preparation & electrical works)


have

Copy of work order

experience in successfully completed for at

Completion Certificate from the Client

least

Certificate from the company

The

Consortium
one

partner

eGovernance

must
project

with

Government/Government-undertaking/PSUs

secretary certifying

st

in last 5 years (as on 31 December 2012) in

10.

value of the project

India.

(excluding site preparation &

The scope of eGovernance project shall have

Electrical works cost) for

any of the following

successfully completed

Development of application software


& Post Implementation Application

projects)
o

coverage of the project

Software support services

should be for multiple

Network Connectivity

districts/states

Data Centre Maintenance

(geographically spread) in

IT Hardware supply & maintenance

India

11

Registration Department Tamil Nadu RFP for SI Selection Volume I


for any Government department.
Note:

Project

should

be

successfully

completed.

Project

should

districts/states

cover

multiple

(geographically

spread) in India

Project value should be a minimum


of Rs. 5 Crores (excluding Site
preparation & electrical works)

11.

The Bidder (Prime) should furnish, as part of

The EMD should be denominated in Indian

its bid, an Earnest Money Deposit (EMD) of

Rupees, and should be in the form of

Rs. <1,00,00,000>

Demand Draft/Bank pay order/irrevocable


Bank Guarantee as per Section: 12.4, in this
RFP

12.

Authorization letter for tender submitting

A board resolution for authorization from the

authority

Board of Directors or Power of Attorney

must

be

provided

by

the

authorizing the tender signing and submitting

Bidder(Prime) and Consortium Partner

authority for bidding the tender


Manufacturers
13.

14.

Manufacturers

Authorization

Form

Authorization

Form

and

As per Section 2.8 & 2.9 Vol. II of this RFP.

for

Only one MAF should be submitted for each

Support Services

of the hardware item present in the bid.

Both bidder (Prime) and Consortium Partner

Copy of Registration Certificate or recent

shall have a local office in Chennai and the

Phone Bills or Service Tax copies etc /

proof for the same should be provided.

Undertaking letter signed by the Authorized

Note: if Bidder (Prime) and/or Consortium

Signatory

Partner does not have a registered office, an


undertaking from party(ies) for establishment
of an office in Chennai within one month from
the date of LoA must be provided.

12

Registration Department Tamil Nadu RFP for SI Selection Volume I

3. Project Profile
Introduction
The role of Information Technology has been well established in the State of Tamil Nadu. The State
has a well-defined IT policy and has been working towards making the State as a preferred
destination for the IT related service industry. Also, there are various activities initiated by the
Government to bring better governance to the citizens. Usage of Information Technology in
governance has brought the total system to work effectively and efficiently. e- Governance assures
transparency in the governance systems and also it has opened new avenues of easy and faster
transactions.
The Department of Registration - GoTN has been successfully rendering registration service to the
citizen over 145 years; it happens to be the one of the highest contributor to states exchequer
considering its vital role both towards the Government & Public. Department of Registration is
primarily responsible for registration of all types of instruments, firms, societies, administration of
stamp duties & also to render Registration related services to the citizens.
Government of Tamil Nadu (GoTN) were the pioneers in the country to computerise the Registration
departmental offices (~578 offices across the state) through Project STAR (since 2000) &
comprehensively render Registration related eServices to citizens, though REGiNET (since 2003).
The Department is constantly in the pursuit for optimising its Registration Process, in order to further
enhance the Citizens-Service-Delivery-Experience (CSDE). In this context registration department
intends for complete system overhaul through a comprehensive Government Process Re-Engineering
(BPR) exercise; and create end-to-end web-based & work-flow system architecture, which shall
seamlessly integrate all the Registration process & its related services in optimal manner.
Some of the envisaged features of this venture
Complete end-to-end Integrated & Centralised System web-based Architecture
Biometric based document registration & fool-proof service delivery
Work-Flow based operations with comprehensive audit trail
Exclusive modules for
Dynamic Real-Time Market valuation module
Appeals Process Management
Financial MIS & Reporting Module
Human Resource module
Provision for Multiple Service-Fee channels including secured online Payment
Gateway of banks/third party.
Capability to integrate with Franking machines/e-stamp
Centralized data repository with Data encryption algorithms
Provision for Aadhaar number (UIDIA) based services
Provision for generation of e-stamp

13

Registration Department Tamil Nadu RFP for SI Selection Volume I

eForms compatibility & adequate provision to interface with state Portal & Service
Delivery Gateway (SP&SDG)
Compatibility provisions for integration of Land Records application with NLRMP
As a first step Department of Registration had hired consultant to carryout comprehensive study of the
existing process and applications; identify the performance gaps & propose a new To-Be System
mitigating the current challenges. This proposal attempts to capture the scope of work, envisaged
project benefits, Project timelines, etc.

This tender call for bids for selection of System Integrator (SI) to Design, Develop, Test
Implement, Supply Hardware, Operate, Maintain & Manage the end-to-end complete integration
of Registration Application in state of Tamil Nadu.

This Scope of work of this tender consists of two phases (viz Phase I & Phase II) as mentioned
below:

Phase - I:
The scope against this phase work covers the Design, Develop, Test & Implement the end-to-end
complete integration of Registration Application as per the scope of work, quantity &
specifications, schedules & requirements as specified in the tender. The historic data needs to be
migrated into the current database. The developed applications would be first tested & implemented
as a pilot. On successful implementation of the pilot application, then the state-wide roll-out would be
commenced. Go-Live commences from the date of successful State-Wide Roll Out of the Registration
Application.

Phase - II:
The scope against this phase covers the Hardware Supply, Operation, Maintenance & Management
of the end-to-end completely integrated Registration Application on 24x7 basis as per the
requirements of the tender and also as per the Service Level Agreement (SLA) over a period of five
years from the date of Go-Live. The scope of phase II also includes manpower outsourcing and
providing connectivity to all the Department offices.

Applicability of Tamil Nadu Transparency in Tender Act, 1998:


This tender will be governed by the Tamil Nadu transparency in Tender Act, 1998 with the Tamil Nadu
Transparency

in

Tender

Rules

2000

as

(http://www.tn.gov.in/gorders/fin446e.htm)

14

amended

from

time

to

time.

Registration Department Tamil Nadu RFP for SI Selection Volume I

Objectives of the Project

Primary Objective:

To migrate to an end-to-end completely web-based environment in order to improve quality


of service through optimized services delivery by the department to be stakeholders

Secondary Objective:

Transparent & citizen friendly environment

To provide services of Registration Department to the citizens at their door steps

Business Intelligent application with appropriate controls against vulnerability

System Work Flow operation

Robust system to cater to the registration process

Centralization of database

Paperless & hassle-free operations

Envisaged Outcomes
Tangible benefits to the Citizen:

Simplified, fast & transparent registration process

ICT enabled service delivery with IVR/SMS based application status review

Easy e-Payments facilitated through Payment Gateway

Minimal Turn-Around-Time to get the registration completed

Registration and return of registered document in single visit

Online issue of certificates

Tangible benefits to the Government:

Better control & visibility over its operations & management

Electronic data processing Paperless office

Empowerment of Common man through easy and simple process

Improved efficiency

Improved service levels

Better quality of service

Fool-proofing against citizens credentials & documents security

Standardization of Systems & Improved Scalability

Automated work-flow will not only ensure smooth and on-time delivery of services but this
will also result in more transparency, improved responsibility and increased productivity in
the organization.

Better monitoring, smooth processes and MIS reporting and auditing

15

Registration Department Tamil Nadu RFP for SI Selection Volume I

4. Overview of Registration Department


i.

Overview of Property Registration in Tamil Nadu State


The Registration Department, one of the oldest (145 years) departments, is the most forward looking
in harnessing Information Technology to make the interface with citizens, a pleasant experience. It
strives to deliver transparent and speedy service to the Registrants. It is the one of the higher revenue
generating department.
There are 578 Sub Registrar offices (SRO), 50 District Registrar offices (DRO) and 9 Deputy
Inspector General of Registration (DIGR) offices in the Department. The process of supply of IT
hardware such as PC, UPS, printers, etc was taken up by the department of Registration GoTN in a
phased manner. Under Phase-I, 14 SROs and 9 DROs were computerized on an outright purchase
basis. Then under Phase-II (a), 89 SROs and 11 DROs were computerized on operating lease basis.
As the model was functioning effectively, the same method was followed for the next 195 SROs, 30
DROs under Phase-II (b). There are 578 registration offices throughout Tamil Nadu, which operate
computerized counters to help citizens to complete process of registration of properties in few days
instead of several days, as was necessary under the earlier system.
Antiquated procedures such as manual copying and indexing of documents, and storage in paper
forms in ill-maintained record rooms have all been replaced. Door delivery of encumbrance
certificates, certified copies of documents and extracts of Hindu Marriages on submission of requests
on the exclusive website (https://www.tnreginet.net) became reality. This case illustrates some of the
key implementation issues faced by State and National Governments in their efforts to use IT to
improve citizen-government interfaces.
The IT enabled registration process emerged as a decision support tool at the strategic management
level even for amending provisions of various Acts. The IT enabled process has taken place in two
levels namely: STAR (Simplified and Transparent Administration of Registration) and REGiNET
(Registration information Network). This e-Governance initiative has been evaluated from the
following perspective:
a) Citizen, Governance and Service Delivery
b) Systemic improvements have helped the department in regaining the confidence of the public
and in
Registration is the process of legalizing a deed. Registration involves presentment of:

ii.

Handwritten or typed pages

On which appropriate stamp duty has been paid

To get the deed representing the transaction legalized

Key Stakeholders

16

Registration Department Tamil Nadu RFP for SI Selection Volume I

TN Govt

Regist
ration
Dept.

Citizens

The key stakeholders in this computerization effort have been highlighted above. The project is
being funded by Government of Tamil Nadu. Registration department is the major stakeholder
where all the implementation will happen. Finally the citizens are the ultimate beneficiaries of this
effort and their convenience is of prime importance during the implementation of the project.

17

Registration Department Tamil Nadu RFP for SI Selection Volume I

iii.

Current Organization Structure

INSPECTOR GENERAL OF
REGISTRATION

Add. IG
(4)

DIG
(11)

SDC (STAMPS) - (11)

AIG

DR(ADMIN)

AEE

(5)

(50)

(2)

Assistant
Superintendent of
Stamps (1)

DR (AUDIT)
(45)

SR

ASST

JA

RC

OA

Inspector General of Registration also holds the position of Chief Controlling Revenue Authority
(CCRA). As CCRA, he is the highest appellate authority in the department and his verdict can only be
challenged in a High Court. The post of Special Deputy Collector (SDC) is filled by the Revenue

18

Registration Department Tamil Nadu RFP for SI Selection Volume I

Department and he is deputed to work in Registration Department and reports to the DIG. He collects
Stamp Duty under Section 47(A). Also, there is an Assistant Executive Engineer (AEE) deputed from
the Public Works Department (PWD) for inspection of building properties worth more than 25 lakhs.
He reports to DIG for review of his assessment.
There are 4 Additional Inspector Generals of Registration who are based in this office and Assist the
IGR. Each of the 4 Additional IGRs are handling different subjects namely Stamps; Guidelines,
Appeals and Information Technology; Intelligence (pertaining to buildings); and Chits and Societies.
Under the Additional Inspector Generals, there are 11 Deputy Inspector Generals of Registration (2
functional + 9 for the different territories). Out of the two functional DIGs, one is working as the
director of the Registration Training Institute (RTI institute) and the other is working as the PA
(general) at the IGR office. Underneath the DIG is the post of Assistant Inspector General of
Registration which numbers 20 (15 functional and 5 for the zones). For each district, there is a District
Registrar (Admin). Also there are District Registrars (Audit) who are at the same level as the DR
(Admin). DR (Admin) reports to directly to DIG while DR (Audit) reports directly to the Assistant IG.
Beneath the District Registrars, there are Sub Registrars who operate at the various Sub-Registrar
Offices in the state. Each SR office may also have Assistant(s), Junior Assistant(s), Record Clerk(s)
and Office Assistant(s). The above mentioned staff members are directly involved in the registration
process. There are other staff members such as Night watchman, mesalji, etc who work to maintain
the office premises and do not affect the process of registration and hence have not been mentioned
in the hierarchy above.

iv.

Overview of Human Resources of the Department


Sl. No.

Post

Allocated Strength

Inspector General of Registration

Additional Inspector Genl. Of Registration

4 (functional)

Deputy Inspector Genl. Of Registration

11 (2 functional + 9 territorial)

Asst. Inspector Genl. Of Registration

20 (15 functional + 5 territorial)

District Registrar Category

137

Sub Registrar (Grade I)

385

Sub Registrar (Grade II)

385

Assistants Category

1472

Junior Assistants Category

1005

10

Record Clerks

204

11

Office Assistants

1267

19

Registration Department Tamil Nadu RFP for SI Selection Volume I

The department has very dedicated and well trained staffs that make every effort to provide better
services to the citizens. They work hard to satisfy the customers on most of the occasions. Their
service quality has been at a relatively good level even at the present state of shortage of staff at most
of the offices. The resource requirements at various levels have been highlighted above. Periodically,
the numbers of resources are decreasing because of regular retirements. The reducing staff strength
puts the department under pressure towards quicker service delivery. The proposed project may be
able to provide the required assistance to the department in improving the service delivery and
gaining the trust of the citizen.

v.

Roles and Responsibilities of DR and SR


The roles and responsibilities of DR and SR have been profiled below:
i.

District Registrar (DR)

The DR is the chief representative of the department at the district level. The responsibilities of the
District Registrar are to inspect the Sub-Registrar offices and to ensure adherence to The Registration
Act and such notifications and rules made by the State Government. The responsibilities of the DR
are as follows:

Conducts inspection once a year

First Appellate Authority for certain disputes

Ensuring implementation of IGRs circulars and Govt. policies at the registration district level

Registering and renewing Firms, Societies and Chit funds

Annual inspection of SR offices pertaining to adherence of all the procedures

Administrative Head for the District thus controlling human resources within the district

Issuing and renewal Authority for Stamp vendors and document writer Three types of
licenses are issued for document writer namely A, B and C. DRO is responsible for only B
and C types which are pertaining to district level and sub-registrar office level. License type A
is for the whole state and is issues by the IGR

ii.

Sub Registrar (SR)

The Sub Registrar in the SRO, along with his staff, represents the department at the grassroots level.
His duties and responsibilities are as follow:

Registering documents - Registration of Documents comes under the purview of Registration


Act 1908

Ensure proper classification of deeds presented for Registration to realize correct Stamp duty
and Registration fees

Ensuring proper classification of land, buildings and other properties

Recording Encumbrances to land & properties

Collecting registration fee, stamp duty, sub-division fee and other charges

Issuing receipt

Periodical filling of returns / Submission of periodical MIS returns

20

Registration Department Tamil Nadu RFP for SI Selection Volume I

vi.

Storing records

Deciding proper Stamp Duty

Attending court matters

Functional Structure and their responsibilities


Below is the list of functional structures operational in the state under Registration Department. Their
responsibilities have been highlighted below.

i.

IGRO

The IGR office is headed by the IGR, an IAS officer and is responsible for administering and
discharging the following duties:

Administrative head of the department for the entire state in all respects

Issue of Christian Marriage Extract

Renewal Authority for document writer of type A pertaining to the State level

Final Appellate Authority in citizen disputes

Appointing authority for Junior Assistants, Assistants, Sub-registrar.

Disciplinary action against these officers and award punishments like removal, suspension

Chairman of Central valuation committee for guideline valuation and fixation

ii.

DRO

The DRO is responsible for discharging the following duties:

Administering the respective districts

Chit Activities such as issue of Prior Sanction Order (PSO), commencement certificate and
release of deposit at the end of a chit period

Societies registration under Societies Registration Act

Registration of firms under Partnership Act

Super Inspection of buildings and Fixation cases

Coordinator for fixing Guideline Value

Christian Marriage Certificate forwarding after proper verification

Authorizing refund of stamp duty

Inspection of respective SROs

iii.

SRO

The SRO is responsible for discharging the following duties:

Deed Registration

Marriage Registration

Filing of minutes of Chit Funds

Preparation and Maintenance of Indexes

Issue of EC, certified copies, marriage extracts, etc.

Proper valuation and building

21

Registration Department Tamil Nadu RFP for SI Selection Volume I

iv.

Camp Office

There are 3 camp offices out of 578 SR offices. These offices are created to serve areas which are
remote and registration activities are minimal. In these offices, there are no permanent SRs sitting at
the office and no records are maintained. However, the camp offices are assigned a parent SR office.
Weekly twice, the SR of the parent office goes there along with an Office Assistant to conduct
registrations. But, regular registration numbers are not allotted to these registrations. Instead a
pending number is assigned. After the Document is brought back to main office, a running registration
number is assigned and it is processed. On days the SR is not visiting the Camp Office, it is shut
down. Other than these distinctions, the duties of a camp office are exactly same as an SRO.
v.

DRO (Audit)

The DRO (audit) is mainly responsible for conducting cent percent Audits of all the SR offices under
the respective DRO (audit). The purpose of his audit is to find out and recover any leakage of
revenue. Generally, quarterly and monthly audit is conducted in all SROs and Joint I SROs under his
jurisdiction. His responsibility is to visit a particular SRO and check all the documents registered one
by one meticulously to find any error in judgement, wrong fixation, wrong calculation, etc. He is
mandated to check all the documents.

vii.

Citizen Impact of the Department


The department impacts almost every citizen in the state. The services provided by departments are
very relevant to all the citizens. Registration of any document serves several purposes that safeguard
common citizens interests which include:

Facilitate conservation of evidence

Department as the notary to the transaction

Publicity of documents

Maintaining transparency of any property pertaining to transactions done

Impact of the department on citizens can be understood by the fact that during 2010-11 financial year,
the department registered more than 32.5 lakhs documents. As a result, the department is one of the
high revenue earning departments for the state. The transaction volumes have been steadily rising
over the last few years due to better market conditions, better awareness and better citizen centric
focus of the department. The department realizes this fact and wants to be capable of serving even
larger number of citizens in future.

22

Registration Department Tamil Nadu RFP for SI Selection Volume I

viii.

Revenue generated by the department


The department is one of the higher revenue generating departments for the state. The revenue
generated by the department over the last five years has been shown below. The revenue generated
in the financial year 2006-07 was 3407.50 crores which jumped to 4232.36 crore showing an increase
of nearly 24%. After that, for the next two years, the department saw dip in the revenue for the next
two years. The revenues showed considerable increase in 2010-11 and department collected 5020.50
crores. Further, it grew to 6620 crores in 2011-12. As the markets conditions remain favourable, the
department expects the revenues to grow at a healthy rate in future.
This initiative to have an integrated service platform would definitely help the department to handle
increase in work load due to growing revenues and number of transactions. Number of registrations
handled by annually is shown below:

No of Docs Registered
4000000

3280503

3500000
3000000

2691002

2832686

3518435

2731026

2500000
2000000
1500000
1000000
500000
0
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012

ix.

Services offered by the department


The department provides the following services to citizens (list mentioned below is not exhaustive):

Performing registration of instruments presented by a citizen

Issuance of certified copies of documents on demand

Issue of encumbrance certificate

Registration of various Marriages and providing certificates

Registration of Chits, Firms and Societies and monitoring Chits and Societies activities

Impounding of documents and deciding it in appeal

Maintaining and updating Guideline values for land and buildings

Issue of extracts of Birth and Death

Selling non-judicial stamps and court fee (CF) Labels

Refund of stamp duty

23

Registration Department Tamil Nadu RFP for SI Selection Volume I

The registration department registers different types of documents. Some of the frequently registered
document types are listed below:

Deed of Conveyance

Agreement of Sale

Agreement relating to deposit of title deeds

Deed of cancellation

Deed of exchange

Deed of indemnity

Deed of Lease

Deed of Partition

Deed of Ratification

Deed of rectification

Deed of settlement

Deed of Trust

Partnership deed

Special Power of Attorney

Gift deed

Adoption Deed

Simple Mortgage deed

General Power of Attorney

Release deed

Will

Cancellation deed of Will (Will and Cancellation deed of Will do not come under Stamp Act
unlike the remaining).

Promissory Note

24

Registration Department Tamil Nadu RFP for SI Selection Volume I

5. Envisaged Registration Application Architecture


The detailed functional requirement of the Registration Application is given as annexure to this
Tender. The application is envisaged to designed & developed with following architecture.
The overall Registration Application shall be a multi-tier architecture cartering to unique services
deliveries. The typical system architecture with its layers are detailed below

Client Layer:

This layer represents the users who will be using the Registration application and avail the
various G2C and G2G services offered online
Broadly these can be categorized as
a. External users These are users external to the Government who will be availing the
services offered as part of the eGovernance initiative mainly citizens & businesses
through IVRS, IPTV, eMail,SMS etc
b. Internal users These are users internal to the government like officials from the
departments, Government agencies and common service centers

Presentation Layer:
The presentation layer encapsulates all presentation logics required to serve the users to access

the system. This layer intercepts all client http requests initiated from the client layer,
authenticates the users, conducts session management, controls access to business services,
constructs the response and delivers the http response back to the client.

The following are the key services offered by this layer

Registration Application Framework

Application Framework is a popular design pattern that provides a clear demarcation of


presentation and business logics. In the proposed framework, all web requests (http/https) will be
handled by the controller components of the framework. This business services (which will reside
in the business layer) are represented as the "model" part of the framework. Based on the
outcome of the request execution, the controller decides which "view" to forward. The view uses
the data in the desired model to create the presentation that is returned to the user.

G2C Presentation Service

The presentation services performs functions such as configuring the visual display of the
content, rendering platform user interface page, accepts and validates user input, acquire
processed data from business service and renders the page. There will be separate user
interfaces for each of the G2C government services for e.g. applying for EC, Birth certificate,
marriage registration, etc. and these services will be availed by citizens and processed by
government agency.

User Personalization & Dashboard Services

25

Registration Department Tamil Nadu RFP for SI Selection Volume I

These are presentation layer services that provide user personalization services allowing users to
maintain their own specific profiles and customize their preferences for better user experience.

Gateway Enabled Services

Gateway enabled services like Payment gateway, email Gateway, SMS Gateway etc would be a
part of the layer.
Business Layer
All business processing for the proposed application software will be centralized in this layer. It

receives requests from the presentation tier, processes the business logic based on the requests,
and mediates access to the other underlying layer (data access layer or integration layer)
resources.
This layer will also host the application infrastructure components like content management
services, workflow and rule management, government data schema management services,
database access services, session management, notifications etc.
The following are the key services offered by this layer

Transactional Government Services

These are the business layer components that will provide the business logics and rules to
achieve the desired service functionality.

Services

These are the internal Application software services that may not be required to expose as
services to external applications. These services will be developed using business logic
components, data access components. These services can in turn call common service
components, workflow process engines, notification service or content services based on the type
of processing requested by the presentation layer. It mediates access to the data access layer to
retrieve data from the data store or persist data in the data store.
o

Search Services These are search components that will provide quick access to
information including documents, images, HTML pages, audio-video files etc.

Workflow & Business Rule Services - During the entire life cycle of the service
requests (initiated by citizens or business) processing, approval / rejection by
intermediary and final approval has been an important service requirements of
authorised bodies.

The proposed solution architecture will make use of open

standard workflow services to cater to the approval / rejection workflow cycle. The
workflow engine deployed in the business layer will takes care of routing approval
request to the respective users and decisions triggered the process for completion.
o

Notification & Messaging Services These services will facilitate sending


notifications to registered users. Users will be able to subscribe for some of the
services like notifications on sale of a particular property, notification on filing of
minutes of a chit, etc.

Reporting These services will be used to generate audit trail reports, web analysis
reports, usage statistics etc.

26

Registration Department Tamil Nadu RFP for SI Selection Volume I

Support & Utility Services

These services will provide support and common functionality to other eService
interface and application infrastructure components. The following are some of the
key support components to be provided by this service -

Audit Trail Services


Audit Trail Services will maintain an historical record of transactions that have been
applied to an object or set of objects. The record should contain enough detail to
determine how the objects affected by the transactions reached their current state.
Audit Trail Services in eService interface can be implemented by following the
Prototype design pattern and also using database functionalities like trigger or stored
procedures.
Exception, Error Handling & Logging Services
A robust and reliable application error handling mechanism should
be part of the basic infrastructure which will handle normal situation
as well as unexpected application error. Error detection, error
handling, propagation of error information and error logging
capabilities will be considered to make the application robust.
Logger will be used to log the system debug activities, errors and
exceptions with different severity level. All errors would be logged
with error code, error level and error message along with timestamp.

27

Registration Department Tamil Nadu RFP for SI Selection Volume I

Application Framework Services

Security Services

The security services will over the user profile management, authentication and authorization
aspects of security control. This is an application framework service that will be availed by any
government interfaces and applications accessing the overall framework. This service run across
all the layers since service components from different layers will interact with the security
components. All public contents should be made available to all users without authentication. The
service will authenticate users and allows access to other features of the framework for which the
user is entitled to.
The security service will provide the following security control features
User Registration & User Profile Management This service will allow system administrator
of the application software, various ministry and govt. agencies to register and create user
profiles for users who will access the system.
User Authentication This security service will validate the identity of the users against
specific security credentials. This service will be realized using underlying HTTP Server and
directory service features, which adds a comprehensive set of Web single sign-on services,
and extends them further with centralized user provisioning that is available in any open
LDAP, version 3-compliant directory service. End users logging on to the interface will be
authenticated against the user name / password credentials.
User Authorization - Users, groups, roles and security policies will be defined to prevent
unauthorized access to specific government services.
o

Server Management & Monitoring Services

This service will provide administration, management and monitoring functionality for networks,
system software and applications, links to internet, hardware nodes etc. This service cuts across
the presentation, business and integration layers. These services will help automate processes
covering aspects like performance monitoring, network monitoring, incident management, data
backup, disaster management etc.

Data Access Services

This service forms the bridge between the business layer and the data storage layer services.
The data access service is responsible for communicating with external source system and data
stores. All access to the underlining eService database will be through these services.
This service may use JDBC/ODBC technology to connect to the database in the data storage
layer. More often it will be required in course of the SDLC to make changes in the underlying
database schema, when propagation of the changes to the services layer will turn out to be very
expensive. An Object Relationship Mapping (ORM) framework steps in to fill this gap providing an
easy to use and powerful object-relational persistence framework. The ORM data access
services will provide persistence to the interface and Application Softwares infrastructure data in
database and facilitate creation, updation and deletion of entities and relation

28

Registration Department Tamil Nadu RFP for SI Selection Volume I

Data Layer

The Back end Departmental Data will reside in this layer. The autonomy of the data lies completely
with the department.
Integration Layer

All interfacing with other department specific application services, external system service (if any)
will take place through this layer. This layer will provide relevant service communication
infrastructure encapsulates container environment for services, service interface, protocol
translation, message routing, data transformation services etc. Integration service will enable the
system to consume different external services exposed this service will also expose services
which can be consumed by other ministry applications, payment authority, etc.

29

Registration Department Tamil Nadu RFP for SI Selection Volume I


Typical Registration System Architecture:

30

Registration Department Tamil Nadu RFP for SI Selection Volume I


The Proposed IT Data Centre Architecture (typical) is schematically shown below
Trusted Source

Untrusted Source

Access Layer
Router

Link Load Balancer

Intrusion Prevention
Perim eter
Firewall

Service Layer

Si

Si
Si

Access Switch

Envisaged Registration
Application
Core Layer

Service Layer

Core Switch

Internal
Firewall
Server Load
Balancer
Ethernet

Management Layer

Si
Si

Si
Si

Si
Si

31

Si
Si

Registration Department Tamil Nadu RFP for SI Selection Volume I

6. Scope of Work Phase I


The scope of work of this RFP is to select System Integrator (SI) who shall design, develop,
migrate, install, test, train, supply hardware & successfully implement the total end-to-end
integrated eGovernance Solution for Registration Department and Operate Maintain & Manage
the solution for period of 5 years post Go-Live. The scope has been strategically dived into two
phases (viz Phase I & II), a brief outline of activities covered in each phase is captured below:

Phase I
This phase starts from the date of issue of LOA to the SI till the date of Go-Live. The SI has to
design, develop, migrate, install, test & implement the end-to-end integrated eGovernance
Registration Solution, throughout the state of Tamil Nadu as per the detailed technical
specifications and schedule of requirements given in the tender. The SI has to supply &
commission the necessary IT compute & support Infrastructure at the various offices as per the
RFP requirements. The SI shall engage in preparation of all offices identified for supply of
hardware with LAN connectivity, electrical connectivity with necessary backup & adequate
redundancy. The existing furniture may be used for placing the required supplied hardware to
respective office, incase of any additional requirements the same made available by the SI.
The SI shall also carry out the necessary Capacity Building & Change Management process for
effective roll-out of the end-to-end eGovernance solution in the state of TamilNadu.
The legacy registration database shall be migrated to envisaged end-to-end Registration
application. The SI shall also responsible smooth migration of digitized historic data provided by
Registration Department. The SI shall facilitate the Registration Department or its Designated
Agency in sharing the data template / structures in which the historic manual data needs to be
digitized, so that there are no challenges during migration.
This developed application shall primarily be rolled out on pilot basis in 10 Sub Registrar office
(SRO) along with atleast higher grade office offices like of IGR (1), DR office(1), Zonal(1), DIG(1),
SDC(1), REGiNET Centre. The IT compute infrastructure installed at State Data Centre, National
Disaster Recovery Centre (DRC) & Near-line Data Centre shall house the application & database
in redundant manner. Post the pilot implementation the system run through stabilization period of
10 days, during the period the system should be able meet the operational SLA requirements
mentioned in this RFP. On compliance to the same the system is deemed to be stable and fit for
State-Wide Roll-Out. The SI shall ensure all the sites are commissioned with necessary compute
& support infrastructure so that web-based application can be made operational throughout the
state of TamilNadu. The SI shall also need take the existing desktops through buy back scheme
post the hardware supply & successful Go-Live.
The SI shall also ensure the application is free from vulnerabilities through a comprehensive
security audit and this mandatory security audit exercise shall be periodically carried out to ensure
the application is free from security threats. The SI is expected to meet minimum required Service

32

Registration Department Tamil Nadu RFP for SI Selection Volume I

Levels mentioned in the RFP w.r.t this implementation phase & liable for penalty incase of any
breach.

x.

Project Deliverables
The Project Deliverables are in two Phases as given below,
Phase I
This phase starts from the date of issue of LOA to the date of Go-Live.
The Successful Bidder has to

Design, Develop, Test & Implement the end-to-end complete integration of


Registration Application along with a web portal for e-service delivery. The web portal
will be an interface to interact and seek registration department services through
internet. Services such as Document Registration Module (includes Model form
creator and SD and Fees calculator), Issuance of Certified Copies, Issuance of EC,
Societies Registration Module, Issue of Birth and Death Extract, Chit Funds
Registration Module, Filling of minutes for Chit Funds, Firm Registration Module,
Marriage Registration Module, Searching for marriage details, Firm, Society, Chit
funds details, etc and ePayment module. Static data for the web-portal will be
provided by the department while only dynamic content would be required to be
fetched from the SDC databases.

Data Migration of historic data which may include both data capture & data migration
of legacy records into the new systems database.

Site preparation work at offices where new hardware is to be supplied by the SI

Staggered Supply and maintenance of hardware as detailed in the RFP

Centralized Helpdesk System setup

Connectivity Supply of routers and set up of an alternative network

Commissioning of Data Centre, Disaster Recovery Center and near-line Disaster


Recovery Center

Change management & Capacity Building

Security & Performance Audit

Pilot Implementation

Stabilisation - Monitoring of Registration Application & support infrastructure for


Stabilisation & Trail-Run

State-wide Roll-Out & Go-Live - Preparation of State-Wide Roll out Strategy plan; the
Go-Live shall be declared after the successful meeting the SLA/performance metrics
during the Stabilisation Period

Buy-back of existing hardware

On successful completion of Pilot Implementation, State-Wide roll out shall


commence

33

Registration Department Tamil Nadu RFP for SI Selection Volume I

Provide and maintain a web portal for citizens, mail server for the department people
and registered citizens

During Phase I, the Successful Bidder has to submit stage-wise Reports and it should be
done strictly in accordance with the scope of work. If the Implementation is not effected as per
tender, Department has the right to cancel the order and to take any such action which will be
deemed fit in such circumstances.

xi.

Design, Development, Testing & Acceptance of Registration Application


Software
The application shall be designed as a work-flow, web-based, 3-tier architecture. The Successful
Bidder shall prepare:
1. A comprehensive High Level System Design (HLSD) Document: The HLSD document
shall contain Data Flow drawings, proposed system architecture, Database architecture
including clustering, mirroring, back up strategies, defining data structures, data dictionary,
etc. as per the standard laid down by government of India/Tamil Nadu.
2. A comprehensive Low Level Design (LLD) document: The LLD should detail each and
every module of the system with the functional logic involved.
3. Relevant System Requirement Specification (SRS) based on the Envisaged process &
Functional Requirement Specifications document attached in this Tender. The SRS shall
be reviewed by the consultant & nodal offices of the Project Implementation Committee
(PIC); based on their recommendation, PIC would approve the SRS with which the SI
would develop the application.
4. Data Architecture detailing interface and integration architecture, etc. The SI shall deploy
adequate manpower with appropriate skill sets to ensure robust application development.
The SI shall also deploy required hardware for development & testing of the Registration
Application.
5. The proposed system should be capable of interfacing with external systems/ agencies in
order to allow for exchange of data and communication with those systems. The following
is an indicative list of external systems / agencies that the proposed system should be
capable of interfacing with:
a. Courts
b. UID
c. Income Tax
d. State Portal and SSDG
e. MSDG Mobile Service Delivery Gateway
f. Corporation and Municipality Database
g. TN Electricity Board
h. Food and Civil Supplies Department
i. Road Transport Corporation
j. Election Commission

34

Registration Department Tamil Nadu RFP for SI Selection Volume I

k. MEA database passport


l. RBI for verification of Bank details
m. Revenue Department patta
n. Survey and Settlement Department
o. CSC and other citizen service delivery projects such as eDistrict
6. The SI should develop any additional modules required by the department arising due to
any change in the existing Act and rules without any additional cost.
7.

The application developed by SI should compatible with various mobile platforms also.

8. The Application software prepared by the SI should have a bi-lingual interface (English and
Tamil)

xii.

