Академический Документы
Профессиональный Документы
Культура Документы
AREQUIPA
VOLUMEN II
VI
ANEXOS
-
ESTUDIO DE TRANSITO
ESTUDIO DE SUELOS
ESTUDIO HIDROLOGICO
ESTUDIO DE IMPACTO AMBIENTAL
METRADOS
MEMORIA DE CALCULO ESTRUCTURAS
MEMORIA DE CALCULO INSTALACIONES ELCTRICAS
ESTUDIO DE TRANSITO
ESTUDIO DE TRANSITO
CONTENIDO
1. GENERALIDADES
2. OBJETIVO Y ALCANCES
3. PARQUE AUTOMOTOR DE AREQUIPA
4. VOLMENES DE TRANSITO
5. ANLISIS DE LA DEMANDA DE TRANSITO
6. CAPACIDAD VIAL
7. PROPUESTA DE SOLUCIN
8. PROYECCIN DEL TRANSITO
Estudio de Trnsito
1.- GENERALIDADES
V. Ligero
V. Transp.
Publico
V. Pesado
V. Menores
Total
Incre mento
Tasa
%
1989
27,397
2,974
7,998
4,601
42,970
1990
27,735
3,033
8,205
4,663
43,636
666
0.8
1.5
1991
29,864
3,814
8,583
4,784
47,045
3,409
7.2
1992
31,984
5,451
8,925
4,903
51,263
4,218
9.0
Estudio de Trnsito
1993
33,310
6,339
9,401
5,009
54,059
2,796
5.5
1994
35,695
7,739
10,301
5,175
58,910
4,851
9.0
1995
41,093
9,145
11,931
5,463
67,632
8,722
14.8
1996
45,230
9,677
12,992
5,692
73,591
5,959
8.8
1997
47,905
9,893
13,468
5,921
77,187
3,596
4.9
1998
57,170
11,072
15,676
S/R
83,918
6,731
8.7
1999
55,129
10,879
15,178
6,150
87,336
3,418
4.1
2000
57,336
11,314
15,785
6,332
90,767
3,431
3.9
2001
59,605
11,765
16,409
6,583
94,362
3,595
4.0
2002
61,989
12,295
17,084
6,769
98,137
3,775
4.0
2003
64,593
12,812
17,793
7,056
102,254
4,117
4.2
2004
67,790
13,446
17,499
7,408
106,143
3,889
3.8
2205
69,748
13,834
19,183
7,626
110,391
4,248
4.0
2006
71,752
14,229
19,976
7,849
113,806
3,415
3.1
2007
75,296
14,929
20,931
8,242
119,398
5,592
4.9
2008
77,700
15,400
21,562
8,511
123,173
3,775
3.2
3.91
12.5%
17.5%
6.9%
100.0%
2008
2010
2020
2030
2040
123 173
132 968
194 133
283 434
413 813
Estudio de Trnsito
SALIDA
(Vehculos)
699
590
547
810
967
191
150
594
Malecn Missouri
240
418
TOTAL
2 603
2 603
VIA
Av. Lambramani
Norte-Sur
Av. Lambramani
Sur-Norte
Av. Los Incas
Oeste-Este
Av. Los Incas
Este-Oeste
Estudio de Trnsito
Estudio de Trnsito
C
1600
1000
N
2
2
CV
6400
2000
Estudio de Trnsito
Malecn Missouri
800
1600
n
carriles
OFERTA
C
Cap./carril
CV
Cap. Vial
V/CV
Grado
Congest.
(Vehic./Hora)
%
Cap. Vial
Prom.
967
191
2
2
1600
1600
3200
3200
0.30
0.06
150
594
2
2
1600
1600
3200
3200
0.05
0.19
Av. Lambramani
Norte-Sur(Entrada)
Norte-Sur(Salida)
699
590
1
1
1000
1000
1000
1000
0.70
0.59
Av. Lambramani
Sur -Norte (Entrada)
Sur-Norte (Salida)
547
810
1
1
1000
1000
1000
1000
0.55
0.81
66.25
Malecn Missouri
(Entrada)
(Salida)
240
418
1
1
800
800
800
800
0.30
0.52
41.00
TOTAL
15.00
5 206 / 2 =
2 603
Estudio de Trnsito
Estudio de Trnsito
CARACTERISTICAS
Circulacin con flujo libre. Los usuarios tienen
libertad para seleccionar la velocidad deseada y
maniobrar dentro del trnsito.
Est dentro del rango de flujo estable, pero la
presencia de otros comienza a influir en el
comportamiento individual de cada uno.
Pertenece al rango de flujo estable, pero la operacin
de los usuarios individuales se ve afectada por la
presencia de otros, desciende en nivel de comodidad.
Representa una circulacin de densidad elevada,
aunque estable, La velocidad y libertad de maniobra
queda restringida
El funcionamiento est en l o cerca del lmite de su
Relacin:
V / CV
0.15
0.27
0.45
0.64
Estudio de Trnsito
1.00
> 1.00
3600
(2 vas)
Av.
Lambramani
Norte-Sur
3600
(2 vas)
Proyeccin
Vol. Prom.
Ao 2009
Ao 2010
Ao 2020
Ao 2030
V/CV
V/CV
V/CV
V/CV
V/CV
566
588
859
1254
0.16
366
380
555
811
0.10
497
516
754
1101
0.25
738
767
1120
1634
0.37
64
66
97
142
0.08
0.24
0.35
0.11
0.15
0.23
2000
(2 vas)
Malecn
Missouri
CAPACIDAD VIAL
0.16
2000
(2 vas)
Av.
Lambramani
Sur-Norte
0.26
0.38
0.55
800
(1 va)
0.38
0.56
0.72
Estudio de Trnsito
0.08
0.12
0.18
ESTUDIO DE SUELOS
SPC&C
Suelos, Pavimentos, Concreto & Construcciones
INFORME TECNICO
CERCADO - AREQUIPA
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
CONTENIDO
1. MEMORIA DESCRIPTIVA
A) RESUMEN DE LAS CONDICIONES DE CIMENTACIN
B) INFORMACION PREVIA
C) EXPLORACION DE CAMPO
D) ENSAYOS DE LABORATORIO
E) PERFIL DEL SUELO
F) NIVEL DE LA NAPA FREATICA
G) ANALISIS DE CIMENTACIN
a) CAPACIDAD PORTANTE
b) ASENTAMIENTOS
c) PARAMETROS DE DISEO DE MUROS
d) ANALISIS DE SALES
H) EFECTO DE SISMO
2. PLANOS Y PERFILES DE SUELOS
3. RESULTADO DE LOS ENSAYOS DE LABORATORIO
4. PANEL FOTOGRAFICO
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
1. MEMORIA DESCRIPTIVA
SPC&C
Suelos, Pavimentos, Concreto & Construcciones
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
1. MEMORIA DESCRIPTIVA
El presente Estudio de Mecnica de Suelos se realiza con fines de cimentacin donde
se proyecta construir las estructuras de la obra Intercambio Vial Av. Lambramani y la
Av. Los Incas.
A) RESUMEN DE LAS CONDICIONES DE CIMENTACIN
1.- Tipo de cimentacin
: Zapata
2.- Estrato de Apoyo de la cimentacin
: Estrato II
3.- Parmetros de diseo
A .- Profundidad de desplante
Df = 1.70 m.
Con respecto al nivel de sub rasante de va de intercambio.
B .- La capacidad portante mnima admisible es de :
Zapata rectangular
: Qa = 3.16 kg/cm2
C .- Factor de Seguridad
: FS = 3
D .- Asentamientos inmediatos esperados
: Pi = 2.20 cm.
4.- La cantidad de cloruros y sulfatos clasifica como despreciable.
RECOMENDACIONES
1.- Los esfuerzos aplicados no debern exceder la capacidad admisible.
2.- Se recomienda utilizar cemento puzolnico 1P en la cimentacin.
B) INFORMACION PREVIA
El rea donde se emplazar el Intercambio Vial entre la Av. Lambramani y la
Av. Los Incas, se ubica en el Cercado, provincia y departamento de Arequipa,
es accesible por las mismas vas.
El proyecto considera muros de contencin laterales y estribos para el soporte
del puente, para ello se debe bajar la rasante con cortes; bsicamente se
necesita anlisis de capacidad portante para los muros de contencin y
estribos, as como el empuje del suelo a ambas estructuras.
C) EXPLORACION DE CAMPO
Con la finalidad de definir el perfil estratigrfico del rea en estudio, se
ejecutaron cuatro (04) calicatas de exploracin mediante exploracin final a
cielo abierto, realizando el registro de forma manual y visual del perfil del suelo
en cada calicata.
El lugar en estudio se halla ubicado en la denominada zona 02 (Plano
geolgico preliminar de Arequipa. R. Rondon), cuyas alturas oscilan entre 2150
y 2600 msnm. y estn caracterizados por presentar terrenos de topografa
regular, los estratos de este cono o abanico aluvial pertenecen a la unidad Qal, denominada aluviales recientes.
La estratigrafa de la zona esta conformada superficialmente por un relleno de
arena limo gravosa, subyaciendo estratos de arenas limosas y arenas
gravosas, de compacidad muy suelta en el estrato uno y de compacidad media
a densa en el estrato dos.
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
D) ENSAYOS DE LABORATORIO
En el laboratorio de mecnica de suelos, se realizaron los ensayos
correspondientes para su identificacin y clasificacin:
I.
II.
III.
IV.
V.
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
SPC&C
Suelos, Pavimentos, Concreto & Construcciones
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
GRAVA
92.92%
3"
76.20
2"
50.80
317.4
251.0
1 1/2"
38.10
315.0
248.6
5.95
88.04
1"
25.40
894.3
827.9
19.81
68.23
3/4"
19.10
424.2
357.8
8.56
59.67
Cu
3.51
1/2"
12.70
995.6
929.2
22.24
37.43
Cc
1.07
6.01
100.00
ARENA
5.87%
93.99
FINOS
1.21%
3/8"
9.52
560.4
494.0
11.82
25.61
4.760
840.8
774.4
18.53
7.08
COEFICIENTES
CONSISTENCIA
L LIQUIDO
2.380
126.5
89.4
1.27
5.81
L PLASTICO
10
2.000
56.3
19.2
0.27
5.54
I PLASTICIDAD
16
1.190
107.6
70.5
1.00
4.54
30
0.590
70.1
33.0
0.47
4.08
TAMIZ # 10
40
0.425
70.5
33.4
0.47
3.60
TAMIZ # 40
3.60%
50
0.300
78.2
41.1
0.58
3.02
TAMIZ # 200
1.21%
80
0.180
92.5
55.4
0.78
2.24
100
0.150
57.9
20.8
0.29
1.94
CLASIFICACION
200
0.074
89.0
51.9
0.74
1.21
SUCS
122.3
85.2
1.21
0.00
AASHTO
-200
PASANTE
5.54%
GP-GM
100
90
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
3"
76.20
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
26.76%
ARENA
59.66%
FINOS
13.58%
2"
50.80
1 1/2"
38.10
166.5
100.3
3.60
96.40
1"
25.40
306.1
239.9
8.62
87.77
3/4"
19.10
96.5
30.3
1.09
86.68
Cu
1/2"
12.70
168.4
102.2
3.67
83.01
Cc
3/8"
9.52
136.0
69.8
2.51
80.50
4.760
268.3
202.1
7.26
73.24
2.380
78.2
41.1
6.03
67.21
L PLASTICO
10
2.000
52.2
15.1
2.21
65.00
I PLASTICIDAD
16
1.190
115.1
78.0
11.44
53.55
30
0.590
77.0
39.9
5.85
47.70
TAMIZ # 10
40
0.425
79.0
41.9
6.15
41.56
TAMIZ # 40
41.56%
50
0.300
83.4
46.3
6.79
34.76
TAMIZ # 200
13.58%
80
0.180
99.9
62.8
9.21
25.55
100
0.150
57.3
20.2
2.96
22.59
CLASIFICACION
200
0.074
98.5
61.4
9.01
13.58
SUCS
129.7
92.6
13.58
0.00
AASHTO
-200
100.00
GRAVA
COEFICIENTES
30.22
0.63
CONSISTENCIA
L LIQUIDO
PASANTE
65.00%
SM
100
90
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
DENSIDAD DE CAMPO
Intercambio Vial de Av. Lambramani y Los Incas
UBICACIN:
Jose L. Bustamante y Rivero
Estrato II Prof. 4,00mts
23/03/2009
Calicata N 01
ZONA:
FECHA:
OBS.
PROYECTO
MUESTRA :
TRAMO:
SOLICITA:
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
DESCRIPCION
PESO SUELO + BANDEJA
PESO BANDEJA
PESO NETO SUELO + GRAVA
PESO GRAVA SECADA AL AIRE
PESO DE ARENA + FRASCO
PESO DE ARENA QUEDADA + FRASCO
PESO DE ARENA EN CONO
PESO NETO DE ARENA EMPLEADA
DENSIDAD DE LA ARENA
VOLUMEN DEL HUECO
VOLUMEN GRAVA POR DESPLAZAMIENTO
PESO DEL SUELO
VOLUMEN DEL SUELO
DENSIDAD HUMEDA
PORCENTAJE DE HUMEDAD
DENSIDAD SECA
DENSIDAD MAXIMA DE LA CURVA
PORCENTAJE DE COMPACTACION
ESPESOR CONTROLADO
CAPA, TIPO DE RELLENO
LADO O CARRIL CONTROLADO
PROGRESIVA
gr.
gr.
gr.
gr.
gr.
gr.
gr.
gr./c.c
c.c.
c.c.
gr.
c.c.
gr./c.c
gr./c.c.
gr./cc.
%
3890.0
186.0
3704.0
1193.0
6236.0
1650.0
1929.0
2657.0
1.48
1795.3
467.8
2511.0
1327.4
1.892
6.5
1.776
Estrato II
Calicata - 1
prof. 2.50mts
HUMEDAD
PESO DE MUESTRA HUMEDA+ TARA
PESO DE MUESTRA SECA + TARA
PESO DE TARA
HUMEDAD
OBSERVACIONES :
gr
gr
gr
%
350.00
328.60
0.00
6.51
RUC 10295652719
DENSIDAD DE CAMPO
PROYECTO :
MUESTRA:
TRAMO:
SOLICITA:
DESCRIPCION
Peso de muestra natural
(gr)
Peso de muestra + parafina
(gr)
Peso de parafina
(gr)
Densidad de parafina
(gr/cm3)
Volumen de parafina
(cm3)
Peso de picnometro + agua
(gr)
Peso de picn.+agua+muestra+paraf.
(gr)
Volumen de muestra+parafina
(cm3)
Volumen de muestra
(cm3)
Densidad natural
(gr/cm3)
Contenido de humedad
(%)
Densidad seca
(gr/cm3)
1
281.90
288.90
7.00
0.88
8.00
1221.80
1366.80
136.90
128.90
2.187
10.32
1.982
HUMEDAD NATURAL
ITEM
1
2
3
4
DESCRIPCION
Peso de muestra hmeda + tara
Peso de muestra seca + tara
Peso de tara
Contenido de humedad en %
(gr)
(gr)
(gr)
411.50
373.00
0.00
10.32
RESUMEN :
DENSIDAD NATURAL
:
HUMEDAD
:
DENSIDAD NATURAL SECA :
OBSERVACIONES :
2.19
10.32%
1.98
gr/cm3
gr/cm3
RUC 10295652719
DENSIDAD MAXIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Maxima
1
10728
6409
4319
2126.03
2.031
2
10736
6409
4327
2126.03
2.035
3
10733
6409
4324
2126.03
2.034
3
10145
6409
3736
2126.03
1.757
2.034 gr/cm3
DENSIDAD MINIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Minima
OBSERVACIONES :
1
10137
6409
3728
2126.03
1.754
2
10150
6409
3741
2126.03
1.760
1.757 gr/cm3
RUC 10295652719
DENSIDAD MAXIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Maxima
1
10523
6409
4114
2126.03
1.935
2
10509
6409
4100
2126.03
1.928
3
10516
6409
4107
2126.03
1.932
3
9911
6409
3502
2126.03
1.647
1.932 gr/cm3
DENSIDAD MINIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Minima
OBSERVACIONES :
1
9911
6409
3502
2126.03
1.647
2
9911
6409
3502
2126.03
1.647
1.647 gr/cm3
RUC 10295652719
CORTE DIRECTO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
ESFUERZO NORMAL
ESFUERZO CORTE
CARGA
ESFUERZO ESFUERZO
0.00
0.00
0.00
4.87
0.16
0.19
14.24
0.47
0.38
23.62
0.78
0.55
33.75
1.11
0.71
43.93
1.45
1.02
CARGA
0.00
5.90
11.55
16.72
21.42
31.00
ESFUERZO DE CORTE(kg/cm2)
1.20
1.2
1.00
1
0.80
0.8
0.60
0.6
0.40
0.4
0.20
0.2
0.00
0
0.00
0
0.20
0.2
0.40
0.4
0.60
0.6
0.80
0.8
1.00
1
1.20
1.2
1.40
1.4
ESFUERZO NORMAL(kg/cm2)
y = 0.6508x + 0.0452
PENDIENTE
0.65077601
RESULTADOS
Cohesin
:
Angulo de friccin:
Humedad :
0.00 kg/cm2
33.1
0%
1.60
1.6
RUC 10295652719
CORTE DIRECTO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
ESFUERZO NORMAL
ESFUERZO CORTE
CARGA
ESFUERZO ESFUERZO
0.00
0.00
0.00
4.87
0.16
0.21
14.24
0.47
0.40
23.62
0.78
0.58
33.75
1.11
0.77
43.93
1.45
1.05
CARGA
0.00
6.37
12.02
17.66
23.30
31.76
ESFUERZO DE CORTE(kg/cm2)
1.2
1.20
1
1.00
0.8
0.80
0.6
0.60
0.4
0.40
0.2
0.20
0
0.00
0
0.00
0.2
0.20
0.4
0.40
0.6
0.60
0.8
0.80
1
1.00
1.2
1.20
1.4
1.40
ESFUERZO NORMAL(kg/cm2)
y = 0.6766x + 0.0529
PENDIENTE
0.67661028
RESULTADOS
Cohesin
:
Angulo de friccin:
Humedad :
0.00 kg/cm2
34.1
0%
1.6
1.60
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
3"
76.20
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
GRAVA
46.26%
ARENA
49.51%
FINOS
4.23%
2"
50.80
1 1/2"
38.10
1"
25.40
466.1
399.7
3/4"
19.10
229.1
162.7
3.64
87.40
Cu
1/2"
12.70
565.9
499.5
11.19
76.21
Cc
3/8"
9.52
393.7
327.3
7.33
68.88
4.760
742.4
676.0
15.14
53.74
L LIQUIDO
2.380
177.7
140.6
15.11
38.63
L PLASTICO
10
2.000
66.5
29.4
3.16
35.47
I PLASTICIDAD
16
1.190
135.9
98.8
10.62
24.85
30
0.590
73.7
36.6
3.93
20.92
TAMIZ # 10
35.47%
40
0.425
71.0
33.9
3.64
17.27
TAMIZ # 40
17.27%
50
0.300
71.2
34.1
3.67
13.61
TAMIZ # 200
4.23%
80
0.180
76.7
39.6
4.26
9.35
100
0.150
51.7
14.6
1.57
7.78
CLASIFICACION
200
0.074
70.1
33.0
3.55
4.23
SUCS
76.5
39.4
4.23
0.00
AASHTO
-200
100.00
8.95
91.05
COEFICIENTES
33.93
1.88
CONSISTENCIA
PASANTE
SW
100
90
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
DENSIDAD MAXIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Maxima
1
10518
6409
4109
2126.03
1.933
2
10507
6409
4098
2126.03
1.928
3
10513
6409
4104
2126.03
1.930
3
9975
6409
3566
2126.03
1.677
1.930 gr/cm3
DENSIDAD MINIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Minima
OBSERVACIONES :
1
9987
6409
3578
2126.03
1.683
2
9965
6409
3556
2126.03
1.673
1.678 gr/cm3
RUC 10295652719
CORTE DIRECTO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
ESFUERZO NORMAL
ESFUERZO CORTE
CARGA
ESFUERZO ESFUERZO
0.00
0.00
0.00
4.87
0.16
0.19
14.24
0.47
0.36
23.62
0.78
0.53
33.75
1.11
0.64
43.93
1.45
0.92
CARGA
0.00
5.90
11.08
15.96
19.54
28.00
ESFUERZO DE CORTE(kg/cm2)
1.2
1.00
1
0.80
0.8
0.60
0.6
0.40
0.4
0.20
0.2
0
0.00
0
0.00
0.2
0.20
0.4
0.40
0.6
0.60
0.8
0.80
1
1.00
1.2
1.20
1.4
1.40
ESFUERZO NORMAL(kg/cm2)
y = 0.583x + 0.0565
PENDIENTE
0.5829708
RESULTADOS
Cohesin
:
Angulo de friccin:
Humedad :
0.00 kg/cm2
30.2
0%
1.6
1.60
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
3"
76.20
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
GRAVA
45.33%
ARENA
52.72%
FINOS
1.95%
2"
50.80
1 1/2"
38.10
1"
25.40
445.3
378.9
3/4"
19.10
215.6
149.2
3.40
87.97
Cu
1/2"
12.70
554.1
487.7
11.11
76.85
Cc
3/8"
9.52
365.2
298.8
6.81
70.05
4.760
741.2
674.8
15.38
54.67
L LIQUIDO
2.380
189.2
152.1
17.23
37.44
L PLASTICO
10
2.000
62.0
24.9
2.82
34.62
I PLASTICIDAD
16
1.190
123.0
85.9
9.73
24.89
30
0.590
74.0
36.9
4.18
20.72
TAMIZ # 10
34.62%
40
0.425
72.0
34.9
3.95
16.76
TAMIZ # 40
16.76%
50
0.300
72.0
34.9
3.95
12.81
TAMIZ # 200
1.95%
80
0.180
85.0
47.9
5.43
7.38
100
0.150
51.2
14.1
1.60
5.79
CLASIFICACION
200
0.074
71.0
33.9
3.84
1.95
SUCS
54.3
17.2
1.95
0.00
AASHTO
-200
100.00
8.63
91.37
COEFICIENTES
26.95
1.71
CONSISTENCIA
PASANTE
SW
100
90
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
3"
76.20
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
19.07%
ARENA
58.13%
FINOS
22.80%
2"
50.80
1 1/2"
38.10
116.9
78.9
3.54
96.46
1"
25.40
58.3
20.3
0.91
95.56
3/4"
19.10
86.8
48.8
2.19
93.37
Cu
1/2"
12.70
124.2
86.2
3.86
89.51
Cc
3/8"
9.52
107.0
69.0
3.09
86.41
4.760
160.4
122.4
5.48
80.93
L LIQUIDO
2.380
67.3
39.2
6.35
74.58
L PLASTICO
10
2.000
35.1
7.0
1.13
73.45
I PLASTICIDAD
16
1.190
61.9
33.8
5.47
67.98
30
0.590
83.8
55.7
9.02
58.96
TAMIZ # 10
40
0.425
53.6
25.5
4.13
54.83
TAMIZ # 40
54.83%
50
0.300
54.9
26.8
4.34
50.49
TAMIZ # 200
22.80%
80
0.180
88.9
60.8
9.85
40.64
100
0.150
51.7
23.6
3.82
36.82
CLASIFICACION
200
0.074
114.7
86.6
14.02
22.80
SUCS
168.9
140.8
22.80
0.00
AASHTO
-200
100.00
GRAVA
COEFICIENTES
20.31
0.60
CONSISTENCIA
PASANTE
73.45%
SM
100
90
PORCENTAJE PASANTE (%)
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
ANALISIS GRANULOMETRICO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
TAMIZ
3"
76.20
W RET+TARA
W RET.
% RET
% PAS. ACUM
FRACCIONES
GRAVA
33.47%
100.00
ARENA
61.61%
FINOS
4.92%
2"
50.80
312.3
232.8
6.89
93.11
1 1/2"
38.10
155.6
76.1
2.25
90.86
1"
25.40
257.5
178.0
5.27
85.60
3/4"
19.10
187.8
108.3
3.20
82.39
Cu
1/2"
12.70
185.8
106.3
3.14
79.25
Cc
3/8"
9.52
186.4
106.9
3.16
76.09
4.760
402.5
323.0
9.56
66.53
L LIQUIDO
2.380
127.6
89.6
11.97
54.56
L PLASTICO
10
2.000
55.9
17.9
2.39
52.16
I PLASTICIDAD
16
1.190
112.2
74.2
9.92
42.25
30
0.590
135.1
97.1
12.98
29.27
TAMIZ # 10
52.16%
40
0.425
74.7
36.7
4.90
24.36
TAMIZ # 40
24.36%
50
0.300
70.4
32.4
4.33
20.03
TAMIZ # 200
4.92%
80
0.180
96.1
58.1
7.76
12.27
100
0.150
50.4
12.4
1.66
10.61
CLASIFICACION
200
0.074
80.6
42.6
5.69
4.92
SUCS
74.8
36.8
4.92
0.00
AASHTO
-200
COEFICIENTES
24.40
0.79
CONSISTENCIA
PASANTE
SP
100
90
PORCENTAJE PASANTE (%)
80
70
60
50
40
30
20
10
0
100
10
1
DIAMETRO DE PARTICULAS (mm)
0.1
0.01
RUC 10295652719
DENSIDAD MAXIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Maxima
1
6235
4444
1791
944
1.897
2
6242
4444
1798
944
1.905
3
6239
4444
1795
944
1.901
3
5970
4444
1526
944
1.617
1.901 gr/cm3
DENSIDAD MINIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Minima
OBSERVACIONES :
1
5987
4444
1543
944
1.635
2
5973
4444
1529
944
1.620
1.624 gr/cm3
RUC 10295652719
DENSIDAD MAXIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Maxima
1
10518
6397
4121
2126.03
1.938
2
10525
6397
4128
2126.03
1.942
3
10522
6397
4125
2126.03
1.940
3
10005
6397
3608
2126.03
1.697
1.940 gr/cm3
DENSIDAD MINIMA
DESCRIPCION
Peso de molde+muestra (gr)
Peso de molde
(gr)
Peso de muestra
(gr)
Volumn de molde
(cm3)
Densidad
(gr/cm3)
Densidad Minima
OBSERVACIONES :
1
10008
6397
3611
2126.03
1.698
2
10001
6397
3604
2126.03
1.695
1.697 gr/cm3
RUC 10295652719
CORTE DIRECTO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
ESFUERZO NORMAL
ESFUERZO CORTE
CARGA
ESFUERZO ESFUERZO
0.00
0.00
0.00
4.87
0.16
0.20
14.24
0.47
0.38
23.62
0.78
0.56
33.75
1.11
0.73
43.93
1.45
0.91
CARGA
0.00
6.19
11.55
16.90
22.07
27.53
ESFUERZO DE CORTE(kg/cm2)
1.2
1.00
1
0.80
0.8
0.60
0.6
0.40
0.4
0.20
0.2
0
0.00
0
0.00
0.2
0.20
y = 0.5968x + 0.068
0.4
0.40
0.6
0.60
0.8
0.80
1
1.00
1.2
1.20
ESFUERZO
ESFUERZONORMAL(kg/cm2)
NORMAL(kg/cm2)
PENDIENTE
0.59676649
RESULTADOS
Cohesin
:
Angulo de friccin:
Humedad :
0.00 kg/cm2
30.8
0%
1.4
1.40
1.6
1.60
RUC 10295652719
CORTE DIRECTO
PROYECTO :
MUESTRA :
TRAMO
:
SOLICITA:
ESFUERZO NORMAL
ESFUERZO CORTE
CARGA
ESFUERZO ESFUERZO
0.00
0.00
0.00
4.87
0.16
0.20
14.24
0.47
0.36
23.62
0.78
0.52
33.75
1.11
0.67
43.93
1.45
0.90
CARGA
0.00
6.19
10.79
15.78
20.48
27.24
ESFUERZO DE CORTE(kg/cm2)
1.2
1.00
1
0.80
0.8
0.60
0.6
0.40
0.4
0.20
0.2
0
0.00
0
0.00
0.2
0.20
y = 0.5771x + 0.0603
0.4
0.40
0.6
0.60
0.8
0.80
1
1.00
1.2
1.20
ESFUERZO
ESFUERZONORMAL(kg/cm2)
NORMAL(kg/cm2)
PENDIENTE
0.57712901
RESULTADOS
Cohesin
:
Angulo de friccin:
Humedad :
0.00 kg/cm2
30.0
0%
1.4
1.40
1.6
1.60
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
4. PANEL FOTOGRAFICO
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
Fotografa N 1
Calicata N 1
Fotografa N 2
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
Fotografa N 3
Calicata N 2
Fotografa N 4
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
Fotografa N 5
Calicata N 3
Fotografa N 6
SPC&C
CIP 59876
Calle Puno N 908.Miraflores/ Telf. 054-222825 / Cel95.9638006 958945275 / RPM *343758 *414995
Fotografa N 7
Calicata N 4
Fotografa N 8
ESTUDIO HIDROLOGICO
INDICE
1.0
HIDROLOGA
1.1
1.2
1.3
INTRODUCCIN
CARACTERSTICAS DEL PROYECTO
INFORMACIN BSICA
1.3.1 Precipitacin Mxima en 24 Horas
ESCORRENTA
1.4.1 Datos Considerados
1.4.2 Anlisis de la Informacin
AVENIDAS DE DISEO
1.5.1 Generalidades
1.5.2 Clculo de Avenidas
DISEO DE LA SECCION DE LA TORRENTERA
1.6.1 Calculo de Parmetros Hidrulicos
1.6.2 Calculo de Socavacin
CONCLUSIONES
1.4
1.5
1.6
1.7
Estudio Hidrolgico
1.0
HIDROLOGA
1.1
INTRODUCCIN
El estudio de hidrologa del proyecto Construccin del Intercambio Vial Av. Lambramani - Av.
Los Incas, tiene como principal finalidad calcular los volmenes probables de avenidas en m3/s
que se presentarn en la poca de lluvias para los diferentes periodos de retorno propuestos, que
servirn para disear las obras de encauzamiento y proteccin en el curso de las Torrenteras II
en el tramo del proyecto.
1.2
INFORMACIN BSICA
1.3.1
Se han considerado dentro del rea del proyecto las cuatro (4) estaciones pluviomtricas
existentes que cuentan con datos suficientes y actualizados. Se ha considerado adicionalmente la
estacin de Imata por guardar correlacin con el rea superior de las cuencas de las torrenteras y
cuenta con un amplio perodo de registros.
Las caractersticas principales de estas estaciones son las siguientes:
N
1
2
3
4
5
Estacin
La Pampilla
Characato
Chiguata
Arequipa - Crpac
Imata
Elevacin
(msnm)
2 355
2 451
2 924
2 525
4 436
Periodo de
Registro
1971-2001
1971-1999
1971-1999
1971-1997
1946-1983
N de Datos
31
29
29
26
38
Estudio Hidrolgico
1.4
ESCORRENTA
AVENIDAS DE DISEO
1.5.1 Generalidades
En el presente acpite se resumen los anlisis realizados y los resultados obtenidos en relacin
a los caudales mximos de avenidas que se puede presentar la Torrenteras II en los puntos de
inters previamente fijados. (Ver Plano Hidrolgico H-01).
Los resultados obtenidos para los puntos de inters en la cuenca, sern utilizados para el
diseo de las obras de proteccin y encauzamiento.
Los anlisis han sido realizados sobre la base de informacin cartogrfica y pluviomtrica
disponible. La extensin de la cuenca y otras caractersticas de las Torrenteras II ha sido
obtenida de la Carta Nacional a escala 1:25 000 elaborada por el IGN. La informacin
pluviomtrica utilizada corresponde a la registrada en la estacin Chiguata entre 1971 y 1999,
estacin ubicada a 2 924 msnm.
1.5.2 Clculo de Avenidas
Con los datos de precipitacin mxima en 24 horas de la estacin Chiguata se realiz un
anlisis de frecuencia con las distribuciones Log Pearson III., por lo que, los anlisis de
avenidas se realizarn con las precipitaciones halladas mediante este mtodo para los perodos
de retorno de 2, 5, 10, 25, 50 y 100 aos. En la Tabla 2 se pueden observar estos clculos.
Con el propsito de estimar los valores de las avenidas mximas en las secciones de control,
en la Torrentera II, se ha utilizado el Mtodo Racional.
Estudio Hidrolgico
Tabla 1
Precipitacin Mxima en 24 horas (mm)
Ao
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
Promedio
Altitud
Pampilla
10.4
21.3
22.1
16.0
46.7
24.0
9.0
8.0
10.9
6.2
5.4
3.9
1.5
14.7
15.6
18.4
19.0
11.5
22.9
11.5
7.7
3.4
13.5
13.6
28.0
12.1
33.4
7.8
12.3
23.7
30.0
15.6
2355
Characato
26.6
35.1
86.6
58.3
36.7
65.3
62.7
15.0
28.1
18.7
55.4
8.1
8.2
19.6
24.3
26.2
83.6
22.0
51.3
18.5
2.8
18.0
17.1
21.9
81.4
20.8
58.9
19.9
52.6
36.0
2451
Estacin
Chiguata
16.0
39.0
19.5
30.9
23.3
42.9
34.6
12.8
24.8
12.4
28.9
9.2
4.9
21.0
20.3
37.9
30.4
22.7
32.2
18.9
13.5
6.0
21.8
35.3
48.8
15.9
19.9
12.6
25.0
23.5
2924
Arequipa - Corpac
14.6
25.0
23.7
50.0
15.8
27.4
9.7
13.8
6.9
6.6
6.5
1.8
9.2
13.9
23.8
25.4
5.2
10.2
6.4
6.3
1.5
12.0
10.6
34.0
4.2
37.6
15.5
2525
Estudio Hidrolgico
Tabla 2
METODO LOG PEARSON III
Media
Desv Estnda
#
Datos
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
P
(mm)
16.00
39.00
19.50
30.90
23.30
42.90
34.60
12.80
24.80
12.40
28.90
9.20
4.90
21.00
20.30
37.90
30.40
22.70
32.20
18.90
13.50
6.00
21.80
35.30
48.80
15.90
19.90
12.60
25.00
Log P
3
m /s
1.204
1.591
1.290
1.490
1.367
1.632
1.539
1.107
1.394
1.093
1.461
0.964
0.690
1.322
1.307
1.579
1.483
1.356
1.508
1.276
1.130
0.778
1.338
1.548
1.688
1.201
1.299
1.100
1.398
T (aos)
(Per. de Ret.)
(1/T)
2
5
10
20
50
100
500
1000
10000
0.429
0.200
0.100
0.050
0.020
0.010
0.002
0.001
0.000
1.32
0.24
Coef. Asim
k
Kt
1.3007
1.7941
2.1460
2.4477
2.7971
3.0349
3.5255
3.7169
4.2919
0.1781
0.8415
1.2817
1.6452
2.0542
2.3268
2.8785
3.0905
3.7191
0.3061
0.8524
1.1547
1.3710
1.5809
1.7025
1.9074
1.9726
2.1268
-0.85
-0.142
P
(mm)
24.48
33.16
39.22
44.22
49.69
53.16
59.56
61.76
67.28
PERIODO DE
RETORNO
AOS
2
5
10
25
ESTACIN
CHIGUATA
(mm/h)
7.55
9.85
11.41
12.67
Estudio Hidrolgico
50
100
a)
14.03
14.89
Mtodo Racional
Este mtodo ha sido aplicado para determinar las mximas avenidas en las quebradas
que cruzan el sistema de conduccin a lo largo de su trazo. Permite determinar los
caudales de mximas avenidas en funcin de las caractersticas principales de las
subcuencas interesadas (rea, coeficiente de escorrenta) y de la precipitacin mxima
que se puede presentar.
Este periodo de retorno, ser de 100 aos.
El propsito principal del estudio es estimar la Escorrenta mxima que pueda
presentarse en los diferentes cauces considerados, con una recurrencia o perodo de
retorno de 100 aos.
La ecuacin aplicada es:
Q = 0.278 * C * I * A
Donde:
Q
Ce
I
A
=
=
=
=
Caudal (m3/s)
Coeficiente de escorrenta
Intensidad de lluvia (mm/hora)
Area de cuenca (km2)
El coeficiente de escorrenta en cada caso ha sido asumido para cada tipo de suelo
segn el autor Ven Te Chow, de acuerdo a los valores y descripciones que se
presentan a continuacin:
Tabla 4 Coeficientes de Escorrenta
Ce
Descripcin
reas Parciales
0,50
0,70
Terrenos de Cultivo
Pavimentos y zonas urbanas
35.04 Km2
15.47 Km2
Los valores de las Intensidades Mximas Horarias en (mm/h) para los diferentes
periodos de retorno se precisan en la Tabla N 3.
Qd = 0.278 * 0.56 * 14.89 * 50.74
Qd = 117.62 m3/seg.
1.6 DISEO DE LA SECCION DE LA TORRENTERA
1.6.1 Clculo de Parmetros Hidrulicos
Se realizo mediante la ecuacin de Manning teniendo como datos iniciales:
Qdiseo = 117.62 m3/seg.
Tirante mximo=1.25m
Ancho de cauce=8.0m
Pendiente= 0.035
Coef. Rugosidad (n) para muros de concreto armado y piso de concreto armado =
0.015
Parmetros Hidrulicos y verificacin de las dimensiones proyectadas en la
Torrentera:
FORMULA DE MANNING
R2/3 x S1/2
V = ---------------------n
Torrentera II
Segn Estudio hidrolgico el caudal de diseo es 117.62 m3/s
a
Ancho
(m)
h
Tirante
(m)
R
Radio hidr.
(m)
n
C. Rugos.
S
Pendiente
V
Velocidad
(m/seg)
Q
Caudal
(m3/seg)
1.25
0.9524
0.015
0.035
12.07
120.70
Q
he = 0 . 476
F
Ecuacion 1
D 50 =
7 mm
Q diseo =
119 m3/s
F =1.76 D50
Ecuacion 2
Reemplazando en la ecuacion N2
F=
4.66
Reemplazando en la ecuacion N1
he=
1.40 m
Estudio Hidrolgico
1.7
CONCLUSIONES
Las dimensiones proyectadas para la torrentera en el tramo del Proyecto son de:
A = 8.00 m. como min.
H = 1.25 m. como min.