Application Implementation, Testing & Acceptance


The System Integrator should develop a Registration Application Prototype to simulate certain
aspects of the Registration Application. This activity should be done parallelly and should be
showcased to the Registration Department for any feedback and approval. This activity should
help in getting valuable feedback in developing the final application.
The module-wise application would be developed & tested by the SIs Testing team. SI should
carryout Integration Testing, System Testing and Performance & Load testing and provide the
results for review by the department. After successful completion of the unit testing, the application
shall be tested for integration & User Acceptance testing at the pilot locations.
The System Integrator will develop the UAT Test plan and a detailed User acceptance procedure.
The same would be reviewed and agreed by the Department. A high-level approach to be followed
by the selected System Integrator for the acceptance testing is mentioned below:
a. UAT would be applicable once the web-portal is operational and all the modules under
the Contract are operational and linked.
b. UAT would involve:

c.

Development of Test cases and their approval from the Department

Application functional testing and testing of other Quality-of-Service requirements

For all tests performed by the Department, the selected System Integrator will prepare the
test reports and submit to the Department for approval. Defects identified in any round of
UAT by the Department would be communicated to the System Integrator. The System
Integrator will do the needful to troubleshoot or resolve the defects and resubmit the
application to Department for UAT. This iterative process for UAT will be performed till
zero defects are shown by the selected System Integrator for the test cases
developed.

d. The selected System Integrator would ensure that errors detected in previous round of
tests do not get repeated in successive tests.
e. Partial acceptance testing (PAT) for each module as and when it is ready can be taken up
by the Department
35

Registration Department Tamil Nadu RFP for SI Selection Volume I

f.

The software application and test environments required to conduct UAT / PAT by the
Department would be provided by the selected System Integrator along with all the
information necessary on-site to complete the UAT / PAT. The test environment would be
maintained by the selected System Integrator and transferred to the Department at the
End of the Contract.

g. The selected System Integrator would inform the Department in writing 15 days in
advance of the date by which it would be ready for PAT / UAT
h. The Department reserves the right to appoint a Third Party Assessment and Acceptance
Agency to review and evaluate the selected System Integrator on test cases and test
results.
i.

Documentation at this stage to include but not be limited to the following


a. Test cases
b. Test results
c. Test assumptions
d. Test coverage and boundary conditions

The pilot district(s) may be decided later by the Registration Department in consultation with the
selected SI and pilot implementation plan may be subsequently finalized. The pilot implementation
should cover the following offices (at least one type of each office should be selected for pilot):
1. IGR office, Chennai
2. Special Deputy Collector Offices (Stamps)
3. Deputy IGR office
4. AIG office
5. District Registrar office
6. Sub-registrar office
SI should supply new hardware to all the pilot locations. However, the pilot implementation should
test the applications and compatibility and stability on both new and old machines. This is
important because during state-wide roll-out, some SROs will have old hardware and some will
have new hardware supplied by the SI.
Before the commencement of Acceptance Testing, the SI shall showcase their readiness for AT.
The consultant along with nodal officers engages in a comprehensive system review & Acceptance
Testing with functional use-cases & predefined AT templates. In case of any observation made
during the AT, SI shall make necessary corrective measures & have new version release. Each
version release shall have proper documentation to articulate the type of change made effect in the
current release. After successful completion of Pilot Implementation; the pilot locations shall
continue to run the application till the date of Go-Live.
Based on the learning from the Pilot implementation SI shall prepare a comprehensive application
Roll-Out strategy. The SI shall Roll-out the application based on approved Roll-Out strategy plan.

36

Registration Department Tamil Nadu RFP for SI Selection Volume I

The Final Acceptance Testing (FAT) for rolled-out application shall be tested for both remotely &
onsite basis. The FAT shall be done by the Department/consultant & their recommendations shall
be reviewed & approved by the PIC. SI must get the application Vulnerability Assessment &
Penetration Testing (VAPT) complaint before hosting in the State Data Center.
The SI shall submit a comprehensive O & M manual which shall articulate on how to use the
registration application & also detail about the various features of the Registration Application. The
O & M shall be reviewed & approved by the PIC based on the recommendations from the
consultant.
The SI shall also provide demo of the Registration Application with voice-over detailing the various
features, FAQ, live demonstration to facilitate e-learning of the end users. This demo should
adequately address the needs of both new users & others users with some doubts in the system.
These informations may be added to all the modules and should be stored in the central server. All
the office staffs should be able to access the videos from the application itself as and when
required. Any changes implemented in the software modules should also be updated and
uploaded in the respective module demo video.

xiii.

Data Migration
i.

One time legacy data migration to proposed Database

The historic data amounting since 1975 shall be effectively migrated. Major data migration includes
- i. Index II data since 1975 which has approximately 6 Cr records; ii. Scanned documents which
have approximately 2.4 Cr records; and iii. Other smaller miscellaneous databases such as Index
III, Index IV, Guideline register, list of local bodies, Chits with 22201 running chits, Firms with 7020
registered firms, Societies with 1,88,471 registrations, Hindu marriage with 4.22 lakhs records, etc.
Index II data and other transactional data table migration should be done ensuring Unicode
compatibility and it should support bilingual (English and Tamil) data entry. Data migration should
be ensuring minimum business downtime for the department. Also, pilot implementation should
ensure all the relevant data migration is successfully completed. Scanned Images are captured in
two tables Scanned index and flat file table and total size is 12 TB. The different types of data
tables are also classified as below:
a. Data from SRO Master tables, transactional tables such as index II, III & IV, Hindu
Marriage & Tamil Nadu Marriage and Scanned images available in the SRO,
The data from the SRO office alone to be migrated in the proposed system database
and central database should not be used for migration.
b. Data from DRO Master & Transactional tables of Firms, Chit & Society, etc. The
data from the DRO office alone to be migrated in the proposed system database and
central database should not be used for migration.
c. Other database like Guideline, etc.

37

Registration Department Tamil Nadu RFP for SI Selection Volume I

The scope may also include data capture of few of essential fields that are not available in the legacy
application. The SI shall comprehend the existing data structure & prepare and submit migration plan,
clearly articulating the field level mapping between the legacy data & fields in the proposed system.
The database structure of the legacy system is to be properly mapped with the proposed database
structure and then migration should be carried out. SI shall ensure through fool-proof data migration
strategy in order to achieve a 100% accuracy of data migration. The SI shall also engage in Data
Cleansing if required before data migration in order to have seamless & hassle free operations. The
quality of the data migrated shall be checked as per ISO standards and accuracy of the migrated data
should be 100%.
ii.

Facilitate digitization by Registration Department/Designated Agency

Responsible for porting of digitized data by Registration Department / Designated Agency into the
proposed DB. Also facilitate the client / third party agency during the data digitization process
a)in sharing the data structures
b)in sharing Physical IT infrastructure provided by SI

xiv.

Site Preparation
The SI is expected to prepare the client sites for setting up the necessary client site infrastructure.
Site preparation at SROs & DROs will exclude providing connection from the main power supply &
will include but not limited to:
a) Body Earthing for infrastructure such as UPS, DG set, etc
b) LAN connectivity (LAN Cables, LAN ports, etc.) with adequate redundancy with
minimum 5 spare over and above the connected hardware for entire SR office
c) Electrical cabling for UPS and Genset, adequate rating Power sockets & switches for
UPS, Desktops, printers
d) After supply of hardware at various offices & peripherals to be placed using the
existing furniture
e) Facilitate during shifting of SR / DR office site. The likely office shifting shall be
approximately 50 offices per annum for 5 years
f)

The electrical cabling and LAN cabling length will vary from 10 meters to 50 meters.
The bidders are advised to visit few sample sites to assess the actual requirement
and quote accordingly. The selected SI will have to wiring for as much length
optimally required at the Registration Department offices.

In addition to the above, other activities as needed shall be carried out by SI to ensure successful
site preparation and installation at every access location to commission it. Site Preparation shall
cover all the activities necessary to enable the SRO/DRO to setup the client side infrastructure and
operate the registration application to be developed by the SI.

38

Registration Department Tamil Nadu RFP for SI Selection Volume I

xv.

Staggered Hardware Supply, Installation & Commissioning


The SI shall supply all the necessary server, storage, network infrastructure that is detailed in the
consolidated BOM in Vol. II of this tender. The SI shall size the servers & other related
infrastructure keeping in mind the total number of SR offices (600 locations including buffer),
concurrent internal users (1000 max), external / citizen users 5,000-10,000 concurrent users
transactions volumes, packet sizes, etc. All the offices already have legacy desktops and other
peripherals which would be used till new hardware is supplied. . These PCs have already been
pre-loaded with MS Windows OS (2007, XP and 2000 versions). However, the SI would be
required to procure hardware (Desktops, printers, vertical scanners, UPS, comfort AC, etc.) for all
the offices in different phases as detailed below. The Department shall provide the space for
installation, furniture, electricity.

Particulars

No. of
offices

Type A Offices for H/w support

168

Type B Offices for H/w support

284

Type C Offices for H/w support

108

Type D with only 3 years


warranty
Sub Total

575

Type B DRO (Admin) offices

41

15

Today

Y-0

Y-1

Y-2

OLB
FMS+
EWC
FMS+
EWC
FMS+
EWC

Y-3

Y-4
SI

SI
SI
SI

FMS+
EWC

SI

Type A DRO (Admin) offices

OLB

SI

Type A DRO (Audit) offices

45

OLB

SI

Type A DIG offices

OLB

SI

Type A SDC offices

11

OLB

SI

Grand Total

Y-5

690

The table below shows the estimated number of hardware to be procured in a particular year. The
bidder should provide the price bid details accordingly. AMC for Type A offices should be the
responsibility of SI after the OLB terms expire. These offices will not receive new hardware but old
systems will have to be maintained.
The above table divides all the 690 offices of Registration department into four categories namely
Type A, B C and D depending on the time of expiry of the contract for the office hardware. Type A
offices have the most latest contract initiated on 1st August, 2011 that will expire on 31th July,
2016. For these offices, the SI would be required to take over the AMC for all the office hardware
for which the contract expired. The SI shall quote the AMC cost for till the expiry of its own contract
with the registration department. Type B represents those offices where the current contract has
ended on 31st July, 2012. In this case, the SI has to procure the hardware immediately after
signing the Master Service Agreement (MSA) with the Registration Department. The SI has to
procure and maintain these offices for the period before the Go-live as well as for entire 5 years
39

Registration Department Tamil Nadu RFP for SI Selection Volume I

after the State-wide Go-Live or more as long its engagement with Registration Department
continues and shall accordingly provide its quotes. For Type C and Type D offices the SI has to
procure the required hardware immediately after signing the MSA. It should be noted that SI shall
provide ADF scanners for all the 625 offices from the start of the go-live of the project and provide
support for the remaining 5 years. The detail requirements of infrastructure for all types of
registration offices have been provided in the table below:
i. Hardware requirements at Registration Department Offices:

Type of
Office

SRO 1
SRO 2
SRO 3
SRO 4
SRO (Rest)
DRO (Type
B)
DRO (Type
A)
DIG Office
RegiNet
RTI
Zonal AIG
Chit
Arbitrator
SDC
Total

Units

PC with
OS

Vertical
ADF
scanner

MFD

Laser
Printer

UPS 5
kVA

UPS 3
kVA

Comfort
AC (1.5
Ton)

181
140
54
32
168

4
5
6
7
0

1
1
2
2
1

1
1
1
1
1

1
1
1
1
0

0
0
1
1
0

1
1
0
0
0

1
1
1
1
0

41

9
9
1
1
4

0
0
5
10
2

1
0
0
0
0

1
1
1
1
0

0
0
1
1
1

0
0
1
1
0

0
0
0
0
1

0
0
1
1
1

3
11

2
1
2134

0
0
711

0
1
647

1
0
457

0
0
88

1
0
369

1
0
457

The hardware listed above should all be supplied immediately after the SI is onboard except for
the vertical ADF scanner. The vertical ADF scanner should be supplied only after during Statewide roll-out and should be commissioned during Go-Live.
Activities to be carried out by the SI at the offices where new desktops are supplied:
a) Preload image (Latest Windows OS, STAR application, Accounts, Scanning,
marriage, antivirus) at the SR/DR offices; Registration department already has 1236
Windows 2000/XP licenses which should be upgraded by the SI. For the remaining
desktops supplied by the SI, fresh windows licenses should be purchased by SI
b) File transfer of scanned copies, registered documents in the SRO / DRO office
available in the old systems into the new supplied system
c) Testing & UAT of legacy application should be done on the new hardware supplied by
the SI & Commissioning the hardware. This will commence the O&M for the supplied
system.
40

Registration Department Tamil Nadu RFP for SI Selection Volume I

d) Vertical ADF scanners and MFD supplied at all locations by the SI have to be
maintained by the SI for the entire contract period.
For the offices where SI is not supplying new desktops, the existing hardware will be maintained
by OLB operator till 31st July 2016. After that, all these hardware listed above should be
maintained by SI till the expiry of SI contract. The hardware available at these 242 offices is as
follows:
Type of Office

Units

PC with OS

Laser Printer

UPS 5/3 kVA

Comfort AC

168

840

168

168

168

DRO(Admin)

36

DRO (Audit)

45

90

45

45

45

DIG

27

SDC

11

11

SRO

ADF and MFD supplied by SI at all these offices have to be maintained by SI only. SI should
ensure power back up as per technical specification mentioned in Volume-II. To ensure proper
backup, the SI should replace the UPS batteries.
The SI shall however plan & supply the adequate software licenses w.r.t Database, Middleware
& GUI required for the Registration Application. The SI should provide proper encryption in the
database to the store the data safely. Incase Registration Application is to be developed in
Windows based environment then all desktops/PCs in the offices would not require any
additional licenses to be installed in the desktops/PCs. All the servers shall be supplied with OS
license coupled along with it. Desktops supplied to registration department should all be
SYSmark rated.
ii. Additional Support Infrastructure - DG Sets:
The Registration Department is in the process of procuring DG sets for all its SROs. The SI is
expected to maintain all the DG sets already procured by Department and should also procure
DG sets for all the remaining SROs for which DG sets have not been procured by the
department. Diesel cost would be reimbursed on actual to SI however other consumables such
as lube oil, etc. would be borne by SI. The SI should supply 269 DG sets of 5kVA while it
should also maintain the 317 DG sets of 7.5 kVA already procured by Registration Department.
Below are the details of DG sets procured/planned to be procured by the department:

41

Registration Department Tamil Nadu RFP for SI Selection Volume I

S.No.

Quantity

DG Capacity

Brand

Month of Procurement

17

7.5 kVA

Mahindra

April 2012

150

7.5 kVA

Mahindra

To be supplied in the month of


April 2013

150

5 kVA

To be procured

Addition of any hardware required by the department as an enhancement at a later stage should
also be supplied by the SI. The supply price would be decided by the PIC after seeking a quote
from the SI. The committee shall seek market rates to decide the final approved price at which the
hardware should be provided

xvi.

Centralized Help Desk


Registration Department intends to set up a central Helpdesk in the state in order to provide the
departmental personnel and external users of its system a one-stop solution for resolution of all
their IT and business process related queries / grievances. An indicative list of activities that the
selected System Integrator would be required to perform for set-up and operationalization of the
Helpdesk are detailed below.
All users (departmental and external) of the system should be able to log a request in the system
using any of the following channels:
1. email
2. Telephonic call on the Toll-free Helpline
3. Online chat on the departmental web-portal
4. Through intranet for departmental users or web-portal for external users
The detailed description of activities to be performed by the selected System Integrator for the
Helpdesk is as listed below:

i.

Site Preparation at Helpdesk


The selected System Integrator has to operate the central Helpdesk on a 24x7 basis from the
Department office in Chennai. The space for the Helpdesk will be provided by the Department.
The selected System Integrator will be responsible for the site preparation at the proposed
Helpdesk location. The minimum site preparation requirements are given in the table below. The
selected System Integrator has to deploy all necessary infrastructures and prepare the site so as
to meet the SLAs mentioned in the RFP.
S. No.

1.

Location

Minimum Site preparation Requirements per Site

Helpdesk
(Space
provided

1. Adequate firefighting equipment


to

be
by

2. Generators
3. UPS with at least 30 minutes of backup upgradeable to 2 hours.

42

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Location
Department)

Minimum Site preparation Requirements per Site


The minimum battery backup required to be provisioned by selected
System Integrator is 30 minutes
4. Structured cabling for Electrical and Network Wiring and Cabling.
The SI needs to undertake the assignment to design, lay & maintain
structured cabling for providing electrical and network connectivity to
all the required devices. The cabling done should ensure adequate
rodent protection, protections at difficult corners of the building,
waterproof cabling. The cabling should be done in a manner so that
least changes are required for future expansion & should also be
resistant to wear & tear.
5. Required Furniture for seating operators
6. Toll-free number with 5 lines
7. Air-conditioning if deemed necessary by the System Integrator
8. Partitioning of the space for operator as required should be done
by the SI
Please note that Civil works, flooring etc at Helpdesk are not
required to be done by the selected System Integrator as part of this
Project

ii.

IT Infrastructure at Helpdesk
The selected System Integrator will be responsible for procurement, installation, commissioning
and operating the IT infrastructure required for the smooth functioning of the Helpdesk. Minimum
IT infrastructure to be provided at Helpdesk is desktops - 5, Antivirus software (client licenses) - 5,
toll-free number 5, helpdesk application 1, EMS license.

The detailed scope of work including indicative list of activities to be performed with respect to the
Infrastructure component of the Helpdesk is similar to that of infrastructure at various other office
locations and may be referred to in Section 3.3 of this Volume of the RFP

iii.

Application Software at Helpdesk


The selected System Integrator will be responsible for installation of application software at the
Helpdesk under the purview of this Project. The functional requirements of the Helpdesk
application are listed below:

Helpdesk Functional Requirements


1

Helpdesk should be able to receive requests from internet / intranet / chat/ phone.

All requests received from external and internal users from the portal / intranet / chat/ phone

43

Registration Department Tamil Nadu RFP for SI Selection Volume I

Helpdesk Functional Requirements


should be logged into the Helpdesk application along with details of who made the request
(User name, email ID), time and date of request etc
3

For requests received via phone, the system shall have the capability of Calling Line
Identification (CLI) or the Automatic Number Identification (ANI) from the telephone system.

A menu based IVR should help categorize the calls and for every call landing on the
Helpdesk through the Helpline, it shall be possible to intelligently route the calls to specific
operators, based on nature of call. If a caller abandons/disconnects the call while waiting for
an agent, such abandoned calls shall be removed from the queue.

System should be able to match the detected number of the caller with the existing dealer
database to retrieve their profile/related information.

System should allow categorization of the request based on type of problem. The application
should be menu-based to arrive at the category of the request.

System should provide unique reference number for all requests logged which can be
quoted by the users at the Helpdesk to know the status of the request

System should send acknowledgement of request received at Helpdesk through SMS or


email to the users (if the user is internal staff or a registered dealer)

Depending upon the category of the request, system should route the request logged into
the Helpdesk application to the designated Helpdesk operator or to a designated officer
within the Department as per process agreed for resolution of requests.

10

System allows queuing of request by category. Requests should be resolved on a FIFO


basis

11

System should allow the user to submit details relating to the response / resolution of the
request

12

After the resolution of any issue, system should send e-mail and SMS requesting for
confirmation of the issue resolution from the internal user who had logged the request.
System shall facilitate capturing the feedback, in both quantitative and qualitative manner as
agreed with Department, from the caller through email, SMS or online form for each call
logged by the caller

13

User should be able to close the request after receiving confirmation from the internal user
or otherwise in case of external user

14

System should allow voice recording of calls as per requirements of the Department.

15

System should provide facility in Helpdesk application to create a knowledge base of all
request logged through various channels and their resolution to allow operators to search /
query the knowledge base based on keywords

16

The knowledge base should provide for FAQs and also be able to provide for the import of
any issue along with its resolution method into the knowledge base

44

Registration Department Tamil Nadu RFP for SI Selection Volume I

iv.

Helpdesk Operators
The selected System Integrator is required to provide operators at Helpdesk for operating and
managing the Helpdesk on a 24 x 7 basis. The operators would have to perform various activities
including:
a.

Understanding the query/issue in the reported request. Query could be related to the

following:
i.

hardware including issues related to desktop/laptop, printer/multi-function device,


local server, routers/switches

ii.

application including login and password issues, accessing a particular module,


navigation assistance, report generation assistance

b.

iii.

network including internet/intranet and Tablet PC connectivity

iv.

others including Digital Certificates

Providing information/ clarification on the spot in case of an informational query or providing

necessary troubleshooting assistance in case of a logged issue.


c.

Forwarding the query to concerned departmental personnel in case the selected System

Integrators personnel does not have sufficient knowledge to answer the information sought and
the query pertains to departmental procedures / policies. The answers to such queries should also
be recorded in the knowledge base for future reference
d. In case of technical issues for which a resolution is not possible instantly, the operator
will submit the request into the system for escalation and further action by the System
Integrators team.
Specific qualifications and experience of manpower to be deployed for Helpdesk operations are
below:
a) Minimum Educational qualifications and certifications: Graduate/Diploma in IT / Computer
Science (atleast 2

nd

division) from a University recognized by Central/ State Government of

India
b) Should have atleast 1 year experience as a Helpdesk operator as on date of submission of
Bid
c) Should be fluent in speaking/reading/writing of at least English and Tamil.
d) Should have expertise in computer skills including usage of operating systems, browsers,
word processing applications.
e) Should have been trained on use of Helpdesk application
f)

Should be familiar with and possess basic knowledge of services, procedures and processes
of the Department

v.

Toll-free Line
a. The selected System Integrator is required to provide the Helpdesk services over a Toll-free
number. Atleast 5 lines should be available 24 X 7 for the Helpdesk services.

45

Registration Department Tamil Nadu RFP for SI Selection Volume I

b. Any one-time charges such as those for procurement, development, registration,


commissioning, etc of the Toll-free lines and any fixed recurring charges such as monthly
rentals etc will be borne by the selected System Integrator for the period of Contract.
c. The phone lines would have to be procured in the name of the Department.

vi.

Helpdesk Capacity
The selected System Integrator is required to provide a minimum 5 seater Helpdesk with 5 phone
lines during all hours (24 x 7). The helpdesk should be manned by 5 operators during the peak
hours (10 AM to 7 PM) while minimum of 2 operators should be available during the off-peak hours
providing 24x7 support. However, if the selected System Integrator believes that in order to meet
the SLAs, additional capacity is required, the same may be provided by the selected System
Integrator. It is also to be noted any supervisors required for the Helpdesk operators would be over
and above the 5 operators mentioned.

vii.

Call logging Critical & Non-Critical Calls


The calls logged should have two types of priorities 1. Critical calls that lead to inability of
registration offices to provide all services to citizens or perform critical back office functions at any
location(s). Such calls will include issues with hardware, software, network, etc. Any dysfunctional
hardware at any of the registration offices would be classified as critical, and 2. Non-critical calls
that do not lead to complete disruption of services at any location(s). Further, Calls related to
application, hardware at registration offices and SDC may be classified as calls pertaining to
availability and performance which may be again classified as critical or non-critical. Availability is
inversely related to downtime while performance is related to memory usage, CPU usage, etc. The
SLA for handling these calls have been provided in section 11.3.

xvii.

Connectivity
All the offices locations namely 575 SROs, 50 DROs (admin), 45 DROs (audit), 11 SDC offices, 9
DIG offices, IGR Office, REGiNET Center, Registration Training Institute (1) and State Data Center
needs to be connected through completely redundant MPLS cloud. In locations where MPLS cloud
is not available due to geographical constraints such as hilly areas, etc. alternate reliable
connectivity may be established without compromising on the minimum bandwidth proposed for
the location. Such locations envisaged with alternate connectivity needs to be reviewed &
approved by Registration Department. The SI is allowed to implement alternate connectivity only
for such approved locations & all other locations shall only operate on MPLS cloud. Location-wise
bandwidth is mapped for all the SROs in Annexure. The minimum bandwidth connectivity at the
various Registration offices as shown in the table below:

Type of Offices
State
Data
Center

National
DR
Center
(NKN)

Nearline
DRC

Class A
& IGR
Office

46

Class B,
RTI &
REGiNET

Class
C

Class
D

DRO,
DIG &
SDC
Office

Registration Department Tamil Nadu RFP for SI Selection Volume I

No of Reg.
trans. Per Day >
No of Offices
Min. Bandwidth
Requirement

1
45
MBPS

More than
60

60-40

40-20

0-20

186
1
MBPS

302
512
KBPS

70
512
KBPS

29

61

100
MBPS

As
required

2 MBPS

1 MBPS

The same shall be increased as & when there is increase in internet traffic to avoid any latency.
The internet connection shall have minimum uptime of 98.5% calculated on a quarterly basis. In
case of any non-conformance appropriate penalty as per agreed SLA shall be applicable. The
application shall remotely communicate with the central database through a secured VPN based
tunnel. The Digital Certificate shall be used for better & enhanced secured & authentic
communication. However, it should be noted that actual bandwidth requirement may be reduced or
increased at the discretion of the department for some of the offices depending on the volume of
transactions.
Additionally, the SI would be needed to supply routers as per the bill of material (mentioned in VolII of this RFP) for locations where no routers are presently available. During implementation, SI
should configure all the modems for the MPLS connectivity and commission after testing for use by
the department.
The current TNSWAN (Primary) connectivity infrastructure has completely redundant fibre
connectivity till district level from TNSWAN Headquarter POP (located at ELCOT premise,
Perungudi, Chennai - co-located with TNSDC). Horizontal connectivity from the district level to the
registration department offices such as Sub-Registrar offices, District Registrar offices, etc. is on
less reliable copper wire based connectivity. In order to ensure High Availability of the connectivity
at the horizontal offices (SROs, DROs, etc.), redundant secured connectivity has been envisaged
as detailed below.
Option I VPNoMPLS & TNSWAN All Horizontal Offices of Registration Department will be on
VPNoMPLS and the end point consolidation of all the offices within a district happens at the District
level. From the District to TNSWAN State Headquarter POP, existing redundant TNSWAN fibrebased infrastructure should be leveraged.
Option II: VPNoBB Connecting all Horizontal Offices of Registration Department through a
secured VPNoBB to the State Headquarter NOC through an intermediate consolidation at the
respective ISP level.
The department shall choose an optimal option from the above connectivity options and SI shall be
responsible to ensure the auto-changeover to the secondary on the failure of primary connectivity.
After the primary connectivity is restored, it should switch back to primary. The auto-changeover
capability should be available for the all Registration Department offices.

47

Registration Department Tamil Nadu RFP for SI Selection Volume I

The SI has to ensure that department is able to use TNSWAN connectivity in case of failure of
primary connectivity. However, for SLA calculation, the uptime maintained by TNSWAN will be
taken as downtime for the SI.

xviii.

Primary Data Centre, Disaster Recovery Setup

i.

Primary Data Centre - Tamil Nadu State Data Center

The SI shall pay 1% per quarter of total hardware cost that is to be deployed at the State Data
Centre (SDC) to the Data Centre Operator (DCO) through Registration Department. The
application shall support clustering & virtualization & same may be done for increasing the
utilization of the each server. TN SDC supports rack servers and hence servers provided by SI for
SDC should be rack only. Other hardware such as access switch, etc. should be procured as per
SDC supported infrastructure requirements.
All legacy data shall follow a periodic archival process; such archived data shall be stored in tapes
/ DVD Disks & stored in the fire Proof storage units.

Typical State Data Centre Architecture is given below

Tamil Nadu data center has some common infrastructure that can be leveraged by all departments.
The following common equipments are available from TNSDC:

48

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No
1.
2.
3.
4.
5.
6.

7.

8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Description of Material

Current Qty

Core Switches

Access Switches

10

External Firewall

Internal Firewall

Internet Router

SWAN Interface Fibre module

AAA Appliance

Link Load Balancer

Server Load Balancer

Network IPS

Backup Servers

Staging Servers

Integration Servers

Archival Server

Directory Server

DNS Server

Enterprise Access Servers

NIPS Server

IP KVM Switches

10

Sever Rack (max 5 KVA)

10

Network Rack

The following common infrastructure is available at the TNSDC which can be utilized by the
Government Departments applications planned to be hosted at TNSDC. Therefore, SI may
have to deduce the additional license/hardware requirement for the below mentioned
common infrastructure and procure the same to ensure effective operation and
maintenance of the proposed Registration solution.

49

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No

Description of Material

1.
2.
3.
4.
5.
6.

Make

Model

Current
Qty

HIPS / AV Server

HP

DL380G6

SAN Storage

EMC

Clarion CX4-480

Tape Library

HP

MSL6060

Backup Software

EMC

EMC Networker

Archival Software

EMC

Disk Extender

Security Management Solution

Novel

50

Registration Department Tamil Nadu RFP for SI Selection Volume I

Storage Requirements
Current legacy storage amounts to approximately 12 TB & is expected to grow by 2 TB annually
contributed by about 35 lakh records. The anticipated storage requirement will tend to grow more
than existing trend because of the storage of Thumb Impressions, digital photos, etc or even due
to increase in number of documents and marriages registered every year. The SI shall be
responsible for providing exclusive SAN storage of 40 TB capacity compatible with SDC
infrastructure.
EMS requirements
The EMS Solution implemented for TNSDC is based on CA suite of Tools like CA-Spectrum, CAeHealth, CA-Wily, CA-Insight and CA-Service Desk. For the Postgres and MySQL DB monitoring
Athenta ATPL manager is deployed. Following diagram depicts the EMS Architecture deployed at
TNSDC.
All implemented CA products have been integrated hand in hand in order to simplify the monitoring
console. CA Ehealth and CA Insight have been integrated with CA Spectrum. CA Wily and CA
Spectrum are integrated with CA Service Desk for generating and tracking incidents. Henceforth,
alarms generated from any of the devices and applications (Routers, switches, servers, firewalls,
database & Application processes) will be viewed as an incident in the Service desk.

51

Registration Department Tamil Nadu RFP for SI Selection Volume I

The following are the modules installed for the EMS solution implemented at TNSDC.
Application Name
Application Function
CA Spectrum 9.2

Monitoring of Network devices

a.CA eHealth 6.2


&
b.CA Insight 11.2.4
CA Service Desk 12.5

a. Reporting of Availability
&
b. DB Monitoring
Incident Management

CA Wily APM 6.0

Application Process monitoring


Application monitoring Customer Experience
Manager
Postgres DB Manager

CA Wily CEM 11.1


Athenta ATPL 4
CA Cleverpath portal 4.7 & Athenta Portal
CA Service Desk BOXI (Business Object
Enterprise 3.1)

Managing of DB Tools
Reporting of Service Desk

The following are the agents installed in the CA based EMS solution at TNSDC.
Type of Servers
Agent currently installed
Application Servers

Database Servers
Other servers

ii.

Ca SysEdge Agent
Ca Intro-scope Agent (for .NET & Java webspehere)
Ca SysEdge Agent
Ca Database Agent (Oracle, MS SQL, IBM DB2, SYBASE)
Ca SysEdge Agent

Disaster Recovery Centre

The Registration Department envisages active-passive type of Disaster Recovery (DR)


management. The registration application shall be developed in such a manner with necessary
clustering, such that it facilitates 3 way DR operations. The primary location being TNSDC and
near-line DR to be at the designated place proposed by Department of Registration, Govt. of TN
and the DR is to be located at NIC Data Center, Pune or proposed state owned DR site at Madurai.
In the event of DR site not being feasible, the SI should place the servers in any of the Public sector
owned Data Centers such as BSNL after getting approval from the department. The DR is planned
in a 3 way mechanism with primary side being TNSDC and National DC at Pune

Disaster Recovery Set-up

52

Registration Department Tamil Nadu RFP for SI Selection Volume I

The near-line DR site space shall be provided by the Registration Department. The SI has to
Design and implement adequate data backup, business continuity and restoration procedures for
the departmental data (including but not limited to the database, attachments and all other data
elements created in and generated by the system and users). The SI should also create the
necessary infrastructure for the near-line DR center such as precision ACs, generators, adequate
power backup, physical partitioning, etc. The SI should ensure that there is no single point of failure
and adequate level of redundancy is built in to meet the uptime and other requirements of this RFP.
While building redundancies, it should be ensured that failure of a single component of
communication link does not result in failure of primary as well as secondary connectivity. Hence
primary and secondary connectivity should be taken from 2 separate communication link providers
and both links should not have any single point of failure. Preferably, all the redundancy will be in
auto fail over mode so that if primary component fails, secondary component automatically takes
over.
It should be ensured that data backup till the last transaction occurring in the system to ensure
enhanced service levels and following RPO and RTO objectives:
a.

Peak hours: Zero RPO and RTO <= 15 minutes

b.

Non-Peak Hours: Zero RPO and RTO <= 60 minutes

Periodic testing may be done to ensure that all replication and data synchronization procedures are
in place all the time. Replication between Data Centre and DR Site as well as change-over during
disaster should be automatic and real-time for minimal impact on user experience.
EMS has to be procured by SI exclusively for managing the Registration Department infrastructure
such as desktops and should be installed at the Near-line DR center. Also, it should be used to
configure the SLA requirements and monitor the same.

53

Registration Department Tamil Nadu RFP for SI Selection Volume I

xix.

Change management & Capacity Building


The selected System Integrator would be required to provide training on various aspects to enable
effective use of the new system to achieve the envisaged outcomes. The scope of work of the
selected System Integrator is described in this section.

i.

Preparation of Training material


a) Training Plan: The selected System Integrator would be required to prepare a detailed
training plan covering atleast the trainings to be conducted, targeted audience, location,
dates for training, duration and training content. The training plan would be submitted to
the Department as per timelines mentioned in this RFP for feedback and approval from
the Department.
b) Training Materials: The following minimum training materials will be required to be
prepared by the selected System Integrator to facilitate the training of users:
Method of training

Brief description

Training Artifacts

Training Material

IT infrastructure

English

adopted for

and dummy data

Tamil

departmental users.

for hands-on

Class room training

This approach can be

(Hands-on training)

Languages of

training

Participant
handouts

Online and Paperbased tests to


evaluate the
quality of learning
and Training

Provision for online


and paper-based
feedback
submission

Self learning

Downloadable

English

both the departmental

Computer Based

Tamil

users and for citizens to

toolkits, PPTs and

learn system operations

videos on system

in the new application.

operations and

This would include

usage

This will be useful for

several self learning

FAQs

methods for enablement

Online help

54

Registration Department Tamil Nadu RFP for SI Selection Volume I

Method of training

Brief description

Training Artifacts

of easy learning and

modules with

adoption of the system

search by

by the departmental

keywords, topic

users and citizens

etc.