Pendiente del 3.5%
Estudio Hidrolgico
3
Declaracin de Impacto Ambiental
INDICE DE CUADROS
Descripcin
Cuadro N1
Cuadro N2
Cuadro N3
Cuadro N4
Cuadro N5
Cuadro N6
Cuadro N7
Cuadro N8
Cuadro N9
Cuadro N10
Cuadro N11
Cuadro N12
Cuadro N13
Cuadro N14
Cuadro N15
Cuadro N16
Cuadro N17
Cuadro N18
Cuadro N19
Pagina
Diagrama Gantt.
Poblacin Censada 2007.
Educacin de Poblacin de 3 y mas aos de edad del
Distrito Arequipa.
Educacin de Poblacin de 3 y mas aos de edad del
Distrito Jos Lus Bustamante y Rivero.
Tipo de Vivienda Poblacin del Distrito Jos Lus
Bustamante y Rivero.
Tipo de Vivienda Poblacin del Distrito Arequipa.
Servicios de Agua y Desage - Alumbrado Elctrico
Poblacin del Distrito Jos Lus Bustamante y Rivero.
Servicios de Agua y Desage - Alumbrado Elctrico
Poblacin del Distrito Arequipa.
Afiliacin a algn Seguro de Salud de la Poblacin del
Distrito Jos Lus Bustamante y Rivero.
Afiliacin a algn Seguro de Salud de la Poblacin del
Distrito Arequipa.
Categora de Educacin de la Poblacin del Distrito Jos
Lus Bustamante y Rivero.
Categora de Educacin de la Poblacin del Distrito
Arequipa.
Efectos Ambientales.
Actividades del Proyecto con potencial de causar impacto.
Componentes del ambiente potencialmente afectables.
Matriz de Identificacin de Impactos Ambientales.
Descripcin de las actividades o procesos susceptibles de
causar impacto ambiental.
Matriz de Evaluacin de Impactos ambientales por
elemento, componente y sistema ambiental afectado.
Presupuesto de Inversin de los Programas de Prevencin
y/o Mitigacion.
13
22
22
22
23
23
23
23
24
24
25
25
30
31
32
33
34
39
58
4
Declaracin de Impacto Ambiental
INDICE DE GRAFICOS
Descripcin
Foto N1
Foto N2
Foto N3
Foto N4
Plano AI-01
Plano S-09
Plano S-10
Plano S-11
Pagina
60
60
61
61
63
64
65
66
5
Declaracin de Impacto Ambiental
ABREVIATURAS
PVA
DIA
CONAM
SPG
CR
EN
VU
NT
DS
RRNN
MTC
SIS
IGV
PBI
AID
AII
S
e
d
po
DME
6
Declaracin de Impacto Ambiental
As mismo el Plan de Manejo Ambiental establece las normas Ambientales para cada
actividad del proceso constructivo que genere un impacto negativo sobre el entorno
ambiental.
7
Declaracin de Impacto Ambiental
8
Declaracin de Impacto Ambiental
II. INTRODUCCION
2.1. Enfoque
Dentro del proyecto se encuentran consideradas la Av. Lambramani, la Av. Los Incas,
el Malecn Missouri y su continuacin hacia el futuro Parque Metropolitano.
El Intercambio Vial esta definido como un Paso a Desnivel de dos vas y dos niveles,
el nivel bajo ser ocupado por una va rpida sin interrupciones que corresponde a la
Av. Los Incas con el recorrido este-oeste y oeste-este. El nivel alto, implementa dos vas
de planta circular del tipo rotonda, que asegura la circulacin ordenada e
ininterrumpida, salvo semaforizacin para los cruces peatonales brindando prioridad de
pase al vehculo que circula en las vas principales.
El planteamiento de la rotonda logra la integracin de las vas alternas, captndolas
hacia el interior del sistema vial en forma semicircular. Distribuyendo ordenadamente la
circulacin de los vehculos.
La velocidad de diseo considerada para la va rpida es de 40 a 60 Km/h, la velocidad
de diseo para la rotonda con intersecciones de calles perpendiculares, es de 10 a 20
Km/h.
2.2. Objetivos y Alcances
Los principales objetivos de este estudio son:
Disminuir los riesgos que puedan amenazar tanto el rea de influencia del
proyecto, como al proyecto mismo.
diagnstico del ambiente del rea de influencia del proyecto que podra ser impactado
por ste; la identificacin de los impactos, positivos y negativos, que podran ocurrir en
el ambiente; as como un Plan de Manejo Socio-ambiental, que contiene un conjunto de
medidas estructuradas en programas de manejo ambiental que permitirn mitigar,
controlar o evitar los impactos ambientales negativos, tanto durante la ejecucin de la
obra as como durante su puesta en operacin.
En el estudio se tienen en cuenta las principales actividades del proyecto y su posible
grado de afectacin sobre los elementos o componentes del medio ambiente de su
mbito de influencia. Estos elementos fueron determinados luego de analizar la
informacin existente acerca de los componentes fsicos, biolgicos y socio-econmicos
que tendran interrelacin con las actividades del proyecto.
III. DESCRIPCION DE PROYECTO
3.1
10
Declaracin de Impacto Ambiental
El nivel bajo contar con dos vas de doble carril, cada va tendr un ancho de
7.20 m, 3.60 m por carril. En el cual se diferencia el tramo de ingreso desde el
lado Oeste, de aproximadamente 80.00 m, con una pendiente de -6.00 %, una va
intermedia de 45.00 m, con una pendiente de 2.00 % y el tramo de salida por el
lado Este con una longitud de 187.00 m y una pendiente de 7.5 %. Siendo ambas
vas separadas mediante un murete de 0.90 m de ancho.
Para la superficie de rodadura de estas vas, se considera la utilizacin de un
pavimento rgido de concreto armado con un espesor de 0.15 m.
c. Rotonda
Las rotondas tienen una forma circular, la primera ubicada en la interseccin de
la Av. Lambramani y la Av. Los Incas con un dimetro de 20.20 m y la segunda
ubicada en el cruce de la Av. Lambramani y el Malecn Missouri con un
dimetro de 15.20 m, contarn con dos vas de dos carriles cada una; cada va
tendr una ancho de 7.20 m, 3.60 m por carril.
Las vas tendrn una pendiente del 3% en direccin oeste de la Av. Los Incas y
de 1.6% en direccin norte de la Av. Lambramani.
La estructura para la primera rotonda estar formada por losas y vigas de
concreto armado apoyadas sobre placas y muros del mismo material. Estar en
promedio a 5.20 m sobre la va inferior y su superficie de rodadura se
conformar de una capa de asfalto en caliente de 0.075 m de espesor. La segunda
rotonda tendr una estructura de pavimento flexible con una capa de asfalto de
0.075 m de espesor.
d. Obras de Arte
Para el proyecto del intercambio vial se propone la colocacin de alcantarillas de
0.90 m de ancho y 0.90 m de altura, en el ingreso del lado Este de la va inferior
de la Av. Los Incas y la va Auxiliar, en el cruce de la Av. Lambramani con la
va Auxiliar; al medio del tramo de ingreso por el lado Este de la va Inferior, en
el cruce de la Av. Lambramani y el Malecn Missouri, en el sector intermedio de
la va inferior y finalizando las vas auxiliares por el lado oeste. Todas las
alcantarillas desfogarn a la torrentera.
Los muros separadores y de contencin proyectados de altura variable sern de
concreto armado, a fin de soportar adecuadamente los empujes de suelos, carga
de vehculos y flujo de agua hacia la torrentera.
e. Encauzamiento de la Torrentera
Se proyecta el encauzamiento de la torrentera ubicada a lo largo del proyecto, en
una longitud promedio de 550.00 m.
f. Instalaciones Sanitarias
11
Declaracin de Impacto Ambiental
12
Declaracin de Impacto Ambiental
Cuadro N1
13
Declaracin de Impacto Ambiental
competente, la que establecer los requisitos que debern cumplirse para tal
efecto.
Artculo 52.- En los casos de peligro grave o inminente para el medio
ambiente, la autoridad sectorial competente podr disponer la adopcin de
una de las siguientes medidas de seguridad por parte del titular de la
actividad:
16
Declaracin de Impacto Ambiental
Son servicios ambientales del bosque los que tienen por objeto la proteccin
del suelo, regulacin del agua, conservacin de la diversidad biolgica,
conservacin de ecosistemas y de la belleza escnica, absorcin de dixido
de carbono y en general el mantenimiento de los procesos ecolgicos
esenciales (artculo 2, inciso 2.3).
El plan de manejo debe incluir la ubicacin de los rboles a extraerse
determinados a travs de sistemas de alta precisin con instrumentos
conocidos como Sistema de Posicin Global (SPG) u otros similares; siendo
tambin parte integrante de este plan el Estudio de Impacto Ambiental
(EIA), cuyas caractersticas son determinadas en el reglamento. (Artculo
15, inciso 15.1).
Reglamento de la Ley Forestal y de Fauna Silvestre (D. S. N 014-2001AG)
Categorizacin de Especies de Fauna Silvestre, amenazadas que consta de
301especies: 65 mamferos, 172 aves, 26 reptiles y 38 anfibios. Distribuidas
indistintamente en las categoras: En Peligro Critico (CR), En Peligro (EN),
Vulnerable (VU), Casi Amenazado (NT).
Ley de Recursos Hdricos (D. Ley N 29338)
Que en su Titulo Disposiciones Generales artculo 2do. Dice: "Las aguas, sin
excepcin alguna, son de propiedad del Estado y su dominio es inalienable e
imprescriptible. No hay propiedad privada de las aguas ni derechos
adquiridos sobre ellas. El uso justificado y racional del agua, slo puede ser
otorgado en armona con el inters social y el desarrollo del pas.
Ley Orgnica para el Aprovechamiento Sostenible de los RR.NN. (ley N
26821)
Promueve polticas de desarrollo sostenible para el aprovechamiento
sostenible de los recursos naturales renovables. Fomentando la generacin de
infraestructura de apoyo a la produccin sostenible de los recursos naturales
renovables y la libre iniciativa y la innovacin productiva en el
aprovechamiento sostenible de los recursos naturales renovables.
Ley General de Residuos Slidos (Ley N 27314)
Ley 27314 Ley General de Residuos Slidos.- Que establece derechos,
obligaciones, atribuciones y responsabilidades de la sociedad en su conjunto,
para asegurar una gestin y manejo de los residuos slidos, sanitaria y
ambientalmente adecuada. Corresponde la definicin Residuos de las
Actividades de Construccin para el presente estudio.
Reglamento de la Ley General de Residuos Slidos (D.S. N 057-2004PCM)
17
Declaracin de Impacto Ambiental
19
Declaracin de Impacto Ambiental
21
Declaracin de Impacto Ambiental
Servicios bsicos
Educacin
En los distritos involucrados se da atencin escolar en los tres niveles bsicos, es
decir inicial, primaria y secundaria, tambin se cuenta con Universidades e
Institutos de Educacin Superior.
Cuadro N3
Poblacion de 3 y mas aos de edad
Distrito AREQUIPA
Sin nivel
Educacin inicial
Primaria
Secundaria
Superior no univ. incompleto
Superior no univ. completo
Superior univ. incompleto
Superior univ. completo
TOTAL
1999
1213
7040
13191
3485
6718
8487
17329
59462
Cuadro N4
Poblacion de 3 y mas aos de edad
Distrito JOSE LUIS BUSTAMANTE Y RIVERO
3853
Sin nivel
1784
Educacin inicial
10754
Primaria
17453
Secundaria
4830
Superior no univ. incompleto
8490
Superior no univ. completo
9357
Superior univ. incompleto
16730
Superior univ. completo
TOTAL
73251
Fuente Censo Nacional 2007
22
Declaracin de Impacto Ambiental
Vivienda
Las viviendas son de material noble (Ladrillo y concreto), los materiales
empleados son de la zona en un 90%.
Cuadro N5
Distrito JOSE LUIS BUSTAMANTE Y RIVERO
16537
Casa independiente
1782
Departamento en edificio
184
Vivienda en quinta
179
Vivienda en casa de vecindad
40
Vivienda improvisada
80
Local no dest.para hab. humana
4
Otro tipo
TOTAL
18806
Fuente Censo Nacional 2007
Cuadro N6
Distrito AREQUIPA
Casa independiente
Departamento en edificio
Vivienda en quinta
Vivienda en casa de vecindad
Vivienda improvisada
Local no dest.para hab. humana
Otro tipo
11934
3187
1121
738
29
45
8
17062
TOTAL
Fuente Censo Nacional 2007
Servicios
En cuanto a los servicios de agua, desage y energa elctrica solo el 2% de las
familias no cuentan con estos servicios.
Cuadro N7
Distrito JOSE LUIS BUSTAMANTE Y RIVERO
TIPO DE SERVICIO HIGINICO QUE TIENE
LA VIVIENDA
Subtotales
16484
696
65
89
11
219
17564
Cuadro N8
Distrito AREQUIPA
DISPONE DE ALUMBRADO ELCTRICO POR
Subtotales
RED PBLICA
SI
NO
14041
13973
68
Red pblica de desague dentro de la vivienda
1141
1119
22
Red pblica de desague fuera de la vivienda
35
31
4
Pozo sptico
28
20
8
Pozo ciego o negro / letrina
32
28
4
Ro, acequia o canal
96
62
34
No tiene
TOTAL
15373
15233
140
23
Declaracin de Impacto Ambiental
Salud
La zona cuenta con gran cantidad de centros de salud, tanto pblicos como
privados.
Cuadro N9
AFILIADO A ALGN SEGURO DE SALUD
Distrito JOSE LUIS BUSTAMANTE Y RIVERO
POBLACION
1070
Menos de 1 ao
15805
De 1 a 14 aos
21102
De 15 a 29 aos
16845
De 30 a 44 aos
14619
De 45 a 64 aos
6969
De 65 y mas ao
TOTALES
76410
Fuente Censo Nacional 2007
ESSALUD
275
2565
721
393
295
186
4435
420
6484
4259
7030
7386
4335
29914
OTRO SEGURO
NINGUNO
67
1362
2123
1660
1455
544
7211
316
5585
14126
8008
5637
1940
35612
Cuadro N10
AFILIADO A ALGN SEGURO DE SALUD
Distrito AREQUIPA
POBLACION
699
Menos de 1 ao
10214
De 1 a 14 aos
17008
De 15 a 29 aos
12581
De 30 a 44 aos
13085
De 45 a 64 aos
7932
De 65 y mas ao
TOTALES
61519
Fuente Censo Nacional 2007
ESSALUD
294
4748
3886
5611
7111
5515
27165
OTRO SEGURO
NINGUNO
47
1052
2219
1361
1309
587
6575
257
3709
10549
5582
4621
1763
26481
Actividad econmica
La contribucin de la ciudad de Arequipa en el PBI de Per es del 5.7 % (el
74,2% del PBI de la Regin Arequipa) siendo el segundo ms alto del pas. La
contribucin al IGV nacional representa el 20.3 %, en impuesto de solidaridad el
17 % siendo el segundo contribuyente nacional en estos tributos. Arequipa tiene
una estructura productiva fuertemente sesgada al sector del comercio y servicios,
el sector primario de agricultura y minera representan el 29.6 % del PBI, el
sector secundario de industria y manufactura el 20.7 % de este y el sector
terciario de comercio y servicios el 49.7 %, ello se fortaleci en los ltimos aos
por falta de inversiones productivas.
24
Declaracin de Impacto Ambiental
Cuadro N11
CATEGORIA DE OCUPACION
Distrito JOSE LUIS BUSTAMANTE Y RIVERO
POBLACION
SUBTOTALES
EMPLEADO
842
70
Agric., ganadera, caza y silvicultura
25
9
Pesca
480
286
Explotacin de minas y canteras
2775
614
Industrias manufactureras
137
97
Suministro de electricidad, gas y agua
1317
251
Construccin
6495
1928
Comerc., rep. veh. autom.,motoc efect.pers.
789
202
Venta, mant.y rep. veh.autom.y motoc.
597
330
Comercio al por mayor
5109
1396
Comercio al por menor
1448
646
Hoteles y restaurantes
2932
1197
Trans., almac. y comunicaciones
550
534
Intermediacin financiera
3242
2175
Activid.inmobil., empres. y de alquiler
1894
1852
Admin.pub. y defensa; p. segur.soc.afil
3304
3049
Enseanza
1760
1472
Servicios sociales y de salud
1195
595
Otras activ. serv.comun.soc y personales
1127
Hogares privados con servicio domstico
862
441
Actividad economica no especificada
30385
15216
TOTALES
TRABAJADOR
OBRERO
INDEPENDIENTE
200
430
13
1
161
17
967
1019
32
6
583
428
260
3622
199
319
20
196
41
3107
69
570
386
1251
2
7
143
784
42
7
229
11
251
85
454
TRABAJADOR
FAMILIAR NO
REMUNERADO
EMPLEADOR O
PATRONO
TRABAJADOR DEL
HOGAR
68
2
16
118
2
43
266
51
25
190
97
76
4
120
74
12
419
18
26
375
66
22
3
20
17
23
33
2
3
28
15
900
48
754
57
1127
109
3070
249
9318
1127
Cuadro N12
Distrito AREQUIPA
POBLACION
SUBTOTALES
EMPLEADO
582
59
Agric., ganadera, caza y silvicultura
17
5
Pesca
288
193
Explotacin de minas y canteras
1983
623
Industrias manufactureras
85
70
Suministro de electricidad, gas y agua
765
237
Construccin
5313
2030
Comerc., rep. veh. autom.,motoc efect.pers.
571
190
Venta, mant.y rep. veh.autom.y motoc.
543
366
Comercio al por mayor
4199
1474
Comercio al por menor
1562
875
Hoteles y restaurantes
1749
910
Trans., almac. y comunicaciones
609
586
Intermediacin financiera
3472
2232
Activid.inmobil., empres. y de alquiler
1163
1144
Admin.pub. y defensa; p. segur.soc.afil
3087
2722
Enseanza
1714
1320
Servicios sociales y de salud
1282
715
Otras activ. serv.comun.soc y personales
1311
Hogares privados con servicio domstico
823
531
Actividad economica no especificada
25805
14252
TOTALES
OBRERO
73
7
56
399
13
218
184
135
28
21
53
137
2
70
19
5
8
45
TRABAJADOR
INDEPENDIENTE
297
4
28
752
1
260
2570
199
99
2272
449
630
13
1013
TRABAJADOR
FAMILIAR NO
REMUNERADO
EMPLEADOR O
PATRONO
96
1
11
159
1
47
256
38
37
181
120
57
8
123
TRABAJADOR DEL
HOGAR
57
50
3
273
9
13
251
65
15
34
318
347
461
34
30
31
8
9
30
158
7301
37
1011
56
600
1311
41
1330
1311
rea de Estudio
El anlisis de los distintos elementos que conforman el medio ambiente, requiere de una
delimitacin previa de las zonas o regiones en las que se desea conocer o analizar sus
caractersticas particulares.
En este sentido, las reas de influencia tienen por objeto circunscribir una serie de
aspectos o afectaciones ambientales a un rea geogrfica especfica; sin embargo, dado
el gran nmero de variables involucradas en un estudio ambiental y la complejidad de
stas, por cada aspecto o impacto analizado sera necesaria la definicin de una zona de
influencia particular.
Para efectos prcticos, se definieron solamente dos zonas de influencia generales, dentro
de las cuales se considera que se presentarn la mayor parte de los impactos y
beneficios generados por la construccin del Intercambio Vial del presente proyecto.
6.1.1
Generalidades
Metodologa
29
Declaracin de Impacto Ambiental
Sistema:
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente:
Cuadro N13
Elemento:
Ficha N.
-Accesos
-Otras Actividades
Etapa de Operacin
32
Declaracin de Impacto Ambiental
Cuadro N16
Matriz de Identificacion de Impactos Ambientales
1-3
2
4
5
6
7
Notas:
INFRAES_
SALUD
TRUCTURA
Vias y Transportes
BILIDAD SOS
Status de Habitad
Diversidad de Organismos
SIDAD
Erosion
Dinamica Fluvial
SUELO
Toxicos
Biodegradables
Inertes
AGUA
Particulas
Gases
Actividad
Operacin de Maquinaria
Excavaciones
Disposicion de Material de Corte
Talleres y Almacenes
AIRE
Elemento
COMPONENTE
RECUR_
Riesgos
DIVER_ ESTA_
SOCIO ECONOMICO
Servicios Sociales
BIOTICO
Ruido
FISICO
Paisaje
SISTEMA
9
8
Numero de ficha de IA
33
Declaracin de Impacto Ambiental
Cuadro N17
Descripcin de las actividades o procesos susceptibles de causar impacto ambiental
Actividad
Descripcin
Movimientos de tierra necesarios para llevar a cabo para la fundacin de los cimientos, peinado de taludes
Excavaciones
adecuacin de obras de drenaje, encuasamiento del rio. Incluye las actividades previas de corte y remocin de la
vegetacin. As como el descapote de la capa superficial del suelo. Eventualmente se requerira de explosivos para
volar tramos que contengan material rocoso.
Incluye la movilizacin y operacin de equipo pesado en las diferentes actividades relacionadas con la conctruccion
Operacin de Maquinaria
del puente rehabilitacion de la va: operacin de maquinaria en excavaciones, cargue, descargue y colocacin de
materiales y equipos: transporte de personal, materiales, maquinaria, sobrantes de corte, desechos, etc.
Para llevar a cabo la adecuada disposicin de los materiales sobrantes de las excavaciones se deben seguir una
serie de pasos que garanticen la estabilidad del botadero y la minimizacin de los impactos sobre el ambiente.
Los pasos incluyen la remocin de vegetacin, el descapote, el tratamiento de la fundacin, la construccin de
cunetas y drenes. La colocacin y compactacin del material y el engramado final.
En los talleres y almacenes se presenta una manipulacin de volmenes considerables de combustibles, lubricantes
Talleres y Almacenes
que requieren un manejo y almacenamiento adecuado para evitar eventuales derrames o accidentes que traerian
daos irreparables al ambiente. En los dos sitios de no usarse las instalaciones existentes debe realizarse su
montaje y desmantelamiento al finalizar las obras.
34
Declaracin de Impacto Ambiental
Fichas de Evaluacin
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: aire
Elemento: partculas
Operacin de maquinaria
La operacin de maquinaria para realizar excavaciones, acarreos de material existente, incrementa la presencia de partculas en el aire.
Ficha N. 1
Efecto Fuerte: 0.75. El equipo utilizado para movimiento de tierra en la zona de la sub estructura, va a generar una considerable cantidad de polvo.
Cierta: 1.0. Es inevitable la produccin de partculas debido a la operacin de maquinaria.
Mediana - semanas: 0.60. Aunque la produccin de partculas es inmediata, el pico de la actividad movimiento de tierras se alcanza en unos cuantas
semanas
Corta - semanas: 0.40 Aunque la duracin del efecto es de das o menos, el movimiento de tierras tarda varias semanas.
En donde sea posible, deber hacerse riego de las zonas expuestas, teniendo en cuenta que no se sobrepasen los lmites mximos permisibles. En los
acarreos se recomienda utilizar mantas que cubran completamente los materiales transportados
Elaboracin Propia
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: aire
Elemento: partculas
Ficha N. 2
Excavaciones
La Construccin del Intercambio Vial requiere del movimiento del terreno modificando la morfologa del lugar ello genera el levantamiento de las
partculas de suelo al medio ambiente mientras dure esta actividad.
Efecto Fuerte: 0.75. Debido a que esta actividad se realizar para la Construccin del Intercambio Vial
Cierta: 1.0. La modificacin de la morfologa del terreno es inevitable para la construccin de los puentes.
Mediana semanas: 0.6. El mximo efecto se presentar cuando se realice el Corte de Talud, lo cual se alcanza en varias semanas.
Media. _ meses: 0.40 Las modificaciones durarn meses mientras dure la construccin del puente
El movimiento de tierras deber ser localizado, solo donde se requiera.
Elaboracin Propia
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Sistema: fsico
Actividad
Componente: aire
Elemento: Partculas
Ficha N. 3
Operacin de Maquinaria
En la construccin de los puentes implica el uso de maquinaria para diversas actividades, como movimiento de tierras, y otros; los equipos generan gases
que contaminan el medio ambiente por lo que esta debe ser controlada.
Efecto Moderado: 0.5 Los equipos desarrollarn sus actividades en forma muy localizada, solo donde se les requiera
Cierta: 1.0. Es inevitable el uso de la maquinaria, pero su manejo controlado mitigara sus efectos agresores al medio ambiente.
Mediana semanas: 0.6. El mximo efecto se presentar cuando se realice el mayor nmero de actividades dentro de la construccin de los puentes.
Media _ meses: 0.40. Los efectos estarn presentes mientras dure las actividades que requieran el uso de lo quipos motorizados.
Controlar permanentemente el mantenimiento de los equipos, para evitar la polucin de partculas contaminantes al medio ambiente.
Componente: aire
Elemento: partculas
Ficha N. 4
Disposicin de material de corte
35
Declaracin de Impacto Ambiental
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Durante la operacin de los sitios de botadero se generan cantidades considerables de material particulado debido a la accin del viento
Efecto fuerte: 0.75. El poco volumen de corte a disponer implica la adecuacin de un sitio para botadero
Cierta: 1.0. Los botaderos deben permanecer desprotegidos durante su utilizacin
Mediana - Semanas: 0.60. La concentracin pico se alcanza unas semanas despus de iniciada la actividad.
Media - meses: 0.40 Aunque la duracin del efecto es muy corta (das o menos) la actividad tarda algunos meses.
En todos los botaderos utilizados, se deber tener en cuenta que estn bien conformados segn se indica en las especificaciones tcnicas, a pesar de que
este no se encuentre sobre poblaciones cercanas.
Elaboracin Propia
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: suelo
Elemento: propiedades. fsico qumicas
Ficha N. 5
Excavaciones
El movimiento de tierras en la construccin del puente modificar las caractersticas fsicas y qumicas de los suelos pre-existentes en el sitio.
Efecto fuerte: 0.75. El volumen de corte implica un rea de depsito de material excedente relativamente grande.
Cierta: 1.0. Es inevitable la modificacin de las propiedades fsico qumicas del suelo en los sitios de depsito de material excedente
Mediana semanas: 0.6. El mximo efecto se alcanza en unas semanas cuando se hayan adecuado el mayor nmero excavaciones.
Media - meses: 0.4. Aunque las modificaciones sobre el suelo original son permanentes, se pueden generar nuevos suelos sobre los sitios de las
excavaciones
Toda excavacin que se realice siempre generara alteraciones en sus propiedades fsico qumicas lo cual debe controlarse en no sobrepasar lo lmites
permisibles.
Elaboracin Propia
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: suelo
Elemento: propiedades. fsico qumicas
Ficha N. 6
Disposicin del material de corte
En los sitios de depsito de material excedente se mezclan horizontes de suelos provenientes de diferentes sitios, deteriorando las caractersticas fsicas y
qumicas de los suelos pre-existentes en el sitio.
Efecto moderado: 0.75. El volumen de corte implica un rea de depsito de material excedente relativamente grande
Cierta: 1.0. Es inevitable la modificacin de las propiedades fsico qumicas del suelo en los sitios de depsito de material excedente
Mediana - semanas: 0.6. El mximo efecto se alcanza en unas semanas cuando se hayan adecuado el mayor nmero de depsito de material excedente.
Larga - aos: 0.6. Aunque las modificaciones sobre el suelo original son permanentes, se pueden generar nuevos suelos sobre los sitios de depsito de
material excedente
La disposicin de sobrantes de cortes en los depsitos de material excedente debe hacerse de acuerdo con un programa que incluya una clasificacin
mnima de los materiales a disponer. Las capas de suelo existentes en el sitio deben ser removidas y almacenadas convenientemente para su posterior
utilizacin. En las capas superiores del depsito de material excedente se deben aportar fertilizantes y materia orgnica, finalizando con su
revegetalizacin y, si es del caso, arborizacin.
Elaboracin Propia
36
Declaracin de Impacto Ambiental
Sistema: fsico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: suelo
Elemento: prop. fsico - qcas
Ficha N. 7
Talleres y almacenes
Las zonas de los talleres y almacenes se generan una serie de actividades que implican la modificacin de las propiedades fsico qumicas, en la
manipulacin de los equipos, en las zonas pozos spticos y percoladores.,
Efecto fuerte: 0.75. En los talleres, la manipulacin de lubricantes, aceites, grasas, implica fuertes riegos contra el suelo y sus propiedades.
Cierta: 1.0. El riesgo es siempre latente dentro de los campamentos en la alteracin de las propiedades fsico qumicas
Media - semanas: 0.60. El mximo efecto se alcanza en unas semanas.
Media meses: 0.4. La recuperacin de las propiedades fsico qumicas de los suelos en estos sitios puede tardar varios semanas
Es necesario almacenar las capas de suelo existentes para su posterior utilizacin.
Elaboracin Propia
Sistema: socio
econmico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: infraestructura
Ficha N. 8
Excavaciones.
Durante la realizacin de algunos cortes, especialmente los requeridos para construir los accesos, el normal trnsito a travs de la va se ver restringido o
suspendido temporalmente
Efecto leve: 0.2. Las excavaciones a realizar son muy pocas y en sitios muy localizados
Cierta: 1.0. Las restricciones en la va en los sitios donde se realizarn excavaciones son inevitables
Lenta - meses: 0.3. El mximo efecto se presenta durante el pico de las excavaciones
Media - meses: 0.4. El impacto se presenta durante el tiempo que tarden las excavaciones.
Establecer un procedimiento constructivo adecuado, una buena sealizacin y una clara informacin a los usuarios sobre los lugares y momentos de
restricciones. Donde sea pertinente, se deben adecuar desvos o pasos temporales.
Elaboracin Propia
Sistema: socio
econmico
Actividad
Descripcin del
impacto
Magnitud
Probabilidad
Velocidad
Duracin
Medida de manejo
Componente: infraestructura
Ficha N. 9
Operacin de maquinaria
La operacin de maquinaria genera un trnsito adicional en la zona que causa restricciones sobre la velocidad de operacin de los vehculos, y genera
riesgos por la entrada y salida de vehculos desde campamentos, talleres, sitios de botadero, etc.
Efecto fuete: 0.75. Se presenta a lo largo del proyecto
Cierta: 1.0. Las restricciones en la va por operacin de maquinaria son inevitables
Media Semanas: 0.6. El mximo efecto se presenta durante el pico de las actividades de construccin
Media - Meses: 0.4. Se presenta durante todo el tiempo que duren los trabajos
Establecer un programa de trabajo adecuado, una buena sealizacin y una clara informacin a los usuarios sobre los lugares de peligro. Educar los
conductores de la diferente maquinaria para que maniobren con responsabilidad y prudencia.
Elaboracin Propia
37
Declaracin de Impacto Ambiental
Anlisis de resultados
A partir de los resultados de calificacin obtenidos (vase tabla 5.4), es posible realizar
los siguientes anlisis, los cuales permiten demostrar que, dadas las caractersticas del
proyecto, los impactos sobre el medio ambiente son mnimos, tanto en cantidad como
en magnitud.
Actividades sobre elementos ambientales
De las 9 actividades identificadas que causaron impacto, y de acuerdo con el rango de
calificaciones establecido en el numeral 5.1, del presente captulo, 2 (23%) se ubican en
el rango muy leve (calificacin entre 0 y 0.25). y 7 (77%) se clasifican como leves
(calificacin entre 0.25 y 0.50). Ningn impacto se clasifica en el rango de impactos
Severos o Muy Severos (calificacin mayor de 0.5), factor que refleja claramente las
caractersticas poco agresivas del proyecto con el medio.
En la ficha de impacto ambiental se describen los impactos que obtuvieron mayor
calificacin en magnitud por presentar un mayor grado de afectacin sobre el medio
ambiente.
Las actividades que produjeron un mayor impacto fueron las siguientes:
-
Las actividad que obtuvo la mayor calificacin de 0.38 es uno, tal como se
puede apreciar en el cuadro de calificaciones ambintales, el elemento
Partculas, que corresponden al componente aire y Propiedades fsico
qumicas, que pertenecen al componente Suelo son los mas afectado, con las
actividades que tienen que ver principalmente con el movimiento de tierras,
como son excavaciones y disposicin de material excedentes.
Respecto a las actividades que producen mayor impacto sobre el medio ambiente son:
-
38
Declaracin de Impacto Ambiental
Cuadro N18
Matriz de Evaluacion de Impactos ambientales por elemento, componente y sistema ambiental afectado
Sisitema
Componente
Aire
Elemento
Particulas
FSICO
Suelo
SOCIO
ECONOMICO
Infraestructu.
Propiedades
fisico-quimica
Vias y
Transportes
Desarrollo analtico.
Calificacin de la actividad
Peso de la actividad
Calificacin del elemento
Peso del elemento
Calificacin del componente
Actividad
1
Operacin de maquinaria
Excavaciones
Operacin de maquinaria
Excavaciones
Talleres, almacenes
Excavaciones
Operacin de maquinaria
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.30
0.30
0.40
0.40
0.40
0.40
0.40
0.60
0.40
0.40
0.40
0.38
0.38
0.25
0.38
0.38
0.45
0.38
0.07
0.26
1.00
0.27
0.18
0.27
0.27
0.33
0.27
0.05
0.19
Calif.
Peso
Element. Element.
0.38
0.73
0.25
1.00
0.35
1.20
0.60
0.05
0.33
1.00
0.40
1.00
Calif.
Componen.
0.33
0.63
0.35
0.35
0.05
0.05
C = M * P* [0.5 * V + 0.5 * D]
P = Calificacin de la actividad / Calificacin de las actividades dentro del elemento
C = Calificacin de la actividad * Peso de la actividad
39
Declaracin de Impacto Ambiental
6.6
los ingresos de los pobladores, generando mejores condiciones de acceso a los bienes y
servicios, lo que a su vez se traducir en una mejora en el nivel de vida de la poblacin
beneficiada.
Dinamizacin de la economa local
El incremento en la demanda de bienes y servicios, asociado a las necesidades de
abastecimiento durante el proceso constructivo del Intercambio Vial, ocasionar un
aumento en la dinmica comercial local.
De modo general, se puede sealar que, a diferencia de la etapa preliminar, este impacto
ser de moderada magnitud y duracin (6 meses), siendo adems de influencia zonal, lo
que determina su moderada significacin ambiental.
Impactos Negativos
Riesgo de afectacin de la calidad del agua de la segunda torrentera
El posible derrame de combustible, grasa y aceite durante las operaciones de excavacin
para cimentaciones de estribos y pilares, construccin de estructuras de concreto
(estribos, pilares y losas), corte de material suelto para construccin del acceso,
conformacin del terrapln, circulacin de la maquinaria de construccin,
funcionamiento del campamento y patio de mquinas, entre otras, podra ocasionar
alteracin de la calidad del agua de la cuenca.
La magnitud de este impacto es variable entre las actividades descritas, siendo desde
moderada a baja, de influencia local, duracin variable entre moderada y corta y
probabilidad de ocurrencia variable entre alta y baja, lo que determina una significacin
tambin variable entre moderada y baja. Sin embargo, este impacto presenta
posibilidades de aplicacin de medidas de mitigacin y prevencin, que lo reduciran
sustancialmente.
Alteracin de la calidad del aire por emisin de material particulado
La emisin de material particulado se producir durante las actividades de corte de
material suelto para construccin de accesos y conformacin de terrapln. Este impacto
ha sido calificado como de magnitud variable entre moderada y baja segn las
caractersticas de las actividades descritas, de influencia puntual y corta duracin, lo que
determina una significacin variable entre moderada y baja. Presentando posibilidades
de aplicacin de medidas de mitigacin.
Alteracin de la calidad del aire por emisin de gases y ruido
Como es de esperar, durante las operaciones de construccin del intercambio se
producirn emisiones de gases, tales como dixido de azufre (SO2), hidrocarburos,
monxido de carbono (CO), dixido de carbono (CO2) y xidos de nitrgeno (NOx),
asociadas al funcionamiento de la maquinaria y vehculos diesel. Sin embargo, debido
al pequeo nmero de maquinaria y vehculos que sern utilizados en la obra, este
42
Declaracin de Impacto Ambiental
En la evaluacin ambiental del Proyecto de Intercambio Vial Av. Lambramani Av. Los
Incas, se ha encontrado que su ejecucin podra ocasionar impactos ambientales directos
e indirectos, positivos y negativos, dentro de su mbito de influencia.
Los impactos positivos ms significativos correspondern a la etapa de funcionamiento
de la obra, y los negativos a la etapa de construccin; estando asociados estos ltimos a
los movimientos de tierra durante excavaciones para las cimentaciones, transporte de
material, funcionamiento del campamento y patio de mquinas, uso de depsito de
material excedente; as como durante los cortes de material, conformacin de terrapln
del accesos principalmente. No obstante, todos los impactos negativos son de moderada
y baja significancia ambiental, y con posibilidad de aplicacin de medidas de
prevencin y/o mitigacin.
En este sentido, sobre la base de los resultados de la evaluacin de impactos se ha
elaborado el presente Plan de Manejo Socio-ambiental (PMSA), el cual contiene un
conjunto de medidas estructuradas en Programas, orientadas a prevenir, corregir o
mitigar los impactos ambientales adversos que podran ser ocasionados por la ejecucin
del proyecto en sus etapas Preliminar, Construccin y Operacin.
7.2
Objetivos
7.3
Estrategia
Instrumentos de la Estrategia
a) Objetivo
Capacitar a los trabajadores del proyecto y a la poblacin local a fin de lograr una
relacin armnica entre ellos y su ambiente durante el tiempo que demande la
construccin del Intercambio Vial.
b) Descripcin
Este Programa se refiere a la realizacin de campaas de educacin y conservacin
ambiental a los trabajadores del proyecto y a la poblacin local, respecto a las
normas elementales de higiene, seguridad y comportamiento de orden ambiental.
Para este propsito se tomar como base el contenido del Informe de Evaluacin
Socio-ambiental, as como informacin relacionada con el tema.
c) Metodologa
La Educacin ambiental ser impartida mediante charlas, conferencias, manuales,
afiches informativos, o cualquier otro instrumento de posible utilizacin. Los
manuales y material escrito complementario quedarn a disposicin del contratista
para su consulta y aplicacin durante el tiempo que dure el proyecto. Esta tarea
estar a cargo del Especialista Ambiental asignado a la obra.
46
Declaracin de Impacto Ambiental
d) Responsable de ejecucin
El responsable de la aplicacin de este programa es el contratista, quien deber
contratar para ello los servicios de un Especialista Ambiental.
e) Duracin
El Programa podr ser aplicado durante todos los meses que durarn las obras de
construccin del Intercambio Vial.
7.4.2
Este Programa est orientado a la defensa y proteccin del entorno que sera
afectado por la construccin del Intercambio Vial, definiendo las precauciones o
medidas a tomar para evitar daos innecesarios que, por lo general, se producen por
la falta de cuidado o de una planificacin eficiente de las operaciones a realizar
durante las etapas de ejecucin del proyecto.
Medidas de prevencin y/o Mitigacion de Impactos Ambientales Potenciales, se
presenta las medidas de prevencin y/o mitigacin propuestas, ordenadas segn
actividad causante, elemento ambiental potencialmente afectado y lugar de
ocurrencia.
a) Control y Prevencin de la produccin de material particulado, gases y ruido.
Para la emisin de material particulado
En la evaluacin de impacto ambiental se ha encontrado que, principalmente durante
la etapa de construccin del Intercambio Vial, se generarn emisiones de material
particulado en los frentes de la propia obra y en los lugares destinados a prstamo y
disposicin final de materiales excedentes, as como en el transporte de los mismos.
Las medidas destinadas a evitar o disminuir el aumento de la concentracin de
material particulado en el aire durante la fase de ejecucin de la obra, son las
siguientes:
- Riego con agua en todas las superficies de actuacin ( accesos y en la propia obra)
de forma que estas reas mantengan el grado de humedad necesario para evitar, en
lo posible, la produccin de material particulado. Dichos riegos se realizarn a
travs de un camin cisterna, con periodicidad diaria o interdiaria. Asimismo, el
contratista deber suministrar al personal de obra el correspondiente equipo de
proteccin personal (principalmente mascarillas).
- El transporte de materiales a la obra y de sta al Depsito de Materiales
Excedentes, deber realizarse con la precaucin de humedecer dichos materiales y
cubrirlos con un toldo hmedo.
Para la emisin de gases en fuentes mviles
47
Declaracin de Impacto Ambiental
48
Declaracin de Impacto Ambiental
49
Declaracin de Impacto Ambiental
50
Declaracin de Impacto Ambiental
51
Declaracin de Impacto Ambiental
calificado y autorizado, slo para el fin con el que fueron diseados. Se revisarn
peridicamente para proceder a su reparacin o reposicin y debern estar dotados
con los dispositivos, instructivos, controles y seales de seguridad exigidos o
recomendados por los fabricantes.
- El contratista est obligado a utilizar solamente vehculos automotores en perfecto
estado, para transportar de forma apropiada y segura personas, materiales y equipos,
de acuerdo con las reglamentaciones de las autoridades de transporte y trnsito. Los
vehculos sern conducidos por personal adiestrado, estarn debidamente
contramarcados y contarn con los avisos de peligro necesarios.
- En caso de ser necesaria la utilizacin de explosivos, el contratista ser el
responsable de su adquisicin, transporte, almacenamiento y utilizacin, lo cual har
siguiendo las instrucciones y normas del fabricante, de las fuerzas armadas y la
reglamentacin expedida por el gobierno.
- En ausencia total o parcial de luz solar, se debe suministrar iluminacin artificial
suficiente en todos los sitios de trabajo, si se requiere realizar trabajos en estas
condiciones, de forma tal que las actividades se desarrollen en forma segura. La
fuente luminosa no debe limitar el campo visual ni producir deslumbramientos.
- Debido a que el aseo y el orden en la zona de trabajo brindan mayor seguridad al
personal y a la comunidad, el contratista contar con personal especfico para las
labores de aseo y limpieza.
g) Sealizacin
Sealizacin ambiental:
La sealizacin ambiental tiene como propsito velar por la mnima afectacin de
los componentes ambientales durante el desarrollo del proceso de construccin del
Intercambio Vial.
De acuerdo a la evaluacin ambiental efectuada, se tiene que los elementos
ambientales que estaran expuestos a mayor riesgo son el agua de la segunda
torrentera, el suelo, la flora y fauna y los terrenos de cultivo aledaos al rea del
Intercambio Vial.
La sealizacin que se propone consistir bsicamente en la colocacin paneles
informativos en los que se indique a la poblacin y al personal de obra sobre la
importancia de la conservacin de los recursos naturales y sern colocadas en el rea
de obras en puntos estratgicos designados por la supervisin ambiental.
Las reas donde ser necesario colocar sealizacin ambiental son las siguientes y
llevaran la inscripcin que se anota:
- En las reas aledaas al Intercambio Vial (1 seal) (NO ARROJES BASURA AL
RIO).
53
Declaracin de Impacto Ambiental
54
Declaracin de Impacto Ambiental
55
Declaracin de Impacto Ambiental
personal y/o de los equipos de trabajo. Estos vehculos debern estar inscritos como
tales, debiendo estar en condiciones adecuadas de funcionamiento: En el caso, de
que alguna unidad mvil sufriera algn desperfecto, deber ser reemplazada por otro
vehculo en buen estado.
El sistema de comunicacin de auxilios debe ser un sistema de alerta en tiempo real;
es decir, los grupos de trabajo deben contar con unidades mviles de comunicacin,
que estarn comunicadas con la unidad central de contingencias y esta, a su vez, con
las unidades de auxilio.
Equipos de auxilios paramdicos
Estos equipos, debern contar con personal preparado en brindar atencin de
primeros auxilios, camillas, balones de oxgeno y medicinas.
Equipos contra incendios
Los equipos mviles estarn compuestos por extintores de polvo qumico. stos
estarn implementados en todas las unidades mviles del proyecto, adems las
instalaciones auxiliares (campamento y patio de maquinarias) debern contar con
extintores y cajas de arena.
7.4.5
Programa de Abandono
Este Programa contiene las acciones a llevarse a cabo luego de finalizadas todas las
obras de construccin del Intercambio Vial.
En el Campamento
Culminada la etapa de construccin del Intercambio Vial, se proceder a retirar
todas las instalaciones auxiliares utilizadas, limpiar totalmente el rea intervenida y
disponer los residuos convenientemente en el DME asignado, sellar los silos, y
luego nivelar el terreno, a fin de integrarlo nuevamente al paisaje original.
Finalmente, colocar una capa de suelo orgnico y revegetar el rea, utilizando
especies de la zona.
En el Patio de Maquinarias y Equipos
Concluidas las actividades de construccin del Intercambio Vial, el escenario
ocupado debe ser restaurado mediante el levantamiento de las instalaciones
habilitadas para el mantenimiento y reparacin de las maquinarias. Los materiales
desechados, as como los restos de paredes y pisos sern dispuestos adecuadamente
en el DME. Todos los suelos contaminados por aceite, petrleo y grasas deben ser
removidos hasta una profundidad de 10 cm. por debajo del nivel inferior de
contaminacin y trasladarlo cuidadosamente a los lugares ms bajos del DME.
Posteriormente, nivelar el rea para integrarla al paisaje circundante. Finalmente,
colocar una capa de suelo orgnico y revegetar el rea, utilizando especies de la
zona.
En el Depsito de Material Excedente
57
Declaracin de Impacto Ambiental
al
el
el
la
Este Presupuesto contiene las inversiones que ser necesario realizar para el
cumplimiento en la aplicacin de las medidas contenidas en el Plan de Manejo
Socio-ambiental.
El costo del Plan de Manejo Socio-ambiental se presentara en los Gastos Generales,
que forma parte del Expediente Tcnico del Estudio Definitivo de Ingeniera para la
Construccin del Intercambio Vial.
Presupuesto de inversin necesaria par ala Implementacin de cada uno de los
programas del Plan de Manejo Socio Ambiental.
Cuadro N19
Presupuesto
Programas de Prevencin y/o Mitigacion.
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE PREVENCION Y/O MINERIA
PROGRAMA DE SEGUIMIENTO Y/O VIGILANCIA
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE ABANDONO
TOTAL S/.
7.4.7
11,469.31
13,763.18
9,175.45
19,115.52
22,938.63
76,462.09
58
Declaracin de Impacto Ambiental
59
Declaracin de Impacto Ambiental
IX PANEL FOTOGRFICO
60
Declaracin de Impacto Ambiental
61
Declaracin de Impacto Ambiental
X PLANOS
62
Declaracin de Impacto Ambiental
METRADOS
RESUMEN DE METRADOS
MUROS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
03
03.01
03.02
03.03
03.04
03.05
03.08
04
04.01
04.02
04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.03
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
05.03.07
05.03.08
05.03.09
05.03.10
05.04
05.04.01
05.04.02
06
06.01
06.01.01
06.01.02
Descripcin
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
NIVELACION, TRAZO Y REPLANTEO
LIMPIEZA AL INICIO DE OBRA
CARTEL DE IDENTIFICACION DE OBRA DE 4.80 X 2.40 M
SEGURIDAD GUARDIANIA Y MANTENIMIENTO DEL TRANSITO
CERCO PROVISIONAL
OBRAS PROVISIONALES
CONSTRUCCION DE ALMACENES Y OFICINAS EN OBRA
DEMOLICIONES Y REMOCIONES
DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO
DEMOLICION DE MURO DE CONCRETO ARMADO
DEMOLICION DE VEREDAS Y SARDINELES
DEMOLICION DE PAVIMENTO EXISTENTE
DEMOLICION DE MURO PERIMETRICO
ELIMINACION DE MATERIAL PROCEDENTE DE DEMOLICIONES
MOVIMIENTO DE TIERAS Y EXPLANACIONES
EXCAVACION DE MATERIAL SUELTO C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE
MUROS
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO F'C=9.81 MPa (100 KG/CM2) e=10 cm PARA SOLADOS
CONCRETO F'C=17.16 MPa (175 KG/CM2) + 30 % P.M. PARAPETO SOBRE GAVION
CONCRETO F'C=9.81 MPa (100 KG/CM2) + 30 % P.G. ZAPATA ESCALONADA
ENCOFRADO Y DESENCOFRADO CARAVISTA PARAPETO SOBRE GAVION
CONCRETO ARMADO
CONCRETO F'C=20.59 MPa (210 KG/CM2) ZAPATAS
ENCOFRADO Y DESENCOFRADO NORMAL ZAPATAS
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) ZAPATAS
CONCRETO F'C=20.59 MPa (210 KG/CM2) MUROS
ENCOFRADO Y DESENCOFRADO CARAVISTA MUROS
ENCOFRADO Y DESENCOFRADO NORMAL MUROS
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) MUROS
CONCRETO F'C=20.59 MPa (210 KG/CM2) CANAL
ENCOFRADO Y DESENCOFRADO NORMAL CANAL
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) CANAL
GAVIONES
GAVION TIPO "A" 1.00X0.65X0.65 M
GAVION TIPO "B" 1.00X1.06X0.74 M
VARIOS
JUNTAS
JUNTA CON PLANCHA DE POLIESTIRENO EXPANDIDO E=1"
JUNTA CON WATER STOP 6"
UND
Metrado
GLB
M2
M2
UND
MES
M
1.00
7,899.47
10,731.45
1.00
6.00
1,582.00
M2
175.00
M3
M3
M2
M2
M2
M3
111.66
1,344.60
819.90
4,491.00
135.60
3,034.95
M3
M3
M3
30,385.02
3,918.67
33,082.94
M3
M3
M3
17,415.36
12,315.68
6,374.60
M3
M3
M3
M2
423.17
37.20
90.68
124.60
M3
M2
KG
M3
M2
M2
KG
M3
M2
KG
2,547.63
216.72
114,358.39
2,638.13
8,288.61
6,139.03
209,112.39
44.78
259.25
1,384.58
UND
UND
785.00
157.00
M
M
119.82
996.64
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
01
TRABAJOS PRELIMINARES
01.01
1.00
1.00
1.00
1.00
01.02
1.00
1.00
207.88
38.00
7,899.47
M2
01.03
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
178.59
330.89
351.36
200.12
14.55
5.05
7.00
20.00
2,598.51
1,671.00
2,459.50
4,002.44
10,731.45
M2
M2
M2
M2
M2
01.04
1.00
1.00
1.00
1.00
01.05
01.06
CERCO PROVISIONAL
1.00
1.00
1,582.00
1.00
1.00
1.00
175.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
13.70
11.65
11.00
50.00
1.25
1.00
10.98
3.50
0.25
0.20
0.20
0.40
12.84
4.66
24.16
70.00
111.66
1.00
1.00
747.00
6.00
0.30
1,344.60
1,344.60
VEREDAS
1.00
1.00
613.68
1.25
767.10
SARDINELES
1.00
1.00
88.00
0.60
52.80
819.90
1.00
1.00
1,247.50
3.60
4,491.00
4,491.00
1.00
1.00
56.50
2.40
135.60
135.60
1.00
1.00
1.00
1.00
1.00
1.30
1.30
1.30
1.30
1.30
02
OBRAS PROVISIONALES
02.01
03
DEMOLICIONES Y REMOCIONES
03.01
03.02
03.03
03.04
03.05
PAVIMENTO
DEMOLICION MURO
03.08
1.00 UND
6.00 MES
1.00 GLB
819.90
4,491.00
135.60
ESPESOR
0.20
0.15
0.30
VOL
111.66
1,344.60
163.98
673.65
40.68
145.16
1,747.98
213.17
875.75
52.88
1,582.00 M
175.00 M2
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
04
04.01
04.02
04.03
EXCAVACION
RELLENO
ELIMINACION
05
MUROS
05.01
05.01.01
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
3,034.95
1.00
1.00
1.00
30,385.02
1.00
30,385.02
30,385.02
1.00
1.00
1.00
3,918.67
1.00
3,918.67
3,918.67
1.00
1.25
1.00
30,385.02
3,918.67
33,082.94
33,082.94
EXCAVACION
M1 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
4.80
4.80
0.52
6.57
0.52
379.27
1.28
M2 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
4.80
4.80
0.52
6.57
0.52
379.27
1.28
M3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
4.45
4.45
0.51
6.49
0.51
347.04
1.16
M4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
4.10
4.10
0.66
6.15
0.88
303.15
2.38
M5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.80
3.80
0.78
5.88
0.88
268.52
2.58
M6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.78
5.50
0.88
221.74
2.28
M7 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.86
5.03
0.88
193.48
2.41
M8 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.78
4.59
0.88
162.82
2.01
M9 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.60
2.60
0.78
4.13
0.88
129.03
1.77
M10 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.30
2.30
0.78
3.81
0.88
105.46
1.56
M11 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.85
1.85
1.14
3.15
0.88
35.07
1.84
M12 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.75
1.75
0.50
2.73
0.50
28.74
0.44
M13 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.55
1.55
0.45
2.52
0.45
23.56
0.32
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
1.40
2.79
0.56
0.75
M14 (N-E)
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
1.00
1.00
6.03
1.40
M15 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
0.75
0.75
0.70
1.11
0.94
5.01
0.50
M16 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
0.75
0.75
0.36
1.00
0.36
4.53
0.10
M17 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
0.75
0.75
0.36
0.93
0.36
4.18
0.10
M18 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
0.75
0.75
0.32
0.87
0.32
3.92
0.08
M19 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
0.75
0.75
0.29
0.85
0.29
3.86
0.06
M20 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
4.40
0.75
0.75
0.25
0.83
0.25
2.74
0.05
M1 (N-O)
1.00
1.00
12.03
4.45
6.14
328.52
M2 (N-O)
1.00
1.00
12.03
4.10
5.93
292.39
M3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.54
5.24
0.54
211.04
0.98
M4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
2.60
2.60
0.74
4.02
0.98
62.90
1.89
M5 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
2.25
2.25
0.55
3.31
0.55
44.89
0.68
M6 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.75
1.75
0.60
2.54
0.60
26.75
0.63
M7 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.75
1.20
0.58
1.63
0.58
11.75
0.58
M8 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.75
0.75
0.58
0.75
0.58
3.37
0.58
M9 (N-O)
1.00
1.00
6.03
0.75
0.69
3.13
M10 (N-O)
1.00
1.00
7.32
0.75
0.63
3.45
MUE - 1.1
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
5.00
5.00
0.61
7.39
0.61
444.20
1.84
MUE - 2
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
5.00
5.00
0.53
7.74
0.71
465.13
1.87
1.00
1.00
1.00
1.00
1.00
1.00
12.03
3.20
2.95
5.00
1.13
0.85
5.06
1.70
1.13
304.09
6.16
2.84
MD-3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.75
2.75
0.93
2.37
1.24
78.43
3.16
Descripcin
Total
(m3)
23.56
0.59
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MD-4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.95
1.95
0.65
2.72
0.65
31.93
0.82
MD-5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.60
1.60
0.60
1.96
0.80
18.94
0.77
MD-6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.75
2.75
0.42
2.03
0.42
66.98
0.49
MD-7 (N-E)
1.00
1.00
8.10
0.75
2.53
15.39
MT - 1 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.75
2.75
0.42
2.11
0.42
69.87
0.49
MT - 2 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.75
2.75
0.42
2.41
0.42
79.73
0.49
MT - 3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.75
2.75
0.42
2.72
0.42
90.07
0.49
MT - 4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.42
3.46
0.42
122.78
0.51
MT - 5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.42
3.87
0.42
137.33
0.52
MT - 6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.43
4.26
0.43
151.03
0.53
MT - 7 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.42
4.55
0.42
161.26
0.52
MT - 8 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.37
4.72
0.37
175.81
0.43
MT - 9 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.74
0.42
176.77
0.55
MT - 10 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.74
0.42
176.65
0.55
MT - 11 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.77
0.42
177.97
0.55
MT - 12 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.83
0.42
179.89
0.55
MT - 13 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.87
0.42
181.58
0.55
MT - 14 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.92
0.42
183.38
0.55
MT - 15 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.42
4.98
0.42
191.80
0.57
MT - 16 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.42
5.04
0.42
193.84
0.57
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
3.20
5.04
0.42
0.42
MT - 17 (N-E)
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
1.00
1.00
l
12.03
3.20
MT - 18 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.32
5.04
0.32
194.08
0.34
MT - 19 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.25
5.10
0.25
196.13
0.20
MT -20 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.25
5.03
0.25
193.60
0.20
MT -21 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.25
5.16
0.25
198.41
0.20
MT -22 (N-E)
1.00
1.00
10.33
3.20
4.99
164.99
MUO -1
1.00
1.00
12.03
6.00
7.77
560.24
MUO -2
1.00
1.00
12.03
6.00
7.30
526.33
MUO -3
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
6.00
6.00
0.28
6.55
0.28
472.82
0.46
MUO -4
ZAPATA ESCALONADA
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
1.00
1.00
12.03
6.00
6.00
6.00
0.46
0.42
5.81
0.46
0.42
419.19
1.26
1.06
MD -1 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.37
4.88
0.37
182.06
0.43
MD -2 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.25
2.25
0.74
3.14
0.98
85.02
1.62
MD -3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.42
4.73
0.42
167.75
0.52
MD -4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.03
1.30
1.30
0.74
1.94
0.98
15.18
0.94
MB -1 (N-O)
1.00
1.00
6.03
0.75
0.81
3.68
MT -1 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
2.95
2.95
0.47
4.72
0.47
167.39
0.65
MB -2 (N-O)
1.00
1.00
6.03
0.75
0.59
2.65
MB -3 (N-O)
1.00
1.00
6.03
0.75
0.59
2.65
MT -2 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.10
3.10
0.42
4.86
0.42
181.22
0.55
MT -3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.42
5.06
0.42
194.56
0.57
MT -4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.94
5.25
1.00
201.90
3.02
Descripcin
Total
(m3)
193.84
0.57
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT -5 (N-O)
1.00
1.00
12.03
3.20
6.22
239.30
MT -6 (N-O)
ZAPATA ESCALONADA
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
1.00
1.00
12.03
3.20
3.20
3.20
0.28
0.42
5.27
0.28
0.42
202.62
0.25
0.57
MT -7 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.20
3.20
0.42
5.03
0.42
193.72
0.57
MT -8 (N-O)
1.00
1.00
12.03
3.20
4.62
177.73
MT -9 (N-O)
1.00
1.00
6.05
2.90
4.38
76.84
MT -1 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.90
3.90
0.42
2.90
0.42
135.88
0.69
MT -2 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.90
3.90
0.42
2.78
0.42
130.23
0.69
MT -3 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.70
3.70
0.42
2.87
0.42
127.83
0.66
MT -4 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.55
3.55
0.42
2.85
0.42
121.45
0.63
MT -5 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.75
0.42
110.75
0.59
MT -6 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.73
0.42
109.91
0.59
MT -7 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -8 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -9 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -10 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.64
2.72
0.70
109.67
1.49
MT -11 (S-O)
1.00
1.00
12.03
3.35
3.13
126.26
MT -12 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -13 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -14 (S-O)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.28
2.72
0.28
109.67
0.27
MT -15 (S-O)
1.00
1.00
8.28
3.35
2.64
73.36
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
3.35
2.75
Cant de
Elemen
1.00
1.00
l
12.03
MT -2 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -3 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -4 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -5 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -6 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -7 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -8 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -9 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -10 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -11 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -12 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -13 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -14 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -15 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -16 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -17 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -18 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -19 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -20 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.72
0.42
109.67
0.59
MT -21 (S-E)
1.00
1.00
12.03
3.35
2.72
109.67
Descripcin
MT -1 (S-E)
Total
(m3)
110.87
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
0.42
0.42
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
3.35
MT -22 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.42
2.69
0.42
108.47
0.59
MT -23 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.37
2.63
0.37
105.82
0.46
MT -24 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.25
2.63
0.25
105.82
0.21
MT -25 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.25
2.63
0.25
105.82
0.21
MT -26 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
12.03
3.35
3.35
0.25
2.63
0.25
105.82
0.21
MT -27 (S-E)
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
9.48
3.35
3.35
0.25
2.63
0.25
83.38
0.21
Descripcin
Total
(m3)
0.59
17,415.36
05.01.02
M1 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
4.80
12.03
12.03
4.80
4.80
0.52
7.00
4.80
0.52
6.57
0.52
0.25
1.59
0.52
379.27
1.28
21.16
(91.76)
(1.28)
M2 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
4.80
12.03
12.03
4.80
4.80
0.52
7.00
4.80
0.52
6.57
0.52
0.25
1.59
0.52
379.27
1.28
21.16
(91.76)
(1.28)
M3 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
4.45
12.03
12.03
4.45
4.45
0.51
5.68
4.45
0.51
6.49
0.51
0.29
1.59
0.51
347.04
1.16
19.48
(84.90)
(1.16)
M4 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
4.10
12.03
12.03
4.10
4.10
0.66
4.75
4.10
0.66
6.15
0.88
0.27
1.51
0.88
303.15
2.38
15.15
(74.45)
(2.38)
M5 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
3.80
12.03
12.03
3.80
3.80
0.78
4.75
3.80
0.78
5.88
0.88
0.21
1.42
0.88
268.52
2.58
12.27
(64.72)
(2.58)
M6 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
3.35
12.03
12.03
3.35
3.35
0.78
4.75
3.35
0.78
5.50
0.88
0.17
1.35
0.88
221.74
2.28
9.62
(54.45)
(2.28)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
3.20
5.03
0.86
0.88
4.75
0.13
3.20
1.18
0.86
0.88
M7 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
l
12.03
3.20
12.03
12.03
3.20
M8 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
2.95
12.03
12.03
2.95
2.95
0.78
3.20
2.95
0.78
4.59
0.88
0.14
1.07
0.88
162.82
2.01
5.32
(38.12)
(2.01)
M9 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
2.60
12.03
12.03
2.60
2.60
0.78
2.20
2.60
0.78
4.13
0.88
0.14
0.99
0.88
129.03
1.77
3.73
(30.90)
(1.77)
M10 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
12.03
2.30
12.03
12.03
2.30
2.30
0.78
1.68
2.30
0.78
3.81
0.88
0.11
0.82
0.88
105.46
1.56
2.31
(22.64)
(1.56)
M11 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.85
6.03
6.03
1.85
1.85
1.14
1.40
1.85
1.14
3.15
0.88
0.09
0.68
0.88
35.07
1.84
0.73
(7.54)
(1.84)
M12 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.75
6.03
6.03
1.75
1.75
0.50
1.10
1.75
0.50
2.73
0.50
0.08
0.62
0.50
28.74
0.44
0.52
(6.51)
(0.44)
M13 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.55
6.03
6.03
1.55
1.55
0.45
0.85
1.55
0.45
2.52
0.45
0.05
0.58
0.45
23.56
0.32
0.24
(5.42)
(0.32)
M14 (N-E)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.40
6.03
6.03
1.40
1.40
0.56
0.85
1.40
0.94
2.79
0.75
0.04
0.53
0.45
23.56
0.59
0.19
(4.47)
(0.59)
M1 (N-O)
TALUD
MURO Y ZAPATA
1.00
1.00
(1.00)
1.00
1.00
1.00
12.03
12.03
12.03
4.45
5.00
4.45
6.14
0.33
1.57
328.52
19.96
(83.81)
M2 (N-O)
TALUD
MURO Y ZAPATA
1.00
1.00
(1.00)
1.00
1.00
1.00
12.03
12.03
12.03
4.10
4.80
4.10
5.93
0.29
1.49
292.39
16.47
(73.35)
M3 (N-O)
ZAPATA ESCALONADA
TALUD
1.00
1.00
1.00
1.00
1.00
1.00
12.03
3.35
12.03
3.35
0.54
4.80
5.24
0.54
0.15
211.04
0.98
8.78
Descripcin
Total
(m3)
193.48
2.41
7.34
(45.36)
(2.41)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Cant de
Elemen
(1.00)
(1.00)
M4 (N-O)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
Descripcin
Concreto y otros
Medidas
a
h
3.35
1.27
0.54
0.54
Total
(m3)
(51.11)
(0.98)
1.00
1.00
l
12.03
3.35
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
2.60
6.03
6.03
2.60
2.60
0.74
2.20
2.60
0.74
4.02
0.98
0.15
0.97
0.98
62.90
1.89
1.99
(15.18)
(1.89)
M5 (N-O)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
2.25
6.03
6.03
2.25
2.25
0.55
1.40
2.25
0.55
3.31
0.55
0.12
0.73
0.55
44.89
0.68
0.98
(9.88)
(0.68)
M6 (N-O)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.75
6.03
6.03
1.75
1.75
0.60
1.40
1.75
0.67
2.54
0.60
0.05
0.56
0.54
26.75
0.63
0.38
(5.87)
(0.63)
M7 (N-O)
ZAPATA ESCALONADA
TALUD
MURO Y ZAPATA
ZAPATA ESCALONADA
1.00
1.00
1.00
(1.00)
(1.00)
1.00
1.00
1.00
1.00
1.00
6.03
1.75
6.03
6.03
1.75
1.20
0.58
1.40
1.75
0.58
1.63
0.58
0.01
0.37
0.58
11.75
0.58
0.12
(3.87)
(0.58)
MUE - 1.1
1.00
1.00
12.03
5.00
5.41
325.52
MUE - 2
1.00
1.00
12.03
5.00
5.92
355.70
MD - 1 Y MD - 2 (N-E)
1.00
1.00
12.03
5.00
3.72
223.44
MD-3 (N-E)
1.00
1.00
12.03
2.75
1.62
53.66
MD-4 (N-E)
1.00
1.00
6.03
1.95
2.02
23.74
MD-5 (N-E)
1.00
1.00
6.03
1.60
1.36
13.13
MD-6 (N-E)
1.00
1.00
12.03
2.75
1.34
44.25
MT - 1 (N-E)
1.00
1.00
12.03
2.75
1.41
46.66
MT - 2 (N-E)
1.00
1.00
12.03
2.75
1.66
54.74
MT - 3 (N-E)
1.00
1.00
12.03
2.75
1.92
63.37
MT - 4 (N-E)
1.00
1.00
12.03
2.75
2.60
85.98
MT - 5 (N-E)
1.00
1.00
12.03
2.75
2.99
98.85
MT - 6 (N-E)
1.00
1.00
12.03
2.75
3.35
110.87
MT - 7 (N-E)
1.00
1.00
12.03
2.75
3.61
119.53
MT - 8 (N-E)
1.00
1.00
12.03
2.75
3.95
130.47
MT - 9 (N-E)
1.00
1.00
12.03
2.75
3.97
131.31
MT - 10 (N-E)
1.00
1.00
12.03
2.75
3.97
131.19
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT - 11 (N-E)
1.00
1.00
12.03
2.75
4.00
132.40
MT - 12 (N-E)
1.00
1.00
12.03
2.75
4.07
134.44
MT - 13 (N-E)
1.00
1.00
12.03
2.75
4.10
135.64
MT - 14 (N-E)
1.00
1.00
12.03
2.75
4.15
137.33
MT - 15 (N-E)
1.00
1.00
12.03
3.20
3.73
143.34
MT - 16 (N-E)
1.00
1.00
12.03
3.20
3.76
144.66
MT - 17 (N-E)
1.00
1.00
12.03
3.20
3.75
144.30
MT - 18 (N-E)
1.00
1.00
12.03
3.20
3.75
144.30
MT - 19 (N-E)
1.00
1.00
12.03
3.20
3.80
146.10
MT - 20 (N-E)
1.00
1.00
12.03
3.20
3.83
147.31
MT - 21 (N-E)
1.00
1.00
12.03
3.20
3.85
148.15
MT - 22 (N-E)
1.00
1.00
10.33
3.20
3.80
125.45
MUO -1
1.00
1.00
12.03
6.00
5.91
426.29
MUO -2
1.00
1.00
12.03
6.00
5.55
400.07
MUO -3
1.00
1.00
12.03
6.00
5.00
360.99
MUO -4
1.00
1.00
12.03
6.00
4.53
326.96
MD -1 (N-O)
1.00
1.00
12.03
3.10
3.66
136.60
MD -2 (N-O)
1.00
1.00
12.03
2.25
2.32
62.77
MD -3 (N-O)
1.00
1.00
12.03
2.25
4.65
125.78
MD -4 (N-O)
1.00
1.00
6.03
1.30
1.30
10.18
MT-1 (N-O)
1.00
1.00
12.03
2.95
3.54
125.42
MT-2 (N-O)
1.00
1.00
12.03
3.10
3.64
135.64
MT-3 (N-O)
1.00
1.00
12.03
3.20
3.79
145.86
MT-4 (N-O)
1.00
1.00
12.03
3.20
3.96
152.26
MT-5 (N-O)
1.00
1.00
12.03
3.20
4.83
185.79
MT-6 (N-O)
1.00
1.00
12.03
3.20
3.98
152.96
MT-7 (N-O)
1.00
1.00
12.03
3.20
3.78
145.27
MT-8 (N-O)
1.00
1.00
12.03
3.20
3.45
132.88
MT -9 (N-O)
1.00
1.00
6.05
2.90
3.31
58.14
MT -1 (S-O)
1.00
1.00
12.03
3.90
1.67
78.16
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT -2 (S-O)
1.00
1.00
12.03
3.90
1.65
77.44
MT -3 (S-O)
1.00
1.00
12.03
3.70
1.64
72.87
MT -4 (S-O)
1.00
1.00
12.03
3.55
1.61
68.90
MT -5 (S-O)
1.00
1.00
12.03
3.35
1.57
63.37
MT -6 (S-O)
1.00
1.00
12.03
3.35
1.56
62.77
MT -7 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -8 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -9 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -10 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -11 (S-O)
1.00
1.00
12.03
3.35
1.94
78.16
MT -12 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -13 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -14 (S-O)
1.00
1.00
12.03
3.35
1.56
62.65
MT -15 (S-O)
1.00
1.00
8.28
3.35
1.49
41.23
MT -1 (S-E)
1.00
1.00
12.03
3.35
1.57
63.37
MT -2 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -3 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -4 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -5 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -6 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -7 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -8 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -9 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -10 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -11 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -12 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -13 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -14 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -15 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -16 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT -17 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -18 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -19 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -20 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -21 (S-E)
1.00
1.00
12.03
3.35
1.56
62.65
MT -22 (S-E)
1.00
1.00
12.03
3.35
1.53
61.57
MT -23 (S-E)
1.00
1.00
12.03
3.35
1.47
59.16
MT -24 (S-E)
1.00
1.00
12.03
3.35
1.47
59.16
MT -25 (S-E)
1.00
1.00
12.03
3.35
1.47
59.16
MT -26 (S-E)
1.00
1.00
12.03
3.35
1.47
59.16
MT -27 (S-E)
1.00
1.00
12.03
3.35
1.47
59.16
12,315.68
EXCAVACION
05.01.03
05.02
05.02.01
CONCRETO SIMPLE
CONCRETO F'C=9.81 MPa (100 KG/CM2) e=10 cm PARA SOLADOS
1.00
1.25
RELLENO
17,415.36
12,315.68
6,374.60
6,374.60
M1 (N-E)
M2 (N-E)
M3 (N-E)
M4 (N-E)
M5 (N-E)
M6 (N-E)
M7 (N-E)
M8 (N-E)
M9 (N-E)
M10 (N-E)
M11 (N-E)
M12 (N-E)
M13 (N-E)
M14 (N-E)
M15 (N-E)
M16 (N-E)
M17 (N-E)
M18 (N-E)
M19 (N-E)
M20 (N-E)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
6.03
6.03
6.03
6.03
6.03
6.03
6.03
6.03
6.03
4.40
4.80
4.80
4.45
4.10
3.80
3.35
3.20
2.95
2.60
2.30
1.85
1.75
1.55
1.40
0.75
0.75
0.75
0.75
0.75
0.75
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
5.77
5.77
5.35
4.93
4.57
4.03
3.85
3.55
3.13
2.77
1.11
1.05
0.93
0.84
0.45
0.45
0.45
0.45
0.45
0.33
M1 (N-O)
M2 (N-O)
M3 (N-O)
M4 (N-O)
M5 (N-O)
M6 (N-O)
M7 (N-O)
M8 (N-O)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