Languages of
Training Material

Online tests that


may be taken up
by the participant
after completing
the learning to
evaluate his
learning

Online forms to
submit feedback
on the quality of
training material

Approval for training materials prepared should be obtained from the Department at least 2 weeks
before delivery of the training program.

ii.

Training Programs
The selected System Integrator would be required to conduct the following Training programmes.

iii.

Departmental Users

The Training programs proposed for departmental users are mentioned below:
Type of Training
Minimum Minimum
Targeted
Location
number
number of Personnel
of days
participant
s
Project Management
1
943
To be provided
Head
to sub-registrars Office, All
and above
division
offices
Business
Processes/Applicatio
n

3624

To be provided
to Record Clerks
and above

Specialized
Technology Training

30

20

To be provided
to personnel
identified by
department

55

Training
modes

Class-room
training

Head
Class-room
Office, All
training
division

Selflearning
offices
Head Office Class-room
training

Registration Department Tamil Nadu RFP for SI Selection Volume I

Maximum number of participants per Batch: 40

Please note that the selected System Integrator would have to plan for training programs in various
locations in line with the proposed implementation plan. For instance, the selected System
Integrator would have to make arrangements for completing training for the targeted number of
users at the pilot location before the pilot rollout so as to facilitate evaluation of all aspects of the
Project at the pilot location.

iv.

Training Assessment and Collection of Feedback


All users who have undergone the training provided by the selected System Integrator would be
assessed. As part of training assessment, Department would perform the following:

Design forms for gathering feedback on the training course and satisfaction level of trained
participants. The feedback would be aimed at gathering participant inputs on parameters
including course coverage and its relevance, quality of presentation, quality of training
material provided, relevant examples / practice sessions, quality of faculty, logistics for the
training, etc.

Supervising conduct of training exams with the help of SI manpower

Evaluation of exams by the Department or its appointed Third Party Agency with support from
the selected System Integrator.

The selected System Integrators responsibilities as part of training assessment are as follows:
a) Develop computer-based tests for evaluation of training and collecting training feedback.
Details of the parameters for tests / feedback, duration of tests, specific questions etc will be
discussed with the selected System Integrator during the implementation stage.
b) Incorporate the feedback to improve the Training Materials and Methods

v.

Space and Physical Infrastructure


The space required to conduct training will be provided by the Department. The training space
provided will be furnished with seating arrangement and a machine per participant for hands-on
Training. The selected System Integrator may provide anything over and above this, as may be
deemed fit to meet the training requirements of this Project.

vi.

Staffing and Training


The selected System Integrator must ensure that:
a) deployed trainers possess needed skills and experience in the specific domains and are fully
aware of the deployed systems and have a prior experience of training personnel in the
Government sector
b) deployed trainers should be fluent in speaking and writing in English and Tamil

vii.

Other arrangements

56

Registration Department Tamil Nadu RFP for SI Selection Volume I

a. The training environment where users are provided hands-on training should be exact
replica of the live application allowing entry of dummy data etc. Any additional infrastructure
required for this may be budgeted for by the Bidder in the pricing format in Volume - III of
the RFP. The Bidder may provision for this Training environment separately or may
provision to use the Test environment for the purpose of delivery hands-on training to
Departmental Staff. This training environment will be handed over to the Department along
with all other assets at the end of Contract Period.
b. Arrangements for travel/boarding/lodging for the training instructors and supporting staff at
all designated locations across the state would be done by the selected System Integrator
at no additional cost.

xx.

Security & Performance Audit


SI shall be responsible for conduct application Vulnerability assessment, security & performance
audit done by any CERT-IN empanelled agency. Only on successful clearance report through a
compliance audit done by the same agency i.e. post SI addressing all the Non-conformance &
vulnerability aspects the application is deemed ready for Go-live. In case of any default there
would penalty levied as per SLA & Tender conditions.

xxi.

Pilot Implementation
This developed application shall primarily be rolled out on pilot basis in 10 Sub Registrar office
(SRO) along with atleast higher grade office offices like of IGR (1), DR office(1), Zonal(1), DIG(1),
SDC(1), Reginet Centre. The IT compute infrastructure installed at State Data Centre, National
Disaster Recovery Centre (DRC) & Near-line Data Centre shall house the application & database
in redundant manner and should be ready before pilot implementation. Training for the pilot
location staff should be completed before initiating pilot implementation. Pilot locations should be
chosen to include locations with older hardware, new hardware supplied by the SI. Connectivity
should be provided for the pilot locations.
Post the pilot implementation the system run through stabilisation period of 10 days, during the
period the system should be able meet the operational SLA requirements mentioned in this RFP.
On compliance to the same the system is deemed to be stable and fit for State-Wide Roll-Out.

xxii.

State-wide Roll-Out
Once the system has been rolled out across the State post pilot acceptance, the System Integrator
will notify the Department so that the State-wide system may be assessed by the Department/Third
Party Assessment and Acceptance Agency. The procedure adopted thereafter is similar to the
procedure adopted for acceptance of Pilot. A sign-off on the Go-Live will be provided by the
Department after Acceptance.

57

Registration Department Tamil Nadu RFP for SI Selection Volume I

xxiii.

Stabilization Period
The application tested for acceptance testing & Final Acceptance Testing is observed over 5
weeks. The application shall be monitored for consistency & efficiency over a period of time. The
application & resources should be well equipped such that SI is able to comprehensively meet the
SLA / performance requirements.

xxiv.

Go-Live
Go-Live is declared by the Department when the proposed solution becomes operational after
successful conclusion of all acceptance tests to the satisfaction of the Department or as provided
in this RFP.

xxv.

Buy-back
a) The existing infrastructure as detailed below is being replaced by the System Integrator; the
System Integrator is required to buy-back the same. Such buy-back should be done at the
time of commissioning of new system at a particular location/office such that this does not
adversely impact the functioning of the current system or the transition to the new system.
b) The detailed plan and modalities of the same can be worked out with the selected System
Integrator. The System Integrator will have to ensure that all data in the infrastructure being
bought-back is deleted securely.
c) The total buy-back value for this infrastructure should be accounted for by the selected
System Integrator in his Total Contract Value (as indicated in Volume - III of the RFP) which
will be used for evaluation of the Bids.
d) The list of hardware available for buyback is provided below:
Hardware

Quantity

Purchase Date

Desktops

1855

1st August 2007

Scanner

771

1st August 2007

Dot Matrix Printer

825

1st August 2007

UPS (5 kVA)

63

1st August 2007

UPS (3 kVA)

370

1st August 2007

Out of the total number of desktops mentioned in the table above, 784 desktops (2 hard-disk
each at 384 offices) should be bought back without the hard-disk and the hard-disk should be
handed over safely to the particular office SR. The Annexure I of Volume I of this RFP
contains the specifications of buy-back hardwares. If the SI desires to inspect the hardware
condition planned for buy-back, then SI needs to get prior approval from Tender Inviting
Authority & then may pay necessary visit to the respective sites to check the current
conditions of the hardware.

xxvi.

Scalability, software upgrades


All vertical upgrades within supplied IT computer & networking infrastructure shall be responsibility
of the SI. The necessary patch updates, software upgrades for already supplied hardware by SI,
shall be the responsibility of the SI.

58

Registration Department Tamil Nadu RFP for SI Selection Volume I

xxvii.

High availability of application services


In case of failure of the network connectivity / Bandwidth, the application should be able to use the
local infrastructure available at the SROs/DROs to store & render the required services. When
connectivity is restored, the offline transactions should then be pushed to SDC.

xxviii.

Integration with Mobile Service gateway


Integration with Mobile service gateway provided by Govt. of India/NIC should be done by the
SI. The cost arising due to installation and maintenance of the integrated SMS service should
be borne by the SI. The recurring cost of SMS should be borne by the SI.

xxix.

Interoperability requirements
The entire system/subsystem should be interoperable, in order to support information flow and
integration. Operating systems, database and storage technologies from several vendors must
interact well with each other. These systems should support the open architecture solutions such
as XML, LDAP, SOAP, etc. where information/data can be ported to any system, whenever
desired.

59

Registration Department Tamil Nadu RFP for SI Selection Volume I

7. Scope of Work - Phase II


This is a five year period commencing from the date of Go-Live, wherein the Successful Bidder has
to Operate, Maintain & Manage the Registration Application on 24x7 basis as per the requirements,
SLA & contract agreement. The Successful Bidder has to do Vulnerability Assessment &
Penetration Testing of the application within the first quarter of operation. The failure to successful
completion & mitigation of all the risks envisaged in the application shall attract Liquidity
Damages as mentioned in the section 13.45 in this tender. The Vulnerability Assessment &
Penetration Testing (VAPT) shall be carried out on yearly basis till the end of contract during the
O&M phase. The submission of monthly SLA/performance reports should be made strictly in
accordance with the Tender Document and should get necessary approval from Registration
Department. The report SLA/Performance metrics, shall not only capture those metric asked in the
tender however it shall also cover other essential metrics deemed necessary by the department
during this phase. In case of any breach w.r.t agreed performance metrics appropriate penalty shall
be levied as per the SLA & Tender Terms & conditions. After the configuration of the SLA
reports in the EMS software, the application should be audited by the third party approved
by the department. The cost of such audits should be borne by SI.
Based on the Quarterly SLA reports, the yearly Audit reports should be submitted. If the
maintenance terms are not effected as per tender and SLA, Registration Department has the right
to cancel the order and to take any such action which will be deemed fit in such circumstances. The
detailed scope under each above mentioned heads are captured below.
Phase II
This is a five year period commencing from the date of Go-Live.
The Successful Bidder during this phase shall,

Operate, Maintain & Manage the Registration Application on 24x7 basis as per the
requirements, SLA & contract agreement.

Update website regularly as directed and maintain the mail server

Facility Management Services

Provide manpower for outsourced activities such as scanning, biometric and photo
capture, data entry and others for offices with heavy workload

Operations and maintenance

Perform mitigation measures to address various challenges envisaged during the


Vulnerability Assessment & Penetration Testing of the application done by a CERT-IN
60

Registration Department Tamil Nadu RFP for SI Selection Volume I

certified agency empanelled by ELCOT/Govt. of India. This VAPT assessment needs


to be completed within the period specified in the SLA.
The submission of monthly SLA/performance reports should be made strictly in accordance with the
Tender

Document

and

should

get

necessary

approval

from

Department.

The

report

SLA/Performance metrics, shall not only capture those metrics asked in the tender, however it shall
also cover other essential metrics deemed necessary by the department during this phase. In case
of any breach w.r.t agreed performance metrics appropriate penalty shall be levied as per the SLA
& Tender Terms & conditions.
Based on the Quarterly SLA reports, the Audit reports should be submitted. If the maintenance
terms are not effected as per tender and SLA, department has the right to cancel the order and to
take any such action which will be deemed fit in such circumstances.

xxx.

Registration Application Operate, Maintain & Manage


The application developed by the SI has to be maintained for 5 years after the Go-Live. The SI has
the responsibility to make it available as per SLA requirements.

xxxi.

Facility Management Services (FMS)


All the hardware shall be covered under 5 years (effective from date of Go-Live) AMC. The SI
should also provide AMC for all the hardware during the implementation phase apart from the five
year AMC mentioned above. SI shall maintain adequate spares to meet the SLA & Tender
requirements. The connectivity shall be maintained as per SLA & tender terms & conditions. The SI
shall engage in necessary mock Disaster Recovery drill to ensure Business-as-usual status
continuously. The SI shall plan for preventive maintenance strategies to ensure the availability of
hardware in the project. The following activities should be part of the FMS services extended by the
SI to the department:

AMC for IT hardware provided by the SI to locations as per section 1.5. The AMC for
hardware provided at the SROs, DROs and other department offices by the SI immediately
after starting the implementation should also cover the period from the commissioning of the
hardware to the Go-Live and further 5 years from the Go-Live.

AMC for IT hardware for type A offices (242 locations) shall be provided by the SI after the
expiry OLB contracts for the remaining period of the SIs contract with the Registration
Department.

Facilitate support services for IP Camera installation with commissioned hardware

AMC for SDC, DRC and Near-line DRC infrastructure

61

Registration Department Tamil Nadu RFP for SI Selection Volume I

Maintenance of Network Connectivity to meet the SLA requirement. The SI should deploy
adequate technical support manpower to ensure high availability of the connectivity.

AMC for MFD and vertical ADF scanner should also be provided at all the offices during the
entire contract period of implementation and 5 year support.

Consumables: The SI should also provide consumable for printers such as toners and paper
for both laser and MFD printers. The number of pages can be estimated to be equal to four
for each registration. One page will be used for receipt print and the other three pages will be
used for first page print of the Document. Total number of registrations (deed) in the
department was approximately 35 lakhs in 2011-2012. An equal number of ECs (35 lakhs)
were generated. The number of ECs generated at the offices is expected to decrease with the
implementation of web-based system. An EC will also involve a receipt and 3 pages of EC.

For marriage registration, a total of approximately 164000 registrations and 50000 registered copies
were issued in the last year. Each marriage registration would involve a page of receipt and an
average of 3 pages for certificate is used. Number of marriages registered and registration copies
sought are expected to increase every year and the cost of consumables should be estimated
accordingly and increased requirement of consumables should be provided by the SI.
The price quoted for the consumables should include the estimated toner cost. Consumables in the
form of legal size paper should be quoted for 1.50 Cr pages and 55 lakhs A5 pages. Additionally,
quote for 10000 legal size pages should also be provided. This would help in compensating the SI
in case of higher consumption of paper. For consumption of paper over and above the estimated
quantities, the SI shall be compensated for every 10000 extra pages at the rate quoted in the price
bid.
For the DG sets, the SI has to maintain the sets. It should also procure, store diesel for consumption
and the SI will be compensated as per actual consumption of diesel subject to maximum
consumption per hour only.

xxxii.

Operation & Maintenance


The SI shall adequate manpower for overall operation & management of the Registration
application. The O & M team shall be by the SI shall take care of all networking, hardware
maintenance and & software related issues. All issues shall be centrally tracked & monitored
through a help desk system. The front-ending support staff shall have L2 level domain professionals
who need to be available for resolution. These L2 domain experts shall be headed by a set of zonal
in-charge & a project manager. Zonal in-charge shall take care of administrative activities in their
respective zones through the support staff. The SI shall ensure necessary on-job training is given to
their support & zonal in-charges.

62

Registration Department Tamil Nadu RFP for SI Selection Volume I

The SI should deploy the following minimum number of Manpower for running O & M operations
1. One technical manpower per 10 SROs, 1 Project Director, 2 Project managers, 4 Zonal
leads, 1 training manager, 1 helpdesk manager and others as required should be
deployed by the SI for successful maintenance during the 5 years period except the
training manager who may be required only during the period when training for the
department staff is carried out.
2. 3 Programmers at the disposal of IGR to customize the application as needed - There
would be an exclusive Application Support Team (a team of developers who would be
used to develop new modules, add-ins/ons, modify work flow, build enhancements and
other related activities) of minimum of 3 members under the disposal of the IGR office
who shall be responsible for configuration level changes in the Registration Application.
Atleast one of these 3 member team shall necessary track, build custom reports. The
department can seek two more developers as and when needed.
3. SDC support team inclusive of network expert, database administrator, system admin,
etc.
The MIS reports of the effective performance, utilization of the resources are to be submitted
periodically to the registration Department.

xxxiii.

SDC, DRC and Near-line DRC management & maintenance


The SI has to provide support in maintaining the SDC, DRC and near-line DRC infrastructure. At
SDC and DRC, SI will be doing shared maintenance of the Registration Department infrastructure
while he has to fully maintain the infrastructure built at the near-line DRC.

xxxiv.

Manpower Outsourcing
The SI shall provide manpower support for certain activities for offices which have more number of
average transactions per day. The number of such offices is 151. The manpower deployed at these
offices should have the capability of handle all the four activities mentioned below and the
department reserves the right to move any outsourced manpower to another office as needed. The
manpower deployed should first be approved by the department and any underperformance may
lead to removal of a particular resource supplied by the SI. The manpower requirements have been
indicated in the following table:
Class A

Class B

Class C

No of Offices

28

59

64

Avg. No of Transactions Per Day

More than 60

60-40

30-40

63

Registration Department Tamil Nadu RFP for SI Selection Volume I

Class A

Class B

Scanning of Registration Documents

0.5

Capturing of biometrics & photo capture

0.5

Rendering services like searching & EC

Data Entry for indexing in Tamil

Minimum Requirement Per Office

Class C

Resource Requirement
1

The following activities are to be outsourced:


a.

Scanning of Registration Documents - The Department handles a lot of registration

documents that are required to be scanned with a scanner that can handle legal size paper
scanning. The documents are scanned at 200 dpi resolution and this may be changed after
discussion with the Registration Department and SI. The scanning has to be done in pdf format.
The Department registered 3273197 documents in 2010-11. Assuming an average of 12 pages per
document, the assignment would involve scanning of approximately 3.93 crore pages. The
scanning should be carried out with 100% accuracy and no damages should be inflicted on the
document during scanning by the manpower deployed by the SI.
b.

Capturing of biometrics & photo - This activity requires capturing biometric thumb

impression using a biometric thumb scanner and capturing photos of the executants and claimants.
The hardware for the activity is already available at all the 575 sub-registrar offices.
The photos and thumb impression should be taken as mandated by the department without any
errors. The number of transactions for this activity is directly proportional to the number of
documents registered. The manpower deployed for Scanning of Registration Documents and
Capturing of biometrics & photo capture should be proficient in handling computer software and
hardware. They shall also be given a basic training on the particular process before deployment by
the SI.
c.

Rendering services like searching & EC - The number of ECs generated every year is

nearly equal to the number of documents registered in that year. Manpower deployed for rendering
services such as searching and EC would require domain training from the department which shall
be coordinated by the SI. The SI shall prepare a time plan for training the manpower and their
further deployment.
d.

Data Entry for indexing in Tamil and English - Manpower deployed for data entry that

would also populate the index II database should necessarily know Tamil and English typing as well
as read and write capabilities in both the languages. They shall be given a basic training on data

64

Registration Department Tamil Nadu RFP for SI Selection Volume I

entry before deployment by the SI. It should be noted that the names of people and places should
be directly copied from the application form and entered in both Tamil and English during the data
entry. Other details may just be written in one language and the application should provide the
details in both languages whenever searched. The application should thus be able to translate from
English to Tamil and vice versa.
The SI should also deploy IGR support manpower (management staff and programmers) for
supporting the application and catering to the requests of the IGR office. These requests would be
related to updating the application according to changes in the delivery process as mandated by
department and government from time to time. The IGR support team would also be responsible to
configure and create MIS reports as per requests. They may also be required to train the
department staff. The IGR support team should be available for the entire 5 years from go-live of
the application.
The SI shall also provide manpower for supporting the SDC activities. It is expected that the SDC
support staff should help stabilize the application and simultaneously provide knowledge transfer to
the designated department staff to help the SDC support. The SI shall prepare a plan for the
knowledge transfer. The SI shall provide support at the SDC for all the 5 years and quote for five
year of support. The need for support staff at the SDC provided by SI may be assessed every year.
The Registration Department may ask the SI to discontinue the support services by their SDC
support staff and payments for SIs services will be not be made for the subsequent years.

xxxv.

Power backup management Maintenance of DG sets


DG sets supplied by the SI as per BOM in section 2.5 Volume-II, has to be maintained for the 5 year
period. Moreover, the SI has to provide the diesel to run the DG sets on a daily basis to each of the
offices where necessary. The SI can claim the diesel consumption expenses from the department
after producing the necessary bills on a monthly basis. Moreover, the DG sets already procured by
Registration Department or to be procured by the department as detailed in Section-6 Clause No.
(xv), the SI has to maintain it for 5 years. The SI has to provide the diesel to run these DG sets also
on a daily basis to each of the offices where necessary.

xxxvi.

Periodic Security and Performance Testing & conformance


SI shall conduct Security and Performance testing by any CERT-IN empanelled agency designated
by the Registration Department. All Non-conformance & vulnerability aspects need to be
immediately mitigated & closed before 2 weeks of succeeding quarter. In case of any default there
would penalty levied as per SLA & Tender conditions.

xxxvii.

SLA monitoring
The Service Level mentioned in these tender needs to be captured, analyzed & reported to the
Registration Department. The consultant & department nodal officers shall review the SLA reports &
65

Registration Department Tamil Nadu RFP for SI Selection Volume I

ratify the same. Based on the ratification, PIC shall approve the SLA/performance report. The SI
shall get his payment after deducting penalties, if any.

xxxviii.

O&M Phase Extension and Knowledge Transfer


After the expiry of O&M phase, the SI should continue to provide support for an extended O&M
phase of 3 months if the department is not able to bring any replacement in time. The O&M phase
may be extended by another 3 months by Registration Department. If O&M phase extension is
required further, then the department can seek extension of another 6 months on mutual
agreement. The payment for the first six month extension will be same as quarterly payment during
the O&M period. The payment for the extension will be made proportionately as per the actual
extended period. Payment for the next 6 months period will be done on a mutually agreed price.
The SI would be required to do knowledge transfer of the operations, responsibilities to the
department/new SI for a period of minimum 1 month to 3 months with limited manpower and should
transfer all responsibilities to the new team. As soon as a new SI is on-board, the O&M extension
will end and knowledge transfer will start. During the knowledge transfer, the SI will not be paid.

66

Registration Department Tamil Nadu RFP for SI Selection Volume I

8. Responsibility Matrix for Different Stakeholders


The roles of the stakeholders shall change over a period of time as the project will evolve from design
to implementation and enter the operations phase. With this background, stakeholders
responsibilities, illustrative organizational structure for the design & implementation phase, operational
phase is given below:
Below mentioned Table summarizes the roles and responsibilities of stakeholders involved in the
project.

Various Stakeholders identified for the Registration Project are as below:


PIC
Project Implementation Committee
Reg. Dept.
Registration Department
SIA
State Implementation Agency (ELCOT)
NIC
National Informatics Centre
Con
Consultant
DCO
Data Center Operator
SI
Successful Bidder/System Integrator
TPA
Third Party Agency
DIT
GOI Department of Information Technology, Government of India
SWO
SWAN Operator
SG/GoTN
State Government/Government of Tamil Nadu

Stakeholders
S.
No.

Activity
PIC

Reg.
Dept.

Con

Project Conceptualization

10

Defining of System Boundary


Functional Requirement Analysis from various
stakeholders
As-Is and To-Be study of various services /
processes
Approval of As-Is and To-Be study of various
services / processes
Sanction of necessary funds for the project
Preparation of RFP for selection of Systems
Integrator
Brainstorming to strategize the collaborated
approach among all project stakeholders;
finalization of detailed Roles & Responsibilities
Finalization of bid Scope, implementation
model, SLA & other essentials Terms &
Conditions for the RFP
Preparation of Budget Estimate

11

Preparation of Implementation Time Plan

12

Approval of RFP

3
4
5
6
7
8

SI

DCO

SWO

GoTN

Y
Y

Y
Y

67

Registration Department Tamil Nadu RFP for SI Selection Volume I

Stakeholders
S.
No.

Activity

13

Bid Process Management

14

Selection of SI through Competitive Bidding

15

Award of LOI
Review & Finalization of Comprehensive
Functional Requirement Specifications (FRS) of
the various User Departments
Preparation
of
System
Requirement
Specification (SRS) based on FRS
Review and ratification of SRS prepared

PIC

16
17
18
19

Designing of High Level Design Document


(HLD) with application architecture

20

Review & Recommendation of System Design


documents i.e. SRS, HLD document, etc

21

Approval of System Design Documents

22

Software Development

23

Development & Approval of Policy Documents


& Standard Operating Procedures

24

26
27
28
29
30
31
32
33
34
35
3
6
3
7
3
8
3
9
4

Con

SI

DCO

SWO

GoTN

Y
Y

Y
Y

Y
Y
Y

Allocation of space for setting up testing facility


Setting up the testing facility with Hardware and
manpower
Module-wise Unit Testing

25

Reg.
Dept.

Y
Y

Integration Testing for Workflow Application


Pre-AT to showcase the readiness for
Application Testing
Preparation of comprehensive Test-Cases for
applications
Conducting the Acceptance Testing as per
Test-Cases
Preparation of recommendations & Acceptance
Report
Submission of O & M manual, Application files,
etc by SI
Declaration of completion of Successful Pilot
Implementation
Appointment of Third Party Agency (TPA) for
surveillance Audit
Monitoring of Application Stabilization of
Pilot implementation
Strategizing for State-Wide workflow
application Roll-out
Review & Recommendation of Roll-Out
Strategy
Finalization of Terms of Reference (TOR)
for Roll-Out strategy
Preparation of Detailed State-Wide RollOut Schedule
State-Wide Roll out

Y
Y
Y
Y
Y

Y
Y

68

Registration Department Tamil Nadu RFP for SI Selection Volume I

Stakeholders
S.
No.

Activity
PIC

Reg.
Dept.

Con

SI

DCO

0
4
1
4
2
4
3
4
4

Final Acceptance Testing

Go-Live

Monitoring of SLA adherence during


Stabilization period
Conducting VAPT & Periodic Surveillance
Audit

4
5

Reporting of any Application, Infrastructure


& Process Vulnerabilities, deviations, etc

4
6
4
7

implementation of mitigation plan for any


vulnerabilities
Project Closure & Exit Management
Process

Y
Y
Y
Y

69

Y
Y

SWO

GoTN

Registration Department Tamil Nadu RFP for SI Selection Volume I

9. Implementation Schedule
The Implementation Schedule for the Registration application is 55 weeks from the date of LOA to
the date of Go-Live
S.No.
1.

Activity

Target Completion Time

Issue of LOA & agreement signing to the Successful


Bidder

Presentation of System Design (High Level Design


2.

Document), SRS, Data Structures, controls to State


Implementation Agency (SIA) for review & ratification

T + 8 weeks

by the department

Development of Registration Application as per the


3.

approved System Design & architecture for pilot

T + 33 weeks

location

4.

Unit Testing of application

T + 35 weeks

5.

Pilot Data Migration

T + 35 weeks *

6.

Training to key Stakeholders for Pilot Implementation

T + 35 weeks *

7.

Acceptance Testing Pilot Application

T + 37 weeks

8.

Roll-Out Strategising

T + 38 weeks

9.

State-wide Roll Out

T + 44 weeks

10.

State-Wide Data Migration

T + 44 weeks *

11.

Training & Change Management

T + 44 weeks *

12.

Final Acceptance Testing (FAT)

T + 46 weeks

13.

Stabilisation Period

T + 51 weeks

14.

Go-Live

15.

Start of O & M phase

16.

Closure of O & M Phase

T + 52 weeks = P
P
P + 5 years

70

Registration Department Tamil Nadu RFP for SI Selection Volume I

10. Resource Requirement


The table below provides the indicative resources that shall be required SDC operations.

Proposed System Integrator Team


Sr. No.

Role

Shift
9X6

1.

Project Director

2.

Domain Expert

3.

Project Manager

4.
5.

Certification/Role/Qualification

24X7
Advisory Capacity
Retired employee of Registration
Department
PMP / PRINCE Certified

Project Manager (Application

OEM Certified (MCSE, etc)

Development)
Training Head

ITIL Certified or equivalent

71

Registration Department Tamil Nadu RFP for SI Selection Volume I

6.

Helpdesk Manager

7.

Programmers

8.

Database Admin

OEM certified level 2 / 3

9.

Network Admin

CCNP or equivalent

10.

Service Desk Staff

OEM certified

11.

Outsourced Manpower

12.

System Administration

CCP/JAVA certified/other relevant


certifications

The System Integrator will also provide District leads for a minimum of one resource per 10 offices,
who should be responsible for handling and resolving issues at the ground level as required. The
Domain Expert should have considerable experience of the Registration Department processes and
preferably may be a retired Registration Department employee. The SI should be employing the
domain expert. Domain expert should be available during the development of the web-based software
and provide all support to the SI till the implementation phase.

72

Registration Department Tamil Nadu RFP for SI Selection Volume I

11. Service Level Agreement

1.1.1 Implementation phase SLA criteria Pilot and statewide rollout


The following timelines and SLA terms will apply to the milestones which are to be achieved during the pilot phase of the Project. The deliverables for
each milestone is discussed in detail in Section 9 of this RFP.
Table 2: Pilot & Statewide rollout SLA Criteria
Milest Milestone
one #

Type

Timeline

Penalty

Presentation of System Design (High Level Design


For Penalty calculation, the milestones are

Document), SRS, Data Structures, controls to


1. Project Implementation Committee (PIC) for review

Type II

T*+8 weeks

divided into Type I and Type II milestones. Type I


milestones are the key milestones, while Type II

& ratification by the department

milestones are the secondary milestones leading


to the Type I milestones.
Development of Registration Application as per the
2.

approved System Design & architecture for pilot

For each week (5 working days) of delay in


Type I

T+33 weeks

location

achieving

any

of

the

Type

II

milestones,

Registration Department shall levy a penalty of Rs


0.1% of total project value from the SI.
3. Unit Testing of application & Pilot Implementation

Type II

T+35 weeks
For each week (5 working days) of delay in

4. Pilot Data Migration

achieving any of the Type I milestone, Registration


Type II

T + 35 weeks***

73

Registration Department Tamil Nadu RFP for SI Selection Volume I


Milest Milestone
one #

Type

Timeline

Penalty
Department shall levy a penalty of 0.2% of total

5. Training to key Stakeholders for Pilot Implementation

project value from the SI.


Type II

T + 35 Weeks***
If the SI completes the Type I milestone 2 in time,
the penalties levied for Type II milestones 1 will

6. Acceptance Testing Pilot Application

Type I

T + 37 Weeks

be waived off, provided all submissions for


milestone 1 are completed before milestone 2.
If the SI completes the Type I milestone 6 in time,
the penalties levied for Type II milestones 3, 4

7. Roll-Out Strategizing

Type II

T + 38 Weeks

and 5 will be waived off, provided all submissions


for these milestones are completed before
milestone 6.

8. State-wide Roll Out

Type II

9. State-Wide Data Migration

Type II

T+44 weeks

If the SI completes the Type I milestone 11 in time,


the penalties levied for Type II milestones 7, 8, 9

T+ 44 Weeks***

and 10 will be waived off, provided all submissions


for

10 Training & Change Management

Type II

T+ 44 Weeks***

these

milestones

are

completed

before

milestone 11.
If the SI completes the Type I milestone 13 and 14
in time, the penalties levied for Type II milestone

11 Final Acceptance Testing (FAT)

Type I

T+ 46 Weeks

12 will be waived off, provided all submissions for


milestone 12 are completed before milestone 13

12

Stabilization Period

and 14.

Type II

T+ 51 Weeks

74

Registration Department Tamil Nadu RFP for SI Selection Volume I


Milest Milestone
one #

Type

Timeline

Penalty
If the overall delay in any of the Type I milestone

13

Go-Live

Type I

T+ 52 Weeks = P

is

beyond

one

months,

then

Registration

Department may at its discretion, invoke the entire


performance
14

Start of O & M phase

bank

guarantee

amount

and

terminate the contract.

Type I

During the Operational and Maintenance


15

Closure of O & M Phase

phase, the department can set application


Type I

P + 5 years

related performance criteria based on the


outcome of the pilot phase

*T refers to the date in which the Master Service Agreement is signed by the System Integrator and Registration Department
**Go-live is the date on which the proposed web-based application (Pilot Phase) is completely operational as per the requirements provided
in Vol I of this RFP, subsequent changes agreed and signed-off with the SI and all the acceptance tests are successfully concluded to the
satisfaction of Department.
*** refers to parallel activities

Deployment of resources as proposed by the SI: In case of any change in the original proposed resource, a prior approval from the department should
be taken and only a better resource can be considered for change. The department can approve the change of a resource if the resource has resigned or
has an exceptional reason for change but still SI insists on a change, the department can levy a penalty of 10 lakhs per change of resource. This SLA
shall be valid during the implementation and O&M phases.

75

Registration Department Tamil Nadu RFP for SI Selection Volume I

xxxix.

Operations SLA Criteria Pilot Offices (valid upto completion of roll-out):


The minimum Service Level Requirements to be complied for successful completion of Pilot Implementation are tabulated below:

S.No.
1

Service Level Parameters


Average availability of web-based
application over the Internet/Intranet

Baseline Metric
>98.5%

Time taken to load the web-based


application Portal page at any time

<2 sec

3.1

Resolution of Critical calls *

< 10 hours per call

3.2

Resolution of critical calls * pertaining to


registration application unavailability

< 5 hour per call

Resolution of Non-Critical calls *

< 48 hours

Adequacy of Training

Data migration (DM)

Basis of Measurement/ Remarks


Measured using an EMS tool. Non-availability of any of the
services would amount to deviation.
Speed measured over a leased circuit or equivalent at 2
mbps bandwidth by using EMS.

The faults will be logged by the helpdesk on the EMS, as and


when alerted by users by e-mail/fax/call.

>80% satisfaction rating

Data migration accuracy should not be


less than 100%

Satisfaction levels measured through questionnaires


circulated to Trainees. (Questionnaire to be finalized by SI
and Registration Department)
Error should be found out using standard sampling methods
as mandated by ISO standards.

*Critical & non-critical calls have been defined in section 6.6.


Deployment of resources as proposed by the SI: In case of any change in the original proposed resource, a prior approval from the department should
be taken and only a better resource can be considered for change. The department can approve the change of a resource if the resource has resigned or
has an exceptional reason for change but still SI insists on a change, the department can levy a penalty of 10 lakhs per change of resource. This SLA
shall be valid during the implementation and O&M phases.

76

Registration Department Tamil Nadu RFP for SI Selection Volume I

xl.

Operations SLA Criteria Post State-wide application Roll-Out


Post the State-wide application Roll-Out a single comprehensive operations SLA to measure the
SIs operational efficiency shall be enforced for all the registration office. This SLA shall cover
entire state of TamilNadu. The following SLA may be further enhanced taking into consideration
the learning & challenges faced during the pilot implementation.
If the SI performs as per the baseline metrics, then 100% of the amount of the quarterly payment
will be paid to the SI as per the payment terms specified in Table 2 Vol I. However, if the SI
falters in one or more of the SLA resulting in lower performance or breach, then penalty
deduction would be appropriately levied as per table below subject to maximum penalty of
25% of quarterly payment. Incase the SIs penalty crosses the maximum limit of 25% of
quarterly then the Registration Department may decide to terminate the SIs contract.
Deployment of resources as proposed by the SI: In case of any change in the original
proposed resource, a prior approval from the department should be taken and only a better
resource can be considered for change. The department can approve the change of a resource if
the resource has resigned or has an exceptional reason for change but still SI insists on a
change, the department can levy a penalty of 10 lakhs per change of resource. This SLA shall
be valid during the implementation and O&M phases.