6.03
6.03
6.03
6.03
6.03
4.45
4.10
3.35
2.60
2.25
1.75
1.20
0.75
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
5.35
4.93
4.03
1.57
1.36
1.05
0.72
0.45
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
0.75
0.10
0.75
0.10
Cant de
Elemen
1.00
1.00
1.00
1.00
6.03
7.32
MUE - 1.1
MUE - 2
MD-1 (N-E) Y MD-2 (N-E)
MD-3 (N-E)
MD-4 (N-E)
MD-5 (N-E)
MD-6 (N-E)
MD-7 (N-E)
MT - 1 (N-E)
MT - 2 (N-E)
MT - 3 (N-E)
MT - 4 (N-E)
MT - 5 (N-E)
MT - 6 (N-E)
MT - 7 (N-E)
MT - 8 (N-E)
MT - 9 (N-E)
MT - 10 (N-E)
MT - 11 (N-E)
MT - 12 (N-E)
MT - 13 (N-E)
MT - 14 (N-E)
MT - 15 (N-E)
MT - 16 (N-E)
MT - 17 (N-E)
MT - 18 (N-E)
MT - 19 (N-E)
MT - 20 (N-E)
MT - 21 (N-E)
MT - 22 (N-E)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
12.03
6.03
6.03
12.03
8.10
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
10.33
5.02
5.97
6.15
2.75
1.95
1.60
2.75
0.75
2.75
2.75
2.75
2.95
2.95
2.95
2.95
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
6.04
7.18
7.40
3.31
1.17
0.96
3.31
0.61
3.31
3.31
3.31
3.55
3.55
3.55
3.55
3.73
3.73
3.73
3.73
3.73
3.73
3.73
3.85
3.85
3.85
3.85
3.85
3.85
3.85
3.30
MUO -1
MUO -2
MUO -3
MUO -4
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
12.03
6.00
6.00
6.00
6.00
0.10
0.10
0.10
0.10
7.22
7.22
7.22
7.22
MD -1 (N-O)
MD -2 (N-O)
MD -3 (N-O)
MD -4 (N-O)
MB -1 (N-O)
MT -1 (N-O)
MB -2 (N-O)
MB -3 (N-O)
MT -2 (N-O)
MT -3 (N-O)
MT -4 (N-O)
MT -5 (N-O)
MT -6 (N-O)
MT -7 (N-O)
MT -8 (N-O)
MT -9 (N-O)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
6.03
6.03
12.03
6.03
6.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
6.05
3.10
2.25
2.95
1.30
0.75
2.95
0.75
0.75
3.10
3.20
3.20
3.20
3.20
3.20
3.10
2.90
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
3.73
2.71
3.55
0.78
0.45
3.55
0.45
0.45
3.73
3.85
3.85
3.85
3.85
3.85
3.73
1.75
MT -1 (S-O)
MT -2 (S-O)
MT -3 (S-O)
MT -4 (S-O)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
12.03
3.90
3.90
3.70
3.55
0.10
0.10
0.10
0.10
4.69
4.69
4.45
4.27
Descripcin
M9 (N-O)
M10 (N-O)
Total
(m3)
0.45
0.55
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
l
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
8.28
MT -1 (S-E)
MT -2 (S-E)
MT -3 (S-E)
MT -4 (S-E)
MT -5 (S-E)
MT -6 (S-E)
MT -7 (S-E)
MT -8 (S-E)
MT -9 (S-E)
MT -10 (S-E)
MT -11 (S-E)
MT -12 (S-E)
MT -13 (S-E)
MT -14 (S-E)
MT -15 (S-E)
MT -16 (S-E)
MT -17 (S-E)
MT -18 (S-E)
MT -19 (S-E)
MT -20 (S-E)
MT -21 (S-E)
MT -22 (S-E)
MT -23 (S-E)
MT -24 (S-E)
MT -25 (S-E)
MT -26 (S-E)
MT -27 (S-E)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
12.03
9.48
Descripcin
Concreto y otros
Medidas
a
h
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
0.10
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
Total
(m3)
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
2.77
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
4.03
3.17
423.17
05.02.02
1.00
124.00
0.50
0.60
37.20
37.20
05.02.03
M1 (N-E)
ZAPATA ESCALONADA
1.00
1.00
4.80
0.52
0.52
1.28
M2 (N-E)
ZAPATA ESCALONADA
1.00
1.00
4.80
0.52
0.52
1.28
M3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
4.45
0.51
0.51
1.16
124.00
1.00
1.00
0.60
124.00
0.60
124.60
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
M4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
4.10
0.66
0.88
2.38
M5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.80
0.78
0.88
2.58
M6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.78
0.88
2.28
M7 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.86
0.88
2.41
M8 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.78
0.88
2.01
M9 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.60
0.78
0.88
1.77
M10 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.30
0.78
0.88
1.56
M11 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.85
1.14
0.88
1.84
M12 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.75
0.50
0.50
0.44
M13 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.55
0.45
0.45
0.32
M14 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.40
0.56
0.75
0.59
M15 (N-E)
ZAPATA ESCALONADA
1.00
1.00
0.75
0.70
0.94
0.50
M17 (N-E)
ZAPATA ESCALONADA
1.00
1.00
0.75
0.36
0.36
0.10
M18 (N-E)
ZAPATA ESCALONADA
1.00
1.00
0.75
0.32
0.32
0.08
M19 (N-E)
ZAPATA ESCALONADA
1.00
1.00
0.75
0.29
0.29
0.06
M20 (N-E)
ZAPATA ESCALONADA
1.00
1.00
0.75
0.25
0.25
0.05
M3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.54
0.54
0.98
M4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
2.60
0.74
0.98
1.89
M16 (N-E)
ZAPATA ESCALONADA
M5 (N-O)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
0.55
0.55
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
2.25
M6 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.75
0.60
0.60
0.63
M7 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.75
0.58
0.58
0.58
M8 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.75
0.58
0.58
0.58
MUE - 1.1
ZAPATA ESCALONADA
1.00
1.00
5.00
0.61
0.61
1.84
MUE - 2
ZAPATA ESCALONADA
1.00
1.00
5.00
0.53
0.71
1.87
1.00
1.00
1.00
1.00
3.20
2.95
1.13
0.85
1.70
1.13
6.16
2.84
MD-3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.75
0.93
1.24
3.16
MD-4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.95
0.65
0.65
0.82
MD-5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
1.60
0.60
0.80
0.77
MD-6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.75
0.42
0.42
0.49
MT - 1 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.75
0.42
0.42
0.49
MT - 2 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.75
0.42
0.42
0.49
MT - 3 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.75
0.42
0.42
0.49
MT - 4 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.42
0.42
0.51
MT - 5 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.42
0.42
0.52
MT - 6 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.43
0.43
0.53
MT - 7 (N-E)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.42
0.42
0.52
MT - 8 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.37
0.37
0.43
MT - 9 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
Descripcin
Total
(m3)
0.68
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT - 10 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
MT - 11 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
MT - 12 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
MT - 13 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
MT - 14 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
MT - 15 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.42
0.42
0.57
MT - 16 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.42
0.42
0.57
MT - 17 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.42
0.42
0.57
MT - 18 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.32
0.32
0.34
MT - 19 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.25
0.25
0.20
MT -20 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.25
0.25
0.20
MT -21 (N-E)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.25
0.25
0.20
MUO -3
ZAPATA ESCALONADA
1.00
1.00
6.00
0.28
0.28
0.46
MUO -4
ZAPATA ESCALONADA
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
6.00
6.00
0.46
0.42
0.46
0.42
1.26
1.06
MD -1 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.37
0.37
0.43
MD -2 (N-O)
ZAPATA ESCALONADA
1.00
1.00
2.25
0.74
0.98
1.62
MD -3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.42
0.42
0.52
MD -4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
1.30
0.74
0.98
0.94
MT -1 (N-O)
ZAPATA ESCALONADA
1.00
1.00
2.95
0.47
0.47
0.65
MT -2 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.10
0.42
0.42
0.55
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
MT -3 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.42
0.42
0.57
MT -4 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.94
1.00
3.02
MT -6 (N-O)
ZAPATA ESCALONADA
ZAPATA ESCALONADA
1.00
1.00
1.00
1.00
3.20
3.20
0.28
0.42
0.28
0.42
0.25
0.57
MT -7 (N-O)
ZAPATA ESCALONADA
1.00
1.00
3.20
0.42
0.42
0.57
MT -1 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.90
0.42
0.42
0.69
MT -2 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.90
0.42
0.42
0.69
MT -3 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.70
0.42
0.42
0.66
MT -4 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.55
0.42
0.42
0.63
MT -5 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -6 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -7 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -8 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -9 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -10 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.64
0.70
1.49
MT -12 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -13 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -14 (S-O)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.28
0.28
0.27
MT -2 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -3 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -4 (S-E)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
0.42
0.42
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
3.35
MT -5 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -6 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -7 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -8 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -9 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -10 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -11 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -12 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -13 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -14 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -15 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -16 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -17 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -18 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -19 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -20 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -21 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -22 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.42
0.42
0.59
MT -23 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.37
0.37
0.46
Descripcin
MT -24 (S-E)
Total
(m3)
0.59
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
0.25
0.25
ZAPATA ESCALONADA
Cant de
Elemen
1.00
1.00
3.35
MT -25 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.25
0.25
0.21
MT -26 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.25
0.25
0.21
MT -27 (S-E)
ZAPATA ESCALONADA
1.00
1.00
3.35
0.25
0.25
0.21
90.68
Descripcin
05.03
CONCRETO ARMADO
05.03.01
M2 (N-E)
M3 (N-E)
M4 (N-E)
M5 (N-E)
M6 (N-E)
M7 (N-E)
M8 (N-E)
M9 (N-E)
Total
(m3)
0.21
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
4.80
4.80
4.45
4.10
3.80
3.35
3.20
2.95
2.60
0.80
0.80
0.80
0.75
0.70
0.65
0.55
0.55
0.45
46.08
46.08
42.72
36.90
31.92
26.13
21.12
19.47
14.04
4.80
4.80
4.45
4.10
3.80
3.35
3.20
2.95
2.60
0.80
0.80
0.80
0.75
0.70
0.65
0.55
0.55
0.45
3.84 1"
5/8"
1"
5/8"
69.00
14.00
49.00
20.00
3.80
13.00
5.00
13.00
262.20
182.00
245.00
260.00
1,059.29
3.84 1"
5/8"
1"
5/8"
69.00
14.00
49.00
20.00
3.80
13.00
5.00
13.00
262.20
182.00
245.00
260.00
3.56 1"
5/8"
1"
5/8"
61.00
13.00
41.00
18.00
3.70
13.00
4.65
13.00
225.70
169.00
190.65
234.00
3.08 1"
5/8"
1"
5/8"
61.00
12.00
49.00
17.00
3.50
13.00
4.30
13.00
213.50
156.00
210.70
221.00
2.66 1"
1/2"
5/8"
1/2"
61.00
15.00
49.00
20.00
3.45
13.00
4.00
13.00
210.45
195.00
196.00
260.00
2.18 3/4"
1/2"
1/2"
1/2"
81.00
13.00
61.00
17.00
2.70
13.00
3.55
13.00
218.70
169.00
216.55
221.00
172.38
220.88
225.42
1.76 1"
1/2"
1/2"
1/2"
41.00
10.00
61.00
13.00
3.20
13.00
3.40
13.00
131.20
130.00
207.40
169.00
132.60
211.55
172.38
1.62 3/4"
1/2"
1/2"
1/2"
61.00
9.00
49.00
12.00
2.45
13.00
3.15
13.00
149.45
117.00
154.35
156.00
119.34
157.44
159.12
1.17 5/8"
1/2"
1/2"
1/2"
81.00
7.00
41.00
9.00
2.15
13.00
2.80
13.00
174.15
91.00
114.80
117.00
92.82
117.10
119.34
291.20
989.80
416.00
1,059.29
291.20
989.80
416.00
911.83
270.40
770.23
374.40
862.54
249.60
851.23
353.60
850.22
198.90
313.60
265.20
503.01
530.05
343.74
278.64
Descripcin
M10 (N-E)
M11 (N-E)
Cant de
Elemen
1.00
1.00
%
1.00
1.00
l
12.00
6.00
Concreto y otros
Medidas
a
h
2.30
0.45
1.85
0.35
Total
(m3)
12.42
3.89
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
2.30
0.45
1.04 5/8"
1/2"
1/2"
1/2"
1.85
0.35
Fierro
N de
Long
Piezas
P/Pz
81.00
2.05
7.00
13.00
41.00
2.50
8.00
13.00
Long
Total
166.05
91.00
102.50
104.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
0.65 5/8"
1/2"
1/2"
1/2"
25.00
5.00
21.00
7.00
1.85
7.00
2.05
7.00
46.25
35.00
43.05
49.00
35.70
43.91
49.98
1.00
6.00
1.75
0.30
3.15
1.75
0.30
0.53 1/2"
1/2"
1/2"
1/2"
31.00
5.00
21.00
6.00
1.60
7.00
1.95
7.00
49.60
35.00
40.95
42.00
50.59
35.70
41.77
42.84
M13 (N-E)
1.00
1.00
6.00
1.55
0.30
2.79
1.55
0.30
0.47 1/2"
1/2"
1/2"
1/2"
25.00
4.00
21.00
6.00
1.55
7.00
1.75
7.00
38.75
28.00
36.75
42.00
39.53
28.56
37.49
42.84
M14 (N-E)
1.00
1.00
6.00
1.40
0.30
2.52
1.40
0.30
0.42 1/2"
1/2"
1/2"
1/2"
25.00
4.00
21.00
5.00
1.40
7.00
1.60
7.00
35.00
28.00
33.60
35.00
35.70
28.56
34.27
35.70
M1 (N-O)
1.00
1.00
12.00
4.45
0.80
42.72
4.45
0.80
3.56 1"
5/8"
1"
5/8"
61.00
13.00
41.00
18.00
3.70
13.00
4.65
13.00
225.70
169.00
190.65
234.00
3.08 1"
5/8"
3/4"
5/8"
61.00
12.00
49.00
17.00
3.50
13.00
4.30
13.00
213.50
156.00
210.70
221.00
2.01 1"
1/2"
1/2"
1/2"
41.00
13.00
61.00
17.00
3.20
13.00
3.55
13.00
131.20
169.00
216.55
221.00
172.38
220.88
225.42
1.17 5/8"
1/2"
1/2"
1/2"
41.00
7.00
21.00
9.00
2.15
7.00
2.80
7.00
88.15
49.00
58.80
63.00
49.98
59.98
64.26
0.79 5/8"
1/2"
1/2"
1/2"
41.00
6.00
21.00
8.00
2.00
7.00
2.45
7.00
82.00
42.00
51.45
56.00
42.84
52.48
57.12
M3 (N-O)
M4 (N-O)
M5 (N-O)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
6.00
6.00
4.10
3.35
2.60
2.25
0.75
0.60
0.45
0.35
36.90
24.12
7.02
4.73
4.10
3.35
2.60
2.25
0.75
0.60
0.45
0.35
1"
1 3/8"
4.04
7.91
74.00
1.00
1.00
2.3
92.82
104.55
106.08
M12 (N-E)
M2 (N-O)
1.6
265.68
911.83
270.40
770.23
374.40
862.54
249.60
484.61
353.60
530.05
141.04
131.20
M6 (N-O)
1.00
1.00
6.00
1.75
0.30
3.15
1.75
0.30
0.53 1/2"
1/2"
1/2"
1/2"
31.00
5.00
21.00
6.00
1.60
7.00
1.95
7.00
49.60
35.00
40.95
42.00
50.59
35.70
41.77
42.84
M7 (N-O)
1.00
1.00
6.00
1.20
0.30
2.16
1.20
0.30
0.36 1/2"
1/2"
1/2"
1/2"
31.00
4.00
21.00
5.00
1.15
7.00
1.40
7.00
35.65
28.00
29.40
35.00
36.36
28.56
29.99
35.70
Descripcin
MUE - 1.1
MUE - 2
MD-1 (N-E)
MD-2 (N-E)
MD-3 (N-E)
MD-4 (N-E)
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
%
1.00
1.00
1.00
1.00
1.00
1.00
l
12.00
12.00
12.00
12.00
12.00
6.00
Concreto y otros
Medidas
a
h
5.02
0.80
5.97
3.20
2.95
2.75
1.95
0.70
0.55
0.50
0.40
0.35
Total
(m3)
48.19
50.15
21.12
17.70
13.20
4.10
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
5.02
0.80
4.02 1"
1/2"
1/2"
1/2"
5.97
3.20
2.95
2.75
1.95
0.70
0.55
0.50
0.40
0.35
Fierro
N de
Long
Piezas
P/Pz
81.00
6.02
21.00
13.00
49.00
6.02
21.00
13.00
Long
Total
487.62
273.00
294.98
273.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
4.18 3/4"
1/2"
1/2"
1/2"
161.00
24.00
49.00
24.00
6.97
13.00
6.97
13.00
1,122.17
312.00
341.53
312.00
318.24
348.36
318.24
1.76 1"
1/2"
1/2"
1/2"
41.00
13.00
61.00
13.00
3.20
13.00
3.40
13.00
131.20
169.00
207.40
169.00
172.38
211.55
172.38
1.48 3/4"
1/2"
1/2"
1/2"
61.00
7.00
49.00
12.00
2.00
13.00
3.15
13.00
122.00
91.00
154.35
156.00
92.82
157.44
159.12
1.10 1/2"
1/2"
3/4"
1/2"
81.00
6.00
49.00
10.00
1.70
13.00
2.75
13.00
137.70
78.00
134.75
130.00
0.68 5/8"
1/2"
1/2"
1/2"
25.00
4.00
21.00
7.00
1.35
7.00
2.15
7.00
33.75
28.00
45.15
49.00
28.56
46.05
49.98
280.60
140.45
79.56
309.93
132.60
54.00
1.60
0.30
2.88
1.60
0.30
0.48 1/2"
1/2"
1/2"
1/2"
21.00
4.00
21.00
6.00
1.20
7.00
1.80
7.00
25.20
28.00
37.80
42.00
25.70
28.56
38.56
42.84
MD-6 (N-E)
1.00
1.00
12.00
2.75
0.40
13.20
2.75
0.40
1.10 1/2"
1/2"
3/4"
1/2"
81.00
6.00
49.00
10.00
1.75
13.00
2.95
13.00
141.75
78.00
144.55
130.00
144.59
79.56
3.30 1/2"
1/2"
3/4"
1/2"
81.00
6.00
49.00
10.00
1.75
13.00
2.95
13.00
425.25
234.00
433.65
390.00
433.76
238.68
5.90 3/4"
1/2"
1/2"
1/2"
61.00
9.00
49.00
12.00
2.45
13.00
3.15
13.00
597.80
468.00
617.40
624.00
477.36
629.75
636.48
11.94 1"
1/2"
1/2"
1/2"
41.00
10.00
49.00
13.00
3.10
13.00
3.30
13.00
889.70
910.00
1,131.90
1,183.00
928.20
1,154.54
1,206.66
14.08 1"
1/2"
1/2"
1/2"
41.00
13.00
61.00
13.00
3.20
13.00
3.40
13.00
1,049.60
1,352.00
1,659.20
1,352.00
1,379.04
1,692.38
1,379.04
MT - 4 @ 7 (N-E)
MT - 8 @ 14 (N-E)
MT - 15 @ 22 (N-E)
4.00
7.00
8.00
1.00
1.00
1.00
12.00
12.00
12.00
2.75
2.95
3.10
3.20
0.40
0.50
0.55
0.55
39.60
70.80
143.22
168.96
2.75
2.95
3.10
3.20
0.40
0.50
0.55
0.55
7.91
530.05
6.00
12.00
1 3/8"
2,580.99
1.00
1.00
1"
4.04
278.46
300.88
278.46
1.00
3.00
2.3
1,969.98
MD-5 (N-E)
MT - 1, 2, 3 (N-E)
1.6
332.47
132.60
997.40
397.80
1,374.94
3,594.39
4,240.38
Descripcin
MUO -1
MUO -2
MUO -3
MUO -4
MD -1 (N-O)
MD -2 (N-O)
MD -3 (N-O)
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
1.00
%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
l
12.00
12.00
12.00
12.00
12.00
12.00
12.00
6.00
6.00
6.00
6.00
3.10
2.25
2.95
0.80
0.75
0.70
0.55
0.55
0.35
0.50
Total
(m3)
57.60
54.00
50.40
39.60
20.46
9.45
17.70
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
6.00
6.00
6.00
6.00
3.10
2.25
2.95
0.80
0.75
0.70
0.55
0.55
0.35
0.50
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
4.80 1"
1/2"
1/2"
1/2"
81.00
25.00
49.00
25.00
7.00
13.00
7.00
13.00
567.00
325.00
343.00
325.00
331.50
349.86
331.50
4.50 1"
1/2"
1/2"
1/2"
81.00
25.00
49.00
25.00
7.00
13.00
7.00
13.00
567.00
325.00
343.00
325.00
331.50
349.86
331.50
4.20 1"
1/2"
1/2"
1/2"
81.00
25.00
49.00
25.00
7.00
13.00
7.00
13.00
567.00
325.00
343.00
325.00
331.50
349.86
331.50
3.30 3/4"
1/2"
1/2"
1/2"
121.00
25.00
49.00
25.00
7.00
13.00
7.00
13.00
847.00
325.00
343.00
325.00
331.50
349.86
331.50
1.71 1"
1/2"
1/2"
1/2"
41.00
10.00
49.00
13.00
3.10
13.00
3.30
13.00
127.10
130.00
161.70
169.00
132.60
164.93
172.38
0.79 5/8"
1/2"
1/2"
1/2"
61.00
5.00
41.00
8.00
1.55
13.00
2.45
13.00
94.55
65.00
100.45
104.00
66.30
102.46
106.08
1.48 3/4"
1/2"
1/2"
1/2"
61.00
6.00
49.00
12.00
2.45
13.00
3.15
13.00
149.45
78.00
154.35
156.00
79.56
157.44
159.12
513.48
151.28
343.74
1.30
0.30
2.34
1.30
0.30
0.39 1/2"
1/2"
1/2"
1/2"
31.00
4.00
21.00
5.00
1.05
7.00
1.50
7.00
32.55
28.00
31.50
35.00
33.20
28.56
32.13
35.70
MT -1 (N-O)
1.00
1.00
12.00
2.95
0.50
17.70
2.95
0.50
1.48 3/4"
1/2"
1/2"
1/2"
61.00
9.00
49.00
12.00
2.70
13.00
3.15
13.00
164.70
117.00
154.35
156.00
119.34
157.44
159.12
1.71 1"
1/2"
1/2"
1/2"
41.00
10.00
49.00
13.00
3.40
13.00
3.30
13.00
139.40
130.00
161.70
169.00
132.60
164.93
172.38
7.04 1"
1/2"
1/2"
1/2"
41.00
10.00
61.00
13.00
3.50
13.00
3.40
13.00
574.00
520.00
829.60
676.00
530.40
846.19
689.52
1.76 1"
1/2"
1/2"
1/2"
41.00
10.00
61.00
13.00
3.50
13.00
3.40
13.00
143.50
130.00
207.40
169.00
132.60
211.55
172.38
MT -3, 4, 6, 7 (N-O)
MT -5 (N-O)
4.00
1.00
1.00
1.00
12.00
12.00
3.10
3.20
3.20
0.55
0.55
0.55
20.46
84.48
21.12
3.10
3.20
3.20
0.55
0.55
0.55
7.91
1,948.10
6.00
12.00
1 3/8"
2,290.68
1.00
1.00
1"
4.04
2,290.68
1.00
1.00
2.3
2,290.68
MD -4 (N-O)
MT -2 (N-O)
1.6
378.81
563.18
2,318.96
579.74
Descripcin
MT -8 (N-O)
MT -9 (N-O)
MT -1, 2 (S-O)
MT -3 (S-O)
MT -4 (S-O)
MT -5 @ 15 (S-O)
MT -1 @ 26 (S-E)
MT -27 (S-E)
Cant de
Elemen
1.00
1.00
2.00
1.00
1.00
11.00
26.00
1.00
%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
l
12.00
6.00
12.00
12.00
12.00
12.00
12.00
9.45
3.10
2.90
3.90
3.70
3.55
3.35
3.35
3.35
0.55
0.50
0.64
0.64
0.65
0.65
0.65
0.65
Total
(m3)
20.46
8.70
60.00
28.56
27.48
286.44
677.04
20.51
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
3.10
2.90
3.90
3.70
3.55
3.35
3.35
3.35
0.55
0.50
0.64
0.64
0.65
0.65
0.65
0.65
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
1.71 1"
1/2"
1/2"
1/2"
41.00
10.00
49.00
13.00
3.00
13.00
3.30
13.00
123.00
130.00
161.70
169.00
132.60
164.93
172.38
1.45 3/4"
1/2"
1/2"
1/2"
31.00
8.00
25.00
10.00
2.80
7.00
3.10
7.00
86.80
56.00
77.50
70.00
57.12
79.05
71.40
5.00 3/4"
1/2"
1/2"
3/8"
81.00
20.00
61.00
4.00
4.10
13.00
2.30
13.00
664.20
520.00
280.60
104.00
2.38 3/4"
1/2"
1/2"
3/8"
81.00
19.00
61.00
4.00
3.90
13.00
2.30
13.00
315.90
247.00
140.30
52.00
2.29 1"
1/2"
1/2"
3/8"
41.00
18.00
61.00
4.00
3.75
13.00
2.25
13.00
153.75
234.00
137.25
52.00
23.87 5/8"
1/2"
1/2"
3/8"
81.00
17.00
61.00
4.00
3.55
13.00
2.27
13.00
3,163.05
2,431.00
1,523.17
572.00
56.42 5/8"
1/2"
1/2"
3/8"
81.00
17.00
61.00
4.00
3.55
13.00
2.27
13.00
7,476.30
5,746.00
3,600.22
1,352.00
2.17 5/8"
1/2"
1/2"
3/8"
64.00
17.00
48.00
4.00
3.55
10.45
2.27
10.45
227.20
177.65
108.96
41.80
05.03.04
M2 (N-E)
1.6
2.3
1"
1 3/8"
4.04
7.91
496.92
199.64
1,527.66
530.40
286.21
62.40
726.57
251.94
143.11
31.20
621.15
238.68
140.00
31.20
5,060.88
2,479.62
1,553.63
343.20
11,962.08
5,860.92
3,672.22
811.20
363.52
181.20
111.14
25.08
-
2,547.63
Peso en Kilogramos/metro
5/8"
3/4"
1,304.28
43,766.43
22,706.32
12,332.19
34,249.18
216.72
1.00
1.00
1.00
12.00
12.00
7.40
7.40
0.51
0.51
45.49
45.49
12.00
12.00
12.00
12.00
7.22
7.24
7.22
7.24
86.64 1/2"
86.89 1"
1"
1/2"
3/8"
5/8"
49.00
49.00
49.00
49.00
37.00
2.00
8.30
8.30
3.45
13.00
13.00
13.00
406.70
406.70
169.05
637.00
481.00
26.00
86.64 1/2"
86.89 1"
1"
1/2"
49.00
49.00
49.00
49.00
8.30
8.30
3.45
13.00
406.70
406.70
169.05
637.00
414.83
1,643.07
682.96
649.74
288.60
41.60
414.83
1,643.07
682.96
649.74
114,358.39
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
3/8"
5/8"
M3 (N-E)
M4 (N-E)
M5 (N-E)
M6 (N-E)
M7 (N-E)
M8 (N-E)
M9 (N-E)
M10 (N-E)
M11 (N-E)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
6.00
7.18
6.75
6.24
5.70
5.20
4.70
4.20
3.70
2.80
0.49
0.46
0.44
0.41
0.39
0.36
0.33
0.26
0.22
42.00
37.44
32.76
28.32
24.12
20.40
16.80
11.55
3.62
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
6.00
7.00
7.02
6.55
6.57
6.05
6.06
5.53
5.55
5.00
5.01
4.51
4.52
4.00
4.01
3.50
3.51
2.68
Fierro
N de
Long
Piezas
P/Pz
37.00
13.00
2.00
13.00
Long
Total
481.00
26.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
288.60
41.60
84.00 1/2"
84.24 1"
1"
1/2"
3/8"
5/8"
49.00
41.00
41.00
47.00
36.00
2.00
8.07
8.07
3.30
13.00
13.00
13.00
395.43
330.87
135.30
611.00
468.00
26.00
403.34
78.60 1/2"
78.84 3/4"
3/4"
1/2"
3/8"
5/8"
41.00
81.00
81.00
33.00
33.00
2.00
7.57
7.57
2.90
13.00
13.00
13.00
310.37
613.17
234.90
429.00
429.00
26.00
72.60 1/2"
72.76 3/4"
3/4"
1/2"
3/8"
5/8"
41.00
81.00
81.00
31.00
31.00
2.00
7.02
7.02
2.85
13.00
13.00
13.00
287.82
568.62
230.85
403.00
403.00
26.00
66.36 1/2"
66.60 3/4"
3/4"
1/2"
3/8"
5/8"
41.00
81.00
81.00
28.00
23.00
2.00
6.45
6.45
2.61
13.00
13.00
13.00
264.45
522.45
211.41
364.00
299.00
26.00
60.00 3/8"
60.12 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.41
13.00
13.00
13.00
355.02
355.02
147.01
338.00
273.00
26.00
213.01
54.12 3/8"
54.24 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
81.00
19.00
19.00
2.00
5.28
5.28
2.16
13.00
13.00
13.00
322.08
427.68
174.96
247.00
247.00
26.00
193.25
48.00 3/8"
48.12 5/8"
5/8"
1/2"
3/8"
1/2"
49.00
81.00
81.00
17.00
14.00
2.00
4.72
4.72
1.91
13.00
13.00
13.00
231.28
382.32
154.71
221.00
182.00
26.00
138.77
42.00 3/8"
42.12 5/8"
5/8"
3/8"
3/8"
3/8"
41.00
61.00
61.00
18.00
12.00
2.00
4.19
4.19
1.74
13.00
13.00
13.00
171.79
255.59
106.14
234.00
156.00
26.00
140.40
93.60
15.60
16.08 3/8"
21.00
3.32
69.72
41.83
1,336.71
546.61
623.22
280.80
41.60
316.58
1,410.29
540.27
437.58
257.40
41.60
293.58
1,307.83
530.96
411.06
241.80
41.60
269.74
1,201.64
486.24
371.28
179.40
41.60
816.55
338.12
344.76
163.80
26.52
684.29
279.94
251.94
148.20
26.52
611.71
247.54
225.42
109.20
26.52
103.07
408.94
169.82
Descripcin
M12 (N-E)
M13 (N-E)
M14 (N-E)
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
6.00
6.00
6.00
2.50
2.25
1.40
0.22
0.19
0.23
Total
(m3)
3.28
2.62
1.93
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
6.00
2.68
16.09 1/2"
1/2"
3/8"
3/8"
3/8"
6.00
6.00
6.00
6.00
6.00
6.00
2.42
2.42
2.25
2.25
1.61
1.61
Fierro
N de
Long
Piezas
P/Pz
41.00
3.32
41.00
1.45
11.00
7.00
6.00
7.00
2.00
7.00
Long
Total
136.12
59.45
77.00
42.00
14.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
14.52 3/8"
14.53 1/2"
3/8"
3/8"
3/8"
21.00
61.00
10.00
6.00
2.00
3.00
3.00
7.00
7.00
7.00
63.00
183.00
70.00
42.00
14.00
37.80
13.50 3/8"
13.50 1/2"
3/8"
3/8"
3/8"
21.00
61.00
10.00
6.00
2.00
2.84
2.84
7.00
7.00
7.00
59.64
173.24
70.00
42.00
14.00
35.78
9.66 3/8"
9.66 1/2"
3/8"
3/8"
3/8"
21.00
41.00
7.00
4.00
2.00
2.20
2.20
7.00
7.00
7.00
46.20
90.20
49.00
28.00
14.00
27.72
176.70
92.00
29.40
16.80
8.40
0.74
30.90
6.00
6.00
2.26
1.60
67.80 3/8"
48.00 3/8"
21.00
19.00
6.00
6.40
630.00
121.60
378.00
72.96
M20 (N-E)
1.00
1.00
4.36
1.40
0.74
4.49
4.36
4.36
2.26
1.60
9.85 3/8"
6.98 3/8"
15.00
19.00
6.00
4.76
90.00
90.44
54.00
54.26
PARAPETO BOTALLANTA 1
1.00
1.00
145.00
0.20
1.37
39.73
145.00
1.80
261.00 3/8"
1/2"
3/8"
11.00
581.00
484.00
146.00
2.95
1.40
1,606.00
1,713.95
677.60
963.60
81.96 1/2"
82.20 1"
1"
1/2"
3/8"
5/8"
49.00
41.00
41.00
46.00
35.00
2.00
7.90
7.90
3.30
13.00
13.00
13.00
387.10
323.90
135.30
598.00
455.00
26.00
76.80 1/2"
77.04 3/4"
3/4"
1/2"
3/8"
5/8"
41.00
81.00
81.00
33.00
33.00
2.00
7.52
7.52
3.11
13.00
13.00
13.00
308.32
609.12
251.91
429.00
429.00
26.00
63.00 1/2"
63.14 3/4"
3/4"
1/2"
3/8"
5/8"
41.00
81.00
81.00
27.00
22.00
2.00
6.12
6.12
3.05
13.00
13.00
13.00
250.92
495.72
247.05
351.00
286.00
26.00
23.10 3/8"
25.00
4.57
114.25
M2 (N-O)
M3 (N-O)
M4 (N-O)
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
6.00
6.50
3.35
4.00
0.49
0.46
0.67
0.35
40.92
36.25
26.78
8.40
12.00
12.00
12.00
12.00
12.00
12.00
6.00
6.83
6.85
6.40
6.42
5.25
5.26
3.85
7.91
42.00
25.20
8.40
1.40
7.00
1 3/8"
186.66
6.00
12.00
1"
4.04
42.00
25.20
8.40
1.00
1.00
2.3
46.20
25.20
8.40
5.00
1.00
1.6
138.84
60.64
M15 @ 19 (N-E)
M1 (N-O)
Peso en Kilogramos/metro
5/8"
3/4"
1,748.23
406.56
394.84
1,308.56
546.61
609.96
273.00
41.60
314.49
1,400.98
579.39
437.58
257.40
41.60
255.94
1,140.16
568.22
358.02
171.60
41.60
68.55
Descripcin
M5 (N-O)
M6 (N-O)
M7 (N-O)
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
6.00
6.00
6.00
3.00
2.25
1.50
0.28
0.20
0.20
Total
(m3)
5.07
2.70
1.80
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
6.00
3.86
23.16 5/8"
5/8"
1/2"
3/8"
1/2"
6.00
6.00
6.00
6.00
6.00
6.00
3.06
3.07
2.25
2.25
1.50
1.50
Fierro
N de
Long
Piezas
P/Pz
41.00
4.57
41.00
1.94
16.00
7.00
13.00
7.00
2.00
7.00
Long
Total
187.37
79.54
112.00
91.00
14.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
21.00
41.00
16.00
11.00
2.00
3.70
3.70
7.00
7.00
7.00
77.70
151.70
112.00
77.00
14.00
46.62
13.50 3/8"
13.50 1/2"
3/8"
3/8"
3/8"
21.00
61.00
10.00
6.00
2.00
2.84
2.84
7.00
7.00
7.00
59.64
173.24
70.00
42.00
14.00
35.78
9.00 3/8"
9.00 1/2"
3/8"
3/8"
3/8"
21.00
61.00
7.00
4.00
2.00
2.10
2.10
7.00
7.00
7.00
44.10
128.10
49.00
28.00
14.00
26.46
242.72
176.70
42.00
25.20
8.40
130.66
29.40
16.80
8.40
0.74
12.36
6.00
6.00
2.26
1.60
27.12 3/8"
19.20 3/8"
21.00
19.00
6.00
6.40
252.00
243.20
151.20
145.92
M10 (N-O)
1.00
1.00
7.32
1.40
0.74
7.54
7.32
7.32
2.26
1.60
16.54 3/8"
11.71 3/8"
25.00
19.00
6.00
7.72
150.00
146.68
90.00
88.01
PARAPETO BOTALLANTA 1
1.00
1.00
60.15
0.20
1.37
16.48
60.15
1.80
108.27 3/8"
1/2"
3/8"
11.00
241.00
201.00
61.15
2.95
1.40
672.65
710.95
281.40
403.59
164.16 1/2"
163.44 1"
1"
1/2"
3/4"
3/4"
1/2"
3/8"
5/8"
1/2"
3/8"
5/8"
49.00
41.00
41.00
49.00
81.00
81.00
47.00
36.00
2.00
45.00
34.00
2.00
8.05
8.05
3.32
7.76
7.76
3.22
13.00
13.00
13.00
13.00
13.00
13.00
394.45
330.05
136.12
380.24
628.56
260.82
611.00
468.00
26.00
585.00
442.00
26.00
142.20 1/2"
142.80 3/4"
3/4"
1/2"
3/4"
3/4"
1/2"
3/8"
5/8"
1/2"
3/8"
5/8"
41.00
81.00
81.00
41.00
81.00
81.00
31.00
31.00
2.00
29.00
30.00
2.00
7.05
7.05
2.95
6.69
6.70
2.75
13.00
13.00
13.00
13.00
13.00
13.00
289.05
571.05
238.95
274.29
542.70
222.75
403.00
403.00
26.00
377.00
390.00
26.00
MUE - 2
1.00
1.00
1.00
1.00
12.00
12.00
7.00
7.00
0.50
0.48
0.39
0.37
41.76
39.96
32.76
31.08
12.00
12.00
12.00
12.00
13.68
13.62
11.85
11.90
7.91
67.20
46.20
8.40
1.40
7.00
7.00
1 3/8"
14.28
18.36 3/8"
18.42 5/8"
3/8"
3/8"
3/8"
6.00
12.00
12.00
1"
4.04
114.24
1.00
1.00
1.00
2.3
54.60
2.00
1.00
1.00
1.6
299.79
127.26
M8 @ 9 (N-O)
MUE - 1.1
Peso en Kilogramos/metro
5/8"
3/4"
725.17
168.84
402.34
1,333.40
549.92
387.84
1,445.69
599.89
623.22
280.80
41.60
596.70
265.20
41.60
294.83
1,313.42
549.59
279.78
1,248.21
512.33
411.06
241.80
41.60
384.54
234.00
41.60
Descripcin
MD-1 (N-E)
MD-2 (N-E)
MD-3 (N-E)
MD-4 (N-E)
Cant de
Elemen
1.00
1.00
1.00
1.00
%
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
l
12.00
12.00
12.00
6.00
5.00
4.50
4.31
2.75
0.40
0.38
0.30
0.23
Total
(m3)
24.00
20.28
15.60
3.72
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
12.00
12.00
12.00
12.00
12.00
12.00
6.00
6.00
5.00
5.00
4.50
4.51
4.31
4.32
2.75
2.75
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
60.00 3/8"
60.00 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.41
13.00
13.00
13.00
355.02
355.02
147.01
338.00
273.00
26.00
213.01
54.00 3/8"
54.12 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
61.00
19.00
19.00
2.00
5.25
5.28
2.17
13.00
13.00
13.00
320.25
427.68
132.37
247.00
247.00
26.00
192.15
51.72 3/4"
51.84 3/8"
3/4"
1/2"
3/8"
1/2"
61.00
41.00
61.00
18.00
15.00
2.00
4.97
4.97
2.10
13.00
13.00
13.00
303.17
203.77
128.10
234.00
195.00
26.00
16.50 3/8"
16.51 1/2"
3/8"
3/8"
3/8"
21.00
41.00
12.00
7.00
2.00
3.40
3.40
7.00
7.00
7.00
71.40
139.40
84.00
49.00
14.00
42.84
163.80
26.52
684.29
211.79
251.94
148.20
26.52
697.29
122.26
294.63
238.68
117.00
26.52
142.19
50.40
29.40
8.40
1.00
6.00
2.00
0.20
2.40
6.00
6.00
2.00
2.00
12.00 3/8"
12.00 3/8"
3/8"
3/8"
3/8"
61.00
21.00
5.00
9.00
2.00
2.58
2.58
7.00
7.00
7.00
157.38
54.18
35.00
63.00
14.00
94.43
32.51
21.00
37.80
8.40
MD-6 (N-E)
1.00
1.00
12.00
4.31
0.30
15.52
12.00
12.00
4.31
4.32
51.72 3/8"
51.84 3/4"
3/4"
1/2"
3/8"
3/8"
41.00
61.00
61.00
18.00
15.00
2.00
4.97
4.96
4.96
13.00
13.00
13.00
203.77
302.56
302.56
234.00
195.00
26.00
122.26
43.20 3/8"
1/2"
3/8"
11.00
97.00
81.00
25.00
2.95
1.40
275.00
286.15
113.40
165.00
24.00 3/8"
1/2"
8.00
49.00
13.00
2.95
104.00
144.55
62.40
155.16 3/8"
155.52 3/4"
3/4"
1/2"
3/8"
1/2"
41.00
61.00
61.00
18.00
15.00
2.00
4.97
4.96
4.96
13.00
13.00
13.00
611.31
907.68
907.68
702.00
585.00
78.00
366.79
216.48 3/8"
216.48 5/8"
5/8"
1/2"
61.00
81.00
81.00
19.00
5.27
5.27
2.17
13.00
1,285.88
1,707.48
703.08
988.00
771.53
PARAPETO BOTALLANTA 2
MT - 1, 2 , 3 (N-E)
MT - 4 @ 7 (N-E)
1.00
3.00
4.00
1.00
1.00
1.00
1.00
24.00
12.00
12.00
12.00
0.20
0.15
4.31
4.50
1.37
1.00
0.30
0.38
6.58
1.80
46.55
81.12
24.00
12.00
12.00
12.00
12.00
12.00
1.80
2.00
4.31
4.32
4.51
4.51
2.3
816.55
338.12
1.00
1.00
1.6
344.76
MD-5 (N-E)
PARAPETO BOTALLANTA 1
Peso en Kilogramos/metro
5/8"
3/4"
695.89
695.89
238.68
117.00
15.60
291.87
68.04
147.44
2,087.66
2,087.66
716.04
351.00
79.56
2,731.97
1,124.93
1,007.76
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
3/8"
1/2"
MT - 8 @ 14 (N-E)
MT - 15 @ 22 (N-E)
PARAPETO BOTALLANTA 2
MUO -1
MUO -2
MUO -3
MUO -4
MD -1 (N-O)
MD -2 (N-O)
7.00
8.00