77

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl
No.

Baseline

Breach

Service Level Parameters

Basis of Measurement/ Remarks


Metric

Deductions (%)

Metric

Deductions (%)
Measured using the EMS tool on

Availability of web-based
application over the

99%

For every 0.5%


drop from 99%

Internet/Intranet

0.5% of
QGR

a quarterly basis. Non-availability


of any of the services would
amount to deviation.

Average web-based application

<1 sec

Portal page loading

Resolution of Critical* calls

Resolution of Non-Critical*

< 3 hours

< 24 hours

calls

For every
second drop
from 1 sec

0.5% of QGR

For every 1
hours

0.01% of QGR

For every hour


>24 hours

0.01% of
QGR

Speed measured over a leased


circuit or equivalent at 2 mbps
bandwidth
Faults will be logged by the
helpdesk on the EMS, as and
when alerted by users by email/fax/call. SLA is applied if SI
is found to have failed once in
case of critical fault and thrice in
case of non critical fault

78

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl
No.

Baseline

Breach

Service Level Parameters

Basis of Measurement/ Remarks


Metric

Adequacy of Training

>60%
index.

Deductions (%)

Metric

Deductions (%)

NA

NA

satisfaction
0

Satisfaction

levels

through

measured
feedback

questionnaires

circulated

to

Trainees. (Questionnaire to be
finalized by SI and Registration
Department). In case of any
candidate
60%

scoring

marks

the

less

than

respective

candidate would need to retrained by SI


Approvals have to be obtained
6

All
vulnerabilities/non- Resolved within 14
conformance reported during days
VAPT shall be resolved within
14 days

For every 1 day


beyond
14
days

0.02%
of QGR

from

the

department

after

conducting VAPT and resolving


the issues raised. If multiple
approval iterations are involved,
then last submission date for
approval will be considered for
SLA imposition.

79

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl
No.

Baseline

Breach

Service Level Parameters

Basis of Measurement/ Remarks


Metric

All Registered
Documents made ready
Scanning documents at each of by SR / DR the same
needs to be scanned on
the SROs
the same day to the
minimum of 60
Registered Documents
per day

Deductions (%)

Metric

For every
document not
scanned on total
of 60 documents
for that day

Deductions (%)
Application
0.0002% of
QGR

shall

have

the

capability to generate the matrix


for

number

of

documents

scanned in a particular SRO in


any day and the time delay in
scanning each document.

Biometric
capture

thumb

and

Biometric thumb and


photo photo capture has to
be captured for all the
documents registered
on the day by SR and
forwarded for thumb
& photo capture

For every
record not
captured or
inappropriately
captured

Application
0.0002% of
QGR

shall

have

capability to generate the matrix


for incomplete biometric thumb
capture and photo capture in a
particular SRO in any day

80

the

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl
No.

Baseline

Breach

Service Level Parameters

Basis of Measurement/ Remarks


Metric

Data Entry

Data Entry has to be


done for all the
documents in a day

Deductions (%)

Metric

Deductions (%)

For every
extra
document
not entered
or wrongly
entry in a
day

0.0002% of
QGR

Application

shall

have

the

capability to generate the matrix


for documents not entered by
DEO

against

generated

tokens/registered documents and


rejected entries by SR in a
particular SRO in any day

10

Data migration (DM) for

Data migration w.r.t


content
accuracy
should not be less
than 100%

For any
error(s) in one
document

81

Penalty of Rs.
500 per
erroneous
document &
the rectification
work to be
completed
within 1 week

Sample Size shall be 5 search


reports per village. In case of any
error the same needs to be
rectified by SI & proof as to be
given

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl
No.

Baseline

Breach

Service Level Parameters

Basis of Measurement/ Remarks


Metric

Deductions (%)

Data migration accuracy


w.r.t scanned image
should not be less than
100%

Metric

Deductions (%)

Sample Size shall be 5


For any error(s) Penalty of Rs. 500
in one document per erroneous
documents reports per village.
document & the
rectification work
to be completed
within 1 week

*Critical & non-critical calls have been defined in section 6.6.

Performance related calls logged pertaining to hardware and software may be classified as critical and non-critical. The threshold for various non-critical calls
may be defined later pertaining to memory utilization, response time, CPU utilization, etc. SLA for performance related calls have already been specified
above.

82

Registration Department Tamil Nadu RFP for SI Selection Volume I

12. Instruction to Bidders


xli.

Advice to the bidders


Bidders are advised to study this RFP document carefully before participating. It shall be deemed that
submission of Bid by the bidder has been done after their careful study and examination of the RFP
document with full understanding to its implications.

xlii.

Sale of bid document


a. The Bid Document is available on Registration Department website http://www.tnreginet.net
as per Table I - Tender Schedule in Volume I of this RFP. Interested bidder may please
download the same form the website. The tender document can also be purchased from the
Office of IG Registration, 100 Santhome High Road, Chennai by paying Rs 10000/- as
tender fee using a demand Draft drawn from Nationalized/Schedule bank in favor of
Accounts Officer, Office of IG Registration, payable at Chennai
b. Bids not submitted in prescribed form will be rejected.
c. The DD needs to be included in Pre-Qualification envelope.

xliii.

Schedule of Tender Process


S.No

Milestone

Time in Working Days

1.

Notice

2.

Pre-Bid Conference

10

3.

Receipt of Bids

35

4.

Opening of Technical Bids

35

5.

Evaluation of Technical Bids

6.
7.
8.

36-40

Opening of Price bids & Selection of Successful


41-45

Bidder
Negotiation and finalisation of the offer.

45-50

Issue of LOA (Letter of Acceptance) of tender


(D)

to the Successful Bidder

9.

Workshop with the Successful Bidder (SI)

(D+7)

10.

Receipt of Security Deposit

(D+15)

Agreement deeds between Department and

(D +15)

11.
12.
13.

SI (Effective date of Contract)


Strategic and basic planning

(D+15)

Presentation by the SI on implementation


(D+15)

methodology

83

Registration Department Tamil Nadu RFP for SI Selection Volume I

xliv.

Procedure for Submission of Bids


I.
Cover Systems
It is proposed to have a Three Cover System for this tender:
Pre-qualification Bid : (3 copies) in one cover (along with the same information on CD)
Technical Bid : (3 copies) in one cover (along with the same information on CD)
Commercial Bid : (3 copies) in one cover (along with the same information on CD)
Each copy of Pre-Qualification Bid, Technical Bid and Commercial Bid of the Tender should be
covered in separate sealed covers super-scribing Pre Qualification Bid, "Technical Bid" and
Commercial Bid respectively. Each copy in each bid should also be marked as "Original", "First
copy" and "Second copy". All the three copies of each bid should be put in a single sealed cover
super-scribing Pre Qualification Bid, "Technical Bid" and Commercial Bid as the case may be.
Please Note that Prices should not be indicated in the Technical Bid and should only be
indicated in the Commercial Bid.
The cover containing three copies of Pre Qualification Bid, the cover containing three copies of
Technical Bid and the cover containing three copies of Commercial Bid should be put in another
single sealed envelope clearly marked SELECTION OF SYSTEM INTEGRATOR (SI) TO DESIGN,
DEVELOP, TEST, INSTALL, OPERATE, MAINTAIN & MANAGE REGISTRATION APPLICATION
This envelope is to be super scribed with Tender Number, Due Date, Item and the wordings DO
NOT OPEN BEFORE DECIDED DATE OF PRE QUALIFICATION
The cover thus prepared should also indicate clearly the name, address and telephone number of the
bidder, to enable the Bid to be returned unopened in case it is declared "Late".
Each copy of the tender should be a complete document and should be bound as a volume. The
document should be page numbered and appropriately flagged and must contain the list of contents
with page numbers. Different copies must be bound separately. Any deficiency in the
documentation may result in the rejection of the Bid.
As part of the bid, Bidder should also provide the technical and commercial bid in soft copy format, in
the form of a non-re-writeable CD (Compact Disc) as follows:
Three (3) copies of CD each containing the Pre Qualification bid - The CDs containing Pre
qualification bid should be sealed along with the hard copies of the respective pre qualification
bids
Three (3) copies of CD each containing the technical bid - The CDs containing technical bid
should be sealed along with the hard copies of the respective technical bids.
Three (3) copies of CD each containing the commercial bid - The CDs containing commercial
bid should be sealed along with the hard copies of the respective commercial bids.
All CDs submitted by the Bidder must be in sealed covers. The sealed covers as well as the CD
media must be duly signed by the Bidder using a Permanent Pen/Marker, should be super scribed
with Pre Qualification Bid / Technical Bid / Commercial Bid (as the case may be) and should bear
the name of the Bidder.
Bidder must ensure that the information furnished by him in respective CDs is identical to that
submitted by him in the original paper bid document. In case of any discrepancy observed by
Registration Department - Tamil Nadu, in the contents of the CDs and original paper bid documents,
the information furnished on original paper bid document will prevail over the soft copy.
Bidder must ensure that Technical Bid CDs do not contain any Commercial items / prices.

84

Registration Department Tamil Nadu RFP for SI Selection Volume I

The original and all copies of the bid shall be typed or written in indelible ink. The original and all
copies shall be signed by the Bidder or a person or persons duly authorized to bind the Bidder to the
Contract in accordance with Section 13. All pages of the bid, except for un-amended printed
literature, shall be initialed and stamped by the person or persons signing the bid.
The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initialed by the person or persons signing
the bid.
The Bidder shall duly sign and seal its bid with the exact name of the firm/company to whom the
contract is to be issued.
All the Bids submitted by hand should be put in the Tender Box at the specified office not later than
1530 Hrs. (IST) on the specified date.
Telex / Telegraphic / Telefax / Xerox / Photocopy bids will not be considered.

II.

Transferability of the RFP document

This RFP document is non-transferable.

III.

Misplacement of the RFP document

Registration Department shall not be responsible for any postal delay about non-receipt / non-delivery
of the documents.

IV.

Pre bid discussions, place, time and date:

Place: Office of IG Registration, 100, Santhome High Road, Pattinapakkam, Chennai - 600028
Date: 03/04/2013
Time: 11.00 am

V.

Address at which the bids are to be submitted:

Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai 600028

VI.

Last time and date for receipt of bid:

Upto 03.00 pm on 22/04/2013

VII.

Place, time and date of opening of pre-qualification bid:

Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai 600028
At 04.00 pm on 22/04/2013

VIII.

Deadline for submission of Proposals

Proposals must be received by the Registration Department at the address specified in the RFP not
later than scheduled date and time. Registration Department may, in exceptional circumstances and

85

Registration Department Tamil Nadu RFP for SI Selection Volume I

at his discretion, extend the deadline for submission of Proposals by issuing a Corrigendum or by
intimating all System Integrators who have purchased the RFP document, in writing by post or email.
In this case, all rights and obligations of the Department and the System Integrators previously subject
to the original deadline will thereafter be subject to the deadline as extended.

IX.

Late Proposals

Any Proposal received by the Registration Department after the deadline for submission of Proposals
prescribed in RFP will be summarily rejected and will be returned unopened to the System Integrator.

X.

Earnest money deposit (EMD)

All bids must be accompanied by an earnest money of Rs. 100,00,000/- (Rs. One Crore only) in the
form of Demand draft/bankers pay order/irrevocable bank guarantee from a scheduled bank in India
and shall be valid for at least three months, in favour of Accounts Officer, Office of IG Registration
payable at Chennai. No interest shall be paid on the earnest money under any circumstances.
Earnest Money Deposit of the Successful Bidder may be adjusted towards Security Deposit and the
balance amount if any will be returned only after the finalization and issue of firm work order to the
Successful Bidder.

XI.

Pre-bid conference
a. Registration Department shall hold a pre-bid conference (PBC) on 03/04/2013. In this
PBC, tenderer would address the clarifications sought by the bidders with regard to the
RFP document and the project. The bidders would be required to submit their queries
to the tenderer in writing on or before 01/04/2013. Queries not submitted within this
deadline may not be taken up at the PBC.
b. Bidders who have purchased/downloaded the RFP document are welcome to attend
the PBC, even if they do not have any specific queries. These bidders would be
required to register for the PBC at Registration Department. No clarifications shall be
entertained after the PBC.
c. Tenderer will entertain queries of and clarifications sought by only those companies
who have purchased/downloaded this RFP document.
d. Tenderer reserves the right not to respond to any/all queries raised or clarifications
sought if, in their opinion and at their sole discretion, they consider that it would be
inappropriate to do so or do not find any merit in it. The minutes of the PBC shall be
circulated by tenderer to all those companies who have purchased/downloaded this
RFP document. No extension to any deadline referred to in this document will be
granted on the basis or grounds that tenderer should respond to any queries to provide
any clarification.
e. The clarification offered at the Pre-Bid meeting will be recorded and the
corrigendum/addendum issued will form part of the tender document. Bidders alone will
be allowed for the meeting along with the authorisation letter.
f.

XII.

OEMs are not allowed to participate in the pre-bid conference

Cross checking

Tenderer reserves the right to contact and verify bidders information, references and data submitted
in the bid proposal without further reference to the bidder.

XIII.

Absence of specifications

86

Registration Department Tamil Nadu RFP for SI Selection Volume I

The absence of specifications details regarding any equipment to be supplied under this RFP implies
that best general practices will prevail and that first quality material and workmanship will be applied
as per the discretion of tenderer. Certification standards, when available, for the to-be-installed
equipments and materials, will prevail.

xlv.

Cost to Bid
The Bidder shall bear all costs associated with the preparation and submission of its bid, including
cost of presentation for the purposes of clarification of the bid, if so desired by the Registration
Department. The Registration Department will in no case be responsible or liable for those costs,
regardless of the conduct or outcome of the Tendering process.

xlvi.

Earnest money refund


a. The draft of earnest money to the bidder(s), who fail(s) to qualify for the technical bid, will
be returned back by tenderer to the authorized representative of the bidder against a proper
receipt or will be sent by the registered post at the mailing address of the bidder as
specified in the bid within four weeks of opening of the pre-qualification bid.
b. The draft of earnest money to the bidder(s), who fail(s) to qualify for the commercial bid, will
be returned back by tenderer to the authorized representative of the bidder against a proper
receipt or will be sent by the registered post at the mailing address of the bidder as
specified in the bid within eight weeks after completion of technical bid evaluation.
c. The draft of earnest money to the bidder(s), who qualify(s) for the commercial bid, but do
not get the order for the project will be returned back by tenderer to the authorized
representative of the bidder against a proper receipt or will be sent by the registered post at
the mailing address of the bidder as specified in the bid within one month after signing of
contract agreement between tenderer and the successful bidder.

xlvii.

Clarification on Tender Document


A prospective Bidder requiring any clarification on the Bidder Document may submit his queries, in
writing, at the Registration Department mailing address and as per schedule indicated in Invitation to
Bids / Important dates. The queries must be submitted in the following format only to be considered
for clarification:
Clause
Sr. No
Section No.
Reference/ Subject
Clarification Sought
No.
..

..

..

..

..

The queries not adhering to the above mentioned format shall not be responded to.
Registration Department will respond in writing, to any request for clarification to queries on the
Tender Document, received not later than the dates prescribed in Invitation to Bids / Important Dates.
Written copies of the clarifications (including the query but without identifying the source of inquiry) will
be sent to all prospective Bidders who have received the Tender Documents.

xlviii.

Language of Bids
The Bids prepared by the Bidder and all correspondence and documents relating to the bids
exchanged by the Bidder and Registration Department, shall be written in English language, provided
that any printed literature furnished by the Bidder may be written in another language so long the
same is accompanied by an English translation in which case, for purposes of interpretation of the bid,
the English translation shall govern.

xlix.

Documents Comprising the Bids


The bid prepared by the Bidder shall comprise of the following components:

87

Registration Department Tamil Nadu RFP for SI Selection Volume I

1.1.1.

Pre qualification Bid

The pre-qualification Bid, besides the other requirements of the Tender, shall comprise of the
following
Compliance for pre-qualification
Cover letter
EMD
All documents supporting the pre qualification criteria
Power of Attorney executed by the Bidder in favour of the Principal Officer or the duly
Authorized Representative, certifying him as an authorized signatory for the purpose of
this Tender
Demand Draft

1.1.2.

Technical Bid

The Technical Bid, besides the other requirements of the Tender, shall comprise of the following:
Technical Bid Letter
General information about the Bidder
Technical Solution
Specifications of the Physical Components
Specifications of the IT Components
Unpriced BOM
Manpower Details
Deviations from the Tender Terms & Conditions

1.1.3.

Commercial Bid

The Commercial Bid, besides the other requirements of the Tender, shall comprise of the following:
Commercial Bid Letter
Breakdown of Cost Components

l.

Bid Prices
a. The Bidder shall indicate in the Performa prescribed, the unit rates and total Bid Prices of
the equipment / services, it proposes to provide under the Contract. Prices should be shown
separately for each item as detailed in Tender Documents.
b. In absence of above information as requested in Clause a above, a bid may be considered
incomplete and be summarily rejected.
c. The Bidder shall prepare the bid based on details provided in the tender documents. It must
be clearly understood that the Scope of Work is intended to give the Bidder an idea about
the order and magnitude of the work and is not in any way exhaustive and guaranteed by
tenderer. The Bidder shall carry out all the tasks in accordance with the requirement of the
tender documents & due diligence and it shall be the responsibility of the Bidder to fully
meet all the requirements of the tender documents. If during the course of execution of the
project any revisions to the work requirements like Technical specifications, Equipment
sizing etc. is to be made to meet the goals of Registration Department - TN project, all such
changes shall be carried out within the current price without any impact to Registration
Department.

li.

Firm Prices
a. Prices quoted in the bid must be firm and final and shall not be subject to any upward
modifications, on any account whatsoever. However, Registration Department reserves
the right to negotiate the prices quoted in the bid to effect downward modification. The Bid
Prices shall be indicated in Indian Rupees (INR) only.

88

Registration Department Tamil Nadu RFP for SI Selection Volume I

b. The Commercial bid should clearly indicate the price to be charged without any
qualifications whatsoever and should include all taxes, duties, fees, levies, works contract
tax and other charges as may be applicable in relation to the activities proposed to be
carried out. It is mandatory that such charges wherever applicable / payable should be
indicated separately in volume III, Section 3.3 Breakdown of Cost Components. However,
should there be a change in the applicable taxes, Registration Department, reserves the
right to negotiate with the Bidder.
c. Prices in any form or by any reason before opening the Commercial Bid should not be
revealed, failing which the offer shall be liable to be rejected. If price change is envisaged
due to any clarification, revised Bid in a separate sealed cover shall be submitted with
prior written permission of Registration Department.

lii.

Bidder Qualification
a. The "Bidder" as used in the tender documents shall mean the one who has signed the
Tender Form. The Bidder may be either the Principal Officer or his duly Authorized
Representative, in either cases he/she shall submit a certificate of authority. All
certificates and documents (including any clarifications sought and any subsequent
correspondences) received hereby, shall, as far as possible, be furnished and signed by
the representative and the principal.
b. It is further clarified that the individual signing the tender or other documents in
connection with the tender must certify whether he/she signs as the Constituted attorney
of the firm, or a company.
c. The authorization shall be indicated by written power-of-attorney accompanying the bid.
d. The power or authorization and any other document consisting of adequate proof of the
ability of the signatory to bind the Bidder shall be annexed to the bid.
e. Any change in the Principal Officer shall be intimated to Registration Department in
advance.

liii.

Period of Validity of Bids


a. Bids shall remain valid for 180 days after the date of opening of Technical Bids prescribed
by Registration Department A bid valid for a shorter period may be rejected as nonresponsive.
b. In exceptional circumstances, Registration Department may request the Bidder(s) for an
extension of the period of validity. The request and the responses thereto shall be made
in writing (or by fax). The validity of EMD shall also be suitably extended.

liv.

Local / Site Conditions


a. It will be incumbent upon each Bidder to fully acquaint himself with the local conditions
and other relevant factors at the proposed Registration Office sites which would have any
effect on the performance of the contract and / or the cost. The Bidders are advised to
visit the proposed locations (at its own cost) and due-diligence should be conducted
before the pre-bid meeting/ bid-submission.
b. The Bidder is expected to make a site visit to the proposed Registration Office sites to
obtain for himself on his own responsibility all information that may be necessary for
preparing the bid and entering into contract. Obtaining such information shall be at
Bidders own cost.
c. Failure to obtain the information necessary for preparing the bid and/or failure to perform
activities that may be necessary for the providing services before entering into contract
will in no way relieve the successful Bidder from performing any work in accordance with
the Tender documents.
d. It will be imperative for each Bidder to fully inform themselves of all legal conditions and
factors which may have any effect on the execution of the contract as described in the

89

Registration Department Tamil Nadu RFP for SI Selection Volume I

bidding documents. The Registration Department shall not entertain any request for
clarification from the Bidder regarding such conditions.
e. It is the responsibility of the Bidder that such factors have properly been investigated and
considered while submitting the bid proposals and that no claim whatsoever including
those for financial adjustment to the contract awarded under the bidding documents will
be entertained by Registration Department and that neither any change in the time
schedule of the contract nor any financial adjustments arising thereof shall be permitted
by Registration Department on account of failure of the Bidder to appraise themselves of
local laws and site conditions.

lv.

Modification and Withdrawal of Bids


a. The Bidder may modify or withdraw its bid after the bid's submission, provided that written
notice of the modification or withdrawal is received by the Registration Department prior
to the last date prescribed for receipt of bids.
b. The Bidders modification or withdrawal notice shall be prepared, sealed, marked and
dispatched in accordance with the provisions of Clause xliii. A withdrawal notice may also
be sent by fax but followed by a signed confirmation copy, post marked not later than the
last date for receipt of bids.
c. No bid may be altered / modified subsequent to the closing time and date for receipt of
bids. Unsolicited correspondences from Bidders will not be considered.
d. No bid may be withdrawn in the interval between the last date for receipt of bids and the
expiry of the bid validity period specified by the Bidder in the Bid. Withdrawal of a bid
during this interval may result in the Bidders forfeiture of its EMD.

lvi.

Opening of Pre qualification Bids


a. An evaluation committee will be formed for verifying the prequalification criteria of the
bids. Decision of the committee would be final and binding upon all the Bidders.
b. Registration Department will open the Pre qualification Bid, in the presence of the
representatives of the Bidders who choose to attend, at the time, date and place, as
mentioned in Invitation for Bids / Important Dates.
c. The Bidders names, modifications, bid withdrawals and the presence or absence of the
requisite EMD and such other details considered appropriate will be announced at the bid
opening.

lvii.

Opening of Technical Bids


a. Registration Department will open the Technical Bid, in the presence of the
representatives of the Bidders who choose to attend, at the time, date and place, as
mentioned in Invitation for Bids / Important Dates.
b. The Bidders names, modifications, bid withdrawals and the presence or absence of other
details considered appropriate will be announced

lviii.

Evaluation of Bids
The evaluation process of the tender proposed to be adopted by the Registration Department is
indicated under this clause. The purpose of this clause is only to provide the Bidders an idea of the
evaluation process that the Registration Department may adopt. However, the Registration
Department reserves the right to modify the evaluation process at any time during the Tender
process, without assigning any reason, whatsoever, and without any requirement of intimating the
Bidders of any such change.

1.1.4.

Preliminary Examination:

a. The Registration Department will examine the bids to determine whether they are
complete, whether the bid format confirms to the Tender requirements, whether any
computational errors have been made, whether required EMD has been furnished,
90

Registration Department Tamil Nadu RFP for SI Selection Volume I

whether the documents have been properly signed, and whether the bids are generally
in order.
b. A bid determined as not substantially responsive will be rejected by the Registration
Department and may not subsequently be made responsive by the Bidder by correction
of the nonconformity.
c. The Registration Department may waive any informality or non-conformity or irregularity
in a bid which does not constitute a material deviation according to the Bidder, provided
such waiver does not prejudice or affect the relative ranking of any Bidder.

1.1.5.

Clarification

When deemed necessary, during the tendering process, the Registration Department, may seek
clarifications or ask the Bidders to make Technical presentations on any aspect from any or all the
Bidders. However, that would not entitle the Bidder to change or cause any change in the substance
of the tender submitted or price quoted.

1.1.6.

Evaluation of Bids

a. Pursuant to the pre-qualification criterion bidders will be short-listed for technical bid.
Technical bids will be opened only for the bidders who succeed the pre-qualification
criterion. The technical bids for the disqualified bidders will be returned unopened at the
address mentioned on the envelopes containing the technical bid.
b. At the stage of technical evaluation, Registration Department will assign points (quality
of services score) to the pre-qualified bidders based on the technical evaluation
criterion prescribed in this RFP. To qualify the technical evaluation stage, the bidder
must score a minimum of 70 marks. The commercial bids of the technically qualified
bidders will then be opened and reviewed to determine whether the commercial bids
are substantially responsive.
c. The evaluation will be made on the basis of Price bid, the lowest bidder (L1) would be
declared successful.

1.1.7.

Technical evaluation Criteria

The following criteria shall be used to evaluate the technical bids. All the bids scoring 70 and above in
the technical evaluation will be qualified for commercial bid opening.

Evaluation will be carried out for the compliance against the Technical Bid. The Technical Bid
will be evaluated based on the compliances filled up in the technical bid and also all the terms
and conditions of the tender. The tenders that do not confirm to the tender conditions and
tenders from firms without adequate capabilities for execution of the work as per tender
requirements shall be liable for rejection straight away, specifying the reason.

The entire documentary proof shall be legible & readable otherwise the document will not be
considered for evaluation.

No content in the documentary proofs should be scored/shaded/deleted/erased otherwise the


document will not be considered for evaluation

Any new historical document will not be accepted for evaluation after opening of the Technical
Bid. However any supporting historical documents for the already submitted document will be
accepted

The Technical Bid will be examined and evaluated by the Technical Evaluation Committee (TEC) as
detailed below.

91

Registration Department Tamil Nadu RFP for SI Selection Volume I

Sl.

Evaluation Parameters

#
A

Organizational Strength

Maximum

Corresponding

Marks

Schedule

30

Average Turnover for Bidder (Prime) from IT related services


which include Software development & support / IT hardware
supply & maintenance / Data Centre establishment &
maintenance / providing network connectivity during the last
three financial years (FY: 2009-2010, FY: 2010-2011, FY:
2011-2012), will be awarded marks as below
>=1000 crore = 10 marks
Schedule A,

>=900 crore but < 1000 crore = 9 marks


1

10

>=800 crore but < 900 crore = 8 marks

Volume II,
Clause 2.7

>=700 crore but < 800 crore = 7 marks


>=600 crore but < 700 crore = 6 marks
>=500 crore but < 600 crore = 5 marks
>=400 crore but < 500 crore = 4 marks
>=300 crore but < 400 crore = 3 marks
>=200 crore but < 300 crore = 2 marks
>=100 crore but < 200 crore = 1 mark
Evaluation of CVs of Key Resources (Project Director, Project
2.

Manager,

Project

Manager

(Application

Development),

Helpdesk Manager, Training Head, Application Engineer, etc)

Schedule B,
10

Clause 2.7

as detailed in section 12.18 (V) of RFP Vol I

Undertaking from

The Bidder (prime) with minimum of over 10,000 IT


3.

professionals as on 31st December 2012 would be awarded

10

full marks others on prorata basis


B

Volume II,

HR on company
letter head to be
submitted

Project Experience

65

The Bidder (Prime) must have experience in successfully


completed project IT related services (application software
development and maintenance) of minimum project value of
st

INR 5 crores for last 5 years (as on 31 December 2012).


1

Schedule C,

Marks will be awarded as follows,

10

>=5 projects = 10 marks

Volume II,
Clause 2.7

>=4 projects= 9 marks


>=3 projects = 8 marks
>=2 projects = 7 marks
>=1 project = 6 marks

92

Registration Department Tamil Nadu RFP for SI Selection Volume I

The Bidder (prime or consortium partner) with experience with


2

Facility Management Services in IT domain. FMS project value


of minimum of INR 50 crores would get maximum marks &

Schedule D,
5

Volume II,
Clause 2.7

others would get marks on prorata basis.


The Bidder (Prime) & Consortium Partner having maximum
number of eGovernance project,
i. of value more than INR 5 crores,
ii. either successfully completed or ongoing
iii.

executed

for

Government/Government

Undertaking/PSU/Public sector banks/public sector insurance


companies
iv. covering multiple districts/states (geographically spread) in
India
v. during last 5 years as on 31st December 2012 in India,

The

scope

of

eGovernance

Government/Government

project

for

Undertaking/PSU/Public

any
sector

Schedule E,
10

Volume II,
Clause 2.7

banks/public sector insurance companies should include any


of the following
Development of application software
System integration
application Maintenance services
connectivity
Hardware supply & maintenance
Marks would be awarded as follows
If Total No. of Projects i.e. from both Bidder (Prime) and
Consortium Partner is more than 10 projects then full marks
will be awarded, others would be awarded on prorata basis
The Bidder (Prime) or Consortium Partner must have
experience

in

eGovernance

high
project

value
with

successfully

completed

Government/Government

Undertaking/PSU/Public sector banks/public sector insurance


companies in last 5 years in India,
4

The

scope

of

eGovernance

Schedule F,
project

for

any

Government/Government Undertaking / PSU/ Public sector


banks/public sector insurance companies should include any
of the following
Development of application software
System integration

93

10

Volume II,
Clause 2.7

Registration Department Tamil Nadu RFP for SI Selection Volume I

application Maintenance services


connectivity
Hardware supply & maintenance
Note:

Project should be successfully completed.

Project

should

cover

multiple

districts/states

(geographically spread) in India


Marks would be awarded for only the highest value project
value and summation of project values for multiple projects will
not be allowed.
If project value (excluding Site preparation & electrical
works) is more than INR 150 crores then full marks will be
awarded others would be awarded on prorata basis
The Bidder (Prime) or Consortium Partner must have
experience

in

successfully

completed/ongoing

software

development project for Registration Department with any


state government in last 5 years in India.
5

Total Project Experience of both i.e. Bidder (Prime) +


Consortium Partner

Schedule G,
5

Volume II,
Clause 2.7

No of Registration Projects >= 4 projects = 5 marks


No of Registration Projects = 3 projects = 4 marks
No of Registration Projects = 2 projects = 3 mark
No of Registration Projects = 1 projects = 2 mark
The Bidder (Prime) shall have experience of management of
Server, Storage, Network & Security in Data Centre in last 3
st

years as on 31 December 2012. A maximum of 5 projects will


be awarded full marks.
6

Schedule H,

No of projects >=5 then = 5 marks

No of projects =4 then = 4 marks

Volume II,
Clause 2.7

No of projects =3 then = 3 marks


No of projects =2 then = 3 marks
No of projects =1 then = 1 marks
The Bidder (Prime) shall have experience of management of
IT Disaster Recovery Operations in last 3 years as on 31

st

December 2012. A maximum of 3 such projects will be


7

awarded full marks.

Schedule I,
5

No of projects >=3 = 5 marks

Volume II,
Clause 2.7

No of projects =2 = 3 marks
No of projects =1 = 1 marks

94

Registration Department Tamil Nadu RFP for SI Selection Volume I

The Bidder (Prime) shall have experience in successfully


completed Data Migration from legacy system of any State or
Central Government/ Government Undertaking/ PSU/ Public
sector banks/public sector insurance companies, in the last 5
st

years as on 31
8

December 2012. A maximum of 5 Data

migration projects will be awarded full marks.

Schedule J,
5

No of projects >=5 then = 5 marks

Volume II,
Clause 2.7

No of projects =4 then = 4 marks


No of projects =3 then = 3 marks
No of projects =2 then = 3 marks
No of projects =1 then = 1 marks
The Bidder (Prime) shall have experience of System
Integration (experience in rendering end-to-end integration of
Application

software,

hardware

supply/maintenance)

for

projects worth more than INR 5 crore in the last 5 years as on


st

31 December 2012. A maximum of 6 such completed projects


9

will be awarded full marks

Schedule K,
10

No of projects >=6 = 10 marks

Clause 2.7

No of projects =5 = 9 marks
No of projects =4 = 7 marks
No of projects =3 = 6 marks
No of projects =2= 5 marks
D.

Bidders value Proposition


Bidders understanding the requirements, approach and
methodology and comprehensive proposal will be awarded
marks by the Committee based on the details provided by the
Bidder. Brief evaluation parameters would be
1. Value Proposition in IT servers specification over and
above minimum specification provided in RFP (2
marks)

2. Proposition for DR process optimisation w.r.t RTO with


clear technical solution to backup the same. If
proposed

bidder

agrees

Volume II,

to

comply

requirement of RTO = 15 minutes

RPO = 15 mins = 0 marks

RPO = 14 mins = 0.5 marks

RPO = 13 mins = 1 marks

RPO = 12 mins = 1.5 marks

95

with

RFP

Registration Department Tamil Nadu RFP for SI Selection Volume I

RPO <= 11 mins = 2 marks

3. Robust Solution Architecture integration with SSDG/


eDistrict / Land Records under NLRMP (1 mark)
Total Marks

100

*If needed, the bidders may be asked to provide National Skill Registry details of the all their
employees for which certificate has been furnished by their HR.
Those Bidders who scored 70% or more in the Technical Bid as well as cleared the sectional cut-offs
of 70% or more in the following two sections viz. Organization Strength and Project Experience will be
called as Technically Qualified Bidders and those Bidders alone will be taken for further
evaluation.

The technically qualified Bidder alone will be informed of the date of opening of the Price
Bid. The Price Bids of technically qualified Bidder will alone be opened and evaluated.
The decision of Registration Department will be final in this regard

1.1.8.

Evaluation of CVs of Key Resources

The key personnel should meet the following minimum profile requirements. The individual resources
can be deployed on need basis.
Project Director

S.No.

Maximum
marks

Description

1
2

Educational Qualification: B.Tech/B.E /MCA +


MBA
PMP/PRINCE Certification

1
2

Relevant year of experience: 20 years or more (full


marks) and less than 20 years (prorata marks)

Relevant experience in delivering large web-based


transactional systems involving delivery of services
: 4 projects or more (full marks) and less than 4
projects (prorata marks)

Project Manager

S.No.

Maximum
marks

Description

1
2

Educational Qualification: B.Tech/B.E / MCA +


MBA
PMP/PRINCE Certification

1
2

Relevant year of experience: 12 years or more (full


marks) and less than 12 years (prorata marks)

96

Registration Department Tamil Nadu RFP for SI Selection Volume I

4
5

Relevant experience in delivering large web-based


transactional systems involving delivery of
services: 3 projects or more (full marks) and less
than 3 projects (prorata marks); Minimum one
project should be with any State or Central
Government/ Government Undertaking/ PSU/
Public sector banks/public sector insurance
companies
Ability to Read write & speak in Tamil (local
language)

3
1

Project manager (Application Development)

S.No.
1
2
3

4
5

Maximum
marks

Description
Educational Qualification: B.Tech/B.E /MCA
OEM Certification such as MCSE
Relevant year of experience: 12 years or more (full
marks) and less than 12 years (prorata marks)
Relevant experience in delivering large web-based
transactional systems involving delivery of
services: 3 projects or more (full marks) and less
than 3 projects (prorata marks); Minimum one
project should be with any State or Central
Government/ Government Undertaking/ PSU/
Public sector banks/public sector insurance
companies
Ability to Read write & speak in Tamil (local
language)

1
2
3

3
1

Database expert/administrator

S.No.

Maximum
marks

Description

Educational Qualification: B.Tech/B.E in


IT/Computer Science /ECE/MCA
OEM Certification such as MCDBA/ORACLE/IBM
certified (certification should be relevant to the
solution proposed)

Relevant year of experience: 10 years or more (full


marks) and less than 10 years (prorata marks)

Relevant experience in delivering large webbased


transactional systems: 4 projects or more (full
marks) and less than 4 projects (prorata marks)

System Administrator

S.No.

Maximum
marks

Description

97

Registration Department Tamil Nadu RFP for SI Selection Volume I

Educational Qualification: B.Tech/B.E in


IT/Computer Science /ECE/MCA
OEM Certification such as MCSA/other relevant
certification

Relevant year of experience: 8 years or more (full


marks) and less than 8 years (prorata marks)

Relevant experience in delivering large web-based


transactional systems involving delivery of
services: 4 projects or more (full marks) and less
than 4 projects (prorata marks)

1
2

Network Expert/Administrator

S.No.

Maximum
marks

Description

1
2

Educational Qualification: B.Tech/B.E /MCA


OEM Certification such as CCNP/CCSP/CCIE

1
2

Relevant year of experience: 8 years or more (full


marks) and less than 8 years (prorata marks)

4
5

Relevant experience in delivering large web-based


transactional systems involving delivery of
services: 3 projects or more (full marks) and less
than 3 projects (prorata marks)
Ability to Read write & speak in Tamil (local
language)

3
1

Helpdesk manager

S.No.

Maximum
marks

Description

Educational Qualification: B.Tech/B.E / MCA/MSc


IT/Computer Science

Relevant year of experience: 10 years or more (full


marks) and less than 10 years (prorata marks)

3
4

Relevant experience in L1/L2 support services for


citizens with English and local language: 4 projects
or more (full marks) and less than 4 projects
(prorata marks)
Ability to Read write & speak in Tamil (local
language)

4
1

Training Head

S.No.
1

Maximum
marks

Description
Educational Qualification: B.Tech/B.E./ MCA/MSc
IT/Computer Science

98

Registration Department Tamil Nadu RFP for SI Selection Volume I

ITIL Certification or equivalent

Relevant year of experience: 10 years or more (full


marks) and less than 10 years (prorata marks)

Relevant experience in managing training


exercises for more than 1000 people in a project: 3
projects or more (full marks) and less than 3
projects (prorata marks)
Ability to Read write & speak in Tamil (local
language)

4
5

3
1

Software Programmers Applicable to the three programmers to be placed at IGR office

S.No.

Maximum
marks

Description

Educational Qualification: B.Tech/B.E in


IT/Computer Science or MCA
Certifications such as CCP/JAVA certified/other
relevant certifications

Relevant year of experience: 6 years or more (full


marks) and less than 6 years (prorata marks)

Relevant experience in software development in


the proposed platform: 3 projects or more (full
marks) and less than 3 projects (prorata marks)
Ability to Read write & speak in Tamil (local
language)

4
5

1
2
3

3
1

Total marks allotted to the all the personnel is 90. This shall be scaled down to 10 for consideration
while calculating the technical qualification marks. It should be noted that the resources proposed in
the RFP should only be deployed for the project implementation at the Registration Department in
Chennai or DR center or other locations within Tamil Nadu. In case of any change in the original
proposed resource, a prior approval from the department should be taken and only a better resource
can be considered for change. The department can approve the change of a resource if the resource
has resigned or has an exceptional reason for change but still SI insists on a change, the department
can levy a penalty of 10 lakhs per change of resource.

1.1.9.
1.1.10.

Evaluation of Commercial Bids

The Price Bid consists of two sections detailed below

Section 1
1. Part A calls for the Bid to develop, test and implement software, hardware installation
at SDC, establishment of connectivity infrastructure, data migration, training
expenses.
2. Part B calls for the OPEX over 5 years against Part A as applicable.

Section 2

99

Registration Department Tamil Nadu RFP for SI Selection Volume I

1. Part D calls for bid for Total Cost infrastructure procurement for all registration Offices
in multiple phases which constitutes Cost of infrastructure procurement
2. Part E calls for cost of manpower outsourcing over a 5 year period
3. Part F calls for AMC over 5 years against Part D as applicable

Part G (Part C + Part D + Part E) constitutes the Grand Total Value of Price Bid

Section 3
1. Part G calls for rate contract of hardware and manpower cost for outsourcing

Part H (Part C + Part D + Part E + Part F + Part G) constitutes the Grand Total Value
of Price Bid

The Price Bid evaluation will be carried out as stated below

a) Arithmetical errors will be rectified on the following basis:


If there is any discrepancy between unit price and the total price i.e. obtained by
multiplying the unit price and the quantity, the unit price shall prevail and the total price
shall be corrected and will be taken for evaluation. If the Bidder does not accept the
correction of the errors, their tender will be rejected.
b) The Price Bid evaluation shall include all central duties such as customs duty and central
excise duty and sales tax as a part of the price as detailed below:
i. In evaluation of the price of an imported item, the price shall be determined
inclusive of the customs duty.
ii. In evaluation of the prices of articles that are subject to excise duty, the price
shall be determined inclusive of such excise duty.
iii. Against this tender where all the Bidders are from within the State of Tamil
Nadu or where all the Bidders are from outside the State of Tamil Nadu, the
sales tax shall be included for the evaluation of the price.
iv. Against this tender where the Bidders are both from the State of Tamil Nadu
as well as from outside the State of Tamil Nadu, the sales tax shall be
excluded for the evaluation of the price.

The Price Bids of the technically qualified Bidders in the Technical Bid evaluation alone
will be opened and evaluated.

The value of the Price Bid as specified above will be taken as reference for evaluation of
the Price Bid.

1.1.11.

Final Evaluation of Bid

The overall bid value will be calculated as follows:The Final Evaluation will be done on Quality-cum-Cost-Based-System (QCBS) with the
weightage of Technical & Price Bid score in the ratio 60:40. The final evaluation of shall be
done as described below,

The marks scored in Technical Bid will be evaluated as follows:

100

Registration Department Tamil Nadu RFP for SI Selection Volume I

TN = TB / TMax * 100
TN

= Normalized technical score of the bidder under consideration

TB

= Evaluated technical score for the bidder under consideration

TMax = Maximum technical score for any bidder

For Technically Qualified Bidders, the commercial scores will be calculated as


FN = FMin / FB * 100
Where
FN

= Normalized financial score of the bidder under consideration

FB

= Evaluated cost for the bidder under consideration

FMin = Minimum evaluated cost for any bidder

Both the Technical Bid mark & Price Bid mark will be added to arrive at the total mark
as follows:
BN = 0.6 * TN + 0.4 * FN
Where
BN = overall score of bidder under consideration
TN = Normalized technical score for the bidder under consideration
FN = Normalized financial score of the bidder under consideration
The total mark will be arranged in the descending order. The Highest scorer (H1) will be
declared as the Successful Bidder.

lix.

Negotiations with the successful Bidder


As per the evaluation criteria specified above in this Tender Document, selection of the
Successful Bidder will be made and such Bidder will be called for negotiations for
improvement of scope of work and commercial terms. Registration Department reserves the
right to negotiate with the Bidder.
While negotiating the following aspects are to be considered:
i. To improve the Service Level Agreement (SLA) and the Quality of Services (QoS).
ii. Further reduction in the offer submitted.
iii. Advancing the commissioning schedule.
iv. To improve the quantity
v. Scope of training offered.

lx.

Post Qualification and Award Criteria


a. An affirmative determination will be a prerequisite for award of the Contract to the Bidder.
A negative determination will result in rejection of the Bidders bid, in which event; the
Registration Department will proceed to the next best evaluated bid to make a similar
determination of that Bidders capabilities to perform satisfactorily.

101

Registration Department Tamil Nadu RFP for SI Selection Volume I

b. The Registration Department is not bound to accept the best evaluated bid or any bid and
reserves the right to accept any bid, wholly or in part.

lxi.

Right to Vary Scope of Contract at the time of Award


a. The Registration Department may at any time, by a written order given to the Bidder,
make changes to the scope of the Contract as specified.
b. If any such change causes an increase or decrease in the cost of, or the time required for
the Bidders performance of any part of the work under the Contract, whether changed or
not changed by the order, an equitable adjustment shall be made in the Contract Value or
time schedule, or both, and the Contract shall accordingly be amended. Any claims by
the Bidder for adjustment under this Clause must be asserted within thirty (30) days from
the date of the Bidders receipt of the Registration Department changed order.

lxii.

Right to Accept Any Bid and to Reject Any or All Bids


a. The Registration Department reserves the right to accept any bid, and to annul the
Tender process and reject all bids at any time prior to award of Contract, without thereby
incurring any liability to the affected Bidders or any obligation to inform the affected
Bidders of the grounds for the Registration Department action.
b. The TN Registration Department reserves the right to negotiate the commercials with the
selected Bidder and seek revised commercial bid.

lxiii.

Notification of Award - Letter of Acceptance


a. Prior to the expiration of the period of bid validity, the Registration Department - Tamil
Nadu will notify the successful Bidder in writing by sending a Letter of Acceptance (LOA)
using registered letter or by fax, to be confirmed in writing by registered letter, that its bid
has been accepted.
b. The commissioning period accepted will be counted from the date of issue of LOA.
c. The notification of award will constitute the formation of the Contract.
d. Upon the successful Bidders furnishing of Bank Guarantee for contract performance the
Registration Department - Tamil Nadu may notify unsuccessful Bidders and will discharge
their EMD

lxiv.

Forfeiture of Earnest Money Deposit


If the Successful Bidder fails to act according to the tender conditions or backs out after his
tender has been accepted, his Earnest Money Deposit will be forfeited to Registration
Department.

lxv.

Signing of Contract
a. At the same time as the Registration Department - Tamil Nadu notifies the successful
Bidder that its bid has been accepted, the Registration Department - Tamil Nadu will send
the Bidders the Proforma for Contract provided in the Tender Document, incorporating all
agreements between the parties.
b. Within 7 days of receipt of the Contract, the successful Bidder shall sign and date the
Contract and return it to the Registration Department - Tamil Nadu. If the same is not
executed within seven working days, the Earnest Money Deposit (EMD) of the Bidder will
be forfeited and their tender will be held as non responsive and the tender is liable for
rejection.

102

Registration Department Tamil Nadu RFP for SI Selection Volume I

lxvi.

Release of Work Order


After the execution of the agreements specified in the Tender Document and after receipt of
the Security Deposit remittance, Registration Department will release the formal Work Order
to the Successful Bidder on behalf of GoTN.

lxvii.

Bank Guarantee for Contract Performance


a. Within 15 days of the receipt of LOA from the Registration Department - Tamil Nadu, the
successful Bidder shall furnish the performance security in accordance with the Terms &
Conditions of Contract, in the Contract Performance Bank Guarantee prescribed at
Volume II, Section 2.11.
b. Failure of the successful Bidder to comply with the requirement of this Clause shall
constitute sufficient grounds for the annulment of the award and forfeiture of the EMD. In
case of exigency, if the Registration Department - Tamil Nadu .gets the work done from
elsewhere, the difference in the cost of getting the work done will be borne by the
successful Bidder.

lxviii.

Contract Period
The Contract will be valid during the implementation period and the operation period of five
years from the date of Go-Live.

lxix.

Rejection Criteria
The right of final acceptance of the tender is entirely vested with the Registration Department
who reserves the right to accept or reject any or all of the tenders in full or in parts without
assigning any reason whatsoever. There is no obligation on the part of Registration
Department to communicate with rejected Bidders. After acceptance of the tender by
Registration Department, the Bidder should have no right to withdraw his tender, or claim
higher price. The tender approving authority may also reject all the tenders for reasons such
as change in scope of work, new technologies, and lack of anticipated financial resources,
court orders, accidents or calamities and other unforeseen circumstances.
Besides other conditions and terms highlighted in the tender document, bids may be rejected
under following circumstances:

1.1.12.

General Rejection Criteria

a. Bids submitted without EMD or with improper EMD


b. Conditional Bids
c. If the information provided by the Bidder is found to be incorrect / misleading at any
stage / time during the Tendering Process
d. Any effort on the part of a Bidder to influence the bid evaluation, bid comparison or
contract award decisions
e. Bids received by the Registration Department - Tamil Nadu, after the last date
prescribed for receipt of bids.
f. Bids without signature of person (s) duly authorized on required pages of the bid
g. Bids without power of authorization and any other document consisting of adequate
proof of the ability of the signatory to bind the Bidder.

1.1.13.

Technical Rejection Criteria

a. Technical Bid containing commercial details.


b. Revelation of Prices in any form or by any reason before opening the Commercial Bid

103

Registration Department Tamil Nadu RFP for SI Selection Volume I

c.

Failure to furnish all information required by the Tender Document or submission of a


bid not substantially responsive to the Tender Document in every respect.
d. Bidders not quoting for the complete scope of Work as indicated in the Tender
documents, addendum (if any) and any subsequent information given to the Bidder.
e. Bidders not complying with the Technical and General Terms and conditions as
stated in the Tender Documents.
f. The Bidder not confirming unconditional acceptance of full responsibility of providing
services in accordance with the Scope of work and Service Level Agreements of this
tender.
g. If the bid does not confirm to the timelines indicated in the bid.

1.1.14.

Commercial Rejection Criteria

a. Incomplete Price Bid


b. Price Bids that do not conform to the Tenders price bid format.
c. Total price quoted by the Bidder does not include all statutory taxes and levies
applicable.
d. If there is an arithmetic discrepancy in the commercial bid calculations the
Registration Department - Tamil Nadu shall rectify the same. If the Bidder does not
accept the correction of the errors, its bid may be rejected.

lxx.

Concessions permissible under statutes


Bidder, while quoting against this tender, must take cognizance of all concessions
permissible under the statutes including the benefit under Central Sale Tax Act, 1956,
failing which it will have to bear extra cost where Bidder does not avail concessional rates
of levies like customs duty, excise duty, sales tax, etc. Registration Department - Tamil
Nadu will not take responsibility towards this. However, Registration Department - Tamil
Nadu may provide necessary assistance, wherever possible, in this regard.

lxxi.

Income tax liability


a. The bidder will have to bear all Income Tax liability both corporate, service and personal
tax.
b. Proprietary rights
c. The bidder/supplier shall indemnify the tenderer against all third party claims of
infringement of patent, copyright, trademark and trade designs arising from use of the
goods or any part thereof in India.
d. The Bidder shall indemnify the tenderer against all third-party claims of infringement of
patent, trademark or industrial design and intellectual property rights arising from the use
of the Goods or any part thereof.
e. Additional information/clarification - Tenderer reserves the right to ask for any additional
information, as it may deem necessary to evaluate the bid proposal. Bidders that fail to
submit additional information or clarification as sought by evaluation committee within 10
days of the receipt of tenderers letter requesting for such additional information and/or
clarification, their bids will be evaluated based on the information furnished along with the
bid proposal.

104

Registration Department Tamil Nadu RFP for SI Selection Volume I

13.

Model Master Service Level Agreement

Format of the contract to be entered between successful bidder and Registration Department TN is given below:
This CONTRACT is made and entered into on this ..day of .. by and between Registration
Department - Tamil Nadu, (hereinafter referred to as Registration Department - Tamil Nadu which
expression shall include its successors, administrators, executors and assignees) on the one part and
M/s ., a company registered under the companies Act with its Registered office at
referred to as the SYSTEM INTEGRATOR (which expression shall include its successors,
administrators, executors and permitted assignees) on the other part.
Whereas Registration Department - Tamil Nadu is desirous of software development, hardware
supply & maintenance for carrying out Registration Department TN, IT operations conforming to
specifications as set forth in the Scope of Work in tender document Vol-I.
And Whereas the SI represents that it has the necessary capabilities for carrying out Registration
Department - TN IT operations as referred to herein and has submitted a bid for providing the required
services against Tender No. all in accordance with the terms and conditions set forth herein
and any other reasonable requirements of the Registration Department - Tamil Nadu from time to
time.
And Whereas Registration Department - Tamil Nadu has accepted the bid of the SI and has placed
Letter of Intent /Notification of Award vide its letter .. Dated. On the SYSTEM INTEGRATOR.
Now it is hereby agreed to by and between the parties as under:

lxxii.

Definitions:
In this Contract, the following terms shall be interpreted as indicated:
a. Business Day means any day that is not a Sunday or a public holiday (as per the official
holidays observed by Registration Department - Tamil Nadu);
b. Confidential Information means any information disclosed to or by any Party to this
Contract and includes any information in relation to the Parties, a third party or any
information with regard to any registrant, or any other person who is covered within the
ambit of any legislation related to Registration Department, Government of Tamil Nadu
including any such information that may come to the knowledge of the Parties hereto /
Bidders Team by virtue of this Contract that:
i. is by its nature confidential or by the circumstances in which it is disclosed
confidential; or
ii. is designated by the disclosing Party as confidential or identified in terms
connoting its confidentiality;
but does not include information which is or becomes public knowledge other than by a
breach of this Contract;
c. Contract means the Agreement entered into between the Registration Department Tamil Nadu and the System Integrator as recorded in the Contract form signed by the
Registration Department - Tamil Nadu
and the System Integrator including all
attachments and Annexes thereto, the Tender and all Annexes thereto and the agreed
terms as set out in the bid, all documents incorporated by reference therein and
amendments and modifications to the above from time to time;
d. System Integrators Representative means the person or the persons appointed by the
SI from time to time to act on its behalf for overall co-ordination, supervision and project
management.

105

Registration Department Tamil Nadu RFP for SI Selection Volume I

e. Document means any embodiment of any text or image however recorded and includes
any data, text, images, sound, voice, codes or and databases or microfilm or computer
generated micro fiche.
f. Effective Date means the date on which this Contract is signed and executed by the
parties hereto. If this Contract is executed in parts, then the date on which the last of such
Contracts is executed shall be construed to be the Effective Date;
g. Intellectual Property Rights means any patent, copyright, trademark, trade name,
design, trade secret, permit, service marks, brands, propriety information, knowledge,
technology, licenses, databases, computer programs, software, know how or other form of
intellectual property right, title, benefits or interest whether arising before or after the
execution of this Contract and the right to ownership and registration of these rights;
h. Kick Off Meeting means a meeting convened by the Registration Department - Tamil
Nadu to discuss and finalize the work execution plan and procedures with System
Integrator.
i. The SI means the company with whom the order has been placed for providing Services
as specified in this tender/contract and shall be deemed to include the System Integrator's
successors, representatives (approved by the Registration Department - Tamil Nadu), heirs,
executors, administrators and permitted assigns, as the case may be, unless excluded by
the terms of the contract.
j. System Integrators Team means the successful Bidder who has to provide services to
the Registration Department - Tamil Nadu under the scope of this Tender / Contract. This
definition shall also include any and/or all of the employees of Bidder, their authorized
agents and representatives and approved Sub-Implementation Agencies or other personnel
employed or engaged either directly or indirectly by the SI for the purposes of the Contract.
k. Parties means the Registration Department - Tamil Nadu and the SI and Party means
either of the Parties;
l. Service means facilities/services to be provided as per the requirements specified in this
tender document and any other incidental services, such as installation, implementation,
maintenance, provision of technical assistance and other such obligations of the SI
covered under the Contract;
m. Service Specification means and include detailed description, statements to technical
data, performance characteristics, and standards as applicable and as specified in the
Contract as well as those specifications relating to Industry standards and codes applicable
to the performance of the work, work performance quality and the specifications affecting
the works or any additional specification required to be produced by the SI to meet the
design criteria.
n. Sub-System Integrator means any person or persons or firm/company or their legal
representatives, successors, assignees to which part of the contract has been outsourced
by the SI after necessary consent of Registration Department - Tamil Nadu
o. The Contract Price/Value means the price payable to the SI under the Contract for the
full and proper performance of its contractual obligations;
p. State Govt shall mean Registration Department - Tamil Nadu and shall include its legal
representatives, successors and permitted assignees.
q. State Govts Representative shall mean the person appointed by the Registration
Department - Tamil Nadu from time to time to act on its behalf at the site for overall
coordination, supervision and project management at site.

lxxiii.

Interpretation
In this Contract unless a contrary intention is evident:
a. the clause headings are for convenient reference only and do not form part of this Contract;
b. unless otherwise specified a reference to a clause number is a reference to all of its subclauses;
c. unless otherwise specified a reference to a clause, sub-clause or section is a reference to a
clause, sub-clause or section of this Contract including any amendments or modifications to
the same from time to time;
106

Registration Department Tamil Nadu RFP for SI Selection Volume I

d.
e.
f.
g.

a word in the singular includes the plural and a word in the plural includes the singular;
a word importing a gender includes any other gender;
a reference to a person includes a partnership and a body corporate;
a reference to legislation includes legislation repealing, replacing or amending that
legislation;
h. where a word or phrase is given a particular meaning it includes the appropriate
grammatical forms of that word or phrase which have corresponding meanings.
i. in the event of an inconsistency between the terms of this Contract and the Tender and the
Bid, the terms hereof shall prevail.

lxxiv.

Conditions Precedent

a.

b.
c.
d.

e.

lxxv.

This Contract is subject to the fulfillment of the following conditions precedent by the
System Integrator.
Furnishing of an unconditional and irrevocable and continuing Bank Guarantee for Contract
Performance of the sum of Rs. _____/- (10% of the total contract value), in a form and
manner acceptable to the Registration Department - Tamil Nadu (Refer Clause lxxxv) which
would remain valid until such time and be renewable as may be stipulated by the
Registration Department - Tamil Nadu.
Execution of a Deed of Indemnity in terms of Clause xcvii of this Contract
Obtaining of all statutory and other approvals required for the performance of the Services
under this Contract
Where the designated SI is a subsidiary of a company or a member of a group of
companies or is a joint venture company or is special purpose vehicle (SPV) [formed to
execute the obligations under this Contract] and where the Registration Department - Tamil
Nadu may specify (on account of the System Integrators failure to fulfill all selection criteria
specified in the Tender), the parent or flagship company/ majority shareholder of such SI
having furnished an unconditional, irrevocable and continuing bank guarantee of an amount
equivalent to Rs ___/- on behalf of the SI in a form and manner acceptable to the
Registration Department - Tamil Nadu which would remain valid until such time, beyond
the term of the Contract, as may be stipulated by the Registration Department - Tamil Nadu
.
The Registration Department - Tamil Nadu reserves the right to waive any or all of the
conditions specified in 13.3 above in writing and no such waiver shall affect or impair any
right, power or remedy that the Registration Department - Tamil Nadu may otherwise have.

Representations & Warranties


In order to convince the Registration Department - Tamil Nadu to enter into this Contract, the SI
hereby represents and warrants as of the date hereof, which representations and warranties
shall survive the term and termination hereof, the following:
a. That the SI has the requisite experience in providing software development and
maintenance services, the technical know-how and the financial wherewithal, the power and
the authority that would be required to successfully provide the Services sought by the
Registration Department - Tamil Nadu for the purposes of this Contract.
b. That the SI is not involved in any major litigation or legal proceedings, pending, existing,
and potential or threatened, that may have an impact of affecting or compromising the
performance or delivery of Services under this Contract.
c. That the representations and warranties made by the SI in the bid or will be made in this
contract are and shall continue to remain true and fulfill all the requirements as are
necessary for executing the obligations and responsibilities as laid down in the Contract and
the Tender and unless the Registration Department - Tamil Nadu specifies to the contrary,
the SI shall be bound by all the terms of the Bid and the contract through the term of the
contract.

107

Registration Department Tamil Nadu RFP for SI Selection Volume I

d. That the SI has the professional skills, personnel and resources/authorizations that are
necessary for providing all such services as are necessary to fulfill the Scope of Work
stipulated in the Tender and this Contract.
e. That there shall not be any privilege, claim or assertion made by a third party with respect to
right or interest in, ownership, mortgage or disposal of any asset, property, movable or
immovable as mentioned in any Intellectual Property Rights, licenses and permits.
f. That the SI shall use such assets of the Registration Department - Tamil Nadu as the
Registration Department may permit for the sole purpose of execution of its obligations
under the terms of the Bid, Tender or this Contract. The SI shall however, have no claim to
any right, title, lien or other interest in any such property, and any possession of property for
any duration whatsoever shall not create any right in equity or otherwise, merely by fact of
such use or possession during or after the term hereof.
g. That the SI shall procure all the necessary permissions and adequate approvals and
licenses for use of various software and any copyrighted process/product free from all
claims, titles, interests and liens thereon and shall keep the Registration Department - Tamil
Nadu indemnified in relation thereto.
h. That the execution of the Services and the Scope of work herein are and shall be in
accordance and in compliance with all applicable laws.
i. That all conditions precedent under the Contract has been satisfied.
j. That neither the execution and delivery by the SI of the Contract nor the System Integrators
compliance with or performance of the terms and provisions of the Contract
will contravene any provision of any Applicable Law or any order, writ, injunction or
decree of any court or Governmental Authority binding on the System Integrator,
will conflict or be inconsistent with or result in any breach of any or the terms,
covenants, conditions or provisions of, or constitute a default under any Contract,
Contract or instrument to which the SI is a party or by which it or any of its property or
assets is bound or to which it may be subject or
will violate any provision of the Memorandum and Articles of Association of the System
Integrator.
k. That the SI certifies that all registrations, recordings, filings and notarizations of the Contract
and all payments of any tax or duty, including without limitation stamp duty, registration
charges or similar amounts which are required to be effected or made by the SI which is
necessary to ensure the legality, validity, enforceability or admissibility in evidence of the
Contract have been made.
l. That the SI owns, has license to use or otherwise has the right to use, free of any pending
or threatened liens or other security or other interests all its Intellectual Property Rights,
which are required or desirable for performance of its services under this contract and
regarding the same the SI does not, so far as the SI is aware, in carrying on its business
and operations, infringe any Intellectual Property Rights of any person. So far as the SI is
aware, none of the Intellectual Property Rights, owned or enjoyed by the SI or which the SI
is licensed to use, which are material in the context of System Integrators business and
operations for the performance of this contract are being infringed nor, so far as the SI is
aware, is there any infringement or threatened infringement of those Intellectual Property
Rights licensed or provided to the SI by any person. All Intellectual Property Rights (owned
by the SI or which the SI is licensed to use) required by the SI for the performance of the
contract are valid and subsisting. All actions (including registration, payment of all
registration and renewal fees) required to maintain the same in full force and effect have
been taken thereon and shall keep the Registration Department - Tamil Nadu indemnified in
relation thereto.
m. That time is the essence of the Contract and hence the SI shall at all times maintain
sufficient manpower, resources, and facilities, to provide the Services in a workmanlike
manner on a timely basis.
n. That its security measures, policies and procedures are adequate to protect and maintain
the confidentiality of the Confidential Information.

108

Registration Department Tamil Nadu RFP for SI Selection Volume I

o. That in providing the Services or deliverables or materials, neither SI nor its agent, nor any
of its employees, shall utilize information which may be considered confidential information
of, or proprietary to, any prior employer or any other person or entity;

lxxvi.

Execution of Work Order


a. In the event of tender being submitted with consortium of partners, the primary Bidder
alone will be liable or responsible to the Department for due fulfilment of terms and
conditions of the tender including installation, commissioning, operation, management
and maintenance of the entire project.
b. The Successful Bidder should nominate and intimate Department a Project Manager
specifically to handle the Work Order from Department and ensure that he fully
familiarizes with the terms and conditions of the tender, scope of work, Work Order and
the guidelines, and is responsible to effectively execute the Work Order complying all the
terms and conditions.
c.

In the event of tender being submitted with consortium of partners, the consortium cannot
change its constituent partners during the execution of the work order.

lxxvii.

Assigning of Tender Whole or In Part


The Successful Bidder should not assign or make over the contract, the benefit or burden
thereof to any other person or persons or body corporate except declared consortium partners.
They should not underlet or sublet to any person/s or body corporate except declared
consortium partners for the execution of the contract or any part thereof unless a proper
approval for subletting is obtained from the Registration Department TN.

lxxviii.

Scope of work/contract
Scope of the CONTRACT shall be as defined in the RFP Ref No xxx/File-xx/xx and the
Corrigendum / Addendum issued with respect to this RFP.

lxxix.

General Requirement

The Bidder shall review the FRS and RFP before the Pre-Bid

The service delivery shall be of the highest quality.

The Bidder should make his own arrangements to obtain all the material required for
this work such as PCs, printers, scanners, adequate human resource, stationery deemed
necessary at various stages of the project.

The Successful Bidder at his own cost shall also arrange all stationary, projectors,
drinking water.

All hardware and software supplied by the bidder shall be properly stored by the
bidder and they shall be responsible for its safe custody it is supplied to the respective
Registration Offices.

All necessary use/test cases for the unit and integration testing shall be designed and
prepared by the bidder under the guidance of the department/consultant.

109

Registration Department Tamil Nadu RFP for SI Selection Volume I

It shall be obligatory for the Bidder to furnish Certificate, if demanded by the


Department/Consultant from manufacturer or the material supplier that the work has
been carried out by using their material and as per their Recommendation

All electrical materials conforming to the Indian Standard Specification shall be used and
the materials must comply with relevant standard specifications

lxxx.

Deviations
The tender should be for the complete scope of work and services. However, in case of any
minor deviations, the Bidder should clearly and separately state the item that is in deviations in
their tender. This should be clearly stated under deviations head quoting the index and serial
references in Technical Specifications. Any deviation mentioned elsewhere in the tender but
not clearly stated under this section should not be considered. The Bidder should also clearly
indicate the services and utilities to be provided by the Department including their obligations,
if any. Department reserves the right to consider or reject these deviations of the tender.

lxxxi.

Training
Training will be provided by the selected bidder to the government officials according to the
need basis. All the training materials (Soft copy & Hard copy) will be provided by the SI.
Detailed training schedule is provided as a part of scope of work defined in this bid

lxxxii.

Licenses
In case of Foreign Supplies, the Successful Bidder should arrange necessary import license
and other clearances.
All the licenses related to software and hardware procured for registration department should
be transferred to Registration Department and should be perpetual licenses.

lxxxiii.

Storage & Risk


The Successful Bidder should make arrangements for transportation of Hardware/Software etc,
to site and build their own stores for the intermediate storage of equipment, maintain the stores
and all related documents and records, transport the equipment to site. SI shall at his own
expense adopt suitable Risk Management methodology to mitigate all risks assumed by the SI
under this CONTRACT. SI shall underwrite all the risk related to its personnel deputed under
this CONTRACT as well as equipment and components of the registration department,
procured for the Department, equipment, tools and any other belongings of the SI or their
personnel during the entire period of their engagement in connection with this CONTRACT and
take all essential steps to reduce and mitigate the risk. Tendering Authority or State
Government will have no liability on this account.

lxxxiv.

Duration of the contract:


The CONTRACT shall remain valid for implementation period till Go-Live and for another 5
years or more in case of extension from the date of Final Acceptance Certificate issued by
Registration Department - TN.

110

Registration Department Tamil Nadu RFP for SI Selection Volume I

lxxxv.

Contract Performance Guarantee/Security Deposit


The Successful Bidder will be required to remit the Security Deposit equivalent to 5% of the
value of the work order inclusive of EMD by way of demand draft payable to Registration
Department, Chennai (or) in the form of unconditional irrevocable Bank Guarantee as per the
sample format valid for a period of six years from the date of LOA, with in fifteen days from the
date of LOA. If the accepted Bidder fails to remit the Security Deposit within the above said
period, their tender will held void and the Earnest Money Deposit remitted by them will be
forfeited to Registration Department.

lxxxvi.

System Integrators Obligations


a. SI should perform the Services specified by the Registration Department - Tamil Nadu and
make available the necessary equipment / facilities / services as may be necessary and
other Scope of work requirements as specified in the tender and changes thereof.
b. The SI shall ensure that the System Integrators Team is competent, professional and
possesses the requisite qualifications and experience appropriate to the task they are
required to perform under this Contract. The SI shall ensure that the Services are
performed through the efforts of the System Integrators Team, in accordance with the
terms hereof and to the satisfaction of the Registration Department - Tamil Nadu. Nothing in
this Contract relieves the SI from its liabilities or obligations under this Contract to provide
the Services in accordance with the Registration Department - Tamil Nadu directions and
requirements and as stated in this Contract and the Bid to the extent accepted by the
Registration Department - Tamil Nadu and the SI shall be liable for any non-performance,
non-compliance, breach or other loss and damage resulting either directly or indirectly by or
on account of its Team.
c. Warranty - The equipment supplied would carry onsite comprehensive OEM warranty for
the entire duration of the contract as mentioned in section 13.13. The supplied software
shall carry warranty/support as per the agreement between the Registration Department,
Tamil Nadu and the software OEMs.
d. Third party claims - The selected System Integrator(s) shall indemnify Registration
Department against all third-party claims of infringement of patent, trademark or industrial
design rights arising from use of the Goods or any part thereof in India.
e. Delivery and documentation - Delivery of Goods shall be made by the selected System
Integrator strictly in accordance with the specifications of the tender document or in case of
deviations, the specifications approved and accepted by the Registration Department. The
SI should also provide a. detailed design document containing details pertaining to
application, network and security; b. Database architecture that includes detailed about
clustering, mirroring, backup strategies, data structure definitions, data dictionary as per
standards laid down by govt. of TN/India; c. Data Architecture containing interface and
integration architecture; d. Detailed system requirement specifications (SRS).
f. Ownership of equipments - All the equipments provided by the selected agency(s) shall
virtually have the right to use of the property by Registration Department throughout the
contract period though the ultimate transfer may come much later, after the expiry of the
contract period. The selected agency will therefore not shift, move, and transfer the
equipments without the prior consent of the Registration Department. Such a request by the
System Integrator should be made with suitable justification and reasoning. However, the
System Integrator will be allowed to carry out normal maintenance activities as scheduled. It
should be noted that if equipment has to be replaced, the replacement must have a
manufacturing date later than the equipment being replaced and the configuration of the
replacement should be same or higher. Information about all such replacements along with
reasons for should be provided in writing to Registration Department.