1.00
1.00
12.00
12.00
4.75
5.00
0.38
0.40
149.69
192.00
12.00
12.00
12.00
12.00
4.75
4.76
5.00
5.01
Fierro
N de
Long
Piezas
P/Pz
19.00
13.00
2.00
13.00
Long
Total
988.00
104.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
61.00
81.00
81.00
20.00
20.00
2.00
5.56
5.56
2.30
13.00
13.00
13.00
2,374.12
3,152.52
1,304.10
1,820.00
1,820.00
182.00
1,424.47
480.00 3/8"
480.96 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.30
13.00
13.00
13.00
2,840.16
2,840.16
1,122.40
2,704.00
2,184.00
208.00
1,704.10
1,185.60
185.64
6,532.37
2,581.52
2,758.08
1,310.40
212.16
34.20
12.00
2.00
456.00 3/8"
1/2"
8.00
49.00
13.00
2.95
1,976.00
2,746.45
2.00
1.00
12.00
7.00
0.50
84.00
12.00
12.00
7.00
7.02
168.00 1/2"
168.48 1"
1"
1/2"
3/8"
5/8"
49.00
41.00
41.00
47.00
36.00
2.00
8.07
8.07
3.32
13.00
13.00
13.00
790.86
661.74
272.24
1,222.00
936.00
52.00
162.00 1/2"
162.48 1"
1"
1/2"
3/8"
5/8"
49.00
41.00
41.00
46.00
34.00
2.00
7.77
7.77
3.17
13.00
13.00
13.00
761.46
637.14
259.94
1,196.00
884.00
52.00
144.00 1/2"
144.48 1"
1"
1/2"
3/8"
5/8"
41.00
41.00
41.00
31.00
31.00
2.00
6.97
6.97
2.87
13.00
13.00
13.00
571.54
571.54
235.34
806.00
806.00
52.00
120.00 3/8"
120.24 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.41
13.00
13.00
13.00
710.04
710.04
294.02
676.00
546.00
52.00
426.02
57.00 3/8"
57.12 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
81.00
20.00
20.00
2.00
5.57
5.57
2.32
13.00
13.00
13.00
339.77
451.17
187.92
260.00
260.00
26.00
203.86
39.00 3/8"
39.12 1/2"
3/8"
41.00
121.00
17.00
3.88
3.88
13.00
159.08
469.48
221.00
95.45
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
12.00
12.00
6.00
5.00
4.75
3.25
0.45
0.40
0.38
0.28
81.12
64.80
48.00
21.48
10.80
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
6.75
6.77
6.00
6.02
5.00
5.01
4.75
4.76
3.25
3.26
7.91
1,092.00
1.00
0.50
1 3/8"
5,044.03
2,086.56
0.15
6.75
1"
4.04
1,856.40
12.00
12.00
2.3
106.08
399.00 3/8"
399.84 5/8"
5/8"
1/2"
3/8"
1/2"
1.00
1.00
1.6
592.80
19.00
2.00
Peso en Kilogramos/metro
5/8"
3/4"
2,801.38
806.68
2,673.43
1,099.85
1,246.44
561.60
83.20
776.69
2,574.05
1,050.16
1,219.92
530.40
83.20
582.97
2,309.02
950.77
822.12
483.60
83.20
1,633.09
676.25
689.52
327.60
53.04
721.87
300.67
265.20
156.00
26.52
478.87
132.60
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
3/8"
3/8"
MD -3 (N-O)
MD -4 (N-O)
PARAPETO BOTALLANTA 1
1.00
1.00
1.00
1.00
1.00
1.00
12.00
6.00
66.00
4.50
1.75
0.20
0.38
0.20
1.37
20.28
2.10
18.08
12.00
12.00
6.00
6.00
66.00
4.50
4.51
1.75
1.75
1.80
Fierro
N de
Long
Piezas
P/Pz
11.00
13.00
2.00
13.00
Long
Total
143.00
26.00
1/4"
3/8"
1/2"
0.26
0.6
1.02
54.00 3/8"
54.12 1"
1/2"
3/8"
1/2"
61.00
41.00
19.00
19.00
2.00
5.27
5.27
13.00
13.00
13.00
321.47
216.07
247.00
247.00
26.00
192.88
10.50 3/8"
10.50 1/2"
3/8"
3/8"
3/8"
21.00
61.00
8.00
4.00
2.00
2.33
2.33
7.00
7.00
7.00
48.93
142.13
56.00
28.00
14.00
29.36
118.80 3/8"
1/2"
3/8"
11.00
265.00
221.00
67.00
2.95
1.40
737.00
781.75
309.40
442.20
26.52
144.97
33.60
16.80
8.40
797.39
185.64
72.00
0.15
1.35
14.58
72.00
2.70
194.40 3/8"
1/2"
12.00
289.00
73.00
3.65
876.00
1,054.85
525.60
MB -1 @ 3 (N-O)
3.00
1.00
6.00
1.90
0.44
15.12
6.00
6.00
2.05
1.35
36.90 3/8"
24.30 3/8"
21.00
17.00
5.55
6.50
349.65
331.50
209.79
198.90
MT -1 (N-O)
1.00
1.00
12.00
4.54
0.37
20.41
12.00
12.00
4.54
4.55
54.48 3/8"
54.60 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
81.00
19.00
19.00
2.00
5.30
5.30
2.18
13.00
13.00
13.00
323.30
429.30
176.58
247.00
247.00
26.00
193.98
56.40 3/8"
56.40 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
81.00
19.00
19.00
2.00
5.50
5.50
2.31
13.00
13.00
13.00
335.50
445.50
187.11
247.00
247.00
26.00
201.30
240.00 3/8"
240.48 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.41
13.00
13.00
13.00
1,420.08
1,420.08
588.04
1,352.00
1,092.00
104.00
852.05
60.00 3/8"
60.12 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
26.00
21.00
2.00
5.82
5.82
2.41
13.00
13.00
13.00
355.02
355.02
147.01
338.00
273.00
26.00
213.01
57.00 3/8"
57.12 5/8"
5/8"
1/2"
3/8"
1/2"
61.00
81.00
81.00
20.00
20.00
2.00
5.56
5.56
2.32
13.00
13.00
13.00
339.16
450.36
187.92
260.00
260.00
26.00
203.50
MT -3, 4, 6, 7 (N-O)
MT -5 (N-O)
MT -8 (N-O)
4.00
1.00
1.00
1.00
1.00
1.00
12.00
12.00
12.00
12.00
4.70
5.00
5.00
4.75
0.37
0.40
0.40
0.38
21.12
96.00
24.00
21.48
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
4.70
4.70
5.00
5.01
5.00
5.01
4.75
4.76
1"
1 3/8"
4.04
7.91
872.92
251.94
1.00
1.00
2.3
148.20
1.00
1.00
1.6
85.80
15.60
PARAPETO BOTALLANTA 3
MT -2 (N-O)
Peso en Kilogramos/metro
5/8"
3/4"
1,075.95
686.88
282.53
251.94
148.20
26.52
712.80
299.38
251.94
148.20
26.52
3,266.18
1,352.49
1,379.04
655.20
106.08
816.55
338.12
344.76
163.80
26.52
720.58
300.67
265.20
156.00
26.52
Descripcin
MT -9 (N-O)
PARAPETO BOTALLANTA 3
MT -1, 2 (S-O)
MT -3 (S-O)
MT -4 (S-O)
MT -5 @ 15(S-O)
MT -1 @ 27(S-E)
Cant de
Elemen
1.00
9.00
2.00
1.00
1.00
11.00
27.00
42.00
%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
l
6.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
4.75
0.15
5.00
4.80
3.55
3.35
3.35
0.20
0.31
1.35
0.38
0.38
0.49
0.39
0.39
0.75
Total
(m3)
8.94
21.87
45.00
21.60
20.70
171.60
421.20
75.60
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
6.00
6.00
4.25
4.26
12.00
2.70
12.00
12.00
5.00
5.01
12.00
12.00
4.80
4.81
12.00
12.00
4.60
4.61
12.00
12.00
4.00
4.01
12.00
12.00
4.00
4.01
12.00
2,638.13
1.32
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
25.50 3/8"
25.53 1"
1/2"
3/8"
1/2"
25.00
21.00
18.00
15.00
2.00
4.96
4.96
7.00
7.00
7.00
124.00
104.16
126.00
105.00
14.00
74.40
291.60 3/8"
1/2"
12.00
49.00
13.00
3.65
1,404.00
1,609.65
842.40
120.00 3/8"
120.24 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
17.00
17.00
2.00
5.86
5.86
2.48
13.00
13.00
13.00
714.92
714.92
302.56
442.00
442.00
52.00
428.95
57.60 3/8"
57.72 3/4"
3/4"
1/2"
3/8"
1/2"
61.00
61.00
61.00
17.00
17.00
2.00
5.67
5.67
2.50
13.00
13.00
13.00
345.87
345.87
152.50
221.00
221.00
26.00
207.52
55.20 3/8"
55.32 3/4"
1/2"
3/8"
1/2"
61.00
81.00
16.00
16.00
2.00
5.47
5.47
13.00
13.00
13.00
333.67
443.07
208.00
208.00
26.00
200.20
528.00 3/8"
529.32 3/4"
1/2"
3/8"
1/2"
49.00
61.00
17.00
17.00
2.00
4.86
4.86
13.00
13.00
13.00
2,619.54
3,261.06
2,431.00
2,431.00
286.00
1,571.72
1,296.00 3/8"
1,299.24 3/4"
1/2"
3/8"
1/2"
49.00
61.00
17.00
17.00
2.00
4.86
4.86
13.00
13.00
13.00
6,429.78
8,004.42
5,967.00
5,967.00
702.00
3,857.87
665.28 3/8"
3/8"
6.00
49.00
13.00
2.21
3,276.00
4,548.18
1,965.60
2,728.91
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
420.81
128.52
63.00
14.28
1,641.84
1,644.32
695.89
450.84
265.20
53.04
795.50
350.75
225.42
132.60
26.52
1,019.06
212.16
124.80
26.52
7,500.44
2,479.62
1,458.60
291.72
18,410.17
6,086.34
3,580.20
716.04
44,546.69
691.68
692.90
1,384.58
51,253.33
19,771.36
71,316.12
22,224.89
8,288.61
6,139.03
CARAVISTA
NORMAL
05.03.08
Diam
209,112.39
1.00
157.12
0.90
0.32
44.78
44.78
157.12
1.65
259.25 3/8"
3/8"
259.25
524.00
7.00
2.20
164.98
1,152.80
1,154.83
1,384.58
Descripcin
05.04
GAVIONES
05.04.01
05.04.02
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
5.00
1.00
157.12
785.00 UND
1.00
1.00
157.12
157.00 UND
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
PROGRESIVA
KM
0+000.000
0+010.000
0+020.000
0+025.000
0+030.000
0+035.000
0+040.000
0+050.000
0+060.000
0+070.000
0+080.000
0+085.000
0+090.000
0+095.000
0+100.000
0+105.000
0+110.000
0+120.000
0+130.000
0+140.000
0+150.000
0+160.000
0+170.000
0+180.000
0+185.000
0+190.000
0+195.000
0+200.000
0+210.000
0+220.000
0+230.000
0+240.000
0+245.000
0+250.000
0+255.000
0+260.000
0+270.000
0+280.000
0+290.000
0+300.000
0+310.000
0+320.000
0+330.000
0+340.000
0+350.000
AREA
M2
6.89
7.11
6.61
6.52
6.50
6.38
7.54
6.65
5.42
4.96
4.89
4.90
4.79
4.88
5.60
7.06
9.93
18.62
35.97
58.47
78.61
92.36
98.52
99.34
99.88
104.18
108.65
108.88
105.74
107.27
108.55
105.60
103.50
100.91
97.14
93.81
84.91
76.06
68.96
61.73
53.85
45.20
36.11
27.85
21.63
CORTE
VOLUMEN
M3
0.00
69.99
68.56
32.78
32.53
32.19
34.85
71.00
60.35
51.91
49.27
24.38
23.93
23.85
25.85
31.20
42.46
142.70
272.90
472.20
685.40
854.80
954.30
989.30
497.80
503.30
525.70
538.10
1068.00
1065.00
1079.00
1070.00
524.00
512.10
496.10
478.40
894.20
804.80
725.10
653.40
577.90
495.20
406.50
319.90
247.50
AREA
M2
0.00
0.00
0.00
0.00
0.15
1.16
2.31
2.16
2.89
3.81
4.83
5.42
5.89
6.03
5.62
4.61
3.14
0.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.07
0.16
0.21
0.47
RELLENO
VOLUMEN
M3
0.00
0.00
0.00
0.00
0.36
3.15
8.39
22.25
25.27
33.51
43.20
25.93
29.09
30.64
29.94
26.29
19.38
17.46
1.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.35
1.13
1.84
3.39
PROGRESIVA
KM
0+360.000
0+370.000
0+380.000
0+390.000
0+400.000
0+410.000
0+415.000
0+420.000
0+430.000
0+440.000
0+445.000
0+450.000
0+460.000
0+470.000
0+475.000
0+480.000
0+485.000
0+490.000
0+495.000
0+500.000
0+510.000
0+520.000
0+530.000
0+540.000
0+545.000
0+550.000
0+555.000
0+560.000
0+570.000
0+580.000
0+590.000
0+600.000
0+610.000
0+617.595
TOTAL
AREA
M2
15.13
9.57
6.93
6.33
5.58
5.43
5.17
5.05
4.28
2.51
2.13
1.64
1.67
1.87
2.00
1.87
1.98
2.49
2.09
2.50
2.32
3.53
2.68
2.65
3.25
3.71
3.93
3.18
3.71
2.36
2.30
4.18
5.56
5.27
2443.78
CORTE
VOLUMEN
M3
183.70
123.40
82.45
66.32
59.53
55.01
26.54
25.61
46.67
33.92
11.62
9.63
16.75
17.93
9.99
9.99
9.94
11.56
11.86
11.69
24.08
29.23
31.05
27.13
15.21
17.84
19.52
18.05
34.46
30.35
23.29
32.41
48.70
41.13
19745.26
AREA
M2
0.90
1.57
1.84
2.00
1.99
1.94
1.78
1.33
0.23
0.14
0.99
1.57
2.75
3.64
2.89
2.34
1.94
1.91
1.06
0.93
0.87
0.29
0.71
0.54
0.16
0.04
0.01
0.38
0.30
1.36
2.17
0.00
0.00
0.00
89.85
RELLENO
VOLUMEN
M3
6.88
12.44
17.33
19.19
19.95
19.66
9.65
8.13
7.85
1.83
2.78
6.23
21.45
31.68
15.95
12.74
10.39
9.35
7.22
4.90
8.97
5.76
5.01
6.15
1.68
0.48
0.13
0.97
3.44
8.30
17.63
10.86
0.00
0.00
638.29
PROGRESIVA
KM
0+000.000
0+020.000
0+030.000
0+040.000
0+050.000
0+060.000
0+070.000
0+080.000
0+090.000
0+100.000
0+120.000
0+140.000
0+160.000
0+180.000
0+200.000
0+220.000
0+240.000
0+260.000
0+280.000
0+300.000
0+320.000
0+340.000
0+360.000
0+380.000
0+400.000
0+420.000
0+440.000
0+460.000
0+470.000
0+480.000
0+490.000
0+500.000
0+520.000
0+540.000
0+550.000
0+560.000
AREA
M2
8.58
9.06
5.02
6.75
26.26
35.89
38.80
40.66
41.76
42.96
41.63
37.72
36.05
37.93
33.08
21.79
12.61
9.88
9.92
9.54
10.07
10.54
10.83
10.12
8.40
8.08
8.05
7.61
6.40
6.56
5.02
4.44
4.68
5.98
7.98
10.48
631.13
CORTE
VOLUMEN
M3
0.00
176.39
70.22
58.67
165.05
310.61
374.52
398.14
412.16
423.80
846.29
793.48
737.77
739.88
715.69
548.79
340.55
224.87
197.99
194.59
196.12
206.11
213.65
209.51
185.20
164.80
161.40
156.62
69.78
63.71
56.91
46.85
91.22
105.70
68.78
92.17
9817.99
RELLENO
AREA
VOLUMEN
M2
M3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.06
0.29
0.11
1.70
0.00
1.15
0.00
0.00
0.00
0.00
0.17
3.14
PROGRESIVA
KM
0+000.000
0+010.000
0+020.000
0+030.000
0+040.000
0+050.000
0+060.000
0+070.000
0+080.000
0+090.000
0+100.000
0+110.000
0+115.000
0+120.000
0+125.000
0+130.000
0+135.000
0+140.000
0+150.000
0+160.000
0+170.000
0+180.000
0+190.000
0+200.000
0+210.000
0+220.000
0+230.000
AREA
M2
5.77
5.22
5.94
6.43
6.58
7.43
11.14
0.00
0.00
0.00
0.00
13.66
6.59
3.52
1.26
0.75
0.70
1.22
0.89
1.04
1.18
1.54
1.90
1.91
2.18
2.45
2.66
91.96
CORTE
VOLUMEN
M3
0.00
54.97
55.83
61.87
65.05
70.03
92.82
0.00
0.00
0.00
0.00
163.46
51.95
27.78
13.09
5.54
3.96
5.13
10.58
9.64
11.09
13.61
17.21
19.06
20.43
23.13
25.54
821.77
AREA
M2
0.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.26
40.93
43.03
40.83
37.97
34.04
29.58
21.38
19.21
20.51
20.83
20.97
20.82
20.57
20.19
19.60
442.98
RELLENO
VOLUMEN
M3
0.00
1.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
394.07
172.77
177.66
177.89
167.17
153.25
142.32
254.85
202.96
198.60
206.71
209.02
208.95
206.92
203.81
198.98
3277.24
Part.
N
06
06.01
VARIOS
JUNTAS
06.01.01
06.01.02
Und
Cant de
Elemen
%
l
Mediadas
b
Total
a, h
1.00
1.00
119.82
119.82
119.82
m
m
1.00
1.00
1.00
1.00
407.44
589.21
407.44
589.21
996.64
RESUMEN DE METRADOS
PUENTE PRINCIPAL-ROTONDA
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09
02.03.10
02.03.11
02.03.12
02.03.13
02.04
02.04.01
02.04.02
03
03.01
03.01.01
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.02
04.02.01
04.02.02
04.02.03
Descripcin
TRABAJOS PRELIMINARES
NIVELACION, TRAZO Y REPLANTEO
PUENTE PRINCIPAL
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO F'C=9.81 MPa (100 KG/CM2) e=10 cm PARA SOLADOS
CONCRETO ARMADO
CONCRETO F'C=20.59 MPa (210 KG/CM2) ZAPATAS
ENCOFRADO Y DESENCOFRADO NORMAL ZAPATAS
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) ZAPATAS
CONCRETO F'C=20.59 MPa (210 KG/CM2) MUROS
ENCOFRADO Y DESENCOFRADO CARAVISTA MUROS
ENCOFRADO Y DESENCOFRADO NORMAL MUROS
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) MUROS
CONCRETO F'C= 27.46 MPa (280 KG/CM2) LOSA Y VIGAS PUENTE
ENCOFRADO Y DESENCOFRADO CARAVISTA LOSA Y VIGAS PUENTE
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) LOSA Y VIGAS PUENTE
CONCRETO F'C= 20.59 MPa (210 KG/CM2) LOSA DE APROXIMACION
ENCOFRADO Y DESENCOFRADO NORMAL LOSA DE APROXIMACION
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) LOSA DE APROXIMACION
APOYOS DE NEOPRENO
APOYOS DE NEOPRENO FIJO
APOYOS DE NEOPRENO MOVIL
VEREDAS, BERMAS Y SARDINELES
PISOS DE ADOQUIN CONCRETO
PISO DE ADOQUIN DE CONCRETO ROJO-CICLOVIA PUENTE E= 6 CM
VARIOS
BARANDAS
BARANDA METALICAS TIPO 1
BARANDA METALICAS TIPO 2
BARANDA METALICAS TIPO 3
BARANDA METALICAS TIPO 4
JUNTAS
JUNTA CON PLANCHA DE POLIESTIRENO EXPANDIDO E=2"
TAPAJUNTA METALICA
JUNTA CON CARTON EMBREADO E=3 MM
UND
Metrado
M2
1,545.00
M3
M3
M3
4,297.37
3,274.19
1,278.98
M3
75.50
M3
M2
KG
M3
M2
M2
KG
M3
M2
KG
M3
M2
KG
621.64
37.23
28,883.87
754.43
1,741.42
1,567.28
66,603.83
360.60
1,361.91
68,258.72
63.23
29.21
5,696.70
UND
UND
42.00
37.00
M2
47.65
M
M
M
M
138.57
69.80
35.44
42.39
M
M
M
23.64
200.20
105.97
Descripcin
01
TRABAJOS PRELIMINARES
01.02
02
PUENTE PRINCIPAL
02.01
02.01.01
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
02.01.02
02.01.03
Cant de
Elemen
1.00
Concreto y otros
Medidas
a
h
Total
(m3)
1.00
51.50
MC-1
1.00
1.00
24.60
5.00
5.16
634.19
MC-2
1.00
1.00
17.78
5.00
5.04
448.11
MUP-1
1.00
1.00
12.03
6.00
7.56
545.21
MUP-2
1.00
1.00
23.25
5.25
7.58
924.65
MUP-3
1.00
1.00
12.52
4.50
7.50
422.42
MUE-1
1.00
1.00
10.37
4.50
7.35
343.04
MTP-1
1.00
1.00
11.54
3.25
4.86
182.22
MTP-2
1.00
1.00
23.27
3.25
5.01
378.84
MTP-3
1.00
1.00
18.30
3.25
4.77
283.65
Z-1
1.00
1.00
13.70
3.00
1.84
75.76
Z-2
1.00
1.00
10.72
3.00
1.84
59.28
4,297.37
MC-1
1.00
1.00
24.60
5.00
3.70
454.63
MC-2
1.00
1.00
17.78
5.00
3.60
320.04
MUP-1
1.00
1.00
12.03
6.00
5.84
421.48
MUP-2
1.00
1.00
23.25
5.25
6.68
814.91
MUP-3
1.00
1.00
12.52
4.50
5.45
306.99
MUE-1
1.00
1.00
10.37
4.50
5.48
255.93
MTP-1
1.00
1.00
11.54
3.25
3.60
135.13
MTP-2
1.00
1.00
23.27
3.25
3.73
282.03
MTP-3
1.00
1.00
18.30
3.25
3.51
208.80
Z-1
1.00
1.00
13.70
3.00
1.01
41.65
Z-2
1.00
1.00
10.72
3.00
1.01
32.59
3,274.19
1.00
1.25
3,274.19
1,278.98
1,278.98
ELIMINACION
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
4,297.37
RELLENO
30.00
1,545.00
Diam
M2
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
02.02
CONCRETO SIMPLE
02.02.01
02.03
02.03.01
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
1.00
1.00
24.60
5.00
0.10
12.30
MC-2
1.00
1.00
17.78
5.00
0.10
8.89
MUP-1
1.00
1.00
12.03
6.00
0.10
7.22
MUP-2
1.00
1.00
23.25
5.25
0.10
12.21
MUP-3
1.00
1.00
12.52
4.50
0.10
5.63
MUE-1
1.00
1.00
10.37
4.50
0.10
4.67
MTP-1
1.00
1.00
11.54
3.25
0.10
3.75
MTP-2
1.00
1.00
23.27
3.25
0.10
7.56
MTP-3
1.00
1.00
18.30
3.25
0.10
5.95
Z-1
1.00
1.00
13.70
3.00
0.10
4.11
Z-2
1.00
1.00
10.72
3.00
0.10
3.22
75.50
MC-1
MC-2
MUP-1
MUP-2
MUP-3
MUE-1
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
MC-1
CONCRETO ARMADO
CONCRETO F'C=20.59 MPa (210 KG/CM2) ZAPATAS
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
24.60
17.78
12.00
23.25
12.52
10.37
5.00
5.00
6.00
5.25
4.50
4.50
1.00
1.00
0.80
0.80
0.80
0.80
123.00
88.88
57.60
97.65
45.07
37.33
5.00
5.00
6.00
5.25
4.50
4.50
1.00
1.00
0.80
0.80
0.80
0.80
5.00 3/4"
5/8"
1"
5/8"
83.00
11.00
83.00
26.00
3.00
25.60
5.30
25.60
249.00
281.60
439.90
665.60
572.70
5.00 3/4"
5/8"
1"
5/8"
60.00
11.00
60.00
26.00
3.00
18.78
5.30
18.78
180.00
206.53
318.00
488.15
4.80 1"
5/8"
5/8"
5/8"
81.00
25.00
41.00
25.00
6.60
13.00
6.30
13.00
534.60
325.00
258.30
325.00
520.00
413.28
520.00
4.20 1"
5/8"
5/8"
5/8"
156.00
22.00
78.00
22.00
5.85
24.25
5.55
24.25
912.60
533.50
432.90
533.50
853.60
692.64
853.60
3.60 1"
5/8"
5/8"
5/8"
84.00
19.00
42.00
19.00
5.10
13.52
4.80
13.52
428.40
256.88
201.60
256.88
411.01
322.56
411.01
3.60 5/8"
5/8"
5/8"
5/8"
42.00
19.00
42.00
19.00
5.10
11.37
4.80
11.37
214.20
216.03
201.60
216.03
342.72
345.65
322.56
345.65
450.56
1,777.20
1,064.96
414.00
330.44
1,284.72
781.04
2,159.78
3,686.90
1,730.74
Descripcin
MTP-1
MTP-2
MTP-3
Cant de
Elemen
1.00
1.00
1.00
%
1.00
1.00
1.00
l
11.54
23.27
18.30
Concreto y otros
Medidas
a
h
3.25
0.70
3.25
3.25
Total
(m3)
26.25
0.70
0.70
52.94
41.63
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
3.25
0.70
2.28 1/2"
1/2"
1"
1/2"
3.25
3.25
0.70
0.70
Fierro
N de
Long
Piezas
P/Pz
77.00
2.65
12.00
12.54
39.00
3.55
17.00
12.54
Long
Total
204.05
150.48
138.45
213.18
1/4"
3/8"
1/2"
0.26
0.6
1.02
1.6
2.3
2.28 1/2"
1/2"
1"
1/2"
156.00
12.00
78.00
17.00
2.65
24.27
3.55
24.27
413.40
291.24
276.90
412.59
421.67
297.06
2.28 1/2"
1/2"
1"
1/2"
123.00
12.00
62.00
17.00
2.65
19.30
3.55
19.30
325.95
231.60
220.10
328.10
332.47
236.23
1,118.68
420.84
889.20
334.66
13.70
3.00
0.70
28.77
3.00
0.70
2.10 3/4"
3/4"
3/4"
3/4"
55.00
13.00
55.00
13.00
3.60
14.30
3.30
14.30
198.00
185.90
181.50
185.90
455.40
427.57
417.45
427.57
Z-2
1.00
1.00
10.72
3.00
0.70
22.51
3.00
0.70
2.10 3/4"
3/4"
3/4"
3/4"
43.00
13.00
43.00
13.00
3.60
11.32
3.30
11.32
154.80
147.16
141.90
147.16
356.04
338.47
326.37
338.47
-
2,622.00
8,981.27
4,074.04
13,206.56
1.00
24.60
6.00
0.59
87.33
24.60
24.60
7.20
7.38
1.00
1.00
17.78
6.00
0.59
63.10
17.78
17.78
7.20
7.38
ACERO DE CABEZAL
MUP-1
37.23
ACERO DE CABEZAL
MC-2
7.91
559.34
1.00
MC-1
1 3/8"
217.44
1.00
1"
4.04
208.13
153.49
Z-1
621.64
02.03.04
Peso en Kilogramos/metro
5/8"
3/4"
2.00
1.00
12.00
6.30
0.58
88.32
12.00
12.00
7.20
7.38
177.12 1/2"
181.55 1"
1"
1/2"
3/8"
83.00
83.00
83.00
32.00
32.00
7.68
7.68
3.45
25.60
25.60
637.44
637.44
286.35
819.20
819.20
3/4"
1/2"
5/8"
5/8"
1/2"
124.00
12.00
99.00
99.00
11.00
3.02
25.60
1.75
2.60
25.60
374.48
307.20
173.25
257.40
281.60
127.98 1/2"
131.18 1"
1"
1/2"
3/8"
60.00
60.00
60.00
32.00
32.00
7.68
7.68
3.45
18.78
18.78
460.80
460.80
207.00
600.80
600.80
3/4"
1/2"
5/8"
5/8"
1/2"
89.00
12.00
72.00
72.00
11.00
3.02
18.78
1.75
2.60
18.78
268.78
225.30
126.00
187.20
206.53
172.80 1/2"
177.12 1"
1"
1/2"
3/8"
41.00
41.00
41.00
32.00
32.00
7.52
7.52
3.20
13.00
13.00
616.64
616.64
262.40
832.00
832.00
650.19
2,575.26
1,156.85
835.58
491.52
861.30
313.34
277.20
411.84
287.23
470.02
1,861.63
836.28
612.82
360.48
618.19
229.81
201.60
299.52
210.66
628.97
2,491.23
1,060.10
848.64
499.20
28,883.87
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
ACERO DE CABEZAL
MUP-2
2.00
1.00
23.25
6.30
0.58
171.12
23.25
23.25
7.20
7.38
ACERO DE CABEZAL
MUP-3
2.00
1.00
12.52
6.30
0.58
92.15
12.52
12.52
7.20
7.38
ACERO DE CABEZAL
MUE-1
1.00
1.00
1.00
1.00
10.37
10.37
7.30
7.30
0.48
0.51
36.19
38.89
10.37
10.37
10.37
10.37
7.30
7.32
7.27
7.46
ACERO DE CABEZAL
MTP-1
ACERO DE CABEZAL
1.00
1.00
11.54
5.85
0.46
31.39
11.54
11.54
7.27
7.46
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
3/4"
1/2"
5/8"
5/8"
1/2"
61.00
12.00
49.00
49.00
11.00
3.02
13.00
1.75
2.60
13.00
368.44
312.00
171.50
254.80
286.00
334.80 1/2"
343.17 1"
1"
1/2"
3/8"
78.00
78.00
78.00
32.00
32.00
7.52
7.52
3.20
24.25
24.25
1,173.12
1,173.12
499.20
1,552.00
1,552.00
3/4"
1/2"
5/8"
5/8"
1/2"
117.00
12.00
94.00
94.00
11.00
3.02
24.25
1.75
2.60
24.25
706.68
582.00
329.00
488.80
533.50
180.29 1/2"
184.80 1"
1"
1/2"
3/8"
42.00
42.00
42.00
32.00
32.00
7.52
7.52
3.20
13.52
13.52
631.68
631.68
268.80
865.28
865.28
3/4"
1/2"
5/8"
5/8"
1/2"
63.00
12.00
51.00
51.00
11.00
3.02
13.52
1.75
2.60
13.52
380.52
324.48
178.50
265.20
297.44
75.70 1/2"
75.91 1"
1"
1/2"
3/8"
35.00
35.00
35.00
37.00
37.00
8.32
8.32
2.89
11.37
11.37
291.20
291.20
101.15
420.69
420.69
75.43 1/2"
77.36 1"
1"
1/2"
3/8"
35.00
35.00
35.00
33.00
33.00
8.00
7.51
2.89
11.37
11.37
280.00
262.85
101.15
375.21
375.21
3/4"
1/2"
5/8"
5/8"
1/2"
52.00
12.00
42.00
42.00
11.00
3.02
11.37
1.75
2.60
11.37
157.04
136.44
73.50
109.20
125.07
83.94 3/8"
86.09 3/4"
3/4"
1/2"
1/2"
58.00
58.00
58.00
26.00
26.00
6.00
6.04
3.11
12.54
12.54
348.00
350.32
180.38
326.04
326.04
3/4"
1/2"
5/8"
5/8"
1/2"
58.00
12.00
47.00
47.00
11.00
3.02
12.54
1.75
2.60
12.54
175.16
150.48
82.25
122.20
137.94
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
847.41
318.24
274.40
407.68
291.72
1,196.58
4,739.40
2,016.77
1,583.04
931.20
1,625.36
593.64
526.40
782.08
544.17
644.31
2,551.99
1,085.95
882.59
519.17
875.20
330.97
285.60
424.32
303.39
297.02
1,176.45
408.65
429.10
252.41
285.60
1,061.91
408.65
382.71
225.13
361.19
139.17
117.60
174.72
127.57
208.80
805.74
414.87
332.56
332.56
402.87
153.49
131.60
195.52
140.70
Descripcin
MTP-2
Cant de
Elemen
1.00
%
1.00
Concreto y otros
Medidas
a
h
l
23.27
5.85
0.46
Total
(m3)
63.29
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
23.27
23.27
7.27
7.46
1.00
1.00
18.30
5.85
0.46
49.78
18.30
18.30
7.27
7.46
P-2
P-3
P-4
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.94
1.90
3.29
3.27
0.35
0.35
0.35
0.35
6.55
6.55
6.55
6.55
13.48
4.36
7.54
7.50
6.58
6.58
6.55
4.53
6.55
7.28
6.55
7.24
6.55
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
117.00
117.00
117.00
26.00
26.00
6.00
6.04
3.11
24.27
24.27
702.00
706.68
363.87
631.02
631.02
3/4"
1/2"
5/8"
5/8"
1/2"
117.00
12.00
94.00
94.00
11.00
3.02
24.27
1.75
2.60
24.27
353.34
291.24
164.50
244.40
266.97
133.11 3/8"
136.52 3/4"
3/4"
1/2"
1/2"
92.00
92.00
92.00
26.00
26.00
6.00
6.04
3.11
19.30
19.30
552.00
555.68
286.12
501.80
501.80
3/4"
1/2"
5/8"
5/8"
1/2"
92.00
12.00
74.00
74.00
11.00
3.02
19.30
1.75
2.60
19.30
277.84
231.60
129.50
192.40
212.30
86.20 3/4"
1/2"
3/8"
3/8"
10.00
20.00
33.00
44.00
8.95
8.95
6.15
2.60
179.00
358.00
405.90
228.80
243.54
137.28
29.67 3/4"
1/2"
3/8"
3/8"
10.00
10.00
33.00
44.00
8.95
8.95
4.15
2.45
89.50
89.50
136.95
107.80
82.17
64.68
47.68 3/4"
1/2"
3/8"
3/8"
10.00
24.00
33.00
44.00
8.95
8.95
6.88
2.60
89.50
214.80
227.04
114.40
47.42 3/4"
1/2"
3/8"
3/8"
10.00
24.00
33.00
44.00
8.95
8.95
6.88
2.60
89.50
214.80
227.04
114.40
ACERO DE CABEZAL
P-1
N de
Piezas
169.27 3/8"
173.59 3/4"
3/4"
1/2"
1/2"
ACERO DE CABEZAL
MTP-3
Diam
VIGA V-2
2.3
1"
1 3/8"
4.04
7.91
1,625.36
836.90
643.64
643.64
812.68
297.06
263.20
391.04
272.31
331.20
1,278.06
658.08
511.84
511.84
639.03
236.23
207.20
307.84
216.55
411.70
365.16
205.85
91.29
205.85
219.10
136.22
68.64
205.85
219.10
136.22
68.64
5,177.71
18,624.14
5,679.36
13,691.51
23,431.11
1,741.42
1,567.28
CARAVISTA
NORMAL
02.03.08
1.6
421.20
754.43
Peso en Kilogramos/metro
5/8"
3/4"
3.00
1.00
1.00
16.90
16.90
0.40
0.40
0.80
0.80
5.41
16.22
16.90
15.07
16.90
15.07
1.20
0.60
0.40
1.20
20.28 1"
9.04 1"
5/8"
1"
1"
1/2"
4.00
2.00
4.00
4.00
2.00
94.00
17.90
3.60
16.90
17.90
7.75
2.40
71.60
7.20
67.60
71.60
15.50
225.60
20.28 1"
54.26 1"
5/8"
1"
4.00
2.00
4.00
4.00
17.90
4.00
16.90
17.90
214.80
24.00
202.80
214.80
289.26
29.09
108.16
289.26
62.62
230.11
867.79
96.96
324.48
867.79
66,603.83
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
1"
1/2"
VIGA V-3
VIGA V-4
VIGA V-5
VIGA V-6
VIGA V-7
VIGA V-11
VIGA V-12
VIGA V-13
VIGA V-14
VIGA V-15
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16.90
6.32
3.50
1.70
22.90
22.95
1.90
17.61
17.61
17.61
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.80
0.80
0.80
0.80
1.05
1.05
0.80
0.80
0.80
0.80
5.41
2.02
1.12
0.54
9.62
9.64
0.61
5.64
11.27
5.64
16.90
15.07
10.27
6.32
3.68
3.50
6.17
1.70
2.58
22.90
13.28
23.00
22.95
22.84
11.72
1.90
2.93
17.61
25.50
17.61
15.70
17.61
0.40
0.60
0.60
0.40
0.60
0.40
0.60
0.40
0.60
0.40
0.95
0.95
0.40
0.95
0.95
0.40
0.60
0.40
0.60
0.40
1.20
0.40
Fierro
N de
Long
Piezas
P/Pz
2.00
7.75
94.00
2.40
Long
Total
46.50
676.80
6.76 1"
9.04 1"
6.16 5/8"
1"
1"
1/2"
4.00
2.00
4.00
4.00
2.00
94.00
17.90
3.60
16.90
17.90
8.55
2.40
71.60
7.20
67.60
71.60
17.10
225.60
2.53 1"
2.21 5/8"
1"
1"
1/2"
3.00
4.00
3.00
2.00
40.00
8.05
7.05
8.05
4.26
2.40
24.15
28.20
24.15
8.51
96.00
1.40 1"
3.70 5/8"
1"
1/2"
3.00
4.00
3.00
23.00
5.00
4.00
5.23
2.40
15.00
16.00
15.69
55.20
0.68 1"
1.55 5/8"
1"
1/2"
3.00
4.00
3.00
12.00
3.13
2.20
3.13
2.40
9.39
8.80
9.39
28.80
9.16 1"
12.62 1"
21.85 5/8"
1"
1"
1/2"
5.00
3.00
6.00
5.00
5.00
130.00
23.90
4.61
22.90
24.33
8.74
2.90
119.50
13.83
137.40
121.65
43.70
377.00
9.18 1"
21.70 1"
11.13 5/8"
1"
1"
1/2"
5.00
2.00
6.00
5.00
5.00
130.00
23.95
3.61
22.95
23.95
8.17
2.90
119.75
7.22
137.70
119.75
40.85
377.00
0.76 1"
1.76 5/8"
1"
1/2"
3.00
4.00
3.00
11.00
3.50
1.90
3.50
2.40
10.50
7.60
10.50
26.40
7.04 1"
15.30 1"
5/8"
1"
1"
1/2"
4.00
2.00
4.00
4.00
2.00
98.00
18.61
4.00
17.61
18.61
13.20
2.40
74.44
8.00
70.44
74.44
26.40
235.20
14.09 1"
37.69 1"
5/8"
1"
1"
1/2"
4.00
3.00
4.00
4.00
3.00
98.00
18.61
4.00
17.61
18.61
12.85
2.40
148.88
24.00
140.88
148.88
77.10
470.40
7.04 1"
4.00
18.61
74.44
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
187.86
690.34
289.26
29.09
108.16
289.26
69.08
230.11
97.57
45.12
97.57
34.38
97.92
60.60
25.60
63.39
56.30
37.94
14.08
37.94
29.38
482.78
55.87
219.84
491.47
176.55
384.54
483.79
29.17
220.32
483.79
165.03
384.54
42.42
12.16
42.42
26.93
300.74
32.32
112.70
300.74
106.66
239.90
601.48
96.96
225.41
601.48
311.48
479.81
300.74
Descripcin
VIGA V-8
VIGA V-9
VIGA V-10
VIGA V-16
VIGA V-17
VIGA V-18'
VIGA V-19
VIGA V-18
VIGA V-24
VIGA V-20
VIGA V-21
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
4.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
51.02
35.93
9.60
7.30
8.10
8.10
8.02
8.00
8.45
56.87
52.32
0.40
0.30
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
Total
(m3)
16.33
8.62
3.07
2.33
2.59
2.59
10.27
38.40
2.70
18.20
16.74
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
17.61
0.60
10.57 1"
15.70
0.60
9.42 5/8"
1"
1"
1/2"
Fierro
N de
Long
Piezas
P/Pz
2.00
4.00
4.00
17.61
4.00
18.61
2.00
13.20
98.00
2.40
Long
Total
8.00
70.44
74.44
26.40
235.20
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
64.70
63.70
2.40
517.60
254.80
849.60
35.93
1.50
53.90 1"
5/8"
1/2"
6.00
4.00
235.00
43.15
42.15
2.20
258.90
168.60
517.00
527.34
15.36 1"
5/8"
1/2"
8.00
4.00
67.00
13.02
12.02
2.40
104.16
48.08
160.80
164.02
11.67 1"
5/8"
1/2"
8.00
4.00
51.00
9.30
9.00
2.40
74.40
36.00
122.40
124.85
9.72 1"
4.67 5/8"
2.91 1"
1"
1/2"
4.00
4.00
4.00
2.00
50.00
9.90
8.90
9.90
4.11
2.40
39.60
35.60
39.60
8.22
120.00
9.35 1"
3.24 5/8"
1"
1"
1/2"
4.00
4.00
4.00
2.00
50.00
9.90
8.90
9.90
4.11
2.40
39.60
35.60
39.60
8.22
120.00
12.83 1"
37.06 5/8"
1"
1"
1/2"
4.00
4.00
4.00
2.00
50.00
9.82
8.82
9.82
4.11
2.40
157.12
141.12
157.12
32.88
480.00
48.00 1"
69.30 5/8"
1"
1"
1/2"
4.00
4.00
4.00
2.00
49.00
9.80
8.80
9.80
4.11
2.40
588.00
528.00
588.00
123.30
1,764.00
10.14 1"
4.89 5/8"
1"
1"
1/2"
4.00
4.00
4.00
2.00
52.00
10.25
9.25
10.25
4.48
2.40
41.00
37.00
41.00
8.96
124.80
68.24 1"
28.12 5/8"
1"
1/2"
6.00
4.00
4.00
316.00
59.87
56.87
59.87
2.40
359.21
227.47
239.47
758.40
62.79 1"
27.07 5/8"
1"
6.00
4.00
4.00
55.32
52.32
55.32
331.94
209.30
221.30
8.10
7.79
4.86
7.79
8.10
8.02
7.72
8.00
7.70
8.45
8.15
56.87
46.87
52.32
45.12
1.20
0.60
0.60
1.20
0.40
0.40
1.20
0.40
0.60
1.20
0.60
1.20
0.60
1.20
0.60
7.91
300.74
106.66
8.00
4.00
354.00
1.60
1 3/8"
239.90
68.07 1"
38.80 5/8"
1/2"
7.30
1"
4.04
112.70
1.20
0.60
1.60
2.3
32.32
56.72
64.67
9.60
1.6
2,091.10
407.68
866.59
1,045.96
269.76
420.81
76.93
300.58
57.60
159.98
56.96
159.98
33.21
122.40
159.98
56.96
159.98
33.21
122.40
634.76
225.79
634.76
132.84
489.60
2,375.52
844.80
2,375.52
498.13
1,799.28
165.64
59.20
165.64
36.20
127.30
1,451.19
363.95
967.46
773.57
1,341.05
334.87
894.03
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
1/2"
VIGA V-22
VIGA V-23
VEREDAS LATERALES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.92
41.48
263.91
25.55
18.00
0.40
0.40
2.28
3.21
3.90
0.80
0.80
0.20
0.20
0.20
1.57
13.27
120.34
16.38
14.04
4.92
41.48
115.75
25.55
18.00
1.60
1.60
2.28
2.37
2.77
Fierro
N de
Long
Piezas
P/Pz
291.00
2.40
Long
Total
698.40
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
712.37
7.87 1"
5/8"
1"
1/2"
6.00
4.00
4.00
28.00
7.92
4.92
7.92
2.40
47.52
19.68
31.68
67.20
191.98
66.37 1"
5/8"
1"
1/2"
6.00
4.00
4.00
231.00
44.48
41.48
44.48
2.40
266.87
165.91
177.91
554.40
263.91 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
1/2"
1/2"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
1/2"
1/2"
5/8"
5/8"
36.00
36.00
27.00
27.00
9.00
9.00
26.00
26.00
78.00
78.00
30.00
30.00
26.00
26.00
27.00
27.00
54.00
54.00
14.00
14.00
27.00
27.00
17.70
16.90
7.90
7.10
1.81
1.01
11.35
10.55
17.11
16.31
18.41
17.61
3.75
2.95
13.65
12.85
10.80
10.00
3.25
2.45
11.35
10.55
637.20
608.40
213.30
191.70
16.29
9.09
295.10
274.30
1,334.58
1,272.18
552.30
528.30
97.50
76.70
368.55
346.95
583.20
540.00
45.50
34.30
306.45
284.85
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
40.00
40.00
80.00
80.00
48.00
48.00
8.00
8.00
18.00
54.00
54.00
52.00
52.00
52.00
52.00
14.00
14.00
9.71
8.91
9.61
8.81
9.61
8.81
5.21
4.41
2.21
11.96
11.16
24.06
24.06
17.53
17.53
3.30
3.30
388.40
356.40
768.80
704.80
461.28
422.88
41.68
35.28
39.78
645.84
602.64
1,251.12
1,251.12
911.56
911.56
46.20
46.20
396.17
363.53
784.18
718.90
470.51
431.34
42.51
35.99
40.58
60.55 1/2"
49.86 1/2"
1/2"
1/2"
3/8"
3/8"
218.00
10.00
218.00
10.00
175.00
2.00
2.00
44.35
2.55
44.35
0.65
44.35
436.00
443.50
555.90
443.50
113.75
88.70
444.72
452.37
567.02
452.37
31.49
127.99
68.54
1,078.16
265.46
718.77
565.49
649.94
620.57
217.57
195.53
16.62
9.27
472.16
438.88
2,135.33
2,035.49
563.35
538.87
99.45
78.23
589.68
555.12
933.12
864.00
46.41
34.99
490.32
455.76
1,033.34
964.22
2,001.79
2,001.79
1,458.50
1,458.50
73.92
73.92
68.25
53.22
121.47
17,824.48
22,616.03
27,696.74
02.03.11
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
360.60
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
1,361.91
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
1.00
1.00
38.72
1.00
1.00
38.90
1.00
1.00
16.67
3.00
0.25
3.00
0.25
3.00
0.25
0.20
0.20
0.20
0.40
0.20
0.20
23.23
1.94
23.34
3.89
10.00
0.83
42.19
0.20
66.73
0.20
37.14
0.20
8.44 1/2"
1/2"
13.35 1/2"
1/2"
7.43 1/2"
1/2"
29.21
1.00
1.00
1.00
1.00
42.00
42.00
02.04.02
03
03.01
03.01.01
2.3
1"
1 3/8"
4.04
7.91
68,258.72
155.00
39.32
156.00
39.50
67.00
17.27
7.25
25.00
8.82
30.00
7.25
25.00
1,123.75
982.92
1,375.92
1,185.00
485.75
431.67
-
VARIOS
APOYOS DE NEOPRENO FIJO
1.6
63.23
02.04
02.04.01
Peso en Kilogramos/metro
5/8"
3/4"
37.00
1.00
1.00
1.00
1.00
2.00
1.00
23.83
1.00
1.00
37.00
37.00
47.65 M2
1,146.23
1,002.58
1,403.44
1,208.70
495.47
440.30
5,696.70
5,696.70
Part.