111

Registration Department Tamil Nadu RFP for SI Selection Volume I

Ownership of all the data created during the period of contract shall be the property of the
Registration Department, however, the responsibility of its maintenance, updation,
correctness and backup would be that of System Integrator.
No third party interest in any form (lien, mortgage, hypothecation etc.) without the prior
approval and consent of the Department, can be created on the assets, equipments etc.
installed by the selected agency (s).
g. The System Integrator is required to ensure that at least one Senior Staff (Project Leader /
Project Manager) who is capable of decision making and required coordination on day-today operations of the project are seated full-time at Department Office in Chennai, for the
rollout and O&M of the project.
h. Interpretation of Clauses - In case of any ambiguity in the interpretation of any of the
clauses in the tender document, the interpretation of the clauses by Authorized
Representative of Registration Department shall be final and binding on all parties.

lxxxvii.

System Integrators Representative


The System Integrators representative shall have all the powers requisite for the performance
of services under this contract. The System Integrators Representative shall liaise with the
Registration Department - Tamil Nadu Representative for the proper coordination and timely
completion of the works and on any other matters pertaining to the works. He will extend full cooperation to Registration Department - Tamil Nadu representative in the manner required by
them for supervision/inspection/observation of the facilities, equipment/material, procedures,
performance, reports and records pertaining to the works. He shall also have complete charge
of the System Integrators personnel engaged in the performance of the works and to ensure
internal discipline, compliance of rules, regulations and safety practice. He shall also coordinate and co-operate with the other Service Providers/Vendors of the Registration
Department - Tamil Nadu working at the Site/offsite for activities related to planning, execution
of scope of work and providing services under this contract.

lxxxviii.

Reporting Progress
a. SI shall monitor progress of all the activities specified in the contract and submit free of
cost monthly progress report about various aspect of the work to the Registration
Department - Tamil Nadu. The Registration Department - Tamil Nadu on mutual
agreement between both parties may change the periodicity of such reports. Extracts of
the progress report to be termed, as Executive Summary shall be submitted in 3 copies,
along with 3 copies of monthly progress report. The same is required to be submitted in
soft copy as well. Formats for such reporting shall be discussed at the Kick-Off meeting.
b. The Infrastructure facilities / services, and manpower to be provided by the SI under the
Contract and the manner and speed of execution and maintenance of the work are to be
conducted in a manner to the satisfaction of Registration Department - Tamil Nadu
representative in accordance with the Contract. The rate of progress of the work,
compliance to the requirements of the Data Centre and departmental offices/its facilities,
or any part of them at any time fall behind the stipulated time for completion or is found to
be too slow to ensure completion of the works or insufficient for satisfactory operation of
the Department, Registration Department - Tamil Nadu representative may so notify the
SI in writing.
c. The SI shall reply to the written notice giving details of the measures he proposes to take
to expedite the progress so as to complete the works by the prescribed time. The SI shall
not be entitled to any additional payment for taking such steps. If at any time it should
appear to the Registration Department - Tamil Nadu or Registration Department - Tamil
Nadu representative that the actual progress of work does not conform to the approved
programme the SI shall produce at the request of the Registration Department - Tamil
Nadu representative a revised programme showing the modification to the approved
programme necessary to ensure completion of the works within the time for completion or
steps initiated to ensure compliance/improvement to the stipulated requirements

112

Registration Department Tamil Nadu RFP for SI Selection Volume I

lxxxix.

Knowledge of Site Conditions


a. The System Integrators undertaking of this Contract shall be deemed to mean that the SI
possesses the knowledge of all the related requirements as stipulated in the Tender
Document including but not limited to environmental, demographic and physical
conditions and all criteria required to meet the design of the systems.
b. The SI shall be deemed to have understood the requirements and have satisfied himself
with the data contained in the Bidding Documents, the quantities and nature of the works
and materials necessary for the completion of the works, etc., and in-general to have
obtained himself all necessary information of all risks, contingencies and circumstances
affecting his obligations and responsibilities therewith under the Contract and his ability to
perform it. However, if during the process of site preparation and installation of the
equipment at the Data Centre and department offices, as required by Registration
Department - Tamil Nadu, SI detects any obstructions affecting the work, the SI shall take
all measures to overcome them.
c. SI shall be deemed to have satisfied himself as to the correctness and sufficiency of the
Contract Price for the works. The consideration provided in the Contract for the SI
undertaking the works shall cover all the System Integrators obligation and all matters
and things necessary for proper execution and maintenance of the works in accordance
with the Contract and for complying with any instructions which the Registration
Department - Tamil Nadu Representative may issue in accordance with the connection
therewith and of any proper and reasonable measures which the SI takes in the absence
of specific instructions from the Registration Department - Tamil Nadu Representative.

xc.

System Integrators Team


a. The SI shall submit to the Registration Department - Tamil Nadu 7 days prior to the
effective date of commencement of works / services or kick-off meeting whichever is
earlier, an organization chart showing the proposed organization/manpower to be
established by the SI for execution of the work/facilities including the identities and
Curriculum-Vitae of the key personnel to be deployed. The SI shall promptly inform the
Registration Department - Tamil Nadu in writing, of any revision or alteration of such
organization charts.
b. The team proposed by the SI as a part of the technical proposal should be deployed at
IGR. Any change in the team profile should be brought in to the notice of Registration
Department - TN. SI should ensure that any replacement personnel, if unavoidable, is
equivalent or better than the original personnel in terms of experience and qualification.
c. The SI shall be responsible for the deployment, transportation, accommodation and other
requirements of all its employees required for the execution of the work and for all
costs/charges in connection thereof.
d. The SI shall provide and deploy, on the Site for carrying out the work, only those
manpower resources who are skilled and experienced in their respective trades and who
are competent to execute or manage/supervise the work in a proper and timely manner.
Any deviation from the team proposed in the Technical Bid shall be given to Registration
Department - TN as and when required.
e. The Registration Department - Tamil Nadu Representative may at any time object to and
require the SI to remove forthwith from the site a supervisor or any other authorized
representative or employee of the SI or any person(s) deployed by SI or his consortium
partner/sub-contractor, if, in the opinion of the Registration Department - Tamil Nadu
Representative the person in question has misconduct himself or his deployment is
otherwise considered undesirable by the Registration Department - Tamil Nadu
Representative the SI shall forthwith remove and shall not again deploy the person in
question of the work site without the written consent of the Registration Department Tamil Nadu Representative.
f. The Registration Department - Tamil Nadu Representative may at any time request the SI
to remove from the work / Site the System Integrators supervisor or any other authorized
representative including any employee of the SI or his sub-SI or any person(s) deployed
by SI or his his consortium partner/sub-contractor for professional incompetence or
113

Registration Department Tamil Nadu RFP for SI Selection Volume I

negligence or for being deployed for work for which he is not suited. The SI shall consider
the Registration Department - Tamil Nadu Representative Request and may accede to or
disregard it. The Registration Department - Tamil Nadu Representative, having made a
request, as aforesaid in the case of any person, which the SI has disregarded, may in
the case of the same person at any time but on a different occasion, and for a different
instance of one of the reasons referred to above in this Clause object to and require the
SI to remove that person from deployment on the work, which the SI shall then forthwith
do and shall not again deploy any person so objected to on the work or on the sort of
work in question (as the case may be) without the written consent of the Registration
Department - Tamil Nadu Representative.
g. The Registration Department - Tamil Nadu Representative shall state to the SI in writing
his reasons for any request or requirement pursuant to this clause.
h. The SI shall maintain backup personnel and shall promptly provide replacement of every
person removed, pursuant to this section, with an equally competent substitute from the
pool of backup personnel.
i. In case of change in its team composition owing to attrition, the SI shall ensure a
reasonable amount of time-overlap in activities to ensure proper knowledge transfer and
handover/ takeover of documents and other relevant materials between the outgoing and
the new member. The exiting team member should be replaced with an equally
competent substitute from the pool of backup personnel.

xci.

Contract administration
a. Either party may appoint any individual / organization as their authorized representative
through a written notice to the other party. Each Representative shall have the authority
to:
b. exercise all of the powers and functions of his/her Party under this Contract other than the
power to amend this Contract and ensure the proper administration and performance of
the terms hereof; and
c. Bind his or her Party in relation to any matter arising out of or in connection with this
Contract.
d. The SI along with the members of Sub-Implementation Agencies/third parties shall be
bound by all undertakings and representations made by the authorized representative of
the SI and any covenants stipulated hereunder, with respect to this Contract, for and on
their behalf.
e. For the purpose of execution or performance of the obligations under this Contract, the
Registration Department - Tamil Nadu representative would act as an interface with the
nominated representative of the System Integrator. The SI
shall comply with any
instructions that are given by the Registration Department - Tamil Nadu representative
during the course of this Contract in relation to the performance of its obligations under
the terms of this Contract and the Tender.
f. A Committee comprising of representatives from the Registration Department - Tamil
Nadu and the SI shall meet on a quarterly basis to discuss any issues / bottlenecks
being encountered. The SI shall draw the minutes of these meetings and circulate to the
Registration Department - Tamil Nadu.

xcii.

Right of Monitoring, Inspection and Periodic Audit


a. The Registration Department - Tamil Nadu, reserves the right to inspect and
monitor/assess the progress/performance/maintenance of the application and
infrastructure at any time during the course of the Contract, after providing due notice to
the System Integrator. The Registration Department - Tamil Nadu may demand and upon
such demand being made, the Registration Department - Tamil Nadu shall be provided
with any document, data, material or any other information which it may require, to enable
it to assess the progress of the project.
b. The Registration Department - Tamil Nadu shall also have the right to conduct, either
itself or through another SI as it may deem fit, an audit to monitor the performance by the
SI of its obligations/functions in accordance with the standards committed to or required
114

Registration Department Tamil Nadu RFP for SI Selection Volume I

by the Registration Department - Tamil Nadu and the SI undertakes to cooperate with and
provide to the Registration Department - Tamil Nadu / any other SI appointed by the
Registration Department - Tamil Nadu all documents and other details as may be
required by them for this purpose. Any deviations or contravention identified as a result of
such audit/assessment would need to be rectified by the SI failing which the Registration
Department - Tamil Nadu may, without prejudice to any other rights that it may have issue
a notice of default.

xciii.

Registration Department - Tamil Nadu Obligations


a. The Registration Department - Tamil Nadu Representative shall interface with the System
Integrator, to provide the required information, clarifications, and to resolve any issues as
may arise during the execution of the Contract. Registration Department - Tamil Nadu
shall provide adequate cooperation in providing details, assisting with coordinating and
obtaining of approvals from various governmental agencies, in cases, where the
intervention of the Registration Department - Tamil Nadu is proper and necessary.
b. Registration Department - Tamil Nadu shall ensure that timely approval is provided to the
System Integrator, where deemed necessary, which should include SR office details and
all specifications related to equipment/material required to be provided as part of the
Scope of Work.

xciv.

Information Security
a. The SI
shall not carry and/or transmit any material, information, layouts, diagrams,
storage media or any other goods/material in physical or electronic form, which are
proprietary to or owned by the Registration Department - Tamil Nadu out of its premises
without prior written permission from the Registration Department - Tamil Nadu.
b. The SI shall adhere to the Information Security policy developed by the state.
c. SI acknowledges that Registration Department - Tamil Nadu business data and other
Registration Department - Tamil Nadu proprietary information or materials, whether
developed by Registration Department - Tamil Nadu or being used by Registration
Department - Tamil Nadu pursuant to a license agreement with a third party (the
foregoing collectively referred to herein as proprietary information) are confidential and
proprietary to Registration Department - Tamil Nadu ; and SI agrees to use reasonable
care to safeguard the proprietary information and to prevent the unauthorized use or
disclosure thereof, which care shall not be less than that used by SI to protect its own
proprietary information. SI recognizes that the goodwill of Registration Department - Tamil
Nadu depends, among other things, upon SI keeping such proprietary information
confidential and that unauthorized disclosure of the same by SI could damage
Registration Department - Tamil Nadu and that by reason of System Integrators duties
here under. SI may come into possession of such proprietary information, even though SI
does not take any direct part in or furnish the services performed for the creation of said
proprietary information and shall limit access thereto to employees with a need to such
access to perform the services required by this agreement. SI shall use such information
only for the purpose of performing the said services.
d. SI shall, upon termination of this agreement for any reason, or upon demand by
Registration Department - Tamil Nadu whichever is earliest, return any and all
information provided to SI by Registration Department - Tamil Nadu including any copies
or reproductions, both hard copy and electronic copy.

xcv.

Ownership of Equipment
The Registration Department - Tamil Nadu shall own the equipment / software and data
centre infrastructure, supplied by the SI arising out of or in connection with this Contract.
Registration Department - TN shall reserve rights to use the software for any other
applications or purpose other than mentioned in this RFP.

115

Registration Department Tamil Nadu RFP for SI Selection Volume I

xcvi.

Insurance
a.

SI shall, at his own expense, arrange appropriate comprehensive insurance to cover all
risks assumed by the SI under this CONTRACT in respect of its personnel deputed under
this CONTRACT as well as SYSTEM INTEGRATORs equipment, tools and any other
belongings of the SI or their personnel during the entire period of their engagement in
connection with this CONTRACT. Registration Department - Tamil Nadu will have no
liability on this account.
b. SI shall take out insurance policies against all risks of loss or damage caused to
Registration Department - Tamil Nadu property/ equipments for property owned or hired
by Registration Department - Tamil Nadu and the works and part of the works taken over
by Registration Department - Tamil Nadu.
c. Notwithstanding anything contained in any provision of this CONTRACT, save as
specified above in this Clause Registration Department - Tamil Nadu shall defend,
indemnify and hold SI harmless from and against any losses, damages, cost or claims
relating to Registration Department - Tamil Nadu existing property except in case of
gross negligence or willful misconduct of the System Integrator, its sub-SI their agents or
employees, in which case the SI shall be liable to bear any loss or damage occurring to
the Property of the Registration Department - Tamil Nadu as a result of its gross
negligence or willful misconduct, provided however, that such liability shall be limited to
100% of the CONTRACT Price.
d. Gross Negligence means: any act or failure to act (whether sole, joint or concurrent) by
a person or entity which was intended to cause, or which was in reckless disregard of or
wanton indifference to, avoidable and harmful consequences such person or entity knew,
or should have known, would result from such act or failure to act. Notwithstanding the
foregoing, Gross negligence shall not include any action taken in good faith for the
safeguard of life or property, willful misconduct means: intentional disregard of good
and prudent standards of performance or proper conduct under the CONTRACT with
knowledge that it is likely to result in any injury to any person or persons or loss or
damage of property.
e. Certificate of Insurance: Before commencing performance of the CONTRACT, SI shall
upon request furnish Registration Department - Tamil Nadu with certificates of insurance
indicating (1) kinds and amounts of insurance as required herein (2) insurance
Registration Department - Tamil Nadu or companies carrying the aforesaid coverage (3)
effective and expiry dates of policies (4) that Registration Department - Tamil Nadu shall
be given thirty (30) days written advance notice of any material change in the policy (5)
waiver of subrogation endorsement has been attached to all policies and (6) the territorial
limits of all policies. If any of the above policy expire or/ are cancelled during the term of
this CONTRACT and SI fails for any reason to renew such policies, then Registration
Department - Tamil Nadu may replace same and charge the cost thereof to SYSTEM
INTEGRATOR. Should the relapse in any insurance required to be carried out by SI
hereunder for any reason; losses resulting there from shall be to the sole account of the
SYSTEM INTEGRATOR. Such insurance shall be affected within Insurance Company
incorporated and registered in India or jointly with a company of International repute and
an Insurance Company incorporated and registered in India.

xcvii.

Indemnity
a. The SI shall execute and furnish to the Registration Department - Tamil Nadu a Deed of
Indemnity in favor of the Registration Department - Tamil Nadu in a form and manner
acceptable to the Registration Department - Tamil Nadu indemnifying the Registration
Department - Tamil Nadu from and against any costs, loss, damages, expense, claims,
patents, trademarks, copyrights including those from third parties or liabilities of any kind
howsoever suffered, arising or incurred inter alia during and after the Contract period out
of:
b. any negligence or wrongful act or omission by the SI or the System Integrators Team or
any sub-System Integrator/ third party in connection with or incidental to this Contract; or

116

Registration Department Tamil Nadu RFP for SI Selection Volume I

c.

Any breach of any of the terms of the System Integrators Bid as agreed, the Tender and
this Contract by the System Integrator, the System Integrators Team or any sub-System
Integrator/ third party.
d. The indemnity shall be to the extent of 100% in favour of the Registration Department Tamil Nadu.

xcviii.

Confidentiality
a. The SI shall not use Confidential Information (Biometric Records etc), the name or the
logo of the Registration Department - Tamil Nadu except for the purposes of providing
the Service as specified under this contract;
b. The SI may only disclose Confidential Information in the following circumstances:
with the prior written consent of the Registration Department - Tamil Nadu ;
to a member of the System Integrators Team (Authorized Person) if:
- the Authorized Person needs the Confidential Information for the performance of
obligations under this contract;
- the Authorized Person is aware of the confidentiality of the Confidential
Information and is obliged to use it only for the performance of obligations under
this contract
c. The SI shall do everything reasonably possible to preserve the confidentiality of the
Confidential Information including execution of a confidentiality agreement with the
members of the, sub Implementation Agencies and other service providers team
members to the satisfaction of the Registration Department - Tamil Nadu.
d. The SI shall sign a Non Disclosure Agreement (NDA) with the Registration Department Tamil Nadu. The System Integrator, its antecedents and the his consortium partner/subcontractor shall be bound by the NDA. The SI will be held responsible for any breach of
the NDA by its antecedents, delegates or sub-Implementation Agencies
e. The SI shall notify the Registration Department - Tamil Nadu promptly if it is aware of any
disclosure of the Confidential Information otherwise than as permitted by this Contract or
with the authority of the Registration Department - Tamil Nadu.
f. The SI shall be liable to fully recompense the Registration Department - Tamil Nadu for
any loss of revenue arising from breach of confidentiality. The Registration Department Tamil Nadu reserves the right to adopt legal proceedings, civil or criminal, against the SI
in relation to a dispute arising out of breach of obligation by the SI under this clause.

xcix.

Term and Extension of the Contract


a. The term of this Contract shall be initially for a period of five years from the date of GoLive issued by Registration Department - TN.
b. After the expiry of contract period, Registration Department may extend the contract term
by 3 months twice subject to maximum of 6 months at the discretion of the Registration
dept., for which payment may be made at the same rate of quarterly payment. The SI will
have to compulsorily provide support for the extended term. After that if mutually agreed it
can further be extended for 3 months twice. For this mutually agreed extended period, the
amount will be paid on mutually agreed rate. The Registration Department - Tamil Nadu
shall reserve the sole right to grant any extension to the term above mentioned and shall
notify in writing to the System Integrator, at least 3 months before the expiration of the
Term hereof, whether it will grant the SI an extension of the Term. The decision to grant
or refuse the extension shall be at the Registration Department - Tamil Nadu discretion.
c. Where the Registration Department - Tamil Nadu is of the view that no further extension
of the term be granted to the System Integrator, the Registration Department - Tamil
Nadu shall notify the SI of its decision at least 3 (three) months prior to the expiry of the
Term. Upon receipt of such notice, the SI shall continue to perform all its obligations
hereunder, until such reasonable time beyond the Term of the Contract within which, the
Registration Department - Tamil Nadu shall either appoint an alternative System
Integrator/service provider or create its own infrastructure to operate such Services as are
provided under this Contract.
117

Registration Department Tamil Nadu RFP for SI Selection Volume I

c.

Prices
a. Prices quoted must be firm and shall not be subject to any upward revision on any
account whatsoever throughout the period of contract.
b. SI shall provide Most Preferred Customer status to the Registration Department - Tamil
Nadu. Accordingly, the prices payable for services relating to the Physical & IT
infrastructure components, Maintenance and Management shall in no event exceed the
lowest price at which the SI offers similar services to any other customer during the
currency of the contract.
c. If at any time during the period of contract, the SI offers services similar in nature to any
other customer, at prices lower than those chargeable under this contract, he shall notify
the same to the Registration Department - Tamil Nadu and extend such reduced prices to
the Registration Department - Tamil Nadu with immediate effect.

ci.

Alteration/Variation
a. The SI agrees that the Data Centre and registration department offices requirements
given in specifications of the Bidding Documents are broad requirements and are in no
way exhaustive and guaranteed by the Registration Department - Tamil Nadu.
b. It shall be the responsibility of the SI to meet all the requirements contained in the
Bidding Documents and any upward revisions and / or additions of quantities /
specifications / sizes given in Specifications and drawings etc. of the Bidding Documents
required to be made during commissioning of Data Centre and department offices shall
not constitute a change order and shall be carried out without a change order and shall
be carried out without any time and cost effect to Registration Department - Tamil Nadu.
c. Further upward revisions and or additions required to make System Integrators selected
space, facilities, equipment and installation procedures to meet Bidding Documents
requirements expressed and to make entire facilities safe, operable and as per specified
codes and standards shall not constitute a change order and shall be carried out without
any time and cost effect to Registration Department - Tamil Nadu.
d. Any upward revision and/or additions consequent to errors, omissions, ambiguities,
discrepancies in the specification, etc. of the Bidding Documents which the SI had not
brought out to the Registration Department - Tamil Nadu notice in his tender shall not
constitute a change order and such upward revisions and/or addition shall be carried out
by SI without any time and cost effect to Registration Department - Tamil Nadu.

cii.

Change Order
a. The change order will be initiated only in case (i) the Registration Department - Tamil
Nadu directs in writing the SI to include any addition to the scope of work covered under
this Contract or delete any part of the scope of the work under the Contract, (ii) SI
requests to delete any part of the work which will not adversely affect the operational
capabilities of the facilities and if the deletions proposed are agreed to by the Registration
Department - Tamil Nadu and for which cost and time benefits shall be passed on to the
Registration Department - Tamil Nadu (iii) the Registration Department - Tamil Nadu
directs in writing the SI to incorporate changes or additions to the various requirements
already covered in the Contract.
b. Any changes required by the Registration Department - Tamil Nadu over and above the
minimum requirements given in the specifications and drawings etc. included in the
Bidding Documents before giving its approval to detailed design or Engineering for
complying with design criteria and changes required to ensure systems compatibility and
reliability for safe (As per codes, standards and recommended practices referred in the
Bidding Documents) and trouble free operation shall not be construed to be change in the
Scope of work under the Contract.
c. Any change order as stated in Clause cii.a. Comprising an alteration which involves
change in the cost of the works (which sort of alteration is hereinafter called a Variation)
118

Registration Department Tamil Nadu RFP for SI Selection Volume I

shall be the Subject of an amendment to the Contract by way of an increase or decrease


in the Contract Price and adjustment of the implementation schedule if any.
d. If there is a different of opinion between the SI and Registration Department - Tamil Nadu
Representative whether a particular work or part of the work constitutes a change order or
not, the matter shall be handled in accordance with the procedures set forth in Clause ciii.
e. Within 14 working days of receiving the comments from the Registration Department Tamil Nadu or the drawings, specification, purchase requisitions and other documents
submitted by the SI for approval, the SI shall respond in writing, which item(s) of the
Comments is/are potential changes(s) in the Scope of work at Section 4 and 5 of the
Volume I of the tender document covered in the Contract and shall advise a date by
which change order (if applicable) will be submitted to the Registration Department Tamil Nadu .

ciii.

Procedures for Change Order


a. During detailed Engineering and subsequently, if the SI observes that any new
requirement which other than that required for meeting the design criteria is not specific or
intended by the Contract has been stipulated by the Registration Department - Tamil
Nadu while approving the specifications, calculations, purchase requisitions, other
documents etc. he would verbally discuss the matter with Registration Department - Tamil
Nadu Representative. Any addition of modules/sub-modules in the Registration
Department software as required by the department during implementation or O&M phase
shall not constitute a change order.
b. In case such requirement arises from the side of the System Integrator, he would also
verbally discuss the matter with Registration Department - Tamil Nadu Representative
giving reasons thereof.
c. In either of the two cases as explained in Clause ciii.a and ciii.b above, the
representatives of both the parties will discuss on the new requirement for better
understanding and to mutually decide whether such requirement constitutes a change
order or not.
d. If it is mutually agreed that such Requirement constitutes a Change Order then a joint
memorandum will be prepared and signed by the SI and Registration Department - Tamil
Nadu to confirm a Change Order and basic ideas of necessary agreed arrangement.
e. Upon completion of the study referred to above under Clause ciii.d, the results of this
study along with all relevant details including the estimated time and cost effect thereof
with supporting documents would be submitted to the Registration Department - Tamil
Nadu to enable the Registration Department - Tamil Nadu to give a final decision whether
SI should proceed with the change order or not in the best interest of the works. The
estimated cost and time impact indicated by SI shall be considered as a ceiling limit and
shall be provisionally considered for taking a decision to implement change order. The
time impact applicable to the Contract shall be mutually agreed, subsequently, on the
basis of the detailed calculations supported with all relevant back up documents. In case
SI fails to submit all necessary support and back up documents, the decision of the
Registration Department - Tamil Nadu regarding time and cost shall be final and binding
on the System Integrator.
f. If Registration Department - Tamil Nadu accepts the implementation of the change order
under Clause ciii.e above in writing, which would be considered as change order, then SI
shall commence to proceed with the relevant work stipulated in the change order pending
final agreement between the parties with regard to adjustment of the Contract Price and
the Construction Schedule.
g. In case, mutual agreement whether new requirement constitutes the change order or not,
is not reached, then SI in the interest of the works, shall take up the implementation of the
work, if advised in writing to do so by Registration Department - Tamil Nadu
Representative pending settlement between the two parties to the effect whether such
requirement constitutes a change order or not as per the terms and conditions of Contract
documents. The time and cost effects in such a case shall be mutually verified and

119

Registration Department Tamil Nadu RFP for SI Selection Volume I

recorded. Should it establish that the said work constitutes a change order; the same
shall be compensated as per the clause h given below.
h. The SI shall submit necessary back up documents for the change order showing the
break-up of the various elements constituting the change order for the Registration
Department - Tamil Nadu review. If no agreement is reached between the Registration
Department - Tamil Nadu and SI within 60 days after Registration Department - Tamil
Nadu instruction in writing to carry out the change concerning the increase or decrease
in the Contract price and all other matters described above, either party may refer the
dispute to arbitration.

civ.

Change of Size/Quantities
The Registration Department - Tamil Nadu will have the option to increase or decrease the
size of the dedicated and exclusive space at its offices as well as the related quantities of
equipment/material to be provisioned by the SI as mentioned in the Contract, at any time
before work is initiated at the site, provided that such increase or decrease shall not exceed
twenty five per cent (25%) as per tender rules of Tamil Nadu. The changes would be effected
by using the unit price quoted by the System Integrator. In case the change required by the
Registration Department - Tamil Nadu exceeds 25% of the total Contract Price, the said
change would be subject to the SI providing his written consent to the Registration
Department - Tamil Nadu request.

cv.

Conditions for extra work/change order


a. The provisions of the Contract shall apply to extra work performed as if the Extra work /
Change order has been included in the original Scope of work. However, the Contract
Price shall increase / decrease and the Time Schedule shall be adjusted on account of
the Extra work / Change orders as may be mutually agreed in terms of provisions set forth
in Clause cii through civ above. The System Integrators obligations with respect to such
work remain in accordance with the Contract.
b. The rates provided by the SI as part of its commercial quote will be considered as
benchmark rates for placing change orders, if any.

cvi.

Suspension of Work
a. The SI shall, if ordered in writing by the Registration Department - Tamil Nadu
Representative, temporarily suspend the works or any part thereof for such a period and
such a time as ordered. The SI shall not be entitled to claim compensation for any loss or
damage sustained by him by reason of temporary suspension of the Works as aforesaid.
An extension of time for completion, corresponding with the delay caused by any such
suspension of the works as aforesaid shall be granted to the System Integrator, if request
for same is made and that the suspension was not consequent to any default or failure on
the part of the System Integrator. In case the suspension of works, is not consequent to
any default or failure on the part of the System Integrator, and lasts for a period of more
than 3 months, the SI shall have the option to request the Registration Department Tamil Nadu to terminate the Contract with mutual consent.
b. In the event that the Registration Department - Tamil Nadu suspends the progress of
work for any reason not attributable to the SI for a period in excess of 90 days in
aggregate, rendering the SI to extend his performance guarantee then Registration
Department - Tamil Nadu shall bear only the cost of extension of such bank guarantee for
such extended period restricted to the normal bank rates as applicable in the international
banking procedures subject to the SI producing the requisite evidence from the bank
concerned.

cvii.

Tenure of Contract
Unless terminated earlier, pursuant to Clauses lxxv, xcv, xcviii, etc. the Contract shall
terminate on the completion of term as specified in the Contract and only after the obligations
mentioned in Clause cxiv are fulfilled to the satisfaction of the Registration Department - Tamil
Nadu.
120

Registration Department Tamil Nadu RFP for SI Selection Volume I

cviii.

Payment Schedule
Phase I
Payments for the Phase-I & II will be released after the stage-wise completion certificate &
final commissioning certificate

Table 3 Payment Terms


Phase

Payment Schedule

Fee Payable

Remarks

UAT

5%

Payable after successful completion of


Unit Acceptance Testing of Pilot
Application

Pilot Implementation

10%

Payable after successful commissioning


Pilot Locations/Districts

State-Wide Application
Roll-Out

15%

Payable on Successful Completion of


State-Wide Roll-Out

20 quarterly payments
equally amortized over
5 years

65%

3.25% per quarter in equated installments;


Performance Service Levels will determine
penalty if any during each Quarter

Handover

5%

After
successful
handover/knowledge
transfer at the end of the project

II

Phase II conditions

The SI shall obtain the VAPT assessment certification for the Registration Application
within the first Quarter of Operations; otherwise it would invite invocation of the Liquidity
Damages mentioned in section 13.45 of this tender. In case of non-fulfilment of this
assessment in the subsequent quarter Registration Department may terminate the
contract.

After the end of every quarter, The Quarterly SLA/performance report in a prescribed
format should be submitted within 7 working days in the succeeding quarter.

Quarterly payment will be released after deducting the LD or penalties as per SLA of the
previous quarter if any.

Note:
1. All Payments shall be made in Indian Rupees Only
2. Registration Department reserves the right to release the part payment for completed work
against the milestone payment.

121

Registration Department Tamil Nadu RFP for SI Selection Volume I

cix.

Penalty for Non-Fulfilment of Service Level Agreement


In case of non-conformity to SLA terms penalty will be deducted from the quarterly payment
as mentioned in the SLA

cx.

Events of Default by the System Integrator


a. The failure on the part of the SI to perform any of its obligations or comply with any of the
terms of this Contract shall constitute an Event of Default on the part of the System
Integrator. The events of default as mentioned above may include inter-alia the following:
b. the SI has failed to perform any instructions or directives issued by the Registration
Department - Tamil Nadu which it deems proper and necessary to execute the scope of
work under the Contract, or
c. the SI has failed to adhere to any of the key performance indicators as laid down in the
Key Performance Measures / Contract, or if the SI has fallen short of matching such
standards/targets as the Registration Department - Tamil Nadu may have designated with
respect to any task necessary for the execution of the scope of work under this Contract.
The above mentioned failure on the part of the SI may be in terms of failure to adhere to
timelines, specifications, requirements or any other criteria as defined by the Registration
Department - Tamil Nadu ;
d. the SI has failed to remedy a failure to perform its obligations in accordance with the
specifications issued by the despite being served with a default notice which laid down
the specific deviance on the part of the SI to comply with any stipulations or standards as
laid down by the Registration Department - Tamil Nadu ; or
e. the System Integrator/System Integrators Team has failed to conform with any of the
Service/Facility Specifications/standards as set out in the scope of work of this Tender
document or has failed to adhere to any amended direction, modification or clarification
as issued by the Registration Department - Tamil Nadu during the term of this Contract
and which the Registration Department - Tamil Nadu deems proper and necessary for
the execution of the scope of work under this Contract
f. the SI has failed to demonstrate or sustain any representation or warranty made by it in
this Contract, with respect to any of the terms of its Bid, the Tender and this Contract
g. There is a proceeding for bankruptcy, insolvency, winding up or there is an appointment
of receiver, liquidator, assignee, or similar official against or in relation to the System
Integrator.
h. The System Integrator/System Integrators Team has failed to comply with or is in breach
or contravention of any applicable laws.
i. Where there has been an occurrence of such defaults inter alia as stated above, the
Registration Department - Tamil Nadu shall issue a notice of default to the System
Integrator, setting out specific defaults / deviances / omissions and providing a notice of
Sixty (60) days to enable such defaulting party to remedy the default committed.
j. Where despite the issuance of a default notice to the SI by the Registration Department Tamil Nadu the SI fails to remedy the default to the satisfaction of the System Integrator,
the Registration Department - Tamil Nadu may, where it deems fit, issue to the defaulting
party another default notice or proceed to adopt such remedies as may be available to
the Registration Department - Tamil Nadu.
k. If the system integrator is given a penalty of more than 25% of any milestone payment, it
constitutes a default and the registration department has the right to consider the
termination at any time after the default.

cxi.

Consequences in Event of Default


a. Where an Event of Default subsists or remains uncured the Registration Department Tamil Nadu may/shall be entitled to:
b. Impose any such obligations and conditions and issue any clarifications as may be
necessary to inter alia ensure smooth continuation of Services and the project which the
SI shall be obliged to comply with which may include unilateral re-determination of the
122

Registration Department Tamil Nadu RFP for SI Selection Volume I

consideration payable to the SI hereunder. The SI shall in addition take all available
steps to minimize loss resulting from such event of default.
c. The Registration Department - Tamil Nadu may, by a written notice of suspension to the
System Integrator, suspend all payments to the SI under the Contract, provided that such
notice of suspension:
d. shall specify the nature of the failure; and
e. shall request the SI to remedy such failure within a specified period from the date of
receipt of such notice of suspension by the System Integrator
f. Where the Registration Department - Tamil Nadu deems necessary, it shall have the right
to require replacement of any of the System Integrators consortium partner/ subcontractors / vendors with another suitable member. The SI shall in such case terminate
forthwith all their agreements/contracts other arrangements with such member and find of
the suitable replacement for such outgoing member with another member to the
satisfaction of the Registration Department - Tamil Nadu who shall execute such
Contracts with the Registration Department - Tamil Nadu as the Registration Department
- Tamil Nadu may require. Failure on the part of the SI to find a suitable replacement
and/or terminate all agreements/contracts with such member, shall amount to a breach of
the terms hereof and the Registration Department - Tamil Nadu in addition to all other
rights, have the right to claim damages and recover from the SI all losses/ or other
damages that may have resulted from such failure.

cxii.

Terminate the Contract


a. Retain such amounts from the payment due and payable by the Registration Department
- Tamil Nadu to the SI as may be required to offset any losses caused to the Registration
Department - Tamil Nadu as a result of such event of default and the SI shall compensate
the Registration Department - Tamil Nadu for any such loss, damages or other costs,
incurred by the Registration Department - Tamil Nadu in this regard. Nothing herein shall
effect the continued obligation of the consortium partner/sub-contractor/other members of
its Team to perform all their obligations and responsibilities under this Contract in an
identical manner as were being performed before the occurrence of the default.
b. Invoke the Performance Bank Guarantee and other Guarantees furnished hereunder,
enforce the Deed of Indemnity, recover such other costs/losses and other amounts from
the SI may have resulted from such default and pursue such other rights and/or remedies
that may be available to the Registration Department - Tamil Nadu under law.

cxiii.

Termination
a. The Registration Department - Tamil Nadu may, terminate this Contract in whole or in
part by giving the SI prior and written notice indicating its intention to terminate the
Contract under the following circumstances:
b. Where the Registration Department - Tamil Nadu is of the opinion that there has been
such Event of Default on the part of the SI which would make it proper and necessary to
terminate this Contract and may include failure on the part of the SI to respect any of its
commitments with regard to any part of its obligations under its Bid, the Tender or under
this Contract.
c. Where it comes to the Registration Department - Tamil Nadu s attention that the SI (or
the System Integrators Team) is in a position of actual conflict of interest with the
interests of the Registration Department - Tamil Nadu in relation to any of terms of the
System Integrators Bid, the Tender or this Contract
d. Where the System Integrators ability to survive as an independent corporate entity is
threatened or is lost owing to any reason whatsoever, including inter-alia the filing of any
bankruptcy proceedings against the System Integrator, any failure by the SI to pay any of
its dues to its creditors, the institution of any winding up proceedings against the SI or the
happening of any such events that are adverse to the commercial viability of the System
Integrator. In the event of the happening of any events of the above nature, the
Registration Department - Tamil Nadu shall reserve the right to take any steps as are
123

Registration Department Tamil Nadu RFP for SI Selection Volume I

necessary, to ensure the effective transition of the project to a successor System


Integrator/service provider, and to ensure business continuity
e. Termination for Insolvency: The Registration Department - Tamil Nadu may at any time
terminate the Contract by giving written notice to the System Integrator, without
compensation to the System Integrator, if the SI becomes bankrupt or otherwise
insolvent, provided that such termination will not prejudice or affect any right of action or
remedy which has accrued or will accrue thereafter to the Registration Department Tamil Nadu.
f. Termination for Convenience: The Registration Department - Tamil Nadu may, by prior
written notice sent to the SI at least 6 months in advance, terminate the Contract, in whole
or in part at any time for its convenience. The notice of termination shall specify that
termination is for the Registration Department - Tamil Nadu convenience, the extent to
which performance of work under the Contract is terminated, and the date upon which
such termination becomes effective.
g. The SI may, subject to approval by the Registration Department - Tamil Nadu terminate
this Contract before the expiry of the term by giving the Registration Department - Tamil
Nadu a prior and written notice at least 12 months in advance indicating its intention to
terminate the Contract by paying losses to the department as estimated by the
department.

cxiv.

Consequences of Termination
a. In the event of termination of this contract due to any cause whatsoever except 13.42 (f),
the SI shall be blacklisted and the empanelment with stand cancelled effective from the
date of termination of this contract.
b. In the event of termination of this Contract due to any cause whatsoever, [whether
consequent to the stipulated Term of the Contract or otherwise] the Registration
Department - Tamil Nadu shall be entitled to impose any such obligations and conditions
and issue any clarifications as may be necessary to ensure an efficient transition and
effective business continuity of the project which the SI shall be obliged to comply with
and take all available steps to minimize loss resulting from that termination/breach, and
further allow and provide all such assistance to the Registration Department - Tamil Nadu
and/or the successor System Integrator/service provider, as may be required, to take-over
the obligations of the erstwhile SI in relation to the execution/continued execution of the
scope of this Contract.
c. Where the termination of the Contract is prior to its stipulated term on account of a Default
on the part of the SI or due to the fact that the survival of the SI as an independent
corporate entity is threatened/has ceased, or for any other reason, whatsoever, the
Registration Department - Tamil Nadu through unilateral re-determination of the
consideration payable to the SI shall pay the SI for that part of the Services which have
been authorized by the Registration Department - Tamil Nadu and satisfactorily
performed by the SI up to the date of termination. Without prejudice any other rights, the
Registration Department - Tamil Nadu may retain such amounts from the payment due
and payable by the Registration Department - Tamil Nadu to the SI as may be required
to offset any losses caused to the Registration Department - Tamil Nadu as a result of
any act/omissions of the System Integrator. In case of any loss or damage due to default
on the part of the SI in performing any of its obligations with regard to executing the
scope of work under this Contract, the SI shall compensate the Registration Department
- Tamil Nadu for any such loss, damages or other costs, incurred by the Registration
Department - Tamil Nadu. Additionally, the sub SI / other members of its team shall
perform all its obligations and responsibilities under this Contract in an identical manner
as were being performed before the collapse of the SI as described above in order to
execute an effective transition and to maintain business continuity. All third parties shall
continue to perform all/any functions as stipulated by the Registration Department - Tamil
Nadu and as may be proper and necessary to execute the scope of work under the
Contract in terms of the System Integrators Bid, the Tender and this Contract.

124

Registration Department Tamil Nadu RFP for SI Selection Volume I

d. Nothing herein shall restrict the right of the Registration Department - Tamil Nadu to
invoke the Bank Guarantee and other Guarantees furnished hereunder, enforce the Deed
of Indemnity and pursue such other rights and/or remedies that may be available to the
Registration Department - Tamil Nadu under law.
e. The termination hereof shall not affect any accrued right or liability of either Party nor
affect the operation of the provisions of this Contract that are expressly or by implication
intended to come into or continue in force on or after such termination.

cxv.

Penalty
The SI should sign the contract with in the timelines as specified in the Section 12.3 of this
RFP. Any Delay in signing the contract would attract a penalty of INR 50,000 per week.

cxvi.

Liquidated Damages for Non-Fulfillment of Commissioning Schedule


a. A penalty as per service level agreement of late completion beyond the stipulated
commissioning schedule will be levied.
b. In the case it leads to termination, the Registration Department - Tamil Nadu shall give 30
days notice to the SI of its intention to terminate the Contract and shall so terminate the
Contract unless during the 30 days notice period, the SI initiates remedial action
acceptable to the Registration Department - Tamil Nadu.
c. The Registration Department - Tamil Nadu may without prejudice to its right to affect
recovery by any other method, deduct the amount of liquidated damages from any money
belonging to the SI in its hands (which includes the Registration Department - Tamil
Nadus right to claim such amount against System Integrators Bank Guarantee) or which
may become due to the System Integrator. Any such recovery or liquidated damages
shall not in any way relieve the SI from any of its obligations to complete the Works or
from any other obligations and liabilities under the Contract.

cxvii.

Compliance with Statutory Requirements


The SI shall have to comply with the Contract labour Act (Regulation & Abolition Act),
Apprentices Act 1961, Payment of Wages ACT, Minimum Wages ACT, Employee State
insurance Act, Employee Provident Fund and Miscellaneous provision ACT, Fatal Accident
ACT, TamilNadu Manual Workers (Regulation of Employment and Conditions of Workers)
ACT 1982 and other applicable Labour Laws and Regulations in force from time to time.

cxviii.

Arbitration
In case of any dispute, the matter will be referred to an Arbitrator under "Arbitration and
Conciliation Act 1996". The arbitration should be held in Chennai only and the Courts at
Chennai only should have jurisdiction in relation thereto.

cxix.

Special Terms

Registration Department reserves the right to reduce or increase the quantity requirement
to an extent of 25% of tendered value at the time of releasing the work order or by issue
of an amendment subsequently.

Any additional active devices that will be provided by GoTN/Government Departments,


during the contract period, which may be under warranty/AMC shall be deployed and
monitored by the Successful Bidder as per the SLA and terms and conditions of the
tender.

125

Registration Department Tamil Nadu RFP for SI Selection Volume I

The SI is allowed to sub-contract some of the activities mentioned in the contract scope
only after approval from the department. The sub-contracting should be limited to only
one level. In case of any deviations, penalties may be imposed.

During the contract period, any additional internet bandwidth as required by GoTN is to
be provided by the SI at the rates finalised in the tender

During the contract period, if any tariff reduction is announced by TRAI, the same has to
be extended by the SI to the internet bandwidth and services.

After the expiry of contract period, it may be extended to maximum of two quarter at same
th

quarterly cost in the 20 Quarter, at the discretion of the Registration Department. In case
of any further extensions, the same may be done at a mutually agreed rate.

cxx.

Dispute Resolution
a. The Registration Department - Tamil Nadu and the SI shall make every effort to resolve
amicably by direct informal negotiations, any disagreement or disputes, arising between
them under or in connection with the Contract.
b. If, after Thirty (30) days from the commencement of such direct informal negotiations, the
Registration Department - Tamil Nadu and the SI have been unable to resolve amicably a
Contract dispute, either party may require that the dispute be referred for resolution to the
formal mechanism specified in Clauses c and d.
c. In the case of a dispute or difference arising between the Registration Department - Tamil
Nadu and the SI relating to any matter arising out of or connected with this Contract,
such dispute or difference shall be referred to the award of two Arbitrators, one Arbitrator
to be nominated by the Registration Department - Tamil Nadu and the other to be
nominated by the SI or in case of the said Arbitrators not agreeing, then to the award of
an Umpire to be appointed by the Arbitrators in writing before proceeding with the
reference, and in case the Arbitrators cannot agree to the Umpire, he may be nominated
by the Secretary, Indian Council of Arbitration, New Delhi. The award of the Arbitrators,
and in the event of their not agreeing, of the Umpire appointed by them or by the
Secretary, Indian Council of Arbitration, New Delhi, shall be final and binding on the
parties.
d. The Arbitration and Conciliation Act 1996, the rules there under and any statutory
modification or reenactments thereof, shall apply to the arbitration proceedings.
e. The venue of arbitration shall be the Chennai, India.
f. The Registration Department - Tamil Nadu may terminate this contract, by giving a written
notice of termination of minimum 30 days, to the System Integrator, if the SI fails to
comply with any decision reached consequent upon arbitration proceedings pursuant to
Clause cxvii.
g. Continuance of the Contract: Notwithstanding the fact that settlement of dispute(s) (if
any) under arbitration may be pending, the parties hereto shall continue to be governed
by and perform the work in accordance with the provisions under the Scope of Work to
ensure continuity of operations.

cxxi.

Limitation of the System Integrators Liability towards the Registration


Department - Tamil Nadu
a. Except in case of gross negligence or willful misconduct on the part of the SI or on the
part of any person or company acting on behalf of the SI in carrying out the Services, the
System Integrator, with respect to damage caused by the SI to Registration Department Tamil Nadus property, shall not be liable.
b. for any indirect or consequential loss or damage; and
c. For any direct loss or damage that exceeds (A) the total payments payable under his
contract to the SI hereunder, or (B) the proceeds the SI may be entitled to receive from

126

Registration Department Tamil Nadu RFP for SI Selection Volume I

any insurance maintained by the SI to cover such a liability, whichever of (A) or (B) is
higher.
d. This limitation of liability shall not affect the SI liability, if any, for damage to Third Parties
caused by the SI or any person or firm/company acting on behalf of the SI in carrying out
the Services.

cxxii.

Conflict of interest
The SI shall disclose to the Registration Department - Tamil Nadu in writing, all actual and
potential conflicts of interest that exist, arise or may arise (either for the SI or the System
Integrators Team) in the course of performing the Services as soon as practical after it
becomes aware of that conflict.

cxxiii.

Severance
In the event any provision of this Contract is held to be invalid or unenforceable under the
applicable law, the remaining provisions of this Contract shall remain in full force and effect.

cxxiv.

Governing Language
a. The Agreement shall be written in English language. All correspondence and other
documents pertaining to the Contract that are exchanged by parties shall be written in
English language only.

cxxv.

No Claim Certificate
The SI shall not be entitled to make any claim, whatsoever against the Registration
Department - Tamil Nadu under or by virtue of or arising out of, this contract, nor shall the
Registration Department - Tamil Nadu entertain or consider any such claim, if made by the
SI after he shall have signed a No claim certificate in favour of the Registration
Department - Tamil Nadu in such forms as shall be required by the Registration Department
- Tamil Nadu after the works are finally accepted.

cxxvi.

Publicity
The SI shall not make or permit to be made a public announcement or media release about
any aspect of this Contract unless the Registration Department - Tamil Nadu first gives the SI
its written consent.

cxxvii.

Force Majeure
a. Force Majeure shall not include any events caused due to acts/omissions of such Party or
result from a breach/contravention of any of the terms of the Contract, Bid and/or the
Tender. It shall also not include any default on the part of a Party due to its negligence or
failure to implement the stipulated/proposed precautions, as were required to be taken
under the Contract.
b. The failure or occurrence of a delay in performance of any of the obligations of either
party shall constitute a Force Majeure event only where such failure or delay could not
have reasonably been foreseen, or where despite the presence of adequate and
stipulated safeguards the failure to perform obligations has occurred. In such an event,
the affected party shall inform the other party in writing within five days of the occurrence
of such event. The Registration Department - Tamil Nadu will make the payments due for
Services rendered till the occurrence of Force Majeure. However, any failure or lapse on
the part of the SI in performing any obligation as is necessary and proper, to negate the
damage due to projected force majeure events or to mitigate the damage that may be
caused due to the abovementioned events or the failure to provide adequate disaster
management/recovery or any failure in setting up a contingency mechanism would not
constitute force majeure, as set out above.

127

Registration Department Tamil Nadu RFP for SI Selection Volume I

c.

cxxviii.

In case of a Force Majeure, all Parties will endeavor to agree on an alternate mode of
performance in order to ensure the continuity of service and implementation of the
obligations of a party under the Contract and to minimize any adverse consequences of
Force Majeure.

Exit Management
For the completion of the five year period or extension thereof, the current SI shall follow the
Exit Management Plan given below.
a) Selection of the SI for the period beyond the current contract (hereinafter referred to as
New SI) by Department. The current SI can also bid for the same.
b) Submission of reports on the history of physical infrastructure / IT hardware / software by
the Current SI to Department.
c) Specification of configuration changes (based on the approval of Department) with
necessary document proof by the current SI.
d) Submission

of

documentation

on

the

current

configuration

to

Registration

Department/GoTN application, hardware, etc.


e) Verification and acceptance of documentation with respect to the physical inventory by
Department.
f)

Deployment of resources at the Registration Department and TNSDC by the New SI to


meet the SLA requirements.

g) Current SI has to co-ordinate with the New SI for smooth rollout.


h) Parallel run by the New SI and Current SI for a period of 1 month to 3 months. The
Current SI has to provide necessary training to the New SI for smooth takeover of
operations.
i)

The Current SI shall transfer in good and working condition, all equipment (without any
liability) necessary for the proper and normal operation of the TNSDC to GoTN.

j)

Any confidential Information relating to the current services rendered and performance
data relating to the performance of the services; Documentation relating to Registration
Department, Projects Intellectual Property Rights; any other project data and confidential
information related to Registration Department shall be transferred to Registration
Department. A due diligence may be carried out by Registration Department or New SI on
the transition of all the information (including but not limited to documents, records and
agreements) relating to the Department to the Registration Department.

k) In case of any contract extension beyond the contract period, the same shall be made
effect as per the clause mentioned in the Special terms

cxxix.

Exit Management Purpose


This Schedule sets out the provisions, which will apply on expiry or termination of the SLA, the Project
Implementation, Operation and Management SLA. The Parties shall ensure that their respective
associated entities carry out their respective obligations set out in this Exit Management Schedule.

128

Registration Department Tamil Nadu RFP for SI Selection Volume I

cxxx.

Transfer of Assets
SI shall be entitled to use the Assets for the duration of the exit management period, which shall be
the four month period from the date of expiry of contract, or termination of the SLA.

cxxxi.

Cooperation and Provision of Information


During the exit management period SI will allow Registration Department - TN access to information
reasonably required to define the then current mode of operation associated with the provision of the
services to enable the client to assess the existing services being delivered.

cxxxii.

Confidential Information, Security and Data


The SI will promptly on the commencement of the exit management period, supply to the Registration
Department - TN or its nominated agencies the following:
a. Information relating to the current services rendered and performance data relating to the
performance of the services; Documentation relating to Projects Intellectual Property Rights; any
other data and confidential information related to Registration Department - TN;
b. Project data as is reasonably required for purposes of the Registration Project or for transitioning
of the services to its Replacing SI in a readily available format.
c. All other information (including but not limited to documents, records and agreements) relating to
the services reasonably necessary to enable the Registration Department - TN and its nominated
agencies, or its Replacing SI to carry out due diligence in order to transition the provision of the
Services to Registration Department - TN or its nominated agencies, or its Replacing SI (as the
case may be).

cxxxiii.

Employees
a. Promptly on reasonable request at any time during the exit management period, the SI shall,
subject to applicable laws, restraints and regulations (including in particular those relating to
privacy) provide to Registration Department - TN a list of all employees (with job titles and
communication address) of the SI, dedicated to providing the services at the commencement of
the exit management period;
b. To the extent that any Transfer Regulation does not apply to any employee of the SI, Registration
Department - TN or Replacing SI may make an offer of employment or contract for services to
such employee of the SI and the SI shall not enforce or impose any contractual provision that
would prevent any such employee from being hired by the Registration Department - TN or any
Replacing SI.

cxxxiv.

Rights of Access to Information


At any time during the exit management period, the SI will be obliged to provide an access of
information to Registration Department - Tamil Nadu and / or any Replacing SI in order to make an
inventory of the Assets (including hardware / Software / Active / passive), layouts, diagrams,
schematics, documentations, manuals, catalogs, archive data, IP addressing, Live data, policy
documents or any other material related to Registration Project.

cxxxv.

Exit Management Plan


a. SI shall provide Registration Department - TN with a recommended exit management plan ("Exit
Management Plan") which shall deal with at least the following aspects of exit management in
relation to the SLA as a whole and in relation to the Project Implementation, the Operation and
Management SLA and Scope of work definition.
i. A detailed program of the transfer process that could be used in conjunction with a
Replacement Successful Bidder including details of the means to be used to ensure continuing
provision of the services throughout the transfer process or until the cessation of the services
and of the management structure to be used during the transfer;
ii. Plans for the communication with such of the SI, staff, suppliers, customers and any related
third party as are necessary to avoid any material detrimental impact on DC Projects
operations as a result of undertaking the transfer;
iii. Plans for provision of contingent support to Registration Department Project and Replacement
SI for a reasonable period (minimum one month) after transfer.
b. SI shall re-draft the Exit Management Plan annually thereafter to ensure that it is kept relevant
and up to date.
129

Registration Department Tamil Nadu RFP for SI Selection Volume I

c.
d.
e.
f.
g.
h.

cxxxvi.

Each Exit Management Plan shall be presented by the SI to and approved by Registration
Department - TN or its nominated agencies.
The terms of payment as stated in the Terms of Payment Schedule include the costs of the SI
complying with its obligations under this Schedule.
In the event of termination or expiry of SLA, Project Implementation, Operation and Management
SLA or Scope of Work each Party shall comply with the Exit Management Plan.
During the exit management period, the SI shall use its best efforts to deliver the services.
Payments during the Exit Management period shall be made in accordance with the Terms of
Payment Schedule.
This Exit Management plan shall be furnished in writing to Registration Department - TN or its
nominated agencies within 15 days from the receipt of notice of termination or one month prior to
the expiry this Agreement.

General

I.

Relationship between the Parties


a. Nothing in this Contract constitutes any fiduciary relationship between the
Registration Department - Tamil Nadu and System Integrator/System Integrators
Team or any relationship of employer employee, principal and agent, or partnership,
between the Registration Department - Tamil Nadu and System Integrator.
b. No Party has any authority to bind the other Party in any manner whatsoever except
as agreed under the terms of this Contract.
c. The Registration Department - Tamil Nadu has no obligations to the System
Integrators Team except as agreed under the terms of this Contract.

II.

No Assignment
The SI shall not transfer any interest, right, benefit or obligation under this Contract
without the prior written consent of the Registration Department - Tamil Nadu.

III.

Survival
The provisions of the clauses of this Contract in relation to documents, data, processes,
property, Intellectual Property Rights, indemnity, publicity and confidentiality and
ownership survive the expiry or termination of this Contract and in relation to
confidentiality, the obligations continue to apply unless the Registration Department Tamil Nadu notifies the SI of its release from those obligations.

IV.

Entire Contract
The terms and conditions laid down in the Tender and all annexure thereto as also the
Bid and any attachments/annexes thereto shall be read in consonance with and form an
integral part of this Contract. This Contract supersedes any prior Contract, understanding
or representation of the Parties on the subject matter.

V.

Governing Law
This Contract shall be governed in accordance with the laws of India.

VI.

Jurisdiction of Courts
The courts of India at Tamil Nadu have exclusive jurisdiction to determine any proceeding
in relation to this Contract.

VII.

Compliance with Laws


The SI shall comply with the laws in force in India in the course of performing this
Contract.
130

Registration Department Tamil Nadu RFP for SI Selection Volume I

VIII.

Notices
A notice means:
i. a notice; or
ii. a consent, approval or other communication required to be in writing under this
Contract.
All notices, requests or consents provided for or permitted to be given under this
Contract shall be in writing and shall be deemed effectively given when personally
delivered or mailed by pre-paid certified / registered mail, return receipt requested,
addressed as follows and shall be deemed received two days after mailing or on the
date of delivery if personally delivered to:
To Registration Department - Tamil Nadu, at:
Office of IG Registration,
100, Santhome High Road, Pattinapakkam,
Chennai - 600028.
Phone: 044 - 24640160
Fax: 044 - 24642774
To SI at:
<Address>
<Phone:>
<Fax:>
Any Party may change the address to which notices are to be directed to it by notice to
the other parties in the manner specified above. A notice served on a Representative is
taken to be notice to that Representatives Party.

IX.

Waiver
a. Any waiver of any provision of this Contract is ineffective unless it is in writing
and signed by the Party waiving its rights.
b. A waiver by either Party in respect of a breach of a provision of this Contract by
the other Party is not a waiver in respect of any other breach of that or any
other provision.
c. The failure of either Party to enforce at any time any of the provisions of this
Contract shall not be interpreted as a waiver of such provision.

X.

Modification
Any modification of this Contract shall be in writing and signed by an authorized
representative of each Party.

XI.

Application
These General Conditions shall apply to the extent that provisions in other parts of the
Contract do not supersede them.

XII.

IT Act 2000
Besides the terms and conditions stated in this document, the contract shall also be
governed by the overall acts and guidelines as mentioned in IT Act 2000.

131

Registration Department Tamil Nadu RFP for SI Selection Volume I

14. Annexures
cxxxvii.

Annexure I - Specifications of Hardware for buy-back


These hardware are offered for buy-back to the SI. On the basis of the specifications mentioned
below, the buy-back quote may be provided by the SI.

Server
Processor

1 No of Intel Xeon Dual Core 5120 Processor @ 1.8 Ghz or above

Cache Memory

4 Mb L2Cache

Memory

4Gb DDR2 SD RAM @ 667Mhz with ECC Upgradeable upto 12 GB on


DIMM

Motherboard

FSB 1066 Mhz with 1 PCI , 1 PCI express , dual LAN

Chipset

Intel 5000 series chipset or better

Raid Controller Not Required


Hard Disk drive 2X144 Gb, 10000/15000 rpm SAS HDD
Optical Drive

DVD writer (CD and DVD read and write )

Video Controller On Board memory 8 MB dynamic video memory


Bays

Minimum 6 Bays (2 External and 4 Internal Hot Plug bays )

Cabinet Type

Rack-1 U with Black/ Grey colour

Chassis

With redundant(1+1) ATX power supply unit 500 W with redundant fans
with redundancy and security locks for the front panel , HDD trays

Management
Software

Server management utility software with facility for failure detection for
voltage variation, thermal, operating system watch dig or equivalent, fan
failure, driver failure, power supply failure, CPU heat sink fan check, log
reports )

Certification

Windows and Linux ( red Hat and Suse linux certification preferred)

Desktops
Processor

Intel PIV Dual Core D 820 @ 2.8 GHz or above

Cache Memory

2 x 1 MB or above L2 Cache

Memory

512 MB DDR 2 SDRAM @533 MHz upgradeable upto 2 GB on DIMM

Motherboard

FSB 800 MHz with 2 PCI, 1 PCI Express X1 and 1 PCI Express X 16,
Integrated Graphics Controller, 10/100/1000 MBPS Network card with
remote booting facility & 1 Serial Port, 4 USB port (2 in front), 1 Parallel
Port & 2 PS/2 Port

Chipset

945G/NVIDIA Chipset or equivalent

Hard Disk

160 GB or higher SATA HDD

Optical Drive

Combo (DVDR-CD RW)

Modem

Modem (Int)

Monitor

17 TFT LCD Colour Monitor ISO Certified

keyboard

PS/2 104 Keys Mechanical Keyboard

Mouse

Optical Mouse with Pad

Bays

4 Bays (2 Internal and 2 External)

Cabinet Type

Mini Tower Type, Black Cabinet

132

Registration Department Tamil Nadu RFP for SI Selection Volume I

OS Support

Windows, RedHAT and Suse Linux

Pre-loaded OS

Windows XP Starter Edition with DVD Media or Suse Linux Enterprise


Desktop 10 with Tamil Language support with DVD Media

Certification

Protective
Cover

Windows & Suse Linux certification should be submitted before


actual delivery if not at the time of submission of bids
ISO Certification Mandatory for the Manufacturing process

Dust covers to be provided for the CPU, keyboard, monitor and mouse

Dot Matrix Printer


Printing method Impact dot matrix
Number of Pins 24
Print Width

136 columns

Print head life

200 million characters or dots/pin or strokes/ wire @ 25% duty cycle

Print Direction

Bi- Directional with logic seeking

Ribbon life

3million characters

Printer Speed
Cps 300 @10 cpi
High speed draft
Fonts

Draft, Roman, Sans serif, Courier, Script, Prestige, Orator, OCR_B,


Orator-S, English, Built in Unicode Fonts

Paper Handling
Paper feed
Friction Feed,(Top), Tractor Feed (Rear)
method
Input Buffer

24 KB or Above

Interfaces
Standard

IEEE 1284 Parallel

Operating
System
Compatibility

Windows & Linux (Linux Drivers Mandatory)

Necessary
Drivers &
Cables

To be provided

Reliability
MTBF

6000 Hrs@25% duty cycle

Electrical
Specifications
Voltage
Frequency

150 270 VAC


47 Hz- 53Hz

Scanner
Type

Flat bed

Scan Resolution 4800 dpi


Color Depth

48 bit color

Scan Speed

Less than 28 secs. 4x6 inch color photo


Less than 47 secs full page of text

133

Registration Department Tamil Nadu RFP for SI Selection Volume I

Max. Document
A4, legal
Size
Interface

Universal Serial Bus (USB)

Operating
System
Compatibility

Windows & Linux O/S (Linux Drivers mandatory)

Necessary
Drivers &
Cables

To be provided

Power
Requirement

230V AC, 50 Hz, Wattage may be specified by the tendered

UPS 3 kVA
Capacity

3.0 KVA TRUE ONLINE UPS

Back up time

2 hour

Inverter Type

MOSFET/IGBT

INPUT
Voltage Mains
(Primary
Source)

170-250V AC, SINGLE PHASE

Input Power
Factor

0.95 Lag unity

Frequency with
50 Hz,+/-3Hz
Tolerance
Battery
(Secondary)

Sealed maintenance free (SMF) type- AH and no of batteries shall be


suitably sketched for a backup time of 30 mins . (minimum) at 2400w
resistive load or 3.0 KVA load with 0.8 PF.

Battery Storage External battery storage box/ Rack for housing the batteries worth safety
Box/ Rack
provisions to be supplied along with the UPS system
OUTPUT
Nominal Voltage 230 V AC, Single phase
Voltage
Regulation

+/-2%

Frequency

50 Hz

Variation in
Frequency

+/-0.2Hz

Load Power
factor

0.70 lag to unity

Waveform

Pure Sine Waves

Overload
capacity

110% load withstand for 10 minutes


125% load withstand for 5 minutes

Overall
efficiency

Greater than 85% at full load

Total Harmonic Less than 5% for non liner load


Distortion
Less than 4 % f0or linear load
Duty Cycle

Continuous

134

Registration Department Tamil Nadu RFP for SI Selection Volume I

Cooling
Protections

Forced Air cooling


1.
2.
3.
4.
5.
6.
7.

Input , output Low and High


Battery low and high voltage
Input, Output Fuse
Battery MCB/fuse
Short Circuit
Overload
Lightening

Mobility

All UPS fitted with castors for mobility

Controls

Manual By pass switch and static bypass switch to be provided with


indications

Power Sockets

2 Nos.(15 Amps , Capacity ) Sockets

Trip Conditions Over Load, Over, Under Voltage, Short Circuit


Indications

Mains ON, Inverter ON , Battery Low , Overload

Alarms (Audio)

For extreme battery low voltage

Meters

AC volt meter for input and output dc

Input Cable and


Proper rated cable with PVC pipe to be provided
Output cable
Manuals

Operating and User manual to be provided

Isolation
Transformer

Isolation transformer must be provided

Certification

SAMEER or ETDC Certification Mandatory

ISO

ISO certification mandatory for the manufacture process

Software

Software for auto save & automatic shutdown of the system compatible
with windows and Linux . technical details of the software to be enclosed
(preferable)

UPS 5 kVA
Capacity

5.0 KVA TRUE ONLINE UPS

Back up time

2 hour

Inverter Type

MOSFET/IGBT

INPUT
Voltage Mains
(Primary
Source)

170-250V AC, SINGLE PHASE

Input Power
Factor

0.95 Lag unity

Frequency with
50 Hz,+/-3Hz
Tolerance
Battery
(Secondary)

Sealed maintenance free (SMF) type- AH and no of batteries shall be


suitably sketched for a backup time of 30 mins. (minimum) at 4000w
resistive load or 5.0 KVA load with 0.8 PF.

Battery Storage External battery storage box/ Rack for housing the batteries worth safety
Box/ Rack
provisions to be supplied along with the UPS system
OUTPUT
Nominal Voltage 230 V AC, Single phase

135

Registration Department Tamil Nadu RFP for SI Selection Volume I

Voltage
Regulation

+/-2%

Frequency

50 Hz

Variation in
Frequency

+/-0.2Hz

Load Power
factor

0.70 lag to unity

Waveform

Pure Sine Waves

Overload
capacity

110% load withstand for 10 minutes


125% load withstand for 5 minutes

Overall
efficiency

Greater than 85% at full load

Total Harmonic Less than 5% for non liner load


Distortion
Less than 4 % f0or linear load
Duty Cycle

Continuous

Cooling

Forced Air cooling

Protections

1.
2.
3.
4.
5.
6.
7.

Input , output Low and High


Battery low and high voltage
Input, Output Fuse
Battery MCB/fuse
Short Circuit
Overload
Lightening

Mobility

All UPS fitted with castors for mobility

Controls

Manual By pass switch and static bypass switch to be provided with


indications

Power Sockets

1 Nos.(32 Amps , Capacity ) Capacity Terminal Block

Trip Conditions Over Load, Over, Under Voltage, Short Circuit


Indications

Mains ON, Inverter ON , Battery Low , Overload

Alarms (Audio)

For extreme battery low voltage

Meters

AC volt meter for input and output DC

Input Cable and Proper rated cable with PVC pipe to be provided (approx 3 mtrs x 3
Output cable
runs)
Manuals

Operating and User manual to be provided

Isolation
Transformer

Isolation transformer must be provided

Certification

SAMEER or ETDC Certification Mandatory

ISO

ISO certification mandatory for the manufacture process

Software

Software for auto save & automatic shutdown of the system compatible
with windows and Linux . technical details of the software to be enclosed
(preferable)

136

Registration Department Tamil Nadu RFP for SI Selection Volume I

cxxxviii.