N
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
VARIOS
BARANDAS
BARANDA METALICAS TIPO 1
BARANDA TIPO 1
Und
Cant de
Elemen
%
l
Mediadas
b
Total
a, h
1.00
138.57
1.00
1.00
1.00
138.57
138.57
1.00
69.80
1.00
1.00
1.00
69.80
69.80
1.00
35.44
1.00
1.00
1.00
35.44
35.44
1.00
42.39
1.00
1.00
1.00
42.39
42.39
04.02
JUNTAS
04.02.01
1.00
1.00
23.64
1.00
TAPAJUNTA METALICA
PUENTE PRINCIPAL
1.00
1.00
200.20
1.00
1.00
1.00
105.97
1.00
04.02.02
04.02.03
23.64
1.00
200.20
105.97
RESUMEN DE METRADOS
TRATAMIENTO DE TORRENTERA
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.01
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.03
02.03.01
02.03.02
02.03.03
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
Descripcin
TRABAJOS PRELIMINARES
NIVELACION, TRAZO Y REPLANTEO
TRATAMIENTO TORRENTERA - ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
BASE DE 0.20 M
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO F'C=20.59 MPa (210 KG/CM2) + 30 % P.G. DEFENSA TORRENTERA
CONCRETO ARMADO
CONCRETO F'C=20.59 MPa (210 KG/CM2) LOSA TORRENTERA C/FIBRA DE ACERO E= 15CM
ENCOFRADO Y DESENCOFRADO NORMAL LOSA DE TORRENTERA
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) LOSA TORRENTERA
VARIOS
JUNTAS
JUNTA DE DILATACION
JUNTA DE CONTRACCION
JUNTA CONSTRUCTIVA TIPO A
JUNTA DE E = 6 MM
UND
Metrado
M2
4,655.20
M3
M3
M2
M3
22.40
2.56
4,655.20
24.80
M3
19.84
M3
M2
KG
698.28
105.29
3,499.92
M
M
M
M
120.00
816.00
581.90
1,163.80
Descripcin
01
TRABAJOS PRELIMINARES
01.01
02
02.01
02.01.01
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO NORMAL C/EQUIPO
DEFENSA TORRENTERA
02.01.02
02.01.03
BASE DE 0.20 M
Cant de
Elemen
1.00
Concreto y otros
Medidas
a
h
1.00
2.00
1.00
2.00
1.00
02.01.04
1.00
1.25
8.00
1.40
8.00
1.00
0.80
02.02
02.02.01
CONCRETO SIMPLE
CONCRETO F'C=20.59 MPa (210 KG/CM2) + 30 % P.G. DEFENSA TORRENTERA
581.90
0.20
8.00
EXCAVACION
TORRENTERA
8.00
4,655.20
120.00
581.90
0.15
0.15
18.00
87.29
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
M2
22.40
22.40
2.56
2.56
CONCRETO ARMADO
CONCRETO F'C=20.59 MPa (210 KG/CM2) LOSA TORRENTERA C/FIBRA DE ACERO E= 15CM
581.90
Diam
1.00
02.03
02.03.01
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
TORRENTERA
DEFENSA TORRENTERA
Total
(m3)
4,655.20
4,655.20
RELLENO
22.40
2.56
24.80
24.80
1.00
8.00
1.40
0.89
19.84
19.84
1.00
581.90
8.00
0.15
698.28
3/4"
1/2"
3/4"
405.00
776.00
2,754.00
0.40
0.75
0.40
162.00
582.00
1,101.60
372.60
593.64
-
698.28
105.29
593.64
2,533.68
2,906.28
3,499.92
Part.
N
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
VARIOS
JUNTAS
JUNTA DE DILATACION
JUNTA EN LOSA TORRENTERA
Und
Cant de
Elemen
%
l
Mediadas
b
Total
a, h
1.00
1.00
120.00
1.00
120.00
120.00
JUNTA DE CONTRACCION
JUNTA EN LOSA TORRENTERA
1.00
1.00
816.00
1.00
816.00
816.00
1.00
1.00
581.90
1.00
581.90
581.90
JUNTA DE E = 6 MM
JUNTA EN PAVIMENTO
1.00
1.00
1,163.80
1.00
1,163.80
RESUMEN DE METRADOS
MODIFICACION DE REDES DE AGUA Y DESAGE
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.04
03.04.01
Descripcin
TRABAJOS PRELIMINARES
NIVELACION, TRAZO Y REPLANTEO
INSTALACION DE REDES DE AGUA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
RELLENO COMPACTADO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE MANUAL
TUBERIAS Y ACCESORIOS
TUBERIA PVC AGUA C-10 160 MM
TUBERIA PVC AGUA C-10 200 MM
TUBERIA SCH40 ASTM-A120 DE 8"
REDUCCION DE PVC DE 200 A 160 MM
ACOPLAMIENTO DE ACERO DE 200 MM
ACOPLAMIENTO DE ACERO DE 160 MM
ESTRUCTURA METALICA DE SOPORTE
DESMONTAJE DE TUBERIA EXISTENTE 160 MM
INSTALACION PROVISIONAL DE TUBERIA DE PVC DE 160 MM
INSTALACION DE REDES DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
RELLENO COMPACTADO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE MANUAL
TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIAS PVC CP-20 300 mm ISO 4435
SUMINISTRO E INSTALACION DE TUBERIAS PVC CP-25 200 mm
BUZONES
BUZONES DE CONCRETO H<3M TAPA DE CONCRETO
BUZONES DE CONCRETO H>3M TAPA DE CONCRETO
MODIFICACION DE REDES DE DESAGUE
ADECUACION DE INSTALACIONES DOMICILIARIAS DE DESAGE
UND
Metrado
400.89
M3
M3
M3
48.90
39.12
12.23
M
M
M
UND
UND
UND
KG
M
M
22.00
17.00
28.00
2.00
4.00
2.00
36.91
60.84
102.06
M3
M3
M3
395.51
316.41
98.88
M
M
234.37
95.22
UND
UND
2.00
4.00
UND
11.00
Part. N
Descripcin
01
TRABAJOS PRELIMINARES
01.02
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Fierro
Diam
1.00
400.89
400.89
Part.
N
Und
Cant de
Elemen
%
l
Mediadas
b
Total
a, h
02
02.01
MOVIMIENTO DE TIERRAS
02.01.01
EXCAVACION DE ZANJAS
EXCAVACION DE ZANJAS
m3
1.00
1.00
40.75
0.60
2.00
48.90
48.90
m3
1.00
1.00
32.60
0.60
2.00
39.12
39.12
m3
1.00
1.25
48.90
39.12
12.23
12.23
02.01.02
02.01.03
02.02
TUBERIAS Y ACCESORIOS
02.02.01
1.00
1.00
22.00
22.00
02.02.02
1.00
1.00
17.00
17.00
02.02.03
1.00
1.00
28.00
28.00
02.02.04
und
2.00
1.00
1.00
2.00
02.02.05
und
4.00
1.00
1.00
4.00
02.02.06
und
2.00
1.00
1.00
2.00
02.02.07
Kg
20.00
1.00
0.48
1.00
MM
1.60
15.25
Kg
10.00
1.00
0.13
0.20
6.00
11.78
Kg
10.00
1.00
0.01
0.50
12.50
4.91
Kg
10.00
1.00
0.01
0.50
12.70
4.98
36.91
02.02.08
1.00
1.00
60.84
60.84
02.02.09
1.00
1.00
102.06
102.06
03
03.01
MOVIMIENTO DE TIERRAS
03.01.01
EXCAVACION DE ZANJAS
EXCAVACION DE ZANJAS
m3
1.00
1.00
329.59
0.60
2.00
395.51
395.51
m3
1.00
1.00
263.67
0.60
2.00
316.41
316.41
m3
1.00
1.25
395.51
316.41
98.88
98.88
TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIAS PVC CP-20 300 mm ISO 4435
SUMINISTRO E INSTALACION DE TUBERIAS PVC CP-25 300 mm
1.00
1.00
234.37
234.37
234.37
1.00
1.00
95.22
95.22
95.22
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.03
03.03.01
BUZONES
BUZONES DE CONCRETO H<3M TAPA DE CONCRETO
und
2.00
1.00
1.00
2.00
03.03.02
und
4.00
1.00
1.00
4.00
Part.
N
Elemento:
Descripcin
03.04
03.04.01
Und
und
Cant de
Elemen
11.00
%
l
1.00
Mediadas
b
Total
a, h
11.00
RESUMEN DE METRADOS
ALCANTARILLADO PLUVIAL
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.04
02.04.01
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
Descripcin
TRABAJOS PRELIMINARES
NIVELACION, TRAZO Y REPLANTEO
ALCANTARILLADO PLUVIAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO F'C=9.81 MPa (100 KG/CM2) e=10 cm PARA SOLADOS
PISO DE CEMENTO PULIDO
CONCRETO ARMADO
CONCRETO F'C= 27.46 MPa (210 KG/CM2) ALCANTARILLAS
ENCOFRADO Y DESENCOFRADO CARAVISTA ALCANTARILLAS
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2)
CONCRETO F'C= 27.46 MPa (210 KG/CM2) CANAL Y SIFON
ENCOFRADO Y DESENCOFRADO CARAVISTA CANAL Y SIFON
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) CANAL Y SIFON
CARPINTERIA METALICA
REJILLA METALICA DE ALCANTARILLA
TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACIONES DE TUBERIA PVC 12"
SUMINISTRO E INSTALACIONES DE TUBERIA PVC SAP 3" PARA DRENAJE
BUZON DE CONCRETO ARMADO H < 3.00 M TAPA DE CONCRETO
BUZON DE CONCRETO ARMADO H > 3.00 M TAPA DE CONCRETO
BUZON DE CONCRETO ARMADO H > 4.00 M TAPA DE CONCRETO
UND
Metrado
765.30
M3
M3
M3
1,825.35
1,279.50
682.32
M3
M2
13.33
87.07
M3
M2
KG
M3
M2
KG
56.84
174.70
3,490.07
22.69
68.51
3,584.48
KG
18,838.56
M
UND
UND
UND
UND
549.59
5.00
12.00
9.00
2.00
Descripcin
01
TRABAJOS PRELIMINARES
01.02
02
ALCANTARILLADO PLUVIAL
02.01
MOVIMIENTO DE TIERRAS
02.01.01
EXCAVACION DE ZANJAS
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
1.00
765.30
ALCANTARILLA N1
BUZON ALCANTARILLA N1
TUBERIA PVC 12"
1.00
1.00
1.00
1.00
1.00
1.00
21.33
1.60
3.25
0.90
1.66
0.75
1.32
2.34
1.69
25.34
6.22
4.12
ALCANTARILLA N2
BUZON ALCANTARILLA N2
BUZON INTERMEDIO ENTRE ALC. 2 Y ALC. 6
TUBERIA PVC 12" BUZON ALC. 2 @ BUZONC INTERMEDIO ENTRE 2 Y 6
TUBERIA PVC 12" BUZON INTERMEDIO ENTRE 2 Y 6 @ ALC 6
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
18.26
1.60
1.60
50.86
61.08
0.90
1.66
2.02
0.90
0.90
1.33
2.34
4.10
1.88
3.46
21.86
6.22
13.24
85.95
189.96
ALCANTARILLA N6
BUZON ALCANTARILLA N6
BUZON INTERMEDIO ENTRE ALC. 6 Y ALC. 8
TUBERIA PVC 12" BUZON ALC. 2 @ BUZON INTERMEDIO ENTRE 6 Y 8
TUBERIA PVC 12" BUZON INTERMEDIO ENTRE 6 Y 8 @ ALC 8
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.36
1.60
1.60
41.11
37.60
0.90
2.09
1.75
0.90
0.90
1.04
4.21
2.70
2.76
1.68
2.20
14.10
7.57
101.95
56.96
ALCANTARILLA N8
BUZON ALCANTARILLA N8
TUBERIA PVC 12"
1.00
1.00
1.00
1.00
1.00
1.00
2.40
1.60
1.41
0.90
1.68
0.75
1.04
2.34
1.64
2.24
6.28
1.73
ALCANTARILLA N3
BUZON ALCANTARILLA N3
BUZON INTERMEDIO ENTRE ALC. 3 Y ALC. 7
TUBERIA PVC 12" BUZON ALC. 3 @ BUZON INTERMEDIO ENTRE 3 Y 7
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.29
1.60
1.60
32.70
29.94
30.00
31.85
0.90
1.76
2.05
0.90
0.90
0.90
0.90
1.06
2.71
4.02
2.51
3.17
3.08
3.32
4.09
7.62
39.56
73.90
85.33
83.10
95.23
ALCANTARILLA N7
BUZON ALCANTARILLA N7
BUZON INTERMEDIO 1
BUZON INTERMEDIO 2
BUZON INTERMEDIO 3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.35
1.60
1.60
1.60
1.60
0.90
2.16
2.14
2.09
1.84
1.05
2.71
4.41
4.22
3.08
3.17
9.38
15.13
14.14
9.06
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
22.55
30.00
35.35
3.00
0.90
0.90
0.90
0.90
3.80
3.66
2.96
2.38
77.12
98.85
94.03
6.43
ALCANTARILLA N5
BUZON ALCANTARILLA N5
BUZON INTERMEDIO 1
BUZON INTERMEDIO 2
BUZON INTERMEDIO 3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
18.00
1.60
1.60
1.60
1.60
0.90
1.59
1.62
1.52
1.49
1.20
1.90
4.41
4.41
4.41
19.44
4.85
11.42
10.72
10.54
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
26.60
29.13
21.60
22.55
0.60
0.60
0.60
0.60
1.27
1.18
0.85
5.70
20.22
20.68
11.02
77.12
765.30
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
02.01.02
Concreto y otros
Medidas
a
h
0.60
0.68
Cant de
Elemen
1.00
1.00
7.81
ALCANTARILLA N4
BUZON ALCANTARILLA N4
TUBERIA PVC 12" BUZON ALC. 4 @ FINAL
1.00
1.00
1.00
1.00
1.00
1.00
5.20
1.60
31.20
0.90
1.96
0.90
1.08
3.62
1.80
5.05
11.33
50.54
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
19.60
7.09
11.29
18.50
0.60
0.60
0.60
0.60
0.91
0.77
0.82
0.91
10.64
3.26
5.53
10.05
1.00
1.00
1.00
1.00
32.35
31.95
0.90
0.90
2.49
4.32
72.40
124.29
Descripcin
Total
(m3)
3.20
4.00
1.00
4.30
0.85
0.65
9.50
1.00
1.00
19.05
1.00
1.73
32.96
EXCAVACION EN SIFON
1.00
1.00
1.00
1.00
1.00
1.00
1.90
1.00
1.90
1.25
9.95
1.25
5.81
0.53
8.18
13.79
5.29
19.44
1,825.35
1.00
1.00
3.25
0.75
1.69
4.12
1.00
1.00
1.00
1.00
50.86
61.08
0.90
0.90
1.88
3.46
85.95
189.96
1.00
1.00
1.00
1.00
41.11
37.60
0.90
0.90
2.76
1.68
101.95
56.96
1.00
1.00
1.41
0.75
1.64
1.73
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
32.70
29.94
30.00
31.85
0.90
0.90
0.90
0.90
2.51
3.17
3.08
3.32
73.90
85.33
83.10
95.23
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
22.55
30.00
35.35
3.00
0.90
0.90
0.90
0.90
3.80
3.66
2.96
2.38
77.12
98.85
94.03
6.43
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
26.60
29.13
21.60
22.55
7.81
0.60
0.60
0.60
0.60
0.60
1.27
1.18
0.85
5.70
0.68
20.22
20.68
11.02
77.12
3.20
1.00
1.00
31.20
0.90
1.80
50.54
(1.00)
1.00
549.59
0.30
0.24
(38.85)
BUZON ALCANTARILLA N1
1.00
1.00
1.60
1.66
2.34
6.22
BUZON ALCANTARILLA N2
1.00
1.00
1.60
1.66
2.34
6.22
- TUBERIAS
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Concreto y otros
Medidas
a
h
2.02
4.10
Cant de
Elemen
1.00
1.00
1.60
BUZON ALCANTARILLA N6
BUZON INTERMEDIO ENTRE ALC. 6 Y ALC. 8
1.00
1.00
1.00
1.00
1.60
1.60
2.09
1.75
4.21
2.70
14.10
7.57
BUZON ALCANTARILLA N8
1.00
1.00
1.60
1.68
2.34
6.28
BUZON ALCANTARILLA N3
BUZON INTERMEDIO ENTRE ALC. 3 Y ALC. 7
1.00
3.00
1.00
1.00
1.60
1.60
1.76
2.05
2.71
4.02
7.62
39.56
BUZON ALCANTARILLA N7
BUZON INTERMEDIO 1
BUZON INTERMEDIO 2
BUZON INTERMEDIO 3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.60
1.60
1.60
1.60
2.16
2.14
2.09
1.84
2.71
4.41
4.22
3.08
9.38
15.13
14.14
9.06
BUZON ALCANTARILLA N5
BUZON INTERMEDIO 1
BUZON INTERMEDIO 2
BUZON INTERMEDIO 3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.60
1.60
1.60
1.60
1.59
1.62
1.52
1.49
1.90
4.41
4.41
4.41
4.85
11.42
10.72
10.54
1.00
1.00
1.60
1.96
3.62
11.33
(1.00)
1.00
1.60
1.26
57.93
(116.47)
Descripcin
BUZON ALCANTARILLA N4
- BUZON
Total
(m3)
13.24
1,279.50
02.01.03
ELIMINACION
02.02
CONCRETO SIMPLE
02.02.01
1.00
1.25
RELLENO
1,825.35
1,279.50
682.32 M3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
21.63
18.35
4.29
5.20
18.00
2.36
3.35
2.40
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.95
1.65
0.39
0.47
1.62
0.21
0.30
0.22
23.00
1.00
1.60
1.26
0.10
4.62
1.00
1.00
19.05
1.00
0.10
1.91
13.33
02.02.02
1.00
1.00
1.00
1.00
1.00
1.00
1.00
21.63
18.35
4.29
5.20
18.00
2.36
3.35
0.90
0.90
0.90
0.90
0.90
0.90
0.90
19.47
16.52
3.86
4.68
16.20
2.12
3.02
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
ALCANTARILLA 8
CANAL NUEVO
Cant de
Elemen
1.00
1.00
2.40
1.00
1.00
19.05
Concreto y otros
Medidas
a
h
0.90
1.00
Total
(m3)
2.16
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
19.05
87.07
02.03
CONCRETO ARMADO
02.03.01
ALCANTARILLA 1
1.00
1.00
1.00
1.00
19.28
2.35
0.58
0.53
1.31
1.38
14.56
1.72
19.28
2.35
2.28
2.55
43.96 3/8"
5.99 3/8"
3/8"
3/8"
3/8"
3/8"
78.00
156.00
33.00
10.00
10.00
32.00
2.00
4.30
20.28
4.00
6.52
3.35
156.00
670.80
669.24
40.00
65.20
107.20
93.60
402.48
401.54
24.00
39.12
64.32
ALCANTARILLA 2
1.00
1.00
1.00
1.00
16.70
1.65
0.58
0.53
1.31
1.38
12.61
1.20
16.70
1.65
2.28
2.55
38.08 3/8"
4.21 3/8"
3/8"
3/8"
3/8"
3/8"
67.00
134.00
33.00
7.00
7.00
32.00
2.00
4.30
16.80
4.00
6.52
2.65
134.00
576.20
554.40
28.00
45.64
84.80
80.40
345.72
332.64
16.80
27.38
50.88
ALCANTARILLA 3
1.00
1.00
4.29
0.71
1.06
3.24
4.29
2.28
9.78 3/8"
3/8"
3/8"
18.00
36.00
33.00
2.00
4.30
4.39
36.00
154.80
144.87
21.60
92.88
86.92
ALCANTARILLA 4
1.00
1.00
5.20
0.71
1.06
3.93
5.20
2.28
11.86 3/8"
3/8"
3/8"
21.00
42.00
33.00
2.00
4.30
5.30
42.00
180.60
174.90
25.20
108.36
104.94
ALCANTARILLA 5
1.00
1.00
1.00
1.00
13.20
4.80
0.71
0.53
1.06
1.38
9.97
3.50
13.20
4.80
2.28
2.55
30.10 3/8"
12.24 3/8"
3/8"
3/8"
3/8"
3/8"
53.00
106.00
33.00
20.00
20.00
32.00
2.00
4.30
13.30
4.00
6.52
5.80
106.00
455.80
438.90
80.00
130.40
185.60
63.60
273.48
263.34
48.00
78.24
111.36
ALCANTARILLA 6
1.00
1.00
2.36
0.71
1.06
1.78
2.36
2.28
5.38 3/8"
3/8"
3/8"
10.00
20.00
33.00
2.00
4.30
2.46
20.00
86.00
81.18
12.00
51.60
48.71
ALCANTARILLA 7
1.00
1.00
3.35
0.71
1.06
2.53
3.35
2.28
7.64 3/8"
3/8"
3/8"
14.00
28.00
33.00
2.00
4.30
3.45
28.00
120.40
113.85
16.80
72.24
68.31
ALCANTARILLA 8
1.00
1.00
2.40
0.71
1.06
1.81
2.40
2.28
5.47 3/8"
3/8"
3/8"
10.00
20.00
33.00
2.00
4.30
2.50
20.00
86.00
82.50
12.00
51.60
49.50
3,490.07
56.84
02.03.04
174.70
1.00
19.05
1.00
0.72
13.72
19.05
2.20
41.91 5/8"
1/2"
1/2"
192.00
192.00
44.00
2.48
2.71
19.05
476.16
520.32
838.20
761.86
530.73
854.96
3,490.07
Descripcin
CANAL CORTE 2 S-S
Cant de
Elemen
1.00
1.00
%
1.00
1.00
l
10.55
2.50
Concreto y otros
Medidas
a
h
1.00
0.68
1.00
0.72
Total
(m3)
7.17
1.80
Encofrado y otros
Medidas
Total
Diam
l
a (h)
(m2)
10.55
2.00
21.10 5/8"
1/2"
1/2"
2.50
2.20
5.50 1/2"
1/2"
1/2"
Fierro
N de
Long
Piezas
P/Pz
106.00
2.48
106.00
2.71
44.00
10.55
26.00
26.00
44.00
2.48
2.71
2.50
Long
Total
262.88
287.26
464.20
1/4"
3/8"
1/2"
0.26
0.6
1.02
02.04
CARPINTERIA METALICA
02.04.01
ALCANTARILLA 1
ALCANTARILLA 2
ALCANTARILLA 3
ALCANTARILLA 4
ALCANTARILLA 5
ALCANTARILLA 6
ALCANTARILLA 7
ALCANTARILLA 8
02.05
TUBERIAS Y ACCESORIOS
02.05.01
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
21.63
18.35
4.29
5.20
18.00
2.36
3.35
2.40
0.54
0.54
0.54
0.54
0.54
0.54
0.54
0.54
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
5,391.35
4,573.80
1,069.30
1,296.12
4,486.56
588.24
835.00
598.21
18,838.56
1.00
1.00
3.25
3.25
1.00
1.00
1.00
1.00
50.86
61.08
50.86
61.08
1.00
1.00
1.00
1.00
41.11
37.60
41.11
37.60
1.00
1.00
1.41
1.41
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
32.70
29.94
30.00
31.85
32.70
29.94
30.00
31.85
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
22.55
30.00
35.35
3.00
22.55
30.00
35.35
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
26.60
29.13
21.60
22.55
7.81
26.60
29.13
21.60
22.55
7.81
1.00
1.00
31.20
31.20
549.59
68.51
1.6
2.3
1"
1 3/8"
4.04
7.91
420.61
293.01
473.48
64.48
70.46
110.00
65.77
71.87
112.20
-
22.69
Peso en Kilogramos/metro
5/8"
3/4"
2,402.02
1,182.46
3,584.48
Descripcin
SUMINISTRO E INSTALACIONES DE TUBERIA PVC SAP 3" PARA DRENAJE
TUBERIAS
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
1.00
5.00 UND
02.05.03
02.05.04
02.05.05
12.00
9.00
2.00
1.00
1.00
1.00
12.00 UND
9.00 UND
2.00 UND
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
RESUMEN DE METRADOS
VEREDAS Y SARDINELES, AREAS VERDES, SEALIZACION Y PAVIMENTOS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.04
02.04.01
02.04.02
02.04.03
02.04.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
Descripcin
TRABAJOS PRELIMINARES
NIVELACION, TRAZO Y REPLANTEO
VEREDAS, BERMAS Y SARDINELES
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS
CONFORMACION DE SUBRASANTE PARA VEREDAS, BERMAS Y CICLOVIAS
BASE GRANULAR PARA VEREDAS E=10 CM
BASE GRANULAR PARA CICLOVIAS E=10 CM
BASE GRANULAR PARA BERMAS E=20 CM
ELIMINACION DE MATERIAL EXCEDENTE MANUAL
CONCRETO SIMPLE
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm PARA SOLADOS
CONCRETO F'C= 17.16 MPa (175 KG/CM2) VEREDAS Y SARDINEL
CONCRETO F'C= 20.59 MPa (210 KG/CM2) SARDINEL
ENCOFRADO Y DESENCOFRADO NORMAL SARDINELES
ENCOFRADO Y DESENCOFRADO CARAVISTA BORDE DE VEREDAS Y SARDINELES
CONCRETO ARMADO
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
ENCOFRADO Y DESENCOFRADO NORMAL
ENCOFRADO Y DESENCOFRADO CARAVISTA
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2)
CONCRETO F'C= 20.59 MPa (210 KG/CM2) SARDINEL
ENCOFRADO Y DESENCOFRADO NORMAL
ENCOFRADO Y DESENCOFRADO CARAVISTA
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2)
PISOS DE ADOQUIN CONCRETO
PISO DE ADOQUIN DE CONCRETO NATURAL-VEREDA E = 8 CM
PISO DE ADOQUIN DE CONCRETO AMARILLO-VEREDA (PLATEA VP) E= 8 CM
BLOQUE DE CONCRETO TIPO CIRCULAR - BERMA E= 8 CM
PISO DE ADOQUIN DE CONCRETO ROJO-CICLOVIA E= 8 CM
PAVIMENTO
PAVIMENTO RIGIDO
BASE 0.20 M
CONCRETO F'C= 20.59 MPa (210 KG/CM2) C/FIBRA DE ACERO E=15 CM
ENCOFRADO Y DESENCOFRADO NORMAL PISO REFORZADO
ACERO DE REFUERZO FY=411.87MPa (4200 KG/CM2) PISO REFORZADO
PAVIMENTO FLEXIBLE
BASE 0.20 M
AFIRMADO E=0.20 M
IMPRIMACION
RIEGO DE LIGA
CARPETA ASFALTICA EN CALIENTE E=0.075 M
CARPETA ASFALTICA EN CALIENTE E=0.05 M
SEALIZACION
PINTADO DE LINEAS CONTINUAS EN EL PAVIMENTO
PINTADO DE LINEAS DISCONTINUAS EN EL PAVIMENTO
PINTADO DE MARCAS EN EL PAVIMENTO
PINTADO DE SEAL CHEVRON
PINTADO DE FILO DE VEREDAS Y SARDINELES
SEALES REGLAMENTARIAS 600 x 900 mm
SEALES PREVENTIVAS 600 x 600 mm
SEALES INFORMATIVAS
UND
Metrado
M2
14,768.33
M3
M2
M2
M2
M2
M3
265.78
2,302.98
1,447.38
523.10
332.50
318.93
M3
M3
M3
M2
M2
99.71
166.72
62.73
226.07
128.44
M3
M2
M2
KG
M3
M2
M2
KG
4.53
15.18
12.60
107.04
565.52
563.52
2,673.37
18,623.97
M2
M2
M2
M2
47.94
232.10
332.50
475.45
M2
M3
M2
KG
4,516.50
677.48
118.30
3,634.89
M2
M2
M2
M2
M2
M2
7,758.60
407.21
8,369.24
8,369.24
7,758.60
610.64
M
M
M2
M2
M2
UND
UND
UND
301.58
1,766.80
268.02
492.75
2,300.24
13.00
17.00
15.00
RESUMEN DE METRADOS
VEREDAS Y SARDINELES, AREAS VERDES, SEALIZACION Y PAVIMENTOS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
oct-09
Elemento:
Part.
N
04.09
04.10
04.11
04.12
05
05.01
05.02
05.03
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
Descripcin
UND
Metrado
M
UND
UND
UND
57.40
373.00
4.00
8.00
M2
M2
UND
2,630.48
2,630.48
22.00
M
M
M
M
M
157.71
781.17
601.58
33.23
1,517.60
Descripcin
01
TRABAJOS PRELIMINARES
01.02
02
02.01
02.01.01
Cant de
Elemen
Concreto y otros
Medidas
a
h
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Total
(m3)
Diam
1.00
2,051.16
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
156.97
40.39
226.14
201.89
22.34
1.00
1.00
1.00
1.00
108.37
316.93
1.00
1.00
187.71
EXCAVACION
0.15
0.15
0.15
0.15
0.15
0.19
0.23
0.24
0.23
0.25
4.36
1.36
8.01
6.81
0.83
0.15
0.15
0.22
0.18
3.58
8.32
0.15
0.31
8.80
1.00
1.00
15.55
0.30
0.22
1.03
1.00
1.00
16.30
0.30
0.25
1.22
1.00
1.00
79.66
0.45
0.23
8.07
1.00
1.00
62.21
0.20
0.31
3.89
1.00
1.00
187.97
0.32
0.15
9.02
1.00
1.00
359.41
0.20
0.37
26.75
1.00
1.00
172.69
0.20
0.38
13.13
1.00
1.00
79.20
0.20
0.10
1.58
1.00
1.00
90.13
0.50
0.24
10.82
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
337.50
13.60
941.90
578.65
0.90
1.00
0.30
0.30
0.10
0.10
0.21
0.33
30.38
1.36
60.05
56.42
265.78
02.01.03
02.01.04
02.01.05
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.65
1.65
1.65
2.00
2.00
2,302.98
707.48
29.05
140.67
261.55
166.25
2,302.98
2,302.98 M2
1,167.34
47.94
232.10
1,447.38 M2
523.10
523.10 M2
332.50
7.20
14,768.33
M2
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
EXCAVACION
02.01.06
02.02
CONCRETO SIMPLE
02.02.01
02.02.02
1.20
RELLENO
265.78
318.93
318.93
1.00
1.00
15.55
0.30
0.10
0.47
1.00
1.00
16.30
0.30
0.10
0.49
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm SOLADO SARDINEL TIPO 2 BARRERA
1.00
1.00
425.30
0.15
0.10
6.38
1.00
1.00
79.66
0.45
0.10
3.58
1.00
1.00
359.41
0.20
0.10
7.19
1.00
1.00
172.69
0.20
0.10
3.45
1.00
1.00
79.20
0.10
0.10
0.79
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm SOLADO SARDINEL TIPO 13 W-W
1.00
1.00
337.50
0.90
0.10
30.38
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm SOLADO SARDINEL TIPO 13 Y-Y
1.00
1.00
13.60
1.00
0.10
1.36
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm SOLADO SARDINEL TIPO 13 X-X
1.00
1.00
941.90
0.30
0.10
28.26
CONCRETO F'C= 9.81 MPa (100 KG/CM2) e= 10 cm SOLADO SARDINEL TIPO 13 Z-Z
1.00
1.00
578.65
0.30
0.10
17.36
99.71 M3
VEREDAS
CONCRETO F'C= 17.16 MPa (175 KG/CM2) VEREDA TIPO 1 ACABADO PASTA C:A 1:2
1.00
1.00
1.65
670.91
0.13
138.38
RAMPAS
CONCRETO F'C= 17.16 MPa (175 KG/CM2) RAMPA ACABADO PASTA C:A 1:2
1.00
1.00
1.65
36.57
0.08
4.53
SARDINEL VEREDA
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.44
13.51
39.15
5.00
5.47
12.76
11.81
16.41
67.95
19.86
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.32
0.79
2.29
0.29
0.32
0.75
0.69
0.96
3.98
1.16
1.00
1.00
187.71
0.44
0.15
1.00
Encofrado y otros
Medidas
Total
Total
(m3)
l
a (h)
(m2)
332.50 M2
1.00
1.00
172.30
11.58
0.39
0.39
0.15
0.15
12.28
166.72 M3
10.08
0.68
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
02.02.04
Concreto y otros
Medidas
a
h
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
0.39
0.15
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
l
13.89
69.21
2.80
6.16
8.10
23.00
10.96
13.38
1.98
4.45
23.00
19.81
5.35
64.40
1.00
1.00
62.21
0.39
0.20
4.82
1.00
1.00
187.97
0.40
0.15
11.28
1.00
1.00
90.13
0.50
0.45
20.28
62.73 M3
Descripcin
Total
(m3)
0.81
4.05
0.16
0.36
0.47
1.35
0.64
0.78
0.12
0.26
1.35
1.16
0.31
3.77
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
1.00
1.00
1.00
1.00
1.00
1.00
5.44
39.15
12.76
11.81
67.95
19.86
0.08
0.08
0.08
0.08
0.08
0.08
0.44
3.13
1.02
0.94
5.44
1.59
1.00
1.00
187.71
0.18
32.85
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
172.30
11.58
13.89
69.21
2.80
6.16
8.10
23.00
10.96
13.38
1.98
4.45
23.00
19.81
5.35
64.40
0.28
0.30
0.30
0.30
0.16
0.16
0.28
0.30
0.28
0.16
0.28
0.28
0.28
0.30
0.28
0.30
47.38
3.47
4.17
20.76
0.43
0.95
2.23
6.90
3.01
2.07
0.54
1.22
6.33
5.94
1.47
19.32
1.00
1.00
62.21
0.16
9.95
1.00
1.00
187.97
0.16
30.08
1.00
1.00
90.13
0.16
14.42
226.07 M2
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
02.03
02.03.01
Descripcin
ENCOFRADO Y DESENCOFRADO CARAVISTA BORDE DE VEREDAS Y SARDINELES
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
1.00
1.00
1.00
1.00
7.43
13.62
0.13
0.20
0.93
2.72
1.00
1.00
1.00
1.00
4.00
2.00
1.00
2.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.51
1.50
1.82
1.20
1.20
1.20
0.50
1.20
1.61
1.20
1.20
1.20
1.30
1.58
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.11
0.11
0.14
0.09
0.36
0.18
0.04
0.18
0.12
0.18
0.18
0.09
0.10
0.12
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.44
13.51
39.15
5.00
5.47
12.76
11.81
67.95
16.41
19.86
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.82
2.04
5.92
0.76
0.83
1.93
1.79
10.28
2.48
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
172.30
11.58
13.89
69.21
2.80
6.16
8.10
23.00
10.96
13.38
1.98
4.45
23.00
19.81
5.35
64.40
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
26.07
1.75
2.10
10.47
0.42
0.93
1.23
3.48
1.66
2.02
0.30
0.67
3.48
3.00
0.81
9.74
1.00
1.00
90.13
0.28
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
CONCRETO ARMADO
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL
SARDINEL TIPO 4 CV-JARDINERA
CONCRETO F'C= 17.16 MPa (175 KG/CM2) SARDINEL TIPO 4
Diam
24.79
128.44 M2
1.00
15.55
0.24
0.65
2.45
3/8"
3/8"
3.00
52.00
15.55
0.80
46.65
41.60
27.99
24.96
1.00
1.00
16.30
0.20
0.65
2.08
3/8"
3/8"
3.00
55.00
16.30
0.75
48.90
41.25
29.34
24.75
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
Cant de
Elemen
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
107.04
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
107.04
18,623.97
4.53 M3
02.03.02
02.03.03
02.03.05
1.00
1.00
1.00
1.00
15.55
15.55
0.63
0.35
9.74
5.44
15.18
1.00
1.00
1.00
1.00
15.55
15.55
0.46
0.35
7.15
5.44
12.60
1.00
1.00
425.30
0.39
0.15
24.97
3/8"
3/8"
3.00
1,702.00
425.30
0.50
1,275.90
851.00
765.54
510.60
1.00
1.00
79.66
0.43
0.65
22.23
3/8"
3/8"
7.00
266.00
79.66
1.62
557.62
430.92
334.57
258.55
1.00
1.00
359.41
0.38
0.20
26.96
3/8"
3/8"
3.00
1,199.00
359.41
0.52
1,078.22
623.48
646.93
374.09
1.00
1.00
172.69
0.50
0.20
17.27
3/8"
3/8"
3.00
576.00
172.69
0.62
518.07
357.12
310.84
214.27
SARDINEL TIPO 11
CONCRETO F'C= 20.59 MPa (210 KG/CM2) SARDINEL TIPO 11 ARBOL
1.00
1.00
79.20
0.10
0.40
3.17
3/8"
3/8"
3.00
265.00
83.16
0.50
249.48
132.50
149.69
79.50
1.00
1.00
337.50
0.57
1.40
270.00
3/8"
3/8"
1/2"
16.00
1,126.00
1,126.00
337.50
2.20
2.10
5,400.00
2,477.20
2,364.60
3,240.00
1,486.32
2,411.89
1.00
1.00
13.60
0.91
0.80
9.93
3/8"
3/8"
10.00
46.00
13.60
2.38
136.00
109.48
81.60
65.69
1.00
1.00
519.10
0.25
0.70
90.32
3/8"
3/8"
6.00
2,077.00
519.10
1.42
3,114.60
2,949.34
1,868.76
1,769.60
1.00
1.00
578.65
0.25
0.70
100.69
3/8"
3/8"
6.00
2,315.00
578.65
1.42
3,471.90
3,287.30
-
565.52 M3
02.03.06
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
32.93
31.00
71.58
71.10
10.10
4.67
2.58
137.59
62.15
1.60
0.35
0.28
0.35
0.28
0.35
0.28
0.08
0.35
0.35
0.28
11.41
8.72
24.80
20.01
3.50
1.31
0.21
47.66
21.53
0.45
1.00
1.00
15.55
0.50
7.78
2,083.14
1,972.38
16,212.08
2,411.89
02.03.07
Descripcin
Cant de
Elemen
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Concreto y otros
Medidas
a
h
Total
(m3)
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
359.41
172.69
0.16
0.29
1.00
79.20
0.40
1.00
1.00
1.00
1.00
337.50
13.60
519.10
578.65
0.40
0.40
0.08
0.08
Diam
56.07
50.08
31.68
135.00
5.44
38.93
43.40
563.52 M2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
32.93
31.00
71.58
71.10
10.10
4.67
2.58
137.59
62.15
1.60
0.31
0.29
0.31
0.29
0.31
0.29
0.31
0.31
0.31
0.29
10.23
8.87
22.23
20.33
3.14
1.34
0.80
42.74
19.30
0.46
1.00
1.00
1.00
1.00
1.00
1.00
15.55
359.41
172.69
0.73
0.14
0.16
11.35
50.82
27.63
1.00
1.00
79.20
0.40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
337.50
13.60
519.10
578.65
2.36
0.98
0.47
0.47
796.50
13.33
243.98
271.97
2,673.37 M2
31.68
02.04
02.04.01
1.00
1.00
1.65
29.05
1.00
47.94 M2
02.04.02
1.00
1.00
1.65
140.67
1.00
232.10 M2
02.04.03
1.00
1.00
2.00
166.25
1.00
332.50 M2
02.04.04
1.00
1.00
2.00
237.73
1.00
475.45 M2
03
PAVIMENTO
03.01
03.01.01
PAVIMENTO RIGIDO
BASE 0.20 M
RAMPA NORTE
1.00
1.00
301.00
7.20
2,167.20
RAMPA SUR
1.00
1.00
301.00
7.20
2,167.20
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
Peso en Kilogramos/metro
5/8"
3/4"
1.6
2.3
1"
1 3/8"
4.04
7.91
Descripcin
AUX. SUR
03.01.02
RAMPA SUR
AUX SUR
Cant de
Elemen
1.00
Concreto y otros
Medidas
a
h
Total
(m3)
1.00
Encofrado y otros
Medidas
Total
l
a (h)
(m2)
90.00
2.02
182.10
4,516.50
Diam
N de
Piezas
Fierro
Long
P/Pz
Long
Total
1/4"
3/8"
1/2"
0.26
0.6
1.02
1.00
1.00
1.00
1.00
1.00
1.00
301.00
301.00
90.00
7.20
7.20
2.02
0.15
0.15
0.15
325.08
325.08
27.32
72.00
301.00
72.00
301.00
9.44
33.24
0.15
0.15
0.15
0.15
0.15
0.15
10.80
45.15
10.80
45.15
1.42
4.99
3/4"
1/2"
3/4"
250.00
402.00
1,300.00
0.40
0.75
0.40
100.00
301.50
520.00
307.53
AFIRMADO E=0.20 M
03.02.03
IMPRIMACION
AFIRMADO
03.02.04
03.02.05
1.00
1.00
1.00
1.00
1,077.58
56.56
7.20
7.20
7,758.60
407.21
7,758.60 M2
1.00
1.00
56.56
7.20
407.21
407.21 M2
1.00
1.00
1.00
1.00
1,077.58
84.81
7.20
7.20
7,758.60
610.64
8,369.24 M2
1.00
1.00
1.00
1.00
1,077.58
84.81
7.20
7.20
7,758.60
610.64
8,369.24 M2
1.00
1.00
1,077.58
7.20
7,758.60
7,758.60 M2
1.00
1.00
84.81
7.20
610.64
610.64 M2
03.02.06
RIEGO DE LIGA
IMPRIMACION EN PAVIMENTO NUEVO
IMPRIMACION EN PAVIMENTO NUEVO SOBRE PUENTE
2.3
1"
1 3/8"
4.04
7.91
230.00
3/4"
1/2"
3/4"
250.00
402.00
1,300.00
0.40
0.75
0.40
100.00
301.50
520.00
307.53
3/4"
1/2"
3/4"
32.00
45.00
113.00
0.40
0.75
0.40
12.80
33.75
45.20
34.43
1,196.00
230.00
1,196.00
29.44
PAVIMENTO FLEXIBLE
BASE 0.20 M
1.6
677.48
03.02
03.02.01
Peso en Kilogramos/metro
5/8"
3/4"
118.30
649.49
103.96
2,985.40
3,634.89
Descripcin
Und
Cant de
Elemen
Mediadas
b
a, h
Total
04
SEALIZACION
04.01
m
m
m
m
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
182.97
22.20
10.00
86.41
182.97
22.20
10.00
86.41
301.58
m
m
1.00
1.00
1.00
1.00
317.80
1,449.00
317.80
1,449.00
1,766.80
m2
m2
10.00
7.00
1.00
1.00
4.50
4.50
0.29
0.29
12.83
8.98
m2
m2
3.00
1.00
1.00
1.00
4.50
4.50
0.31
0.31
4.24
1.41
m2
m2
14.00
3.00
1.00
1.00
4.50
4.50
0.40
0.40
24.94
5.34
m2
2.00
1.00
4.50
0.41
3.65
FLECHAS EN CICLOVIA
AV. LAMBRAMANI FLECHAS TIPO 1
m2
15.00
1.00
2.70
0.17
6.93
m2
1.00
1.00
2.70
0.19
0.51
m2
3.00
1.00
2.70
0.24
1.92
m2
1.00
1.00
2.70
0.28
0.74
SEAL DE PARE
m2
1.00
1.00
2.80
2.50
7.00
CRUCE PETONAL
AV. LAMBRAMANI
L=3,50
L=3,75
L=3,30
L=3,00
L=2,00
L=2,42
L=3,30
L=5,80
L=3,60
L=6,70
L=7,20
PASE CICLOVIA
AV LAMBRAMANI
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
46.00
7.00
7.00
8.00
9.00
6.00
2.00
1.00
4.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.50
3.75
3.30
3.00
2.00
2.42
6.60
5.80
3.60
6.70
7.20
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
80.50
13.12
11.55
12.00
9.00
7.29
6.60
2.90
7.20
3.34
10.80
m2
101.00
1.00
0.50
0.50
25.25
04.02
04.03
Descripcin
Und
Cant de
Elemen
Mediadas
b
a, h
Total
268.02
04.04
04.05
04.06
04.07
04.08
m2
1.00
1.00
492.75
1.00
0.60
492.75
492.75
m2
1.00
1.00
337.65
1.00
2.60
877.89
BOTALLANTA LATERAL
AV. LOS INCAS
AV LAMBRAMANI
m2
m2
1.00
1.00
1.00
1.00
455.40
50.50
1.00
1.00
0.60
0.60
273.24
30.30
m2
1.00
1.00
601.30
1.00
0.75
450.98
m2
1.00
1.00
17.00
1.00
1.20
20.40
m2
1.00
1.00
23.20
1.00
0.60
13.92
VEREDAS Y SARDINELES
AV LAMBRAMANI
PINTURA VEREDAS
PINTURA SARDINELES
PINTURA SARDINELES DE BURBUJA
m2
m2
m2
1.00
1.00
1.00
1.00
1.00
1.00
882.30
662.42
188.05
0.30
0.50
0.20
und
und
und
und
und
6.00
1.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
1.00
1.00
4.00
13.00
und
und
und
und
und
und
und
1.00
5.00
1.00
1.00
1.00
1.00
7.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
1.00
1.00
1.00
1.00
7.00
17.00
und
und
1.00
1.00
1.00
1.00
1.00
1.00
und
und
und
und
2.00
4.00
6.00
1.00
1.00
1.00
1.00
1.00
2.00
4.00
6.00
1.00
SEALES INFORMATIVAS
I-20
I-22
SEALES INFORMATIVAS DE UBICACIN
CARTEL 0.80x0.20
CARTEL 0.80x0.25
CARTEL 0.70x0.25
CARTEL 0.65x0,25
264.69
331.21
37.61
2,300.24
Descripcin
Und
Cant de
Elemen
Mediadas
b
a, h
Total
15.00
04.09
04.10
1.00
1.00
57.40
57.40
57.40
und
373.00
1.00
373.00
373.00
SEMAFORO VEHICULAR
SEMAFORO VEHICULAR
und
4.00
1.00
4.00
SEMAFORO PEATONAL
SEMAFORO PEATONAL
und
8.00
1.00
8.00
05
05.01
CONFORMACION DE JARDINES
AREA 1
AREA 2
AREA 3
AREA 4
AREA 5
AREA 6
AREA 7
AREA 8
AREA 9
AREA 10
AREA 11
AREA 12
AREA 13
AREA 14
AREA 15
AREA 16
AREA 17
AREA 18
PISO BLOCK BERMA TIPO 1 ESTACIONAMIENTO
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.40
3.97
3.97
32.32
43.68
18.71
9.20
18.85
9.26
5.89
4.57
15.61
10.59
1.42
8.28
30.18
266.97
114.85
55.09
2.00
1.10
1.10
1.10
1.10
6.94
3.91
5.90
4.02
5.46
5.46
7.39
3.37
3.37
2.39
1.60
4.85
1.75
5.70
166.25
4.37
4.37
35.55
48.05
129.86
35.99
111.22
37.22
32.16
24.95
115.39
35.70
4.77
19.78
48.29
1,294.79
200.99
314.03
133.00
2,630.48
SEMBRADO DE GRASS
AREA 1
AREA 2
AREA 3
AREA 4
AREA 5
AREA 6
AREA 7
AREA 8
AREA 9
AREA 10
AREA 11
AREA 12
AREA 13
AREA 14
AREA 15
AREA 16
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.97
3.97
32.32
43.68
18.71
9.20
18.85
9.26
5.89
4.57
15.61
10.59
1.42
8.28
30.18
266.97
1.10
1.10
1.10
1.10
6.94
3.91
5.90
4.02
5.46
5.46
7.39
3.37
3.37
2.39
1.60
4.85
4.37
4.37
35.55
48.05
129.86
35.99
111.22
37.22
32.16
24.95
115.39
35.70
4.77
19.78
48.29
1,294.79
04.11
04.12
05.02
Descripcin
AREA 17
AREA 18
PISO BLOCK BERMA TIPO 1 ESTACIONAMIENTO
Und
m2
m2
m2
Cant de
Elemen
1.00
1.00
1.00
%
1.00
1.00
0.40
l
114.85
55.09
2.00
Mediadas
b
1.75
5.70
166.25
a, h
Total
200.99
314.03
133.00
2,630.48
05.03
SEMBRADO DE ARBOLES
ARBOLES
und
22.00
1.00
22.00
22.00
Part.
N
Und
Cant de
Elemen
%
l
Mediadas
b
Total
a, h
06
06.01
VARIOS
JUNTAS
06.01.01
JUNTA DE DILATACION
JUNTA EN PAVIMENTO
1.00
1.00
157.71
1.00
157.71
157.71
JUNTA DE CONTRACCION
JUNTA EN PAVIMENTO
1.00
1.00
781.17
1.00
781.17
781.17
1.00
1.00
601.58
1.00
601.58
601.58
1.00
1.00
33.23
1.00
33.23
JUNTA DE E = 6 MM
JUNTA EN PAVIMENTO
1.00
1.00
1,517.60
1.00
1,517.60
06.01.02
06.01.03
06.01.04
06.01.05
RESUMEN DE METRADOS
INSTALACIONES ELECTRICAS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
nov-09
Elemento:
Part.
N
Descripcin
01
INSTALACIONES ELECTRICAS
01.01
BAJA TENSION
01.01.01
SUMINISTRO DE MATERIALES
01.01.01.01
DUCTO DE C DE 2 VIAS DE 4"
01.01.01.02
DUCTO DE C DE 4 VIAS DE 4"
01.01.01.03
POSTES CAC 15/300
01.01.01.04
POSTES CAC 9/200
01.01.01.05
POSTES CAC 8/200
01.01.01.06
POSTES METALICOS DE 9 M
01.01.01.07
PASTORAL METALICO FG 1 1/2" SIMPLE/ABRAZADERAS
01.01.01.08
PASTORAL METALICO FG 1 1/2" DOBLE/ABRAZADERAS
01.01.01.09
PASTORAL METALICO FG 1 1/2" TRIPLE/ABRAZADERAS
01.01.01.10
LUMINARIA DE 150 W V.S. P/AUTOMATICA
01.01.01.11
LUMINARIA DE 70 W V.S. P/AUTOMATICA
01.01.01.12
LUMINARIA RSP PARA EXTERIORES DE 70 W DE V.S.
01.01.01.13
REFLECTOR HALOGENURO METALICO 400 W HPI
01.01.01.14
TUBERIAS FIERRO GALVANIZADO 3"
01.01.01.15
TUBERIAS FIERRO GALVANIZADO 2"
01.01.01.16
TUBERIAS PVC SAP (ELECTRICAS) D=3"
01.01.01.17
TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2"
01.01.01.18
TUBERIAS PVC SAP (ELECTRICAS) D=1"
01.01.01.19
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
01.01.01.20
CABLE ELECTRICO NYY 6 MM2.
01.01.01.21
CABLE ELECTRICO NYY 10 MM2.
01.01.01.22
CABLE ELECTRICO NYY 16 MM2.
01.01.01.23
CABLE ELECTRICO NYY 35 MM2.
01.01.01.24
CABLE ELECTRICO NYY 70 MM2.
01.01.01.25
CABLE ELECTRICO NYY 120 MM2.
01.01.01.26
CABLE ELECTRICO THW 1 X 4 MM2
01.01.01.27
CONDUCTOR TIPO NLT 2X14 AWG
01.01.01.28
BUZONES DE CONCRETO DE 0.60X0.60X0.80 M
01.01.01.29
CAJA DE PASO 200X200X100 MM
01.01.01.30
CAJA OCTOGONAL 100X55 MM
01.01.02
MANO DE OBRA
01.01.02.01
RETIRO DE POSTES
01.01.02.02
RETIRO DE CONDUCTOR
01.01.02.03
REUBICACION DE POSTES DE 8 M DE CONCRETO
01.01.02.04
EXCAVACION PARA ESTRUCTURAS
01.01.02.05
RELLENO COMPACTADO PARA ESTRUCTURAS
01.01.02.06
ELIMINACION DE MATERIAL EXCEDENTE MANUAL
01.01.02.07
INSTALACION DE DUCTOS DE CONCRETO DE 2 VIAS 4"
01.01.02.08
INSTALACION DE DUCTOS DE CONCRETO DE 4 VIAS 4"
01.01.02.09
INSTALACION DE POSTES CAC 15/300
01.01.02.10
INSTALACION DE POSTES CAC 9/200
01.01.02.11
INSTALACION DE POSTES CAC 8/200
01.01.02.12
INSTALACION DE POSTES METALICOS DE 9 M
UND
Metrado
m
m
und
und
und
und
und
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
und
96.00
20.00
1.00
12.00
29.00
26.00
47.00
24.00
1.00
66.00
29.00
10.00
8.00
12.00
12.00
420.00
6.00
100.00
108.00
2,919.00
1,710.00
243.00
730.00
64.00
149.00
220.00
830.00
30.00
28.00
30.00
und
m
und
m3
m3
m3
m
m
und
und
und
und
38.00
700.00
5.00
375.78
280.68
118.87
96.00
20.00
1.00
12.00
29.00
26.00
RESUMEN DE METRADOS
INSTALACIONES ELECTRICAS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
nov-09
Elemento:
Part.
N
01.01.02.13
01.01.02.14
01.01.02.15
01.01.02.16
01.01.02.17
01.01.02.18
01.01.02.19
01.01.02.20
01.01.02.21
01.01.02.22
01.01.02.23
01.01.02.24
01.01.02.25
01.01.02.26
01.01.02.27
01.01.02.28
01.01.02.29
01.01.02.30
01.01.02.31
01.01.02.32
01.01.02.33
01.01.02.34
01.01.02.35
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02.01.06
01.02.01.07
01.02.01.08
01.02.01.09
01.02.01.10
01.02.01.11
01.02.01.12
01.02.01.13
01.02.01.14
01.02.01.15
01.02.01.16
01.02.01.17
01.02.01.18
01.02.01.19
01.02.01.20
01.02.01.21
01.02.02
Descripcin
INSTALACION DE PASTORAL METALICO FG 1 1/2" SIMPLE/ABRAZADERAS
INSTALACION DE PASTORAL METALICO FG 1 1/2" DOBLE/ABRAZADERAS
INSTALACION DE PASTORAL METALICO FG 1 1/2" TRIPLE/ABRAZADERAS
INSTALACION DE LUMINARIA DE 150 W V.S. P/AUTOMATICA
INSTALACION DE LUMINARIA DE 70 W V.S. P/AUTOMATICA
INSTALACION DE LUMINARIA RSP PARA EXTERIORES DE 70 W DE V.S.
INSTALACION DE REFLECTOR HALOGENURO METALICO 400 W HPI
INSTALACION DE TUBERIAS FG 3"
INSTALACION DE TUBERIAS FG 2"
INSTALACION DE TUBERIAS PVC SAP (ELECTRICAS) D=3"
INSTALACION DE TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2"
INSTALACION DE TUBERIAS PVC SAP (ELECTRICAS) D=1"
INSTALACION DE TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
INSTALACION CABLE ELECTRICO NYY 6 MM2.
INSTALACION CABLE ELECTRICO NYY 10 MM2.
INSTALACION CABLE ELECTRICO NYY 16 MM2.
INSTALACION CABLE ELECTRICO NYY 35 MM2.
INSTALACION CABLE ELECTRICO NYY 70 MM2.
INSTALACION CABLE ELECTRICO NYY 120 MM2.
INSTALACION CABLE ELECTRICO THW 1 X 4 MM2
INSTALACION CONDUCTOR TIPO NLT 2X14 AWG
INSTALACION CAJA DE PASO 200X200X55 MM
INSTALACION CAJA OCTOGONAL 100X55 MM
MEDIA TENSION
SUMINISTRO DE MATERIALES
POSTES CAC 13/300
CABLE DE ENERGIA TIPO N2XSY DE 35 MM2
TUBERIAS FIERRO GALVANIZADO 3"
RETENIDA SIMPLE INC. ANCLAJE
BUZONES DE CONCRETO DE 1.00X1.00X1.00 M
CRUCETAS DE MADERA DE 100X100 MM X 1.80 M
ABRAZADERAS UM REDONDO DE 5/8"
SECCIONADOR TIPO CUT OUT 15 KV, 125 KV,BIL, 100 A UNIPOLAR
FUSIBLE CHICOTE DE 10 AMP.
TERMINACION EXTERIOR CABLE SECO 10 KV
MANGUITO DE EMPALME DE ALEACION DE ALUMINIO 35 mm2
CONDUCTOR DE COBRE DESNUDO TEMPLE BLANDO 25 MM2
SISTEMA DE PUESTA A TIERRA
PLATAFORMA DE C.A.V.
PALOMILLA DE C.A.V.
CRUCETAS ASIMETRICA DE FG DE 90X90X6 MM X 1.50 M
TUBERIAS PVC SAP (ELECTRICAS) D=3"
DUCTO DE C DE 2 VIAS DE 4"
AISLADORES POLIMERICOS TIPO PIN Y FERRETERIA
AISLADORES POLIMERICOS TIPO SUSPENSION Y FERRETERIA
GRAPA DE ANCLAJE TIPO PISTOLA PARA 35 MM2
MANO DE OBRA
UND
Metrado
und
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
47.00
24.00
1.00
66.00
29.00
10.00
8.00
12.00
12.00
420.00
6.00
100.00
108.00
2,919.00
1,710.00
243.00
730.00
64.00
149.00
440.00
2,490.00
56.00
50.00
und
m
m
und
und
und
pza
und
und
jgo
und
m
jgo
und
und
und
m
m
pza
pza
pza
2.00
648.00
12.00
1.00
9.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
6.00
6.00
RESUMEN DE METRADOS
INSTALACIONES ELECTRICAS
Obra
CONSTRUCCION DEL INTERCAMBIO VIAL AV. LAMBRAMANI - AV. LOS INCAS
Propietario MUNICIPALIDAD PROVINCIAL DE AREQUIPA
Fecha
nov-09
Elemento:
Part.
N
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.02.10
01.02.02.11
01.02.02.12
01.02.02.13
01.02.02.14
01.02.02.15
01.02.02.16
01.02.02.17
01.02.02.18
01.02.02.19
01.02.02.20
01.02.02.21
01.02.02.22
01.02.02.23
01.02.02.24
01.02.02.25
Descripcin
EXCAVACION PARA ESTRUCTURAS
RELLENO COMPACTADO PARA ESTRUCTURAS
ELIMINACION DE MATERIAL EXCEDENTE
INSTALACION DE POSTES CAC 13/300
INSTALACION CABLE DE ENERGIA TIPO N2XSY DE 35 MM2
INSTALACION TRANSFORMADOR DE 100 KVA
INSTALACION TABLERO DE DISTRIBUCION EQUIPADO
INSTALACION DE TUBERIAS FG 3"
INSTALACION RETENIDA SIMPLE INC. ANCLAJE
INSTALACION CRUCETAS DE MADERA DE 100X100 MM X 1.80 M
INSTALACION ABRAZADERAS UM REDONDO DE 5/8"
INSTALACION SECCIONADOR TIPO CUT OUT 15 KV, 125 KV,BIL, 100 A UNIPOLAR
INSTALACION FUSIBLE CHICOTE DE 10 AMP.
INSTALACION TERMINACION EXTERIOR CABLE SECO 10 KV
INSTALACION MANGUITO DE EMPALME DE ALEACION DE ALUMINIO AAAC 35 mm2
INSTALACION CONDUCTOR DE COBRE DESNUDO TEMPLE BLANDO 25 MM2
INSTALACION SISTEMA DE PUESTA A TIERRA
PLATAFORMA DE C.A.V.
PALOMILLA DE C.A.V.
CRUCETAS ASIMETRICA DE FG DE 90X90X6 MM X 1.50 M
INSTALACION DE TUBERIAS PVC SAP (ELECTRICAS) D=3"
INSTALACION DE DUCTOS DE CONCRETO DE 2 VIAS 4"
INSTALACION AISLADORES POLIMERICOS TIPO PIN Y FERRETERIA
INSTALACION AISLADORES POLIMERICOS TIPO SUSPENSION Y FERRETERIA
INSTALACION DE GRAPA DE ANCLAJE TIPO PISTOLA PARA 35 MM2
UND
m3
m3
m3
und
m
und
und
m
und
und
pza
und
und
jgo
und
m
jgo
und
und
und
m
m
pza
pza
pza
Metrado
45.44
33.43
15.01
2.00
648.00
1.00
1.00
12.00
1.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
6.00
6.00
Part.
N
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.01.05
01.01.01.06
01.01.01.07
01.01.01.08
01.01.01.09
01.01.01.10
01.01.01.11
01.01.01.12
01.01.01.13
01.01.01.14
01.01.01.15
01.01.01.16
01.01.01.17
01.01.01.18
01.01.01.19
01.01.01.20
01.01.01.21
01.01.01.22
01.01.01.23
01.01.01.24
01.01.01.25
01.01.01.26
01.01.01.27
01.01.01.28
01.01.01.29
01.01.01.30
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
INSTALACIONES ELECTRICAS
BAJA TENSION
SUMINISTRO DE MATERIALES
DUCTO DE C DE 2 VIAS DE 4"
DUCTO DE C DE 4 VIAS DE 4"
POSTES CAC 15/300
POSTES CAC 9/200
POSTES CAC 8/200
POSTES METALICOS DE 9 M
PASTORAL METALICO FG 1 1/2" SIMPLE/ABRAZADERAS
PASTORAL METALICO FG 1 1/2" DOBLE/ABRAZADERAS
PASTORAL METALICO FG 1 1/2" TRIPLE/ABRAZADERAS
LUMINARIA DE 150 W V.S. P/AUTOMATICA
LUMINARIA DE 70 W V.S. P/AUTOMATICA
LUMINARIA RSP PARA EXTERIORES DE 70 W DE V.S.
REFLECTOR HALOGENURO METALICO 400 W HPI
TUBERIAS FIERRO GALVANIZADO 3"
TUBERIAS FIERRO GALVANIZADO 2"
TUBERIAS PVC SAP (ELECTRICAS) D=3"
TUBERIAS PVC SAP (ELECTRICAS) D=1 1/2"
TUBERIAS PVC SAP (ELECTRICAS) D=1"
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
CABLE ELECTRICO NYY 6 MM2.
CABLE ELECTRICO NYY 10 MM2.
CABLE ELECTRICO NYY 16 MM2.
CABLE ELECTRICO NYY 35 MM2.
CABLE ELECTRICO NYY 70 MM2.
CABLE ELECTRICO NYY 120 MM2.
CABLE ELECTRICO THW 1 X 4 MM2
CONDUCTOR TIPO NLT 2X14 AWG
BUZONES DE CONCRETO DE 0.60X0.60X0.80 M
CAJA DE PASO 200X200X100 MM
CAJA OCTOGONAL 100X55 MM
MANO DE OBRA
RETIRO DE POSTES
RETIRO DE CONDUCTOR
RETIRO CONDUCTOR DE S.E. 4019 CIRCUITO ALUMBRADO PUBLICO
RETIRO CONDUCTOR DE S.E. 3255 CIRCUITO ALUMBRADO PUBLICO
RETIRO CONDUCTOR DE S.E. 1422 CIRCUITO SERVICIO ALUMBRADO
RETIRO CONDUCTOR DE S.E. 1422 CIRCUITO SERVICIO PUBLICO
Und
Cant de
Elemen
%
l
Mediadas
b
m
m
und
und
und
und
und
und
und
und
und
und
und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
und
96.00
20.00
1.00
12.00
29.00
26.00
47.00
24.00
1.00
66.00
29.00
10.00
8.00
12.00
12.00
420.00
6.00
100.00
108.00
2919.00
1710.00
243.00
730.00
64.00
149.00
220.00
830.00
30.00
14.00
10.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.00
96.00
20.00
1.00
12.00
29.00
26.00
47.00
24.00
1.00
66.00
29.00
10.00
8.00
12.00
12.00
420.00
6.00
100.00
108.00
2,919.00
1,710.00
243.00
730.00
64.00
149.00
220.00
830.00
30.00
28.00
30.00
und
38.00
1.00
38.00
m
m
m
m
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
und
5.00
1.00
m3
m3
m3
m3
m3
m3
m3
1.00
1.00
1.00
12.00
29.00
26.00
30.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
545.40
110.20
1.00
1.00
0.90
0.85
0.80
0.60
0.60
1.00
1.00
0.90
0.85
0.80
0.65
1.00
1.70
1.60
1.50
1.10
1.05
212.71
66.12
1.70
19.20
35.24
20.66
20.16
375.78
m3
m3
1.00
1.00
1.00
1.00
545.40
110.20
0.60
0.60
0.65
1.00
214.12
66.56
280.68
m3
m
m
und
und
und
und
und
und
und
und
und
und
und
1.00
96.00
20.00
1.00
12.00
29.00
26.00
47.00
24.00
1.00
66.00
29.00
10.00
8.00
1.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
280.68
118.87
96.00
20.00
1.00
12.00
29.00
26.00
47.00
24.00
1.00
66.00
29.00
10.00
8.00
325.00
150.00
125.00
100.00
325.00
150.00
125.00
100.00
700.00
5.00
EXC.
01.01.02.06
01.01.02.07
01.01.02.08
01.01.02.09
01.01.02.10
01.01.02.11
01.01.02.12
01.01.02.13
01.01.02.14
01.01.02.15
01.01.02.16
01.01.02.17
01.01.02.18
01.01.02.19
Total
a, h
RELL.
375.78
Part.
N
01.01.02.20
01.01.02.21
01.01.02.22
01.01.02.23
01.01.02.24
01.01.02.25
01.01.02.26
01.01.02.27
01.01.02.28
01.01.02.29
01.01.02.30
01.01.02.31
01.01.02.32
01.01.02.33
01.01.02.34
01.01.02.35
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02.01.06
01.02.01.07
01.02.01.08
01.02.01.09
01.02.01.10
01.02.01.11
01.02.01.12
01.02.01.13
01.02.01.14
01.02.01.15
01.02.01.16
01.02.01.17
01.02.01.18
01.02.01.19
01.02.01.20
01.02.01.21
01.02.02
01.02.02.01
01.02.02.02
Und
m
m
m
m
m
m
m
m
m
m
m
m
m
m
und
und
Cant de
Elemen
12.00
12.00
420.00
6.00
100.00
108.00
2919.00
1710.00
243.00
730.00
64.00
149.00
220.00
830.00
14.00
10.00
und
m
m
und
und
und
pza
und
und
jgo
und
m
jgo
und
und
und
m
m
pza
pza
pza
%
l
Mediadas
b
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.00
4.00
5.00
12.00
12.00
420.00
6.00
100.00
108.00
2,919.00
1,710.00
243.00
730.00
64.00
149.00
440.00
2,490.00
56.00
50.00
2.00
648.00
12.00
1.00
9.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
6.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
648.00
12.00
1.00
9.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
6.00
6.00
m3
m3
m3
und
1.00
9.00
1.00
2.00
1.00
1.00
1.00
1.00
25.40
1.20
22.30
0.80
0.60
1.20
0.60
0.80
1.00
1.15
1.00
1.50
15.24
14.90
13.38
1.92
45.44
m3
m3
1.00
1.00
1.00
1.00
25.40
22.30
0.60
0.60
1.00
1.00
17.80
15.63
33.43
m3
und
m
und
und
m
und
und
pza
und
und
jgo
und
m
jgo
und
und
und
m
m
pza
1.00
2.00
648.00
1.00
1.00
12.00
1.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
1.25
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
33.43
15.01
2.00
648.00
1.00
1.00
12.00
1.00
4.00
4.00
9.00
9.00
6.00
9.00
40.00
2.00
2.00
2.00
2.00
256.20
44.00
6.00
EXC.
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.02.10
01.02.02.11
01.02.02.12
01.02.02.13
01.02.02.14
01.02.02.15
01.02.02.16
01.02.02.17
01.02.02.18
01.02.02.19
01.02.02.20
01.02.02.21
01.02.02.22
01.02.02.23
Total
a, h
RELL.
45.44
Part.
N
01.02.02.24
01.02.02.25
Und
pza
pza
Cant de
Elemen
6.00
6.00
%
l
1.00
1.00
Mediadas
b
Total
a, h
6.00
6.00
CIVSA
CONTENIDO
1.0 PUENTE PRINCIPAL
1.1 CONFIGURACION ESTRUCTURAL
1.2 HIPOTESIS DE CLCULO
1.3 NORMA DE DISEO
1.4 COMBINACIONES DE CARGA
1.5 PREDIMENSIONAMIENTO
1.6 MODELO DE ESTRUCTURA EN EL SAP2000
1.7 PARAMETROS DE SITIO
1.8 CALCULO DE LAS SOLICITACIONES
2.0 MUROS DE CONTENCION
2.1 CONFIGURACION ESTRUCTURAL
2.2 CALCULO DE LAS SOLICITACIONES
3.0 PAVIMENTO RIGIDO
3.1 CONFIGURACION ESTRUCTURAL
3.2 CALCULO DE LAS SOLICITACIONES
Camin de Diseo
Eje Tandem.