Annexure II SRO office list for Tamil Nadu State


S. No.

Zone Name

District Name

SRO Code

SRO Name

Chennai

Chengalpattu

38

Achirapakkam

Chennai

Chengalpattu

44

Cheyyur

Chennai

Chengalpattu

43

Jt-I Chengelpattu

Chennai

Chengalpattu

42

Jt-II Chengelpattu

Chennai

Chengalpattu

47

Maduranthagam

Chennai

Chengalpattu

40

Salavakkam

Chennai

Chengalpattu

48

Sriperumpudur

Chennai

Chengalpattu

604

Chennai

Chengalpattu

45

Thirupour

10

Chennai

Chengalpattu

46

Thiukalukundram

11

Chennai

Chengalpattu

39

Uthiramerur

12

Chennai

Chenna North

17

Ambattur

13

Chennai

Chenna North

18

Arani

14

Chennai

Chenna North

20

Gummidipoondi

15

Chennai

Chenna North

22

Joint I Chennai North

16

Chennai

Chenna North

27

konnur

17

Chennai

Chenna North

605

18

Chennai

Chenna North

25

Ponneri

19

Chennai

Chenna North

26

Redhills

20

Chennai

Chenna North

19

Royapuram

21

Chennai

Chenna North

21

Sembium

22

Chennai

Chenna North

23

sowcarpet

23

Chennai

Chenna North

24

Thiruvottiyur

24

Chennai

Chenna South

Adayar

25

Chennai

Chenna South

Alandur

Chennai

Chenna South

14

Avadi

27

Chennai

Chenna South

10

Guduvanchery

28

Chennai

Chenna South

Joint-I Chennai South

29

Chennai

Chenna South

Joint-II Chennai South

30

Chennai

Chenna South

11

Kundrathur

31

Chennai

Chenna South

16

Neelankarai

32

Chennai

Chenna South

12

Padappai

33

Chennai

Chenna South

34

Chennai

Chenna South

15

35

Chennai

Chenna South

36

Chennai

Chenna South

603

Salaiyur

37

Chennai

Chenna South

T.Nagar

38

Chennai

Chenna South

Tambaram

39

Chennai

Chenna South

13

Velacherry

Chennai

Chenna South

Chennai

Chennai Central

26

40
41

28

137

Sunguvar Chattiram

Madavaram

Pallavaram
Pammal
Ponnemallee

Virugambakkam
Anna Nager

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

Chennai

Chennai Central

37

Ashok Nager

Chennai

Chennai Central

33

Joint-I Chennai Central

44

Chennai

Chennai Central

35

Joint-II Chennai Central

45

Chennai

Chennai Central

29

Kodambakkam

46

Chennai

Chennai Central

34

Mylapore

47

Chennai

Chennai Central

32

Periamet

48

Chennai

Chennai Central

31

Purasaivakkam

49

Chennai

Chennai Central

30

Triplicane

50

Chennai

Chennai Central

36

Villivakkam

51

Chennai

Kanchipuram

50

Joint-I Kancheepuram

52

Chennai

Kanchipuram

51

Joint-II Kancheepuram

53

Chennai

Kanchipuram

52

Joint-IV Kancheepuram

54

Chennai

Kanchipuram

59

Manavalnagar

55

Chennai

Kanchipuram

56

Pallipet

56

Chennai

Kanchipuram

57

Peramabakkam

Chennai

Kanchipuram

60

R.K.pettai

58

Chennai

Kanchipuram

53

Thamal

59

Chennai

Kanchipuram

58

Thiruvalangadu

60

Chennai

Kanchipuram

54

Tirutani

61

Chennai

Kanchipuram

55

Tiruvallur

62

Chennai

Kanchipuram

49

Uthukottai

61

Walajabath

Coimbatore

75

Aanamalai

Coimbatore

62

Annur

Coimbatore

65

Coimbatore Joint I

Coimbatore

66

Coimbatore Joint II

Coimbatore

72

Ganapathy

Coimbatore

64

Gandhipuram

Coimbatore

78

Kinathukadavu

Coimbatore

70

Madukkarai

Coimbatore

71

Mettupalayam

Coimbatore

83

Negamam

Coimbatore

73

Peelamedu

Coimbatore

69

Periyanaickenpalayam

76

Chennai
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e

Kanchipuram

Coimbatore

85

Pollachi

77

Coimbator

Coimbatore

67

Singanallur

42
43

57

63
64
65
66
67
68
69
70
71
72
73
74
75

138

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

99
10
0
10
1
10
2
10
3
10
4

Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e

10

Coimbator

78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

Coimbatore

80

Sulur

Coimbatore

68

Thondamuthur

Coimbatore

74

Vadavalli

Erode

106

Erode

93

Erode

102

AvalPoondurai

Erode

100

Bhavani

Erode

98

Chenniamalai

Erode

94

Erode Joint I

Erode

96

Kodumudi

Erode

101

Erode

97

Erode

104

Surampatti

99

Thingalore

Erode
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam
Gobichetti
palayam

Ammapettai
Anthiyur

Perundurai
Sivagiri

111

Gobi Joint I

112

Gobi Joint II

109

Kavundapadi

116

Nambiyur

117

Punjaipuliampatti

113

Sathyamangalam

114

Thalavadi

115

Thookanaickan palayam

The Nilgiris

88

Coonoor

The Nilgiris

89

Gudalur

The Nilgiris

90

Kothagiri.

The Nilgiris

91

Ooty Joint I

The Nilgiris

92

Ooty Joint II

Tirupur

63

Avinashi

139

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

10
6
10
7
10
8
10
9
11
0
11
1
11
2
11
3
11
4
11
5
11
6
11
7
11
8
11
9
12
0
12
1
12
2
12
3
12
4
12
5
12
6
12
7
12
8
12
9
13
0
13
1
13
2

Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e
Coimbator
e

13

District Name

SRO Code

SRO Name

Tirupur

105

Tirupur

79

Tirupur

103

Tirupur

77

Tirupur

110

Kunnathur

Tirupur

107

Moolanur

Tirupur

86

Nallur

Tirupur

84

Palladam

Tirupur

87

Thottipalayam

Tirupur

81

Tirupur Joint I

Tirupur

82

Tirupur Joint II

Tirupur

76

Udumalai pettai

Tirupur

95

Uthukuli

Tirupur

108

Vellakoil

Cuddalore

Chicambaram

154

Bhuvanagiri

Cuddalore

Chicambaram

151

JT.I Chidambaram

Cuddalore

Chicambaram

150

Kumaratchi

Cuddalore

Chicambaram

156

Mannarkudi

Cuddalore

Chicambaram

153

Parangipettai

Cuddalore

Chicambaram

155

Pundhuchattiram

Cuddalore

Chicambaram

152

Sethiyathoppu

Cuddalore

Cuddalore

118

Joint 1 cuddalore

Cuddalore

Cuddalore

119

Joint 2 Cuddalore

Cuddalore

Cuddalore

120

Kadampuliyur

Cuddalore

Cuddalore

122

Kullanchavadi

Cuddalore

Cuddalore

121

Kurinjipadi

Cuddalore

Cuddalore

124

Nellikuppam

Cuddalore

Cuddalore

125

Panruti

140

Dharapuram
Gomangalam
Kangeyam
Kaniyur

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

3
13
4
13
5
13
6
13
7
13
8
13
9
14
0
14
1
14
2
14
3
14
4
14
5
14
6
14
7
14
8
14
9
15
0
15
1
15
2
15
3
15
4
15
5
15
6
15
7
15
8
15
9
16
0
16

Cuddalore

Cuddalore

126

pudupettai

Cuddalore

Cuddalore

123

Thirunavalur

Cuddalore

Cuddalore

127

Vadalur

Cuddalore

Kallakurich

143

Chinna selam

Cuddalore

Kallakurich

139

Elavanasurekottai

Cuddalore

Kallakurich

140

JTI Kallakurich

Cuddalore

Kallakurich

141

JTII Kallakurich

Cuddalore

Kallakurich

145

Nagalore

Cuddalore

Kallakurich

146

Rishivandiyam

Cuddalore

Kallakurich

142

Sankarapuram

Cuddalore

Kallakurich

144

Thiyagadurgam

Cuddalore

Kallakurich

148

Vadakkanandal

Cuddalore

Kallakurich

147

Vadaponparappi

Cuddalore

Tindivanam

158

Avalurpettai

Cuddalore

Tindivanam

157

Avarapakkam

Cuddalore

Tindivanam

161

Gingee

Cuddalore

Tindivanam

162

JTI Tindivanam

Cuddalore

Tindivanam

163

JTII Tindivanam

Cuddalore

Tindivanam

164

Marakkanam

Cuddalore

Tindivanam

165

Mayilam

Cuddalore

Tindivanam

160

Sethiyamangalam

Cuddalore

Tindivanam

167

Valathi

Cuddalore

Tindivanam

166

Vallam

Cuddalore

Tindivanam

168

Vanur

Cuddalore

Villupuram

129

Anathapuram

Cuddalore

Villupuram

128

Anniyur

Cuddalore

Villupuram

130

Aragandanallur

Cuddalore

Villupuram

133

JTI Villupuram

141

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

1
16
2
16
3
16
4
16
5
16
6
16
7
16
8
16
9
17
0
17
1
17
2
17
3
17
4
17
5
17
6
17
7
17
8
17
9
18
0
18
1
18
2
18
3
18
4
18
5
18
6
18
7
18
8
18

Cuddalore

Villupuram

134

JTII Villupuram

Cuddalore

Villupuram

137

Kandamangalam

Cuddalore

Villupuram

135

Manalurpettai

Cuddalore

Villupuram

132

Thirukovilur

Cuddalore

Villupuram

131

Thiruvennainallur

Cuddalore

Villupuram

136

Valavanur

Cuddalore

Villupuram

138

Vikkaravandi

Cuddalore

Virudhachallam

169

JTI Virudhachallam

Cuddalore

Virudhachallam

172

Kammapuram

Cuddalore

Virudhachallam

174

Mangalampattai

Cuddalore

Virudhachallam

175

Nallur

Cuddalore

Virudhachallam

179

Pennadam

Cuddalore

Virudhachallam

176

Sirupakkam

Cuddalore

Virudhachallam

173

Thozhudur

Cuddalore

Virudhachallam

171

Tirumuttam

Cuddalore

Virudhachallam

170

Titagudi

Cuddalore

Virudhachallam

177

Ulundorpettai

Cuddalore
Madurai

Virudhachallam
Dindigul

178
207

Vepure
JointI SRO

Madurai

Dindigul

205

Nilakottai

Madurai

Dindigul

198

Athoor

Madurai

Dindigul

199

Ayyampalayam

Madurai

Dindigul

210

Batlagundu

Madurai

Dindigul

200

Chinnalapatti

Madurai

Dindigul

201

JointII SRO

Madurai

Dindigul

203

Kannivadi

Madurai

Dindigul

202

Kodaikanal

Madurai

Dindigul

204

Nagalnayakenpatti

142

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

9
19
0
19
1
19
2
19
3
19
4
19
5
19
6
19
7
19
8
19
9
20
0
20
1
20
2
20
3
20
4
20
5
20
6
20
7
20
8
20
9
21
0
21
1
21
2
21
3
21
4
21
5
21
6
21

Madurai

Dindigul

206

Natham

Madurai

Dindigul

208

Sanarpatti

Madurai

Dindigul

209

Sendurai

Madurai

Karaikudi

211

Aranthangi

Madurai

Karaikudi

212

Devakkottai

Madurai

Karaikudi

215

Karaikudi joint I

Madurai

Karaikudi

213

Karaikudi joint II

Madurai

Karaikudi

214

Meemisal

Madurai

Karaikudi

216

Ponnamaravathi

Madurai

Karaikudi

217

Singampunari

Madurai

Karaikudi

219

Thiruvadanai

Madurai

Karaikudi

218

Thiupathur

Madurai

Karaikudi

220

Thondi

Madurai

Periyakulam

232

Andipatti

Madurai

Periyakulam

234

Chinnamanur

Madurai

Periyakulam

235

Ezhumalai

Madurai

Periyakulam

239

Jt1, Periakulam

Madurai

Periyakulam

236

Jt2, Periakulam

Madurai

Periyakulam

237

Kadamalaikundu

Madurai

Periyakulam

238

Kambam

Madurai

Periyakulam

233

Podinayakanur

Madurai

Periyakulam

240

Sindhupatti

Madurai

Periyakulam

241

Theni

Madurai

Periyakulam

242

Thevaram

Madurai

Periyakulam

244

Usilampatti

Madurai

Periyakulam

243

Uthamapalayam

Madurai

Ramanathapura
m
Ramanathapura

245

Abiramam

256

Joint I Ramnad

Madurai

143

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

7
21
8
21
9
22
0
22
1
22
2
22
3
22
4
22
5
22
6
22
7
22
8
22
9
23
0
23
1
23
2
23
3
23
4
23
5
23
6
23
7
23
8
23
9
24
0
24
1
24
2
24
3
24
4
24

District Name

SRO Code

SRO Name

m
Madurai

Madurai

Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Ramanathapura
m
Sivaganga

Madurai

Sivaganga

279

Jt. I SRO

Madurai

Sivaganga

274

Jt. II SRO

Madurai

Sivaganga

275

Kalayarkovil

Madurai

Sivaganga

277

Madagupatti

Madurai

Sivaganga

276

Manamadurai

Madurai

Sivaganga

278

Nainarkovil

Madurai

Sivaganga

280

Paramakudi

Madurai

Sivaganga

281

Tiruppuvanam

Madurai

Virudhunagar

258

Aruppukkottai

Madurai

Virudhunagar

259

Coonoor

Madurai

Virudhunagar

261

Kariapatti

Madurai

Virudhunagar

262

KeelaRajakularaman

Madurai

Virudhunagar

264

Panthalkudi

Madurai

Virudhunagar

265

Rajapalayam

Madurai

Virudhunagar

266

Sathur

Madurai

Virudhunagar

267

Sethur

Madurai
Madurai
Madurai
Madurai
Madurai
Madurai
Madurai
Madurai
Madurai
Madurai

144

246

Joint II Ramnad

247

Kadaladi

248

Kamuthi

249

Keelakarai

250

Mudukulathur

253

Perunazhi

254

Poghalur

251

R.S.Mangalam

252

Rameshvaram

255

Sayalkudi

257

Velipattinam

273

Ilayangudi

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

5
24
6
24
7
24
8
24
9
25
0
25
1
25
2
25
3
25
4
25
5
25
6
25
7
25
8
25
9
26
0
26
1
26
2
26
3
26
4
26
5
26
6
26
7
26
8
26
9
27
0
27
1
27
2
27

Madurai

Virudhunagar

268

Sivakasi

Madurai

Virudhunagar

269

Srivilliputhur

Madurai

Virudhunagar

271

Thiruchuli

Madurai

Virudhunagar

270

Thiruthangal

Madurai

Virudhunagar

282

Veerachozhan

Madurai

Virudhunagar

263

Virudhunagar Joint I

Madurai

Virudhunagar

260

Virudhunagar Joint II

Madurai

Virudhunagar

272

Watrap

Madurai

Madurai North

189

Alanganallur

Madurai

Madurai North

190

Chockikulam

Madurai

Madurai North

191

Karungalakudi

Madurai

Madurai North

192

Melur

Madurai

Madurai North

196

Original Regn Branch

Madurai

Madurai North

602

Othakadai

Madurai

Madurai North

194

Tallakulam

Madurai

Madurai North

193

Tamaraipatti

Madurai

Madurai North

195

Teppakulam

Madurai

Madurai North

197

Vadipatti

Madurai

Madurai South

180

Arasaradi

Madurai

Madurai South

181

Chekkanurani

Madurai
Madurai

Madurai South
Madurai South

186
182

Cholavandan
District Registrar Office

Madurai
Madurai

Madurai South
Madurai South

183
184

Joint IV Sub Registrar


Kallikudi

Madurai

Madurai South

185

Peraiyur

Madurai

Madurai South

187

Thirumangalam

Madurai

Madurai South

188

Thirupparankundram

Madurai

Palani

225

Joint I SRO Palani

145

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

3
27
4
27
5
27
6
27
7
27
8
27
9
28
0
28
1
28
2
28
3
28
4
28
5
28
6
28
7
28
8
28
9
29
0
29
1
29
2
29
3
29
4
29
5
29
6
29
7
29
8
29
9
30
0
30

Madurai

Palani

223

Joint II SRO Palani

Madurai

Palani

221

SRO Chathiraptti

Madurai

Palani

231

SRO Kallimandayam

Madurai

Palani

226

SRO Keeranur

Madurai

Palani

227

SRO Kujiliamparai

Madurai

Palani

224

SRO Ottanchathiram

Madurai

Palani

228

SRO Vadamaudari

Madurai

Palani

229

SRO Vedasandur

Salem

Dharmapuri

289

Barur

Salem

Dharmapuri

284

Dharmapuri (West)

Salem

Dharmapuri

283

Harur

Salem

Dharmapuri

293

Joint I Dharmapuri

Salem

Dharmapuri

285

Joint II Dharmapuri

Salem

Dharmapuri

286

Kadathur

Salem

Dharmapuri

287

Karimangalam

Salem

Dharmapuri

294

Marandahalli

Salem

Dharmapuri

288

Morappur

Salem

Dharmapuri

290

Palacode

Salem

Dharmapuri

291

Pappireddipatty

Salem

Dharmapuri

292

Pennagaram

Salem

Krishnagiri

295

Bargur

Salem

Krishnagiri

303

Denkanikottai

Salem

Krishnagiri

299

Hosur

Salem

Krishnagiri

306

Joint I Krishnagiri

Salem

Krishnagiri

296

Joint II Krishnagiri

Salem

Krishnagiri

297

Kaveripattinam

Salem

Krishnagiri

298

Kelamangalam

Salem

Krishnagiri

300

Pochampalli

146

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

1
30
2
30
3
30
4
30
5
30
6
30
7
30
8
30
9
31
0
31
1
31
2
31
3
31
4
31
5
31
6
31
7
31
8
31
9
32
0
32
1
32
2
32
3
32
4
32
5
32
6
32
7
32
8
32

Salem

Krishnagiri

301

Rayakottai

Salem

Krishnagiri

302

Soolagiri

Salem

Krishnagiri

304

Uthangarai

Salem

Krishnagiri

305

Veppanapalli

Salem

Namakkal

307

Erumapatti

Salem

Namakkal

314

Joint I Namakkal

Salem

Namakkal

308

Joint II Namakkal

Salem

Namakkal

309

Kumarapalayam

Salem

Namakkal

310

Mallasamuthiram

Salem

Namakkal

311

Mohanur

Salem

Namakkal

313

Namagiripettai

Salem

Namakkal

317

Pallipalayam

Salem

Namakkal

315

Paramathi

Salem

Namakkal

316

Puduchathiram

Salem

Namakkal

318

Rasipuram

Salem

Namakkal

319

Sendamangalam

Salem

Namakkal

320

Thiruchengode

Salem

Namakkal

322

Velagoundampatti

Salem

Namakkal

321

Vellur

Salem

Salem(East)

325

Attur

Salem

Salem(East)

332

Ayothiyapattinam

Salem

Salem(East)

327

Dadagapatti

Salem

Salem(East)

326

Gangavalli

Salem

Salem(East)

324

Joint 1 Salem (East)

Salem

Salem(East)

329

Pethanayackanpalayam

Salem

Salem(East)

331

Thalaivasal

Salem

Salem(East)

330

Thammampatti

Salem

Salem(East)

328

Valappady

147

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

Salem

Salem(East)

333

Veerapandy

Salem

Salem(East)

334

Yercaud

Salem

Salem(West)

343

Edappadi

Salem

Salem(West)

342

Jalakandapuram

Salem

Salem(West)

335

Joint I Salem (west)

Salem

Salem(West)

336

Joint III Salem (west)

Salem

Salem(West)

344

Magudanchavadi

Salem

Salem(West)

341

Mecheri

Salem

Salem(West)

340

Mettur

Salem

Salem(West)

337

Omalur

Salem

Salem(West)

345

Sankagiri

Salem

Salem(West)

338

Suramangalam

Salem

Salem(West)

339

Tharamangalam

Thanjavur

Kumbakonam

454

Kumbakonam

Thanjavur

Kumbakonam

458

Nachiyarkoil

Thanjavur

Kumbakonam

459

Papanasam

Thanjavur

Kumbakonam

455

Swamimalai

Thanjavur

Kumbakonam

457

Thiruppanandal

Thanjavur

Kumbakonam

456

Thiruvidaimarudhur

Thanjavur

Kumbakonam

460

Valangaiman

Thanjavur

Myladuthurai

405

Kollidam

Thanjavur

Myladuthurai

404

Kudavasal

Thanjavur

Myladuthurai

403

Kuthalam

Thanjavur

Myladuthurai

409

Myladuthurai Joint.I

Thanjavur

Myladuthurai

407

Myladuthurai Joint.II

Thanjavur

Myladuthurai

408

Nannillam

Thanjavur

Myladuthurai

411

Peralam

Thanjavur

Myladuthurai

402

Sembanarkoil

9
33
0
33
1
33
2
33
3
33
4
33
5
33
6
33
7
33
8
33
9
34
0
34
1
34
2
34
3
34
4
34
5
34
6
34
7
34
8
34
9
35
0
35
1
35
2
35
3
35
4
35
5
35
6
35

148

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

7
35
8
35
9
36
0
36
1
36
2
36
3
36
4
36
5
36
6
36
7
36
8
36
9
37
0
37
1
37
2
37
3
37
4
37
5
37
6
37
7
37
8
37
9
38
0
38
1
38
2
38
3
38
4
38

Thanjavur

Myladuthurai

412

Serkazhi

Thanjavur

Myladuthurai

413

Tharangambadi

Thanjavur

Nagapattinam

415

Koothanalur

Thanjavur

Nagapattinam

416

Mannarkudi

Thanjavur

Nagapattinam

417

Muthupettai

Thanjavur

Nagapattinam

420

Nagapatinam Joint I

Thanjavur

Nagapattinam

419

Nagoor

Thanjavur

Nagapattinam

418

Needamangalam

Thanjavur

Nagapattinam

426

Thakkattur

Thanjavur

Nagapattinam

429

Thirukuvalai

Thanjavur

Nagapattinam

422

Thirupoondi

Thanjavur

Nagapattinam

423

Thiruthuraipoondi

Thanjavur

Nagapattinam

424

Thiruvaroor

Thanjavur

Nagapattinam

428

Vedharanyam

Thanjavur

Pattukkottai

430

Adhirampattinam

Thanjavur

Pattukkottai

431

Erandampulikkadu

Thanjavur

Pattukkottai

433

Keeramangalam

Thanjavur

Pattukkottai

434

Madukkur

Thanjavur

Pattukkottai

437

Orathanadu

Thanjavur

Pattukkottai

438

Pappanadu

Thanjavur

Pattukkottai

436

Pattukkottai Jt-1

Thanjavur

Pattukkottai

432

Pattukkottai Jt-2

Thanjavur

Pattukkottai

440

Peravurani

Thanjavur

Pattukkottai

441

Subramaniyapuram

Thanjavur

Pattukkottai

442

Thiruvonam

Thanjavur

Pattukkottai

444

Ullikkottai

Thanjavur

Thanjavur

445

Ayyampettai

Thanjavur

Thanjavur

446

Budalur

149

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

5
38
6
38
7
38
8
38
9
39
0
39
1
39
2
39
3
39
4
39
5
39
6
39
7
39
8
39
9
40
0
40
1
40
2
40
3
40
4
40
5
40
6
40
7
40
8
40
9
41
0
41
1
41
2
41

Thanjavur

Thanjavur

447

Joint 1, Thanjavur

Thanjavur

Thanjavur

448

Karuthanttankudi

Thanjavur

Thanjavur

449

Maharnombuchavadi

Thanjavur

Thanjavur

451

Thirukkattuppalli

Thanjavur

Thanjavur

452

Thiruvaiyaru

Thanjavur

Thanjavur

453

Vallam

461

Ambasamudhiram

467

Cheranmadevi Jt I

462

Cheranmadevi Jt II

463

Kadayam

464

Kalakkadu

465

Kallidaikurichi

466

Mukkoodal

468

Vadakkuveeravanallur

469

Vickramasingapuram

Tirunelveli

Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i
Cheranmahadev
i

Tirunelveli

Kanyakumari

470

Boothapandi

Tirunelveli

Kanyakumari

471

Eranial

Tirunelveli

Kanyakumari

472

Idalagudi

Tirunelveli

Kanyakumari

476

Kanyakumari Jt I

Tirunelveli

Kanyakumari

473

Kottaram

Tirunelveli

Kanyakumari

474

Kulatchal

Tirunelveli

Kanyakumari

475

Manavalakurichi

Tirunelveli

Kanyakumari

477

Palliyadi

Tirunelveli

Kanyakumari

478

Rajackamangalam

Tirunelveli

Kanyakumari

479

Thackalai

Tirunelveli

Kanyakumari

481

Thovalai

Tirunelveli

Kanyakumari

480

Vadaseri

Tirunelveli

Marthandam

482

Arumanai

Tirunelveli
Tirunelveli
Tirunelveli
Tirunelveli
Tirunelveli
Tirunelveli
Tirunelveli
Tirunelveli

150

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

3
41
4
41
5
41
6
41
7
41
8
41
9
42
0
42
1
42
2
42
3
42
4
42
5
42
6
42
7
42
8
42
9
43
0
43
1
43
2
43
3
43
4
43
5
43
6
43
7
43
8
43
9
44
0
44

Tirunelveli

Marthandam

485

Karungal

Tirunelveli

Marthandam

484

Kollankodu

Tirunelveli

Marthandam

487

Marthandam Jt I

Tirunelveli

Marthandam

483

Marthandam Jt II

Tirunelveli

Marthandam

486

Munchirai

Tirunelveli

Marthandam

488

Palugal

Tirunelveli

Marthandam

489

Thiruvattar

Tirunelveli

Marthandam

490

Verkilambi

Tirunelveli

Palayamkottai

491

Alwarthirunagar

Tirunelveli

Palayamkottai

492

Burkitmanagaram

Tirunelveli

Palayamkottai

493

Ettayapuram

Tirunelveli

Palayamkottai

494

Kadambur

Tirunelveli

Palayamkottai

495

Kalugumalai

Tirunelveli

Palayamkottai

498

Kayathar

Tirunelveli

Palayamkottai

497

Kommadikottai

Tirunelveli

Palayamkottai

496

Kovilpatti

Tirunelveli

Palayamkottai

500

Melapalayam

Tirunelveli

Palayamkottai

501

Murapanadu

Tirunelveli

Palayamkottai

502

Nazareth

Tirunelveli

Palayamkottai

503

Palayankottai Jt I

Tirunelveli

Palayamkottai

505

Sathankulam

Tirunelveli

Palayamkottai

506

Srivaikundam

Tirunelveli
Tirunelveli

Palayamkottai
Tenkasi

508
535

Thisaiyanvilai
ALANGULAM

Tirunelveli

Tenkasi

536

IDAIKKAL

Tirunelveli

Tenkasi

549

JOINT I SRO

Tirunelveli

Tenkasi

537

JOINT II SRO

Tirunelveli

Tenkasi

538

KADAYANALLUR

151

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

1
44
2
44
3
44
4
44
5
44
6
44
7
44
8
44
9
45
0
45
1
45
2
45
3
45
4
45
5
45
6
45
7
45
8
45
9
46
0
46
1
46
2
46
3
46
4
46
5
46
6
46
7
46
8
46

Tirunelveli

Tenkasi

539

Tirunelveli

Tenkasi

540

KARIVALAMVANTHANALL
UR
MEELANELITHANALLUR

Tirunelveli

Tenkasi

541

PANPOLI

Tirunelveli

Tenkasi

542

PAVOORCHARTRAM

Tirunelveli

Tenkasi

543

PULIYANKUDI

Tirunelveli

Tenkasi

544

SANKARANKOVIL

Tirunelveli

Tenkasi

547

SHENCOTTAI

Tirunelveli

Tenkasi

545

SIVAGIRI

Tirunelveli

Tenkasi

546

SURANDAI

Tirunelveli

Tenkasi

548

UTHUMALAI

Tirunelveli

Tenkasi

550

VASUDEVANALLUR

Tirunelveli

Tenkasi

551

VEERASIGAMANI

Tirunelveli

Thoothukudi.

519

Eral

Tirunelveli

Thoothukudi.

521

Kayalpattinam

Tirunelveli

Thoothukudi.

523

Keezhur

Tirunelveli

Thoothukudi.

524

Melur

Tirunelveli

Thoothukudi.

528

Ottapidaram

Tirunelveli

Thoothukudi.

531

Perungkulam

Tirunelveli

Thoothukudi.

530

Pudukottai

Tirunelveli

Thoothukudi.

529

Pudur

Tirunelveli

Thoothukudi.

532

Thiruchendur

Tirunelveli

Thoothukudi.

527

Tuticorin Jt1

Tirunelveli

Thoothukudi.

520

Tuticorin Jt2

Tirunelveli

Thoothukudi.

533

Udankudi

Tirunelveli

Thoothukudi.

534

Vilathikulam

Tirunelveli

Tirunelveli

509

Gangaikondan

Tirunelveli

Tirunelveli

511

Moolakaraipatti

Tirunelveli

Tirunelveli

512

Nanguneri

152

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

9
47
0
47
1
47
2
47
3
47
4
47
5
47
6
47
7
47
8
47
9
48
0
48
1
48
2
48
3
48
4
48
5
48
6
48
7
48
8
48
9
49
0
49
1
49
2
49
3
49
4
49
5
49
6
49

Tirunelveli

Tirunelveli

514

Panagudi

Tirunelveli

Tirunelveli

515

Pettai

Tirunelveli

Tirunelveli

516

Radhapuram

Tirunelveli

Tirunelveli

517

Thirukarungudi

Tirunelveli

Tirunelveli

513

Tirunelveli Jt I

Tirunelveli

Tirunelveli

510

Tirunelveli Jt II

Tirunelveli
Trichy

Tirunelveli
Ariyalur

518
347

Valliyur
Aandimadam

Trichy

Ariyalur

354

Ariyalur Joint I

Trichy

Ariyalur

348

Ariyalur Joint II

Trichy

Ariyalur

349

Chettikulam

Trichy

Ariyalur

366

Erumbulikurichi

Trichy

Ariyalur

350

Jayakondam

Trichy

Ariyalur

351

Keezhaapazhur

Trichy

Ariyalur

352

Lalkudi

Trichy

Ariyalur

353

Meensurutti

Trichy

Ariyalur

355

Perambalur

Trichy

Ariyalur

356

Pullampadi

Trichy

Ariyalur

357

Sendurai

Trichy

Ariyalur

358

Tha.Pazhur

Trichy

Ariyalur

359

Thuraiyur

Trichy

Ariyalur

360

Udayarpalayam

Trichy

Ariyalur

361

Uppiliyapuram

Trichy

Ariyalur

362

Valighandapuram

Trichy

Ariyalur

365

Veppanthattai

Trichy

Ariyalur

364

Veppur

Trichy

Ariyalur

363

Vikramangalam

Trichy

Karur

367

Aravakurichi

153

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

7
49
8
49
9
50
0
50
1
50
2
50
3
50
4
50
5
50
6
50
7
50
8
50
9
51
0
51
1
51
2
51
3
51
4
51
5
51
6
51
7
51
8
51
9
52
0
52
1
52
2
52
3
52
4
52

Trichy

Karur

368

Chinnadarapuram

Trichy

Karur

373

Karur (West)

Trichy

Karur

370

Karur Joint I

Trichy

Karur

369

Karur Joint II

Trichy

Karur

372

Krishnarayapuram

Trichy

Karur

371

Kulithalai

Trichy

Karur

374

Nangavaram

Trichy

Karur

375

Tharagampatti

Trichy

Karur

377

Velayuthampalayam

Trichy

Karur

376

Velliyanai

Trichy

Pudukottai

378

Alangudi

Trichy

Pudukottai

379

Annavasal

Trichy

Pudukottai

383

Gandarvakottai

Trichy

Pudukottai

380

Illuppur

Trichy

Pudukottai

381

Karambakudi

Trichy

Pudukottai

382

Keelanilai

Trichy

Pudukottai

384

Kulathur

Trichy

Pudukottai

385

Manamelkudi

Trichy

Pudukottai

386

ORB - Pudukkottai

Trichy

Pudukottai

387

Perungalur

Trichy

Pudukottai

388

Thirumayam

Trichy

Pudukottai

389

Viralimalai

Trichy

Trichy

390

JOINT 3 SRO

Trichy

Trichy

392

K.SATHANUR

Trichy

Trichy

391

KATTUPUTHUR

Trichy

Trichy

401

MANACHANALLUR

Trichy

Trichy

393

MANAPARAI

Trichy

Trichy

394

MUSIRI

154

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

5
52
6
52
7
52
8
52
9
53
0
53
1
53
2
53
3
53
4
53
5
53
6
53
7
53
8
53
9
54
0
54
1
54
2
54
3
54
4
54
5
54
6
54
7
54
8
54
9
55
0
55
1
55
2
55

Trichy

Trichy

395

ORB

Trichy

Trichy

396

SRIRANGAM

Trichy

Trichy

397

THATHAIYANGARPETTAI

Trichy

Trichy

398

THIRUVERMBUR

Trichy

Trichy

399

THUVARANKURICHI

Trichy

Trichy

400

WORAIYUR

Vellore

Arakonam

559

Arakonam Joint I

Vellore

Arakonam

555

Arakonam Joint II

Vellore

Arakonam

552

Arcot

Vellore

Arakonam

556

Kalavai

Vellore

Arakonam

557

Kaveripakkam

Vellore

Arakonam

558

Nemili

Vellore

Arakonam

561

Sholingar

Vellore

Arakonam

563

Walaja

Vellore

Cheyyar

564

Arani

Vellore

Cheyyar

566

Dusi

Vellore

Cheyyar

571

Joint-I Cheyyer

Vellore

Cheyyar

567

Joint-II Cheyyer

Vellore

Cheyyar

568

Kalambur

Vellore

Cheyyar

569

Kannamangalam

Vellore

Cheyyar

570

Kilkodungalore

Vellore

Cheyyar

572

Peranmallur

Vellore

Cheyyar

573

Thellur

Vellore

Cheyyar

574

Vandavasi

Vellore

Cheyyar

575

Vembakkam

Vellore

Tiruvannamalai

576

Chengam

Vellore

Tiruvannamalai

577

Chetput

Vellore

Tiruvannamalai

584

Joint I Thiruvannamalai

155

Registration Department Tamil Nadu RFP for SI Selection Volume I

S. No.

Zone Name

District Name

SRO Code

SRO Name

3
55
4
55
5
55
6
55
7
55
8
55
9
56
0
56
1
56
2
56
3
56
4
56
5
56
6
56
7
56
8
56
9
57
0
57
1
57
2
57
3
57
4
57
5

Vellore

Tiruvannamalai

579

Joint II Thiruvannamalai

Vellore

Tiruvannamalai

580

Kadaladi

Vellore

Tiruvannamalai

581

kalasapakkam

Vellore

Tiruvannamalai

582

Kilpennathur

Vellore

Tiruvannamalai

583

Mangalam

Vellore

Tiruvannamalai

585

Polur

Vellore

Tiruvannamalai

586

Thandrampet

Vellore

Tiruvannamalai

587

Thanipadi

Vellore

Tiruvannamalai

588

Vettavalam

Vellore

Vellore

589

Ambur

Vellore

Vellore

593

Gudiyatham

Vellore

Vellore

590

jolarpet

Vellore

Vellore

592

Kaniyampadi

Vellore

Vellore

591

Katpadi

Vellore

Vellore

601

Keezh vazhithunkuppam

Vellore

Vellore

594

Natrampalli

Vellore

Vellore

596

Odugathur

Vellore

Vellore

597

Pallikonda

Vellore

Vellore

598

Pernambutt

Vellore

Vellore

599

Tirupathur

Vellore

Vellore

600

Vaniyambadi

Vellore

Vellore

595

Vellore-Joint I

156

Вам также может понравиться