Sobrecarga Equivalente.
Carga para momento negativo.
Manual de Diseo de Puente, de la direccin General de Caminos y Ferrocarriles Ministerio de Transportes y Comunicaciones.
Reglamento Nacional de Edificaciones Vigente.
Pilares
Disposicin de los elementos estructurales del Puente de Concreto
Zonificacin:
Considerando la ubicacin de la Edificacin dentro del Mapa de Zonificacin Ssmica, segn Norma
E-030 art.5. , la ciudad de Arequipa se encuentra ubicada en la Zona 3.
Condiciones Geotcnicas:
Tipo S1
Ts=0.6
S =1,20
Df= 1.70m.
qa=2.00 kg/cm2
F.S.=3
Coeficiente de Aceleracin:
Corresponde al factor de amplificacin de la respuesta estructural respecto a la aceleracin en el
suelo.
Zona Arequipa Anexo Isoacelraciones MTC 2003
A=0.400
Clasificacin de importancia:
Categora = I Puente Esencial 3.10.3
Y adems:
El factor de reduccin (R) se ha considerado igual a 1.5 para el caso de Pilar tipo placa de gran dimensin (Tabla 3.10.7.1-1), para el diseo del pilar en la direccin mas desfavorable se analizara
como columna con factor de reduccin (R)=2.
Vigas Principales
40 x80 cm
Momento ltimo actuante =-70.47 tn-m
Concreto fc=280 kg/cm2
Acero fy=4200 kg/cm2
b= 40 cm
d= 80-6 = 74 cm
Se tiene:
b*d= 40 x 74 = 2960
b*d2= 40 x 742 = 219040
Hallamos Ku:
Ku =
Mu
b.d 2
Ku= 34.29
De tablas se tiene:
= 0.0099 (mn)
As= 29.44 cm2
Usar 7 1
CONTROL DE DESPLAZAMIENTOS
Desplazamientos mximos en la parte central de la losa sobre la torrentera 1.00 cm.
1.8.1
PLACA P-1
ESC. 1/25
P (tn)
6000
4000
2000
0
0
1000
2000
3000
4000
5000
6000
7000
-2000
M (tn-m)
P
438
tn
M
640
tn-m
DIAGRAMA DE INTERACCIN
10000
8000
P (tn)
6000
4000
2000
0
0
200
400
600
800
1000
1200
1400
1600
-2000
M (tn-m)
P
438
tn
M
215
tn-m
CONFIGURACION ESTRUCTURAL
Los muros de contencin sern del tipo voladizo que soportaran la carga axial del Puente Principal de Francisco Mostajo, as mismo el empuje del terreno tendr una altura de
pantalla 6.35, altura de la zapata de 0.75, la pantalla es de seccin variable con 0.70m
en la parte inferior llegando en la parte superior como mensula donde apoyara las vigas principales del puente.
Las cargas que se consideraron en su diseo:
Carga axial obtenida del anlisis del puente
: 45 tn.
Sobrecarga distribuida debido a la carga vehicular : 1.00 Tn/m2
2.2
Fase 1: Fase
1 DATOS DE SITIO
PESO ESPECIFICO DEL SUELO
Y1
PESO ESPECIFICO DEL SUELO
Y2
PESO ESPECIFICO DEL SUELO PASIVO
Yp
PESO ESPECIFICO DEL AGUA
Ya
PESO ESPECIFICO DEL CONCRETO
Yc
ANGULO DE FRICCION TERRENO
1
ANGULO DE FRICCION TERRENO
2
ANGULO DE FRICCION TERRENO
p
ANGULO DE SUPERF DEL TERRENO
1
COEFICIENTE DE FRICCION S/C
Us/c
COEFICIENTE DE FRICCION S/S
Us/s
CAPACIDAD PORTANTE DEL TERRENO
1980.00
1980.00
1980.00
0.00
2400.00
30.80
30.80
30.80
0.00
0.55
0.00
2.76
210.00
4200.00
0.8
3.18
3.18
1.10
7.10
0.25
75.00
1000.00
1.00
kg/m3
kg/m3
kg/m3
kg/m3
kg/m3
0.25
1000.00 Kg/m
75.00
kg/cm2
kg/cm2
kg/cm2
3.18
6.35
m
m
m
3.18
1.10
m
m
m
Kg/m
m
Talon
2.13
Pantalla
6.39
1.70
OK
6.35
OK
0.75
1.70
Donde
t1
t2
hz
Ka1
Ka2
Kp
Vu
Vc
Et
FSD
Et
Met
0.5120
0.5120
0.5120
0.3227
0.3227
-0.3227
0.70
1.70
5 DISEO DE LA PANTALLA
5a
CALCULO DE LA PRESIONES DE EMPUJE SOBRE LA PANTALLA
Presion P1
Presion P2
Presion P3
Presion P4
Ep1
Ep2
Ep1/2
Ep3
Presion P1
Presion P2
Presion P3
Ka1 * s/c
Ka1 * y1(h1+s/c/Y1)
Ka2 * (Y2-m*Ya) * ( h2+Y1*h1+s/c)/(Y2-m*Ya)+Ya*h2
Kp*Yp*hp
P1*(h1+h2)
P2*h1/2
P2*h2
P3*h2/2
Presion
kg/m2
322.71
2351.45
4380.19
Presion P4
5b
-702.87
6351.49
Empuje
(kg)
Ep1
Ep2
Ep1/2
Ep3
Epasivo
FACTO R
AMPLIFIC
2049.23
3732.93
7465.87
3220.63
1.8
1.8
1.8
1.8
1.8
16468.66
Momento
kg x m
11711.37
28444.95
21333.72
6135.29
67625.33
Mu
SECCION
RESISTENCIA
Base (b)
Peralte (d)
f`c=
Fy=
(Tn.m)
(cm)
(cm)
(kg/cm2)
(kg/cm2)
67.63
100.00
65.00
210
4200
w1
w2
0.9
a
(cm)
79852500
0.59
p min
-1.00
0.08
0.089
1.606
Ac minimo
Acero
3/8"
1/2"
5/8"
3/4"
1"
(cm2)
(cm2)
12
As colo
Espaciamiento
ACERO TEORICO
0.0045
0.0024
6.84
ACERO COLOCADO
15.70
29.06
(cm2)
PANTALLA
123/4"
PANTALLA 123/4"
1 3/8"
m
34.2
0.08
5c
Vc
kg
49922.79
Ka1 * s/c
Ka1 * y1(h1+s/c/Y1)
Ka2 * (Y2-m*Ya) * ( (h2+hz)+(Y1*h1+s/c)/(Y2-m*Ya))+Ya*(h2+hz)
Kp*Yp*(hp+hz)
P1*(h1+h2+hz)
P2*h1/2
P2*(h2+hz)
P3*(h2+Hz)/2
6b
-1182.10
50429.52
Mto ultimo
Meu (kg x m)
13094.59748
33484.41501
32603.06055
11591.05584
0
90773.13
ALTURA
h
m
6.35
75.00
6.35
0.75
0.75
0.75
1.00
1.00
0.50
1.00
1.00
1.00
PESO
ESPECIFI
kg/m3
2400.00
2400.00
2400.00
2400.00
2400.00
2400.00
3.18
3.18
3.18
3.18
1.00
1.10
1.00
0.50
1.00
0.50
1.00
1.00
1980.00
1980.00
1980.00
1980.00
1
1980.00
FACTOR
PESO
Pt
kg
3810.00
45000.00
3429.00
3060.00
1260.00
3060.00
10687.05
707.23
12101.51
707.23
1000.00
3702.60
88524.63
BRAZO
X
m
1.83
1.83
2.10
3.25
2.05
0.85
3.25
2.58
3.14
2.06
3.03
0.85
MTO
Mt
kg x m
6953.25
82125.00
7200.90
9945.00
2583.00
2601.00
34732.91
1821.12
37968.50
1458.66
3025.00
3147.21
193561.55
FACTO R
AMPLIFIC
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.80
1.50
PESO
ULTIMO
kg
5715.00
67500.00
5143.50
4590.00
1890.00
4590.00
MTO
ULTIMO
kg x m
10429.88
123187.50
10801.35
14917.50
3874.50
3901.50
16030.58
1060.85
18152.27
1060.85
1800.00
5553.90
133086.94
52099.37
2731.68
56952.74
2188.00
5445.00
4720.82
291249.83
FSD
Mt / Met > 2
FSV
6e
20175.55
FACTO R
AMPLIFIC
1.8
1.8
1.8
1.8
1.8
6d
Momento
Met (kg x m)
7274.78
18602.45
18112.81
6439.48
6c
2291.27
3732.93
9229.46
4921.89
Empuje
Et (kg)
Ep1
Ep2
Ep1/2
Ep3
Epasivo
1.62
0.43
0.683
1 = Pt / A * ( 1+6 * e / B)
2 = Pt / A * ( 1-6 * e / B)
6f
1
2
3.53 Kg/cm2
0.79 Kg/cm2
2.76 Kg/cm2
7.10
0.25
0.70
75.00
4.10
0.75
1.70
1.70
6.35
0.65
m
m
m
m
m
m
m
m
m
m
1.51
0.54
0.68
Esfuerzos cuando la excentricidad (e) cae dentro del tercio central (e < B/6)
u1 = Pu / A * ( 1+6 * e / B)
u2 = Pu / A * ( 1-6 * e / B)
Esfuerzo cuando la excentricidad (e) cae fuera del tercio central (e > B/6)
u = 2*P / (3 * L (B / 2-e))
u1
u2
7b
5.83
0.664
Kg/cm2
Kg/cm2
FACTOR
1.00
1.00
1.00
1.00
PESO ESPEC
kg/m3
1.00
1980.00
1980.00
2400.00
FACTOR
1.50
1.50
FACTOR
1.50
1.50
1.50
1.50
PESO ULTIMO
kg/m
3267.00
2700.00
BRAZO
MTO ULTIMO
m
Tn*m
1.70
4.721
1.70
3.902
8.622
PESO ULTIMO
kg/m
1500.00
9429.75
9429.75
2700.00
23059.50
BRAZO
m
1.70
1.70
1.70
1.70
MTO ULTIMO
Tn*m
2.17
13.63
13.63
3.90
33.32
7c
u2
Tn/m2
ua
Tn/m2
6.636
40.75
ub
Tn/m2
30.80
Mu PUNTA
Tn*m
58.889
16.888
75.78
Mu TALON
Tn*m
9.59
11.64
21.23
Mu
SECCION
RESISTENCIA
Base (b)
Peralte (d)
f`c=
Fy=
(Tn.m)
(cm)
(cm)
(kg/cm2)
(kg/cm2)
PUNTA
75.78
100.00
70.00
210
4200
0.9
TALON
21.23
100.00
70.00
210
4200
0.9
w1
w2
consta
a
(cm)
PUNTA
92610000
0.59
-1.00
0.08
0.086
1.609
7.10
TALON
92610000
0.59
-1.00
0.02
0.023
1.672
1.91
p min
Ac minimo
Acero
3/8"
1/2"
5/8"
3/4"
1"
1 3/8"
(cm2)
(cm2)
NRO
ACERO TEORICO
ACERO COLOCADO
PUNTA
0.0043
0.0024
16.91
30.17
TALON
0.0012
0.0024
16.91
8.13
As colo
Espaciamiento
(cm2)
NRO
PUNTA
61"
PUNTA 61"
30.42
0.17
TALON
41"
TALON 41"
20.28
0.25
CONFIGURACION ESTRUCTURAL
El presente proyecto trata de una losa monoltica apoyada sobre el suelo, la cual ser
ejecutada en concreto fibroreforzado.
Pavimentos rgidos realizados en concreto fibroreforzado traen consigo ventajas tcnicas y econmicas en comparacin con las pavimentaciones rgidas ejecutadas en concreto reforzados convencionalmente
La incorporacin de fibras de acero WIRAND logran un incremento sustancial en las
propiedades de esfuerzo y tenacidad, especialmente en condiciones de subbase desfavorables
No es necesaria la utilizacin de una capa regularizadora o recubrimiento para la losa,
por lo que el espesor de la losa puede ser generalmente optimizado o reducido.
El ahorro en tiempo y costo que viene dado por la utilizacin de fibras de acero WIRAND debido a la eliminacin de costos de colocacin y control del acero convencional, adems que el camin de concreto puede accesar directamente hasta el sitio de
colocacin evitando as gastos en la utilizacin de bombas de concreto.
Las fibras de acero WIRAND pueden ser aadidas a la mezcla de concreto con mucha facilidad, ya sea directamente al camin con la mezcla lista o en la planta durante el
proceso de introduccin de los agregados. En el caso de introduccin directa en el camin, el tiempo de mezclado ser aproximadamente de 1 minuto por metro cbico,
desde el inicio de colocacin de las fibras.
No es necesaria la utilizacin de equipos especiales de dosificacin de fibras, pero los
mismos se encuentran disponibles en caso que el cliente lo considere apropiado para
incrementar la productividad de la obra.
Diseo Estructural
El principio general de la metodologa de diseo es la determinacin del espesor de la
losa de concreto o pavimento. La consideracin de las caractersticas reales del concreto fibroreforzado permite obtener resultados validos en la prctica.
El diseo estructural de losas de concreto fibroreforzado se basa en reglas tcnicas y
recomendaciones incluidas en el cdigo ingles TR 34/3. Este procedimiento facilita el
uso de las propiedades mecnicas naturales del concreto mejorando las propiedades
de esfuerzo y comportamiento post fisuracin debido a la incorporacin de fibras de
acero WIRAND FF1. Las reflexiones sobre factores de seguridad estn acorde al cdigo EC 2 / TR34. [TR34] Los clculos y las consideraciones de diseo de este mtodo
estn basadas en los cdigos EN206, Eurocdigo 2, y en el reporte TR34 tercera edicin, de "The Concrete Society", UK, de pisos de concreto apoyados sobre suelos.
Las teoras de diseo estn basadas en los mtodos de Losberg, Meyerhof y Hetenyi.
[NLFM] Los clculos y las consideraciones de diseo de este mtodo estn basados en
MEMORIA DE CALCULO ESTRUCTURAS
los cdigos EN206, Eurocdigo 2, y en la metodologa de diseo basada en la mecnica de la fractura no lineal para losas apoyadas sobre el suelo, desarrollado por Officine
Maccaferri S.p.A. [WEST] El siguiente clculo de diseo est basado en el cdigo EN
206, Eurocdigo 2 en el trabajo de Westergaard para un sistema elstico. Las fibras de
acero seleccionadas son las fibras WIRAND FF1 de Officine Maccaferri S.p.A. Bologna/Italy. El uso de fibras no especificadas en este diseo puede resultar en daos en la
losa de concreto.
El presente diseo es nicamente valido para las fibras de acero y/o fibras de polipropileno especificadas en la presente evaluacin.
Las siguientes evaluaciones representan una propuesta para el Ingeniero diseador y el
usuario para el proyecto a desarrollar con el uso de concreto reforzado con fibras de
acero WIRAND. Este reporte no representa ninguna sustitucin de la documentacin
legal del proyecto y deber ser verificado y aprobado por el Ingeniero proyectista. El
mismo deber ser verificado y aprobado por el usuario si esto representa una necesidad legal.
Toda la informacin base con la cual el autor del diseo ha desarrollado la propuesta
deber ser verificada antes de la ejecucin del piso industrial o pavimento en referencia
dentro de esta propuesta.
3.2
CALCULO DE SOLICITACIONES
El procedimiento de clculo adaptado por el programa PAVE 2008 est basado en los
reglamentos mencionados en los prrafos anteriores, el cual puede ser seleccionado
por el diseador segn su preferencia.
A partir de un pre-diseo (Peralte de losa y dosificacin de fibras metlicas y/o polipropileno) se determina los esfuerzos admisibles de la estructura. Luego, se determinan
los esfuerzos actuantes debido a las cargas sobre el pavimento, los cambios de temperatura y los esfuerzos de retraccin que estn presentes en el concreto;en el caso de
las cargas se verificar tambin si la carga es en el borde del pao, en la esquina o en
el centro, considerando tambin si las juntas sern con dowells o no. Estos esfuerzos
actuantes son amplificados utilizando los factores de seguridad que estipule el cdigo
seleccionado para el diseo.
Finalmente, se compararn los esfuerzos actuantes con los admisibles por la estructura
y se calcularn factores de seguridad que sern los que determinen la certeza del diseo recomendado.
Datos de Diseo:
CBR del terreno natural = 40% y CBR de la base (e=0.20m) = 80%.
Resistencia de Concreto fc = 210kg/cm2 con un mdulo de rotura de 3.10MPa.
Espesor de losa de 15.00cm con 20kg/m3 de fibra de acero Wirand FF1 y 600gr/m3
de fibra de polipropileno Fibromac12.
Carga para el diseo:
Distribucin de Cargas:
Peso total de la carga HS20 + 30% = 42.44tn.
Entonces el peso por cada rueda es de:
Peso de eje delantero + 30% = 4.72tn
Peso de ejes traseros + 30% = 18.86tn
Clculo del espesor de la losa de concreto:
Se introducen los principales datos del sistema (espesor y dosificacin de fibras a verificar), datos de temperatura, calidad de concreto, valores de resistencia, etc. como se
muestra a continuacin:
Luego se introducen los parmetros de apoyo, como se coment inicialmente esta losa
estar apoyada sobre un suelo con un CBR de 40%, mejorndolo con una capa de base granular de 20cm de CBR al 80%, obteniendo as un CBR de diseo del 42.67%,
con esto el programa podr determinar entre otras cosas el radio de rigidez, longitud caracterstica y tener la consideracin de apoyo para el diseo:
Para el caso que tenemos actualmente con una base compactada de 20cm al 95% del
Proctor modificado y el tipo de suelo que se usar en ella se puede esperar llegar a un
CBR del 80% en el mejor de los casos. Debido al tipo de suelo la potencialidad de influencia de cargas debera ser de 3.00m.
Por lo tanto: CBR Base = 80.0% CBR Suelo = 40.0 %
h potencial = 3.00m
CBR diseo = 4.0 x 2.80 + 80.0 x 0.20 = 42.67 %
Seguidamente, se introducen las cargas que estarn presentes sobre la losa durante su
vida til, entre las cuales el programa determinar cual es ms perjudicial para la losa.
En este momento el programa puede determinar las cargas actuantes en el sistema y la
carga admisible del sistema, con lo que nos podemos dar una primera impresin de la
seguridad de la losa:
Finalmente el programa suma los efectos de las cargas a los ocasionados por el alabeo
provocado por el cambio de temperatura y los compara con los admisibles:
Factores de Seguridad:
Factor de Seguridad Global Cargas de Flexin = 1.09 OK.
Factor de Seguridad Mnimo al Punzonamiento = 1.10 OK.
Concluimos que el diseo ptimo para este pavimento es de una losa de 15.00cm de
espesor con una dosificacin de 20kg/m3 de fibras de acero Wirand FF1 y 600gr/m3 de
fibras de polipropileno Fibromac 12.
DETALLE DE LAS JUNTAS
Junta de Contraccin
- Concreto Simple:
Ecs = (24 a 36) x espesor de losa Ecs = 4.50m
- Concreto Fibroreforzado:
Ecfr = Ecs Ecfr = 5.00m
Se considerar una junta de contraccin cada 5.00m como mximo.
Concreto de f'c =210Kg/cm
reforzado con 20kg/m de Fibras de
Acero Wirand FF1, + 600 gr/m de fibra
de Polipropileno Fibromac12
Sellador Elastomrico
de Poliuretano
Acero liso
de 3/4" @30 cm
Base de Losa
JUNTA DE CONTRACCION
Terreno Compactado
100% Proctor Modificado
ESC : 1/5 A1
Junta de Dilatacin
L = LxTxF
L = 15 a 20mm
F = Coeficiente de expansin trmica del concreto (5.5x10-6/F)
T = Diferencia de Temperatura (F)
Datos:
L = 15mm
Temperatura mnima = 15 C = 59 F
Temperatura Mxima = 35 C = 95 F T = 36 F
L = 0.015 / (5.5 x 10 -6 x 36) = 75.75m.
Se considerar una junta de dilatacin cada 75.00m.
Concreto de f'c=210Kg/cm
reforzado con 20kg/m de Fibras de
Acero Wirand FF1, + 600 gr/m de fibra
de Polipropileno Fibromac12
Tubo PVC 1"
Sellador Elastomrico
de Poliuretano
Poliestireno expandido
(tecnopor) e = 15mm
Acero liso
de 3/4" @ 30 cm
Base de Losa
JUNTA DE DILATACION
Terreno Compactado
100% Proctor Modificado
Junta de Construccin:
Concreto de f'c = 210Kg/cm reforzado con 20 kg de Fibras de
Acero Wirand FF1.
Sellador plstico-elstico a base de bitumen-caucho.
Concreto de f'c =210Kg/cm
reforzado con 20kg/m de Fibras de
Acero Wirand FF1, + 600 gr/m de fibra
de Polipropileno Fibromac12
Sellador Elastomrico
de Poliuretano
Poliestireno expandido
(tecnopor) e = 6mm
Varilla corrugada
de 1/2" @ 75 cm
Base de Losa
Terreno Compactado
100% Proctor Modificado
ESC : 1/10 A3
Concreto de f'c =210Kg/cm
reforzado con 20kg/m de Fibras de
Acero Wirand FF1, + 600 gr/m de fibra
de Polipropileno Fibromac12
Tubo PVC 5/8"
Sellador Elastomrico
de Poliuretano
Poliestireno expandido
(tecnopor) e = 6mm
Varilla corrugada
de 1/2" @ 75 cm
BASE DE LOSA
Terreno Compactado
100% Proctor Modificado
MEMORIA DE CLCULO
INSTALACIONES ELECTRICAS
BAJA TENSION
1. CONSIDERACIONES DE DISEO
1.1. NORMAS
Los clculos de las redes secundarias se efectuaron tomando en consideracin el
cdigo y normas vigentes en el pas, entre los cuales podemos mencionar:
2.
CALCULO ELECTRICOS
2.1. CALCULO DE CAIDAS DE TENSION
A.- REDES SUBTERRNEAS
En cables subterrneos la reactancia es muy pequea por lo que la despreciaremos.
El clculo de cadas de Tensin se calcula por medio de las formulas siguientes:
-
Circuitos Trifsicos
DV=P*L*FCT3
FCT3=_1_*[R*1000]
V
Circuitos Monofsicos
DV=P*L*FCT1
FCT1=_2_*[R*1000]
V
Donde:
Dv, es la cada de tensin en voltios.
P, es la potencia en Kw.
L, es la long. del tramo en metros.
FCT, es el factor de cada de tensin,
V, es la tensin de la red (entre fases circuitos trifsicos y entre fase
neutro circuitos monofsicos).
R,es la resistencia del conductor por metro
RESISTENCIA ELECTRICA
mm2
a 20C Ohm/km
2.977
10
1.786
16
1.116
25
0.7144
35
0.510
50
0.357
70
0.255
es el coeficiente de temperatura(3.92X10-3K-1)
RESISTENCIA ELECTRICA
mm2
3.327 Ohm/km
10
1.996 Ohm/km
16
1.247 Ohm/km
25
0.798 Ohm/km
35
0.570 Ohm/km
50
0.399 Ohm/km
70
0.285 Ohm/km
La capacidad admisible de corriente para cables con aislamiento termoplstico del tipo
NYY es:
SECCIN
CAPACIDAD CORRIENTE
TEMP. OPERACIN 80C
FACTOR DE CORRECCIN
PROX. DE CABLES
10
72
90
0.82
0.82
16
123
0.82
25
151
0.82
35
183
0.82
50
261
0.82
70
272
0.82
FACTOR DE CORRECCIN
PROFUND. TENDIDO 0.6m
1.0
1.0
1.0
1.0
1.0
1.0
1.0
FACTOR DE CORRECCIN
RESIST.TERMICA SUELO
1.10
1.10
1.10
1.10
1.12
1.12
1.12
FACTOR DE CORRECCIN
TEMP. SUELO 20 C
1.0
1.0
1.0
1.0
1.0
1.0
1.0
64.9
81.2
168.1
239.7
249.8
CAPACIDAD CORRIENTE
CORREGIDA
111
136
(*) Tal como se muestra en los cuadros de cadas de tensin los conductores estn
sobredimensionados con respecto a la corriente admisible.
De acuerdo a las frmulas anteriores los factores de cada de tensin utilizados son:
FACTORES DE CADAS DE TENSIN (FCT)
Trifsica
Monofsico
70mm2
0.000750
0.002591
50mm2
0.00105
0.00363
35mm2
0.00150
0.00518
25mm2
0.00210
0.00725
16mm2
0.00328
0.01134
10 mm2
0.00525
0.01814
6mm2
0.00875
0.02722
En base a los factores anteriores las cadas de tensin se pueden calcular por:
V=P * L * FCT [V]
Donde:
P
L
FCT
= es la potencia en kw
= es la long. Del tramo en metros.
= es el factor de cada de tensin
5%Vn
0.9
380/220V
60 Hz.
0.5
1.0
0.6m.
70 C cm/w
20C
Lnea trifsica:
PET = 3xfpx365x24x(Imax2 R)/1000
kw-hr/ao
Lnea Monofsica:
PET = 1xfpx365x24x(Imax2 R)/1000
kw-hr/ao
Donde:
-
fp es el factor de prdidas
Imax es la corriente mxima
R es la resistencia del conductor
Tipo de
Alumbrado
I
II
III
IV
V
Luminancia media
revestimiento seco
(cd/m2)
1.5 - 2.0
1.0 - 2.0
0.5 - 1.0
Iluminancia media
Lux
Calzada clara
15-20
10-20
5-10
2-5
1-3
Indice de
control de
Deslumbramiento
Calzada oscura
30-40
20-40
10-20
5-10
2-6
>6
5-6
5-6
4-5
4-5
Tabla IV
Uniformidad media de Luminancia
Tipo de
alumbrado
III
IV
Uniformidad
media
0.25-0.35
> 0.15
MEDIA TENSION
3.
CONSIDERACIONES DE DISEO
3.1 NORMAS
Los clculos de las redes primarias se efectuaron tomando en consideracin el cdigo y normas
vigentes en el pas, entre los cuales podemos mencionar:
- Cdigo Nacional de Electricidad.
- La Norma MEM/DEP-001
- Normas del Ministerio de Enega y Minas.
- Ley de concesiones Elctricas y su reglamento
3.2 CALCULO ELECTRICOS
3.2.1
In =
3.2.2
Sn
3V
387.5 KvA
= 22.37 A
3 10 Kv
V = K**In*L / S =
(0.0015)(0.0175)(22.37)(190.26)
= 0.003197
35
I = corriente nominal en A
L = longitud del tramo, en m
K = factor de cada de tensin trifsico
= 0.0175 ohm.mm/m Resistividad del cobre
S = seccin del conductor como mnimo
%V = 0.00319
La cada mxima de tensin en las redes no deber exceder el 3% de la tensin nominal.
3.3
100 KVA
10 Kv
3
0,9
I CC 3 =
I base
[Z
1( pu )
I LL =
I 3lb
(Z 1 + Z 2 )
I ccLT =
[2Z
3I base
1
+ Z 0 + Z1( pu )
IpMRT
=S/V
Isp
=1,5 Ip
ICC
=20 Ip
Iins
S
Ip
Isp
ICC
Iins
=12 Ip
Potencia del transformador (kVA)
Corriente nominal en el Primario (A)
Corriente de sobrecarga en el primario (A)
Corriente de corto circuito en alta tensin (A)
Corriente de insercin (A)
CURVA DE FUSIBLES TIPO K (Tiempo versus Corriente)
3.4
Luego seleccionamos un cable NYY para la bajada en B.T. para cada tablero y adems
consideramos una reserva para futuras ampliaciones, el cable ser de:
S = 50 mm
ESPECIFICACIONES CABLES NYY UNIPOLAR
CALIBRE NUMERO
CABLE
HILOS
N x mm
ESPESORES
DIAMETRO
AISLAMIENTO
CUBIERTA
PESO
EXTERIOR
AIRE
DUCTO
mm
mm
mm
(Kg/Km)
1 x 35
1,2
1,4
12.6
445
195
161
157
1 x 50
19
1,4
1,4
14.3
583
230
196
186
ALUMBRADO PUBLICO
INTERCAMBIO LAMBRAMANI -LOS INCAS
Cdigo del proyecto:
Fecha:
Cliente:
Referencia del cliente:
005/2009-AP
30-08-2009
MUNICIPALIDAD PROVINCIAL DE AREQUIPA
INTERCAMBIO VIAL
Proyectista:
Descripcin:
Los valores nominales mostrados en este informe son el resultado de clculos exactos, basados en luminarias colocadas con precisin, con
una relacin fija entre s y con el rea en cuestin. En la prctica, los valores pueden variar debido a tolerancias en luminarias, posicin de las
luminarias, propiedades reflectivas y suministro elctrico.
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
13
12
-3
-2
-1
10
11
Y(m)
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
-13
-12
-11
-10
-9
-8
-7
-6
-5
-4
-3
-2
-1
10
11
12
X(m)
Pgina:
2/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
2. Resumen
2.1 Calzada principal
Tipo de Luminaria
Tipo de Lmpara
Flujo Lmpara
Inclin90
Tipo de rejilla
Factor Mantenimiento Proyecto
(T)
:
:
:
:
:
:
Carretera
Mediana
Anchura Calzada
Nmero de Carriles
Tabla de Reflexin
Q0 de la Tabla
Instalacin
Altura
Separacin
Saliente
(M)
(A)
(H)
(S)
(E)
:
:
:
:
:
:
:
:
:
:
5.1
Iluminancia Horizontal
Media
Mnima/Media
=
=
18.1 lux
0.64
Pgina:
3/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (O1) (1.88, -60.00,
1.50) (cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
Tipo Calzada
X (m)
Y (m)
23.75
0.63
1.88
3.13
4.38
5.63
6.88
1.2
1.3
1.3
1.2
1.2
1.0
21.25
1.2
1.3
1.3
1.3
1.3
1.1
18.75
1.2
1.3
1.2
1.2
1.2
1.1
16.25
1.2
1.2
1.2
1.2
1.2
1.1
13.75
1.2
1.3
1.2
1.2
1.2
1.1
11.25
1.3
1.3
1.2
1.2
1.2
1.1
8.75
1.3
1.3
1.2
1.2
1.2
1.0
6.25
1.3
1.3
1.2
1.1
1.1
1.0<
3.75
1.3
1.3>
1.3
1.2
1.2
1.1
1.25
1.3
1.3
1.3
1.2
1.1
1.0
Media
1.20
Mn/Media
0.84
Mn/Mx
0.74
( 1.88,-20.63, 1.50) =
13.2%
4/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (O1) (1.88, -60.00,
1.50) (cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
13.2%
210
Tipo Calzada
( 1.88,-20.63, 1.50) =
BB
160
BB
BB
110
BB
BB
Y(m)
60
BB
BB
1.25
10
1.2
5
1.1.
152
BB
BB
-40
BB
BB
-90
BB
-140
BB
-160
-110
-60
-10
40
90
140
X(m)
B
Media
1.20
Mn/Mx
0.74
Escala
1:2000
Pgina:
5/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (O2) (5.63, -60.00,
1.50) (cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
Tipo Calzada
X (m)
Y (m)
23.75
0.63
1.88
3.13
4.38
5.63
6.88
1.2
1.3
1.5
1.4
1.3
1.1
21.25
1.1
1.3
1.4
1.5
1.4
1.2
18.75
1.2
1.3
1.4
1.4
1.4
1.2
16.25
1.2
1.2
1.3
1.4
1.3
1.2
13.75
1.2
1.3
1.3
1.4
1.4
1.2
11.25
1.2
1.3
1.4
1.4
1.4
1.2
8.75
1.2
1.3
1.3
1.4
1.3
1.1<
6.25
1.2
1.3
1.4
1.4
1.4
1.1
3.75
1.2
1.3
1.5
1.5
1.4
1.2
1.25
1.2
1.3
1.5>
1.4
1.3
1.1
Media
1.30
Mn/Media
0.85
Mn/Mx
0.74
( 5.63,-20.63, 1.50) =
13.9%
6/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (O2) (5.63, -60.00,
1.50) (cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
13.9%
210
Tipo Calzada
( 5.63,-20.63, 1.50) =
BB
160
BB
BB
110
BB
BB
Y(m)
60
BB
BB
1.4
1.3
12
10
1.2
1.3
1.4
BB
BB
-40
BB
BB
-90
BB
-140
BB
-160
-110
-60
-10
40
90
140
X(m)
B
Media
1.30
Mn/Mx
0.74
Escala
1:2000
Pgina:
7/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
: Iluminancia horizontal (lux)
X (m)
Y (m)
23.75
0.63
1.88
3.13
4.38
5.63
6.88
23
23
22
23
23
22
21.25
20
20
20
22
24>
23
18.75
16
16
16
18
20
19
16.25
13
13
13
16
18
17
13.75
12
12
12
14
17
17
11.25
12<
12
12
14
17
17
8.75
13
13
13
16
18
17
6.25
16
16
16
18
20
19
3.75
20
20
20
22
24
23
1.25
23
23
22
23
23
22
Media
18.1
Mn/Media
0.64
Mn/Mx
0.48
8/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
240
Rejilla
Clculo
190
BB
BB
140
BB
BB
90
BB
Y(m)
BB
40
BB
.5
.
2107
B B22
222.5017.51512.5
-10
BB
BB
-60
BB
BB
-160
-110
BB
-160
-110
-60
-10
40
90
140
X(m)
B
Media
18.1
Mn/Mx
0.48
Escala
1:2000
Pgina:
9/10
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
:
:
:
:
:
:
0.58
0.00
0.58
16500 lm
168.0 W
027-2000
90o
90o
60o
60o
375
30o
C = 180o
C = 270o
C = 195o
0o
Imx
Pgina:
30o
C = 0o
C = 90 o
C = 15 o
10/10
ALUMBRADO PUBLICO
INTERCAMBIO LAMBRAMANI -LOS INCAS
Cdigo del proyecto:
Fecha:
Cliente:
Referencia del cliente:
005/2009-AP
30-08-2009
MUNICIPALIDAD PROVINCIAL DE AREQUIPA
INTERCAMBIO VIAL
Proyectista:
Descripcin:
Los valores nominales mostrados en este informe son el resultado de clculos exactos, basados en luminarias colocadas con precisin, con
una relacin fija entre s y con el rea en cuestin. En la prctica, los valores pueden variar debido a tolerancias en luminarias, posicin de las
luminarias, propiedades reflectivas y suministro elctrico.
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
1.
1.1
2.
Resumen
2.1
Calzada principal
3.
3.1
3.2
3.3
3.4
5
6
7
8
4.
4.1
Pgina:
2/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
25
26
27
28
13
12
1
10
11
Y(m)
14
15
16
17
18
19
20
21
22
23
24
-3
-2
-1
-9
-8
-7
-6
-5
-4
-3
-2
-1
10
11
12
13
14
15
16
X(m)
Pgina:
3/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
2. Resumen
2.1 Calzada principal
Tipo de Luminaria
Tipo de Lmpara
Flujo Lmpara
Inclin90
Tipo de rejilla
Factor Mantenimiento Proyecto
(T)
:
:
:
:
:
:
Carretera
Anchura Calzada
Nmero de Carriles
Tabla de Reflexin
Q0 de la Tabla
Instalacin
Altura
Separacin
Saliente
(A)
(H)
(S)
(E)
:
:
:
:
:
:
:
:
:
6.9
Iluminancia Horizontal
Media
Mnima/Media
=
=
7.99 lux
0.49
Pgina:
4/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (3.75, -60.00, 1.50)
(cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
Tipo Calzada
X (m)
Y (m)
23.75
1.25
3.75
6.25
0.41
0.46
0.51
21.25
0.41
0.50
0.61
18.75
0.47
0.49
0.57
16.25
0.52
0.50
0.53
13.75
0.54
0.51
0.63
11.25
0.52
0.50
0.64>
8.75
0.58
0.52
0.53
6.25
0.37
0.50
0.55
3.75
0.34<
0.51
0.56
1.25
0.38
0.44
0.48
Media
0.50
Mn/Media
0.68
Mn/Mx
0.54
( 3.75,-17.88, 1.50) =
6.3%
5/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
TI
: Luminancia hacia CEN Observer (3.75, -60.00, 1.50)
(cd/m2)
: Asphalt CIE C2 con Q0 = 0.070
6.3%
210
Tipo Calzada
( 3.75,-17.88, 1.50) =
160
110
Y(m)
60
0.4
0.5
04
10
0.6
5
0.5
0.35
445
550.
0 0.
0 .5
-40
-90
-140
-160
-110
-60
-10
40
90
140
X(m)
A
Media
0.50
Mn/Mx
0.54
Escala
1:2000
Pgina:
6/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
: Main en Z = 0.00 m
: Iluminancia horizontal (lux)
X (m)
Y (m)
23.75
1.25
3.75
6.25
8.7
10.1
11.9
21.25
7.0
9.1
12.7>
18.75
5.5
7.0
10.3
16.25
4.6
5.7
8.6
13.75
3.9
5.1
9.8
11.25
3.9<
5.1
9.8
8.75
4.6
5.7
8.6
6.25
5.5
7.0
10.3
3.75
7.0
9.1
12.7
1.25
8.7
10.1
11.9
Media
7.99
Mn/Media
0.49
Mn/Mx
0.31
7/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
240
Rejilla
Clculo
190
140
90
Y(m)
8
1210
12
40
-10
-60
-160
-110
-160
-110
-60
-10
40
90
140
X(m)
A
Media
7.99
Mn/Mx
0.31
Escala
1:2000
Pgina:
8/9
ALUMBRADO PUBLICO
005/2009-AP
Fecha: 30-08-2009
:
:
:
:
:
:
0.73
0.00
0.73
6600 lm
80.0 W
LUMUCV-811
90o
90o
60o
60o
1000
30o
C = 180o
C = 270o
C = 205o
0o
Imx
Pgina:
30o
C = 0o
C = 90 o
C = 25 o
9/9
VII
AUTORIZACIONES EPS
VIII
PLANOS